{"id":99136,"date":"2026-10-15T15:53:51","date_gmt":"2026-10-15T15:53:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99136"},"modified":"2026-10-15T15:54:03","modified_gmt":"2026-10-15T15:54:03","slug":"hrube-kapacitni-planovani","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/","title":{"rendered":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n \u0159\u00edk\u00e1, co hodl\u00e1te vyr\u00e1b\u011bt. Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed ov\u011b\u0159uje, zda na to maj\u00ed kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje dostate\u010dnou kapacitu. Tuto kontrolu je d\u016fle\u017eit\u00e9 prov\u00e9st d\u0159\u00edve, ne\u017e n\u00e1kup, v\u00fdroba a obchod za\u010dnou jednat podle pl\u00e1nu, kter\u00fd z\u00e1vod nedok\u00e1\u017ee splnit.<\/p>\n\n\n<p>Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed (RCCP) p\u0159ev\u00e1d\u00ed pl\u00e1novan\u00e1 v\u00fdrobn\u00ed mno\u017estv\u00ed na zat\u00ed\u017een\u00ed kl\u00ed\u010dov\u00fdch v\u00fdrobn\u00edch zdroj\u016f a porovn\u00e1v\u00e1 je s dostupnou kapacitou. Umo\u017e\u0148uje tak v\u010das rozhodnout, zda hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n ponechat, upravit mno\u017estv\u00ed \u010di term\u00edny, nebo zajistit dal\u0161\u00ed kapacitu.<\/p>\n\n\n<p>Vyrovnan\u00e1 t\u00fddenn\u00ed bilance ale je\u0161t\u011b neznamen\u00e1 provediteln\u00e9 po\u0159ad\u00ed operac\u00ed. Stroj m\u016f\u017ee m\u00edt v sou\u010dtu dostatek hodin, a p\u0159esto nemus\u00ed b\u00fdt voln\u00fd pr\u00e1v\u011b ve chv\u00edli, kdy ho pot\u0159ebuje urgentn\u00ed zak\u00e1zka. Pomoc\u00ed RCCP ov\u011b\u0159te, zda lze v\u00fdrobn\u00ed z\u00e1vazek splnit, a pot\u00e9 ve SkyPlanner APS rozvrhn\u011bte souvisej\u00edc\u00ed pr\u00e1ci do koordinovan\u00e9ho harmonogramu. Arcturus vypo\u010d\u00edt\u00e1 na\u010dasov\u00e1n\u00ed podle va\u0161ich v\u00fdrobn\u00edch zdroj\u016f a priorit; \u010dasov\u00e1 osa Gantt uk\u00e1\u017ee, co to znamen\u00e1 pro v\u00fdrobu a dod\u00e1vky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed?<\/h2>\n\n\n<p>RCCP ov\u011b\u0159uje kapacitn\u00ed proveditelnost <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/\">hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu (MPS)<\/a>. Zam\u011b\u0159uje se na v\u00fdrobn\u00ed zdroje, kter\u00e9 by mohly zabr\u00e1nit jeho spln\u011bn\u00ed. M\u016f\u017ee j\u00edt o skupinu stroj\u016f tvo\u0159\u00edc\u00ed \u00fazk\u00e9 m\u00edsto, specializovan\u00fd mont\u00e1\u017en\u00ed t\u00fdm, pec nebo kapacitn\u011b omezenou v\u00fdrobn\u00ed linku.<\/p>\n\n\n<p>Kl\u00ed\u010dov\u00e1 ot\u00e1zka je konkr\u00e9tn\u00ed: kolik kapacity dan\u00e9ho zdroje bude MPS vy\u017eadovat v ka\u017ed\u00e9m pl\u00e1novac\u00edm obdob\u00ed a kolik j\u00ed m\u016f\u017eete re\u00e1ln\u011b zajistit?<\/p>\n\n\n<p>O \u201ehrub\u00e9\u201c pl\u00e1nov\u00e1n\u00ed jde proto, \u017ee k odhalen\u00ed z\u00e1sadn\u00edho nesouladu nemus\u00edte ur\u010dit po\u0159ad\u00ed ka\u017ed\u00e9 operace. Vyberete kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje a pou\u017eijete zjednodu\u0161en\u00fd model n\u00e1rok\u016f na jejich kapacitu. RCCP je proto u\u017eite\u010dn\u00e9 ve f\u00e1zi, kdy je\u0161t\u011b m\u016f\u017eete zm\u011bnit v\u00fdrobn\u00ed z\u00e1vazky, zajistit dal\u0161\u00ed sm\u011bny nebo projednat kooperaci.<\/p>\n\n\n<p>Mnoha v\u00fdrobc\u016fm vyhovuj\u00ed t\u00fddenn\u00ed pl\u00e1novac\u00ed obdob\u00ed, pro RCCP v\u0161ak neexistuje univerz\u00e1ln\u00ed po\u010det t\u00fddn\u016f \u010di m\u011bs\u00edc\u016f. Zvolte horizont, kter\u00fd pokryje pot\u0159ebn\u00e1 rozhodnut\u00ed, a d\u00e9lku obdob\u00ed, kter\u00e1 odhal\u00ed p\u0159et\u00ed\u017een\u00ed, je\u017e mus\u00edte \u0159e\u0161it. Na kapacitn\u00ed zm\u011bny s dlouhou dobou p\u0159\u00edpravy pot\u0159ebujete v\u011bt\u0161\u00ed p\u0159edstih ne\u017e na p\u0159es\u010dasovou sm\u011bnu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kam RCCP pat\u0159\u00ed: MPS, MRP, CRP a rozvrhov\u00e1n\u00ed<\/h2>\n\n\n<p>Ka\u017ed\u00e1 z t\u011bchto pl\u00e1novac\u00edch \u010dinnost\u00ed odpov\u00edd\u00e1 na jinou ot\u00e1zku:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u010cinnost<\/th><th>Hlavn\u00ed ot\u00e1zka<\/th><th>Obvykl\u00e1 m\u00edra podrobnosti<\/th><\/tr><\/thead><tbody><tr><td>Tvorba hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu<\/td><td>Jak\u00e9 v\u00fdrobky m\u00e1me vyr\u00e1b\u011bt, v jak\u00e9m mno\u017estv\u00ed a ve kter\u00fdch obdob\u00edch?<\/td><td>Polo\u017eky hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu a pl\u00e1novan\u00e1 mno\u017estv\u00ed k dokon\u010den\u00ed<\/td><\/tr><tr><td>Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><td>Maj\u00ed kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje kapacitu na spln\u011bn\u00ed hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu?<\/td><td>Zat\u00ed\u017een\u00ed kl\u00ed\u010dov\u00fdch v\u00fdrobn\u00edch zdroj\u016f podle obdob\u00ed<\/td><\/tr><tr><td>Pl\u00e1nov\u00e1n\u00ed materi\u00e1lov\u00fdch pot\u0159eb (MRP)<\/td><td>Jak\u00fd materi\u00e1l a jak\u00e9 komponenty pot\u0159ebujeme a kdy?<\/td><td>Pot\u0159eby odvozen\u00e9 ze struktury v\u00fdrobk\u016f a \u00fadaj\u016f o z\u00e1sobov\u00e1n\u00ed<\/td><\/tr><tr><td>Pl\u00e1nov\u00e1n\u00ed kapacitn\u00edch pot\u0159eb (CRP)<\/td><td>Jakou kapacitu vy\u017eaduje podrobn\u00fd materi\u00e1lov\u00fd pl\u00e1n?<\/td><td>Podrobn\u011bj\u0161\u00ed kapacitn\u00ed po\u017eadavky na \u00farovni operac\u00ed a pracovi\u0161\u0165<\/td><\/tr><tr><td>Detailn\u00ed rozvrhov\u00e1n\u00ed v\u00fdroby<\/td><td>Kter\u00e1 operace se bude prov\u00e1d\u011bt kde a kdy?<\/td><td>Pracovi\u0161t\u011b, operace, sm\u011bny, n\u00e1vaznosti a priority operac\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MPS a RCCP mus\u00ed fungovat ve zp\u011btnovazebn\u00edm cyklu. Pokud kapacitn\u00ed kontrola nevyjde, upravte navr\u017een\u00fd pl\u00e1n nebo dostupnou kapacitu a kontrolu zopakujte. Nep\u0159ed\u00e1vejte p\u0159et\u00ed\u017een\u00fd hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n do dal\u0161\u00edch f\u00e1z\u00ed s p\u0159edpokladem, \u017ee detailn\u00ed rozvrhov\u00e1n\u00ed chyb\u011bj\u00edc\u00ed hodiny vytvo\u0159\u00ed.<\/p>\n\n\n<p>D\u016fle\u017eit\u00e1 je i zp\u011btn\u00e1 vazba opa\u010dn\u00fdm sm\u011brem: pokud detailn\u00ed rozvrhov\u00e1n\u00ed odhal\u00ed opakuj\u00edc\u00ed se \u00fazk\u00e9 m\u00edsto, prom\u00edtn\u011bte tuto informaci do kapacitn\u00edch p\u0159edpoklad\u016f. Zdroj, kter\u00fd p\u0159i skladb\u011b v\u00fdrobk\u016f v minul\u00e9m \u010dtvrtlet\u00ed nebyl kritick\u00fd, u\u017e m\u016f\u017ee vy\u017eadovat zahrnut\u00ed do p\u0159\u00ed\u0161t\u00ed kontroly RCCP.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak vypo\u010d\u00edtat hrub\u00e9 kapacitn\u00ed pot\u0159eby<\/h2>\n\n\n<p>Vych\u00e1zejte z v\u00fdrobn\u00edch mno\u017estv\u00ed v MPS a nep\u0159i\u010d\u00edtejte k nim znovu popt\u00e1vku z\u00e1kazn\u00edk\u016f. Hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n u\u017e m\u00e1 vyjad\u0159ovat rozhodnut\u00ed o tom, co se bude vyr\u00e1b\u011bt. Op\u011btovn\u00fdm zapo\u010dten\u00edm t\u00e9\u017ee popt\u00e1vky byste zat\u00ed\u017een\u00ed nadhodnotili.<\/p>\n\n\n<p>Pro model zalo\u017een\u00fd na hodin\u00e1ch plat\u00ed:<\/p>\n\n\n<p><strong>Pot\u0159ebn\u00e9 hodiny v\u00fdrobn\u00edho zdroje = sou\u010det (mno\u017estv\u00ed podle MPS \u00d7 hodiny v\u00fdrobn\u00edho zdroje na jednotku) plus p\u0159\u00edpadn\u00e9 samostatn\u011b modelovan\u00e9 hodiny se\u0159\u00edzen\u00ed.<\/strong><\/p>\n\n\n<p>V\u00fdpo\u010det prove\u010fte pro ka\u017ed\u00fd vybran\u00fd v\u00fdrobn\u00ed zdroj a ka\u017ed\u00e9 obdob\u00ed. V\u00fdsledek pak porovnejte s kapacitou vyj\u00e1d\u0159enou ve stejn\u00e9 jednotce:<\/p>\n\n\n<p><strong>M\u00edra kapacitn\u00edho zat\u00ed\u017een\u00ed = pot\u0159ebn\u00e9 hodiny \u00f7 dostupn\u00e9 hodiny \u00d7 100 %.<\/strong><\/p>\n\n\n<p>Hodnota nad 100 % signalizuje p\u0159i pou\u017eit\u00fdch p\u0159edpokladech p\u0159et\u00ed\u017een\u00ed. Hodnota pod 100 % znamen\u00e1, \u017ee celkov\u00e1 kapacita sta\u010d\u00ed; nedokazuje v\u0161ak, \u017ee v\u0161echny operace stihnou sv\u00e9 jednotliv\u00e9 term\u00edny.<\/p>\n\n\n<p>P\u0159i v\u00fdpo\u010dtu postupujte v p\u011bti kroc\u00edch:<\/p>\n\n\n<p>1. <strong>Vyberte kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje.<\/strong> Zahr\u0148te stroje, odborn\u00e9 dovednosti nebo linky, kter\u00e9 mohou omezit spln\u011bn\u00ed z\u00e1vazku. Nepou\u017e\u00edvejte pouze souhrn za cel\u00fd z\u00e1vod, v n\u011bm\u017e voln\u00e1 kapacita jednoho zdroje zakryje p\u0159et\u00ed\u017een\u00ed jin\u00e9ho.<\/p>\n\n\n<p>2. <strong>Stanovte kapacitn\u00ed po\u017eadavky.<\/strong> Pro ka\u017edou polo\u017eku hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu pou\u017e\u00edvejte jednotn\u011b sestaven\u00fd p\u0159ehled kapacitn\u00edch n\u00e1rok\u016f nebo profil v\u00fdrobn\u00edch zdroj\u016f. Strojn\u00ed hodiny a pracovn\u00ed hodiny evidujte odd\u011blen\u011b. Zahr\u0148te i p\u0159\u00edslu\u0161nou pr\u00e1ci na komponentech, ale nezapo\u010d\u00edt\u00e1vejte ji znovu jinde.<\/p>\n\n\n<p>3. <strong>Za\u0159a\u010fte zat\u00ed\u017een\u00ed do spr\u00e1vn\u00e9ho obdob\u00ed.<\/strong> Pokud kl\u00ed\u010dov\u00e1 operace prob\u00edh\u00e1 p\u0159ed term\u00ednem dokon\u010den\u00ed hotov\u00e9ho v\u00fdrobku, posu\u0148te odpov\u00eddaj\u00edc\u00edm zp\u016fsobem i jej\u00ed kapacitn\u00ed po\u017eadavek. Jinak m\u016f\u017ee zjednodu\u0161en\u00fd v\u00fdpo\u010det pro t\u00fdden dokon\u010den\u00ed zakr\u00fdt nedostatek kapacity v d\u0159\u00edv\u011bj\u0161\u00edm obdob\u00ed.<\/p>\n\n\n<p>4. <strong>Vypo\u010d\u00edtejte re\u00e1ln\u011b dostupnou kapacitu.<\/strong> Vych\u00e1zejte z pracovn\u00edho kalend\u00e1\u0159e, person\u00e1ln\u00edho obsazen\u00ed a pl\u00e1novan\u00fdch odst\u00e1vek. P\u0159\u00edpadn\u00e9 korekce na o\u010dek\u00e1van\u00fd v\u00fdkon uplat\u0148ujte jednotn\u011b; stejn\u00e9 ztr\u00e1ty neode\u010d\u00edtejte dvakr\u00e1t.<\/p>\n\n\n<p>5. <strong>Vyhodno\u0165te rozd\u00edly a pl\u00e1n p\u0159epo\u010d\u00edtejte.<\/strong> Zaznamenejte navr\u017een\u00e9 opat\u0159en\u00ed, v\u00fdrobn\u00ed zdroj a obdob\u00ed, kter\u00fdch se t\u00fdk\u00e1, i upraven\u00e9 zat\u00ed\u017een\u00ed. P\u0159et\u00ed\u017een\u00ed bez dohodnut\u00e9ho \u0159e\u0161en\u00ed z\u016fst\u00e1v\u00e1 p\u0159et\u00ed\u017een\u00edm.<\/p>\n\n\n<p>Pokud je pro linku vhodn\u011bj\u0161\u00ed pl\u00e1nov\u00e1n\u00ed v jednotk\u00e1ch produkce, porovn\u00e1vejte pl\u00e1novan\u00e9 mno\u017estv\u00ed s mno\u017estv\u00edm, kter\u00e9 lze v dan\u00e9m obdob\u00ed re\u00e1ln\u011b vyrobit. Pou\u017eit\u00e1 v\u00fdrobn\u00ed rychlost mus\u00ed odpov\u00eddat skladb\u011b v\u00fdrobk\u016f; r\u016fzn\u00e9 v\u00fdrobky nelze v\u017edy pova\u017eovat za zam\u011bniteln\u00e9 kusy.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kterou metodu RCCP zvolit?<\/h3>\n\n\n<p>T\u0159i b\u011b\u017en\u00e9 p\u0159\u00edstupy se li\u0161\u00ed m\u00edrou jednoduchosti a t\u00edm, jak podrobn\u011b zachycuj\u00ed zat\u00ed\u017een\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pomoc\u00ed souhrnn\u00fdch koeficient\u016f (CPOF)<\/strong> p\u0159ev\u00e1d\u00ed MPS na celkov\u00e9 pracovn\u00ed zat\u00ed\u017een\u00ed a pot\u00e9 je rozd\u011bluje podle historick\u00fdch pod\u00edl\u016f jednotliv\u00fdch v\u00fdrobn\u00edch zdroj\u016f. Jde o rychl\u00fd odhad, p\u0159i zm\u011bn\u011b skladby v\u00fdrobk\u016f v\u0161ak mohou b\u00fdt historick\u00e9 pod\u00edly zav\u00e1d\u011bj\u00edc\u00ed.<\/li><li><strong>P\u0159ehledy kapacitn\u00edch n\u00e1rok\u016f v\u00fdrobk\u016f<\/strong> stanovuj\u00ed, kolik hodin kl\u00ed\u010dov\u00fdch v\u00fdrobn\u00edch zdroj\u016f vy\u017eaduje ka\u017ed\u00fd v\u00fdrobek. Ukazuj\u00ed, pro\u010d mohou dva hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1ny se stejn\u00fdm celkov\u00fdm mno\u017estv\u00edm vytv\u00e1\u0159et zcela odli\u0161n\u00e1 \u00fazk\u00e1 m\u00edsta.<\/li><li><strong>Profily v\u00fdrobn\u00edch zdroj\u016f<\/strong> nav\u00edc rozkl\u00e1daj\u00ed tyto po\u017eadavky v \u010dase pomoc\u00ed posun\u016f podle pr\u016fb\u011b\u017en\u00fdch dob. Pom\u00e1haj\u00ed odhalit kl\u00ed\u010dovou operaci, kterou je nutn\u00e9 prov\u00e9st v d\u0159\u00edv\u011bj\u0161\u00edm obdob\u00ed, ne\u017e ve kter\u00e9m m\u00e1 b\u00fdt hotov\u00fd v\u00fdrobek dokon\u010den.<\/li><\/ul>\n\n\n<p>Pou\u017eijte co nejjednodu\u0161\u0161\u00ed model, kter\u00fd v\u00e1m je\u0161t\u011b poskytne podklady pro pot\u0159ebn\u00e9 rozhodnut\u00ed. V\u00fdpo\u010det podle p\u0159ehledu kapacitn\u00edch n\u00e1rok\u016f je u\u017eite\u010dn\u00fdm v\u00fdchoz\u00edm bodem, pokud r\u016fzn\u00e9 v\u00fdrobky zat\u011b\u017euj\u00ed sd\u00edlen\u00e9 v\u00fdrobn\u00ed zdroje rozd\u00edln\u011b. Jestli\u017ee v\u00fdrobn\u00ed postup zasahuje do v\u00edce pl\u00e1novac\u00edch obdob\u00ed, dopl\u0148te \u010dasov\u00e9 posuny.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159\u00edklad RCCP: t\u00fdden, ve kter\u00e9m chyb\u00ed 19 strojn\u00edch hodin<\/h2>\n\n\n<p>P\u0159edstavte si v\u00fdrobce, kter\u00fd vyr\u00e1b\u00ed dv\u011b \u010derpadlov\u00e9 sestavy, A a B. Ob\u011b vyu\u017e\u00edvaj\u00ed stejnou skupinu obr\u00e1b\u011bc\u00edch stroj\u016f a stejn\u00fd mont\u00e1\u017en\u00ed t\u00fdm. V tomto zjednodu\u0161en\u00e9m p\u0159\u00edkladu prob\u00edhaj\u00ed kl\u00ed\u010dov\u00e9 operace ve stejn\u00e9m t\u00fddnu jako dokon\u010den\u00ed v\u00fdrobku a hodinov\u00e9 normy na jednotku ji\u017e zahrnuj\u00ed p\u0159edpokl\u00e1dan\u00fd pod\u00edl \u010dasu se\u0159\u00edzen\u00ed.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>V\u00fdrobek<\/th><th>Strojn\u00ed hodiny obr\u00e1b\u011bn\u00ed na jednotku<\/th><th>Pracovn\u00ed hodiny mont\u00e1\u017ee na jednotku<\/th><th>MPS \u2013 t\u00fdden 1<\/th><th>MPS \u2013 t\u00fdden 2<\/th><th>MPS \u2013 t\u00fdden 3<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>0,40<\/td><td>0,25<\/td><td>120<\/td><td>180<\/td><td>100<\/td><\/tr><tr><td>B<\/td><td>0,75<\/td><td>0,50<\/td><td>80<\/td><td>100<\/td><td>80<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pracovi\u0161t\u011b obr\u00e1b\u011bn\u00ed m\u00e1 dva stroje. Ka\u017ed\u00fd z nich pracuje p\u011bt dn\u00ed ve dvou osmihodinov\u00fdch sm\u011bn\u00e1ch denn\u011b. Pl\u00e1novan\u00e1 kapacita je 2 stroje \u00d7 2 sm\u011bny denn\u011b \u00d7 8 hodin na sm\u011bnu \u00d7 5 dn\u00ed = 160 strojn\u00edch hodin. P\u0159i pl\u00e1novac\u00edm koeficientu 80 % je vyu\u017eiteln\u00e1 kapacita 128 strojn\u00edch hodin t\u00fddn\u011b. Tento koeficient ji\u017e zohled\u0148uje o\u010dek\u00e1van\u00e9 kapacitn\u00ed ztr\u00e1ty, kter\u00e9 se proto znovu neode\u010d\u00edtaj\u00ed.<\/p>\n\n\n<p>Dostupn\u00e1 kapacita mont\u00e1\u017en\u00edho t\u00fdmu \u010din\u00ed 96 pracovn\u00edch hodin t\u00fddn\u011b a po\u010d\u00edt\u00e1 se samostatn\u011b podle jeho person\u00e1ln\u00edho obsazen\u00ed a pracovn\u00edho kalend\u00e1\u0159e.<\/p>\n\n\n<p>Obr\u00e1b\u011bn\u00ed v t\u00fddnu 2 vy\u017eaduje:<\/p>\n\n\n<p><strong>(180 \u00d7 0,40) + (100 \u00d7 0,75) = 147 strojn\u00edch hodin.<\/strong><\/p>\n\n\n<p>To je o 19 hodin v\u00edce ne\u017e dostupn\u00fdch 128 hodin. M\u00edra kapacitn\u00edho zat\u00ed\u017een\u00ed tak po zaokrouhlen\u00ed na jedno desetinn\u00e9 m\u00edsto \u010din\u00ed 114,8 %.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kl\u00ed\u010dov\u00fd v\u00fdrobn\u00ed zdroj<\/th><th>Dostupn\u00e9 hodiny t\u00fddn\u011b<\/th><th>Pot\u0159ebn\u00e9 hodiny \u2013 t\u00fdden 1<\/th><th>Pot\u0159ebn\u00e9 hodiny v t\u00fddnu 2<\/th><th>Pot\u0159ebn\u00e9 hodiny v t\u00fddnu 3<\/th><\/tr><\/thead><tbody><tr><td>Skupina obr\u00e1b\u011bc\u00edch stroj\u016f<\/td><td>128<\/td><td>108<\/td><td>147<\/td><td>100<\/td><\/tr><tr><td>Mont\u00e1\u017en\u00ed t\u00fdm<\/td><td>96<\/td><td>70<\/td><td>95<\/td><td>65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mont\u00e1\u017e se v ka\u017ed\u00e9m t\u00fddnu vejde do dostupn\u00e9 kapacity, ale jej\u00ed voln\u00e9 hodiny pr\u00e1ce nemohou nahradit strojn\u00ed hodiny obr\u00e1b\u011bn\u00ed. Ani voln\u00e1 kapacita stroj\u016f v t\u00fddnu 3 nepom\u016f\u017ee splnit dod\u00e1vku sl\u00edbenou na t\u00fdden 2, pokud se nezm\u011bn\u00ed term\u00edn dod\u00e1n\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Od zji\u0161t\u011bn\u00e9ho p\u0159et\u00ed\u017een\u00ed ke konkr\u00e9tn\u00edmu rozhodnut\u00ed<\/h3>\n\n\n<p>Jednou z mo\u017enost\u00ed je zajistit v t\u00fddnu 2 dal\u0161\u00edch 19 vyu\u017eiteln\u00fdch hodin obr\u00e1b\u011bn\u00ed. Je nutn\u00e9 ov\u011b\u0159it n\u00e1klady a person\u00e1ln\u00ed zaji\u0161t\u011bn\u00ed, ale pot\u0159ebn\u00e9 nav\u00fd\u0161en\u00ed kapacity je jasn\u00e9.<\/p>\n\n\n<p>Dal\u0161\u00ed mo\u017enost\u00ed je vyrobit 50 kus\u016f v\u00fdrobku A v t\u00fddnu 1 m\u00edsto t\u00fddne 2. T\u00edm se p\u0159esune 20 strojn\u00edch hodin obr\u00e1b\u011bn\u00ed a 12,5 hodin pr\u00e1ce na mont\u00e1\u017ei do d\u0159\u00edv\u011bj\u0161\u00edho t\u00fddne:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritick\u00fd v\u00fdrobn\u00ed zdroj<\/th><th>Upraven\u00e9 zat\u00ed\u017een\u00ed v t\u00fddnu 1<\/th><th>Upraven\u00e9 zat\u00ed\u017een\u00ed v t\u00fddnu 2<\/th><th>T\u00fddenn\u00ed kapacita<\/th><\/tr><\/thead><tbody><tr><td>Skupina obr\u00e1b\u011bc\u00edch stroj\u016f<\/td><td>128<\/td><td>127<\/td><td>128<\/td><\/tr><tr><td>Mont\u00e1\u017en\u00ed t\u00fdm<\/td><td>82,5<\/td><td>82,5<\/td><td>96<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Upraven\u00fd MPS pro v\u00fdrobek A je 170, 130, 100; u v\u00fdrobku B z\u016fst\u00e1v\u00e1 80, 100, 80. Celkov\u00fd objem v\u00fdroby za t\u0159i t\u00fddny se nem\u011bn\u00ed. P\u0159et\u00ed\u017een\u00ed v tomto modelu zmiz\u00ed, ale obr\u00e1b\u011bn\u00ed v t\u00fddnu 1 nem\u00e1 \u017e\u00e1dnou dal\u0161\u00ed rezervu nad r\u00e1mec ztr\u00e1t ji\u017e zohledn\u011bn\u00fdch ve v\u00fdpo\u010dtu kapacity.<\/p>\n\n\n<p>V\u00fdroba v p\u0159edstihu je tedy podnikatelsk\u00e9 rozhodnut\u00ed, nikoli \u0159e\u0161en\u00ed bez n\u00e1klad\u016f. Materi\u00e1l pot\u0159ebujete d\u0159\u00edve a mus\u00edte m\u00edt kde skladovat hotov\u00e9 sestavy. D\u0159\u00edv\u011bj\u0161\u00ed v\u00fdroba nav\u00edc mus\u00ed b\u00fdt opodstatn\u011bn\u00e1 popt\u00e1vkou po v\u00fdrobku a jeho specifikac\u00ed. Tyto n\u00e1klady porovnejte s p\u0159es\u010dasy, subdod\u00e1vkami nebo dohodnutou zm\u011bnou term\u00ednu dod\u00e1n\u00ed.<\/p>\n\n\n<p>RCCP d\u00e1v\u00e1 jednotliv\u00fdm mo\u017enostem konkr\u00e9tn\u00ed podobu. Nerozhodne v\u0161ak za v\u00e1s, kter\u00fd z\u00e1vazek m\u00e1 pro va\u0161i firmu nejv\u011bt\u0161\u00ed hodnotu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pro\u010d \u00fasp\u011b\u0161n\u00e1 kontrola RCCP nezaru\u010duje v\u010dasn\u00e9 dod\u00e1vky<\/h2>\n\n\n<p>Upraven\u00fd p\u0159\u00edklad se vejde do t\u00fddenn\u00ed kapacity obou v\u00fdrobn\u00edch zdroj\u016f. Nyn\u00ed si p\u0159edstavte, \u017ee materi\u00e1l pro jednu ze zak\u00e1zek v t\u00fddnu 1 doraz\u00ed a\u017e ve \u010dtvrtek, zat\u00edmco n\u011bkolik dal\u0161\u00edch zak\u00e1zek pot\u0159ebuje stejnou skupinu obr\u00e1b\u011bc\u00edch stroj\u016f je\u0161t\u011b p\u0159ed p\u00e1te\u010dn\u00ed mont\u00e1\u017e\u00ed.<\/p>\n\n\n<p>Celkov\u00fdch 128 hodin za t\u00fdden nen\u00ed tot\u00e9\u017e jako hodiny, kter\u00e9 zb\u00fdvaj\u00ed po dod\u00e1n\u00ed materi\u00e1lu. Rozhoduj\u00edc\u00ed je nyn\u00ed po\u0159ad\u00ed operac\u00ed, za\u010d\u00e1tky a konce sm\u011bn i p\u0159ed\u00e1n\u00ed d\u00edl\u016f na mont\u00e1\u017e. Hrub\u00e1 kapacitn\u00ed kontrola nedok\u00e1\u017ee toto na\u010dasov\u00e1n\u00ed ov\u011b\u0159it jen z celkov\u00fdch sou\u010dt\u016f.<\/p>\n\n\n<p>Sledujte \u010dty\u0159i d\u016fvody, pro\u010d m\u016f\u017ee kapacitn\u011b vyrovnan\u00fd pl\u00e1n p\u0159i realizaci p\u0159esto selhat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Na\u010dasov\u00e1n\u00ed v r\u00e1mci obdob\u00ed:<\/strong> n\u011bkolik operac\u00ed pot\u0159ebuje stejn\u00fd v\u00fdrobn\u00ed zdroj ve stejn\u00fd den.<\/li><li><strong>N\u00e1vaznosti operac\u00ed:<\/strong> mont\u00e1\u017e nem\u016f\u017ee vyu\u017e\u00edt volnou kapacitu, dokud nejsou pot\u0159ebn\u00e9 d\u00edly obroben\u00e9.<\/li><li><strong>Zp\u016fsobilost v\u00fdrobn\u00edho zdroje:<\/strong> jin\u00fd stroj m\u00e1 sice voln\u00e9 hodiny, ale nedok\u00e1\u017ee prov\u00e9st po\u017eadovanou operaci.<\/li><li><strong>M\u011bn\u00edc\u00ed se podm\u00ednky:<\/strong> zpo\u017ed\u011bn\u00ed materi\u00e1lu, porucha nebo urgentn\u00ed zak\u00e1zka zm\u011bn\u00ed pl\u00e1n a\u017e po jeho kontrole.<\/li><\/ul>\n\n\n<p>V tuto chv\u00edli je \u010das p\u0159ej\u00edt od <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">kontroly souhrnn\u00e9ho zat\u00ed\u017een\u00ed k rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami<\/a>. RCCP nad\u00e1le pou\u017e\u00edvejte pro prvotn\u00ed rozhodnut\u00ed, zda se k dod\u00e1vce zav\u00e1zat. Podrobn\u00fdm rozvrhem pak ov\u011b\u0159te, jak na sebe jednotliv\u00e9 pr\u00e1ce skute\u010dn\u011b navazuj\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Od rozhodnut\u00ed o kapacit\u011b k rozvrhu ve SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS doporu\u010dujeme jako dal\u0161\u00ed krok, pokud va\u0161i pl\u00e1nova\u010di tr\u00e1v\u00ed \u010das p\u0159ev\u00e1d\u011bn\u00edm t\u011bchto rozhodnut\u00ed na po\u0159ad\u00ed operac\u00ed u jednotliv\u00fdch stroj\u016f a p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b ve v\u00fdrob\u011b je mus\u00ed sestavovat znovu. RCCP ponechte jako sou\u010d\u00e1st tvorby hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu a pro navazuj\u00edc\u00ed podrobn\u00e9 rozvrhov\u00e1n\u00ed pou\u017e\u00edvejte SkyPlanner.<\/p>\n\n\n<p>ERP si ponechte jako zdroj obchodn\u00edch a v\u00fdrobn\u00edch dat. SkyPlanner <a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">lze propojit s libovoln\u00fdm ERP nebo MES prost\u0159ednictv\u00edm jeho otev\u0159en\u00e9ho REST API<\/a>. Tato data tak p\u0159\u00edmo slou\u017e\u00ed k rozvrhov\u00e1n\u00ed v\u00fdroby a pl\u00e1nova\u010d nemus\u00ed pl\u00e1n opakovan\u011b sestavovat ru\u010dn\u011b.<\/p>\n\n\n<p>Nastavte pracovi\u0161t\u011b, kroky v\u00fdrobn\u00edho postupu, sm\u011bny, obsluhu a priority. Arcturus vypo\u010d\u00edt\u00e1 rozvrh podle nastaven\u00fdch kapacit, n\u00e1vaznost\u00ed a pravidel. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, na\u010dasov\u00e1n\u00ed ovliv\u0148uje tak\u00e9 dostupnost materi\u00e1lu a o\u010dek\u00e1van\u00e9 dod\u00e1vky. V\u00fdsledn\u00e9 operace i jejich vazby uvid\u00edte na \u010dasov\u00e9 ose Gantt.<\/p>\n\n\n<p>V p\u0159\u00edkladu s \u010derpadly je dal\u0161\u00edm praktick\u00fdm krokem rozvrhnout upraven\u00e1 v\u00fdrobn\u00ed mno\u017estv\u00ed a ov\u011b\u0159it, kdy skon\u010d\u00ed obr\u00e1b\u011bn\u00ed a mont\u00e1\u017e. Pokud se posune dod\u00e1vka materi\u00e1lu, aktualizujte \u00fadaje o dod\u00e1vce a rozvrh p\u0159epo\u010d\u00edtejte. Zobrazen\u00ed Gantt v\u00e1m poskytne konkr\u00e9tn\u00ed podklad pro rozhodnut\u00ed, zda dodac\u00ed z\u00e1vazek zachovat, zm\u011bnit priority, nebo zajistit dal\u0161\u00ed kapacitu.<\/p>\n\n\n<p>U\u0161et\u0159\u00edte tak pr\u00e1ci s pl\u00e1nov\u00e1n\u00edm tam, kde hrub\u00fd kapacitn\u00ed v\u00fdpo\u010det kon\u010d\u00ed: p\u0159i koordinaci pr\u00e1ce mezi v\u00fdrobn\u00edmi zdroji a jej\u00edm pr\u016fb\u011b\u017en\u00e9m sla\u010fov\u00e1n\u00ed p\u0159i zm\u011bn\u00e1ch podm\u00ednek. Pl\u00e1nova\u010d ur\u010duje priority, Arcturus po\u010d\u00edt\u00e1 rozvrh. Pokud se po\u017eadovan\u00e1 pr\u00e1ce ani tak nevejde do stanoven\u00fdch term\u00edn\u016f, nutnost podnikatelsk\u00e9ho rozhodnut\u00ed z\u016fst\u00e1v\u00e1 z\u0159eteln\u00e1. Nezakryje ji vyrovnan\u00fd t\u00fddenn\u00ed sou\u010det.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp: od hrub\u00e9ho t\u00fddenn\u00edho zat\u00ed\u017een\u00ed k podrobn\u00e9mu rozvrhu<\/h3>\n\n\n<p>Finsk\u00fd zak\u00e1zkov\u00fd v\u00fdrobce plechov\u00fdch d\u00edl\u016f KJH-Comp ji\u017e m\u011bl hrub\u00fd p\u0159ehled t\u00fddenn\u00edho zat\u00ed\u017een\u00ed v ERP C9000 a v tabulk\u00e1ch. Probl\u00e9m nast\u00e1val v dal\u0161\u00edm kroku: z\u00e1kaznick\u00e9 zak\u00e1zky m\u011bly konkr\u00e9tn\u00ed denn\u00ed term\u00edny, ale mist\u0159i st\u00e1le p\u0159i\u0159azovali operace ke stroj\u016fm ru\u010dn\u011b. Dva mist\u0159i tak ka\u017ed\u00fd v\u011bnovali rozvrhov\u00e1n\u00ed kapacit alespo\u0148 polovinu sv\u00e9ho \u010dasu.<\/p>\n\n\n<p>Firma si ponechala sv\u00e9 ERP a pro rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami zavedla SkyPlanner. Ve zve\u0159ejn\u011bn\u00e9 z\u00e1kaznick\u00e9 p\u0159\u00edpadov\u00e9 studii KJH-Comp popisuje automatick\u00e9 p\u0159i\u0159azov\u00e1n\u00ed ke stroj\u016fm, d\u0159\u00edv\u011bj\u0161\u00ed odhalov\u00e1n\u00ed \u00fazk\u00fdch m\u00edst a m\u00e9n\u011b ru\u010dn\u00ed pr\u00e1ce p\u0159i rozvrhov\u00e1n\u00ed. Odpov\u011bdnost za rozvrhov\u00e1n\u00ed p\u0159e\u0161la ze dvou mistr\u016f na jednoho a druh\u00fd se za\u010dal v\u011bnovat jin\u00fdm \u00fakol\u016fm.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/kjh-comp\/\">KJH-Comp uv\u00e1d\u00ed<\/a>, \u017ee v\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % v roce 2026. Jde o zku\u0161enost t\u00e9to firmy s jej\u00edm vlastn\u00edm nasazen\u00edm. Pro kontrolu RCCP je podstatn\u00e9, jakou praktickou mezeru se poda\u0159ilo p\u0159eklenout: p\u0159ehled t\u00fddenn\u00edho zat\u00ed\u017een\u00ed se prom\u011bnil v koordinovanou ka\u017edodenn\u00ed pr\u00e1ci, nikoli v dal\u0161\u00ed fronty operac\u00ed, kter\u00e9 by mist\u0159i museli ru\u010dn\u011b sestavovat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prom\u011b\u0148te p\u0159\u00ed\u0161t\u00ed kontrolu kapacit v konkr\u00e9tn\u00ed kroky<\/h2>\n\n\n<p>P\u0159i p\u0159\u00ed\u0161t\u00ed kontrole MPS ur\u010dete kritick\u00fd v\u00fdrobn\u00ed zdroj s nejv\u011bt\u0161\u00edm nedostatkem kapacity. Dohodn\u011bte se, zda p\u0159esunete v\u00fdrobu, nav\u00fd\u0161\u00edte vyu\u017eitelnou kapacitu, nebo zm\u011bn\u00edte dodac\u00ed z\u00e1vazek, a pot\u00e9 p\u0159epo\u010d\u00edtejte hrub\u00e9 zat\u00ed\u017een\u00ed. Ne\u017e upravenou v\u00fdrobu uvoln\u00edte, ov\u011b\u0159te jej\u00ed podrobn\u00e9 na\u010dasov\u00e1n\u00ed s ohledem na ostatn\u00ed operace a dostupnost materi\u00e1lu.<\/p>\n\n\n<p>Se SkyPlanner tento posledn\u00ed krok zvl\u00e1dnete rychleji a z\u00edsk\u00e1te z n\u011bj u\u017eite\u010dn\u011bj\u0161\u00ed podklady. <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">Spus\u0165te zku\u0161ebn\u00ed verzi s uk\u00e1zkov\u00fdmi daty<\/a> a seznamte se s postupem rozvrhov\u00e1n\u00ed, nebo si <a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">rezervujte uk\u00e1zku<\/a> zam\u011b\u0159enou na va\u0161e \u00fazk\u00e9 m\u00edsto, sm\u011bny a dodac\u00ed z\u00e1vazky. P\u0159ineste v\u00fdrobn\u00ed pl\u00e1n, kter\u00fd chcete splnit, a pod\u00edvejte se, jak v\u00e1m Arcturus a \u010dasov\u00e1 osa Gantt pomohou p\u0159ev\u00e9st jej na rozvrh, podle kter\u00e9ho m\u016f\u017ee v\u00e1\u0161 t\u00fdm pracovat.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP Domov &raquo; Zdroje &raquo; Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP Hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n \u0159\u00edk\u00e1, co hodl\u00e1te vyr\u00e1b\u011bt. Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed ov\u011b\u0159uje, zda na to maj\u00ed kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje dostate\u010dnou kapacitu. Tuto kontrolu je d\u016fle\u017eit\u00e9 prov\u00e9st d\u0159\u00edve, ne\u017e n\u00e1kup, v\u00fdroba a obchod za\u010dnou jednat podle pl\u00e1nu, kter\u00fd z\u00e1vod &#8230; <a title=\"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/\" aria-label=\"Read more about Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99166,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-99136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP<\/title>\n<meta name=\"description\" content=\"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\" \/>\n<meta property=\"og:description\" content=\"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T15:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T15:54:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/\"},\"wordCount\":3137,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/\",\"name\":\"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:03+00:00\",\"description\":\"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hrube-kapacitni-planovani\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP","description":"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/","og_locale":"cs_CZ","og_type":"article","og_title":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP","og_description":"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T15:53:51+00:00","article_modified_time":"2026-10-15T15:54:03+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:03+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/"},"wordCount":3137,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/","name":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:03+00:00","description":"Zvl\u00e1dnou kl\u00ed\u010dov\u00e9 zdroje hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n? P\u0159\u00edklad RCCP v\u00e1m pom\u016f\u017ee odhalit p\u0159et\u00ed\u017een\u00ed a p\u0159ev\u00e9st pl\u00e1n na provediteln\u00fd rozvrh.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hrube-kapacitni-planovani\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP Domov &raquo; Zdroje &raquo; Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed: ov\u011b\u0159te MPS pomoc\u00ed RCCP Hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n \u0159\u00edk\u00e1, co hodl\u00e1te vyr\u00e1b\u011bt. Hrub\u00e9 kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed ov\u011b\u0159uje, zda na to maj\u00ed kl\u00ed\u010dov\u00e9 v\u00fdrobn\u00ed zdroje dostate\u010dnou kapacitu. Tuto kontrolu je d\u016fle\u017eit\u00e9 prov\u00e9st d\u0159\u00edve, ne\u017e n\u00e1kup, v\u00fdroba a obchod za\u010dnou jednat podle pl\u00e1nu, kter\u00fd z\u00e1vod&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=99136"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99136\/revisions"}],"predecessor-version":[{"id":99195,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/99136\/revisions\/99195"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/99166"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=99136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=99136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=99136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}