{"id":96554,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96554"},"modified":"2026-10-19T14:43:17","modified_gmt":"2026-10-19T14:43:17","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/","title":{"rendered":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky<\/h1>\n\n\n<p>Dal\u0161\u00ed zak\u00e1zka je p\u0159ipraven\u00e1, ale stroj je\u0161t\u011b ne. Obsluha pot\u0159ebuje spr\u00e1vn\u00e9 n\u00e1stroje, je nutn\u00e9 zkontrolovat nastaven\u00ed a schv\u00e1lit prvn\u00ed d\u00edly. Mezit\u00edm ostatn\u00ed zak\u00e1zky ve front\u011b d\u00e1l \u010dekaj\u00ed.<\/p>\n\n\n<p>Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed zvy\u0161uje n\u00e1klady na ka\u017ed\u00e9 rozhodnut\u00ed p\u0159i rozvrhov\u00e1n\u00ed v\u00fdroby. Kdy\u017e p\u0159ejdete na jin\u00fd v\u00fdrobek, abyste stihli term\u00edn dod\u00e1n\u00ed, ztrat\u00edte v\u00fdrobn\u00ed \u010das. Pokud budete d\u00e9le vyr\u00e1b\u011bt se stejn\u00fdm se\u0159\u00edzen\u00edm, m\u016f\u017eete vyr\u00e1b\u011bt d\u00edly, kter\u00e9 zat\u00edm nejsou pot\u0159eba, zat\u00edmco nal\u00e9hav\u011bj\u0161\u00ed zak\u00e1zka \u010dek\u00e1. V <a href=\"\/cs\/zdroje\/davkova-vyroba\/\">d\u00e1vkov\u00e9 v\u00fdrob\u011b<\/a> tento kompromis ovliv\u0148uje velikost d\u00e1vek i jejich po\u0159ad\u00ed.<\/p>\n\n\n<p>SMED pom\u00e1h\u00e1 tento kompromis p\u0159ekonat t\u00edm, \u017ee zkracuje samotn\u00e9 p\u0159etypov\u00e1n\u00ed. SkyPlanner v\u00e1m pom\u00e1h\u00e1 vyu\u017e\u00edt u\u0161et\u0159en\u00fd \u010das: p\u0159i rozvrhov\u00e1n\u00ed zohled\u0148uje \u010dasy se\u0159\u00edzen\u00ed, tak\u017ee dok\u00e1\u017ee seskupovat operace s podobn\u00fdmi po\u017eadavky na se\u0159\u00edzen\u00ed a z\u00e1rove\u0148 br\u00e1t v \u00favahu priority dod\u00e1vek. Spole\u010dn\u011b v\u00e1m tak d\u00e1vaj\u00ed v\u011bt\u0161\u00ed volnost vyr\u00e1b\u011bt zak\u00e1zky, kter\u00e9 va\u0161i z\u00e1kazn\u00edci skute\u010dn\u011b pot\u0159ebuj\u00ed jako dal\u0161\u00ed v po\u0159ad\u00ed. Krat\u0161\u00ed \u010dasy se\u0159\u00edzen\u00ed tak\u00e9 usnad\u0148uj\u00ed opakovanou v\u00fdrobu men\u0161\u00edch d\u00e1vek v r\u00e1mci <a href=\"\/cs\/zdroje\/heijunka\/\">vyrovn\u00e1v\u00e1n\u00ed v\u00fdroby<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je SMED ve v\u00fdrob\u011b?<\/h2>\n\n\n<p>Zkratka SMED vych\u00e1z\u00ed z anglick\u00e9ho Single-Minute Exchange of Die, tedy v\u00fdm\u011bny n\u00e1stroje v jednocifern\u00e9m po\u010dtu minut. Jde o metodu zkracov\u00e1n\u00ed \u010dasu pot\u0159ebn\u00e9ho k p\u0159etypov\u00e1n\u00ed v\u00fdrobn\u00edho za\u0159\u00edzen\u00ed z jedn\u00e9 operace nebo v\u00fdrobku na jin\u00fd. N\u00e1zev vyjad\u0159uje c\u00edl dostat se pod deset minut, nikoli p\u0159\u00edslib p\u0159etypov\u00e1n\u00ed za jednu minutu.<\/p>\n\n\n<p>Z\u00e1kladem je rozli\u0161en\u00ed mezi <strong>intern\u00edm se\u0159\u00edzen\u00edm<\/strong>, kter\u00e9 vy\u017eaduje zastaven\u00ed stroje, a <strong>extern\u00edm se\u0159\u00edzen\u00edm<\/strong>, kter\u00e9 lze prov\u00e1d\u011bt za chodu. T\u00fdm p\u0159esune vhodn\u00e9 p\u0159\u00edpravn\u00e9 \u010dinnosti mimo odst\u00e1vku a zjednodu\u0161\u00ed pr\u00e1ci, kter\u00e1 se mus\u00ed prov\u00e1d\u011bt p\u0159i zastaven\u00e9m stroji.<\/p>\n\n\n<p>Tento princip se neomezuje jen na v\u00fdm\u011bnu n\u00e1stroj\u016f. V\u00fdrobce jej m\u016f\u017ee vyu\u017e\u00edt i p\u0159i dal\u0161\u00edch opakovan\u00fdch p\u0159echodech mezi v\u00fdrobky, nap\u0159\u00edklad p\u0159i v\u00fdm\u011bn\u011b n\u00e1strojov\u00e9ho vybaven\u00ed nebo zm\u011bn\u011b form\u00e1tu.<\/p>\n\n\n<p>SMED je metoda zlep\u0161ov\u00e1n\u00ed; \u010das se\u0159\u00edzen\u00ed je doba, kterou se sna\u017e\u00edte zkr\u00e1tit. Rozvrhov\u00e1n\u00ed p\u0159edstavuje samostatnou mo\u017enost zlep\u0161en\u00ed: m\u016f\u017ee sn\u00ed\u017eit \u010detnost p\u0159etypov\u00e1n\u00ed mezi nekompatibiln\u00edmi operacemi. Dobr\u00fd pl\u00e1n vyu\u017e\u00edv\u00e1 oboj\u00ed, m\u00edsto aby od seskupov\u00e1n\u00ed operac\u00ed o\u010dek\u00e1val n\u00e1pravu zbyte\u010dn\u011b dlouh\u00e9ho p\u0159etypov\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dn\u011bte tam, kde krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed pom\u016f\u017ee zak\u00e1zce<\/h2>\n\n\n<p>Vyberte pracovi\u0161t\u011b, kde ztr\u00e1ty \u010dasu p\u0159i se\u0159izov\u00e1n\u00ed ohro\u017euj\u00ed dod\u00e1vky, ne jen stroj s nejdel\u0161\u00edm zaznamenan\u00fdm p\u0159etypov\u00e1n\u00edm. Ptejte se, u kter\u00e9 fronty zak\u00e1zek mus\u00edte pravideln\u011b volit mezi v\u00fdm\u011bnou n\u00e1stroj\u016f a dokon\u010den\u00edm urgentn\u00ed pr\u00e1ce.<\/p>\n\n\n<p>Dobr\u00fdm p\u0159\u00edkladem je vyt\u00ed\u017een\u00fd oh\u00fdbac\u00ed stroj. Pokud se na n\u011bm p\u0159ed expedic\u00ed mus\u00ed zpracovat n\u011bkolik zak\u00e1zek, z\u00edskan\u00fd \u010das m\u016f\u017ee pomoci posunout v\u00fdrobu d\u00e1l. \u00daspora stejn\u00fdch minut na m\u00e1lo vyt\u00ed\u017een\u00e9m stroji m\u016f\u017ee b\u00fdt tento t\u00fdden m\u00e9n\u011b p\u0159\u00ednosn\u00e1. <a href=\"\/cs\/zdroje\/vyrobni-postup\/\">Technologick\u00fd postup<\/a> v\u00e1m uk\u00e1\u017ee, kter\u00e9 zak\u00e1zky dan\u00e9 pracovi\u0161t\u011b pot\u0159ebuj\u00ed a kam pokra\u010duj\u00ed potom.<\/p>\n\n\n<p>Vyberte jedno opakuj\u00edc\u00ed se p\u0159etypov\u00e1n\u00ed, kter\u00e9 obsluha dob\u0159e zn\u00e1. Projd\u011bte je s lidmi, kte\u0159\u00ed pr\u00e1ci prov\u00e1d\u011bj\u00ed, a zapojte kolegy z \u00fadr\u017eby nebo kvality, pokud jejich \u00fakoly ovliv\u0148uj\u00ed p\u0159ipravenost stroje. U\u017eite\u010dn\u00e1 ot\u00e1zka nezn\u00ed \u201epro\u010d v\u00e1m to tak dlouho trv\u00e1?\u201c, ale \u201eco se mus\u00ed st\u00e1t, ne\u017e tento stroj vyrob\u00ed dal\u0161\u00ed vyhovuj\u00edc\u00ed d\u00edl?\u201c<\/p>\n\n\n<p>Tato ot\u00e1zka p\u0159esune pozornost od rychlosti k p\u0159\u00edprav\u011b, po\u0159ad\u00ed \u010dinnost\u00ed a opakovatelnosti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vytvo\u0159te postup SMED, kter\u00fd t\u00fdm dok\u00e1\u017ee opakovat<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Sledujte cel\u00e9 p\u0159etypov\u00e1n\u00ed<\/h3>\n\n\n<p>M\u011b\u0159te v\u017edy od posledn\u00edho dobr\u00e9ho d\u00edlu p\u0159edchoz\u00ed s\u00e9rie vyroben\u00e9ho p\u0159i b\u011b\u017en\u00e9 v\u00fdrobn\u00ed rychlosti po prvn\u00ed dobr\u00fd d\u00edl n\u00e1sleduj\u00edc\u00ed s\u00e9rie p\u0159i b\u011b\u017en\u00e9 v\u00fdrobn\u00ed rychlosti. Stroj, kter\u00fd se znovu rozb\u011bhl, ale st\u00e1le vyr\u00e1b\u00ed zku\u0161ebn\u00ed d\u00edly nebo zmetky, se je\u0161t\u011b nevr\u00e1til k vyu\u017eiteln\u00e9 v\u00fdrob\u011b.<\/p>\n\n\n<p>Zaznamenejte \u010dinnosti i \u010dek\u00e1n\u00ed mezi t\u011bmito dv\u011bma body. U ka\u017ed\u00e9ho \u00fakolu si poznamenejte, kdo jej prov\u00e1d\u00ed, co k n\u011bmu pot\u0159ebuje a zda skute\u010dn\u011b vy\u017eaduje zastaven\u00e9 za\u0159\u00edzen\u00ed. Pokud je to mo\u017en\u00e9, sledujte v\u00edce p\u0159etypov\u00e1n\u00ed: jedno mimo\u0159\u00e1dn\u011b hladk\u00e9 p\u0159etypov\u00e1n\u00ed nen\u00ed spolehliv\u00fdm podkladem pro dal\u0161\u00ed p\u0159\u00edslib term\u00ednu v\u00fdroby.<\/p>\n\n\n<p>Sledujte oba ukazatele: dobu odst\u00e1vky stroje i pr\u00e1ci pot\u0159ebnou k p\u0159\u00edprav\u011b dal\u0161\u00ed s\u00e9rie. P\u0159esun p\u0159\u00edpravy na d\u0159\u00edv\u011bj\u0161\u00ed dobu uvoln\u00ed \u010das za\u0159\u00edzen\u00ed, nemus\u00ed v\u0161ak odstranit samotnou p\u0159\u00edpravnou pr\u00e1ci.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Odd\u011blte pr\u00e1ci vy\u017eaduj\u00edc\u00ed odst\u00e1vku od pr\u00e1ce za chodu<\/h3>\n\n\n<p>\u00dakol, kter\u00fd se dnes prov\u00e1d\u00ed b\u011bhem odst\u00e1vky, nemus\u00ed automaticky pat\u0159it k intern\u00edmu se\u0159\u00edzen\u00ed. T\u00fdm mo\u017en\u00e1 sh\u00e1n\u00ed dokumentaci k dal\u0161\u00ed operaci a\u017e po zastaven\u00ed jen proto, \u017ee nikdo p\u0159edem nev\u011bd\u011bl, kter\u00e1 operace bude n\u00e1sledovat.<\/p>\n\n\n<p>P\u0159edstavte si opakuj\u00edc\u00ed se p\u0159etypov\u00e1n\u00ed s n\u00e1sleduj\u00edc\u00edm zjednodu\u0161en\u00fdm z\u00e1znamem \u010dinnost\u00ed. V\u0161echny \u010dty\u0159i \u00fakoly se nyn\u00ed prov\u00e1d\u011bj\u00ed postupn\u011b a\u017e po zastaven\u00ed v\u00fdroby:<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>\u00dakol<\/th>\n<th>Sou\u010dasn\u00e1 doba odst\u00e1vky<\/th>\n<th>Doba odst\u00e1vky po \u00faprav\u011b<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Shrom\u00e1\u017ed\u011bn\u00ed a kontrola n\u00e1stroj\u016f pro dal\u0161\u00ed operaci<\/td>\n<td>8 minut<\/td>\n<td>0 minut: p\u0159ipraveno p\u0159edem<\/td>\n<\/tr>\n<tr>\n<td>Obstar\u00e1n\u00ed a ov\u011b\u0159en\u00ed pracovn\u00edch instrukc\u00ed<\/td>\n<td>7 minut<\/td>\n<td>0 minut: p\u0159ipraveno p\u0159edem<\/td>\n<\/tr>\n<tr>\n<td>Demont\u00e1\u017e a mont\u00e1\u017e n\u00e1stroj\u016f<\/td>\n<td>18 minut<\/td>\n<td>15 minut<\/td>\n<\/tr>\n<tr>\n<td>Se\u0159\u00edzen\u00ed a schv\u00e1len\u00ed prvn\u00edch vyhovuj\u00edc\u00edch d\u00edl\u016f<\/td>\n<td>12 minut<\/td>\n<td>10 minut<\/td>\n<\/tr>\n<tr>\n<td><strong>Celkov\u00e1 doba odst\u00e1vky stroje<\/strong><\/td>\n<td><strong>45 minut<\/strong><\/td>\n<td><strong>25 minut<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Jde o ilustrativn\u00ed \u010d\u00edsla, nikoli o v\u00fdsledek dosa\u017een\u00fd u z\u00e1kazn\u00edka. Prvn\u00ed dv\u011b \u00fapravy p\u0159esouvaj\u00ed patn\u00e1ct minut p\u0159\u00edpravy mimo odst\u00e1vku. Zb\u00fdvaj\u00edc\u00edch p\u011bt minut se u\u0161et\u0159\u00ed zlep\u0161en\u00edm postupu intern\u00edho se\u0159\u00edzen\u00ed.<\/p>\n\n\n<p>Extern\u00ed pr\u00e1ci st\u00e1le mus\u00ed n\u011bkdo vykonat. Dohodn\u011bte se, kdo a kdy p\u0159iprav\u00ed n\u00e1stroje a instrukce pro dal\u0161\u00ed operaci. Voz\u00edk ozna\u010den\u00fd jako \u201ep\u0159ipraven\u00fd\u201c m\u00e1 smysl jen tehdy, pokud je vybaven\u00ed pro dal\u0161\u00ed operaci skute\u010dn\u011b kompletn\u00ed a zkontrolovan\u00e9.<\/p>\n\n\n<p>Hledejte tak\u00e9 intern\u00ed \u00fakoly, kter\u00e9 by p\u0159i jin\u00e9m uspo\u0159\u00e1d\u00e1n\u00ed mohly b\u00fdt extern\u00ed. N\u00e1hradn\u00ed p\u0159\u00edpravek m\u016f\u017ee nap\u0159\u00edklad umo\u017enit p\u0159\u00edpravu a ustaven\u00ed pro dal\u0161\u00ed operaci mimo b\u011b\u017e\u00edc\u00ed stroj, tak\u017ee b\u011bhem odst\u00e1vky zbude jen v\u00fdm\u011bna p\u0159\u00edpravku. Ne\u017e takovou zm\u011bnu zavedete, posu\u010fte n\u00e1klady, vhodnost vybaven\u00ed a bezpe\u010dn\u00fd pracovn\u00ed postup.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Zlep\u0161ete intern\u00ed \u010dinnosti bez zbyte\u010dn\u00e9ho sp\u011bchu<\/h3>\n\n\n<p>U \u010dinnost\u00ed, kter\u00e9 z\u016fstanou intern\u00ed, hledejte opakovateln\u00e9 postupy, kter\u00e9 odstran\u00ed hled\u00e1n\u00ed, duplicitn\u00ed kontroly a zbyte\u010dn\u00e9 se\u0159izov\u00e1n\u00ed. Jak\u00e9koli zm\u011bny p\u0159\u00edpravk\u016f, upevn\u011bn\u00ed nebo po\u0159ad\u00ed pr\u00e1ce by m\u011bli posoudit lid\u00e9 odpov\u011bdn\u00ed za za\u0159\u00edzen\u00ed. \u010casov\u00fd c\u00edl nesm\u00ed b\u00fdt d\u016fvodem k obch\u00e1zen\u00ed postup\u016f bezpe\u010dn\u00e9ho zastaven\u00ed ani schv\u00e1len\u00ed kvality.<\/p>\n\n\n<p>V p\u0159\u00edkladu trv\u00e1 upraven\u00fd postup mont\u00e1\u017ee a se\u0159\u00edzen\u00ed dvacet p\u011bt minut. To je p\u0159\u00ednosn\u00e9, i kdy\u017e se zat\u00edm nepoda\u0159ilo dostat pod deset minut. Prvn\u00edm c\u00edlem je spolehliv\u00e9 zlep\u0161en\u00ed, kter\u00e9 dok\u00e1\u017eete zopakovat, nikoli p\u016fsobiv\u00e9 \u010d\u00edslo z jednoho v\u00fdjime\u010dn\u011b zda\u0159il\u00e9ho p\u0159etypov\u00e1n\u00ed.<\/p>\n\n\n<p>Upraven\u00fd postup zdokumentujte, zajist\u011bte dostupnost pot\u0159ebn\u00e9ho vybaven\u00ed a ov\u011b\u0159ujte dal\u0161\u00ed p\u0159etypov\u00e1n\u00ed. Pokud po\u0159ad\u00ed \u010dinnost\u00ed z\u00e1vis\u00ed na v\u010dasn\u00e9 znalosti n\u00e1sleduj\u00edc\u00ed zak\u00e1zky, st\u00e1v\u00e1 se rozvrh v\u00fdroby sou\u010d\u00e1st\u00ed podm\u00ednek, za kter\u00fdch bude postup fungovat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed d\u00e1v\u00e1 v\u011bt\u0161\u00ed volnost p\u0159i \u0159azen\u00ed operac\u00ed<\/h2>\n\n\n<p>Pod\u00edvejme se na stejn\u00fd stroj po zlep\u0161en\u00ed. P\u0159edstavte si \u010dty\u0159i p\u0159ipraven\u00e9 operace A1, B1, A2 a B2. Ka\u017ed\u00e1 vy\u017eaduje dvacet minut zpracov\u00e1n\u00ed. Operace A pou\u017e\u00edvaj\u00ed jednu skupinu n\u00e1stroj\u016f, operace B jinou. P\u0159echod mezi skupinami trv\u00e1 v obou sm\u011brech dvacet p\u011bt minut, zat\u00edmco po sob\u011b jdouc\u00ed operace ve stejn\u00e9 skupin\u011b nevy\u017eaduj\u00ed dal\u0161\u00ed p\u0159etypov\u00e1n\u00ed mezi skupinami.<\/p>\n\n\n<p>V tomto p\u0159\u00edkladu stroj za\u010d\u00edn\u00e1 v 08:00 s ji\u017e osazen\u00fdmi n\u00e1stroji skupiny A. Ve\u0161ker\u00fd materi\u00e1l i obsluha jsou k dispozici, nejsou \u017e\u00e1dn\u00e9 p\u0159est\u00e1vky ani dal\u0161\u00ed p\u0159\u00edpravn\u00e9 \u00fakoly. Operace B1 mus\u00ed b\u00fdt na tomto stroji dokon\u010dena do 09:10. Ostatn\u00ed operace maj\u00ed pozd\u011bj\u0161\u00ed term\u00edny, kter\u00e9 umo\u017e\u0148uj\u00ed n\u00ed\u017ee uveden\u00e1 po\u0159ad\u00ed.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Po\u0159ad\u00ed operac\u00ed<\/th>\n<th>Po\u010det p\u0159echod\u016f mezi skupinami<\/th>\n<th>Celkov\u00fd \u010das p\u0159etypov\u00e1n\u00ed mezi skupinami<\/th>\n<th>Dokon\u010den\u00ed B1<\/th>\n<th>Dokon\u010den\u00ed posledn\u00ed operace<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A1 \u2192 B1 \u2192 A2 \u2192 B2<\/td>\n<td>3<\/td>\n<td>75 minut<\/td>\n<td>09:05<\/td>\n<td>10:35<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 A2 \u2192 B1 \u2192 B2<\/td>\n<td>1<\/td>\n<td>25 minut<\/td>\n<td>09:25<\/td>\n<td>09:45<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 B1 \u2192 B2 \u2192 A2<\/td>\n<td>2<\/td>\n<td>50 minut<\/td>\n<td>09:05<\/td>\n<td>10:10<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Seskupen\u00ed v\u0161ech operac\u00ed A a n\u00e1sledn\u011b v\u0161ech operac\u00ed B vede k nejd\u0159\u00edv\u011bj\u0161\u00edmu dokon\u010den\u00ed cel\u00e9 sady, ale B1 nestihne po\u017eadovan\u00fd term\u00edn. Pokud B1 za\u0159ad\u00edte dostate\u010dn\u011b brzy a hned za n\u00ed za\u0159ad\u00edte B2, u\u0161et\u0159\u00edte oproti st\u0159\u00edd\u00e1n\u00ed skupin jedno p\u0159etypov\u00e1n\u00ed a z\u00e1rove\u0148 dodr\u017e\u00edte term\u00edn B1.<\/p>\n\n\n<p>Pr\u00e1v\u011b v tom spo\u010d\u00edv\u00e1 p\u0159\u00edle\u017eitost pro pl\u00e1nov\u00e1n\u00ed. Nemus\u00edte volit mezi seskupen\u00edm v\u0161eho a \u00fapln\u00fdm p\u0159ehl\u00ed\u017een\u00edm se\u0159\u00edzen\u00ed. Pot\u0159ebujete seskupovat v takov\u00e9 m\u00ed\u0159e, jak\u00e1 odpov\u00edd\u00e1 zak\u00e1zk\u00e1m, kter\u00e9 m\u00e1te pr\u00e1v\u011b p\u0159ed sebou.<\/p>\n\n\n<p>D\u016fle\u017eit\u00e9 je i zlep\u0161en\u00ed samotn\u00e9ho p\u0159etypov\u00e1n\u00ed. P\u0159ed zaveden\u00edm SMED vy\u017eadovalo st\u0159\u00eddav\u00e9 po\u0159ad\u00ed t\u0159i p\u0159etypov\u00e1n\u00ed po \u010dty\u0159iceti p\u011bti minut\u00e1ch: celkem 135 minut odst\u00e1vky. P\u0159i stejn\u00e9m po\u0159ad\u00ed po zaveden\u00ed SMED tato doba klesne na 75 minut. T\u0159et\u00ed po\u0159ad\u00ed, kter\u00e9 respektuje term\u00edn, ji d\u00e1le sn\u00ed\u017e\u00ed na 50 minut. Metoda u\u0161et\u0159\u00ed \u0161edes\u00e1t minut a \u00faprava po\u0159ad\u00ed dal\u0161\u00edch dvacet p\u011bt.<\/p>\n\n\n<p>U skute\u010dn\u00fdch zak\u00e1zek je t\u0159eba zohlednit tak\u00e9 n\u00e1vaznosti, <a href=\"\/cs\/zdroje\/cas-cyklu-ve-vyrobe\/\">r\u016fzn\u00e9 doby zpracov\u00e1n\u00ed<\/a> a dal\u0161\u00ed zdroje. Po dokon\u010den\u00ed operace na tomto stroji m\u016f\u017ee b\u00fdt p\u0159ed expedic\u00ed je\u0161t\u011b nutn\u00e9 sva\u0159ov\u00e1n\u00ed nebo kontrola. U <a href=\"\/cs\/zdroje\/zakazkova-vyroba\/\">v\u00fdroby na zak\u00e1zku<\/a> je podstatn\u00e9 uvolnit kapacitu v\u010das pro zak\u00e1zku z\u00e1kazn\u00edka \u2013 nesta\u010d\u00ed jen p\u0159ehledn\u011b se\u0159adit operace na stroji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyva\u017eujte se\u0159\u00edzen\u00ed a priority dod\u00e1vek pomoc\u00ed SkyPlanner<\/h2>\n\n\n<p>Jednou to ud\u011blat pro \u010dty\u0159i operace je jednoduch\u00e9. Obt\u00ed\u017en\u00e9 je udr\u017eovat spr\u00e1vnou rovnov\u00e1hu p\u0159i pr\u016fb\u011b\u017en\u00fdch zm\u011bn\u00e1ch v zak\u00e1zk\u00e1ch. Nov\u00e1 urgentn\u00ed zak\u00e1zka, zpo\u017ed\u011bn\u00fd materi\u00e1l nebo nedostupn\u00fd stroj mohou pr\u00e1v\u011b sestaven\u00e9 po\u0159ad\u00ed znehodnotit.<\/p>\n\n\n<p>SkyPlanner APS zahrnuje \u0159azen\u00ed operac\u00ed se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed do <a href=\"\/cs\/zdroje\/co-je-planovani-vyroby\/\">rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>. Jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed, Arcturus, vypo\u010d\u00edt\u00e1v\u00e1 rozvrh podle nastaven\u00fdch kapacit, n\u00e1vaznost\u00ed operac\u00ed a priorit. Vy ur\u010dujete, na \u010dem z\u00e1le\u017e\u00ed; um\u011bl\u00e1 inteligence rozvrhuje podle t\u011bchto pokyn\u016f.<\/p>\n\n\n<p>Pokud p\u0159etypov\u00e1n\u00ed na pracovi\u0161ti z\u00e1vis\u00ed na pou\u017eit\u00fdch n\u00e1stroj\u00edch, definujte u v\u00fdrobk\u016f odpov\u00eddaj\u00edc\u00ed vlastnost. Operace, kter\u00e9 mohou vyu\u017e\u00edt stejn\u00e9 se\u0159\u00edzen\u00ed, by pro tuto vlastnost m\u011bly m\u00edt shodnou hodnotu. Zapn\u011bte pro dan\u00e9 pracovi\u0161t\u011b zohled\u0148ov\u00e1n\u00ed podobnosti a v nastaven\u00ed Dynamic Priorities p\u0159id\u011blte podobn\u00fdm operac\u00edm v\u00e1hu. Pravidlo podobnosti ve SkyPlanner umo\u017e\u0148uje vybrat vlastnost, zadat \u010das se\u0159\u00edzen\u00ed p\u0159i p\u0159echodu mezi odli\u0161n\u00fdmi operacemi a ur\u010dit, jak d\u016fle\u017eit\u00e9 je \u0159adit podobn\u00e9 operace za sebou.<\/p>\n\n\n<p>Praktick\u00fd p\u0159\u00ednos spo\u010d\u00edv\u00e1 v tom, \u017ee syst\u00e9m m\u016f\u017ee p\u0159i v\u00fdpo\u010dtu pl\u00e1nu zohlednit preferovan\u00e9 seskupov\u00e1n\u00ed operac\u00ed, tak\u017ee nemus\u00edte ru\u010dn\u011b p\u0159euspo\u0159\u00e1d\u00e1vat ka\u017edou frontu. Jako krit\u00e9rium podobnosti lze pou\u017e\u00edt i jinou vlastnost, kter\u00e1 v\u00fdznamn\u011b ovliv\u0148uje pot\u0159ebu p\u0159etypov\u00e1n\u00ed, nap\u0159\u00edklad barvu nebo materi\u00e1l, pokud to odpov\u00edd\u00e1 dan\u00e9mu procesu. Vyberte vlastnost, kter\u00e1 vystihuje, <a href=\"\/cs\/zdroje\/matice-serizovacich-casu\/\">co na dan\u00e9m pracovi\u0161ti skute\u010dn\u011b vyvol\u00e1v\u00e1 pot\u0159ebu p\u0159etypov\u00e1n\u00ed<\/a>.<\/p>\n\n\n<p>Pot\u00e9 zkontrolujte v\u00fdsledn\u00fd rozvrh v Gantt diagramu s ohledem na priority dod\u00e1vek. Pokud seskupov\u00e1n\u00ed operac\u00ed ub\u00edr\u00e1 prostor urgentn\u00edm zak\u00e1zk\u00e1m, upravte priority. Podobnost nepova\u017eujte za bezpodm\u00edne\u010dn\u00fd pokyn. Pomoc\u00ed pravidel a z\u00e1mk\u016f m\u016f\u017eete zachovat pl\u00e1novac\u00ed rozhodnut\u00ed, kter\u00e1 mus\u00ed z\u016fstat beze zm\u011bny.<\/p>\n\n\n<p>S t\u00edm, jak se v\u00fdroba zlep\u0161uje, pr\u016fb\u011b\u017en\u011b aktualizujte \u010dasy pou\u017e\u00edvan\u00e9 p\u0159i pl\u00e1nov\u00e1n\u00ed. Kroky technologick\u00e9ho postupu maj\u00ed vlastn\u00ed \u010dasy se\u0159\u00edzen\u00ed a pravidlo podobnosti obsahuje \u010das pro p\u0159etypov\u00e1n\u00ed mezi odli\u0161n\u00fdmi operacemi. Zkontrolujte, zda ka\u017ed\u00fd \u00fadaj odpov\u00edd\u00e1 p\u0159\u00edslu\u0161n\u00e9 pr\u00e1ci a zda stejn\u00fd \u010das nezapo\u010d\u00edt\u00e1v\u00e1te dvakr\u00e1t. V Gantt zobrazen\u00ed je \u010das se\u0159\u00edzen\u00ed zahrnut do celkov\u00e9 doby trv\u00e1n\u00ed operace, nezobrazuje se jako samostatn\u00fd barevn\u00fd \u00fasek.<\/p>\n\n\n<p>SkyPlanner nenahrazuje pr\u00e1ci t\u00fdmu p\u0159i zav\u00e1d\u011bn\u00ed metody SMED p\u0159\u00edmo ve v\u00fdrob\u011b. Umo\u017e\u0148uje jej\u00ed v\u00fdsledky vyu\u017e\u00edt v pl\u00e1nu: krat\u0161\u00ed \u010dasy se\u0159\u00edzen\u00ed a vhodn\u011b zvolen\u00e9 vlastnosti pro posuzov\u00e1n\u00ed podobnosti slou\u017e\u00ed jako vstupy pro rozvrh, kter\u00fd zohled\u0148uje i ostatn\u00ed v\u00fdrobu. <a href=\"\/cs\/funkce\/\">Prozkoumejte funkce SkyPlanner pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/a> a zjist\u011bte, jak spolu souvisej\u00ed kapacity, priority a pl\u00e1n v Gantt diagramu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak to funguje v KJH-Comp<\/h2>\n\n\n<p>KJH-Comp, finsk\u00fd zak\u00e1zkov\u00fd v\u00fdrobce plechov\u00fdch d\u00edl\u016f, pl\u00e1noval t\u00fddenn\u00ed vyt\u00ed\u017een\u00ed v syst\u00e9mu C9000 ERP a v tabulk\u00e1ch. Vedouc\u00ed p\u0159itom ru\u010dn\u011b p\u0159i\u0159azovali operace ke stroj\u016fm na jednotliv\u00e9 dny. S roz\u0161i\u0159ov\u00e1n\u00edm sortimentu bylo st\u00e1le obt\u00ed\u017en\u011bj\u0161\u00ed toto ru\u010dn\u00ed rozvrhov\u00e1n\u00ed zvl\u00e1dat.<\/p>\n\n\n<p>Se SkyPlanner se zak\u00e1zky nad\u00e1le zad\u00e1vaj\u00ed do st\u00e1vaj\u00edc\u00edho ERP, zat\u00edmco rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami a p\u0159i\u0159azov\u00e1n\u00ed ke stroj\u016fm prob\u00edh\u00e1 automaticky. Firma ve sv\u00e9m p\u0159\u00edb\u011bhu popisuje praktick\u00fd p\u0159\u00ednos pro oh\u00fdb\u00e1n\u00ed: operace se stejn\u00fdmi n\u00e1stroji a stejnou tlou\u0161\u0165kou materi\u00e1lu n\u00e1sleduj\u00ed bezprost\u0159edn\u011b za sebou, co\u017e zkracuje \u010dasy se\u0159\u00edzen\u00ed a omezuje ne\u010dinnost stroj\u016f.<\/p>\n\n\n<p>Tent\u00fd\u017e p\u0159\u00edb\u011bh ukazuje, pro\u010d se nelze \u0159\u00eddit jen seskupov\u00e1n\u00edm operac\u00ed. Pr\u00e1ce, kter\u00e1 bude pot\u0159eba a\u017e za dva t\u00fddny, u\u017e nevytla\u010duje zak\u00e1zku s expedic\u00ed na z\u00edt\u0159ek a vedouc\u00ed m\u00e1 p\u0159ehled o vyt\u00ed\u017een\u00ed \u010dty\u0159metrov\u00e9ho ohra\u0148ovac\u00edho lisu. Efektivita se\u0159izov\u00e1n\u00ed a dodr\u017een\u00ed term\u00edn\u016f dod\u00e1vek pat\u0159\u00ed do jednoho rozhodov\u00e1n\u00ed o v\u00fdrob\u011b.<\/p>\n\n\n<p>Zku\u0161enost KJH-Comp je zde relevantn\u00ed, proto\u017ee ukazuje zm\u011bnu v ka\u017edodenn\u00edm provozu, nikoli jen princip rozvrhov\u00e1n\u00ed: m\u00e9n\u011b ru\u010dn\u00edho pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed, lep\u0161\u00ed p\u0159ehled o \u00fazk\u00fdch hrdlech a po\u0159ad\u00ed operac\u00ed, kter\u00e9 l\u00e9pe vyu\u017e\u00edv\u00e1 ji\u017e nasazen\u00e9 n\u00e1stroje. <a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti KJH-Comp se SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eijte u\u0161et\u0159en\u00fd \u010das<\/h2>\n\n\n<p>Po zlep\u0161en\u00ed p\u0159etypov\u00e1n\u00ed porovn\u00e1vejte srovnatelnou pr\u00e1ci a m\u011b\u0159te v\u017edy od stejn\u00e9ho po\u010d\u00e1te\u010dn\u00edho do stejn\u00e9ho koncov\u00e9ho bodu. Zkontrolujte, jak dlouho trvaj\u00ed nezbytn\u00e1 p\u0159etypov\u00e1n\u00ed, kolik p\u0159echod\u016f mezi skupinami v\u00fdrobk\u016f vy\u017eaduje dan\u00e9 po\u0159ad\u00ed a zda urgentn\u00ed zak\u00e1zky st\u00e1le kon\u010d\u00ed v po\u017eadovan\u00e9m term\u00ednu. Do hodnocen\u00ed zahr\u0148te tak\u00e9 kvalitu p\u0159i rozb\u011bhu v\u00fdroby a pracnost extern\u00ed p\u0159\u00edpravy.<\/p>\n\n\n<p>Krat\u0161\u00ed pr\u016fm\u011brn\u00fd \u010das se\u0159\u00edzen\u00ed je pokrok. Skute\u010dn\u00fd p\u0159\u00ednos pro provoz ale p\u0159ich\u00e1z\u00ed tehdy, kdy\u017e d\u00edky krat\u0161\u00edmu se\u0159\u00edzen\u00ed z\u00edsk\u00e1te prostor pro dokon\u010den\u00ed dal\u0161\u00ed d\u016fle\u017eit\u00e9 zak\u00e1zky.<\/p>\n\n\n<p>SkyPlanner se prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API propoj\u00ed s jak\u00fdmkoli ERP nebo MES. M\u016f\u017eete si tak ponechat syst\u00e9my, ve kter\u00fdch vedete zak\u00e1zky, a vyu\u017e\u00edt jejich v\u00fdrobn\u00ed data p\u0159i rozvrhov\u00e1n\u00ed, kter\u00e9 zohled\u0148uje \u010dasy se\u0159\u00edzen\u00ed. Nemus\u00edte za\u010d\u00ednat v\u00fdm\u011bnou ERP, kter\u00e9 u\u017e va\u0161\u00ed firm\u011b dob\u0159e slou\u017e\u00ed.<\/p>\n\n\n<p>Chcete-li zjistit, jak\u00fd p\u0159\u00ednos to m\u016f\u017ee m\u00edt pro va\u0161i v\u00fdrobu, <a href=\"\/cs\/kontaktni-prodej\/\">objednejte si uk\u00e1zku SkyPlanner<\/a>. P\u0159ipravte si p\u0159\u00edklad vyt\u00ed\u017een\u00e9ho pracovi\u0161t\u011b, vlastnost, kter\u00e1 ur\u010duje pot\u0159ebu p\u0159etypov\u00e1n\u00ed, nam\u011b\u0159en\u00fd \u010das se\u0159\u00edzen\u00ed a n\u011bkolik zak\u00e1zek s r\u016fzn\u00fdmi term\u00edny. Na t\u011bchto podkladech m\u016f\u017eeme smyslupln\u011b probrat, kde seskupov\u00e1n\u00ed operac\u00ed pom\u00e1h\u00e1 a kde mus\u00ed m\u00edt p\u0159ednost term\u00edn dod\u00e1n\u00ed.<\/p>\n\n\n<p>Pokud si chcete nejprve prohl\u00e9dnout pl\u00e1novac\u00ed prost\u0159ed\u00ed, <a href=\"\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky Dal\u0161\u00ed zak\u00e1zka je p\u0159ipraven\u00e1, ale stroj je\u0161t\u011b ne. Obsluha pot\u0159ebuje spr\u00e1vn\u00e9 n\u00e1stroje, je nutn\u00e9 zkontrolovat nastaven\u00ed a schv\u00e1lit prvn\u00ed d\u00edly. Mezit\u00edm ostatn\u00ed zak\u00e1zky ve front\u011b d\u00e1l \u010dekaj\u00ed. Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed zvy\u0161uje n\u00e1klady na ka\u017ed\u00e9 rozhodnut\u00ed p\u0159i rozvrhov\u00e1n\u00ed v\u00fdroby. Kdy\u017e p\u0159ejdete na jin\u00fd v\u00fdrobek, abyste stihli term\u00edn dod\u00e1n\u00ed, ztrat\u00edte v\u00fdrobn\u00ed &#8230; <a title=\"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/\" aria-label=\"Read more about SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-96554","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, \u010das pro zak\u00e1zky &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky\" \/>\n<meta property=\"og:description\" content=\"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/\"},\"wordCount\":2941,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/\",\"name\":\"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, \u010das pro zak\u00e1zky &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"description\":\"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Bending machine beside tooling prepared on a cart for the next production changeover\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, \u010das pro zak\u00e1zky &#8211; SkyPlanner","description":"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/","og_locale":"cs_CZ","og_type":"article","og_title":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky","og_description":"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-19T14:43:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/"},"wordCount":2941,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/","name":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, \u010das pro zak\u00e1zky &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","description":"Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed ub\u00edr\u00e1 \u010das zak\u00e1zk\u00e1m. SMED a rozvrhov\u00e1n\u00ed ve SkyPlanner se zohledn\u011bn\u00edm se\u0159\u00edzen\u00ed pom\u00e1haj\u00ed uvolnit \u010das stroj\u016f a zachovat priority dod\u00e1vek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","width":1672,"height":941,"caption":"Bending machine beside tooling prepared on a cart for the next production changeover"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: Krat\u0161\u00ed p\u0159etypov\u00e1n\u00ed, v\u00edce \u010dasu na zak\u00e1zky Dal\u0161\u00ed zak\u00e1zka je p\u0159ipraven\u00e1, ale stroj je\u0161t\u011b ne. Obsluha pot\u0159ebuje spr\u00e1vn\u00e9 n\u00e1stroje, je nutn\u00e9 zkontrolovat nastaven\u00ed a schv\u00e1lit prvn\u00ed d\u00edly. Mezit\u00edm ostatn\u00ed zak\u00e1zky ve front\u011b d\u00e1l \u010dekaj\u00ed. Dlouh\u00e9 p\u0159etypov\u00e1n\u00ed zvy\u0161uje n\u00e1klady na ka\u017ed\u00e9 rozhodnut\u00ed p\u0159i rozvrhov\u00e1n\u00ed v\u00fdroby. Kdy\u017e p\u0159ejdete na jin\u00fd v\u00fdrobek, abyste stihli term\u00edn dod\u00e1n\u00ed, ztrat\u00edte v\u00fdrobn\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/96554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=96554"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/96554\/revisions"}],"predecessor-version":[{"id":96753,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/96554\/revisions\/96753"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/97692"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=96554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=96554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=96554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}