{"id":95886,"date":"2026-10-04T00:45:24","date_gmt":"2026-10-04T00:45:24","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=95886"},"modified":"2026-10-19T14:42:28","modified_gmt":"2026-10-19T14:42:28","slug":"master-production-schedule","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/","title":{"rendered":"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat<\/h1>\n\n\n<p>Obchod o\u010dek\u00e1v\u00e1, \u017ee d\u00e1vka bude hotov\u00e1 p\u0159\u00ed\u0161t\u00ed p\u00e1tek. N\u00e1kup s t\u00edmto term\u00ednem po\u010d\u00edt\u00e1 a pl\u00e1n z\u00e1sob ukazuje dostate\u010dn\u00e9 mno\u017estv\u00ed pro pokryt\u00ed popt\u00e1vky. V\u00fdroba pak zjist\u00ed, \u017ee pro tuto d\u00e1vku pot\u0159ebuje stroj, kter\u00fd u\u017e je vyhrazen\u00fd pro jinou pr\u00e1ci.<\/p>\n\n\n<p>Probl\u00e9m nemus\u00ed b\u00fdt v progn\u00f3ze popt\u00e1vky. Spo\u010d\u00edv\u00e1 v nesouladu mezi p\u0159\u00edslibem dod\u00e1n\u00ed v\u00fdrobku a operacemi, kter\u00e9 jsou k jeho spln\u011bn\u00ed pot\u0159eba.<\/p>\n\n\n<p>Hlavn\u00ed pl\u00e1n v\u00fdroby v\u00e1m pom\u00e1h\u00e1 rozhodnout, co vyr\u00e1b\u011bt a kdy maj\u00ed b\u00fdt v\u00fdrobky k dispozici. Aby se na tyto p\u0159\u00edsliby dalo spolehnout, propojte je s rozvrhem v\u00fdroby, kter\u00fd vych\u00e1z\u00ed z dostupn\u00fdch kapacit. SkyPlanner APS prov\u00e1d\u00ed v\u00fdpo\u010det detailn\u00edho rozvrhu, tak\u017ee zjist\u00edte, zda se pr\u00e1ce do kapacit vejde, je\u0161t\u011b ne\u017e se ze sl\u00edben\u00e9 d\u00e1vky stane opo\u017ed\u011bn\u00e1 dod\u00e1vka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je hlavn\u00ed pl\u00e1n v\u00fdroby?<\/h2>\n\n\n<p><strong>Master production schedule (MPS), \u010desky hlavn\u00ed pl\u00e1n v\u00fdroby,<\/strong> je pl\u00e1n \u010dlen\u011bn\u00fd do \u010dasov\u00fdch obdob\u00ed, kter\u00fd stanov\u00ed, kter\u00e9 vybran\u00e9 v\u00fdrobky nebo pl\u00e1novac\u00ed polo\u017eky hodl\u00e1 v\u00fdrobce vyr\u00e1b\u011bt, v jak\u00e9m mno\u017estv\u00ed a k jak\u00fdm dat\u016fm nebo v jak\u00fdch obdob\u00edch. Pl\u00e1nov\u00e1n\u00ed na t\u00e9to \u00farovni spo\u010d\u00edv\u00e1 ve stanovov\u00e1n\u00ed t\u011bchto z\u00e1vazk\u016f a jejich pr\u016fb\u011b\u017en\u00e9 aktualizaci.<\/p>\n\n\n<p>Jde o pl\u00e1n pokryt\u00ed popt\u00e1vky, nikoli jen o kopii progn\u00f3zy prodeje. Popt\u00e1vka \u0159\u00edk\u00e1, co budou z\u00e1kazn\u00edci podle o\u010dek\u00e1v\u00e1n\u00ed pot\u0159ebovat. MPS stanov\u00ed, co pl\u00e1nujete vyrobit po zohledn\u011bn\u00ed z\u00e1sob, rozpracovan\u00e9 v\u00fdroby, c\u00edlov\u00fdch stav\u016f z\u00e1sob a kapacit.<\/p>\n\n\n<p>P\u0159i v\u00fdrob\u011b na sklad to obvykle znamen\u00e1 pl\u00e1novan\u00e9 p\u0159\u00edjmy hotov\u00fdch v\u00fdrobk\u016f. Podnik s mont\u00e1\u017e\u00ed na zak\u00e1zku m\u016f\u017ee do hlavn\u00edho pl\u00e1nu zahrnout d\u016fle\u017eit\u00e9 moduly nebo podsestavy. P\u0159i v\u00fdrob\u011b na zak\u00e1zku mohou z\u00e1vazky vych\u00e1zet z potvrzen\u00fdch z\u00e1kaznick\u00fdch objedn\u00e1vek. Zvolte takovou \u00farove\u0148 pl\u00e1nov\u00e1n\u00ed, na kter\u00e9 mno\u017estv\u00ed a term\u00edn p\u0159edstavuj\u00ed smyslupln\u00e9 rozhodnut\u00ed pro v\u00fdrobu.<\/p>\n\n\n<p>V n\u00ed\u017ee uveden\u00e9m p\u0159\u00edkladu s t\u00fddenn\u00edmi obdob\u00edmi znamen\u00e1 p\u0159\u00edjem podle MPS, \u017ee hotov\u00e9 kusy budou v dan\u00e9m t\u00fddnu k dispozici, nikoli \u017ee se tehdy za\u010dnou vyr\u00e1b\u011bt. V\u00fdrobn\u00ed operace m\u016f\u017ee b\u00fdt nutn\u00e9 zah\u00e1jit d\u0159\u00edve. Pokud z\u00e1kazn\u00edk pot\u0159ebuje kusy v \u00fater\u00fd, dokon\u010den\u00ed v p\u00e1tek tuto popt\u00e1vku nepokryje jen proto, \u017ee ob\u011b data spadaj\u00ed do stejn\u00e9ho t\u00fddenn\u00edho sloupce.<\/p>\n\n\n<p>P\u0159\u00ednosem je spole\u010dn\u00e1 dohoda: obchod m\u00e1 p\u0159ehled o o\u010dek\u00e1van\u00e9 dostupnosti, n\u00e1kup m\u016f\u017ee p\u0159ipravit pot\u0159ebn\u00e9 vstupy a v\u00fdroba v\u00ed, jak\u00e9 mno\u017estv\u00ed m\u00e1 dodat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MPS, MRP a detailn\u00ed rozvrhov\u00e1n\u00ed odpov\u00eddaj\u00ed na r\u016fzn\u00e9 ot\u00e1zky<\/h2>\n\n\n<p>MPS propojuje celkov\u00fd podnikov\u00fd pl\u00e1n s v\u00fdrobou jednotliv\u00fdch polo\u017eek. <a href=\"\/cs\/zdroje\/uvolneni-sily-sop-ve-vyrobe\/\">Proces S&amp;OP<\/a> ur\u010duje celkov\u00e9 sm\u011b\u0159ov\u00e1n\u00ed popt\u00e1vky a jej\u00edho pokryt\u00ed; MPS je p\u0159ev\u00e1d\u00ed na mno\u017estv\u00ed a term\u00edny pro vybran\u00e9 polo\u017eky.<\/p>\n\n\n<p>Pro spln\u011bn\u00ed t\u011bchto z\u00e1vazk\u016f je pak pot\u0159eba jak pl\u00e1n materi\u00e1lu, tak rozvrh vyu\u017eit\u00ed v\u00fdrobn\u00edch zdroj\u016f.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00darove\u0148 pl\u00e1nov\u00e1n\u00ed<\/th><th>Hlavn\u00ed ot\u00e1zka<\/th><th>Typick\u00fd v\u00fdstup<\/th><\/tr><\/thead><tbody><tr><td>Hlavn\u00ed pl\u00e1n v\u00fdroby<\/td><td>Kter\u00e9 vybran\u00e9 polo\u017eky budeme vyr\u00e1b\u011bt, kolik a kdy?<\/td><td>Mno\u017estv\u00ed jednotliv\u00fdch polo\u017eek a term\u00edny jejich dostupnosti<\/td><\/tr><tr><td>Pl\u00e1nov\u00e1n\u00ed materi\u00e1lov\u00fdch pot\u0159eb (MRP)<\/td><td>Kter\u00e9 komponenty a materi\u00e1ly pot\u0159ebujeme a kdy?<\/td><td>\u010casov\u011b rozvr\u017een\u00e9 materi\u00e1lov\u00e9 pot\u0159eby a n\u00e1vrhy na dopln\u011bn\u00ed z\u00e1sob<\/td><\/tr><tr><td>Detailn\u00ed rozvrhov\u00e1n\u00ed v\u00fdroby<\/td><td>Kde a kdy bude prob\u00edhat ka\u017ed\u00e1 operace?<\/td><td>P\u0159i\u0159azen\u00ed v\u00fdrobn\u00edch zdroj\u016f, za\u010d\u00e1tky a konce operac\u00ed a po\u0159ad\u00ed pr\u00e1ce<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MRP propojuje pl\u00e1n v\u00fdrobk\u016f s <a href=\"\/cs\/zdroje\/erp-bom-kusovnik\/\">kusovn\u00edkem<\/a>, z\u00e1sobami a ji\u017e zaji\u0161t\u011bn\u00fdmi dod\u00e1vkami a vypo\u010d\u00edt\u00e1v\u00e1 tak pot\u0159eby pro pl\u00e1novanou v\u00fdrobu. Podrobn\u011bji tento v\u00fdpo\u010det vysv\u011btluje n\u00e1\u0161 <a href=\"\/cs\/zdroje\/mrp-strucny-pruvodce\/\">pr\u016fvodce MRP<\/a>.<\/p>\n\n\n<p>Samotn\u00fd pl\u00e1n materi\u00e1lu nevy\u0159e\u0161\u00ed v\u0161echny fronty pr\u00e1ce na stroj\u00edch. Detailn\u00ed rozvrhov\u00e1n\u00ed propojuje operace, dostupnost v\u00fdrobn\u00edch zdroj\u016f a n\u00e1vaznosti nutn\u00e9 k dokon\u010den\u00ed pr\u00e1ce. Pr\u00e1v\u011b tuto \u00falohu pln\u00ed SkyPlanner vedle va\u0161eho st\u00e1vaj\u00edc\u00edho pl\u00e1novac\u00edho syst\u00e9mu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159\u00edklad hlavn\u00edho pl\u00e1nu v\u00fdroby<\/h2>\n\n\n<p>Ne\u017e stanov\u00edte mno\u017estv\u00ed, porovnejte u ka\u017ed\u00e9 pl\u00e1novan\u00e9 polo\u017eky dostupn\u00e9 z\u00e1soby hotov\u00fdch v\u00fdrobk\u016f, z\u00e1vazn\u00e9 objedn\u00e1vky, progn\u00f3zu popt\u00e1vky a o\u010dek\u00e1van\u00e9 p\u0159\u00edjmy z rozpracovan\u00e9 v\u00fdroby. O\u010dek\u00e1van\u00fd p\u0159\u00edjem z ji\u017e zadan\u00e9 v\u00fdroby zapo\u010d\u00edtejte pouze jednou, nikoli znovu jako novou v\u00fdrobu. Dohodn\u011bte c\u00edlovou \u00farove\u0148 pojistn\u00e9 z\u00e1soby a povolen\u00e9 velikosti d\u00e1vek. Pot\u00e9 zvolte <a href=\"\/cs\/zdroje\/planovaci-horizont\/\">pl\u00e1novac\u00ed horizont<\/a> dostate\u010dn\u011b dlouh\u00fd na to, aby pokryl dodac\u00ed a v\u00fdrobn\u00ed lh\u016fty pot\u0159ebn\u00e9 ke spln\u011bn\u00ed va\u0161ich z\u00e1vazk\u016f. Nejbli\u017e\u0161\u00ed obdob\u00ed mus\u00ed b\u00fdt rozpracov\u00e1na natolik podrobn\u011b, aby byly z\u0159ejm\u00e9 d\u016fle\u017eit\u00e9 term\u00edny; vzd\u00e1len\u011bj\u0161\u00ed obdob\u00ed mohou b\u00fdt m\u00e9n\u011b podrobn\u00e1.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee vyr\u00e1b\u00edte standardn\u00ed t\u011bleso \u010derpadla v d\u00e1vk\u00e1ch po 100 kusech. M\u00e1te k dispozici 70 hotov\u00fdch kus\u016f, chcete si ponechat alespo\u0148 30 jako pojistnou z\u00e1sobu a pl\u00e1nujete n\u00e1sleduj\u00edc\u00ed \u010dty\u0159i t\u00fddny. V tomto zjednodu\u0161en\u00e9m p\u0159\u00edkladu nejsou \u017e\u00e1dn\u00e9 o\u010dek\u00e1van\u00e9 p\u0159\u00edjmy z ji\u017e zadan\u00e9 v\u00fdroby, kter\u00e9 by bylo t\u0159eba p\u0159i\u010d\u00edst.<\/p>\n\n\n<p>Dohodnut\u00e1 popt\u00e1vka \u010din\u00ed 80, 90, 60 a 100 kus\u016f. Tato mno\u017estv\u00ed ji\u017e zahrnuj\u00ed z\u00e1kaznick\u00e9 objedn\u00e1vky i zb\u00fdvaj\u00edc\u00ed progn\u00f3zu; stejn\u00e1 popt\u00e1vka se nepo\u010d\u00edt\u00e1 dvakr\u00e1t. P\u0159edpokl\u00e1dejme, \u017ee p\u0159\u00edjem z v\u00fdroby v ka\u017ed\u00e9m t\u00fddnu bude k dispozici p\u0159ed term\u00ednem popt\u00e1vky, kterou m\u00e1 pokr\u00fdt.<\/p>\n\n\n<p>Z\u00e1kladn\u00ed v\u00fdpo\u010det z\u00e1sob je n\u00e1sleduj\u00edc\u00ed:<\/p>\n\n\n<p><strong>P\u0159edpokl\u00e1dan\u00e1 kone\u010dn\u00e1 z\u00e1soba = po\u010d\u00e1te\u010dn\u00ed z\u00e1soba + p\u0159\u00edjmy z v\u00fdroby \u2212 popt\u00e1vka.<\/strong><\/p>\n\n\n<p>Kone\u010dn\u00fd stav ka\u017ed\u00e9ho t\u00fddne se st\u00e1v\u00e1 po\u010d\u00e1te\u010dn\u00ed z\u00e1sobou n\u00e1sleduj\u00edc\u00edho t\u00fddne.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>T\u011blesa \u010derpadel<\/th><th>T\u00fdden 1<\/th><th>T\u00fdden 2<\/th><th>T\u00fdden 3<\/th><th>T\u00fdden 4<\/th><\/tr><\/thead><tbody><tr><td>Po\u010d\u00e1te\u010dn\u00ed z\u00e1soba<\/td><td>70<\/td><td>90<\/td><td>100<\/td><td>40<\/td><\/tr><tr><td>Popt\u00e1vka k pokryt\u00ed<\/td><td>80<\/td><td>90<\/td><td>60<\/td><td>100<\/td><\/tr><tr><td>Nov\u00e9 p\u0159\u00edjmy podle MPS<\/td><td>100<\/td><td>100<\/td><td>0<\/td><td>100<\/td><\/tr><tr><td>P\u0159edpokl\u00e1dan\u00e1 kone\u010dn\u00e1 z\u00e1soba<\/td><td>90<\/td><td>100<\/td><td>40<\/td><td>40<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Bez p\u0159\u00edjmu v t\u00fddnu 1 by v\u00e1m na jeho konci chyb\u011blo deset kus\u016f. D\u00e1vka 100 kus\u016f pokryje popt\u00e1vku a zbude 90. Pokud byste v t\u00fddnu 2 vyu\u017eili jen t\u011bchto 90 kus\u016f, nez\u016fstala by \u017e\u00e1dn\u00e1 rezerva. Dal\u0161\u00ed d\u00e1vka proto udr\u017e\u00ed kone\u010dn\u00fd stav nad c\u00edlovou z\u00e1sobou 30 kus\u016f.<\/p>\n\n\n<p>V t\u00fddnu 3 nen\u00ed pot\u0159eba nov\u00e1 d\u00e1vka: dostupn\u00fdch 100 kus\u016f pokryje popt\u00e1vku 60 kus\u016f a zbude 40. V t\u00fddnu 4 je pot\u0159eba dal\u0161\u00edch 100 kus\u016f, aby se pokryla popt\u00e1vka a z\u00e1rove\u0148 zachovala rezerva.<\/p>\n\n\n<p>Proto je MPS u\u017eite\u010dn\u011bj\u0161\u00ed ne\u017e vyr\u00e1b\u011bt ka\u017ed\u00fd t\u00fdden stejn\u00e9 mno\u017estv\u00ed. Vyu\u017e\u00edv\u00e1 st\u00e1vaj\u00edc\u00ed z\u00e1soby, zachov\u00e1v\u00e1 zvolenou rezervu pro pokryt\u00ed popt\u00e1vky a vynech\u00e1v\u00e1 d\u00e1vku v t\u00fddnu 3, kterou nepot\u0159ebujete. D\u016fle\u017eit\u00e1 je i velikost d\u00e1vky: d\u00e1vka 100 kus\u016f vytvo\u0159\u00ed vy\u0161\u0161\u00ed z\u00e1sobu ne\u017e v\u00fdroba p\u0159esn\u011b podle \u010dist\u00e9 pot\u0159eby.<\/p>\n\n\n<p>Tabulka stanovila n\u00e1vrh pl\u00e1nu pokryt\u00ed popt\u00e1vky. Zat\u00edm ale neprok\u00e1zala, \u017ee v\u00fdroba dok\u00e1\u017ee zajistit tyto p\u0159\u00edjmy v\u010das.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zapo\u010d\u00edt\u00e1vejte progn\u00f3zu a z\u00e1kaznick\u00e9 objedn\u00e1vky jednotn\u011b<\/h3>\n\n\n<p>Objedn\u00e1vka \u010dasto nahrazuje \u010d\u00e1st ji\u017e progn\u00f3zovan\u00e9 popt\u00e1vky, m\u00edsto aby p\u0159id\u00e1vala zcela novou. Pokud progn\u00f3za \u010din\u00ed 80 kus\u016f a potvrzen\u00e9 objedn\u00e1vky pokr\u00fdvaj\u00ed 50 z nich, sou\u010dtem 80 a 50 byste tuto \u010d\u00e1st zapo\u010d\u00edtali dvakr\u00e1t.<\/p>\n\n\n<p>P\u0159i jednoduch\u00e9m pravidle, kdy objedn\u00e1vky spot\u0159ebov\u00e1vaj\u00ed progn\u00f3zu ve stejn\u00e9m obdob\u00ed, by zb\u00fdvaj\u00edc\u00ed progn\u00f3za \u010dinila 30 kus\u016f a celkov\u00e1 popt\u00e1vka 80. Pokud by potvrzen\u00e9 objedn\u00e1vky naopak dos\u00e1hly 95 kus\u016f, popt\u00e1vka by byla alespo\u0148 95. Va\u0161e skute\u010dn\u00e1 pravidla mohou spot\u0159ebov\u00e1vat progn\u00f3zu nap\u0159\u00ed\u010d r\u016fzn\u00fdmi term\u00edny, rozli\u0161ovat kategorie popt\u00e1vky nebo jinak zach\u00e1zet s objedn\u00e1vkami pro nejbli\u017e\u0161\u00ed obdob\u00ed.<\/p>\n\n\n<p>Pou\u017e\u00edvejte popt\u00e1vku, kterou v\u00e1\u0161 pl\u00e1novac\u00ed syst\u00e9m vypo\u010d\u00edt\u00e1 podle t\u011bchto pravidel. I p\u0159ehledn\u00e1 tabulka z\u00e1sob vytvo\u0159en\u00e1 z duplicitn\u011b zapo\u010d\u00edtan\u00e9 popt\u00e1vky vede ke zbyte\u010dn\u00fdm z\u00e1sob\u00e1m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nezam\u011b\u0148ujte kone\u010dnou z\u00e1sobu za mno\u017estv\u00ed, kter\u00e9 lze p\u0159isl\u00edbit<\/h3>\n\n\n<p>P\u0159edpokl\u00e1dan\u00e1 z\u00e1soba a <strong>mno\u017estv\u00ed dostupn\u00e9 k p\u0159isl\u00edben\u00ed (ATP)<\/strong> slou\u017e\u00ed k r\u016fzn\u00fdm rozhodnut\u00edm. P\u0159edpokl\u00e1dan\u00fd stav ukazuje z\u00e1sobu po pokryt\u00ed popt\u00e1vky zahrnut\u00e9 v pl\u00e1nu. ATP ur\u010duje mno\u017estv\u00ed, kter\u00e9 lze p\u0159isl\u00edbit dal\u0161\u00edm z\u00e1kaznick\u00fdm objedn\u00e1vk\u00e1m podle va\u0161ich pravidel pro potvrzov\u00e1n\u00ed dod\u00e1vek.<\/p>\n\n\n<p>Kladn\u00fd kone\u010dn\u00fd stav neznamen\u00e1, \u017ee m\u016f\u017eete v\u0161e prodat. \u010c\u00e1st m\u016f\u017ee tvo\u0159it pojistnou z\u00e1sobu a dostupnost mus\u00ed odpov\u00eddat term\u00ednu po\u017eadovan\u00e9mu z\u00e1kazn\u00edkem. Ne\u017e p\u0159ijmete dal\u0161\u00ed z\u00e1vazek, pou\u017eijte v\u00fdpo\u010det ATP ve sv\u00e9m pl\u00e1novac\u00edm syst\u00e9mu a ov\u011b\u0159te proveditelnost v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159ed p\u0159ijet\u00edm pl\u00e1nu ov\u011b\u0159te kapacitu kl\u00ed\u010dov\u00fdch v\u00fdrobn\u00edch zdroj\u016f<\/h2>\n\n\n<p><a href=\"\/cs\/zdroje\/hrube-kapacitni-planovani\/\">Hrub\u00e9 ov\u011b\u0159en\u00ed kapacit<\/a> p\u0159ev\u00e1d\u00ed mno\u017estv\u00ed z hlavn\u00edho v\u00fdrobn\u00edho pl\u00e1nu (MPS) na zat\u00ed\u017een\u00ed kl\u00ed\u010dov\u00fdch v\u00fdrobn\u00edch zdroj\u016f. Pom\u016f\u017ee v\u00e1m odhalit nesplniteln\u00fd z\u00e1vazek, ani\u017e byste museli nejprve podrobn\u011b prov\u011b\u0159ovat ka\u017edou operaci.<\/p>\n\n\n<p>Vra\u0165me se k t\u011bles\u016fm \u010derpadel. P\u0159edstavte si, \u017ee d\u00e1vka pro t\u00fdden 1 vy\u017eaduje 20 hodin na kl\u00ed\u010dov\u00e9m obr\u00e1b\u011bc\u00edm centru v\u010detn\u011b se\u0159\u00edzen\u00ed. Ostatn\u00ed v\u00fdrobky, k jejich\u017e dod\u00e1n\u00ed jste se ji\u017e zav\u00e1zali, na n\u011bm pot\u0159ebuj\u00ed 24 hodin a dostupn\u00e1 kapacita \u010din\u00ed 40 hodin.<\/p>\n\n\n<p>Navr\u017een\u00e9 zat\u00ed\u017een\u00ed \u010din\u00ed <strong>44 hodin p\u0159i dostupn\u00e9 kapacit\u011b 40 hodin<\/strong>. Pl\u00e1n z\u00e1sob vych\u00e1z\u00ed, ale pl\u00e1n vyu\u017eit\u00ed v\u00fdrobn\u00edch zdroj\u016f nikoli.<\/p>\n\n\n<p>Te\u010f mus\u00edte rozhodnout o konkr\u00e9tn\u00edm \u0159e\u0161en\u00ed. Mohla by se d\u00e1vka za\u010d\u00edt vyr\u00e1b\u011bt d\u0159\u00edve? Je k dispozici jin\u00fd vhodn\u00fd stroj? Vy\u0159e\u0161ila by chyb\u011bj\u00edc\u00ed kapacitu schv\u00e1len\u00e1 sm\u011bna nav\u00edc? Nebo je nutn\u00e9 posunout sl\u00edben\u00fd term\u00edn dod\u00e1n\u00ed v\u00fdrobku? Ne\u017e se rozhodnete, ov\u011b\u0159te p\u0159ipravenost materi\u00e1lu a dopad na ostatn\u00ed zak\u00e1zky.<\/p>\n\n\n<p>I kdy\u017e celkov\u00e1 t\u00fddenn\u00ed kapacita vych\u00e1z\u00ed, je nutn\u00e9 ov\u011b\u0159it po\u0159ad\u00ed operac\u00ed. Voln\u00e9 hodiny na konci t\u00fddne mohou p\u0159ij\u00edt p\u0159\u00edli\u0161 pozd\u011b pro operaci, po kter\u00e9 je\u0161t\u011b n\u00e1sleduje dokon\u010dov\u00e1n\u00ed nebo mont\u00e1\u017e. Nedostupn\u00e1 obsluha, nedokon\u010den\u00e1 p\u0159edchoz\u00ed operace nebo chyb\u011bj\u00edc\u00ed dod\u00e1vka materi\u00e1lu mohou zabr\u00e1nit pr\u00e1ci i na stroji, kter\u00fd je podle pl\u00e1nu voln\u00fd.<\/p>\n\n\n<p>Pomoc\u00ed <a href=\"\/cs\/zdroje\/kapacitni-planovani-vyroby\/\">kapacitn\u00edho pl\u00e1nov\u00e1n\u00ed<\/a> posu\u010fte zat\u00ed\u017een\u00ed a pomoc\u00ed <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pl\u00e1nov\u00e1n\u00ed do omezen\u00fdch kapacit<\/a> rozvrhn\u011bte skute\u010dn\u00e9 operace do dostupn\u00e9ho \u010dasu. Spole\u010dn\u011b v\u00e1m \u0159eknou mnohem v\u00edc ne\u017e zelen\u011b ozna\u010den\u00fd stav z\u00e1sob.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159eve\u010fte z\u00e1vazky z MPS do rozvrhu v\u00fdroby pomoc\u00ed syst\u00e9mu SkyPlanner<\/h2>\n\n\n<p>Progn\u00f3zy popt\u00e1vky a rozhodov\u00e1n\u00ed o dopl\u0148ov\u00e1n\u00ed z\u00e1sob jednotliv\u00fdch v\u00fdrobk\u016f ponechte v ERP nebo ve sv\u00e9m procesu pl\u00e1nov\u00e1n\u00ed. SkyPlanner neprogn\u00f3zuje popt\u00e1vku ani automaticky nevytv\u00e1\u0159\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy z progn\u00f3z. Rozvrhuje v\u00fdrobn\u00ed p\u0159\u00edkazy, kter\u00e9 vytvo\u0159\u00edte nebo p\u0159ed\u00e1te prost\u0159ednictv\u00edm integrace.<\/p>\n\n\n<p>D\u00edky tomuto rozd\u011blen\u00ed \u00faloh je p\u0159ed\u00e1n\u00ed do rozvrhov\u00e1n\u00ed jednoduch\u00e9: MPS stanov\u00ed pl\u00e1novan\u00e1 mno\u017estv\u00ed a term\u00edny jejich dostupnosti, zat\u00edmco SkyPlanner vypo\u010d\u00edt\u00e1 podrobn\u00fd rozvrh operac\u00ed pot\u0159ebn\u00fdch k jejich v\u00fdrob\u011b.<\/p>\n\n\n<p><strong>SkyPlanner lze propojit s libovoln\u00fdm ERP nebo MES prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API.<\/strong> St\u00e1vaj\u00edc\u00ed data o zak\u00e1zk\u00e1ch a v\u00fdrob\u011b m\u016f\u017eete propojit s jeho rozvrhovac\u00edm j\u00e1drem, ani\u017e byste museli nahrazovat ERP, kter\u00e9 firm\u011b dob\u0159e slou\u017e\u00ed. Pod\u00edvejte se na <a href=\"\/cs\/integrace\/\">mo\u017enosti integrace s ERP a MES<\/a>.<\/p>\n\n\n<p>Pro d\u00e1vku t\u011bles \u010derpadel jsou pot\u0159ebn\u00fdmi vstupy jednotliv\u00e9 kroky v\u00fdrobn\u00edho postupu a jejich d\u00e9lky, po\u017eadavky na se\u0159\u00edzen\u00ed, vhodn\u00e1 pracovi\u0161t\u011b, pracovn\u00ed sm\u011bny a dostupnost obsluhy. Arcturus rozvrhne d\u00e1vku spole\u010dn\u011b s ostatn\u00edmi v\u00fdrobn\u00edmi p\u0159\u00edkazy v t\u00e9m\u017ee pl\u00e1nu podle nastaven\u00fdch kapacit, n\u00e1vaznost\u00ed a priorit.<\/p>\n\n\n<p>V\u00fdsledek uvid\u00edte v diagramu Gantt. M\u016f\u017eete sledovat pr\u016fchod d\u00e1vky jednotliv\u00fdmi operacemi, zjistit, kter\u00e9 dal\u0161\u00ed operace vyu\u017e\u00edvaj\u00ed stejn\u00e9 v\u00fdrobn\u00ed zdroje, a porovnat pl\u00e1novan\u00e9 dokon\u010den\u00ed s term\u00ednem dostupnosti po\u017eadovan\u00fdm v MPS. Pokud dokon\u010den\u00ed vych\u00e1z\u00ed p\u0159\u00edli\u0161 pozd\u011b, zjist\u00edte, kter\u00fd z\u00e1vazek je t\u0159eba \u0159e\u0161it, je\u0161t\u011b ne\u017e budou n\u00e1kup a prodej d\u00e1l sm\u011b\u0159ovat k nere\u00e1ln\u00e9mu term\u00ednu.<\/p>\n\n\n<p>Priority ur\u010dujete vy, v\u00fdpo\u010det zaji\u0161\u0165uje Arcturus. Kdy\u017e zm\u011bn\u00edte prioritu nebo zaznamen\u00e1te zm\u011bnu kapacity, m\u016f\u017ee p\u0159epo\u010d\u00edtat dot\u010den\u00fd rozvrh, abyste nemuseli ru\u010dn\u011b sestavovat nov\u00e9 po\u0159ad\u00ed operac\u00ed.<\/p>\n\n\n<p>Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, Arcturus p\u0159i v\u00fdpo\u010dtu za\u010d\u00e1tk\u016f operac\u00ed bere v \u00favahu tak\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky materi\u00e1lu. O\u010dek\u00e1van\u00e1 n\u00e1kupn\u00ed dod\u00e1vka p\u0159edstavuje p\u0159edpokl\u00e1danou dostupnost, nikoli ji\u017e p\u0159ijat\u00fd materi\u00e1l; stav z\u00e1sob se aktualizuje potvrzen\u00edm dod\u00e1vky. Udr\u017eujete-li tyto vstupy aktu\u00e1ln\u00ed, zpo\u017ed\u011bn\u00ed dodavatele se projev\u00ed v rozvrhu v\u00fdroby.<\/p>\n\n\n<p>\u0160ir\u0161\u00ed postup najdete v na\u0161em <a href=\"\/cs\/zdroje\/co-je-planovani-vyroby\/\">pr\u016fvodci rozvrhov\u00e1n\u00edm v\u00fdroby<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Udr\u017eujte pl\u00e1n pou\u017eiteln\u00fd i p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b<\/h2>\n\n\n<p>Hlavn\u00ed v\u00fdrobn\u00ed pl\u00e1n pot\u0159ebuje stabilitu, ale tak\u00e9 mo\u017enost reagovat na skute\u010dnost. Neust\u00e1l\u00e9 zm\u011bny z\u00e1vazk\u016f pro nejbli\u017e\u0161\u00ed obdob\u00ed naru\u0161uj\u00ed n\u00e1kup i v\u00fdrobu. Pokud v\u0161ak odm\u00edtnete zm\u011bnit nesplniteln\u00fd z\u00e1vazek, toto naru\u0161en\u00ed se jen projev\u00ed pozd\u011bji.<\/p>\n\n\n<p>Dohodn\u011bte se, kter\u00e9 zm\u011bny MPS v nejbli\u017e\u0161\u00edm obdob\u00ed vy\u017eaduj\u00ed schv\u00e1len\u00ed. <strong><a href=\"\/cs\/zdroje\/planovaci-casova-hranice\/\">Pl\u00e1novac\u00ed \u010dasov\u00e1 hranice<\/a><\/strong> pom\u00e1h\u00e1 vymezit obdob\u00ed, v n\u011bm\u017e zm\u011bny podl\u00e9haj\u00ed kontrole, zat\u00edmco ve vzd\u00e1len\u011bj\u0161\u00edch obdob\u00edch z\u016fst\u00e1v\u00e1 v\u011bt\u0161\u00ed volnost. D\u00e9lku tohoto obdob\u00ed stanovte podle pr\u016fb\u011b\u017en\u00fdch dob v\u00fdroby a n\u00e1kupu, nikoli podle univerz\u00e1ln\u00edho po\u010dtu dn\u016f.<\/p>\n\n\n<p>Toto pravidlo pro schvalov\u00e1n\u00ed je odd\u011blen\u00e9 od ochrany operac\u00ed v podrobn\u00e9m rozvrhu. Funkce Running Time Lock v syst\u00e9mu SkyPlanner br\u00e1n\u00ed tomu, aby Arcturus p\u0159epl\u00e1noval nadch\u00e1zej\u00edc\u00ed operace ve vymezen\u00e9m obdob\u00ed. Pom\u00e1h\u00e1 zachovat rozvrh pr\u00e1ce, kterou se d\u00edlna pr\u00e1v\u011b chyst\u00e1 prov\u00e9st, zat\u00edmco p\u0159ehodnocujete pozd\u011bj\u0161\u00ed operace. Nejde o schvalovac\u00ed postup pro zm\u011bny samotn\u00e9ho MPS.<\/p>\n\n\n<p>Kdy\u017e nastane odchylka od pl\u00e1nu, prom\u00edtn\u011bte ji do cel\u00e9ho procesu:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Popt\u00e1vka roste:<\/strong> rozhodn\u011bte, zda vyu\u017eijete st\u00e1vaj\u00edc\u00ed z\u00e1soby, nebo zm\u011bn\u00edte pl\u00e1novan\u00e9 v\u00fdrobn\u00ed mno\u017estv\u00ed, a pot\u00e9 ov\u011b\u0159te, zda kapacita sta\u010d\u00ed na dodate\u010dnou pr\u00e1ci.<\/li><li><strong>Materi\u00e1l se zpozd\u00ed:<\/strong> aktualizujte o\u010dek\u00e1vanou dostupnost a p\u0159epo\u010d\u00edtejte podrobn\u00fd rozvrh se zapnut\u00fdm zohledn\u011bn\u00edm materi\u00e1lu. Pokud ji\u017e d\u00e1vku nelze dokon\u010dit v\u010das, upravte pl\u00e1novan\u00fd p\u0159\u00edjem v MPS.<\/li><li><strong>V\u00fdrobn\u00ed zdroj ztrat\u00ed \u010d\u00e1st kapacity:<\/strong> zaznamenejte zm\u011bnu dostupnosti, zkontrolujte nov\u011b vypo\u010dten\u00e9 term\u00edny dokon\u010den\u00ed a rozhodn\u011bte, kter\u00e9 z\u00e1vazky vy\u017eaduj\u00ed jin\u00e9 \u0159e\u0161en\u00ed.<\/li><\/ul>\n\n\n<p>V\u00fdsledn\u00e1 mno\u017estv\u00ed a term\u00edny p\u0159edejte zp\u011bt lidem, kte\u0159\u00ed s pl\u00e1nem v\u00fdrobk\u016f pracuj\u00ed. P\u0159\u00ednosem nen\u00ed rozvrh, kter\u00fd se nikdy nem\u011bn\u00ed, ale zm\u011bna, kter\u00e9 v\u0161ichni rozum\u011bj\u00ed a podle n\u00ed\u017e mohou jednat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak vypad\u00e1 p\u0159ehled o kapacit\u00e1ch p\u0159i v\u00fdrob\u011b na sklad<\/h2>\n\n\n<p>Opes Corporation je u\u017eite\u010dn\u00fdm p\u0159\u00edkladem propojen\u00ed p\u0159edv\u00eddateln\u00e9 popt\u00e1vky s pru\u017enou v\u00fdrobou. Tento finsk\u00fd v\u00fdrobce specializovan\u00fdch produkt\u016f vyr\u00e1b\u00ed na sklad, zpravidla na z\u00e1klad\u011b p\u0159edv\u00eddateln\u00fdch t\u0159\u00edm\u011bs\u00ed\u010dn\u00edch odb\u011brov\u00fdch z\u00e1vazk\u016f z\u00e1kazn\u00edk\u016f.<\/p>\n\n\n<p>D\u0159\u00edv\u011bj\u0161\u00ed kombinace Excelu a samostatn\u00e9 skladov\u00e9 aplikace znamenala, \u017ee informace byly rozpt\u00fdlen\u00e9 na r\u016fzn\u00fdch m\u00edstech. P\u0159i zaveden\u00ed byl SkyPlanner propojen se syst\u00e9mem Visma Nova. P\u0159\u00edb\u011bh z\u00e1kazn\u00edka popisuje lep\u0161\u00ed p\u0159ehled o kapacit\u00e1ch a rychlej\u0161\u00ed zm\u011bny rozvrhu p\u0159i za\u0159azov\u00e1n\u00ed v\u00fdvojov\u00fdch s\u00e9ri\u00ed nebo urgentn\u00edch mal\u00fdch zak\u00e1zek, kter\u00e9 naru\u0161uj\u00ed b\u011b\u017en\u00fd pl\u00e1n.<\/p>\n\n\n<p>Opes uv\u00e1d\u00ed, \u017ee v obdob\u00ed popsan\u00e9m ve sv\u00e9m p\u0159\u00edb\u011bhu udr\u017eela v\u010dasnost dod\u00e1vek na 100 %. Tento v\u00fdsledek vych\u00e1z\u00ed z v\u00fdroby na sklad a p\u0159edv\u00eddateln\u00fdch odb\u011brov\u00fdch z\u00e1vazk\u016f z\u00e1kazn\u00edk\u016f, p\u0159i\u010dem\u017e SkyPlanner pom\u00e1h\u00e1 zajistit p\u0159ehled o kapacit\u00e1ch a po\u0159ad\u00ed operac\u00ed.<\/p>\n\n\n<p>Praktick\u00e9 pou\u010den\u00ed je jednoduch\u00e9: i p\u0159i p\u0159edv\u00eddateln\u00e9 popt\u00e1vce se hod\u00ed rozvrh, kter\u00fd uk\u00e1\u017ee, co se stane p\u0159i p\u0159\u00edchodu ne\u010dekan\u00e9 pr\u00e1ce. <a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010dt\u011bte si p\u0159\u00edb\u011bh Opes Corporation<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zvy\u0161te d\u016fv\u011bru v p\u0159\u00ed\u0161t\u00ed z\u00e1vazek k dod\u00e1vce v\u00fdrobk\u016f<\/h2>\n\n\n<p>U\u017eite\u010dn\u00fd MPS propojuje popt\u00e1vku, z\u00e1soby a v\u00fdrobn\u00ed mno\u017estv\u00ed. U\u017eite\u010dn\u00fd rozvrh v\u00fdroby ukazuje, jak je z\u00e1vod vyrob\u00ed a dod\u00e1. Propojen\u00ed obou pl\u00e1n\u016f v\u00e1m umo\u017en\u00ed \u0159e\u0161it nedostatek, p\u0159et\u00ed\u017een\u00ed nebo opo\u017ed\u011bn\u00fd p\u0159\u00edjem, dokud je\u0161t\u011b m\u016f\u017eete rozhodnout o dal\u0161\u00edm postupu.<\/p>\n\n\n<p>Chcete-li toto propojen\u00ed vid\u011bt na vlastn\u00ed v\u00fdrob\u011b, <a href=\"\/cs\/kontaktni-prodej\/\">objednejte si uk\u00e1zku SkyPlanner<\/a>. P\u0159ipravte si jeden pravideln\u011b vyr\u00e1b\u011bn\u00fd produkt, jeho v\u00fdrobn\u00ed postup a p\u0159\u00edklad t\u00fddne, kdy bylo obt\u00ed\u017en\u00e9 dodr\u017eet pl\u00e1novan\u00fd p\u0159\u00edjem. Z\u00edsk\u00e1te tak konkr\u00e9tn\u00ed v\u00fdchoz\u00ed bod pro uk\u00e1zku toho, jak SkyPlanner dok\u00e1\u017ee rozvrhnout pr\u00e1ci pot\u0159ebnou ke spln\u011bn\u00ed va\u0161ich z\u00e1vazk\u016f.<\/p>\n\n\n<p>Pokud chcete nejprve prozkoumat samotn\u00e9 rozvrhov\u00e1n\u00ed, <a href=\"\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat Obchod o\u010dek\u00e1v\u00e1, \u017ee d\u00e1vka bude hotov\u00e1 p\u0159\u00ed\u0161t\u00ed p\u00e1tek. N\u00e1kup s t\u00edmto term\u00ednem po\u010d\u00edt\u00e1 a pl\u00e1n z\u00e1sob ukazuje dostate\u010dn\u00e9 mno\u017estv\u00ed pro pokryt\u00ed popt\u00e1vky. V\u00fdroba pak zjist\u00ed, \u017ee pro tuto d\u00e1vku pot\u0159ebuje stroj, kter\u00fd u\u017e je vyhrazen\u00fd pro jinou pr\u00e1ci. Probl\u00e9m nemus\u00ed b\u00fdt v progn\u00f3ze popt\u00e1vky. Spo\u010d\u00edv\u00e1 v &#8230; <a title=\"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/\" aria-label=\"Read more about Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97634,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-95886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Master production schedule: Co lze dodat &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat\" \/>\n<meta property=\"og:description\" content=\"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T00:45:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat\",\"datePublished\":\"2026-10-04T00:45:24+00:00\",\"dateModified\":\"2026-10-19T14:42:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/\"},\"wordCount\":3150,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero-1.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/\",\"name\":\"Master production schedule: Co lze dodat &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero-1.png\",\"datePublished\":\"2026-10-04T00:45:24+00:00\",\"dateModified\":\"2026-10-19T14:42:28+00:00\",\"description\":\"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Product batches moving through a manufacturing machine to finished stock for the master production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/master-production-schedule\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Master production schedule: Co lze dodat &#8211; SkyPlanner","description":"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/","og_locale":"cs_CZ","og_type":"article","og_title":"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat","og_description":"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T00:45:24+00:00","article_modified_time":"2026-10-19T14:42:28+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat","datePublished":"2026-10-04T00:45:24+00:00","dateModified":"2026-10-19T14:42:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/"},"wordCount":3150,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/","name":"Master production schedule: Co lze dodat &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png","datePublished":"2026-10-04T00:45:24+00:00","dateModified":"2026-10-19T14:42:28+00:00","description":"Pl\u00e1n vych\u00e1z\u00ed, ale zvl\u00e1dne v\u00fdroba dodat? Seznamte se s MPS na p\u0159\u00edkladu a zjist\u011bte, jak SkyPlanner rozvrhuje operace pot\u0159ebn\u00e9 k jeho spln\u011bn\u00ed.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png","width":1672,"height":941,"caption":"Product batches moving through a manufacturing machine to finished stock for the master production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/master-production-schedule\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Master production schedule (MPS): Pl\u00e1nujte to, co dok\u00e1\u017eete dodat Obchod o\u010dek\u00e1v\u00e1, \u017ee d\u00e1vka bude hotov\u00e1 p\u0159\u00ed\u0161t\u00ed p\u00e1tek. N\u00e1kup s t\u00edmto term\u00ednem po\u010d\u00edt\u00e1 a pl\u00e1n z\u00e1sob ukazuje dostate\u010dn\u00e9 mno\u017estv\u00ed pro pokryt\u00ed popt\u00e1vky. V\u00fdroba pak zjist\u00ed, \u017ee pro tuto d\u00e1vku pot\u0159ebuje stroj, kter\u00fd u\u017e je vyhrazen\u00fd pro jinou pr\u00e1ci. Probl\u00e9m nemus\u00ed b\u00fdt v progn\u00f3ze popt\u00e1vky. Spo\u010d\u00edv\u00e1 v&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/95886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=95886"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/95886\/revisions"}],"predecessor-version":[{"id":95915,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/95886\/revisions\/95915"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/97634"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=95886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=95886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=95886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}