{"id":8266,"date":"2022-10-28T07:54:22","date_gmt":"2022-10-28T07:54:22","guid":{"rendered":"https:\/\/skyplanner.ai\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/"},"modified":"2026-10-19T14:41:33","modified_gmt":"2026-10-19T14:41:33","slug":"jak-optimalizovat-dodaci-lhuty-ve-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/","title":{"rendered":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi"},"content":{"rendered":"<div class=\"gb-container gb-container-leadtime01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi<\/h1>\n\n\n<p>Podle technologick\u00e9ho postupu sta\u010d\u00ed dvan\u00e1ct hodin. Z\u00e1kazn\u00edkovi ale bylo sl\u00edbeno dokon\u010den\u00ed za osm dn\u00ed. Mezi prvn\u00ed operac\u00ed a dokon\u010den\u00edm zak\u00e1zky tr\u00e1v\u00ed rozpracovan\u00e1 v\u00fdroba mnohem v\u00edce \u010dasu \u010dek\u00e1n\u00edm ne\u017e samotn\u00fdm zpracov\u00e1n\u00edm.<\/p>\n\n\n<p>Pro pl\u00e1nova\u010de v\u00fdroby je pochopen\u00ed tohoto rozd\u00edlu prvn\u00edm krokem ke zkr\u00e1cen\u00ed pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby. Rychlej\u0161\u00ed obr\u00e1b\u011bn\u00ed m\u016f\u017ee pomoci, ale nevy\u0159e\u0161\u00ed situaci, kdy operace \u010dek\u00e1 dva dny na nejbli\u017e\u0161\u00ed voln\u00fd term\u00edn.<\/p>\n\n\n<p>Podstatn\u00e1 ot\u00e1zka zn\u00ed: <strong>co se mus\u00ed ud\u011blat a v jak\u00e9m po\u0159ad\u00ed, aby mohla b\u00fdt zak\u00e1zka hotov\u00e1?<\/strong> SkyPlanner propojuje tyto operace s kapacitami a prioritami, kter\u00e9 ur\u010duj\u00ed jejich pr\u016fb\u011bh. Z\u00edsk\u00e1te rozvrh, kter\u00fd v\u00e1m pom\u016f\u017ee zkr\u00e1tit zbyte\u010dn\u00e9 prodlevy a z\u00e1kazn\u00edk\u016fm nab\u00eddnout term\u00edny vych\u00e1zej\u00edc\u00ed z pr\u00e1ce, kter\u00e1 v\u00e1s \u010dek\u00e1.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby?<\/h2>\n\n\n<p>Pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby je celkov\u00fd \u010das, kter\u00fd v\u00fdrobek nebo zak\u00e1zka pot\u0159ebuje k pr\u016fchodu vymezen\u00fdm v\u00fdrobn\u00edm procesem. Zahrnuje zpracov\u00e1n\u00ed a se\u0159\u00edzen\u00ed, ale tak\u00e9 \u010dek\u00e1n\u00ed ve front\u00e1ch, p\u0159esuny, kontroly a dal\u0161\u00ed prodlevy v r\u00e1mci tohoto procesu.<\/p>\n\n\n<p>V tomto \u010dl\u00e1nku ji m\u011b\u0159\u00edme <strong>od uvoln\u011bn\u00ed do v\u00fdroby a\u017e do okam\u017eiku, kdy je zak\u00e1zka dokon\u010den\u00e1 a p\u0159ipraven\u00e1 k expedici<\/strong>. Zapo\u010d\u00edt\u00e1v\u00e1me tedy i \u010dek\u00e1n\u00ed mezi uvoln\u011bn\u00edm a prvn\u00ed operac\u00ed. N\u00e1kup materi\u00e1lu p\u0159ed uvoln\u011bn\u00edm ani dopravu hotov\u00fdch v\u00fdrobk\u016f k z\u00e1kazn\u00edkovi automaticky nezahrnujeme.<\/p>\n\n\n<p>Firmy i pl\u00e1novac\u00ed syst\u00e9my mohou pr\u016fb\u011b\u017en\u00e9 a dodac\u00ed doby vymezovat r\u016fzn\u011b. Ne\u017e za\u010dnete porovn\u00e1vat hodnoty, ur\u010dete, jak\u00e1 ud\u00e1lost m\u011b\u0159en\u00ed zahajuje a jak\u00e1 ho ukon\u010duje:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ukazatel<\/th><th>Za\u010d\u00e1tek a konec<\/th><th>Na jakou ot\u00e1zku odpov\u00edd\u00e1<\/th><\/tr><\/thead><tbody><tr><td>Pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby podle tohoto \u010dl\u00e1nku<\/td><td>Od uvoln\u011bn\u00ed do v\u00fdroby po p\u0159ipravenost k expedici<\/td><td>Jak dlouho zak\u00e1zka str\u00e1v\u00ed v na\u0161em v\u00fdrobn\u00edm procesu?<\/td><\/tr><tr><td>Dodac\u00ed doba z\u00e1kaznick\u00e9 objedn\u00e1vky<\/td><td>Od p\u0159ijet\u00ed objedn\u00e1vky po p\u0159evzet\u00ed z\u00e1kazn\u00edkem<\/td><td>Jak dlouho bude z\u00e1kazn\u00edk \u010dekat?<\/td><\/tr><tr><td>Dodac\u00ed doba dodavatele<\/td><td>Od odesl\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky po p\u0159\u00edjem materi\u00e1lu<\/td><td>Kdy m\u016f\u017eeme o\u010dek\u00e1vat nakoupen\u00fd materi\u00e1l?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tyto intervaly se mohou p\u0159ekr\u00fdvat. Pokud se materi\u00e1l objedn\u00e1v\u00e1 je\u0161t\u011b b\u011bhem technick\u00e9 p\u0159\u00edpravy zak\u00e1zky, se\u010dten\u00edm obou dob v pln\u00e9 d\u00e9lce byste \u010d\u00e1st \u010dek\u00e1n\u00ed zapo\u010d\u00edtali dvakr\u00e1t. Sledujte skute\u010dn\u00fd \u010dasov\u00fd pr\u016fb\u011bh m\u00edsto s\u010d\u00edt\u00e1n\u00ed odhad\u016f pr\u016fb\u011b\u017en\u00fdch a dodac\u00edch dob ze v\u0161ech odd\u011blen\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby nen\u00ed \u010das cyklu ani pr\u016fchodnost<\/h3>\n\n\n<p><a href=\"\/cs\/zdroje\/cas-cyklu-ve-vyrobe\/\">\u010cas cyklu ve v\u00fdrob\u011b<\/a> vyjad\u0159uje dobu pot\u0159ebnou k v\u00fdrob\u011b jednoho kusu nebo proveden\u00ed konkr\u00e9tn\u00ed operace. Pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby sleduje v\u00fdrobek v \u0161ir\u0161\u00edm procesu a zahrnuje i prodlevy mezi operacemi.<\/p>\n\n\n<p><a href=\"\/cs\/zdroje\/pruchodnost-vyroby\/\">Pr\u016fchodnost v\u00fdroby<\/a> vyjad\u0159uje objem produkce za jednotku \u010dasu, nap\u0159\u00edklad po\u010det vyhovuj\u00edc\u00edch sestav za sm\u011bnu. Jde o tempo v\u00fdroby, nikoli o dobu trv\u00e1n\u00ed. Stroj m\u016f\u017ee m\u00edt kr\u00e1tk\u00fd \u010das cyklu, zat\u00edmco zak\u00e1zka, do n\u00ed\u017e vyroben\u00e9 d\u00edly pat\u0159\u00ed, m\u00e1 st\u00e1le dlouhou pr\u016fb\u011b\u017enou dobu v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak vypo\u010d\u00edtat pr\u016fb\u011b\u017enou dobu v\u00fdroby<\/h2>\n\n\n<p>U dokon\u010den\u00e9 zak\u00e1zky vych\u00e1zejte ze zaznamenan\u00fdch ud\u00e1lost\u00ed:<\/p>\n\n\n<p><strong>Pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby = okam\u017eik p\u0159ipravenosti k expedici \u2212 okam\u017eik uvoln\u011bn\u00ed do v\u00fdroby<\/strong><\/p>\n\n\n<p>P\u0159edstavte si zak\u00e1zku uvoln\u011bnou do v\u00fdroby v pond\u011bl\u00ed v 08:00 a p\u0159ipravenou k expedici ve \u010dtvrtek v 08:00. Jej\u00ed pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby \u010din\u00ed <strong>72 kalend\u00e1\u0159n\u00edch hodin<\/strong>, i kdy\u017e se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed zaberou jen dvan\u00e1ct hodin.<\/p>\n\n\n<p>Zb\u00fdvaj\u00edc\u00edch <strong>60 hodin<\/strong> p\u0159ipad\u00e1 na \u010das mimo se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed. M\u016f\u017ee j\u00edt o \u010dek\u00e1n\u00ed ve front\u00e1ch, p\u0159esuny, kontroly, no\u010dn\u00ed p\u0159est\u00e1vky v provozu nebo nezbytn\u00e9 chladnut\u00ed. Nepova\u017eujte v\u0161ech \u0161edes\u00e1t hodin za pl\u00fdtv\u00e1n\u00ed, kter\u00e9 lze odstranit: zjist\u011bte, co jednotliv\u00e9 prodlevy p\u0159edstavuj\u00ed.<\/p>\n\n\n<p>Chcete-li celkovou dobu vysv\u011btlit, rozd\u011blte \u010dasov\u00fd pr\u016fb\u011bh do kategori\u00ed, kter\u00e9 se nep\u0159ekr\u00fdvaj\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed:<\/strong> p\u0159\u00edprava za\u0159\u00edzen\u00ed a prov\u00e1d\u011bn\u00ed operac\u00ed.<\/li>\n\n<li><strong>\u010cek\u00e1n\u00ed ve front\u011b:<\/strong> \u010dek\u00e1n\u00ed na voln\u00fd stroj, obsluhu nebo term\u00edn kontroly.<\/li>\n\n<li><strong>P\u0159esuny a kontroly:<\/strong> p\u0159eprava a \u010dinnosti souvisej\u00edc\u00ed s kvalitou v r\u00e1mci vymezen\u00e9ho procesu.<\/li>\n\n<li><strong>Ostatn\u00ed doba:<\/strong> nezbytn\u00e9 prodlevy, doba mimo dostupn\u00e9 sm\u011bny a p\u0159eru\u0161en\u00ed, kter\u00e1 u\u017e nejsou zapo\u010dtena jinde.<\/li>\n<\/ul>\n\n\n<p>Celkovou dobu ur\u010dete z \u010dasov\u00fdch z\u00e1znam\u016f a jednotliv\u00e9 kategorie pou\u017eijte k rozboru p\u0159\u00ed\u010din. Pokud dv\u011b operace prob\u00edhaj\u00ed soub\u011b\u017en\u011b, jejich d\u00e9lky nelze jednodu\u0161e se\u010d\u00edst a z\u00edskat tak pr\u016fb\u011b\u017enou dobu v\u00fdroby.<\/p>\n\n\n<p>D\u016fsledn\u011b tak\u00e9 rozli\u0161ujte zp\u016fsob m\u011b\u0159en\u00ed \u010dasu. Kalend\u00e1\u0159n\u00ed hodiny vyjad\u0159uj\u00ed celkov\u00fd uplynul\u00fd \u010das, pracovn\u00ed hodiny pouze \u010das v r\u00e1mci stanoven\u00e9ho sm\u011bnov\u00e9ho kalend\u00e1\u0159e. Oboj\u00ed m\u016f\u017ee b\u00fdt u\u017eite\u010dn\u00e9, ale dvan\u00e1ct pracovn\u00edch hodin a sedmdes\u00e1t dva kalend\u00e1\u0159n\u00edch hodin nelze zam\u011b\u0148ovat. Sd\u011blte obchodn\u00edmu odd\u011blen\u00ed, z jak\u00e9ho zp\u016fsobu m\u011b\u0159en\u00ed sl\u00edben\u00fd term\u00edn vych\u00e1z\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pro\u010d i kr\u00e1tk\u00fd technologick\u00fd postup m\u016f\u017ee znamenat dlouhou pr\u016fb\u011b\u017enou dobu v\u00fdroby<\/h2>\n\n\n<p>Technologick\u00fd postup popisuje, co zak\u00e1zka pot\u0159ebuje. Fronta pr\u00e1ce ur\u010duje, kdy na to p\u0159ijde \u0159ada.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee obr\u00e1b\u011bn\u00ed skon\u010d\u00ed v \u00fater\u00fd r\u00e1no, ale na dokon\u010dovac\u00edm pracovi\u0161ti nen\u00ed a\u017e do \u010dtvrtka k dispozici vhodn\u00e1 kapacita. Zkr\u00e1cen\u00ed obr\u00e1b\u011bn\u00ed o hodinu neusp\u00ed\u0161\u00ed dokon\u010den\u00ed, pokud term\u00edn na dokon\u010dovac\u00edm pracovi\u0161ti z\u016fstane stejn\u00fd. Prostor pro zlep\u0161en\u00ed rozvrhu spo\u010d\u00edv\u00e1 v koordinaci obou operac\u00ed, nikoli jen v d\u0159\u00edv\u011bj\u0161\u00edm zah\u00e1jen\u00ed t\u00e9 prvn\u00ed.<\/p>\n\n\n<p>Tyto prodlevy vznikaj\u00ed v d\u016fsledku \u0159ady ka\u017edodenn\u00edch rozhodnut\u00ed:<\/p>\n\n\n<p><strong>Zah\u00e1jen\u00ed v\u00fdroby bez n\u00e1vazn\u00e9 kapacity v dal\u0161\u00edch operac\u00edch.<\/strong> Prvn\u00ed pracovi\u0161t\u011b je vyt\u00ed\u017een\u00e9, ale na dal\u0161\u00edch se hromad\u00ed rozpracovan\u00e9 zak\u00e1zky. P\u0159i uvol\u0148ov\u00e1n\u00ed do v\u00fdroby zohledn\u011bte cel\u00fd navazuj\u00edc\u00ed technologick\u00fd postup. Tento princip podporuje tak\u00e9 <a href=\"\/cs\/zdroje\/just-in-time-vyroba\/\">v\u00fdrobu just-in-time<\/a>: samotn\u00e1 \u010dinnost je\u0161t\u011b neznamen\u00e1 plynul\u00fd tok v\u00fdroby.<\/p>\n\n\n<p><strong>Pl\u00e1nov\u00e1n\u00ed s kapacitou, kter\u00e1 ve skute\u010dnosti nen\u00ed dostupn\u00e1.<\/strong> Zd\u00e1nliv\u011b voln\u00fd stroj m\u016f\u017ee pot\u0159ebovat obsluhu, kter\u00e1 pr\u00e1v\u011b pracuje jinde. M\u016f\u017ee chyb\u011bt po\u017eadovan\u00fd n\u00e1stroj nebo materi\u00e1l. Pl\u00e1novan\u00fd za\u010d\u00e1tek mus\u00ed zohlednit v\u00fdrobn\u00ed zdroje, kter\u00e9 operace skute\u010dn\u011b pot\u0159ebuje.<\/p>\n\n\n<p><strong>Zm\u011bny priorit jen v jednotliv\u00fdch front\u00e1ch.<\/strong> Urgentn\u00ed operace se posune dop\u0159edu, ale navazuj\u00edc\u00ed operace z\u016fstane na p\u016fvodn\u00edm m\u00edst\u011b. Jin\u00e1 zak\u00e1zka p\u0159ijde o sv\u016fj term\u00edn, ani\u017e by n\u011bkdo posoudil dopad na jej\u00ed dokon\u010den\u00ed.<\/p>\n\n\n<p><strong>Pova\u017eov\u00e1n\u00ed nezbytn\u00fdch prodlev za voln\u00fd \u010das.<\/strong> V\u00fdrobek m\u016f\u017ee pot\u0159ebovat su\u0161en\u00ed, chladnut\u00ed nebo schv\u00e1len\u00ed odd\u011blen\u00edm kvality. Zaznamenejte tyto kroky do technologick\u00e9ho postupu, aby dal\u0161\u00ed operace nebyla napl\u00e1nov\u00e1na d\u0159\u00edve, ne\u017e bude v\u00fdrobek p\u0159ipraven.<\/p>\n\n\n<p><a href=\"\/cs\/zdroje\/stihla-vyroba-odemknuta-efektivita\/\">\u0160t\u00edhl\u00e1 v\u00fdroba<\/a> pom\u00e1h\u00e1 odhalovat zbyte\u010dn\u00e9 \u010dek\u00e1n\u00ed a p\u0159esuny. Koordinovan\u00fd rozvrh umo\u017e\u0148uje tato zlep\u0161en\u00ed vyu\u017e\u00edt p\u0159i ka\u017edodenn\u00ed pr\u00e1ci se zak\u00e1zkami. Dal\u0161\u00ed metody zlep\u0161ov\u00e1n\u00ed najdete v na\u0161em pr\u016fvodci <a href=\"\/cs\/zdroje\/zkraceni-dodaci-lhuty-tajemstvi-chytrejsiho-podnikani\/\">zkracov\u00e1n\u00edm pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zkra\u0165te prodlevy mezi operacemi pomoc\u00ed SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS sestavuje z operac\u00ed zak\u00e1zek v\u00fdrobn\u00ed rozvrh s omezen\u00fdmi kapacitami. Arcturus, jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed, zohled\u0148uje nastaven\u00e9 kapacity pracovi\u0161\u0165, sm\u011bny, n\u00e1vaznosti a priority. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, ovliv\u0148uje term\u00edny operac\u00ed tak\u00e9 dostupnost materi\u00e1lu.<\/p>\n\n\n<p>Pl\u00e1nova\u010d tak z\u00edsk\u00e1 u\u017eite\u010dn\u011bj\u0161\u00ed podklad ne\u017e pau\u0161\u00e1ln\u00ed p\u0159\u00edslib typu \u201ev\u0161echno trv\u00e1 osm dn\u00ed\u201c. Gantt\u016fv diagram zobrazuje po\u0159ad\u00ed operac\u00ed nap\u0159\u00ed\u010d pracovi\u0161ti. M\u016f\u017eete tak posoudit, kdy m\u00e1 zak\u00e1zka podle rozvrhu za\u010d\u00edt, kde st\u00e1le z\u016fst\u00e1vaj\u00ed prodlevy a kdy by m\u011bla skon\u010dit jej\u00ed posledn\u00ed operace.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Za\u0159a\u010fte krat\u0161\u00ed pr\u016fb\u011b\u017enou dobu v\u00fdroby mezi sv\u00e9 priority<\/h3>\n\n\n<p>SkyPlanner nab\u00edz\u00ed samostatnou <strong>prioritu pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby<\/strong>: Arcturus se sna\u017e\u00ed minimalizovat interval mezi prvn\u00edm a posledn\u00edm krokem v\u00fdrobn\u00edho procesu u ka\u017ed\u00e9 polo\u017eky zak\u00e1zky. To je p\u0159\u00ednosn\u00e9 zejm\u00e9na tehdy, kdy\u017e je samotn\u00e1 pr\u00e1ce pom\u011brn\u011b kr\u00e1tk\u00e1, ale jednotliv\u00e9 kroky jsou od sebe \u010dasov\u011b vzd\u00e1len\u00e9.<\/p>\n\n\n<p>Tento optimalizovan\u00fd interval je u\u017e\u0161\u00ed ne\u017e v\u00fd\u0161e uveden\u00e9 m\u011b\u0159en\u00ed od uvoln\u011bn\u00ed do v\u00fdroby po p\u0159ipravenost k expedici. Nezahrnuje ve\u0161ker\u00e9 \u010dek\u00e1n\u00ed p\u0159ed prvn\u00edm krokem a nep\u0159edstavuje p\u0159\u00edslib zkr\u00e1cen\u00ed n\u00e1kupu ani dopravy k z\u00e1kazn\u00edkovi.<\/p>\n\n\n<p>Tuto prioritu nastavujete spole\u010dn\u011b s prioritami term\u00edn\u016f dokon\u010den\u00ed, z\u00e1kazn\u00edk\u016f a operac\u00ed. Zkr\u00e1cen\u00ed doby v\u00fdroby jedn\u00e9 polo\u017eky je nutn\u00e9 vyv\u00e1\u017eit v\u016f\u010di dodac\u00edm z\u00e1vazk\u016fm u ostatn\u00edch zak\u00e1zek. M\u00edsto toho, abyste v\u0161echny priority ozna\u010dili za stejn\u011b nal\u00e9hav\u00e9, nastavte rozvrhov\u00e1n\u00ed podle priorit, kter\u00e9 va\u0161e firma skute\u010dn\u011b pot\u0159ebuje dodr\u017eovat.<\/p>\n\n\n<p>Dal\u0161\u00ed informace o t\u00e9to mo\u017enosti rozvrhov\u00e1n\u00ed najdete v <a href=\"\/cs\/zdroje\/funkce-rizeni-casu-realizace-optimalizujte-kazdou-minutu\/\">p\u0159ehledu funkce SkyPlanner pro \u0159\u00edzen\u00ed pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159epo\u010d\u00edtejte rozvrh, kdy\u017e se podm\u00ednky zm\u011bn\u00ed<\/h3>\n\n\n<p>Kdy\u017e p\u0159ijde urgentn\u00ed zak\u00e1zka nebo se zm\u011bn\u00ed sm\u011bna, Arcturus m\u016f\u017ee p\u0159epo\u010d\u00edtat rozvrh podle nov\u00e9 situace. Zkontrolujte v\u00fdsledn\u00e9 term\u00edny dokon\u010den\u00ed, nejen operaci, kterou jste p\u0159esunuli. Pomoc\u00ed z\u00e1mk\u016f m\u016f\u017eete zachovat pl\u00e1novac\u00ed rozhodnut\u00ed, kter\u00e1 maj\u00ed z\u016fstat pevn\u00e1.<\/p>\n\n\n<p>M\u00e9n\u011b \u010dasu tak str\u00e1v\u00edte p\u0159estavov\u00e1n\u00edm jednotliv\u00fdch front a z\u00edsk\u00e1te jasn\u011bj\u0161\u00ed p\u0159ehled o d\u016fsledc\u00edch zm\u011bny. Je\u0161t\u011b p\u0159ed pl\u00e1novanou expedic\u00ed zak\u00e1zky se m\u016f\u017eete rozhodnout, zda upravit kapacitu, zm\u011bnit prioritu nebo projednat nov\u00fd term\u00edn.<\/p>\n\n\n<p>Va\u0161e st\u00e1vaj\u00edc\u00ed syst\u00e9my maj\u00ed i nad\u00e1le sv\u00e9 m\u00edsto. <a href=\"\/cs\/zdroje\/vyrobni-erp-komplexni-pruvodce\/\">Syst\u00e9m ERP<\/a> dod\u00e1v\u00e1 \u00fadaje o zak\u00e1zk\u00e1ch, zat\u00edmco <a href=\"\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/\">MES<\/a> m\u016f\u017ee poskytovat informace o skute\u010dn\u00e9m pr\u016fb\u011bhu v\u00fdroby. <strong>SkyPlanner se prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API integruje s libovoln\u00fdm ERP nebo MES<\/strong> a propojuje tyto informace s rozvrhov\u00e1n\u00edm v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co lep\u0161\u00ed p\u0159ehled zm\u011bnil ve spole\u010dnosti Eskomatic<\/h2>\n\n\n<p>Finsk\u00e1 spole\u010dnost Eskomatic, kter\u00e1 se zab\u00fdv\u00e1 zak\u00e1zkov\u00fdm obr\u00e1b\u011bn\u00edm, d\u0159\u00edve sestavovala fronty pr\u00e1ce p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b ve star\u0161\u00edm syst\u00e9mu ERP a \u0159\u00edzen\u00ed v\u00fdroby. Z\u00edskat celkov\u00fd p\u0159ehled bylo pracn\u00e9 a nedostatek materi\u00e1lu se mohl projevit a\u017e t\u011bsn\u011b p\u0159ed pl\u00e1novan\u00fdm zah\u00e1jen\u00edm operace.<\/p>\n\n\n<p>D\u00edky SkyPlanner z\u00edskali jej\u00ed pl\u00e1nova\u010di p\u0159ehledn\u011bj\u0161\u00ed vizu\u00e1ln\u00ed frontu pr\u00e1ce a mohli l\u00e9pe sledovat nadch\u00e1zej\u00edc\u00ed vyt\u00ed\u017een\u00ed podle rozvrhu sestaven\u00e9ho um\u011blou inteligenc\u00ed. P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby ve spole\u010dnosti Eskomatic syst\u00e9m upozor\u0148uje na chyb\u011bj\u00edc\u00ed materi\u00e1l, co\u017e t\u00fdmu pom\u00e1h\u00e1 p\u0159edch\u00e1zet zastaven\u00edm v\u00fdroby zp\u016fsoben\u00fdm jeho nedostatkem.<\/p>\n\n\n<p>Automatick\u00e9 rozvrhov\u00e1n\u00ed vyt\u00ed\u017een\u00ed tak\u00e9 pom\u00e1h\u00e1 spole\u010dnosti Eskomatic z\u00edskat realistick\u00fd p\u0159ehled o term\u00ednech dokon\u010den\u00ed a stanovit p\u0159esn\u011bj\u0161\u00ed dodac\u00ed term\u00edny pro z\u00e1kazn\u00edky. Pr\u00e1v\u011b v tom spo\u010d\u00edv\u00e1 praktick\u00e1 vazba mezi pr\u016fb\u011b\u017enou dobou v\u00fdroby a rozvrhov\u00e1n\u00edm: term\u00edn vych\u00e1z\u00ed z p\u0159ehledu pr\u00e1ce a jej\u00edch omezen\u00ed, nikoli z pau\u0161\u00e1ln\u00ed \u010dasov\u00e9 rezervy p\u0159idan\u00e9 ke ka\u017ed\u00e9 zak\u00e1zce.<\/p>\n\n\n<p>Cel\u00fd p\u0159\u00edb\u011bh najdete v \u010dl\u00e1nku <a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">o zku\u0161enostech spole\u010dnosti Eskomatic se syst\u00e9mem SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zkra\u0165te skute\u010dnou pr\u016fb\u011b\u017enou dobu, nejen \u010d\u00edslo v p\u0159ehledu<\/h2>\n\n\n<p>Za\u010dn\u011bte jednou skupinou v\u00fdrobk\u016f, u kter\u00e9 dokon\u010den\u00ed zak\u00e1zek opakovan\u011b trv\u00e1 d\u00e9le, ne\u017e o\u010dek\u00e1v\u00e1te. Porovnejte \u010dasov\u00e9 \u00fadaje o uvoln\u011bn\u00ed do v\u00fdroby, jednotliv\u00fdch operac\u00edch a p\u0159ipravenosti k expedici. Najd\u011bte opakuj\u00edc\u00ed se prodlevu, kter\u00e1 nej\u010dast\u011bji odsouv\u00e1 dokon\u010den\u00ed, a ov\u011b\u0159te, zda ji pom\u016f\u017ee zkr\u00e1tit zm\u011bna rozvrhu nebo v\u00fdrobn\u00edho procesu.<\/p>\n\n\n<p>Vedle pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby sledujte i dodr\u017eov\u00e1n\u00ed dodac\u00edch term\u00edn\u016f. Krat\u0161\u00ed doba v\u00fdroby nen\u00ed zlep\u0161en\u00edm, pokud kv\u016fli n\u00ed jin\u00e9 zak\u00e1zky nestihnou sl\u00edben\u00fd term\u00edn. Podobn\u011b m\u016f\u017ee pozd\u011bj\u0161\u00ed uvoln\u011bn\u00ed do v\u00fdroby opticky zkr\u00e1tit dobu od uvoln\u011bn\u00ed do p\u0159ipravenosti k expedici, p\u0159esto\u017ee z\u00e1kazn\u00edk \u010dek\u00e1 celkov\u011b \u00fapln\u011b stejn\u011b dlouho. \u010cek\u00e1n\u00ed p\u0159ed uvoln\u011bn\u00edm proto sledujte samostatn\u011b, m\u00edsto aby z p\u0159ehledu zmizelo.<\/p>\n\n\n<p>SkyPlanner je vhodnou volbou, kdy\u017e pot\u0159ebujete koordinovat mnoho zak\u00e1zek, kter\u00e9 vyu\u017e\u00edvaj\u00ed spole\u010dn\u00e9 v\u00fdrobn\u00ed zdroje. Arcturus vypo\u010d\u00edt\u00e1 rozvrh, zat\u00edmco priority i uzam\u010den\u00e1 rozhodnut\u00ed z\u016fst\u00e1vaj\u00ed pod va\u0161\u00ed kontrolou. M\u016f\u017eete tak usilovat o krat\u0161\u00ed prodlevy a spolehliv\u011bj\u0161\u00ed term\u00edny dokon\u010den\u00ed, ani\u017e byste museli ru\u010dn\u011b upravovat ka\u017edou frontu operac\u00ed.<\/p>\n\n\n<p><a href=\"\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku syst\u00e9mu SkyPlanner<\/a> a p\u0159ipravte si p\u0159\u00edklad zak\u00e1zky, kter\u00e1 vy\u017eadovala hodiny pr\u00e1ce, ale jej\u00ed dokon\u010den\u00ed trvalo n\u011bkolik dn\u00ed. Jej\u00ed technologick\u00fd postup, \u010dek\u00e1n\u00ed a nejvyt\u00ed\u017een\u011bj\u0161\u00ed v\u00fdrobn\u00ed zdroj jsou dobr\u00fdm v\u00fdchoz\u00edm bodem pro posouzen\u00ed, co by mohl zm\u011bnit koordinovan\u00fd rozvrh. Pokud se chcete nejprve sezn\u00e1mit se syst\u00e9mem sami, <a href=\"\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi Podle technologick\u00e9ho postupu sta\u010d\u00ed dvan\u00e1ct hodin. Z\u00e1kazn\u00edkovi ale bylo sl\u00edbeno dokon\u010den\u00ed za osm dn\u00ed. Mezi prvn\u00ed operac\u00ed a dokon\u010den\u00edm zak\u00e1zky tr\u00e1v\u00ed rozpracovan\u00e1 v\u00fdroba mnohem v\u00edce \u010dasu \u010dek\u00e1n\u00edm ne\u017e samotn\u00fdm zpracov\u00e1n\u00edm. Pro pl\u00e1nova\u010de v\u00fdroby je pochopen\u00ed tohoto rozd\u00edlu prvn\u00edm krokem ke zkr\u00e1cen\u00ed pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby. Rychlej\u0161\u00ed obr\u00e1b\u011bn\u00ed m\u016f\u017ee &#8230; <a title=\"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/\" aria-label=\"Read more about Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":98259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-8266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi<\/title>\n<meta name=\"description\" content=\"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\" \/>\n<meta property=\"og:description\" content=\"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-28T07:54:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:41:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/\"},\"wordCount\":2380,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/\",\"name\":\"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"description\":\"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"width\":1280,\"height\":720,\"caption\":\"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u010cl\u00e1nky\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi","description":"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/","og_locale":"cs_CZ","og_type":"article","og_title":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi","og_description":"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2022-10-28T07:54:22+00:00","article_modified_time":"2026-10-19T14:41:33+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","type":"image\/png"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jesse Sinisalo","Odhadovan\u00e1 doba \u010dten\u00ed":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/"},"wordCount":2380,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/","name":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","description":"Hodiny pr\u00e1ce mohou trvat dny. Poznejte pr\u016fb\u011b\u017enou dobu v\u00fdroby, odhalte \u010dek\u00e1n\u00ed mezi operacemi a se SkyPlanner pl\u00e1nujte spolehliv\u011bj\u0161\u00ed term\u00edny.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","width":1280,"height":720,"caption":"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"\u010cl\u00e1nky","item":"https:\/\/skyplanner.ai\/cs\/zdroje\/"},{"@type":"ListItem","position":3,"name":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":"Lead time ve v\u00fdrob\u011b: odhalte prodlevy mezi operacemi Podle technologick\u00e9ho postupu sta\u010d\u00ed dvan\u00e1ct hodin. Z\u00e1kazn\u00edkovi ale bylo sl\u00edbeno dokon\u010den\u00ed za osm dn\u00ed. Mezi prvn\u00ed operac\u00ed a dokon\u010den\u00edm zak\u00e1zky tr\u00e1v\u00ed rozpracovan\u00e1 v\u00fdroba mnohem v\u00edce \u010dasu \u010dek\u00e1n\u00edm ne\u017e samotn\u00fdm zpracov\u00e1n\u00edm. Pro pl\u00e1nova\u010de v\u00fdroby je pochopen\u00ed tohoto rozd\u00edlu prvn\u00edm krokem ke zkr\u00e1cen\u00ed pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby. Rychlej\u0161\u00ed obr\u00e1b\u011bn\u00ed m\u016f\u017ee&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/8266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=8266"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/8266\/revisions"}],"predecessor-version":[{"id":93097,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/8266\/revisions\/93097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/98259"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=8266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=8266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=8266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}