{"id":7088,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=7088"},"modified":"2026-10-10T14:05:53","modified_gmt":"2026-10-10T14:05:53","slug":"mes-system-co-to-je-a-jak-funguje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/","title":{"rendered":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>Syst\u00e9m MES<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/cs\/zdroje\/mes-vs-erp-jaky-je-mezi-nimi-rozdil\/\">MES vs ERP<\/a><\/strong><br><br><strong><a href=\"\/cs\/zdroje\/sila-integrace-mes-erp\/\">MES ERP Integrace<\/a><\/strong><br><br><a href=\"\/cs\/zdroje\/vyhody-funkci-mes\/\"><strong>Funkce MES<\/strong><\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/monitorovani-vyroby-mes\/\">Monitorov\u00e1n\u00ed v\u00fdroby<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/rizeni-kvality-mes-ve-vyrobe\/\">Kontrola kvality<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/optimalizace-zasob-mes\/\">Optimalizace z\u00e1sob<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/sprava-datovych-toku-mes\/\">Spr\u00e1va datov\u00fdch tok\u016f<\/a><br>\u00b7<a href=\"\/cs\/zdroje\/mes-analyza-vyroby\/\"> V\u00fdrobn\u00ed analytika<\/a><br>\u00b7<a href=\"\/cs\/zdroje\/sledovani-vyroby-v-systemu-mes\/\"> Sledov\u00e1n\u00ed v\u00fdroby<\/a><br><br><strong><a href=\"\/cs\/zdroje\/reseni-mes-jak-vybrat-to-spravne\/\">\u0158e\u0161en\u00ed MES<\/a><\/strong><br>\u00b7<a href=\"\/cs\/zdroje\/mes-zalozeny-na-cloudu\/\"> Cloudov\u00fd MES<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/mistni-systemy-mes\/\">On-premises MES<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/mes-pro-male-podniky\/\">MES pro mal\u00e9 firmy<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/mes-rizeny-umelou-inteligenci\/\">AI \u0159\u00edzen\u00fd MES<\/a><br>\u00b7 <a href=\"\/cs\/zdroje\/podnikovy-mes\/\">Enterprise MES<\/a><br>\u00b7<a href=\"\/cs\/zdroje\/mes-specificke-pro-dane-odvetvi\/\"> Odv\u011btvov\u011b specifick\u00fd MES<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/cs\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">\u010cl\u00e1nky<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">Kdy\u017e se do v\u00fdroby poprv\u00e9 za\u010dala za\u010dle\u0148ovat automatizace, vznikl term\u00edn Manufacturing Execution System (MES). MES byl n\u00e1stroj pro spr\u00e1vu automatizovan\u00fdch syst\u00e9m\u016f zp\u016fsobem, kter\u00fd by umo\u017enil hladk\u00fd chod v\u00fdrobn\u00edch z\u00e1vod\u016f. Toho dosahoval zefektivn\u011bn\u00edm proces\u016f, jejich sledov\u00e1n\u00edm ve v\u00fdrob\u011b a automatickou dokumentac\u00ed ud\u00e1lost\u00ed.<\/p>\n\n\n\n<p>Postupem \u010dasu firmy nach\u00e1zely nov\u00e9 zp\u016fsoby vyu\u017eit\u00ed tohoto nov\u00e9ho n\u00e1stroje. S rostouc\u00ed popt\u00e1vkou po zak\u00e1zkov\u00fdch produktech bylo t\u0159eba procesy zefektivnit tak, aby pracovaly s vy\u0161\u0161\u00ed \u00fa\u010dinnost\u00ed, a&nbsp;<a href=\"\/cs\/\" target=\"_blank\" rel=\"noreferrer noopener\">pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/a>&nbsp;vy\u017eadovalo optimalizaci. Pro tyto \u00fa\u010dely se MES uk\u00e1zal jako fantastick\u00fd n\u00e1stroj.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tObsah\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#co-je-mes\" class=\"uagb-toc-link__trigger\">Co je MES?<\/a><li class=\"uagb-toc__list\"><a href=\"#funkce-mes\" class=\"uagb-toc-link__trigger\">Funkce MES<\/a><li class=\"uagb-toc__list\"><a href=\"#vlastnosti-mes\" class=\"uagb-toc-link__trigger\">Vlastnosti MES<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0159e\u0161en\u00ed-mes\" class=\"uagb-toc-link__trigger\">\u0158e\u0161en\u00ed MES<\/a><li class=\"uagb-toc__list\"><a href=\"#rady-pro-v\u00fdb\u011br-spr\u00e1vn\u00e9ho-\u0159e\u0161en\u00ed\" class=\"uagb-toc-link__trigger\">Rady pro v\u00fdb\u011br spr\u00e1vn\u00e9ho \u0159e\u0161en\u00ed<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-a-erp\" class=\"uagb-toc-link__trigger\">MES a ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#v\u00fdhody-pou\u017e\u00edv\u00e1n\u00ed-mes\" class=\"uagb-toc-link__trigger\">V\u00fdhody pou\u017e\u00edv\u00e1n\u00ed MES<\/a><li class=\"uagb-toc__list\"><a href=\"#budouc\u00ed-aplikace-manufacturing-execution-system\" class=\"uagb-toc-link__trigger\">Budouc\u00ed aplikace Manufacturing Execution System<\/a><li class=\"uagb-toc__list\"><a href=\"#posu\u0148te-\u0159\u00edzen\u00ed-proces\u016f-ve-va\u0161\u00ed-spole\u010dnosti-na-vy\u0161\u0161\u00ed-\u00farove\u0148\" class=\"uagb-toc-link__trigger\">Posu\u0148te \u0159\u00edzen\u00ed proces\u016f ve va\u0161\u00ed spole\u010dnosti na vy\u0161\u0161\u00ed \u00farove\u0148!<\/a><li class=\"uagb-toc__list\"><a href=\"#\u010dasto-kladen\u00e9-ot\u00e1zky\" class=\"uagb-toc-link__trigger\">\u010casto kladen\u00e9 ot\u00e1zky<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>Syst\u00e9m MES (Manufacturing Execution System) sleduje a dokumentuje pr\u016fb\u011bh v\u00fdroby na shopflooru a poskytuje t\u00fdm\u016fm aktu\u00e1ln\u00ed informace o operac\u00edch, materi\u00e1lech a kvalit\u011b. ERP zaji\u0161\u0165uje podnikov\u00e9 pl\u00e1nov\u00e1n\u00ed, zat\u00edmco MES podporuje samotn\u00e9 prov\u00e1d\u011bn\u00ed v\u00fdroby. ISA-95 stanovuje modely a terminologii pro v\u00fdm\u011bnu informac\u00ed mezi \u0159\u00edzen\u00edm v\u00fdroby a podnikov\u00fdmi funkcemi; nejde o z\u00e1vazn\u00fd seznam funkc\u00ed syst\u00e9mu MES. Modern\u00ed syst\u00e9my MES nab\u00edzej\u00ed nap\u0159\u00edklad sledov\u00e1n\u00ed v\u00fdroby, evidenci z\u00e1sob a anal\u00fdzu v\u00fdrobn\u00edch dat. Propojen\u00ed MES se SkyPlanner APS p\u0159id\u00e1v\u00e1 rozvrhov\u00e1n\u00ed v\u00fdroby na z\u00e1klad\u011b v\u00fdrobn\u00edch dat a priorit stanoven\u00fdch pl\u00e1nova\u010di v\u00fdroby.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Co je MES?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Syst\u00e9m MES (Manufacturing Execution System) je software, kter\u00fd sleduje, dokumentuje a podporuje prov\u00e1d\u011bn\u00ed v\u00fdroby na shopflooru. Shroma\u017e\u010fuje data od oper\u00e1tor\u016f, ze za\u0159\u00edzen\u00ed a z propojen\u00fdch syst\u00e9m\u016f, aby t\u00fdmy mohly sledovat pr\u016fb\u011bh operac\u00ed, spot\u0159ebu materi\u00e1lu a kvalitu.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">MES a ERP se vz\u00e1jemn\u011b dopl\u0148uj\u00ed. ERP podporuje podnikov\u00e9 procesy, nap\u0159\u00edklad zpracov\u00e1n\u00ed objedn\u00e1vek, n\u00e1kup a finance, zat\u00edmco MES poskytuje podrobn\u011bj\u0161\u00ed informace o pr\u016fb\u011bhu v\u00fdroby. D\u00edky integraci si oba syst\u00e9my mohou p\u0159ed\u00e1vat po\u017eadavky na v\u00fdrobu i jej\u00ed v\u00fdsledky.<\/p>\n\n\n\n<p>MES je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje vybaven\u00ed, materi\u00e1ly a pracovn\u00edky. Poukazuje na \u00fazk\u00e1 m\u00edsta v procesech, pom\u00e1h\u00e1 p\u0159edem pl\u00e1novat \u00fadr\u017ebu za\u0159\u00edzen\u00ed a lze jej tak\u00e9 pou\u017e\u00edt k poskytov\u00e1n\u00ed p\u0159izp\u016fsoben\u00fdch instrukc\u00ed pro pracovn\u00edky a za\u0159\u00edzen\u00ed na z\u00e1klad\u011b objedn\u00e1vky. To pom\u00e1h\u00e1 udr\u017eovat procesy efektivn\u00ed a poskytuje spolehliv\u011bj\u0161\u00ed pl\u00e1nov\u00e1n\u00ed.<\/p>\n\n\n\n<p>Kdy\u017e byl MES je\u0161t\u011b v plenk\u00e1ch, byl definov\u00e1n pom\u011brn\u011b voln\u011b. T\u00e9m\u011b\u0159 jak\u00e1koli metoda sledov\u00e1n\u00ed, dokumentov\u00e1n\u00ed nebo \u0159\u00edzen\u00ed procesu mohla b\u00fdt naz\u00fdv\u00e1na MES. To zp\u016fsobovalo probl\u00e9my p\u0159i provozu rozhran\u00ed mezi MES a ostatn\u00edmi syst\u00e9my.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> definuje modely, terminologii a v\u00fdm\u011bnu informac\u00ed pro integraci \u0159\u00edzen\u00ed v\u00fdroby s podnikov\u00fdmi funkcemi. Toto zam\u011b\u0159en\u00ed na integraci se li\u0161\u00ed od historick\u00fdch model\u016f funkc\u00ed MES, kter\u00e9 vyvinula organizace <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a>. N\u00e1sleduj\u00edc\u00ed seznam p\u0159edstavuje p\u0159ehled b\u011b\u017en\u00fdch funkc\u00ed MES, nikoli seznam z\u00e1vazn\u00fdch po\u017eadavk\u016f ISA-95:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">Funkce MES<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Sb\u011br dat<\/li>\n\n\n\n<li>Kontrola kvality<\/li>\n\n\n\n<li>Rozvrhov\u00e1n\u00ed v\u00fdroby<\/li>\n\n\n\n<li>Anal\u00fdza v\u00fdkonnosti<\/li>\n\n\n\n<li>Tok produkt\u016f<\/li>\n\n\n\n<li>Genealogie a sledovatelnost<\/li>\n\n\n\n<li>\u0158\u00edzen\u00ed proces\u016f<\/li>\n\n\n\n<li>\u0158\u00edzen\u00ed zdroj\u016f<\/li>\n\n\n\n<li>\u0158\u00edzen\u00ed pracovn\u00edk\u016f<\/li>\n\n\n\n<li>\u0158\u00edzen\u00ed \u00fadr\u017eby<\/li>\n\n\n\n<li>Spr\u00e1va dokument\u016f<\/li>\n<\/ol>\n\n\n\n<p>Rozsah funkc\u00ed konkr\u00e9tn\u00edho syst\u00e9mu MES z\u00e1vis\u00ed na produktu a jeho implementaci. Ur\u010dete, kter\u00fd syst\u00e9m odpov\u00edd\u00e1 za jednotliv\u00e9 \u00fakoly a jak se data p\u0159ed\u00e1vaj\u00ed mezi MES, ERP a softwarem pro rozvrhov\u00e1n\u00ed v\u00fdroby, nap\u0159\u00edklad APS.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">Vlastnosti MES<\/h2>\n\n\n\n<p>P\u0159i hlub\u0161\u00edm ponoru do oblasti tohoto syst\u00e9mu naraz\u00edme na nov\u011bj\u0161\u00ed, vzru\u0161uj\u00edc\u00ed aspekt:&nbsp;<a href=\"\/cs\/zdroje\/vyhody-funkci-mes\/\">Vlastnosti MES<\/a>. Pokud rozum\u00edme nuanc\u00edm tohoto n\u00e1stroje, z\u016fst\u00e1v\u00e1 rozli\u0161en\u00ed mezi funkc\u00ed MES a vlastnost\u00ed MES z\u00e1sadn\u00ed.<\/p>\n\n\n\n<p>Zjednodu\u0161en\u011b \u0159e\u010deno, funkce MES odkazuje na z\u00e1kladn\u00ed operace nebo \u00fakoly, kter\u00e9 syst\u00e9m m\u016f\u017ee prov\u00e1d\u011bt. Tyto funkce tvo\u0159\u00ed p\u00e1te\u0159 syst\u00e9mu MES. Mezit\u00edm jeho vlastnosti zd\u016fraz\u0148uj\u00ed specifick\u00e9 n\u00e1stroje nebo schopnosti syst\u00e9mu, kter\u00e9 zvy\u0161uj\u00ed jeho funk\u010dn\u00ed potenci\u00e1l. B\u011bhem na\u0161eho zkoum\u00e1n\u00ed syst\u00e9m\u016f MES jsme identifikovali \u0161est inovativn\u00edch vlastnost\u00ed, kter\u00e9 vynikaj\u00ed:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/cs\/zdroje\/monitorovani-vyroby-mes\/\">Monitorov\u00e1n\u00ed v\u00fdroby<\/a><\/strong>: Tato funkce poskytuje dohled nad v\u00fdrobn\u00edm procesem v re\u00e1ln\u00e9m \u010dase a zaji\u0161\u0165uje, \u017ee v\u0161e prob\u00edh\u00e1 hladce a efektivn\u011b. D\u00edky tomuto monitorov\u00e1n\u00ed z\u00edsk\u00e1vaj\u00ed pl\u00e1nova\u010di v\u00fdroby cenn\u00e9 p\u0159ehledy a mohou podle pot\u0159eby prov\u00e1d\u011bt \u00fapravy.<\/li>\n\n\n\n<li><a href=\"\/cs\/zdroje\/rizeni-kvality-mes-ve-vyrobe\/\"><strong>Kontrola kvality ve v\u00fdrob\u011b<\/strong>:<\/a> Robustn\u00ed syst\u00e9m MES se neomezuje na pouh\u00e9 sledov\u00e1n\u00ed v\u00fdroby, ale v\u011bnuje se i kvalit\u011b vyr\u00e1b\u011bn\u00fdch produkt\u016f. Zaznamen\u00e1v\u00e1 kontroly kvality a upozor\u0148uje na odchylky, aby t\u00fdm mohl zas\u00e1hnout a zajistit dodr\u017een\u00ed po\u017eadovan\u00fdch standard\u016f.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/optimalizace-zasob-mes\/\">Optimalizace z\u00e1sob<\/a><\/strong>: Vedle samotn\u00e9 v\u00fdroby m\u00e1 z\u00e1sadn\u00ed v\u00fdznam i \u0159\u00edzen\u00ed z\u00e1sob. Syst\u00e9my MES sleduj\u00ed pohyb a spot\u0159ebu materi\u00e1lu a pom\u00e1haj\u00ed t\u00fdm\u016fm odhalovat nedostatek i p\u0159ebyte\u010dn\u00e9 z\u00e1soby.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/sprava-datovych-toku-mes\/\">\u0158\u00edzen\u00ed toku dat<\/a><\/strong>: V na\u0161\u00ed digitalizovan\u00e9 dob\u011b jsou data na prvn\u00edm m\u00edst\u011b. \u0158\u00edzen\u00ed toku dat se proto st\u00e1v\u00e1 z\u00e1sadn\u00ed. MES syst\u00e9m vybaven\u00fd touto funkc\u00ed zaji\u0161\u0165uje plynul\u00fd pohyb, ukl\u00e1d\u00e1n\u00ed a p\u0159\u00edstup k dat\u016fm, \u010d\u00edm\u017e zjednodu\u0161uje rozhodovac\u00ed proces.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/mes-analyza-vyroby\/\">Analytika v\u00fdroby<\/a><\/strong>: Pono\u0159en\u00edm se do dat dok\u00e1\u017eou MES syst\u00e9my z\u00edskat kl\u00ed\u010dov\u00e9 anal\u00fdzy. D\u00edky nim mohou pl\u00e1nova\u010di v\u00fdroby rozpozn\u00e1vat vzorce, p\u0159edv\u00eddat trendy a \u010dinit informovan\u00e1 rozhodnut\u00ed.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/sledovani-vyroby-v-systemu-mes\/\">Sledov\u00e1n\u00ed v\u00fdroby<\/a><\/strong>: V neposledn\u00ed \u0159ad\u011b z\u016fst\u00e1v\u00e1 sledov\u00e1n\u00ed v\u00fdroby skute\u010dn\u00fdm klenotem. Umo\u017e\u0148uje jasn\u00fd p\u0159ehled o tom, kde se ka\u017ed\u00fd produkt na v\u00fdrobn\u00ed lince nach\u00e1z\u00ed, a otev\u00edr\u00e1 cestu k lep\u0161\u00edmu rozd\u011blen\u00ed zdroj\u016f a vy\u0161\u0161\u00ed efektivit\u011b.<\/li>\n<\/ol>\n\n\n\n<p>Pod\u00edvejme se na jednu z t\u011bchto vlastnost\u00ed pro jasn\u011bj\u0161\u00ed pochopen\u00ed. Monitorov\u00e1n\u00ed v\u00fdroby \u2013 Tato vlastnost nab\u00edz\u00ed komplexn\u00ed p\u0159ehled o v\u00fdrobn\u00edm procesu. P\u0159edstavte si ji jako bd\u011blou str\u00e1\u017e. Tato vlastnost aktivn\u011b detekuje nepravidelnosti, potenci\u00e1ln\u00ed neefektivitu a zn\u00e1mky poruch syst\u00e9mu. <\/p>\n\n\n\n<p>Poskytov\u00e1n\u00edm aktu\u00e1ln\u00edch dat zaji\u0161\u0165uje monitorov\u00e1n\u00ed v\u00fdroby, \u017ee pl\u00e1nova\u010di v\u00fdroby jsou v\u017edy informov\u00e1ni, co\u017e jim umo\u017e\u0148uje okam\u017eit\u011b jednat a v p\u0159\u00edpad\u011b pot\u0159eby vylep\u0161ovat procesy.<br><br>Sv\u011bt syst\u00e9m\u016f MES se nad\u00e1le vyv\u00edj\u00ed a nab\u00edz\u00ed sofistikovan\u011bj\u0161\u00ed n\u00e1stroje a vlastnosti. T\u00edm, \u017ee z\u016fstanou v obraze a informovan\u00ed, mohou pl\u00e1nova\u010di v\u00fdroby vyu\u017e\u00edt pln\u00fd potenci\u00e1l t\u011bchto syst\u00e9m\u016f a posunout sv\u00e9 provozy do lep\u0161\u00ed budoucnosti.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 Obr\u00e1zek produktu pro pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed v\u00fdroby, \u010deln\u00ed pohled\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">P\u0159e\u010dt\u011bte si v\u00edce o na\u0161em p\u0159\u00edstupu k pl\u00e1nov\u00e1n\u00ed a optimalizaci v\u00fdroby s vyu\u017eit\u00edm s\u00edly AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/cs\/\" aria-label=\"Objednat demo\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">\u0158e\u0161en\u00ed MES<\/h2>\n\n\n\n<p>R\u016fzn\u00e1 <a href=\"\/cs\/zdroje\/reseni-mes-jak-vybrat-to-spravne\/\">\u0159e\u0161en\u00ed MES <\/a>jsou p\u0159ipravena \u0159e\u0161it odli\u0161n\u00e9 provozn\u00ed v\u00fdzvy v r\u00e1mci rozs\u00e1hl\u00e9 dom\u00e9ny syst\u00e9m\u016f MES. Ka\u017ed\u00e9 z nich p\u0159edstavuje svou jedine\u010dnou hodnotu, od zjednodu\u0161en\u00fdch schopnost\u00ed cloudov\u00fdch syst\u00e9m\u016f a\u017e po specializovan\u00e9 nab\u00eddky odv\u011btvov\u011b specifick\u00fdch MES. Poj\u010fme spole\u010dn\u011b proj\u00edt tyto mo\u017enosti a zjistit, jak m\u016f\u017ee ka\u017ed\u00e1 z nich optim\u00e1ln\u011b podpo\u0159it a vylep\u0161it specifick\u00e9 v\u00fdrobn\u00ed pot\u0159eby va\u0161\u00ed spole\u010dnosti.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/cs\/zdroje\/mes-zalozeny-na-cloudu\/\">Cloudov\u00fd MES<\/a><\/strong>: Funguje z cloudu, tak\u017ee k n\u011bmu m\u00e1te p\u0159\u00edstup odkudkoli s p\u0159ipojen\u00edm k internetu. Nab\u00edz\u00ed flexibilitu a \u010dasto ni\u017e\u0161\u00ed po\u010d\u00e1te\u010dn\u00ed n\u00e1klady. Z\u00e1vis\u00ed v\u0161ak na stabiln\u00edm internetov\u00e9m p\u0159ipojen\u00ed.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/mistni-systemy-mes\/\">MES na vlastn\u00ed infrastruktu\u0159e<\/a><\/strong>: Tento syst\u00e9m se instaluje na hardware a servery va\u0161\u00ed spole\u010dnosti. P\u0159esto\u017ee m\u016f\u017ee vy\u017eadovat vy\u0161\u0161\u00ed po\u010d\u00e1te\u010dn\u00ed investici, nab\u00edz\u00ed v\u011bt\u0161\u00ed kontrolu nad daty a lze jej p\u0159izp\u016fsobit pot\u0159eb\u00e1m va\u0161\u00ed firmy.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/mes-pro-male-podniky\/\">MES pro mal\u00e9 podniky<\/a><\/strong>: Tyto syst\u00e9my jsou navr\u017eeny p\u0159\u00edmo pro men\u0161\u00ed provozy, jsou obvykle jednodu\u0161\u0161\u00ed a cenov\u011b dostupn\u011bj\u0161\u00ed. Zam\u011b\u0159uj\u00ed se na z\u00e1kladn\u00ed funkce, kter\u00e9 mal\u00fd podnik pot\u0159ebuje, ani\u017e by jej zahltily slo\u017eit\u00fdmi mo\u017enostmi.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/mes-rizeny-umelou-inteligenci\/\">MES s podporou AI<\/a><\/strong>: D\u00edky za\u010dlen\u011bn\u00ed um\u011bl\u00e9 inteligence dok\u00e1\u017eou tyto syst\u00e9my p\u0159edv\u00eddat trendy, automatizovat \u00fakoly a optimalizovat procesy. Jsou vynikaj\u00edc\u00ed volbou pro firmy, kter\u00e9 cht\u011bj\u00ed z\u016fstat v \u010dele inovac\u00ed.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/podnikovy-mes\/\">Podnikov\u00fd MES<\/a><\/strong>: Toto \u0159e\u0161en\u00ed je ur\u010den\u00e9 pro velk\u00e9 spole\u010dnosti s komplexn\u00edmi pot\u0159ebami, nab\u00edz\u00ed rozs\u00e1hl\u00e9 funkce, zvl\u00e1d\u00e1 velk\u00e9 objemy dat a bezprobl\u00e9mov\u011b se integruje s dal\u0161\u00edmi podnikov\u00fdmi syst\u00e9my.<\/li>\n\n\n\n<li><strong><a href=\"\/cs\/zdroje\/mes-specificke-pro-dane-odvetvi\/\">Oborov\u011b specifick\u00fd MES<\/a><\/strong>: Tyto syst\u00e9my jsou p\u0159izp\u016fsobeny konkr\u00e9tn\u00edm odv\u011btv\u00edm, jako je farmaceutick\u00fd nebo automobilov\u00fd pr\u016fmysl. Jsou p\u0159edem vybaveny n\u00e1stroji a funkcemi jedine\u010dn\u00fdmi pro tyto sektory.<\/li>\n<\/ol>\n\n\n\n<p>V\u00fdb\u011br spr\u00e1vn\u00e9ho \u0159e\u0161en\u00ed MES pro va\u0161e podnik\u00e1n\u00ed m\u016f\u017ee b\u00fdt kl\u00ed\u010dov\u00fd pro efektivitu a \u00fasp\u011bch va\u0161eho v\u00fdrobn\u00edho procesu.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">Rady pro v\u00fdb\u011br spr\u00e1vn\u00e9ho \u0159e\u0161en\u00ed<\/h2>\n\n\n\n<p>U\u010dinit nejlep\u0161\u00ed volbu z t\u00e9to rozmanit\u00e9 \u0161k\u00e1ly syst\u00e9m\u016f MES se m\u016f\u017ee zpo\u010d\u00e1tku zd\u00e1t skli\u010duj\u00edc\u00ed. Je nezbytn\u00e9 sladit vybran\u00fd syst\u00e9m s odli\u0161n\u00fdmi provozn\u00edmi pot\u0159ebami a budouc\u00edmi c\u00edli va\u0161\u00ed spole\u010dnosti. Abychom v\u00e1s provedli t\u00edmto kritick\u00fdm rozhodnut\u00edm, zde je n\u011bkolik neoceniteln\u00fdch tip\u016f, kter\u00e9 stoj\u00ed za zv\u00e1\u017een\u00ed:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Pochopte sv\u00e9 pot\u0159eby<\/strong>: Ne\u017e se rozhodnete, zmapujte konkr\u00e9tn\u00ed po\u017eadavky sv\u00e9 spole\u010dnosti. Pot\u0159ebujete slo\u017eit\u00e9 funkce, nebo jen ty z\u00e1kladn\u00ed?<\/li>\n\n\n\n<li><strong>Rozpo\u010dtov\u00e1 hlediska<\/strong>: Z\u00edskat syst\u00e9m, kter\u00fd odpov\u00edd\u00e1 va\u0161im pot\u0159eb\u00e1m, je z\u00e1sadn\u00ed, ale stejn\u011b d\u016fle\u017eit\u00e9 je zv\u00e1\u017eit, kolik jste ochotni investovat.<\/li>\n\n\n\n<li><strong>\u0160k\u00e1lovatelnost<\/strong>: Myslete dlouhodob\u011b. Zvolte MES syst\u00e9m, kter\u00fd m\u016f\u017ee r\u016fst spolu s va\u0161\u00ed spole\u010dnost\u00ed.<\/li>\n\n\n\n<li><strong>Integrace<\/strong>: Ujist\u011bte se, \u017ee syst\u00e9m Manufacturing Execution System lze dob\u0159e integrovat s dal\u0161\u00edm softwarem, kter\u00fd pou\u017e\u00edv\u00e1te.<\/li>\n\n\n\n<li><strong>Snadn\u00e9 pou\u017e\u00edv\u00e1n\u00ed<\/strong>: Syst\u00e9m, ve kter\u00e9m se obt\u00ed\u017en\u011b orientuje, m\u016f\u017ee brzdit produktivitu. Zvolte takov\u00fd, kter\u00fd je intuitivn\u00ed a u\u017eivatelsky p\u0159\u00edv\u011btiv\u00fd.<\/li>\n\n\n\n<li><strong>Podpora a \u0161kolen\u00ed<\/strong>: Ov\u011b\u0159te si, zda poskytovatel nab\u00edz\u00ed dostate\u010dnou podporu a \u0161kolen\u00ed, kter\u00e1 pomohou va\u0161emu t\u00fdmu sezn\u00e1mit se se syst\u00e9mem.<\/li>\n<\/ul>\n\n\n\n<p>A\u010dkoli je k dispozici n\u011bkolik mo\u017enost\u00ed syst\u00e9m\u016f MES, spr\u00e1vnou volbou bude v\u017edy ta, kter\u00e1 nejl\u00e9pe odpov\u00edd\u00e1 jedine\u010dn\u00fdm pot\u0159eb\u00e1m a pl\u00e1n\u016fm r\u016fstu va\u0161\u00ed spole\u010dnosti.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES a ERP<\/h2>\n\n\n\n<p>P\u0159i pono\u0159en\u00ed se do slo\u017eitost\u00ed pr\u016fmyslov\u00e9ho softwaru se \u010dasto objevuje debata \u201e<a href=\"\/cs\/zdroje\/mes-vs-erp-jaky-je-mezi-nimi-rozdil\/\">MES vs ERP<\/a>\u201c a je snadn\u00e9 pochopit pro\u010d.<\/p>\n\n\n\n<p class=\"has-text-align-left\">MES a&nbsp;<a href=\"\/cs\/zdroje\/vyrobni-erp-komplexni-pruvodce\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;\u010dasto vy\u017eaduj\u00ed vyjasn\u011bn\u00ed, proto\u017ee je t\u011b\u017ek\u00e9 ur\u010dit, kde jeden kon\u010d\u00ed a druh\u00fd za\u010d\u00edn\u00e1. Oba syst\u00e9my maj\u00ed n\u011bkter\u00e9 p\u0159ekr\u00fdvaj\u00edc\u00ed se funkce a v n\u011bkter\u00fdch z\u00e1kladn\u00edch p\u0159\u00edpadech nen\u00ed MES ani vy\u017eadov\u00e1n. Nicm\u00e9n\u011b optimalizace chodu z\u00e1vodu se m\u016f\u017ee uk\u00e1zat jako obt\u00ed\u017en\u00e1 pouze s ERP.<\/p>\n\n\n\n<p>ERP (Enterprise Resource Planning) je softwarov\u00fd syst\u00e9m navr\u017een\u00fd pro \u0159\u00edzen\u00ed cel\u00e9ho podniku. Pokou\u0161\u00ed se integrovat a spravovat v\u0161echny aspekty podnik\u00e1n\u00ed spole\u010dnosti. ERP funguje jako neust\u00e1le se aktualizuj\u00edc\u00ed datab\u00e1ze ud\u00e1lost\u00ed na v\u0161ech \u00farovn\u00edch. Tyto informace lze bu\u010f ru\u010dn\u011b, nebo automaticky pou\u017e\u00edt k \u0159\u00edzen\u00ed zdroj\u016f pot\u0159ebn\u00fdch k optim\u00e1ln\u00edmu fungov\u00e1n\u00ed.<\/p>\n\n\n\n<p>MES naproti tomu nep\u0159esahuje hranice podniku. Jeho hlavn\u00edm \u00fakolem je zjistit, jak\u00e9 zdroje (suroviny, person\u00e1l, za\u0159\u00edzen\u00ed) m\u00e1 k dispozici, a ur\u010dit, jak je co nejl\u00e9pe vyu\u017e\u00edt k v\u00fdrob\u011b objednan\u00fdch produkt\u016f. Pat\u0159\u00ed sem mimo jin\u00e9 <a href=\"\/cs\/zdroje\/co-je-planovani-vyroby\/\">rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>, \u00fadr\u017eba za\u0159\u00edzen\u00ed, \u0159\u00edzen\u00ed z\u00e1sob, kontrola kvality a dokumentace.<\/p>\n\n\n\n<p>V optim\u00e1ln\u00ed situaci mohou syst\u00e9my ERP vytv\u00e1\u0159et p\u0159edpov\u011bdi zalo\u017een\u00e9 na tr\u017en\u00ed projekci budouc\u00ed popt\u00e1vky po ur\u010dit\u00fdch produktech a p\u0159ed\u00e1vat tyto informace do MES. MES pak m\u016f\u017ee upravit v\u00fdrobu tak, aby vyhovovala pot\u0159eb\u00e1m ERP. Manufacturing Execution System m\u016f\u017ee optim\u00e1ln\u011b a automaticky alokovat v\u00edce zdroj\u016f na v\u00fdrobu produkt\u016f s vysokou popt\u00e1vkou. T\u00edmto zp\u016fsobem mohou ERP a MES bezprobl\u00e9mov\u011b spolupracovat.<\/p>\n\n\n\n<p>A\u010dkoli ERP <em>m\u016f\u017ee<\/em> b\u00fdt pou\u017eit k \u0159\u00edzen\u00ed i t\u011bch nejmen\u0161\u00edch detail\u016f v\u00fdrobn\u00edho procesu, tento \u00fakol je \u010dasto nejlep\u0161\u00ed ponechat na Manufacturing Execution System. ERP software ide\u00e1ln\u011b \u0159e\u0161\u00ed to, co do z\u00e1vodu vstupuje a co z n\u011bj vych\u00e1z\u00ed, zat\u00edmco MES \u0159e\u0161\u00ed v\u0161e, co se d\u011bje uvnit\u0159 budovy z\u00e1vodu.<\/p>\n\n\n\n<p>Integrace syst\u00e9m\u016f MES a ERP nen\u00ed jen ot\u00e1zkou pohodl\u00ed \u2013 je to strategick\u00fd krok, kter\u00fd m\u016f\u017ee zp\u016fsobit revoluci v operac\u00edch spole\u010dnosti. Kdy\u017e se tyto dva v\u00fdkonn\u00e9 syst\u00e9my synchronizuj\u00ed, nab\u00edzej\u00ed harmonizovan\u00fd pohled na v\u00fdrobn\u00ed operace a obchodn\u00ed procesy a zaji\u0161\u0165uj\u00ed, \u017ee rozhodnut\u00ed jsou zalo\u017eena na komplexn\u00edch datech v re\u00e1ln\u00e9m \u010dase. Takov\u00e1 integrace eliminuje nadbyte\u010dn\u00e9 \u00fakoly, p\u0159eklenuje informa\u010dn\u00ed mezery a zvy\u0161uje celkovou efektivitu.<\/p>\n\n\n\n<p><a href=\"\/cs\/zdroje\/sila-integrace-mes-erp\/\" target=\"_blank\" rel=\"noreferrer noopener\">Integrace MES ERP<\/a>&nbsp;p\u0159in\u00e1\u0161\u00ed jednotnou, ucelenou perspektivu a stav\u00ed podniky do pozice, kdy jsou agiln\u011bj\u0161\u00ed, responzivn\u011bj\u0161\u00ed a konkurenceschopn\u011bj\u0161\u00ed.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">V\u00fdhody pou\u017e\u00edv\u00e1n\u00ed MES<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Syst\u00e9m MES shroma\u017e\u010fuje v\u00fdrobn\u00ed data z p\u0159ipojen\u00fdch za\u0159\u00edzen\u00ed, od oper\u00e1tor\u016f a z dal\u0161\u00edch syst\u00e9m\u016f a zp\u0159\u00edstup\u0148uje je t\u00fdmu. Vedouc\u00ed pracovn\u00edci mohou tyto informace vyu\u017e\u00edt k odhalen\u00ed zpo\u017ed\u011bn\u00ed a rozhodov\u00e1n\u00ed o pot\u0159ebn\u00fdch zm\u011bn\u00e1ch. Z\u00e1znamy o pr\u016fb\u011bhu v\u00fdroby, spot\u0159eb\u011b materi\u00e1lu a kontrol\u00e1ch kvality podporuj\u00ed kontrolu kvality i \u0159\u00edzen\u00ed z\u00e1sob.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/cs\/zdroje\/jak-optimalizovat-dodaci-lhuty-ve-vyrobe\/\" target=\"_blank\" rel=\"noreferrer noopener\">Optimalizace pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby je z\u00e1sadn\u00ed pro \u00fasp\u011bch<\/a> a syst\u00e9m MES k n\u00ed p\u0159isp\u00edv\u00e1 t\u00edm, \u017ee zviditel\u0148uje pr\u016fb\u011bh operac\u00ed i zpo\u017ed\u011bn\u00ed. P\u0159i zm\u011bn\u011b objedn\u00e1vky pom\u00e1haj\u00ed aktu\u00e1ln\u00ed v\u00fdrobn\u00ed z\u00e1znamy t\u00fdmu posoudit, kter\u00e9 operace je\u0161t\u011b zb\u00fdvaj\u00ed a zda je zm\u011bna provediteln\u00e1. Dopad na pr\u016fb\u011b\u017enou dobu v\u00fdroby z\u00e1vis\u00ed na dostupn\u00e9 kapacit\u011b, materi\u00e1lech a ji\u017e dokon\u010den\u00e9 pr\u00e1ci; \u00fapravy na p\u0159\u00e1n\u00ed z\u00e1kazn\u00edka se neobejdou bez z\u00e1sah\u016f do pr\u016fb\u011bhu v\u00fdroby.<\/p>\n\n\n\n<p>MES m\u016f\u017ee p\u0159ed\u00e1vat v\u00fdsledky v\u00fdroby do ERP, aby podnikov\u00e1 evidence odpov\u00eddala skute\u010dn\u00e9mu d\u011bn\u00ed na shopflooru. ERP zaji\u0161\u0165uje procesy na podnikov\u00e9 \u00farovni, zat\u00edmco MES dod\u00e1v\u00e1 podrobn\u00e9 \u00fadaje o pr\u016fb\u011bhu v\u00fdroby. Jde o vz\u00e1jemn\u011b se dopl\u0148uj\u00edc\u00ed syst\u00e9my propojen\u00e9 integrac\u00ed.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">Budouc\u00ed aplikace Manufacturing Execution System<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Budouc\u00ed vyu\u017eit\u00ed MES m\u016f\u017ee spo\u010d\u00edvat v propojen\u00ed v\u00fdrobn\u00edch z\u00e1znam\u016f s analytick\u00fdmi n\u00e1stroji a um\u011blou inteligenc\u00ed, kter\u00e9 t\u00fdm\u016fm pomohou rozpozn\u00e1vat vzorce a reagovat na zm\u011bny. N\u00e1stroje pro tvorbu progn\u00f3z je t\u0159eba vyhodnocovat na z\u00e1klad\u011b skute\u010dn\u00fdch v\u00fdrobn\u00edch dat a s ohledem na rozhodnut\u00ed, kter\u00e1 maj\u00ed podporovat.<\/p>\n\n\n\n<p>Rozvrhov\u00e1n\u00ed v\u00fdroby s vyu\u017eit\u00edm um\u011bl\u00e9 inteligence u\u017e dnes nach\u00e1z\u00ed praktick\u00e9 uplatn\u011bn\u00ed vedle MES. V syst\u00e9mu SkyPlanner APS nastavuj\u00ed pl\u00e1nova\u010di v\u00fdroby priority a omezen\u00ed a Arcturus vypo\u010d\u00edt\u00e1v\u00e1 v\u00fdrobn\u00ed pl\u00e1n na z\u00e1klad\u011b v\u00fdrobn\u00edch dat, kapacit a materi\u00e1l\u016f. Prost\u0159ednictv\u00edm t\u011bchto pravidel a z\u00e1mk\u016f si pl\u00e1nova\u010di v\u00fdroby zachov\u00e1vaj\u00ed kontrolu. Jde o automatizaci rozvrhov\u00e1n\u00ed v\u00fdroby, nikoli o autonomn\u00ed \u0159\u00edzen\u00ed cel\u00e9ho podniku.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Posu\u0148te \u0159\u00edzen\u00ed proces\u016f ve va\u0161\u00ed spole\u010dnosti na vy\u0161\u0161\u00ed \u00farove\u0148!<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Integrace syst\u00e9mu MES se <a href=\"\/cs\/\">syst\u00e9mem APS, jako je SkyPlanner<\/a>, propojuje data o pr\u016fb\u011bhu v\u00fdroby s jej\u00edm rozvrhov\u00e1n\u00edm. <a href=\"\/cs\/funkce\/\">SkyPlanner APS<\/a> se prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API integruje s jak\u00fdmkoli syst\u00e9mem ERP nebo MES a vyu\u017e\u00edv\u00e1 tato data p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle priorit stanoven\u00fdch pl\u00e1nova\u010di v\u00fdroby.<\/p>\n\n\n\n<p>P\u0159i zm\u011bn\u011b objedn\u00e1vek, kapacit nebo pr\u016fb\u011bhu v\u00fdroby vyu\u017e\u00edv\u00e1 SkyPlanner APS n\u00e1stroj Arcturus k p\u0159epo\u010d\u00edt\u00e1n\u00ed v\u00fdrobn\u00edho pl\u00e1nu podle pravidel a priorit pl\u00e1nova\u010de v\u00fdroby. Pokud je zapnut\u00e1 funkce Autopilot, mohou zm\u011bny spustit automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed v\u00fdroby, p\u0159i\u010dem\u017e pravidla a z\u00e1mky z\u016fst\u00e1vaj\u00ed v platnosti. \u010casov\u00e1 osa Gantt zobrazuje napl\u00e1novan\u00e9 operace na jednotliv\u00fdch pracovi\u0161t\u00edch, tak\u017ee t\u00fdm vid\u00ed aktualizovan\u00fd pl\u00e1n.<\/p>\n\n\n\n<p>Chcete ve sv\u00e9 v\u00fdrob\u011b vyu\u017e\u00edt spole\u010dnou s\u00edlu <a href=\"\/cs\/zdroje\/pokrocile-planovani-a-rozvrhovani\/\">MES a APS<\/a>? <a href=\"\/cs\/kontaktni-prodej\/\">Kontaktujte n\u00e1s a zjist\u011bte v\u00edce!<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n\n\n<p>Zde jsou n\u011bkter\u00e9 \u010dasto kladen\u00e9 ot\u00e1zky o syst\u00e9mech Manufacturing Execution System (MES), kter\u00e9 v\u00e1m pomohou hloub\u011bji proniknout do tohoto \u017eivotn\u011b d\u016fle\u017eit\u00e9ho aspektu modern\u00edch v\u00fdrobn\u00edch proces\u016f. Tyto FAQ nab\u00edzej\u00ed komplexn\u00ed pohled na Manufacturing Execution System, od jeho z\u00e1kladn\u00ed definice a\u017e po to, jak se li\u0161\u00ed od jin\u00fdch syst\u00e9m\u016f, jako je ERP. A\u0165 u\u017e p\u0159em\u00fd\u0161l\u00edte o jeho funkc\u00edch, chcete porozum\u011bt vlastnostem sou\u010dasn\u00fdch syst\u00e9m\u016f MES nebo chcete odhalit slo\u017eitosti jeho v\u00fdvoje, tato sekce FAQ m\u00e1 v\u0161echny odpov\u011bdi. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Co je Manufacturing Execution System (MES)?<\/h4>\n\n\n\n<p>Syst\u00e9m MES je software, kter\u00fd sleduje, dokumentuje a podporuje prov\u00e1d\u011bn\u00ed v\u00fdroby na shopflooru. Shroma\u017e\u010fuje data od oper\u00e1tor\u016f, ze za\u0159\u00edzen\u00ed a z propojen\u00fdch syst\u00e9m\u016f a zobrazuje pr\u016fb\u011bh operac\u00ed, spot\u0159ebu materi\u00e1lu a kvalitu.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">Jak se MES li\u0161\u00ed od ERP?<\/h4>\n\n\n\n<p>Zat\u00edmco Enterprise Resource Planning (ERP) je navr\u017een pro \u0159\u00edzen\u00ed cel\u00e9ho podniku integrac\u00ed a spr\u00e1vou v\u0161ech aspekt\u016f, MES se zam\u011b\u0159uje konkr\u00e9tn\u011b na aktivity v prost\u0159ed\u00ed v\u00fdrobn\u00edho z\u00e1vodu, kde optimalizuje zdroje a procesy.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Jak\u00e9 jsou prim\u00e1rn\u00ed funkce Manufacturing Execution System?<\/h4>\n\n\n\n<p>Mezi z\u00e1kladn\u00ed funkce tohoto n\u00e1stroje pat\u0159\u00ed mimo jin\u00e9 sb\u011br dat, kontrola kvality, pl\u00e1nov\u00e1n\u00ed, anal\u00fdza v\u00fdkonu, tok produkt\u016f a spr\u00e1va zdroj\u016f.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Jak\u00e9 vlastnosti nab\u00edzej\u00ed modern\u00ed syst\u00e9my MES?<\/h4>\n\n\n\n<p>Modern\u00ed syst\u00e9my MES se py\u0161n\u00ed vlastnostmi, jako je monitorov\u00e1n\u00ed v\u00fdroby v re\u00e1ln\u00e9m \u010dase, kontrola kvality ve v\u00fdrob\u011b, optimalizace z\u00e1sob, spr\u00e1va datov\u00fdch tok\u016f, v\u00fdrobn\u00ed analytika a sledov\u00e1n\u00ed v\u00fdroby.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Jak se definice MES v pr\u016fb\u011bhu \u010dasu vyv\u00edjela?<\/h4>\n\n\n\n<p>Modely funkc\u00ed MES postupn\u011b pom\u00e1haly popisovat \u010dinnosti spojen\u00e9 s prov\u00e1d\u011bn\u00edm v\u00fdroby. Organizace MESA zve\u0159ejnila n\u011bkolik model\u016f pro v\u00fdrobn\u00ed podniky. ISA-95 se zab\u00fdv\u00e1 integrac\u00ed \u0159\u00edzen\u00ed v\u00fdroby a podnikov\u00fdch funkc\u00ed pomoc\u00ed spole\u010dn\u00fdch model\u016f, terminologie a v\u00fdm\u011bny informac\u00ed; nejde o pevn\u011b stanoven\u00fd seznam povinn\u00fdch funkc\u00ed MES.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Jak\u00e9 typy \u0159e\u0161en\u00ed MES jsou k dispozici?<\/h4>\n\n\n\n<p>\u0158e\u0161en\u00ed Manufacturing Execution System mohou b\u00fdt cloudov\u00e1, on-premises, p\u0159izp\u016fsoben\u00e1 pro mal\u00e9 firmy, \u0159\u00edzen\u00e1 AI, navr\u017een\u00e1 pro velk\u00e9 podniky nebo specifick\u00e1 pro ur\u010dit\u00e1 odv\u011btv\u00ed, jako je farmacie.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Jak m\u016f\u017ee integrace MES s jin\u00fdmi syst\u00e9my prosp\u011bt podniku?<\/h4>\n\n\n\n<p>MES poskytuje data o pr\u016fb\u011bhu v\u00fdroby, zat\u00edmco APS vypo\u010d\u00edt\u00e1v\u00e1 v\u00fdrobn\u00ed pl\u00e1n. SkyPlanner APS se propojuje s jak\u00fdmkoli syst\u00e9mem ERP nebo MES prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API. Arcturus rozvrhuje operace podle v\u00fdrobn\u00edch dat a priorit stanoven\u00fdch pl\u00e1nova\u010di v\u00fdroby a \u010dasov\u00e1 osa Gantt zobrazuje v\u00fdsledn\u00fd pl\u00e1n.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Jak se MES v budoucnu p\u0159izp\u016fsob\u00ed?<\/h4>\n\n\n\n<p>MES m\u016f\u017ee st\u00e1le v\u00edce propojovat v\u00fdrobn\u00ed z\u00e1znamy s analytick\u00fdmi n\u00e1stroji a n\u00e1stroji vyu\u017e\u00edvaj\u00edc\u00edmi um\u011blou inteligenci. Praktick\u00fdm p\u0159\u00edkladem, kter\u00fd se vyu\u017e\u00edv\u00e1 u\u017e dnes, je rozvrhov\u00e1n\u00ed v\u00fdroby pomoc\u00ed APS vedle syst\u00e9mu MES: pl\u00e1nova\u010di v\u00fdroby stanovuj\u00ed priority a rozvrhovac\u00ed n\u00e1stroj p\u0159epo\u010d\u00edt\u00e1v\u00e1 pl\u00e1n podle zm\u011bn ve v\u00fdrob\u011b. Automatizovan\u00e9 rozvrhov\u00e1n\u00ed v\u00fdroby se i nad\u00e1le \u0159\u00edd\u00ed pravidly a omezen\u00edmi pl\u00e1nova\u010de v\u00fdroby.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 Pohled na pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed v\u00fdroby\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Vyst\u0159elte svou v\u00fdrobu do v\u00fd\u0161in se SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Rezervujte si demo s na\u0161\u00edm technick\u00fdm t\u00fdmem a pod\u00edvejte se, jak SkyPlanner APS funguje v re\u00e1ln\u00e9m \u017eivot\u011b.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/cs\/kontaktni-prodej\/\" aria-label=\"Objednat demo\">Objednat demo<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":7042,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2664,303],"tags":[],"class_list":["post-7088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-systemy-mes","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1 | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1\" \/>\n<meta property=\"og:description\" content=\"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T14:05:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/\"},\"wordCount\":3567,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"Syst\u00e9my MES\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/\",\"name\":\"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1 | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"description\":\"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"MES - What it is and what it does header image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mes-system-co-to-je-a-jak-funguje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u010cl\u00e1nky\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1 | SkyPlanner APS","description":"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/","og_locale":"cs_CZ","og_type":"article","og_title":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1","og_description":"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T14:05:53+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jesse Sinisalo","Odhadovan\u00e1 doba \u010dten\u00ed":"18 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/"},"wordCount":3567,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["Syst\u00e9my MES","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/","name":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1 | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","description":"MES (Manufacturing Execution System) je integrovan\u00fd syst\u00e9m senzor\u016f a softwaru, kter\u00fd sleduje, dokumentuje a \u0159\u00edd\u00ed v\u00fdrobu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280,"caption":"MES - What it is and what it does header image"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mes-system-co-to-je-a-jak-funguje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"\u010cl\u00e1nky","item":"https:\/\/skyplanner.ai\/cs\/zdroje\/"},{"@type":"ListItem","position":3,"name":"Syst\u00e9m MES \u2013 Co to je a co d\u011bl\u00e1"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/7088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=7088"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/7088\/revisions"}],"predecessor-version":[{"id":93024,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/7088\/revisions\/93024"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/7042"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=7088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=7088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=7088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}