{"id":44108,"date":"2024-10-15T08:06:16","date_gmt":"2024-10-15T08:06:16","guid":{"rendered":"https:\/\/skyplanner.ai\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/"},"modified":"2024-10-15T08:19:33","modified_gmt":"2024-10-15T08:19:33","slug":"hnizdici-sofware-co-to-je-a-jak-to-funguje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/","title":{"rendered":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-nesting-sofware-what-it-is-and-how-it-works\">Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/\">Home<\/a> &#8220; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &#8220; Nesting Sofware: Co to je a jak to funguje?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">P\u0159edpokl\u00e1dan\u00e1 doba \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Ka\u017ed\u00fd v\u00fdrobce v\u017edy hled\u00e1 zp\u016fsoby, jak sn\u00ed\u017eit mno\u017estv\u00ed odpadu. Chyt\u0159ej\u0161\u00ed hospoda\u0159en\u00ed se zdroji vede k lep\u0161\u00edm v\u00fdsledk\u016fm, a\u0165 u\u017e jde o sn\u00ed\u017een\u00ed mno\u017estv\u00ed zbytkov\u00e9ho materi\u00e1lu, \u00fasporu drahocenn\u00e9ho \u010dasu nebo efektivn\u011bj\u0161\u00ed vyu\u017e\u00edv\u00e1n\u00ed energie. Kl\u00ed\u010dov\u00e9 je naj\u00edt k tomu spr\u00e1vn\u00e9 n\u00e1stroje, a pr\u00e1v\u011b zde nastupuje hn\u00edzd\u00edc\u00ed software. Tento n\u00e1stroj pom\u00e1h\u00e1 \u0161et\u0159it \u010das mezi jednotliv\u00fdmi \u00fakoly, sni\u017eovat n\u00e1klady a zefektiv\u0148ovat zp\u016fsob vyu\u017e\u00edv\u00e1n\u00ed materi\u00e1l\u016f p\u0159i v\u00fdrob\u011b, \u010d\u00edm\u017e minimalizuje pl\u00fdtv\u00e1n\u00ed a podporuje v\u00e1\u0161 z\u00e1vazek k<a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/podpora-ekologicke-vyroby-s-aps\/\"> ekologick\u00e9 v\u00fdrob\u011b<\/a>.   <\/p>\n\n\n\n<p>V tomto \u010dl\u00e1nku se sezn\u00e1m\u00edme s t\u00edm, co je to nestingov\u00fd software, jak toto \u0159e\u0161en\u00ed funguje a jak velk\u00fd rozd\u00edl m\u016f\u017ee p\u0159in\u00e9st do va\u0161ich v\u00fdrobn\u00edch proces\u016f. Dotkneme se tak\u00e9 toho, jak m\u016f\u017ee sp\u00e1rov\u00e1n\u00ed tohoto softwaru se softwarem SkyPlanner zv\u00fd\u0161it efektivitu mezi va\u0161imi procesy. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tObsah\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#hn\u00edzd\u00edc\u00ed-sofware-co-to-je-a-jak-to-funguje\" class=\"uagb-toc-link__trigger\">Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#porozum\u011bn\u00ed-softwaru-pro-hn\u00edzd\u011bn\u00ed\" class=\"uagb-toc-link__trigger\">Porozum\u011bn\u00ed softwaru pro hn\u00edzd\u011bn\u00ed<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#hn\u00edzd\u011bn\u00ed-ve-v\u00fdrob\u011b-jak-to-funguje\" class=\"uagb-toc-link__trigger\">Hn\u00edzd\u011bn\u00ed ve v\u00fdrob\u011b: Jak to funguje?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#5-kl\u00ed\u010dov\u00fdch-v\u00fdhod-softwaru-pro-hn\u00edzd\u011bn\u00ed-ve-v\u00fdrob\u011b\" class=\"uagb-toc-link__trigger\">5 kl\u00ed\u010dov\u00fdch v\u00fdhod softwaru pro hn\u00edzd\u011bn\u00ed ve v\u00fdrob\u011b<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#odv\u011btv\u00ed-kter\u00e1-maj\u00ed-z-hn\u00edzd\u00edc\u00edho-softwaru-velk\u00fd-prosp\u011bch\" class=\"uagb-toc-link__trigger\">Odv\u011btv\u00ed, kter\u00e1 maj\u00ed z hn\u00edzd\u00edc\u00edho softwaru velk\u00fd prosp\u011bch<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#mont\u00e1\u017en\u00ed-pr\u00e1ce-kl\u00ed\u010dov\u00e1-funkce-programu-skyplanner\" class=\"uagb-toc-link__trigger\">Mont\u00e1\u017en\u00ed pr\u00e1ce: Kl\u00ed\u010dov\u00e1 funkce programu SkyPlanner<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-understanding-nesting-software\">Porozum\u011bn\u00ed softwaru pro hn\u00edzd\u011bn\u00ed<\/h2>\n\n\n\n<p><strong>Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.<\/strong>  M\u016f\u017ee tak\u00e9 kombinovat d\u00edly z r\u016fzn\u00fdch zak\u00e1zek na jednom materi\u00e1lov\u00e9m listu, co\u017e d\u00e1le zvy\u0161uje efektivitu. V\u00fdrobci v oborech, jako je zpracov\u00e1n\u00ed d\u0159eva, v\u00fdroba plech\u016f a CNC obr\u00e1b\u011bn\u00ed, se na n\u011bj spol\u00e9haj\u00ed, aby zajistili co nejefektivn\u011bj\u0161\u00ed \u0159ez\u00e1n\u00ed materi\u00e1l\u016f. <\/p>\n\n\n\n<p>Software pro hn\u00edzd\u011bn\u00ed se star\u00e1 o pl\u00e1nov\u00e1n\u00ed p\u0159esn\u00e9ho um\u00edst\u011bn\u00ed 2D a 3D d\u00edl\u016f do prostoru materi\u00e1lu, co\u017e je velmi obt\u00ed\u017en\u00e9 prov\u00e9st ru\u010dn\u011b.  <strong>Jako celek je software Nesting navr\u017een tak, aby eliminoval zbyte\u010dn\u00fd odpad a z\u00e1rove\u0148 urychlil v\u00fdrobu, co\u017e z n\u011bj \u010din\u00ed z\u00e1kladn\u00ed n\u00e1stroj pro ka\u017ed\u00e9ho v\u00fdrobce, kter\u00fd chce zv\u00fd\u0161it efektivitu.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hn\u00edzd\u011bn\u00ed ve v\u00fdrob\u011b: Jak to funguje?<\/h2>\n\n\n\n<p>Software pro hn\u00edzd\u011bn\u00ed uspo\u0159\u00e1d\u00e1v\u00e1 tvary nebo d\u00edly pro v\u00fdrobu v\u00fdrobku na ploch\u00e9m listu materi\u00e1lu co nejefektivn\u011bj\u0161\u00edm zp\u016fsobem, aby se minimalizoval odpad. Software analyzuje rozm\u011bry materi\u00e1lu a tvary, kter\u00e9 je t\u0159eba vy\u0159\u00edznout, a pot\u00e9 ur\u010d\u00ed nejlep\u0161\u00ed rozlo\u017een\u00ed. Toto rozvr\u017een\u00ed umo\u017e\u0148uje v\u00fdrobci vyu\u017e\u00edt ka\u017ed\u00fd kousek materi\u00e1lu a zanechat minim\u00e1ln\u00ed odpad.  <\/p>\n\n\n\n<p>Snadn\u00fdm p\u0159\u00edkladem m\u016f\u017ee b\u00fdt v\u00fdrobce oken, kter\u00fd pou\u017e\u00edv\u00e1 velkou tabulku skla a pot\u0159ebuje z n\u00ed vy\u0159ezat n\u011bkolik okenn\u00edch tabul\u00ed pro r\u016fzn\u00e9 zak\u00e1zky. Software pro hn\u00edzd\u011bn\u00ed vypo\u010d\u00edt\u00e1 nejlep\u0161\u00ed zp\u016fsob uspo\u0159\u00e1d\u00e1n\u00ed t\u011bchto tabul\u00ed na archu tak, aby bylo mo\u017en\u00e9 vy\u0159\u00edznout maxim\u00e1ln\u00ed po\u010det oken s co nejmen\u0161\u00edm mno\u017estv\u00edm zbytk\u016f skla. Tot\u00e9\u017e plat\u00ed pro d\u0159evo &#8211; pokud \u0159e\u017eete kusy pro n\u00e1bytek, software zajist\u00ed, abyste z ka\u017ed\u00e9ho archu d\u0159eva vyt\u011b\u017eili maximum a minimalizovali odpad a n\u00e1klady na \u0159ez\u00e1n\u00ed.  <\/p>\n\n\n\n<p>Na rozd\u00edl od ru\u010dn\u00edho vytv\u00e1\u0159en\u00ed rozvr\u017een\u00ed tento software rychle a p\u0159esn\u011b ur\u010duje nejlep\u0161\u00ed zp\u016fsob uspo\u0159\u00e1d\u00e1n\u00ed materi\u00e1l\u016f, co\u017e z n\u011bj \u010din\u00ed velmi u\u017eite\u010dn\u00fd n\u00e1stroj v modern\u00ed v\u00fdrob\u011b.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5 kl\u00ed\u010dov\u00fdch v\u00fdhod softwaru pro hn\u00edzd\u011bn\u00ed ve v\u00fdrob\u011b<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Minimalizuje materi\u00e1lov\u00fd odpad<\/strong>: Hn\u00edzd\u00edc\u00ed software zaji\u0161\u0165uje efektivn\u00ed vyu\u017eit\u00ed ka\u017ed\u00e9ho kousku materi\u00e1lu, co\u017e znamen\u00e1, \u017ee v ko\u0161i kon\u010d\u00ed m\u00e9n\u011b odpadu. Pokud nap\u0159\u00edklad \u0159e\u017eete okenn\u00ed tabule ze sklen\u011bn\u00e9 tabule, software uspo\u0159\u00e1d\u00e1 \u0159ezy tak, aby zbylo co nejm\u00e9n\u011b zbytk\u016f, \u010d\u00edm\u017e u\u0161et\u0159\u00edte pen\u00edze za suroviny. <\/li>\n\n\n\n<li><strong>\u00daspora \u010dasu p\u0159i v\u00fdrob\u011b<\/strong>: Ru\u010dn\u00ed pl\u00e1nov\u00e1n\u00ed je \u010dasov\u011b n\u00e1ro\u010dn\u00e9 a n\u00e1chyln\u00e9 k chyb\u00e1m. Software pro hn\u00edzd\u011bn\u00ed automatizuje proces rozvr\u017een\u00ed, tak\u017ee pl\u00e1nova\u010di v\u00fdroby nemus\u00ed tr\u00e1vit drahocenn\u00e9 hodiny vym\u00fd\u0161len\u00edm, jak um\u00edstit tvary na arch. <\/li>\n\n\n\n<li><strong>Zvy\u0161uje efektivitu v\u00fdroby<\/strong>: Software urychluje v\u00fdrobn\u00ed proces t\u00edm, \u017ee vytv\u00e1\u0159\u00ed p\u0159esn\u00e9 rozvr\u017een\u00ed \u0159ezu. Stroje pracuj\u00ed plynuleji a v\u00fdrobn\u00ed cykly se zkracuj\u00ed. <\/li>\n\n\n\n<li><strong>Podporuje udr\u017eitelnou v\u00fdrobu<\/strong>: Nen\u00ed \u017e\u00e1dn\u00fdm p\u0159ekvapen\u00edm, \u017ee software pro tvorbu hn\u00edzd se dob\u0159e hod\u00ed k udr\u017eiteln\u00fdm postup\u016fm. Sn\u00ed\u017een\u00edm mno\u017estv\u00ed materi\u00e1lov\u00e9ho odpadu a zv\u00fd\u0161en\u00edm efektivity v\u00fdroby pom\u00e1h\u00e1 v\u00fdrobc\u016fm sn\u00ed\u017eit jejich dopad na \u017eivotn\u00ed prost\u0159ed\u00ed.M\u00e9n\u011b odpadu znamen\u00e1, \u017ee je pot\u0159eba m\u00e9n\u011b surovin, co\u017e je dobr\u00e9 jak pro podnik\u00e1n\u00ed, tak pro planetu. <\/li>\n\n\n\n<li><strong>Sni\u017euje n\u00e1klady v cel\u00e9m rozsahu<\/strong>: M\u00e9n\u011b odpadu a rychlej\u0161\u00ed v\u00fdroba maj\u00ed p\u0159\u00edm\u00fd dopad na va\u0161e finan\u010dn\u00ed v\u00fdsledky. \u0160et\u0159\u00edte n\u00e1klady na materi\u00e1l a sni\u017eujete v\u00fddaje na pracovn\u00ed s\u00edlu a energii. Hn\u00edzdic\u00ed software ze\u0161t\u00edhluje cel\u00fd proces a umo\u017e\u0148uje v\u00e1m ud\u011blat v\u00edce s men\u0161\u00edmi n\u00e1klady.  <\/li>\n<\/ol>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-industries-that-benefit-greatly-from-nesting-software\">Odv\u011btv\u00ed, kter\u00e1 maj\u00ed z hn\u00edzd\u00edc\u00edho softwaru velk\u00fd prosp\u011bch<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-c013d753 gb-headline-text\">V\u00fdroba skla<\/h4>\n\n\n\n<p><text x=\"-9999\" y=\"-9999\"><\/text><path d=\"M37.5324 16.8707C37.9808 15.5241 38.1363 14.0974 37.9886 12.6859C37.8409 11.2744 37.3934 9.91076 36.676 8.68622C35.6126 6.83404 33.9882 5.3676 32.0373 4.4985C30.0864 3.62941 27.9098 3.40259 25.8215 3.85078C24.8796 2.7893 23.7219 1.94125 22.4257 1.36341C21.1295 0.785575 19.7249 0.491269 18.3058 0.500197C16.1708 0.495044 14.0893 1.16803 12.3614 2.42214C10.6335 3.67624 9.34853 5.44666 8.6917 7.47815C7.30085 7.76286 5.98686 8.3414 4.8377 9.17505C3.68854 10.0087 2.73073 11.0782 2.02839 12.312C0.956464 14.1591 0.498905 16.2988 0.721698 18.4228C0.944492 20.5467 1.83612 22.5449 3.268 24.1293C2.81966 25.4759 2.66413 26.9026 2.81182 28.3141C2.95951 29.7256 3.40701 31.0892 4.12437 32.3138C5.18791 34.1659 6.8123 35.6322 8.76321 36.5013C10.7141 37.3704 12.8907 37.5973 14.9789 37.1492C15.9208 38.2107 17.0786 39.0587 18.3747 39.6366C19.6709 40.2144 21.0755 40.5087 22.4946 40.4998C24.6307 40.5054 26.7133 39.8321 28.4418 38.5772C30.1704 37.3223 31.4556 35.5506 32.1119 33.5179C33.5027 33.2332 34.8167 32.6547 35.9659 31.821C37.115 30.9874 38.0728 29.9178 38.7752 28.684C39.8458 26.8371 40.3023 24.6979 40.0789 22.5748C39.8556 20.4517 38.9639 18.4544 37.5324 16.8707ZM22.4978 37.8849C20.7443 37.8874 19.0459 37.2733 17.6994 36.1501C17.7601 36.117 17.8666 36.0586 17.936 36.0161L25.9004 31.4156C26.1003 31.3019 26.2663 31.137 26.3813 30.9378C26.4964 30.7386 26.5563 30.5124 26.5549 30.2825V19.0542L29.9213 20.998C29.9389 21.0068 29.9541 21.0198 29.9656 21.0359C29.977 21.052 29.9842 21.0707 29.9867 21.0902V30.3889C29.9842 32.375 29.1946 34.2791 27.7909 35.6841C26.3872 37.0892 24.4838 37.8806 22.4978 37.8849ZM6.39227 31.0064C5.51397 29.4888 5.19742 27.7107 5.49804 25.9832C5.55718 26.0187 5.66048 26.0818 5.73461 26.1244L13.699 30.7248C13.8975 30.8408 14.1233 30.902 14.3532 30.902C14.583 30.902 14.8088 30.8408 15.0073 30.7248L24.731 25.1103V28.9979C24.7321 29.0177 24.7283 29.0376 24.7199 29.0556C24.7115 29.0736 24.6988 29.0893 24.6829 29.1012L16.6317 33.7497C14.9096 34.7416 12.8643 35.0097 10.9447 34.4954C9.02506 33.9811 7.38785 32.7263 6.39227 31.0064ZM4.29707 13.6194C5.17156 12.0998 6.55279 10.9364 8.19885 10.3327C8.19885 10.4013 8.19491 10.5228 8.19491 10.6071V19.808C8.19351 20.0378 8.25334 20.2638 8.36823 20.4629C8.48312 20.6619 8.64893 20.8267 8.84863 20.9404L18.5723 26.5542L15.206 28.4979C15.1894 28.5089 15.1703 28.5155 15.1505 28.5173C15.1307 28.5191 15.1107 28.516 15.0924 28.5082L7.04046 23.8557C5.32135 22.8601 4.06716 21.2235 3.55289 19.3046C3.03862 17.3858 3.30624 15.3413 4.29707 13.6194ZM31.955 20.0556L22.2312 14.4411L25.5976 12.4981C25.6142 12.4872 25.6333 12.4805 25.6531 12.4787C25.6729 12.4769 25.6928 12.4801 25.7111 12.4879L33.7631 17.1364C34.9967 17.849 36.0017 18.8982 36.6606 20.1613C37.3194 21.4244 37.6047 22.849 37.4832 24.2684C37.3617 25.6878 36.8382 27.0432 35.9743 28.1759C35.1103 29.3086 33.9415 30.1717 32.6047 30.6641C32.6047 30.5947 32.6047 30.4733 32.6047 30.3889V21.188C32.6066 20.9586 32.5474 20.7328 32.4332 20.5338C32.319 20.3348 32.154 20.1698 31.955 20.0556ZM35.3055 15.0128C35.2464 14.9765 35.1431 14.9142 35.069 14.8717L27.1045 10.2712C26.906 10.1554 26.6803 10.0943 26.4504 10.0943C26.2206 10.0943 25.9948 10.1554 25.7963 10.2712L16.0726 15.8858V11.9982C16.0715 11.9783 16.0753 11.9585 16.0837 11.9405C16.0921 11.9225 16.1048 11.9068 16.1207 11.8949L24.1719 7.25025C25.4053 6.53903 26.8158 6.19376 28.2383 6.25482C29.6608 6.31589 31.0364 6.78077 32.2044 7.59508C33.3723 8.40939 34.2842 9.53945 34.8334 10.8531C35.3826 12.1667 35.5464 13.6095 35.3055 15.0128ZM14.2424 21.9419L10.8752 19.9981C10.8576 19.9893 10.8423 19.9763 10.8309 19.9602C10.8195 19.9441 10.8122 19.9254 10.8098 19.9058V10.6071C10.8107 9.18295 11.2173 7.78848 11.9819 6.58696C12.7466 5.38544 13.8377 4.42659 15.1275 3.82264C16.4173 3.21869 17.8524 2.99464 19.2649 3.1767C20.6775 3.35876 22.0089 3.93941 23.1034 4.85067C23.0427 4.88379 22.937 4.94215 22.8668 4.98473L14.9024 9.58517C14.7025 9.69878 14.5366 9.86356 14.4215 10.0626C14.3065 10.2616 14.2466 10.4877 14.2479 10.7175L14.2424 21.9419ZM16.071 17.9991L20.4018 15.4978L24.7325 17.9975V22.9985L20.4018 25.4983L16.071 22.9985V17.9991Z\" fill=\"currentColor\"><\/path>Software pro hn\u00edzd\u011bn\u00ed pom\u00e1h\u00e1 v\u00fdrobc\u016fm efektivn\u011b uspo\u0159\u00e1dat sklen\u011bn\u00e9 tabule na velk\u00fdch listech a zajistit, aby vyu\u017eili co nejv\u00edce materi\u00e1lu. P\u0159edstavte si \u0159ez\u00e1n\u00ed oken nebo zrcadel &#8211; software vypo\u010d\u00edt\u00e1 nejlep\u0161\u00ed rozlo\u017een\u00ed, sn\u00ed\u017e\u00ed mno\u017estv\u00ed zbyl\u00fdch kus\u016f a u\u0161et\u0159\u00ed sklo i pen\u00edze. To m\u00e1 z\u00e1sadn\u00ed v\u00fdznam v odv\u011btv\u00edch, kde jsou suroviny drah\u00e9.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a34394b5 gb-headline-text\">V\u00fdroba n\u00e1bytku a zpracov\u00e1n\u00ed d\u0159eva<\/h4>\n\n\n\n<p>P\u0159i pr\u00e1ci se d\u0159evem se po\u010d\u00edt\u00e1 ka\u017ed\u00fd centimetr &#8211; zejm\u00e9na u drah\u00fdch materi\u00e1l\u016f, jako je tvrd\u00e9 d\u0159evo. Software pro tvorbu hn\u00edzd pom\u00e1h\u00e1 v\u00fdrobn\u00edm pl\u00e1nova\u010d\u016fm zjistit nejefektivn\u011bj\u0161\u00ed zp\u016fsob \u0159ez\u00e1n\u00ed kus\u016f n\u00e1bytku, \u010d\u00edm\u017e se sni\u017euje mno\u017estv\u00ed odpadu a zaji\u0161\u0165uje, \u017ee z ka\u017ed\u00e9ho listu z\u00edsk\u00e1te maximum. M\u00e9n\u011b d\u0159ev\u011bn\u00e9ho odpadu znamen\u00e1 ni\u017e\u0161\u00ed n\u00e1klady a udr\u017eiteln\u011bj\u0161\u00ed v\u00fdrobu.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2bad86e6 gb-headline-text\">V\u00fdroba textilu a od\u011bv\u016f<\/h4>\n\n\n\n<p>V odv\u011btv\u00edch, jako je m\u00f3da, kde mohou b\u00fdt l\u00e1tky jako hedv\u00e1b\u00ed neuv\u011b\u0159iteln\u011b drah\u00e9, se odpad m\u016f\u017ee rychle nahromadit. Software pro hn\u00edzd\u011bn\u00ed uspo\u0159\u00e1d\u00e1 kusy l\u00e1tky tak, aby minimalizoval pl\u00fdtv\u00e1n\u00ed, a zajist\u00ed, \u017ee v\u00fdrobci vyu\u017eij\u00ed ka\u017ed\u00fd kousek materi\u00e1lu co nejefektivn\u011bji. A\u0165 u\u017e se jedn\u00e1 o \u0161pi\u010dkov\u00e9 \u0161aty nebo \u010daloun\u011bn\u00ed, tento software pom\u00e1h\u00e1 projektant\u016fm efektivn\u011bji st\u0159\u00edhat l\u00e1tky, \u0161et\u0159it n\u00e1klady a p\u0159izp\u016fsobit se <strong>ekologick\u00fdm v\u00fdrobn\u00edm<\/strong> postup\u016fm.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6aecb910 gb-headline-text\">V\u00fdroba kov\u016f<\/h4>\n\n\n\n<p>A\u0165 u\u017e \u0159e\u017eete ocel pro automobily nebo hlin\u00edk pro letadlov\u00e9 d\u00edly, software pro \u0159ez\u00e1n\u00ed do hn\u00edzda uspo\u0159\u00e1d\u00e1 plechy co nejefektivn\u011bji. To pom\u00e1h\u00e1 sni\u017eovat mno\u017estv\u00ed kovov\u00e9ho odpadu, co\u017e \u010dasem vede k velk\u00fdm \u00faspor\u00e1m. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4dbad421 gb-headline-text\">Leteck\u00e1 a kosmick\u00e1 v\u00fdroba<\/h4>\n\n\n\n<p>V\u00fdrobci v letectv\u00ed a kosmonautice pracuj\u00ed s drah\u00fdmi materi\u00e1ly, jako jsou uhl\u00edkov\u00e1 vl\u00e1kna nebo titan, kde je odpad drah\u00fd a p\u0159esnost neoddiskutovateln\u00e1. Software tyto materi\u00e1ly pe\u010dliv\u011b uspo\u0159\u00e1d\u00e1 tak, aby v\u00fdrobci efektivn\u011b vyu\u017eili ka\u017ed\u00fd kousek. V\u00fdsledkem je nejen \u00faspora n\u00e1klad\u016f na materi\u00e1l, ale tak\u00e9 zv\u00fd\u0161en\u00ed efektivity v\u00fdroby &#8211; oboj\u00ed je kl\u00ed\u010dov\u00e9 v odv\u011btv\u00ed, kter\u00e9 vy\u017eaduje dokonalost.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2c602590 gb-headline-text\">V\u00fdroba plast\u016f a kompozitn\u00edch materi\u00e1l\u016f<\/h4>\n\n\n\n<p>V pr\u016fmyslov\u00fdch odv\u011btv\u00edch, jako jsou obaly nebo elektronika, kde se pou\u017e\u00edvaj\u00ed plastov\u00e9 a kompozitn\u00ed materi\u00e1ly, pom\u00e1h\u00e1 software pro \u0159ez\u00e1n\u00ed sn\u00ed\u017eit mno\u017estv\u00ed odpadu optimalizac\u00ed zp\u016fsobu \u0159ez\u00e1n\u00ed plech\u016f. To je d\u016fle\u017eit\u00e9 zejm\u00e9na p\u0159i v\u00fdrob\u011b ve velk\u00e9m m\u011b\u0159\u00edtku. M\u00e9n\u011b odpadu znamen\u00e1, \u017ee je pot\u0159eba m\u00e9n\u011b surovin, co\u017e se projev\u00ed v ni\u017e\u0161\u00edch n\u00e1kladech a zefektivn\u011bn\u00ed v\u00fdrobn\u00edho procesu.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-35a13511 gb-headline-text\">Ko\u017eed\u011bln\u00fd a obuvnick\u00fd pr\u016fmysl<\/h4>\n\n\n\n<p>K\u016f\u017ee je dal\u0161\u00edm materi\u00e1lem, kde z\u00e1le\u017e\u00ed na ka\u017ed\u00e9m kousku, zejm\u00e9na p\u0159i pr\u00e1ci s vysoce kvalitn\u00edmi nebo drah\u00fdmi k\u016f\u017eemi. Software pro hn\u00edzd\u011bn\u00ed uspo\u0159\u00e1d\u00e1 kusy pot\u0159ebn\u00e9 pro boty, ta\u0161ky nebo jin\u00e9 dopl\u0148ky tak, aby se minimalizovaly zbytky k\u016f\u017ee. V\u00fdrobci tak mohou ze stejn\u00e9ho mno\u017estv\u00ed materi\u00e1lu vyrobit v\u00edce v\u00fdrobk\u016f, co\u017e sni\u017euje n\u00e1klady a omezuje mno\u017estv\u00ed odpadu.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cd85835 gb-headline-text\">Mont\u00e1\u017en\u00ed pr\u00e1ce: Kl\u00ed\u010dov\u00e1 funkce programu SkyPlanner<\/h2>\n\n\n\n<p>Software pro hn\u00edzd\u011bn\u00ed a <a href=\"https:\/\/skyplanner.ai\/cs\/\">pl\u00e1nov\u00e1n\u00ed v\u00fdroby SkyPlanner s um\u011blou inteligenc\u00ed<\/a> tvo\u0159\u00ed v\u00fdkonnou kombinaci pro zefektivn\u011bn\u00ed v\u00fdroby a sn\u00ed\u017een\u00ed n\u00e1klad\u016f. Zat\u00edmco software pro nesting se zam\u011b\u0159uje na vytvo\u0159en\u00ed nejoptim\u00e1ln\u011bj\u0161\u00edho rozlo\u017een\u00ed \u0159ezu, aby se minimalizoval odpad materi\u00e1lu, SkyPlanner se postar\u00e1 o dal\u0161\u00ed f\u00e1zi. Pomoc\u00ed sv\u00e9ho pl\u00e1nov\u00e1n\u00ed \u0159\u00edzen\u00e9ho um\u011blou inteligenc\u00ed, zejm\u00e9na s funkc\u00ed mont\u00e1\u017en\u00edch \u00faloh, SkyPlanner slad\u00ed v\u00edce zak\u00e1zek do jedn\u00e9 efektivn\u00ed \u00falohy na z\u00e1klad\u011b ide\u00e1ln\u00edho rozlo\u017een\u00ed hn\u00edzdovac\u00edho softwaru. To umo\u017e\u0148uje v\u00fdrobc\u016fm \u0159ezat d\u00edly z r\u016fzn\u00fdch zak\u00e1zek sou\u010dasn\u011b ze stejn\u00e9ho materi\u00e1lu, co\u017e v\u00fdrazn\u011b sni\u017euje pl\u00fdtv\u00e1n\u00ed a urychluje v\u00fdrobu. Tradi\u010dn\u00ed n\u00e1stroje, jako je<a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/vyzvy-planovani-vyroby-excel-skyplanner-aps\/\"> pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Excelu<\/a>, prost\u011b nemohou konkurovat t\u00e9to \u00farovni p\u0159esnosti a efektivity.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"366\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png\" alt=\"Mont&#xE1;&#x17E;n&#xED; pr&#xE1;ce Skyplanner\" class=\"wp-image-44072\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-300x107.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-768x274.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner.png 1419w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Tento <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/pokrocile-planovani-a-rozvrhovani\/\">pokro\u010dil\u00fd syst\u00e9m pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed<\/a> s um\u011blou inteligenc\u00ed zaji\u0161\u0165uje optim\u00e1ln\u00ed vyu\u017eit\u00ed zdroj\u016f, <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/snizeni-vyrobnich-nakladu-pomoci-aps\/\">sni\u017euje n\u00e1klady na v\u00fdrobu<\/a> a minimalizuje dodac\u00ed lh\u016fty. Kombinac\u00ed p\u0159esnosti softwaru pro hn\u00edzd\u011bn\u00ed a inteligentn\u00edho pl\u00e1nov\u00e1n\u00ed SkyPlanner mohou v\u00fdrobci dos\u00e1hnout vysoce efektivn\u00edho a flexibiln\u00edho \u0159e\u0161en\u00ed, kter\u00e9 optimalizuje v\u00fdrobu od za\u010d\u00e1tku do konce. <\/p>\n\n\n\n<p>Na co \u010dek\u00e1te? Vyzkou\u0161ejte si na\u0161i <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">dvout\u00fddenn\u00ed bezplatnou zku\u0161ebn\u00ed verzi<\/a> a poznejte, jak\u00fd rozd\u00edl m\u016f\u017ee software pro tvorbu hn\u00edzd a SkyPlanner p\u0159in\u00e9st do va\u0161eho v\u00fdrobn\u00edho procesu. <a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Kontaktujte n\u00e1\u0161 profesion\u00e1ln\u00ed t\u00fdm<\/a> je\u0161t\u011b dnes a dozv\u00edte se v\u00edce o na\u0161ich slu\u017eb\u00e1ch bezprobl\u00e9mov\u00e9 integrace a za\u010dn\u011bte optimalizovat svou efektivitu! <\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Assembly Jobs: Save time and reduce costs in your processes\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/i5i94qP5VZo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? Home &#8220; Zdroje &#8220; Nesting Sofware: Co to je a jak to funguje? Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad. Ka\u017ed\u00fd v\u00fdrobce v\u017edy hled\u00e1 zp\u016fsoby, jak sn\u00ed\u017eit mno\u017estv\u00ed odpadu. Chyt\u0159ej\u0161\u00ed hospoda\u0159en\u00ed se zdroji vede k lep\u0161\u00edm &#8230; <a title=\"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/\" aria-label=\"Read more about Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43947,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-44108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?\" \/>\n<meta property=\"og:description\" content=\"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-15T08:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-15T08:19:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:19:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/\"},\"wordCount\":1840,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/\",\"name\":\"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:19:33+00:00\",\"description\":\"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"width\":4990,\"height\":3327,\"caption\":\"Nesting software. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/hnizdici-sofware-co-to-je-a-jak-to-funguje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? &#8211; SkyPlanner","description":"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/","og_locale":"cs_CZ","og_type":"article","og_title":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?","og_description":"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-15T08:06:16+00:00","article_modified_time":"2024-10-15T08:19:33+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"SkyPlanner","Odhadovan\u00e1 doba \u010dten\u00ed":"9 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:19:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/"},"wordCount":1840,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/","name":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:19:33+00:00","description":"Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","width":4990,"height":3327,"caption":"Nesting software. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/hnizdici-sofware-co-to-je-a-jak-to-funguje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/cs\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Hn\u00edzd\u00edc\u00ed sofware: Co to je a jak to funguje? Home &#8220; Zdroje &#8220; Nesting Sofware: Co to je a jak to funguje? Hn\u00edzd\u00edc\u00ed software je \u0159e\u0161en\u00ed, kter\u00e9 zlep\u0161uje uspo\u0159\u00e1d\u00e1n\u00ed tvar\u016f na ploch\u00fdch materi\u00e1lech, maximalizuje vyu\u017eit\u00ed materi\u00e1lu a minimalizuje odpad. Ka\u017ed\u00fd v\u00fdrobce v\u017edy hled\u00e1 zp\u016fsoby, jak sn\u00ed\u017eit mno\u017estv\u00ed odpadu. Chyt\u0159ej\u0161\u00ed hospoda\u0159en\u00ed se zdroji vede k lep\u0161\u00edm&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/44108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=44108"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/44108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/43947"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=44108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=44108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=44108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}