{"id":20496,"date":"2023-09-21T11:08:56","date_gmt":"2023-09-21T11:08:56","guid":{"rendered":"https:\/\/skyplanner.ai\/zdroje\/plat-vyrobniho-reditele-ve-francii-2023\/"},"modified":"2026-10-03T09:51:01","modified_gmt":"2026-10-03T09:51:01","slug":"plat-vyrobniho-reditele-ve-francii-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/","title":{"rendered":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Plat vedouc\u00edho v\u00fdroby ve Francii 2026<\/h1>\n\n\n\n<p>\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovnejte m\u011bs\u00ed\u010dn\u00ed mzdu a N\u011bmecko.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Plat vedouc\u00edho v\u00fdroby ve Francii: m\u011bs\u00ed\u010dn\u00ed a ro\u010dn\u00ed mzda<\/h2>\n\n\n\n<p>Pro francouzskou pozici responsable de production uv\u00e1d\u00ed <a href=\"https:\/\/www.randstad.fr\/metiers\/responsable-de-production\/\">Randstad<\/a> (ov\u011b\u0159eno 3. \u0159\u00edjna 2026) orienta\u010dn\u00ed hrub\u00e9 ro\u010dn\u00ed mzdy podle f\u00e1ze kari\u00e9ry: p\u0159ibli\u017en\u011b \u20ac40 000 na za\u010d\u00e1tku kari\u00e9ry, po n\u011bkolika letech praxe potenci\u00e1ln\u011b \u20ac70 000 a v pozd\u011bj\u0161\u00ed f\u00e1zi kari\u00e9ry a\u017e p\u0159ibli\u017en\u011b \u20ac90 000.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>F\u00e1ze kari\u00e9ry<\/th><th>Hrub\u00e1 ro\u010dn\u00ed mzda<\/th><th>Vypo\u010dten\u00fd ekvivalent hrub\u00e9 m\u011bs\u00ed\u010dn\u00ed mzdy (ro\u010dn\u00ed mzda \u00f7 12)<\/th><\/tr><\/thead><tbody><tr><td>Za\u010d\u00e1tek kari\u00e9ry<\/td><td>P\u0159ibli\u017en\u011b \u20ac40 000<\/td><td>P\u0159ibli\u017en\u011b \u20ac3 333<\/td><\/tr><tr><td>Po n\u011bkolika letech praxe<\/td><td>M\u016f\u017ee vzr\u016fst na p\u0159ibli\u017en\u011b \u20ac70 000<\/td><td>P\u0159ibli\u017en\u011b \u20ac5 833<\/td><\/tr><tr><td>Pozd\u011bj\u0161\u00ed f\u00e1ze kari\u00e9ry<\/td><td>M\u016f\u017ee dos\u00e1hnout p\u0159ibli\u017en\u011b \u20ac90 000<\/td><td>P\u0159ibli\u017en\u011b \u20ac7 500<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>M\u011bs\u00ed\u010dn\u00ed ekvivalenty vych\u00e1zej\u00ed z dvan\u00e1cti stejn\u00fdch plateb a jsou zaokrouhleny na nejbli\u017e\u0161\u00ed euro. Hrub\u00e1 mzda je \u010d\u00e1stka p\u0159ed sr\u00e1\u017ekami zam\u011bstnance, \u010dist\u00e1 mzda je \u010d\u00e1stka vyplacen\u00e1 po sr\u00e1\u017ek\u00e1ch.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Co ovliv\u0148uje plat vedouc\u00edho v\u00fdroby ve Francii?<\/h2>\n\n\n\n<p>Praxe a odborn\u00e1 specializace mohou zv\u00fd\u0161it v\u00e1\u0161 v\u00fdd\u011blkov\u00fd potenci\u00e1l. Mzdu ovliv\u0148uje tak\u00e9 lokalita a odv\u011btv\u00ed, stejn\u011b jako rozsah va\u0161ich odpov\u011bdnost\u00ed a to, zda m\u00e1te z\u00e1stupce. Bonusy v\u00e1zan\u00e9 na v\u00fdkon mohou zv\u00fd\u0161it celkovou odm\u011bnu p\u0159i spln\u011bn\u00ed v\u00fdrobn\u00edch c\u00edl\u016f.<\/p>\n\n\n\n<p>Role zahrnuje pl\u00e1nov\u00e1n\u00ed v\u00fdroby, materi\u00e1l, kvalitu, rozpo\u010dty a veden\u00ed t\u00fdmu, jak uv\u00e1d\u00ed <a href=\"\/cs\/zdroje\/popis-pracovni-pozice-manazer-vyroby\/\">popis pracovn\u00ed pozice vedouc\u00edho v\u00fdroby<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Jak si Francie stoj\u00ed ve srovn\u00e1n\u00ed s N\u011bmeckem?<\/h2>\n\n\n\n<p>V sousedn\u00edm N\u011bmecku uv\u00e1d\u00ed <a href=\"https:\/\/www.hays.de\/jobprofile\/produktionsleiter\">Hays<\/a> (ov\u011b\u0159eno 3. \u0159\u00edjna 2026) pr\u016fm\u011brn\u00fd hrub\u00fd ro\u010dn\u00ed plat vedouc\u00edho v\u00fdroby \u20ac64 000, p\u0159i\u010dem\u017e junior mana\u017ee\u0159i pob\u00edraj\u00ed p\u0159ibli\u017en\u011b \u20ac46 000 a senior mana\u017ee\u0159i v\u00edce ne\u017e \u20ac77 000. Francouzsk\u00e1 \u010d\u00e1stka p\u0159ibli\u017en\u011b \u20ac40 000 na za\u010d\u00e1tku kari\u00e9ry je ni\u017e\u0161\u00ed ne\u017e \u010d\u00e1stka pro junior mana\u017eery v N\u011bmecku, zat\u00edmco plat ve Francii v pozd\u011bj\u0161\u00ed f\u00e1zi kari\u00e9ry m\u016f\u017ee dos\u00e1hnout p\u0159ibli\u017en\u011b \u20ac90 000.<\/p>\n\n\n\n<p>N\u011bmeck\u00fd ro\u010dn\u00ed pr\u016fm\u011br \u20ac64 000 odpov\u00edd\u00e1 vypo\u010dten\u00e9 m\u011bs\u00ed\u010dn\u00ed \u010d\u00e1stce p\u0159ibli\u017en\u011b \u20ac5 333. Prozkoumejte <a href=\"\/cs\/zdroje\/platy-vyrobnich-manazeru-v-nemecku-2026\/\">plat vedouc\u00edho v\u00fdroby v N\u011bmecku<\/a>, kde najdete informace o \u00farovn\u00edch zku\u0161enost\u00ed v N\u011bmecku a faktorech ovliv\u0148uj\u00edc\u00edch mzdu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/h2>\n\n\n\n<p>SkyPlanner APS je software pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed, kter\u00fd automaticky rozvrhuje pr\u00e1ci ve v\u00fdrob\u011b nap\u0159\u00ed\u010d pracovi\u0161ti a zohled\u0148uje dostupnost materi\u00e1lu, sm\u011bny, priority a term\u00edny dod\u00e1n\u00ed. Jeho interaktivn\u00ed \u010dasov\u00e1 osa Gantt umo\u017e\u0148uje va\u0161emu t\u00fdmu pracovat s rozvrhem. SkyPlanner se integruje s jak\u00fdmkoli syst\u00e9mem ERP nebo MES prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API.<\/p>\n\n\n\n<p>Prozkoumejte <a href=\"\/cs\/funkce\/\">funkce SkyPlanner pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">si rezervujte uk\u00e1zku<\/a> pro sv\u016fj v\u00fdrobn\u00ed t\u00fdm.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Kolik si vedouc\u00ed v\u00fdroby ve Francii vyd\u011bl\u00e1 m\u011bs\u00ed\u010dn\u011b?<\/h3>\n\n\n\n<p>Pro francouzskou pozici responsable de production \u010din\u00ed orienta\u010dn\u00ed ekvivalenty hrub\u00e9 m\u011bs\u00ed\u010dn\u00ed mzdy vypo\u010dten\u00e9 jako ro\u010dn\u00ed mzda \u00f7 12 \u20ac3 333 na za\u010d\u00e1tku kari\u00e9ry (\u20ac40 000 ro\u010dn\u011b), \u20ac5 833 po n\u011bkolika letech praxe (\u20ac70 000 ro\u010dn\u011b) a \u20ac7 500 v pozd\u011bj\u0161\u00ed f\u00e1zi kari\u00e9ry (\u20ac90 000 ro\u010dn\u011b). Posledn\u00edch dvou ro\u010dn\u00edch mezd lze dos\u00e1hnout s prax\u00ed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Kolik si vedouc\u00ed v\u00fdroby ve Francii vyd\u011bl\u00e1 ro\u010dn\u011b?<\/h3>\n\n\n\n<p>Hrub\u00e1 ro\u010dn\u00ed mzda \u010din\u00ed p\u0159ibli\u017en\u011b \u20ac40 000 na za\u010d\u00e1tku kari\u00e9ry, po n\u011bkolika letech praxe m\u016f\u017ee vzr\u016fst na p\u0159ibli\u017en\u011b \u20ac70 000 a v pozd\u011bj\u0161\u00ed f\u00e1zi kari\u00e9ry m\u016f\u017ee dos\u00e1hnout p\u0159ibli\u017en\u011b \u20ac90 000.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Jsou \u00fadaje o platu vedouc\u00edho v\u00fdroby hrub\u00e9, nebo \u010dist\u00e9?<\/h3>\n\n\n\n<p>Ro\u010dn\u00ed \u010d\u00e1stky i vypo\u010dten\u00e9 m\u011bs\u00ed\u010dn\u00ed ekvivalenty jsou hrub\u00e9, tedy p\u0159ed sr\u00e1\u017ekami zam\u011bstnance. \u010cist\u00e1 mzda je \u010d\u00e1stka vyplacen\u00e1 po sr\u00e1\u017ek\u00e1ch.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Co m\u016f\u017ee zv\u00fd\u0161it plat vedouc\u00edho v\u00fdroby ve Francii?<\/h3>\n\n\n\n<p>Mzdu ovliv\u0148uj\u00ed praxe, odborn\u00e1 specializace, lokalita, odv\u011btv\u00ed, rozsah povinnost\u00ed, podpora z\u00e1stupce a bonusy v\u00e1zan\u00e9 na v\u00fdkon.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Jak se plat vedouc\u00edho v\u00fdroby ve Francii srovn\u00e1v\u00e1 s N\u011bmeckem?<\/h3>\n\n\n\n<p>Orienta\u010dn\u00ed hrub\u00e9 ro\u010dn\u00ed mzdy ve Francii podle f\u00e1ze kari\u00e9ry \u010din\u00ed \u20ac40 000 na za\u010d\u00e1tku kari\u00e9ry, po n\u011bkolika letech potenci\u00e1ln\u011b \u20ac70 000 a v pozd\u011bj\u0161\u00ed f\u00e1zi kari\u00e9ry a\u017e p\u0159ibli\u017en\u011b \u20ac90 000. N\u011bmeck\u00fd hrub\u00fd ro\u010dn\u00ed pr\u016fm\u011br je \u20ac64 000, p\u0159i\u010dem\u017e junior mana\u017ee\u0159i pob\u00edraj\u00ed p\u0159ibli\u017en\u011b \u20ac46 000 a senior mana\u017ee\u0159i v\u00edce ne\u017e \u20ac77 000.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Plat vedouc\u00edho v\u00fdroby ve Francii 2026 \u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovnejte m\u011bs\u00ed\u010dn\u00ed mzdu a N\u011bmecko. Plat vedouc\u00edho v\u00fdroby ve Francii: m\u011bs\u00ed\u010dn\u00ed a ro\u010dn\u00ed mzda Pro francouzskou pozici responsable de production uv\u00e1d\u00ed Randstad (ov\u011b\u0159eno 3. \u0159\u00edjna 2026) orienta\u010dn\u00ed hrub\u00e9 ro\u010dn\u00ed mzdy podle f\u00e1ze kari\u00e9ry: &#8230; <a title=\"Plat vedouc\u00edho v\u00fdroby ve Francii 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/\" aria-label=\"Read more about Plat vedouc\u00edho v\u00fdroby ve Francii 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":20807,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2666,303],"tags":[],"class_list":["post-20496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-a-platy","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Plat vedouc\u00edho v\u00fdroby ve Francii 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plat vedouc\u00edho v\u00fdroby ve Francii 2026\" \/>\n<meta property=\"og:description\" content=\"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-21T11:08:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T09:51:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minuty\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Plat vedouc\u00edho v\u00fdroby ve Francii 2026\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/\"},\"wordCount\":806,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"articleSection\":[\"Kari\u00e9ra a platy\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/\",\"name\":\"Plat vedouc\u00edho v\u00fdroby ve Francii 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"description\":\"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in France\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/plat-vyrobniho-reditele-ve-francii-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Plat vedouc\u00edho v\u00fdroby ve Francii 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026 &#8211; SkyPlanner","description":"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/","og_locale":"cs_CZ","og_type":"article","og_title":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026","og_description":"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-21T11:08:56+00:00","article_modified_time":"2026-10-03T09:51:01+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"SkyPlanner","Odhadovan\u00e1 doba \u010dten\u00ed":"4 minuty"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/"},"wordCount":806,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","articleSection":["Kari\u00e9ra a platy","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/","name":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","description":"\u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovn\u00e1n\u00ed m\u011bs\u00ed\u010dn\u00ed mzdy a N\u011bmecka.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","width":4990,"height":3327,"caption":"Production Manager Salary in France"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/plat-vyrobniho-reditele-ve-francii-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/cs\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Plat vedouc\u00edho v\u00fdroby ve Francii 2026 \u20ac40 000 hrub\u00e9ho ro\u010dn\u011b na za\u010d\u00e1tku kari\u00e9ry vedouc\u00edho v\u00fdroby ve Francii, s prax\u00ed a\u017e \u20ac90 000. Porovnejte m\u011bs\u00ed\u010dn\u00ed mzdu a N\u011bmecko. Plat vedouc\u00edho v\u00fdroby ve Francii: m\u011bs\u00ed\u010dn\u00ed a ro\u010dn\u00ed mzda Pro francouzskou pozici responsable de production uv\u00e1d\u00ed Randstad (ov\u011b\u0159eno 3. \u0159\u00edjna 2026) orienta\u010dn\u00ed hrub\u00e9 ro\u010dn\u00ed mzdy podle f\u00e1ze kari\u00e9ry:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/20496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=20496"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/20496\/revisions"}],"predecessor-version":[{"id":93856,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/20496\/revisions\/93856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/20807"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=20496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=20496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=20496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}