{"id":111815,"date":"2026-10-28T17:16:38","date_gmt":"2026-10-28T17:16:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111815"},"modified":"2026-10-28T17:16:50","modified_gmt":"2026-10-28T17:16:50","slug":"stari-zasob","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/","title":{"rendered":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Paleta le\u017e\u00ed ve skladu u\u017e n\u011bkolik m\u011bs\u00edc\u016f. N\u00e1kup v n\u00ed vid\u00ed pen\u00edze v\u00e1zan\u00e9 v materi\u00e1lu. V\u00fdroba p\u0159\u00edle\u017eitost, jak se vyhnout dal\u0161\u00edmu n\u00e1kupu. Odd\u011blen\u00ed kvality mus\u00ed teprve potvrdit, zda lze materi\u00e1l pou\u017e\u00edt. Stroj, kter\u00fd by ho mohl zpracovat, je mezit\u00edm vyt\u00ed\u017een\u00fd z\u00e1kaznick\u00fdmi zak\u00e1zkami.<\/p>\n\n\n<p>P\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob v\u00e1m pom\u016f\u017ee takovou paletu naj\u00edt. Skute\u010dn\u00fd p\u0159\u00ednos ale spo\u010d\u00edv\u00e1 v rozhodnut\u00ed, co s n\u00ed ud\u011blat, a v jeho uskute\u010dn\u011bn\u00ed.<\/p>\n\n\n<p>Ve v\u00fdrob\u011b nejde jen o to, aby nejstar\u0161\u00ed z\u00e1soby zmizely. C\u00edlem je vyu\u017e\u00edt vhodn\u00fd materi\u00e1l pro skute\u010dnou popt\u00e1vku, neohrozit dod\u00e1vky a zabr\u00e1nit opakovan\u00e9mu vzniku stejn\u00fdch p\u0159ebytk\u016f. S realizac\u00ed pom\u00e1h\u00e1 SkyPlanner APS: za\u0159ad\u00ed schv\u00e1len\u00e9 operace pro spot\u0159ebu tohoto materi\u00e1lu do v\u00fdrobn\u00edho rozvrhu vedle ostatn\u00edch zak\u00e1zek, kter\u00e9 pot\u0159ebuj\u00ed stejn\u00e9 kapacity.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je st\u00e1\u0159\u00ed z\u00e1sob?<\/h2>\n\n\n<p><strong>Anal\u00fdza st\u00e1\u0159\u00ed z\u00e1sob sleduje, jak dlouho jsou zb\u00fdvaj\u00edc\u00ed z\u00e1soby na sklad\u011b, a rozd\u011bluje je podle dohodnut\u00e9ho v\u00fdchoz\u00edho data do v\u011bkov\u00fdch p\u00e1sem.<\/strong> P\u0159i anal\u00fdze podle data p\u0159\u00edjmu se u mno\u017estv\u00ed, kter\u00e9 st\u00e1le z\u016fst\u00e1v\u00e1 na sklad\u011b, m\u011b\u0159\u00ed doba od p\u0159\u00edjmu materi\u00e1lu do rozhodn\u00e9ho data p\u0159ehledu.<\/p>\n\n\n<p>P\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob toto rozlo\u017een\u00ed uk\u00e1\u017ee. M\u00edsto pouh\u00e9 informace, \u017ee je na sklad\u011b 600 kus\u016f sou\u010d\u00e1sti, uv\u00e1d\u00ed, kolik z tohoto z\u016fstatku poch\u00e1z\u00ed ze star\u0161\u00edch p\u0159\u00edjm\u016f a kolik dorazilo ned\u00e1vno. Pom\u016f\u017ee v\u00e1m tak naj\u00edt materi\u00e1l, kter\u00e9mu je t\u0159eba v\u011bnovat pozornost, ne\u017e nakoup\u00edte nebo vyrob\u00edte dal\u0161\u00ed.<\/p>\n\n\n<p>Ne\u017e za\u010dnete p\u0159ehled vyhodnocovat, sjedno\u0165te si, od kter\u00e9ho okam\u017eiku se doba po\u010d\u00edt\u00e1. N\u011bkter\u00e9 p\u0159ehledy m\u011b\u0159\u00ed dobu od posledn\u00edho pohybu, nikoli st\u00e1\u0159\u00ed zb\u00fdvaj\u00edc\u00edho mno\u017estv\u00ed z jednotliv\u00fdch p\u0159\u00edjm\u016f. Oba pohledy mohou b\u00fdt u\u017eite\u010dn\u00e9, ale odpov\u00eddaj\u00ed na jin\u00e9 ot\u00e1zky. Sou\u010d\u00e1st se m\u016f\u017ee spot\u0159ebov\u00e1vat ka\u017ed\u00fd t\u00fdden, zat\u00edmco \u010d\u00e1st star\u00e9 dod\u00e1vky z\u016fst\u00e1v\u00e1 nedot\u010den\u00e1.<\/p>\n\n\n<p>St\u00e1\u0159\u00ed z\u00e1sob je tak\u00e9 t\u0159eba odli\u0161ovat od n\u00e1sleduj\u00edc\u00edch pojm\u016f:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Doba pou\u017eitelnosti:<\/strong> doba, po kterou materi\u00e1l za stanoven\u00fdch podm\u00ednek vyhovuje po\u017eadavk\u016fm. Datum expirace se m\u016f\u017ee odv\u00edjet od v\u00fdroby, otev\u0159en\u00ed nebo jin\u00e9 ud\u00e1losti, nikoli od data p\u0159\u00edjmu do va\u0161eho skladu.<\/li><li><strong>N\u00edzk\u00e1 pohyblivost z\u00e1sob:<\/strong> n\u00edzk\u00e1 spot\u0159eba nebo mal\u00fd objem v\u00fddej\u016f za ur\u010dit\u00e9 obdob\u00ed. I ned\u00e1vno p\u0159ijat\u00fd materi\u00e1l se m\u016f\u017ee spot\u0159ebov\u00e1vat pomaleji, ne\u017e se pl\u00e1novalo.<\/li><li><strong>Nadbyte\u010dn\u00e9 z\u00e1soby:<\/strong> z\u00e1soby p\u0159esahuj\u00edc\u00ed pot\u0159ebu danou popt\u00e1vkou a pravidly dopl\u0148ov\u00e1n\u00ed. Mohou b\u00fdt nov\u00e9 i star\u00e9.<\/li><li><strong>Zastaralost:<\/strong> stav, kdy z\u00e1soby ji\u017e nelze p\u0159ijateln\u00fdm zp\u016fsobem vyu\u017e\u00edt k zam\u00fd\u0161len\u00e9mu \u00fa\u010delu, nap\u0159\u00edklad kv\u016fli konstruk\u010dn\u00ed zm\u011bn\u011b. Samotn\u00e9 st\u00e1\u0159\u00ed k takov\u00e9mu z\u00e1v\u011bru nesta\u010d\u00ed.<\/li><\/ul>\n\n\n<p>U\u017eite\u010dn\u00e1 ot\u00e1zka tedy nezn\u00ed \u201eJe to star\u00e9?\u201c, ale \u201eCo st\u00e1\u0159\u00ed znamen\u00e1 u tohoto materi\u00e1lu s ohledem na jeho stav a na\u0161i nejbli\u017e\u0161\u00ed pot\u0159ebu?\u201c<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak vypo\u010d\u00edtat st\u00e1\u0159\u00ed z\u00e1sob<\/h2>\n\n\n<p>P\u0159i hodnocen\u00ed podle data p\u0159\u00edjmu pou\u017eijte tento vzorec:<\/p>\n\n\n<p><strong>St\u00e1\u0159\u00ed z\u00e1sob ve dnech = rozhodn\u00e9 datum p\u0159ehledu \u2212 p\u016fvodn\u00ed datum p\u0159\u00edjmu<\/strong><\/p>\n\n\n<p>Takto vypo\u010dten\u00e9 st\u00e1\u0159\u00ed p\u0159i\u0159a\u010fte ke <strong>zb\u00fdvaj\u00edc\u00edmu mno\u017estv\u00ed z dan\u00e9ho p\u0159\u00edjmu<\/strong>, nikoli k p\u016fvodn\u011b dodan\u00e9mu mno\u017estv\u00ed. Pokud u\u017e byla v\u011bt\u0161ina dod\u00e1vky spot\u0159ebov\u00e1na, spot\u0159ebovan\u00e9 kusy do dne\u0161n\u00edho p\u0159ehledu st\u00e1\u0159\u00ed skladov\u00fdch z\u00e1sob nepat\u0159\u00ed.<\/p>\n\n\n<p>Nejprve stanovte jedno pevn\u00e9 rozhodn\u00e9 datum a rozsah anal\u00fdzy: z\u00e1vod, sklad, polo\u017eku a podle pot\u0159eby i \u0161ar\u017ei nebo revizi. Ov\u011b\u0159te, \u017ee zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed odpov\u00eddaj\u00ed skladov\u00e9mu z\u016fstatku ve stejn\u00e9m rozsahu a ke stejn\u00e9mu datu. V\u00fdpo\u010det st\u00e1\u0159\u00ed, kter\u00fd p\u016fsob\u00ed p\u0159esn\u011b, nem\u00e1 smysl, pokud zahrnuje mno\u017estv\u00ed, je\u017e u\u017e sklad opustilo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zachovejte p\u016fvodn\u00ed datum i p\u0159i \u010d\u00e1ste\u010dn\u00e9 spot\u0159eb\u011b a p\u0159esunech<\/h3>\n\n\n<p>V\u00fddej \u010d\u00e1sti \u0161ar\u017ee neomlad\u00ed jej\u00ed zbytek. Ani p\u0159esun star\u00e9 palety mezi skladov\u00fdmi m\u00edsty by se nem\u011bl pova\u017eovat za nov\u00fd extern\u00ed p\u0159\u00edjem, pokud m\u00e1 anal\u00fdza m\u011b\u0159it celkovou dobu, po kterou ji m\u00e1te v z\u00e1sob\u00e1ch.<\/p>\n\n\n<p>Zajist\u011bte, aby p\u016fvodn\u00ed datum z\u016fstalo dohledateln\u00e9 i po t\u011bchto pohybech. Pro vratky, \u00fapravy skladov\u00fdch stav\u016f a po\u010d\u00e1te\u010dn\u00ed z\u016fstatky stanovte jasn\u00e1 pravidla. Pokud p\u016fvodn\u00ed datum nezn\u00e1te, tuto nejistotu p\u0159iznejte, m\u00edsto abyste p\u0159i\u0159adili v\u00fdhodn\u011bj\u0161\u00ed ned\u00e1vn\u00e9 datum. U polo\u017eek vlastn\u00ed v\u00fdroby ur\u010dete, kter\u00fd p\u0159\u00edjem z v\u00fdroby nebo okam\u017eik dokon\u010den\u00ed slou\u017e\u00ed jako po\u010d\u00e1tek pro v\u00fdpo\u010det st\u00e1\u0159\u00ed. U nedokon\u010den\u00e9 v\u00fdroby uve\u010fte, zda m\u011b\u0159\u00edte celkovou dobu od uvoln\u011bn\u00ed do v\u00fdroby, nebo \u010dek\u00e1n\u00ed v konkr\u00e9tn\u00ed f\u00e1zi.<\/p>\n\n\n<p>Ne ka\u017ed\u00fd syst\u00e9m dok\u00e1\u017ee ur\u010dit, kter\u00e9 fyzick\u00e9 kusy z jednotliv\u00fdch p\u0159\u00edjm\u016f na sklad\u011b zb\u00fdvaj\u00ed. N\u011bkter\u00e9 p\u0159ehledy rekonstruuj\u00ed vrstvy p\u0159\u00edjm\u016f ze skladov\u00e9ho z\u016fstatku a historie pohyb\u016f podle p\u0159edpokl\u00e1dan\u00e9ho zp\u016fsobu p\u0159i\u0159azov\u00e1n\u00ed v\u00fddej\u016f k p\u0159\u00edjm\u016fm. To m\u016f\u017ee pomoci p\u0159i anal\u00fdze st\u00e1\u0159\u00ed, ale nen\u00ed to d\u016fkaz, \u017ee je odpov\u00eddaj\u00edc\u00ed fyzick\u00e1 \u0161ar\u017ee k dispozici k vyskladn\u011bn\u00ed. Ne\u017e podle p\u0159ehledu zad\u00e1te skladu pokyny, ov\u011b\u0159te logiku jeho sestaven\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nezam\u011b\u0148ujte st\u00e1\u0159\u00ed \u0161ar\u017ee za obr\u00e1tkovost z\u00e1sob<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/\">Obr\u00e1tkovost z\u00e1sob<\/a> a doba obratu z\u00e1sob popisuj\u00ed hospoda\u0159en\u00ed se z\u00e1sobami za ur\u010dit\u00e9 obdob\u00ed. Ne\u0159\u00edkaj\u00ed, kdy dorazila konkr\u00e9tn\u00ed \u0161ar\u017ee, kter\u00e1 dosud z\u016fst\u00e1v\u00e1 na sklad\u011b.<\/p>\n\n\n<p>Pro provozn\u00ed pot\u0159eby m\u016f\u017eete u jedn\u00e9 polo\u017eky ve stejn\u00e9 m\u011brn\u00e9 jednotce vypo\u010d\u00edtat pr\u016fm\u011br:<\/p>\n\n\n<p><strong>St\u00e1\u0159\u00ed v\u00e1\u017een\u00e9 mno\u017estv\u00edm = sou\u010det (zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed \u00d7 st\u00e1\u0159\u00ed ve dnech) \u00f7 celkov\u00e9 zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed<\/strong><\/p>\n\n\n<p>Pr\u016fm\u011br pou\u017e\u00edvejte jako souhrnn\u00fd \u00fadaj, ne jako n\u00e1hradu v\u011bkov\u00fdch p\u00e1sem. Nes\u010d\u00edtejte r\u016fzn\u00e9 m\u011brn\u00e9 jednotky nap\u0159\u00ed\u010d materi\u00e1ly. Souhrn v\u00e1\u017een\u00fd hodnotou je jin\u00fd ukazatel a mus\u00ed b\u00fdt jako takov\u00fd ozna\u010den.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co m\u00e1 obsahovat p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, podle kter\u00e9ho lze jednat<\/h2>\n\n\n<p>U\u017eite\u010dn\u00fd p\u0159ehled pro v\u00fdrobu propojuje st\u00e1\u0159\u00ed z\u00e1sob s rozhodnut\u00edm o dal\u0161\u00edm postupu. Uv\u00e1d\u011bjte spole\u010dn\u011b identifik\u00e1tor polo\u017eky, specifikaci nebo revizi, um\u00edst\u011bn\u00ed, odkaz na \u0161ar\u017ei \u010di p\u0159\u00edjem, v\u00fdchoz\u00ed datum pro v\u00fdpo\u010det st\u00e1\u0159\u00ed a zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed. Dopl\u0148te informace pot\u0159ebn\u00e9 k rozhodnut\u00ed: stav z hlediska kvality, st\u00e1vaj\u00edc\u00ed rezervace, p\u0159\u00edpadn\u00e9 datum expirace \u010di dal\u0161\u00edho posouzen\u00ed a nejbli\u017e\u0161\u00ed skute\u010dnou pot\u0159ebu.<\/p>\n\n\n<p>Pokud pot\u0159ebujete up\u0159ednostnit finan\u010dn\u011b v\u00fdznamn\u00e9 z\u016fstatky, uve\u010fte i hodnotu z\u00e1sob a jasn\u011b ozna\u010dte zp\u016fsob ocen\u011bn\u00ed. Hodnotu uv\u00e1d\u011bjte odd\u011blen\u011b od fyzick\u00e9ho mno\u017estv\u00ed i od o\u010dek\u00e1van\u00fdch v\u00fdnos\u016f z prodeje.<\/p>\n\n\n<p>Zvolte nep\u0159ekr\u00fdvaj\u00edc\u00ed se v\u011bkov\u00e1 p\u00e1sma vhodn\u00e1 pro dan\u00fd materi\u00e1l. P\u0159ehled m\u016f\u017ee nap\u0159\u00edklad pou\u017e\u00edvat p\u00e1sma <strong>0\u201330, 31\u201360, 61\u201390, 91\u2013180 a v\u00edce ne\u017e 180 dn\u016f<\/strong>. Jde o intervaly pro vykazov\u00e1n\u00ed, nikoli o univerz\u00e1ln\u00ed hranice mezi \u0159\u00e1dn\u00fdmi z\u00e1sobami a odpadem. Materi\u00e1l s kr\u00e1tkou dobou pou\u017eitelnosti vy\u017eaduje pozornost d\u0159\u00edve ne\u017e trvanliv\u00e1 sou\u010d\u00e1st, kterou z\u00e1m\u011brn\u011b dr\u017e\u00edte pro pot\u0159ebu s dlouhou dodac\u00ed lh\u016ftou.<\/p>\n\n\n<p>Ke ka\u017ed\u00e9 polo\u017ece vy\u017eaduj\u00edc\u00ed \u0159e\u0161en\u00ed ur\u010dete odpov\u011bdnou osobu, konkr\u00e9tn\u00ed krok a term\u00edn. Ozna\u010den\u00ed \u201eV\u00edce ne\u017e 90 dn\u016f\u201c upozorn\u00ed na z\u016fstatek. Pokyn \u201ePotvrdit uvoln\u011bn\u00ed a napl\u00e1novat spot\u0159ebu na zak\u00e1zku X\u201c u\u017e n\u011bkomu zad\u00e1v\u00e1 konkr\u00e9tn\u00ed pr\u00e1ci.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159\u00edklad: polovina z\u00e1sob je star\u00e1, ale jen \u010d\u00e1st je voln\u00e1 k pou\u017eit\u00ed<\/h3>\n\n\n<p>P\u0159edstavte si v\u00fdrobce, kter\u00fd posuzuje t\u0159i p\u0159\u00edjmy stejn\u00e9 sou\u010d\u00e1sti ve stejn\u00e9 m\u011brn\u00e9 jednotce. N\u00ed\u017ee uveden\u00e1 mno\u017estv\u00ed p\u0159edstavuj\u00ed z\u016fstatek k rozhodn\u00e9mu datu p\u0159ehledu, nikoli p\u016fvodn\u011b dodan\u00e1 mno\u017estv\u00ed.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>P\u0159\u00edjem<\/th><th>Zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed<\/th><th>St\u00e1\u0159\u00ed od p\u0159\u00edjmu<\/th><th>V\u011bkov\u00e9 p\u00e1smo<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>300 kus\u016f<\/td><td>120 dn\u016f<\/td><td>91\u2013180 dn\u016f<\/td><\/tr><tr><td>B<\/td><td>100 kus\u016f<\/td><td>60 dn\u016f<\/td><td>31\u201360 dn\u016f<\/td><\/tr><tr><td>C<\/td><td>200 kus\u016f<\/td><td>10 dn\u016f<\/td><td>0\u201330 dn\u016f<\/td><\/tr><tr><td>Celkem<\/td><td>600 kus\u016f<\/td><td><\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pr\u016fm\u011brn\u00e9 st\u00e1\u0159\u00ed v\u00e1\u017een\u00e9 mno\u017estv\u00edm je <strong>73,3 dne<\/strong>: sou\u010det 44 000 kusodn\u016f vyd\u011bl\u00edte 600 kusy. P\u0159itom <strong>50 % mno\u017estv\u00ed je star\u0161\u00ed ne\u017e 90 dn\u016f<\/strong>. Pr\u016fm\u011br tak zakr\u00fdv\u00e1 velk\u00fd pod\u00edl star\u0161\u00edch z\u00e1sob.<\/p>\n\n\n<p>Nyn\u00ed se pod\u00edvejme na p\u0159\u00edjem A. Z jeho 300 kus\u016f je 100 ji\u017e rezervov\u00e1no pro jinou zak\u00e1zku a 50 je blokov\u00e1no z d\u016fvodu kvality. Pouze 150 kus\u016f je schv\u00e1len\u00fdch k pou\u017eit\u00ed a nen\u00ed v\u00e1z\u00e1no na jinou pot\u0159ebu, tak\u017ee lze rozhodnout o jejich nov\u00e9m vyu\u017eit\u00ed.<\/p>\n\n\n<p>T\u011bchto 150 vhodn\u00fdch kus\u016f by mohla spot\u0159ebovat z\u00e1kaznick\u00e1 zak\u00e1zka. Je to u\u017eite\u010dn\u00e1 p\u0159\u00edle\u017eitost, nikoli svolen\u00ed vydat v\u0161ech 300 kus\u016f, obej\u00edt blokaci nebo odebrat materi\u00e1l p\u0159isl\u00edben\u00fd jinam. Sklad mus\u00ed ur\u010dit spr\u00e1vn\u00e9 z\u00e1soby a pl\u00e1nova\u010d v\u00fdroby mus\u00ed naj\u00edt \u010das pro operace, kter\u00e9 je spot\u0159ebuj\u00ed.<\/p>\n\n\n<p>Pr\u00e1v\u011b v tomto bod\u011b se p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob m\u011bn\u00ed v \u00fakol pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozhodn\u011bte, zda z\u00e1soby spot\u0159ebovat, pozastavit jejich pou\u017eit\u00ed, vr\u00e1tit je, nebo vy\u0159adit<\/h2>\n\n\n<p>Projd\u011bte star\u0161\u00ed z\u00e1soby s lidmi, kte\u0159\u00ed dok\u00e1\u017eou posoudit jejich stav, pot\u0159ebu a dal\u0161\u00ed nakl\u00e1d\u00e1n\u00ed s nimi. Nejstar\u0161\u00ed polo\u017eka nemus\u00ed b\u00fdt nejnal\u00e9hav\u011bj\u0161\u00ed: p\u0159ednost m\u016f\u017ee dostat materi\u00e1l s bl\u00ed\u017e\u00edc\u00edm se koncem pou\u017eitelnosti, z\u00e1soby pro zru\u0161en\u00fd v\u00fdrobek nebo z\u00e1soby vysok\u00e9 hodnoty, pro kter\u00e9 u\u017e nen\u00ed budouc\u00ed pot\u0159eba.<\/p>\n\n\n<p><strong>Spot\u0159ebujte je na skute\u010dnou pot\u0159ebu<\/strong>, pokud materi\u00e1l spl\u0148uje po\u017eadovanou specifikaci, je schv\u00e1len\u00fd k pou\u017eit\u00ed a nen\u00ed rezervovan\u00fd pro jin\u00fd \u00fa\u010del. Potvr\u010fte zak\u00e1zku a mno\u017estv\u00ed ke spot\u0159eb\u011b. Pokud je nutn\u00e1 z\u00e1m\u011bna materi\u00e1lu nebo p\u0159epracov\u00e1n\u00ed, zajist\u011bte p\u0159\u00edslu\u0161n\u00e9 schv\u00e1len\u00ed je\u0161t\u011b p\u0159ed rozvr\u017een\u00edm takov\u00e9ho postupu. Tam, kde je to vhodn\u00e9, postupujte podle principu FIFO: z vyhovuj\u00edc\u00edch z\u00e1sob vyd\u00e1vejte nejd\u0159\u00edve ty, kter\u00e9 byly p\u0159ijaty nejd\u0159\u00edve. P\u0159i pou\u017eit\u00ed principu FEFO vyd\u00e1vejte nejd\u0159\u00edve vyhovuj\u00edc\u00ed materi\u00e1l s nejbli\u017e\u0161\u00edm koncem pou\u017eitelnosti. Pokyny pro v\u00fddej \u0161ar\u017e\u00ed ze skladu mus\u00ed toto rozhodnut\u00ed respektovat.<\/p>\n\n\n<p><strong>Pozastavte jejich pou\u017eit\u00ed z jasn\u011b stanoven\u00e9ho d\u016fvodu<\/strong>, pokud je d\u016fvodem k ponech\u00e1n\u00ed z\u00e1sob kontrola, technick\u00e9 schv\u00e1len\u00ed nebo budouc\u00ed pot\u0159eba. Ur\u010dete odpov\u011bdnou osobu a datum p\u0159ezkoum\u00e1n\u00ed. V\u011bta \u201emo\u017en\u00e1 to n\u011bkdy budeme pot\u0159ebovat\u201c m\u00e1 v\u00e9st k diskusi o budouc\u00ed pot\u0159eb\u011b, nikoli k dal\u0161\u00edmu prodlou\u017een\u00ed na neur\u010dito.<\/p>\n\n\n<p><strong>Vra\u0165te je, p\u0159eve\u010fte je jinam nebo najd\u011bte jin\u00e9 schv\u00e1len\u00e9 vyu\u017eit\u00ed<\/strong>, pokud dohoda s dodavatelem, jin\u00fd z\u00e1vod nebo jin\u00e1 opr\u00e1vn\u011bn\u00e1 pot\u0159eba nab\u00edz\u00ed lep\u0161\u00ed \u0159e\u0161en\u00ed. Ne\u017e z\u00e1soby ozna\u010d\u00edte za vy\u0159e\u0161en\u00e9, potvr\u010fte jejich p\u0159ijet\u00ed druhou stranou i praktick\u00fd postup. Intern\u00ed p\u0159evod m\u016f\u017ee vy\u0159e\u0161it nevhodn\u00e9 um\u00edst\u011bn\u00ed z\u00e1sob, ale nem\u011bn\u00ed p\u016fvodn\u00ed st\u00e1\u0159\u00ed materi\u00e1lu.<\/p>\n\n\n<p><strong>Vy\u0159a\u010fte je schv\u00e1len\u00fdm postupem likvidace<\/strong>, pokud u\u017e pro n\u011b nen\u00ed \u017e\u00e1dn\u00e9 p\u0159ijateln\u00e9 vyu\u017eit\u00ed. P\u0159\u00edpadn\u00e9 sn\u00ed\u017een\u00ed \u00fa\u010detn\u00ed hodnoty nebo odpis maj\u00ed samostatn\u011b posoudit pracovn\u00edci finan\u010dn\u00edho odd\u011blen\u00ed podle \u00fa\u010detn\u00edch pravidel spole\u010dnosti. Za\u0159azen\u00ed do v\u011bkov\u00e9ho p\u00e1sma pro provozn\u00ed \u00fa\u010dely samo o sob\u011b nerozhoduje o ocen\u011bn\u00ed z\u00e1sob.<\/p>\n\n\n<p>Nevyr\u00e1b\u011bjte hotov\u00e9 v\u00fdrobky jen proto, abyste spot\u0159ebovali starou surovinu. Bez skute\u010dn\u00e9 popt\u00e1vky m\u016f\u017eete probl\u00e9m st\u00e1rnouc\u00edch z\u00e1sob pouze p\u0159esunout do n\u00e1kladn\u011bj\u0161\u00ed podoby a p\u0159itom zabrat kapacitu pot\u0159ebnou pro dod\u00e1vky z\u00e1kazn\u00edk\u016fm.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u0159a\u010fte schv\u00e1lenou spot\u0159ebu do v\u00fdrobn\u00edho rozvrhu se SkyPlanner<\/h2>\n\n\n<p>Jakmile je rozhodnuto o vyu\u017eit\u00ed materi\u00e1lu, p\u0159ich\u00e1z\u00ed konkr\u00e9tn\u00ed ot\u00e1zka: <strong>kdy mohou operace, kter\u00e9 tento materi\u00e1l spot\u0159ebuj\u00ed, prob\u011bhnout vedle v\u0161ech ostatn\u00edch sl\u00edben\u00fdch zak\u00e1zek?<\/strong><\/p>\n\n\n<p>Samostatn\u00fd seznam opat\u0159en\u00ed pro star\u00e9 z\u00e1soby na to neodpov\u00ed. M\u016f\u017ee v n\u011bm st\u00e1t, \u017ee se m\u00e1 tento t\u00fdden spot\u0159ebovat 150 kus\u016f z p\u0159\u00edjmu A, p\u0159esto\u017ee pot\u0159ebn\u00fd stroj i navazuj\u00edc\u00ed operace jsou u\u017e vyt\u00ed\u017een\u00e9 jin\u00fdmi zak\u00e1zkami. Pokud ka\u017ed\u00e9 opat\u0159en\u00ed pl\u00e1nujete odd\u011blen\u011b, mus\u00ed pak n\u011bkdo ru\u010dn\u011b sladit po\u0159ad\u00ed prac\u00ed, kter\u00e9 pot\u0159ebuj\u00ed stejn\u00e9 kapacity.<\/p>\n\n\n<p>SkyPlanner APS propojuje operace zak\u00e1zek s pracovi\u0161ti, sm\u011bnami, kapacitami, n\u00e1vaznostmi a prioritami. Jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed, Arcturus, vypo\u010d\u00edt\u00e1 <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">v\u00fdrobn\u00ed rozvrh<\/a> a Gantt\u016fv diagram p\u0159ehledn\u011b zobraz\u00ed po\u0159ad\u00ed i \u010dasov\u00e9 za\u0159azen\u00ed operac\u00ed. Pokud je zapnut\u00e9 zohled\u0148ov\u00e1n\u00ed materi\u00e1lu p\u0159i rozvrhov\u00e1n\u00ed, bere syst\u00e9m u operace, kter\u00e1 materi\u00e1l spot\u0159ebov\u00e1v\u00e1, v \u00favahu tak\u00e9 pr\u016fb\u011b\u017en\u011b aktualizovan\u00e9 \u00fadaje o jeho dostupnosti.<\/p>\n\n\n<p>U zak\u00e1zky z p\u0159\u00edkladu udr\u017eujte aktu\u00e1ln\u00ed schv\u00e1len\u00e9 mno\u017estv\u00ed i spr\u00e1vn\u00fd materi\u00e1lov\u00fd po\u017eadavek, zachovejte pokyn pro v\u00fdb\u011br \u0161ar\u017ee ve skladu a za\u0159a\u010fte operace spot\u0159ebov\u00e1vaj\u00edc\u00ed materi\u00e1l do spole\u010dn\u00e9ho rozvrhu. Pl\u00e1nova\u010d nastav\u00ed jejich prioritu a Arcturus vypo\u010d\u00edt\u00e1 jejich za\u0159azen\u00ed mezi ostatn\u00ed pr\u00e1ci. Ne\u017e rozhodnete o zm\u011bn\u011b priority nebo uvoln\u011bn\u00ed dal\u0161\u00ed kapacity, posu\u010fte v\u00fdsledn\u00e9 na\u010dasov\u00e1n\u00ed a dopady na dod\u00e1vky.<\/p>\n\n\n<p>V\u00fdsledkem je m\u00e9n\u011b ru\u010dn\u00edch \u00faprav po\u0159ad\u00ed prac\u00ed a jasn\u011bj\u0161\u00ed p\u0159ehled o tom, co rozhodnut\u00ed o spot\u0159eb\u011b z\u00e1sob znamen\u00e1 pro ostatn\u00ed zak\u00e1zky. M\u016f\u017eete vyu\u017e\u00edt rozumnou p\u0159\u00edle\u017eitost ke spot\u0159eb\u011b, ani\u017e by p\u0159ekro\u010den\u00ed hranice st\u00e1\u0159\u00ed z\u00e1sob slou\u017eilo jako d\u016fvod k odsunut\u00ed v\u0161ech z\u00e1kaznick\u00fdch zak\u00e1zek.<\/p>\n\n\n<p>Pokud star\u0161\u00ed materi\u00e1l nelze uvolnit k pou\u017eit\u00ed, je t\u0159eba do stejn\u00e9ho pl\u00e1nu zahrnout i n\u00e1hradn\u00ed dod\u00e1vku. SkyPlanner p\u0159i rozvrhov\u00e1n\u00ed vyu\u017e\u00edv\u00e1 evidovan\u00e9 term\u00edny dod\u00e1n\u00ed z n\u00e1kupu. Aktualizujte o\u010dek\u00e1van\u00fd term\u00edn a p\u0159epo\u010d\u00edtejte rozvrh, abyste vid\u011bli, kam lze dot\u010den\u00e9 operace za\u0159adit. M\u016f\u017eete pak jednat o realistick\u00e9 \u00faprav\u011b v\u00fdroby m\u00edsto toho, aby operace z\u016fstala napl\u00e1novan\u00e1 s materi\u00e1lem, kter\u00fd nen\u00ed p\u0159ipraven\u00fd k pou\u017eit\u00ed.<\/p>\n\n\n<p>SkyPlanner m\u016f\u017ee pracovat se skladov\u00fdmi mno\u017estv\u00edmi aktualizovan\u00fdmi prost\u0159ednictv\u00edm integrace nebo spravovan\u00fdmi v jeho skladov\u00e9m modulu. <strong><a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">Prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API jej lze propojit s libovoln\u00fdm ERP nebo MES<\/a><\/strong>. St\u00e1vaj\u00edc\u00ed \u00fadaje o zak\u00e1zk\u00e1ch a materi\u00e1lu tak m\u016f\u017eete propojit s rozvrhov\u00e1n\u00edm v\u00fdroby, ani\u017e byste kv\u016fli lep\u0161\u00edmu pl\u00e1nu museli nahrazovat funguj\u00edc\u00ed ERP.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Co ve spole\u010dnosti Eskomatic zm\u011bnil lep\u0161\u00ed p\u0159ehled o materi\u00e1lu<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/eskomatic\/\">Eskomatic, finsk\u00e1 spole\u010dnost zab\u00fdvaj\u00edc\u00ed se zak\u00e1zkov\u00fdm obr\u00e1b\u011bn\u00edm<\/a>, d\u0159\u00edve sestavovala fronty pr\u00e1ce p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b a m\u011bla omezen\u00fd p\u0159ehled o stavu materi\u00e1lu. Jeho nedostatek se tak mohl projevit a\u017e t\u011bsn\u011b p\u0159ed pl\u00e1novan\u00fdm zah\u00e1jen\u00edm operace.<\/p>\n\n\n<p>Po propojen\u00ed syst\u00e9mu SkyPlanner s daty ze sv\u00e9ho ERP z\u00edskala spole\u010dnost grafick\u00fd p\u0159ehled po\u0159ad\u00ed operac\u00ed a jasn\u011bj\u0161\u00ed p\u0159ehled o chyb\u011bj\u00edc\u00edm materi\u00e1lu. Eskomatic uv\u00e1d\u00ed m\u00e9n\u011b p\u0159eru\u0161en\u00ed v\u00fdroby kv\u016fli nedostatku materi\u00e1lu a p\u0159esn\u011bj\u0161\u00ed stanovov\u00e1n\u00ed dodac\u00edch term\u00edn\u016f. Stejn\u00fd princip plat\u00ed i p\u0159i vyhodnocov\u00e1n\u00ed st\u00e1\u0159\u00ed z\u00e1sob: informace o materi\u00e1lu jsou u\u017eite\u010dn\u00e9 tehdy, kdy\u017e pom\u00e1haj\u00ed ur\u010dit, kter\u00e9 operace lze skute\u010dn\u011b prov\u00e9st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zabra\u0148te opakovan\u00e9mu hromad\u011bn\u00ed star\u00fdch z\u00e1sob<\/h2>\n\n\n<p>P\u0159i p\u0159\u00ed\u0161t\u00edm p\u0159ezkoum\u00e1n\u00ed ov\u011b\u0159te, zda se dohodnut\u00e9 opat\u0159en\u00ed skute\u010dn\u011b provedlo. Napl\u00e1novan\u00e1 operace je\u0161t\u011b neznamen\u00e1 spot\u0159ebovan\u00fd materi\u00e1l. Zkontrolujte z\u00e1znam o v\u00fddeji nebo spot\u0159eb\u011b a zb\u00fdvaj\u00edc\u00ed z\u00e1sobu. Ani vr\u00e1cen\u00ed nen\u00ed dokon\u010den\u00e9 jen t\u00edm, \u017ee o n\u011b n\u011bkdo po\u017e\u00e1dal.<\/p>\n\n\n<p>Pot\u00e9 \u0159e\u0161te, pro\u010d se z\u00e1soby nahromadily. Zru\u0161en\u00e1 zak\u00e1zka m\u016f\u017ee vy\u017eadovat zm\u011bnu v n\u00e1kupu. Po revizi v\u00fdkresu u\u017e nemus\u00ed b\u00fdt materi\u00e1l podle star\u0161\u00ed specifikace pot\u0159eba. Velk\u00e9 n\u00e1kupn\u00ed nebo v\u00fdrobn\u00ed d\u00e1vky mohou opakovan\u011b p\u0159evy\u0161ovat skute\u010dnou spot\u0159ebu podniku. Dlouhodob\u00e9 pozastaven\u00ed pou\u017eit\u00ed m\u016f\u017ee m\u00edsto dal\u0161\u00ed \u00fapravy pl\u00e1nu vy\u017eadovat rozhodnut\u00ed \u00fatvaru kvality nebo technick\u00e9ho \u00fatvaru.<\/p>\n\n\n<p>Posuzujte nevy\u0159\u00edzen\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky a pl\u00e1novanou v\u00fdrobu spole\u010dn\u011b se zb\u00fdvaj\u00edc\u00edm pou\u017eiteln\u00fdm mno\u017estv\u00edm, aby nov\u00e9 dod\u00e1vky znovu nevytvo\u0159ily pr\u00e1v\u011b odstran\u011bn\u00fd p\u0159ebytek. Nedokon\u010den\u00e1 opat\u0159en\u00ed a star\u0161\u00ed z\u00e1soby sledujte ve stejn\u00e9m rozsahu a podle jednotn\u00fdch pravidel pro ur\u010dov\u00e1n\u00ed st\u00e1\u0159\u00ed. Jinak m\u016f\u017ee p\u0159evod z\u00e1sob nebo zm\u011bna v\u00fdkaznictv\u00ed p\u016fsobit jako zlep\u0161en\u00ed, ani\u017e by se samotn\u00fd probl\u00e9m zmen\u0161il.<\/p>\n\n\n<p>Za\u010dn\u011bte skupinou materi\u00e1l\u016f, u n\u00ed\u017e jsou z\u00e1soby v\u00fdznamn\u00e9 a p\u0159ijat\u00e1 rozhodnut\u00ed lze dot\u00e1hnout do konce. C\u00edlem je opakovateln\u00fd postup: ur\u010dit zb\u00fdvaj\u00edc\u00ed star\u0161\u00ed z\u00e1soby, schv\u00e1lit vhodn\u00e9 opat\u0159en\u00ed, rozvrhnout pot\u0159ebnou pr\u00e1ci a ov\u011b\u0159it v\u00fdsledek.<\/p>\n\n\n<p>Chcete-li tento postup vid\u011bt v praxi ve v\u00fdrob\u011b, <strong><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">domluvte si uk\u00e1zku SkyPlanner<\/a><\/strong>. P\u0159ipravte si \u00fadaje o star\u0161\u00edch z\u00e1sob\u00e1ch materi\u00e1lu, schv\u00e1len\u00e9 zak\u00e1zce, kter\u00e1 by je mohla spot\u0159ebovat, a dal\u0161\u00edch operac\u00edch vyu\u017e\u00edvaj\u00edc\u00edch stejn\u00e9 zdroje. Pod\u00edvejte se, jak SkyPlanner za\u0159ad\u00ed pr\u00e1ci, kter\u00e1 by mohla tento materi\u00e1l spot\u0159ebovat, do v\u00fdrobn\u00edho rozvrhu a uk\u00e1\u017ee jej\u00ed dopad na sl\u00edben\u00e9 dodac\u00ed term\u00edny. Pokud se chcete nejd\u0159\u00edve sezn\u00e1mit se syst\u00e9mem sami, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n Domov &raquo; Zdroje &raquo; St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n Paleta le\u017e\u00ed ve skladu u\u017e n\u011bkolik m\u011bs\u00edc\u016f. N\u00e1kup v n\u00ed vid\u00ed pen\u00edze v\u00e1zan\u00e9 v materi\u00e1lu. V\u00fdroba p\u0159\u00edle\u017eitost, jak se vyhnout dal\u0161\u00edmu n\u00e1kupu. Odd\u011blen\u00ed kvality mus\u00ed teprve potvrdit, zda lze materi\u00e1l pou\u017e\u00edt. Stroj, kter\u00fd by ho &#8230; <a title=\"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/\" aria-label=\"Read more about St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111842,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-111815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n<\/title>\n<meta name=\"description\" content=\"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\" \/>\n<meta property=\"og:description\" content=\"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T17:16:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T17:16:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\",\"datePublished\":\"2026-10-28T17:16:38+00:00\",\"dateModified\":\"2026-10-28T17:16:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/\"},\"wordCount\":3191,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/\",\"name\":\"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T17:16:38+00:00\",\"dateModified\":\"2026-10-28T17:16:50+00:00\",\"description\":\"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Stored metal rings beside an hourglass, with a selected portion at an assembly fixture for production use.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/stari-zasob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n","description":"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/","og_locale":"cs_CZ","og_type":"article","og_title":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n","og_description":"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T17:16:38+00:00","article_modified_time":"2026-10-28T17:16:50+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n","datePublished":"2026-10-28T17:16:38+00:00","dateModified":"2026-10-28T17:16:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/"},"wordCount":3191,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/","name":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","datePublished":"2026-10-28T17:16:38+00:00","dateModified":"2026-10-28T17:16:50+00:00","description":"Star\u00fd materi\u00e1l nemus\u00ed b\u00fdt odpad ani p\u0159ipraven k pou\u017eit\u00ed. Projd\u011bte p\u0159ehled st\u00e1\u0159\u00ed z\u00e1sob, zvolte postup a napl\u00e1nujte schv\u00e1lenou spot\u0159ebu se SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","width":1536,"height":864,"caption":"Stored metal rings beside an hourglass, with a selected portion at an assembly fixture for production use."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/stari-zasob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n Domov &raquo; Zdroje &raquo; St\u00e1\u0159\u00ed z\u00e1sob: prom\u011b\u0148te star\u00e9 z\u00e1soby ve v\u00fdrobn\u00ed pl\u00e1n Paleta le\u017e\u00ed ve skladu u\u017e n\u011bkolik m\u011bs\u00edc\u016f. N\u00e1kup v n\u00ed vid\u00ed pen\u00edze v\u00e1zan\u00e9 v materi\u00e1lu. V\u00fdroba p\u0159\u00edle\u017eitost, jak se vyhnout dal\u0161\u00edmu n\u00e1kupu. Odd\u011blen\u00ed kvality mus\u00ed teprve potvrdit, zda lze materi\u00e1l pou\u017e\u00edt. Stroj, kter\u00fd by ho&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=111815"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111815\/revisions"}],"predecessor-version":[{"id":111878,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111815\/revisions\/111878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/111842"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=111815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=111815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=111815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}