{"id":111689,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111689"},"modified":"2026-10-28T03:02:33","modified_gmt":"2026-10-28T03:02:33","slug":"system-dvou-zasobniku","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/","title":{"rendered":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Na mont\u00e1\u017en\u00edm pracovi\u0161ti dojde drobn\u00fd d\u00edl. N\u011bkde v z\u00e1vod\u011b sice z\u00e1soba je, ale n\u011bkdo ji mus\u00ed naj\u00edt, po\u017e\u00e1dat o dopln\u011bn\u00ed a dopravit d\u00edly k obsluze. Kv\u016fli levn\u00e9 sou\u010d\u00e1stce se pr\u00e1v\u011b zastavila v\u00fdroba a ztr\u00e1c\u00ed se drahocenn\u00fd \u010das.<\/p>\n\n\n<p>Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f tuto pot\u0159ebu zviditeln\u00ed d\u0159\u00edv, ne\u017e na pracovi\u0161ti d\u00edly \u00fapln\u011b dojdou. Obsluha odeb\u00edr\u00e1 d\u00edly z jednoho z\u00e1sobn\u00edku, zat\u00edmco druh\u00fd z\u016fst\u00e1v\u00e1 v z\u00e1loze. Vypr\u00e1zdn\u011bn\u00ed prvn\u00edho z\u00e1sobn\u00edku je sign\u00e1lem k dopln\u011bn\u00ed; druh\u00fd z\u00e1sobuje v\u00fdrobu, ne\u017e doraz\u00ed nov\u00e9 d\u00edly.<\/p>\n\n\n<p>Podstatn\u00e9 nen\u00ed to, zda m\u00e1te dv\u011b n\u00e1doby, ale zda se poda\u0159\u00ed z\u00e1sobu doplnit d\u0159\u00edv, ne\u017e se rezerva vy\u010derp\u00e1. U d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch na stroj\u00edch, kter\u00e9 sd\u00edlej\u00ed kapacitu s dal\u0161\u00ed v\u00fdrobou, v\u00e1m s odpov\u011bd\u00ed pom\u016f\u017ee SkyPlanner APS. P\u0159ijat\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy na dopln\u011bn\u00ed za\u0159ad\u00ed do pl\u00e1nu spole\u010dn\u011b se z\u00e1kaznick\u00fdmi zak\u00e1zkami, m\u00edsto aby z\u016fstaly na samostatn\u00e9m seznamu po\u017eadavk\u016f na dopln\u011bn\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je syst\u00e9m dvou z\u00e1sobn\u00edk\u016f?<\/h2>\n\n\n<p><strong>Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f<\/strong> je vizu\u00e1ln\u00ed metoda dopl\u0148ov\u00e1n\u00ed z\u00e1sob. Vyu\u017e\u00edv\u00e1 dv\u011b stanoven\u00e1 mno\u017estv\u00ed stejn\u00e9ho d\u00edlu v opakuj\u00edc\u00edm se cyklu spot\u0159eby a dopl\u0148ov\u00e1n\u00ed. Z jednoho z\u00e1sobn\u00edku se odeb\u00edr\u00e1 p\u0159\u00edmo na m\u00edst\u011b spot\u0159eby. Jakmile se vypr\u00e1zdn\u00ed, karta, pr\u00e1zdn\u00e1 n\u00e1doba nebo jin\u00fd dohodnut\u00fd sign\u00e1l vyvol\u00e1 po\u017eadavek na dopln\u011bn\u00ed a obsluha za\u010dne odeb\u00edrat z druh\u00e9ho z\u00e1sobn\u00edku.<\/p>\n\n\n<p>Druh\u00fd z\u00e1sobn\u00edk pokr\u00fdv\u00e1 spot\u0159ebu po dobu pot\u0159ebnou k dopln\u011bn\u00ed. V\u00fdhoda je jednoduch\u00e1: obsluha nemus\u00ed po\u010d\u00edtat v\u0161echny zb\u00fdvaj\u00edc\u00ed d\u00edly, aby poznala, kdy je t\u0159eba z\u00e1sobu doplnit. Pot\u0159eba je z\u0159ejm\u00e1 u\u017e z fyzick\u00e9ho stavu z\u00e1sobn\u00edk\u016f.<\/p>\n\n\n<p>Ve v\u00fdrob\u011b se tato metoda hod\u00ed zejm\u00e9na pro pravideln\u011b pou\u017e\u00edvan\u00fd spojovac\u00ed materi\u00e1l, fitinky a dal\u0161\u00ed drobn\u00e9 d\u00edly s opakovanou spot\u0159ebou. Z\u00e1sobu lze dopl\u0148ovat z centr\u00e1ln\u00edho skladu, od extern\u00edho dodavatele nebo z vlastn\u00ed v\u00fdroby. Podle zdroje se li\u0161\u00ed \u010dinnosti, kter\u00e9 po sign\u00e1lu n\u00e1sleduj\u00ed, pot\u0159eba spolehliv\u00e9ho dopln\u011bn\u00ed v\u0161ak z\u016fst\u00e1v\u00e1 stejn\u00e1.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Jak funguje cyklus se stejn\u00fdm mno\u017estv\u00edm v obou z\u00e1sobn\u00edc\u00edch<\/h3>\n\n\n<p>Pro jednoduch\u00e9 pilotn\u00ed zaveden\u00ed pou\u017eijte dva z\u00e1sobn\u00edky se stejn\u00fdm standardn\u00edm mno\u017estv\u00edm:<\/p>\n\n\n<p>1. <strong>Odeb\u00edrejte pouze z jednoho z\u00e1sobn\u00edku.<\/strong> Druh\u00fd z\u0159eteln\u011b ozna\u010dte jako rezervu, nikoli jako dal\u0161\u00ed m\u00edsto pro odb\u011br.<\/p>\n\n\n<p>2. <strong>Po vypr\u00e1zdn\u011bn\u00ed pou\u017e\u00edvan\u00e9ho z\u00e1sobn\u00edku vy\u0161lete sign\u00e1l.<\/strong> P\u0159esu\u0148te pr\u00e1zdn\u00fd z\u00e1sobn\u00edk nebo jeho kartu na ur\u010den\u00e9 sb\u011brn\u00e9 m\u00edsto, p\u0159\u00edpadn\u011b zaznamenejte po\u017eadavek dohodnut\u00fdm elektronick\u00fdm zp\u016fsobem.<\/p>\n\n\n<p>3. <strong>Za\u010dn\u011bte odeb\u00edrat z pln\u00e9ho rezervn\u00edho z\u00e1sobn\u00edku.<\/strong> V\u00fdroba pokra\u010duje, zat\u00edmco odpov\u011bdn\u00e1 osoba zaji\u0161\u0165uje dopln\u011bn\u00ed.<\/p>\n\n\n<p>4. <strong>Potvr\u010fte, \u017ee se po\u017eadavek na dopln\u011bn\u00ed vy\u0159izuje.<\/strong> Odpov\u011bdn\u00e1 osoba potvrd\u00ed p\u0159ijet\u00ed sign\u00e1lu a stanov\u00ed, kdy maj\u00ed b\u00fdt pou\u017eiteln\u00e9 d\u00edly op\u011bt na m\u00edst\u011b.<\/p>\n\n\n<p>5. <strong>Dopln\u011bn\u00fd z\u00e1sobn\u00edk vra\u0165te jako rezervn\u00ed.<\/strong> Zkontrolujte d\u00edl i mno\u017estv\u00ed, obnovte ozna\u010den\u00ed z\u00e1sobn\u00edku a uzav\u0159ete z\u00e1znam o dopln\u011bn\u00ed. Z pr\u00e1v\u011b pou\u017e\u00edvan\u00e9ho z\u00e1sobn\u00edku odeb\u00edrejte d\u00e1l, dokud se nevypr\u00e1zdn\u00ed.<\/p>\n\n\n<p>Z\u00e1sobn\u00edky si pak znovu vym\u011bn\u00ed role. Pr\u00e1v\u011b pou\u017e\u00edvan\u00fd z\u00e1sobn\u00edk pr\u016fb\u011b\u017en\u011b nedopl\u0148ujte: mohli byste t\u00edm zakr\u00fdt okam\u017eik vypr\u00e1zdn\u011bn\u00ed, kter\u00fd m\u00e1 b\u00fdt sign\u00e1lem k dopln\u011bn\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyberte d\u00edly, jejich\u017e spot\u0159eba a z\u00e1sobov\u00e1n\u00ed t\u00e9to metod\u011b vyhovuj\u00ed<\/h2>\n\n\n<p>Za\u010dn\u011bte s d\u00edly, kter\u00e9 se spot\u0159ebov\u00e1vaj\u00ed opakovan\u011b, jsou jednozna\u010dn\u011b ozna\u010den\u00e9 a maj\u00ed spolehliv\u00fd zdroj dopl\u0148ov\u00e1n\u00ed. Nejvhodn\u011bj\u0161\u00ed jsou d\u00edly, se kter\u00fdmi se snadno manipuluje ve standardn\u00edm mno\u017estv\u00ed a jejich\u017e specifikace se mezi zak\u00e1zkami nem\u011bn\u00ed.<\/p>\n\n\n<p>Levn\u00fd d\u00edl m\u016f\u017ee b\u00fdt vhodn\u00fdm kandid\u00e1tem i tehdy, kdy\u017e jeho nedostatek zastav\u00ed n\u00e1kladnou operaci. Po\u0159izovac\u00ed cena d\u00edlu toti\u017e nevypov\u00edd\u00e1 o n\u00e1kladech jeho nedostatku. Naopak napln\u011bn\u00ed dvou velk\u00fdch z\u00e1sobn\u00edk\u016f drahou, z\u0159\u00eddka pou\u017e\u00edvanou polo\u017ekou m\u016f\u017ee v\u00e1zat pen\u00edze, ani\u017e by \u0159e\u0161ilo opakovan\u00fd probl\u00e9m se z\u00e1sobov\u00e1n\u00edm.<\/p>\n\n\n<p>V\u011bt\u0161\u00ed opatrnost je na m\u00edst\u011b p\u0159i nepravideln\u00e9 spot\u0159eb\u011b nebo tam, kde ji ur\u010duj\u00ed ob\u010dasn\u00e9 velk\u00e9 zak\u00e1zky. Jedin\u00fd odb\u011br m\u016f\u017ee vy\u010derpat rezervu d\u00e1vno p\u0159edt\u00edm, ne\u017e doraz\u00ed obvykl\u00e9 dopln\u011bn\u00ed. Tak\u00e9 d\u00edly ur\u010den\u00e9 pro konkr\u00e9tn\u00ed zak\u00e1zku, \u010dast\u00e9 konstruk\u010dn\u00ed zm\u011bny, kr\u00e1tk\u00e1 skladovatelnost nebo n\u00e1ro\u010dn\u00e9 po\u017eadavky na \u0159\u00edzen\u00ed \u0161ar\u017e\u00ed vy\u017eaduj\u00ed v\u00edc ne\u017e jen praktickou dvojici z\u00e1sobn\u00edk\u016f. Zachovejte po\u017eadovan\u00e9 postupy pro identifikaci, rotaci z\u00e1sob a sledovatelnost.<\/p>\n\n\n<p>Dopl\u0148ov\u00e1n\u00ed pomoc\u00ed dvou z\u00e1sobn\u00edk\u016f <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/kanban-ve-vyrobe\/\">souvis\u00ed s kanbanem<\/a>, ale <strong>dva z\u00e1sobn\u00edky neznamenaj\u00ed dv\u011b kanbanov\u00e9 karty<\/strong>. Dvoukartov\u00fd kanbanov\u00fd okruh ve v\u00fdrob\u011b rozli\u0161uje opr\u00e1vn\u011bn\u00ed k v\u00fdrob\u011b a opr\u00e1vn\u011bn\u00ed k p\u0159esunu materi\u00e1lu. Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f popsan\u00fd v tomto \u010dl\u00e1nku se t\u00fdk\u00e1 fyzick\u00e9 z\u00e1soby a postupu po vy\u010derp\u00e1n\u00ed jednoho stanoven\u00e9ho mno\u017estv\u00ed.<\/p>\n\n\n<p>Nejde ani o tot\u00e9\u017e rozhodnut\u00ed jako p\u0159i nastaven\u00ed <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/\">min\u2013max \u0159\u00edzen\u00ed z\u00e1sob<\/a>. Min\u2013max pracuje s bodem pro objedn\u00e1n\u00ed a c\u00edlovou \u00farovn\u00ed, do kter\u00e9 se z\u00e1soba dopl\u0148uje. Dva z\u00e1sobn\u00edky naproti tomu zviditel\u0148uj\u00ed konkr\u00e9tn\u00ed hranici spot\u0159eby p\u0159\u00edmo na m\u00edst\u011b pou\u017eit\u00ed. Pr\u00e1zdn\u00e9 i pln\u00e9 z\u00e1sobn\u00edky m\u016f\u017ee p\u0159ev\u00e1\u017eet obsluha po z\u00e1sobovac\u00ed trase, samotn\u00fd svoz a rozvoz v\u0161ak neznamen\u00e1 potvrzen\u00ed p\u0159ijet\u00ed po\u017eadavku ani dokon\u010den\u00ed dopln\u011bn\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rezervu dimenzujte na celou dobu dopl\u0148ov\u00e1n\u00ed<\/h2>\n\n\n<p>M\u011b\u0159te dobu od <strong>sign\u00e1lu vyvolan\u00e9ho spot\u0159ebou a\u017e po dod\u00e1n\u00ed pou\u017eiteln\u00fdch d\u00edl\u016f na ur\u010den\u00e9 pracovi\u0161t\u011b<\/strong>. M\u011b\u0159en\u00ed nekon\u010d\u00ed odesl\u00e1n\u00edm n\u00e1kupn\u00ed objedn\u00e1vky, dokon\u010den\u00edm obr\u00e1b\u011bn\u00ed na stroji ani p\u0159\u00edjezdem dod\u00e1vky k br\u00e1n\u011b z\u00e1vodu.<\/p>\n\n\n<p>Do t\u00e9to doby m\u016f\u017ee pat\u0159it \u010dek\u00e1n\u00ed na sb\u011br sign\u00e1l\u016f, kontrola a uvoln\u011bn\u00ed po\u017eadavku, vychyst\u00e1n\u00ed nebo v\u00fdroba, kontrola kvality, p\u0159eprava i ulo\u017een\u00ed d\u00edl\u016f zp\u011bt na spr\u00e1vn\u00e9 m\u00edsto. U d\u00edl\u016f z vlastn\u00ed v\u00fdroby m\u016f\u017ee m\u00edt \u010dek\u00e1n\u00ed na stroj sd\u00edlen\u00fd s dal\u0161\u00ed v\u00fdrobou v\u011bt\u0161\u00ed vliv ne\u017e samotn\u00e1 doba zpracov\u00e1n\u00ed.<\/p>\n\n\n<p>Pro v\u00fdchoz\u00ed v\u00fdpo\u010det vyn\u00e1sobte o\u010dek\u00e1vanou spot\u0159ebu za provozn\u00ed obdob\u00ed po\u010dtem t\u011bchto obdob\u00ed, b\u011bhem nich\u017e mus\u00ed z\u00e1soba pokr\u00fdt \u010dek\u00e1n\u00ed na dopln\u011bn\u00ed. Pot\u00e9 p\u0159idejte rezervu na v\u00fdkyvy popt\u00e1vky a doby dopl\u0148ov\u00e1n\u00ed, kter\u00e9 mus\u00ed v\u00e1\u0161 proces zvl\u00e1dnout. Bezpe\u010dnostn\u00ed z\u00e1soba je dodate\u010dn\u00e1 rezerva zahrnut\u00e1 v tomto mno\u017estv\u00ed, ne nutn\u011b cel\u00fd druh\u00fd z\u00e1sobn\u00edk.<\/p>\n\n\n<h3 class=\"wp-block-heading\">N\u00e1zorn\u00fd p\u0159\u00edklad se dv\u011bma z\u00e1sobn\u00edky<\/h3>\n\n\n<p>P\u0159edstavte si mont\u00e1\u017en\u00ed pracovi\u0161t\u011b, kter\u00e9 spot\u0159ebuje 40 p\u0159\u00edchytek za provozn\u00ed sm\u011bnu. Ka\u017ed\u00fd z\u00e1sobn\u00edk obsahuje 240 pou\u017eiteln\u00fdch p\u0159\u00edchytek. Kdy\u017e se jeden vypr\u00e1zdn\u00ed a obsluha p\u0159ejde na druh\u00fd, pln\u00fd z\u00e1sobn\u00edk p\u0159i t\u00e9to spot\u0159eb\u011b pokryje \u0161est provozn\u00edch sm\u011bn.<\/p>\n\n\n<p>Pokud cel\u00fd proces dopln\u011bn\u00ed trv\u00e1 \u010dty\u0159i provozn\u00ed sm\u011bny, pracovi\u0161t\u011b b\u011bhem \u010dek\u00e1n\u00ed spot\u0159ebuje 160 p\u0159\u00edchytek. V okam\u017eiku n\u00e1vratu dopln\u011bn\u00e9ho z\u00e1sobn\u00edku zb\u00fdv\u00e1 v pou\u017e\u00edvan\u00e9m z\u00e1sobn\u00edku je\u0161t\u011b 80 p\u0159\u00edchytek. Toto zb\u00fdvaj\u00edc\u00ed mno\u017estv\u00ed v na\u0161em p\u0159\u00edkladu chr\u00e1n\u00ed p\u0159ed v\u00fdkyvy; nejde o doporu\u010denou rezervu pro ka\u017ed\u00fd z\u00e1vod.<\/p>\n\n\n<p>Nyn\u00ed p\u0159edpokl\u00e1dejme, \u017ee samotn\u00e1 v\u00fdroba p\u0159\u00edchytek trv\u00e1 jen kr\u00e1tce, ale fronta pr\u00e1ce p\u0159ed v\u00fdrobn\u00edm strojem zpozd\u00ed jejich n\u00e1vrat na dobu del\u0161\u00ed ne\u017e \u0161est provozn\u00edch sm\u011bn. Syst\u00e9m sel\u017ee navzdory spr\u00e1vn\u00fdm z\u00e1sobn\u00edk\u016fm a viditeln\u00e9mu sign\u00e1lu. Mus\u00edte zkr\u00e1tit dobu dopl\u0148ov\u00e1n\u00ed, zv\u00fd\u0161it rezervu nebo zvolit jin\u00fd zp\u016fsob dopl\u0148ov\u00e1n\u00ed.<\/p>\n\n\n<p>P\u0159i v\u00fdpo\u010dtu d\u016fsledn\u011b zohled\u0148ujte provozn\u00ed kalend\u00e1\u0159e. Pokud mont\u00e1\u017e spot\u0159ebov\u00e1v\u00e1 d\u00edly b\u011bhem no\u010dn\u00ed sm\u011bny, ale sklad, dodavatel nebo proces dopl\u0148ov\u00e1n\u00ed v t\u00e9 dob\u011b nepracuje, rezerva se \u010derp\u00e1 i b\u011bhem t\u00e9to mezery. V\u00fdpo\u010det zalo\u017ete na skute\u010dn\u00e9 spot\u0159eb\u011b v dob\u011b, kdy dopln\u011bn\u00ed nen\u00ed k dispozici, nikoli na nejasn\u00e9 kombinaci kalend\u00e1\u0159n\u00edch dn\u016f a pracovn\u00edch hodin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mus\u00ed b\u00fdt v obou z\u00e1sobn\u00edc\u00edch stejn\u00e9 mno\u017estv\u00ed?<\/h3>\n\n\n<p>Ne. Lze pou\u017e\u00edt v\u011bt\u0161\u00ed pracovn\u00ed z\u00e1sobu a men\u0161\u00ed rezervu dimenzovanou na dobu dopl\u0148ov\u00e1n\u00ed. Pro takov\u00e9 uspo\u0159\u00e1d\u00e1n\u00ed ale stanovte jin\u00e9 pravidlo obnoven\u00ed v\u00fdchoz\u00edho stavu: po p\u0159\u00edjmu nejprve dopl\u0148te rezervu na p\u0159edepsan\u00e9 mno\u017estv\u00ed a zbytek vlo\u017ete do pracovn\u00edho z\u00e1sobn\u00edku.<\/p>\n\n\n<p>Z\u00e1sobn\u00edky s r\u016fzn\u00fdm mno\u017estv\u00edm nest\u0159\u00eddejte, jako by ka\u017ed\u00fd poskytoval stejnou ochranu. P\u0159i prvn\u00edm zav\u00e1d\u011bn\u00ed se v\u00fdm\u011bna z\u00e1sobn\u00edk\u016f se stejn\u00fdm mno\u017estv\u00edm sn\u00e1ze vysv\u011btluje i kontroluje. R\u016fzn\u00e1 mno\u017estv\u00ed volte jen tehdy, kdy\u017e \u00faspora z\u00e1sob nebo m\u00edsta ospravedln\u00ed vy\u0161\u0161\u00ed n\u00e1roky na dodr\u017eov\u00e1n\u00ed postupu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za ka\u017ed\u00fd sign\u00e1l pr\u00e1zdn\u00e9ho z\u00e1sobn\u00edku mus\u00ed n\u011bkdo odpov\u00eddat<\/h2>\n\n\n<p>Karta odlo\u017een\u00e1 ve sb\u011brn\u00e9m boxu je po\u017eadavek, nikoli d\u016fkaz, \u017ee se j\u00edm n\u011bkdo zab\u00fdv\u00e1. P\u0159ed spu\u0161t\u011bn\u00edm pilotn\u00edho provozu se dohodn\u011bte, kdo sign\u00e1l p\u0159ij\u00edm\u00e1, jak rychle potvrd\u00ed jeho p\u0159ijet\u00ed a kdo zas\u00e1hne, pokud se dopln\u011bn\u00ed opozd\u00ed. Odpov\u011bdnost ur\u010dete pro v\u0161echny sm\u011bny, v\u010detn\u011b z\u00e1stupu p\u0159i nep\u0159\u00edtomnosti b\u011b\u017en\u011b odpov\u011bdn\u00e9 osoby.<\/p>\n\n\n<p>Sign\u00e1l mus\u00ed obsahovat dost \u00fadaj\u016f, aby bylo mo\u017en\u00e9 dopln\u011bn\u00ed zajistit bez telefonick\u00e9ho up\u0159es\u0148ov\u00e1n\u00ed. Uve\u010fte ozna\u010den\u00ed d\u00edlu a p\u0159\u00edpadn\u011b jeho revizi, standardn\u00ed dopl\u0148ovan\u00e9 mno\u017estv\u00ed, zdroj, m\u00edsto vr\u00e1cen\u00ed a identifik\u00e1tor z\u00e1sobn\u00edku nebo karty. Osoba zaji\u0161\u0165uj\u00edc\u00ed dopln\u011bn\u00ed mus\u00ed b\u00fdt schopna tento po\u017eadavek odli\u0161it od jin\u00e9ho, kter\u00fd se ji\u017e vy\u0159izuje.<\/p>\n\n\n<p>Pou\u017e\u00edvejte nap\u0159\u00edklad dohodnut\u00e9 stavy jako \u201epo\u017eadov\u00e1no\u201c, \u201ep\u0159ijato\u201c a \u201evr\u00e1ceno\u201c. Pap\u00edrov\u00fd sign\u00e1l m\u016f\u017ee fungovat zcela spolehliv\u011b, pokud odpov\u011bdn\u00e1 osoba potvrd\u00ed jeho p\u0159ijet\u00ed a nevy\u0159\u00edzen\u00e9 po\u017eadavky z\u016fstanou na o\u010d\u00edch. Pokud stejn\u00fd po\u017eadavek evidujete i elektronicky, oba z\u00e1znamy propojte, m\u00edsto abyste spustili druh\u00e9 dopln\u011bn\u00ed.<\/p>\n\n\n<p>Fyzick\u00fd ob\u011bh z\u00e1sobn\u00edk\u016f mus\u00ed odpov\u00eddat i skladov\u00e9 evidenci. Samotn\u00e9 p\u0159em\u00edst\u011bn\u00ed z\u00e1sobn\u00edku neznamen\u00e1 elektronick\u00fd skladov\u00fd pohyb ani vytvo\u0159en\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu. Ur\u010dete, ve kter\u00e9m okam\u017eiku se ve zvolen\u00e9m postupu eviduje spot\u0159eba, intern\u00ed p\u0159esun, p\u0159\u00edjem a p\u0159\u00edpadn\u00fd po\u017eadavek na v\u00fdrobu. Pokud u\u017e byla z\u00e1soba odeps\u00e1na p\u0159i vykazov\u00e1n\u00ed v\u00fdroby, neodepisujte ji znovu jen proto, \u017ee n\u011bkdo odvezl pr\u00e1zdn\u00fd z\u00e1sobn\u00edk.<\/p>\n\n\n<p>P\u0159i vr\u00e1cen\u00ed dopln\u011bn\u00e9ho z\u00e1sobn\u00edku ov\u011b\u0159te p\u0159ed uzav\u0159en\u00edm po\u017eadavku mno\u017estv\u00ed pou\u017eiteln\u00fdch kus\u016f, jejich identitu a um\u00edst\u011bn\u00ed. Po\u0161kozen\u00e9 d\u00edly v na pohled pln\u00e9m z\u00e1sobn\u00edku neposkytuj\u00ed zam\u00fd\u0161lenou ochranu p\u0159ed nedostatkem. Dopln\u011bn\u00ed je hotov\u00e9 a\u017e tehdy, kdy\u017e m\u00e1 odb\u011brn\u00e9 pracovi\u0161t\u011b k dispozici spr\u00e1vn\u00e9 a pou\u017eiteln\u00e9 d\u00edly, nikoli jen kdy\u017e n\u011bkdo ozna\u010d\u00ed p\u0159edchoz\u00ed \u00fakol za dokon\u010den\u00fd.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u010cerp\u00e1n\u00ed rezervy je b\u011b\u017en\u00fd sign\u00e1l, opo\u017ed\u011bn\u00e9 dopln\u011bn\u00ed vy\u017eaduje z\u00e1sah<\/h3>\n\n\n<p>S \u010derp\u00e1n\u00edm z druh\u00e9ho z\u00e1sobn\u00edku se po\u010d\u00edt\u00e1. S jeho vypr\u00e1zdn\u011bn\u00edm bez dopln\u011bn\u00ed nikoli.<\/p>\n\n\n<p>Stanovte okam\u017eik eskalace dostate\u010dn\u011b v\u010das, aby zb\u00fdval prostor k z\u00e1sahu, dokud je je\u0161t\u011b z\u00e1soba k dispozici. Pokud pracovn\u00edk odpov\u011bdn\u00fd za dopln\u011bn\u00ed nem\u016f\u017ee potvrdit n\u00e1vrat z\u00e1sobn\u00edku d\u0159\u00edve, ne\u017e zb\u00fdvaj\u00edc\u00ed z\u00e1soba dojde, zapojte \u010dlov\u011bka, kter\u00fd m\u016f\u017ee zm\u011bnit rozhodnut\u00ed o z\u00e1sobov\u00e1n\u00ed nebo v\u00fdrob\u011b. Nouzov\u00fd p\u0159esun m\u016f\u017ee b\u00fdt vhodn\u00fdm \u0159e\u0161en\u00edm, ale zaevidujte ho a n\u00e1sledn\u011b obnovte stanoven\u00e1 mno\u017estv\u00ed v obou z\u00e1sobn\u00edc\u00edch. Neohl\u00e1\u0161en\u00e9 vyp\u016fj\u010dov\u00e1n\u00ed z jin\u00e9ho pracovi\u0161t\u011b pouze p\u0159esouv\u00e1 nedostatek jinam.<\/p>\n\n\n<p>B\u011bhem pilotn\u00edho provozu sledujte nepotvrzen\u00e9 po\u017eadavky, skute\u010dnou dobu od sign\u00e1lu po vr\u00e1cen\u00ed dopln\u011bn\u00e9ho z\u00e1sobn\u00edku, zb\u00fdvaj\u00edc\u00ed rezervu p\u0159i jeho n\u00e1vratu a nouzov\u00e9 z\u00e1sahy. Ne\u017e za\u010dnete sni\u017eovat z\u00e1soby, vyu\u017eijte tato zji\u0161t\u011bn\u00ed ke zlep\u0161en\u00ed svozu a dopl\u0148ov\u00e1n\u00ed. Mno\u017estv\u00ed znovu prov\u011b\u0159te p\u0159i zm\u011bn\u011b popt\u00e1vky, sm\u011bnn\u00e9ho re\u017eimu, v\u00fdkonnosti dodavatel\u016f nebo v\u00fdrobn\u00edho postupu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Intern\u00ed dopl\u0148ov\u00e1n\u00ed pl\u00e1nujte spole\u010dn\u011b s v\u00fdrobou, se kterou sd\u00edl\u00ed kapacity<\/h2>\n\n\n<p>U nakupovan\u00e9ho spojovac\u00edho materi\u00e1lu m\u016f\u017ee dopln\u011bn\u00ed spo\u010d\u00edvat hlavn\u011b ve vychyst\u00e1n\u00ed, dod\u00e1vce od dodavatele a vnitropodnikov\u00e9 doprav\u011b. U spony, dr\u017e\u00e1ku nebo distan\u010dn\u00edho d\u00edlu vyr\u00e1b\u011bn\u00e9ho intern\u011b v\u0161ak dopl\u0148ov\u00e1n\u00ed soupe\u0159\u00ed o stroje a \u010das tak\u00e9 se z\u00e1kaznick\u00fdmi zak\u00e1zkami. Seznam d\u00e1vek k dopln\u011bn\u00ed, kter\u00fd tyto z\u00e1vazky ignoruje, nen\u00ed v\u011brohodn\u00fdm podkladem pro p\u0159\u00edslib term\u00ednu n\u00e1vratu.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud dopl\u0148ov\u00e1n\u00ed z\u00e1sob pot\u0159ebuje tyto sd\u00edlen\u00e9 v\u00fdrobn\u00ed kapacity.<\/strong> Jakmile je dopln\u011bn\u00ed p\u0159ijato jako v\u00fdrobn\u00ed p\u0159\u00edkaz, Arcturus, um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed ve SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">vypo\u010d\u00edt\u00e1 rozvrh jeho operac\u00ed spole\u010dn\u011b s ostatn\u00ed v\u00fdrobou<\/a>. Zohledn\u00ed nastaven\u00e1 pracovi\u0161t\u011b, kapacity, sm\u011bny, n\u00e1vaznosti operac\u00ed a priority. V\u00fdsledn\u00e9 po\u0159ad\u00ed a pl\u00e1novan\u00e9 dokon\u010den\u00ed zobraz\u00ed Gantt\u016fv diagram.<\/p>\n\n\n<p>Odpad\u00e1 tak pr\u00e1ce s veden\u00edm jedn\u00e9 fronty pro z\u00e1kaznick\u00e9 zak\u00e1zky a druh\u00e9 pro dopl\u0148ovac\u00ed d\u00e1vky i s jejich n\u00e1sledn\u00fdm ru\u010dn\u00edm sla\u010fov\u00e1n\u00edm. Vid\u00edte, zda se dopln\u011bn\u00ed vejde do rozvrhu p\u0159ed o\u010dek\u00e1van\u00fdm vy\u010derp\u00e1n\u00edm rezervy a jak zm\u011bna priority ovlivn\u00ed ostatn\u00ed z\u00e1vazky.<\/p>\n\n\n<p>Vra\u0165me se k p\u0159\u00edkladu s p\u0159\u00edchytkami. Pro pl\u00e1nov\u00e1n\u00ed je podstatn\u00e9, zda p\u0159ijat\u00e1 dopl\u0148ovac\u00ed d\u00e1vka projde v\u00fdrobn\u00edm postupem v\u010das, aby se stihla kontrola a doprava zp\u011bt na mont\u00e1\u017e. Pokud je sd\u00edlen\u00fd stroj u\u017e obsazen jinou zak\u00e1zkou, m\u016f\u017eete tento st\u0159et \u0159e\u0161it d\u0159\u00edve, ne\u017e na mont\u00e1\u017ei dojdou d\u00edly. Priority ur\u010dujete vy; Arcturus podle nich vypo\u010d\u00edt\u00e1 rozvrh.<\/p>\n\n\n<p>Pokud je zapnut\u00e9 zohled\u0148ov\u00e1n\u00ed materi\u00e1lu p\u0159i rozvrhov\u00e1n\u00ed a \u00fadaje o z\u00e1sob\u00e1ch jsou udr\u017eov\u00e1ny aktu\u00e1ln\u00ed, SkyPlanner bere v \u00favahu i materi\u00e1l pot\u0159ebn\u00fd pro dopln\u011bn\u00ed. Voln\u00fd stroj nesta\u010d\u00ed, pokud pro d\u00e1vku chyb\u00ed vstupn\u00ed materi\u00e1l. U nakupovan\u00fdch d\u00edl\u016f lze evidovan\u00e9 term\u00edny dod\u00e1n\u00ed z n\u00e1kupn\u00edch objedn\u00e1vek zohlednit v rozvrhu v\u00fdroby, kter\u00e1 je pot\u0159ebuje. Kdy\u017e se tyto term\u00edny zm\u011bn\u00ed, rozvrh p\u0159epo\u010d\u00edtejte.<\/p>\n\n\n<p>SkyPlanner lze prost\u0159ednictv\u00edm jeho otev\u0159en\u00e9ho REST API propojit s jak\u00fdmkoli syst\u00e9mem ERP nebo MES. St\u00e1vaj\u00edc\u00ed \u00fadaje o zak\u00e1zk\u00e1ch a z\u00e1sob\u00e1ch tak m\u016f\u017eete propojit s v\u00fdrobn\u00edm rozvrhem, m\u00edsto abyste vytv\u00e1\u0159eli odd\u011blen\u00e9 pl\u00e1nov\u00e1n\u00ed dopl\u0148ov\u00e1n\u00ed. Na pracovi\u0161ti zachovejte jednoduch\u00fd sign\u00e1l pr\u00e1zdn\u00e9ho z\u00e1sobn\u00edku a pro navazuj\u00edc\u00ed pr\u00e1ci p\u0159ipravte pl\u00e1n, kter\u00fd zohled\u0148uje i zbytek z\u00e1vodu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Co ve spole\u010dnosti Eskomatic zm\u011bnil p\u0159ehled o materi\u00e1lu<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/eskomatic\/\">Eskomatic, finsk\u00e1 spole\u010dnost zam\u011b\u0159en\u00e1 na zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/a>, d\u0159\u00edve sestavovala fronty pr\u00e1ce p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b. Kv\u016fli omezen\u00e9mu p\u0159ehledu o dostupnosti materi\u00e1lu se jeho nedostatek mohl projevit a\u017e t\u011bsn\u011b p\u0159ed pl\u00e1novan\u00fdm zah\u00e1jen\u00edm operace.<\/p>\n\n\n<p>Propojen\u00edm SkyPlanner se st\u00e1vaj\u00edc\u00edm ERP z\u00edskala spole\u010dnost p\u0159ehledn\u011bj\u0161\u00ed grafick\u00e9 zobrazen\u00ed po\u0159ad\u00ed pr\u00e1ce a automatick\u00e9 pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed kapacit. Eskomatic uv\u00e1d\u00ed p\u0159esn\u011bj\u0161\u00ed term\u00edny dod\u00e1n\u00ed a m\u00e9n\u011b p\u0159eru\u0161en\u00ed v\u00fdroby zp\u016fsoben\u00fdch nedostatkem materi\u00e1lu.<\/p>\n\n\n<p>Jej\u00ed zku\u0161enost ukazuje p\u0159\u00ednos propojen\u00ed materi\u00e1lov\u00e9 p\u0159ipravenosti s ka\u017edodenn\u00edm rozvrhov\u00e1n\u00edm: pl\u00e1nova\u010di mohou reagovat d\u0159\u00edve, m\u00edsto aby rozpl\u00e9tali probl\u00e9m ve chv\u00edli, kdy u\u017e m\u00e1 v\u00fdroba b\u011b\u017eet. P\u0159i dopl\u0148ov\u00e1n\u00ed syst\u00e9mu dvou z\u00e1sobn\u00edk\u016f v\u00fdrobou na sd\u00edlen\u00fdch stroj\u00edch jde o stejnou praktickou pot\u0159ebu \u2014 o\u010dek\u00e1van\u00fd term\u00edn n\u00e1vratu mus\u00ed m\u00edt oporu ve skute\u010dn\u00e9m v\u00fdrobn\u00edm pl\u00e1nu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dn\u011bte jedn\u00edm d\u00edlem a ov\u011b\u0159te cel\u00fd cyklus<\/h2>\n\n\n<p>Pilotn\u00ed provoz spus\u0165te s jedn\u00edm opakovan\u011b pou\u017e\u00edvan\u00fdm d\u00edlem na jednom odb\u011brn\u00e9m m\u00edst\u011b. Ov\u011b\u0159te po\u010d\u00e1te\u010dn\u00ed mno\u017estv\u00ed v obou z\u00e1sobn\u00edc\u00edch, zkontrolujte a sla\u010fte ji\u017e otev\u0159en\u00e9 po\u017eadavky na dopln\u011bn\u00ed, ozna\u010dte m\u00edsta a s obsluhou i pracovn\u00edky odpov\u011bdn\u00fdmi za dopln\u011bn\u00ed nacvi\u010dte v\u00fdm\u011bnu pr\u00e1zdn\u00e9ho z\u00e1sobn\u00edku. Ne\u017e syst\u00e9m roz\u0161\u00ed\u0159\u00edte, sledujte n\u011bkolik \u00fapln\u00fdch cykl\u016f v\u010detn\u011b p\u0159ed\u00e1v\u00e1n\u00ed sm\u011bn.<\/p>\n\n\n<p>Zachovejte to, v \u010dem spo\u010d\u00edv\u00e1 p\u0159\u00ednos syst\u00e9mu dvou z\u00e1sobn\u00edk\u016f: jednozna\u010dn\u00fd sign\u00e1l a jednoduch\u00fd postup pro obsluhu. P\u0159i pl\u00e1nov\u00e1n\u00ed se zam\u011b\u0159te na to podstatn\u00e9 \u2014 zajist\u011bte, aby proces navazuj\u00edc\u00ed na tento sign\u00e1l skute\u010dn\u011b dok\u00e1zal z\u00e1sobu doplnit.<\/p>\n\n\n<p>Chcete-li vid\u011bt, jak by SkyPlanner rozvrhoval va\u0161e intern\u00ed dopl\u0148ov\u00e1n\u00ed z\u00e1sob, <a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">domluvte si uk\u00e1zku<\/a> a p\u0159ipravte si jeden opakovan\u011b pou\u017e\u00edvan\u00fd d\u00edl, dobu kryt\u00ed jeho rezervou a z\u00e1kaznickou zak\u00e1zku, kter\u00e1 pot\u0159ebuje stejn\u00fd v\u00fdrobn\u00ed zdroj. M\u016f\u017eete si prohl\u00e9dnout m\u00edsto dopl\u0148ovac\u00ed d\u00e1vky ve spole\u010dn\u00e9m rozvrhu i jej\u00ed vliv na ostatn\u00ed v\u00fdrobu. Nebo <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>. Pokud d\u00e1v\u00e1te p\u0159ednost \u00favodu s pr\u016fvodcem, vyu\u017eijte funkci Za\u010d\u00edn\u00e1me, ve kter\u00e9 v\u00e1m Asistent pom\u016f\u017ee s vyu\u017eit\u00edm um\u011bl\u00e9 inteligence.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu Domov &raquo; Zdroje &raquo; Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu Na mont\u00e1\u017en\u00edm pracovi\u0161ti dojde drobn\u00fd d\u00edl. N\u011bkde v z\u00e1vod\u011b sice z\u00e1soba je, ale n\u011bkdo ji mus\u00ed naj\u00edt, po\u017e\u00e1dat o dopln\u011bn\u00ed a dopravit d\u00edly k obsluze. Kv\u016fli levn\u00e9 sou\u010d\u00e1stce se pr\u00e1v\u011b zastavila v\u00fdroba a ztr\u00e1c\u00ed se &#8230; <a title=\"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/\" aria-label=\"Read more about Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-111689","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu<\/title>\n<meta name=\"description\" content=\"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\" \/>\n<meta property=\"og:description\" content=\"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:02:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:02:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/\"},\"wordCount\":3275,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/\",\"name\":\"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:02:33+00:00\",\"description\":\"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/system-dvou-zasobniku\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu","description":"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/","og_locale":"cs_CZ","og_type":"article","og_title":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu","og_description":"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:02:33+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:02:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/"},"wordCount":3275,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/","name":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:02:33+00:00","description":"Pr\u00e1zdn\u00fd z\u00e1sobn\u00edk m\u00e1 spustit dopln\u011bn\u00ed, ne zastavit v\u00fdrobu. Zave\u010fte spolehliv\u00fd syst\u00e9m dvou z\u00e1sobn\u00edk\u016f a ve SkyPlanner pl\u00e1nujte v\u00fdrobu d\u00edl\u016f vyr\u00e1b\u011bn\u00fdch u v\u00e1s.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/system-dvou-zasobniku\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu Domov &raquo; Zdroje &raquo; Syst\u00e9m dvou z\u00e1sobn\u00edk\u016f: Drobn\u00e9 d\u00edly p\u0159ipraven\u00e9 pro v\u00fdrobu Na mont\u00e1\u017en\u00edm pracovi\u0161ti dojde drobn\u00fd d\u00edl. N\u011bkde v z\u00e1vod\u011b sice z\u00e1soba je, ale n\u011bkdo ji mus\u00ed naj\u00edt, po\u017e\u00e1dat o dopln\u011bn\u00ed a dopravit d\u00edly k obsluze. Kv\u016fli levn\u00e9 sou\u010d\u00e1stce se pr\u00e1v\u011b zastavila v\u00fdroba a ztr\u00e1c\u00ed se&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=111689"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111689\/revisions"}],"predecessor-version":[{"id":111752,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111689\/revisions\/111752"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=111689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=111689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=111689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}