{"id":111317,"date":"2026-10-27T18:49:22","date_gmt":"2026-10-27T18:49:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111317"},"modified":"2026-10-27T18:49:36","modified_gmt":"2026-10-27T18:49:36","slug":"min-max-rizeni-zasob","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/","title":{"rendered":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>V z\u00e1sobn\u00edku doch\u00e1zej\u00ed d\u00edly, a tak n\u00e1kup\u010d\u00ed objedn\u00e1 dal\u0161\u00ed d\u00e1vku. Ve v\u00fdrob\u011b u\u017e ale mezit\u00edm b\u011b\u017e\u00ed p\u0159\u00edkaz na dopln\u011bn\u00ed stejn\u00e9 polo\u017eky. Ka\u017ed\u00e9 z t\u011bchto rozhodnut\u00ed samo o sob\u011b d\u00e1v\u00e1 smysl. Dohromady v\u0161ak vytvo\u0159\u00ed z\u00e1sobu, kterou z\u00e1vod nepot\u0159eboval.<\/p>\n\n\n<p>Min-max \u0159\u00edzen\u00ed z\u00e1sob stanovuje pro dopl\u0148ov\u00e1n\u00ed jednotn\u00e9 pravidlo: doln\u00ed mez ur\u010duje, kdy zas\u00e1hnout, a horn\u00ed c\u00edl, na jakou \u00farove\u0148 z\u00e1sobu doplnit. Aby tento p\u0159\u00edstup ve v\u00fdrob\u011b fungoval, mus\u00edte zapo\u010d\u00edtat i o\u010dek\u00e1van\u00e9 dod\u00e1vky a ji\u017e z\u00e1vazn\u00e9 po\u017eadavky, nejen kusy na reg\u00e1lu.<\/p>\n\n\n<p>Pot\u00e9 p\u0159ich\u00e1z\u00ed rozhodnut\u00ed o v\u00fdrob\u011b. Pokud z\u00e1sobu dopl\u0148ujete vlastn\u00ed v\u00fdrobou, mus\u00edte pro v\u00fdrobu dan\u00e9ho mno\u017estv\u00ed vyhradit \u010das na stroj\u00edch, na nich\u017e se zpracov\u00e1vaj\u00ed i z\u00e1kaznick\u00e9 zak\u00e1zky. SkyPlanner APS za\u0159ad\u00ed schv\u00e1len\u00e9 dopln\u011bn\u00ed do spole\u010dn\u00e9ho pl\u00e1nu, kter\u00fd zohled\u0148uje kapacity i materi\u00e1l. Uvid\u00edte tak, kdy bude hotov\u00e9, ani\u017e byste museli ru\u010dn\u011b sestavovat samostatnou frontu zak\u00e1zek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je min-max \u0159\u00edzen\u00ed z\u00e1sob?<\/h2>\n\n\n<p>Min-max \u0159\u00edzen\u00ed z\u00e1sob je zp\u016fsob dopl\u0148ov\u00e1n\u00ed, kter\u00fd pro ka\u017edou skladovanou polo\u017eku stanovuje dva parametry:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Minimum:<\/strong> mez, p\u0159i jej\u00edm\u017e p\u0159ekro\u010den\u00ed sm\u011brem dol\u016f je t\u0159eba rozhodnout o dopln\u011bn\u00ed.<\/li><li><strong>Maximum:<\/strong> c\u00edlov\u00e1 disponibiln\u00ed z\u00e1soba, na kterou dopl\u0148ujete.<\/li><\/ul>\n\n\n<p>Minimum nen\u00ed \u00farove\u0148, p\u0159i kter\u00e9 maj\u00ed z\u00e1soby doj\u00edt. M\u00e1 poskytnout dostatek \u010dasu na dopln\u011bn\u00ed, zat\u00edmco spot\u0159eba pokra\u010duje. Maximum nen\u00ed mno\u017estv\u00ed, kter\u00e9 poka\u017ed\u00e9 objedn\u00e1v\u00e1te, ani z\u00e1ruka, \u017ee fyzick\u00e1 z\u00e1soba tuto \u00farove\u0148 nikdy nep\u0159ekro\u010d\u00ed.<\/p>\n\n\n<p>P\u0159i min-max \u0159\u00edzen\u00ed se objedn\u00e1van\u00e9 mno\u017estv\u00ed m\u011bn\u00ed podle rozd\u00edlu do c\u00edlov\u00e9 \u00farovn\u011b. Pokud je c\u00edlem 600 kus\u016f a p\u0159\u00edslu\u0161n\u00e1 disponibiln\u00ed z\u00e1soba \u010din\u00ed 230, v\u00fdchoz\u00ed mno\u017estv\u00ed k dopln\u011bn\u00ed je 370 kus\u016f. P\u0159i disponibiln\u00ed z\u00e1sob\u011b 280 kus\u016f je to naopak 320.<\/p>\n\n\n<p>Zaznamenejte, zda dopln\u011bn\u00ed spou\u0161t\u00ed \u201epokles pod minimum\u201c, nebo \u201edosa\u017een\u00ed minima \u010di pokles pod n\u011bj\u201c. Syst\u00e9my i firemn\u00ed pravidla se v tomto hrani\u010dn\u00edm bod\u011b mohou li\u0161it. V n\u00e1sleduj\u00edc\u00edch p\u0159\u00edkladech se dopln\u011bn\u00ed spou\u0161t\u00ed p\u0159i poklesu disponibiln\u00ed z\u00e1soby <strong>pod<\/strong> minimum.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Po\u010d\u00edtejte s disponibiln\u00ed z\u00e1sobou, nejen s fyzick\u00fdm stavem skladu<\/h2>\n\n\n<p>Fyzick\u00fd stav skladu \u0159\u00edk\u00e1, co m\u00e1te pr\u00e1v\u011b na m\u00edst\u011b. Disponibiln\u00ed z\u00e1soba pom\u00e1h\u00e1 rozhodnout, zda je pot\u0159eba dal\u0161\u00ed dopln\u011bn\u00ed, a to po zapo\u010dten\u00ed ji\u017e zaji\u0161t\u011bn\u00fdch dod\u00e1vek a z\u00e1vazn\u00fdch po\u017eadavk\u016f.<\/p>\n\n\n<p>Pokud va\u0161e pravidla po\u010d\u00edtaj\u00ed s ode\u010dten\u00edm z\u00e1vazn\u00fdch po\u017eadavk\u016f, pou\u017eijte tento vztah:<\/p>\n\n\n<p><strong>Disponibiln\u00ed z\u00e1soba = pou\u017eiteln\u00e1 fyzick\u00e1 z\u00e1soba + dosud nedodan\u00e9 dopln\u011bn\u00ed \u2212 zahrnut\u00e9 z\u00e1vazn\u00e9 po\u017eadavky<\/strong><\/p>\n\n\n<p>Dosud nedodan\u00e9 dopln\u011bn\u00ed m\u016f\u017ee zahrnovat otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky, p\u0159esuny nebo intern\u00ed p\u0159\u00edkazy na dopln\u011bn\u00ed z\u00e1sob. Ka\u017ed\u00fd zdroj zapo\u010d\u00edtejte jen jednou. Po \u010d\u00e1ste\u010dn\u00e9m p\u0159\u00edjmu po\u010d\u00edtejte pouze se zb\u00fdvaj\u00edc\u00edm mno\u017estv\u00edm, kter\u00e9 m\u00e1 je\u0161t\u011b dorazit, nikoli s p\u016fvodn\u00edm mno\u017estv\u00edm objedn\u00e1vky.<\/p>\n\n\n<p>P\u0159ed v\u00fdpo\u010dtem vymezte jeho rozsah: jednu polo\u017eku, jedno skladov\u00e9 m\u00edsto nebo dohodnutou skupinu m\u00edst, jednu m\u011brnou jednotku a jednotn\u00e9 \u010dasov\u00e9 hranice pro dod\u00e1vky i po\u017eadavky. Vy\u0159a\u010fte z\u00e1soby v karant\u00e9n\u011b \u010di jinak nepou\u017eiteln\u00e9 z\u00e1soby. Stejn\u00fd z\u00e1vazek neode\u010d\u00edtejte dvakr\u00e1t: pokud je v\u00fdchoz\u00ed stav u\u017e o\u010di\u0161t\u011bn\u00fd o rezervace, znovu je neode\u010d\u00edtejte.<\/p>\n\n\n<p>Ne ka\u017ed\u00e9 \u0159e\u0161en\u00ed ode\u010d\u00edt\u00e1 stejn\u00e9 kategorie po\u017eadavk\u016f. Podstatn\u00e9 je v\u011bd\u011bt, co v\u00e1\u0161 \u00fadaj zahrnuje, a pou\u017e\u00edvat meze stanoven\u00e9 na stejn\u00e9m z\u00e1klad\u011b. Minimum vypo\u010dten\u00e9 podle jedn\u00e9 definice nelze bez prov\u011b\u0159en\u00ed bezpe\u010dn\u011b pou\u017e\u00edt pro jinou.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159\u00edklad min-max \u0159\u00edzen\u00ed z\u00e1sob ve v\u00fdrob\u011b<\/h3>\n\n\n<p>P\u0159edstavte si v\u00fdrobce, kter\u00fd dr\u017e\u00ed skladem standardn\u00ed konzolu pro opakovan\u00e9 zak\u00e1zky. Minimum m\u00e1 nastaven\u00e9 na 300 kus\u016f a maxim\u00e1ln\u00ed c\u00edlovou \u00farove\u0148 na 600. Podle jeho pravidel se ode\u010d\u00edtaj\u00ed z\u00e1vazn\u00e9 po\u017eadavky v dohodnut\u00e9m pl\u00e1novac\u00edm obdob\u00ed.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vstup<\/th><th>Mno\u017estv\u00ed<\/th><th>Zp\u016fsob zapo\u010dten\u00ed<\/th><\/tr><\/thead><tbody><tr><td>Pou\u017eiteln\u00e9 konzoly na sklad\u011b<\/td><td>180<\/td><td>Zahrnout jako sou\u010dasnou z\u00e1sobu<\/td><\/tr><tr><td>Ji\u017e schv\u00e1len\u00e9, dosud nedodan\u00e9 dopln\u011bn\u00ed<\/td><td>200<\/td><td>P\u0159i\u010d\u00edst jednou jako o\u010dek\u00e1vanou dod\u00e1vku<\/td><\/tr><tr><td>Z\u00e1vazn\u00e9 po\u017eadavky zahrnut\u00e9 do tohoto posouzen\u00ed<\/td><td>150<\/td><td>Ode\u010d\u00edst jednou<\/td><\/tr><tr><td>Disponibiln\u00ed z\u00e1soba<\/td><td>230<\/td><td>Porovnat s minimem 300<\/td><\/tr><tr><td>Nov\u00e9 mno\u017estv\u00ed k dopln\u011bn\u00ed<\/td><td>370<\/td><td>Zv\u00fd\u0161it disponibiln\u00ed z\u00e1sobu z 230 na 600<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>V\u00fdpo\u010det je <strong>180 + 200 \u2212 150 = 230<\/strong>. Proto\u017ee 230 je m\u00e9n\u011b ne\u017e 300, je podle stanoven\u00fdch pravidel pot\u0159eba doplnit z\u00e1sobu. V\u00fdchoz\u00ed objedn\u00e1van\u00e9 mno\u017estv\u00ed \u010din\u00ed <strong>600 \u2212 230 = 370 kus\u016f<\/strong>.<\/p>\n\n\n<p>Pokud byste opomenuli st\u00e1vaj\u00edc\u00ed objedn\u00e1vku na 200 kus\u016f, n\u00e1vrh by zn\u011bl na 570 kus\u016f. Pro stejn\u00fd po\u017eadavek byste tak 200 kus\u016f objednali dvakr\u00e1t. Naopak bez ode\u010dten\u00ed z\u00e1vazn\u00fdch po\u017eadavk\u016f by disponibiln\u00ed z\u00e1soba vy\u0161la na 380 kus\u016f a pot\u0159eba dopln\u011bn\u00ed by se v\u016fbec neprojevila.<\/p>\n\n\n<p>C\u00edl vyjad\u0159uje \u010distou disponibiln\u00ed z\u00e1sobu po zapo\u010dten\u00ed nov\u00e9 objedn\u00e1vky, nikoli nutn\u011b fyzick\u00fd stav skladu v okam\u017eiku jej\u00edho dod\u00e1n\u00ed. B\u011bhem n\u00e1kupu \u010di v\u00fdroby objednan\u00e9ho mno\u017estv\u00ed spot\u0159eba pokra\u010duje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">I objednan\u00e9 dopln\u011bn\u00ed m\u016f\u017ee dorazit pozd\u011b<\/h3>\n\n\n<p>Disponibiln\u00ed z\u00e1soba pom\u00e1h\u00e1 ur\u010dit pot\u0159ebn\u00e9 mno\u017estv\u00ed. Sama o sob\u011b ale nedokazuje, \u017ee bude ka\u017ed\u00fd po\u017eadavek pokryt\u00fd v po\u017eadovan\u00e9m term\u00ednu.<\/p>\n\n\n<p>V p\u0159\u00edkladu s konzolami p\u0159edpokl\u00e1dejme, \u017ee v \u00fater\u00fd pot\u0159ebujete 120 kus\u016f a ve st\u0159edu dal\u0161\u00edch 30. Pou\u017eiteln\u00e1 z\u00e1soba 180 kus\u016f pokryje oba po\u017eadavky. Pokud se v\u0161ak v\u0161ech 200 kus\u016f z ji\u017e objednan\u00e9ho dopln\u011bn\u00ed zpozd\u00ed a\u017e za term\u00edn nov\u00e9ho po\u017eadavku, tento pozd\u011bj\u0161\u00ed po\u017eadavek m\u016f\u017ee z\u016fstat nepokryt\u00fd, p\u0159esto\u017ee objedn\u00e1vku zapo\u010d\u00edt\u00e1v\u00e1te do celkov\u00e9 disponibiln\u00ed z\u00e1soby.<\/p>\n\n\n<p>Vedle celkov\u00e9ho mno\u017estv\u00ed kontrolujte tak\u00e9 term\u00edny. Urychlen\u00ed nebo p\u0159epl\u00e1nov\u00e1n\u00ed st\u00e1vaj\u00edc\u00ed objedn\u00e1vky m\u016f\u017ee probl\u00e9m vy\u0159e\u0161it rozumn\u011bji ne\u017e dal\u0161\u00ed objedn\u00e1vka na pln\u00e9 dopln\u011bn\u00ed. <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/doba-kryti-zasob\/\">Kontrola kryt\u00ed z\u00e1sob v \u010dase<\/a> min-max \u0159\u00edzen\u00ed dopl\u0148uje, nenahrazuje v\u0161ak jeho spou\u0161t\u011bc\u00ed mez ani c\u00edlovou \u00farove\u0148.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak nastavit minim\u00e1ln\u00ed a maxim\u00e1ln\u00ed \u00farove\u0148 z\u00e1sob<\/h2>\n\n\n<p>Za\u010dn\u011bte polo\u017ekou s opakovanou spot\u0159ebou, pro kterou m\u00e1te spolehliv\u00e9 z\u00e1znamy o spot\u0159eb\u011b i dopl\u0148ov\u00e1n\u00ed. Ob\u011b \u00farovn\u011b stanovujte spole\u010dn\u011b, ka\u017ed\u00e1 v\u0161ak mus\u00ed plnit jinou \u00falohu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nastavte minimum tak, aby pokrylo dobu do dopln\u011bn\u00ed<\/h3>\n\n\n<p>P\u0159i pom\u011brn\u011b stabiln\u00ed popt\u00e1vce lze jako praktick\u00e9 v\u00fdchodisko pou\u017e\u00edt:<\/p>\n\n\n<p><strong>Minimum = o\u010dek\u00e1van\u00e1 popt\u00e1vka b\u011bhem doby dopln\u011bn\u00ed + bezpe\u010dnostn\u00ed z\u00e1soba<\/strong><\/p>\n\n\n<p>Po\u010d\u00edtejte s celou dobou, ne\u017e bude z\u00e1soba pou\u017eiteln\u00e1, nikoli jen s dobou p\u0159epravy od dodavatele nebo zpracov\u00e1n\u00ed na stroji. Do t\u00e9to doby m\u016f\u017ee vstupovat schvalov\u00e1n\u00ed, n\u00e1kup, \u010dek\u00e1n\u00ed na v\u00fdrobn\u00ed kapacitu i p\u0159\u00edjem na sklad.<\/p>\n\n\n<p>P\u0159edstavte si polo\u017eku se spot\u0159ebou 40 kus\u016f za pracovn\u00ed den. Dopln\u011bn\u00ed trv\u00e1 p\u011bt pracovn\u00edch dn\u016f a firma zvolila bezpe\u010dnostn\u00ed z\u00e1sobu 80 kus\u016f. O\u010dek\u00e1van\u00e1 popt\u00e1vka b\u011bhem doby dopln\u011bn\u00ed je tedy 200 kus\u016f a v\u00fdchoz\u00ed minimum \u010din\u00ed <strong>280 kus\u016f<\/strong>.<\/p>\n\n\n<p>Rezerva 80 kus\u016f je p\u0159edpokladem tohoto p\u0159\u00edkladu, nikoli doporu\u010denou \u00farovn\u00ed obsluhy. Bezpe\u010dnostn\u00ed z\u00e1sobu volte podle variability a n\u00e1sledk\u016f p\u0159\u00edpadn\u00e9ho nedostatku. Levn\u00e1 sou\u010d\u00e1stka, jej\u00ed\u017e nedostatek zastav\u00ed fin\u00e1ln\u00ed mont\u00e1\u017e, si m\u016f\u017ee zaslou\u017eit v\u011bt\u0161\u00ed pozornost, ne\u017e by napov\u00eddala jej\u00ed po\u0159izovac\u00ed hodnota.<\/p>\n\n\n<p>Z\u00e1le\u017e\u00ed tak\u00e9 na \u010detnosti kontroly. Pr\u016fb\u011b\u017en\u00e9 sledov\u00e1n\u00ed nen\u00ed tot\u00e9\u017e jako p\u0159ehled kontrolovan\u00fd jednou t\u00fddn\u011b. Pokud m\u016f\u017ee z\u00e1soba klesnout pod mez t\u011bsn\u011b po kontrole, zohledn\u011bte i dal\u0161\u00ed \u010dek\u00e1n\u00ed, ne\u017e n\u011bkdo objedn\u00e1vku vystav\u00ed. Jinak m\u016f\u017ee i zd\u00e1nliv\u011b dostate\u010dn\u00e9 minimum v\u00e9st k p\u0159\u00edli\u0161 pozdn\u00edmu z\u00e1sahu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Maximem nastavte po\u017eadovan\u00fd cyklus dopl\u0148ov\u00e1n\u00ed<\/h3>\n\n\n<p>Maximum ur\u010duje, na jakou \u00farove\u0148 obnov\u00edte disponibiln\u00ed z\u00e1sobu po poklesu pod spou\u0161t\u011bc\u00ed mez. Vy\u0161\u0161\u00ed maximum zpravidla znamen\u00e1 v\u011bt\u0161\u00ed dopl\u0148ovan\u00e9 mno\u017estv\u00ed a v\u011bt\u0161\u00ed objem dr\u017een\u00fdch z\u00e1sob. Ni\u017e\u0161\u00ed maximum obvykle vede k \u010dast\u011bj\u0161\u00edmu dopl\u0148ov\u00e1n\u00ed, a tedy i k \u010dast\u011bj\u0161\u00edmu objedn\u00e1v\u00e1n\u00ed nebo se\u0159izov\u00e1n\u00ed.<\/p>\n\n\n<p>V p\u0159\u00edkladu se spot\u0159ebou 40 kus\u016f denn\u011b p\u0159edpokl\u00e1dejme, \u017ee zvol\u00edte maximum 600 kus\u016f. Rozd\u00edl oproti minimu 280 kus\u016f \u010din\u00ed 320 kus\u016f, co\u017e p\u0159i t\u00e9to pr\u016fm\u011brn\u00e9 spot\u0159eb\u011b odpov\u00edd\u00e1 osmi pracovn\u00edm dn\u016fm. Takto si m\u016f\u017eete ud\u011blat p\u0159edstavu o navr\u017een\u00e9m cyklu dopl\u0148ov\u00e1n\u00ed. Nen\u00ed to ale d\u016fkaz, \u017ee c\u00edlov\u00e1 hodnota 600 je nejlevn\u011bj\u0161\u00ed nebo nejlep\u0161\u00ed.<\/p>\n\n\n<p>Ov\u011b\u0159te c\u00edlovou hodnotu s ohledem na skladovac\u00ed prostor, dobu pou\u017eitelnosti, riziko zastar\u00e1n\u00ed, pracovn\u00ed kapit\u00e1l a velikosti v\u00fdrobn\u00edch \u010di dodavatelsk\u00fdch d\u00e1vek. U pomaluobr\u00e1tkov\u00e9 polo\u017eky s kr\u00e1tkou dobou pou\u017eitelnosti m\u016f\u017ee i zd\u00e1nliv\u011b dob\u0159e nastaven\u00e9 rozmez\u00ed min\u2013max v\u00e9st k n\u00e1kladn\u00e9mu pl\u00fdtv\u00e1n\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159ed uvoln\u011bn\u00edm objedn\u00e1vky zohledn\u011bte omezen\u00ed objedn\u00e1van\u00e9ho mno\u017estv\u00ed<\/h3>\n\n\n<p>Vypo\u010dten\u00fd rozd\u00edl je v\u00fdchoz\u00edm mno\u017estv\u00edm. Minim\u00e1ln\u00ed odb\u011br u dodavatele, n\u00e1sobky balen\u00ed a omezen\u00ed v\u00fdrobn\u00edch d\u00e1vek mohou zm\u011bnit mno\u017estv\u00ed, kter\u00e9 lze skute\u010dn\u011b objednat.<\/p>\n\n\n<p>Pokud n\u00e1vrh na dopln\u011bn\u00ed konzol \u010din\u00ed 370 kus\u016f, ale dopln\u011bn\u00ed je mo\u017en\u00e9 pouze v balen\u00edch po 50, zaokrouhlen\u00edm nahoru z\u00edsk\u00e1te 400 kus\u016f. T\u00edm p\u0159ekro\u010d\u00edte p\u016fvodn\u00ed c\u00edlovou hodnotu o 30 kus\u016f. Rozhodn\u011bte, zda tento rozd\u00edl p\u0159ijmete, zm\u011bn\u00edte podm\u00ednky dopl\u0148ov\u00e1n\u00ed, nebo uprav\u00edte jeho pravidla. Nezam\u011b\u0148ujte \u201emaxim\u00e1ln\u00ed c\u00edlovou z\u00e1sobu\u201c s \u201emaxim\u00e1ln\u00edm objedn\u00e1van\u00fdm mno\u017estv\u00edm\u201c: prvn\u00ed hodnota vyjad\u0159uje po\u017eadovanou disponibiln\u00ed z\u00e1sobu, druh\u00e1 omezuje jednotlivou objedn\u00e1vku.<\/p>\n\n\n<p>Schv\u00e1len\u00e9 dopln\u011bn\u00ed neprodlen\u011b zaevidujte jako dosud nep\u0159ijatou dod\u00e1vku. T\u00edm zabr\u00e1n\u00edte tomu, aby p\u0159i dal\u0161\u00ed kontrole nebo jin\u00fd n\u00e1kup\u010d\u00ed objednal stejn\u00e9 chyb\u011bj\u00edc\u00ed mno\u017estv\u00ed znovu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdy min-max \u0159\u00edzen\u00ed z\u00e1sob funguje a kdy samotn\u00e9 mezn\u00ed hodnoty nesta\u010d\u00ed<\/h2>\n\n\n<p>Min-max \u0159\u00edzen\u00ed z\u00e1sob je vhodn\u00e9 pro skladov\u00e9 polo\u017eky s opakovanou spot\u0159ebou, u nich\u017e m\u016f\u017eete sledovat pr\u016fb\u011bh dopl\u0148ov\u00e1n\u00ed: b\u011b\u017en\u00e9 sou\u010d\u00e1sti, standardn\u00ed podsestavy nebo \u010dasto pou\u017e\u00edvan\u00fd spot\u0159ebn\u00ed materi\u00e1l. Jeho v\u00fdhodou jsou jednotn\u00e1 pravidla. Ka\u017ed\u00fd vid\u00ed, pro\u010d je pot\u0159eba z\u00e1sobu doplnit a jak bylo stanoveno mno\u017estv\u00ed.<\/p>\n\n\n<p>Tato metoda je m\u00e9n\u011b spolehliv\u00e1, pokud se za pr\u016fm\u011brem skr\u00fdvaj\u00ed velk\u00e9 po\u017eadavky s konkr\u00e9tn\u00edmi term\u00edny. U sou\u010d\u00e1sti pou\u017e\u00edvan\u00e9 jen v ob\u010dasn\u00fdch z\u00e1kaznick\u00fdch d\u00e1vk\u00e1ch m\u016f\u017ee b\u00fdt m\u00edsto pevn\u011b stanoven\u00e9ho rozmez\u00ed z\u00e1sob pot\u0159eba pl\u00e1novat materi\u00e1lov\u00e9 pot\u0159eby v \u010dase. U n\u00e1hradn\u00edho d\u00edlu s nepravidelnou spot\u0159ebou m\u016f\u017ee b\u00fdt zase nutn\u00e9 rozhodnout o skladov\u00e9 z\u00e1sob\u011b podle jeho kriti\u010dnosti. N\u00edzk\u00e1 pr\u016fm\u011brn\u00e1 spot\u0159eba toti\u017e ne\u0159\u00edk\u00e1, jak n\u00e1kladn\u00e1 by byla jeho nedostupnost.<\/p>\n\n\n<p>Rozli\u0161ujte mezi souvisej\u00edc\u00edmi metodami a p\u0159\u00edstupy:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/bezpecnostni-zasoba\/\">Bezpe\u010dnostn\u00ed z\u00e1soba<\/a><\/strong> slou\u017e\u00ed jako rezerva proti nejistot\u011b. M\u016f\u017ee pomoci p\u0159i stanoven\u00ed minima, ale neur\u010duje cel\u00e1 pravidla min-max \u0159\u00edzen\u00ed z\u00e1sob.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/optimalni-velikost-objednavky\/\">Optim\u00e1ln\u00ed velikost objedn\u00e1vky (EOQ)<\/a><\/strong> stanovuje velikost d\u00e1vky na z\u00e1klad\u011b p\u0159edpokl\u00e1dan\u00fdch n\u00e1klad\u016f na objedn\u00e1v\u00e1n\u00ed a dr\u017een\u00ed z\u00e1sob. Min-max \u0159\u00edzen\u00ed z\u00e1sob naproti tomu dopl\u0148uje prom\u011bnliv\u00fd rozd\u00edl do horn\u00ed c\u00edlov\u00e9 hodnoty.<\/li><li><strong>V\u00fdroba na sklad<\/strong> znamen\u00e1 vyr\u00e1b\u011bt p\u0159ed p\u0159ijet\u00edm z\u00e1kaznick\u00fdch objedn\u00e1vek. Min-max \u0159\u00edzen\u00ed z\u00e1sob je jedn\u00edm z mo\u017en\u00fdch zp\u016fsob\u016f, jak v r\u00e1mci t\u00e9to strategie \u0159\u00eddit dopl\u0148ov\u00e1n\u00ed.<\/li><\/ul>\n\n\n<p>P\u0159i zm\u011bn\u011b spot\u0159eby, spolehlivosti dodavatel\u016f, pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby nebo \u017eivotnosti v\u00fdrobku nastaven\u00e9 \u00farovn\u011b prov\u011b\u0159te. Ne\u017e pouze roz\u0161\u00ed\u0159\u00edte rozmez\u00ed, zjist\u011bte p\u0159\u00ed\u010diny opakovan\u00fdch nedostatk\u016f i p\u0159ebytk\u016f z\u00e1sob. Pozdn\u00ed p\u0159\u00edjmy, nep\u0159esn\u00e9 skladov\u00e9 stavy a duplicitn\u00ed objedn\u00e1vky vy\u017eaduj\u00ed r\u016fzn\u00e1 \u0159e\u0161en\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u0159a\u010fte schv\u00e1len\u00e9 dopln\u011bn\u00ed z\u00e1sob do v\u00fdrobn\u00edho pl\u00e1nu<\/h2>\n\n\n<p>U d\u00edlu vyr\u00e1b\u011bn\u00e9ho ve vlastn\u00edm z\u00e1vod\u011b je \u201eobjednat 370 kus\u016f\u201c jen polovina rozhodnut\u00ed. Ne\u0159\u00edk\u00e1 to, zda budou konzoly hotov\u00e9 d\u0159\u00edve, ne\u017e z\u00e1soba p\u0159estane sta\u010dit, ani kter\u00e9 z\u00e1kaznick\u00e9 zak\u00e1zky bude nutn\u00e9 posunout, aby se pro n\u011b uvolnila kapacita.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee schv\u00e1len\u00e9 dopln\u011bn\u00ed z\u00e1sob pot\u0159ebuje stejn\u00e9 obr\u00e1b\u011bc\u00ed centrum jako z\u00e1kaznick\u00e1 zak\u00e1zka s term\u00ednem dod\u00e1n\u00ed tento t\u00fdden. Pokud dopln\u011bn\u00ed za\u0159ad\u00edte na prvn\u00ed m\u00edsto samostatn\u00e9ho seznamu pro dopl\u0148ov\u00e1n\u00ed z\u00e1sob, tento konflikt z\u016fstane skryt\u00fd. Kdy\u017e ho za\u0159ad\u00edte do spole\u010dn\u00e9ho pl\u00e1nu, uvid\u00edte, co bude nutn\u00e9 up\u0159ednostnit a za jakou cenu, dokud je je\u0161t\u011b \u010das rozhodnout.<\/p>\n\n\n<p>Zvolte <strong>SkyPlanner APS<\/strong> a <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">usnadn\u011bte si spr\u00e1vu spole\u010dn\u00e9ho v\u00fdrobn\u00edho pl\u00e1nu<\/a>. Arcturus, jeho um\u011bl\u00e1 inteligence pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby, vypo\u010d\u00edt\u00e1v\u00e1 pl\u00e1n podle nastaven\u00fdch pracovi\u0161\u0165, sm\u011bn, priorit, n\u00e1vaznost\u00ed operac\u00ed a materi\u00e1l\u016f. Gantt\u016fv diagram ukazuje, kam se dopln\u011bn\u00ed z\u00e1sob vejde mezi ostatn\u00ed zak\u00e1zky a kdy by m\u011blo b\u00fdt dokon\u010deno. Str\u00e1v\u00edte m\u00e9n\u011b \u010dasu sla\u010fov\u00e1n\u00edm seznamu z\u00e1sob s frontami pr\u00e1ce na jednotliv\u00fdch stroj\u00edch a z\u00edsk\u00e1te jasn\u011bj\u0161\u00ed podklady pro dodr\u017een\u00ed term\u00edn\u016f dod\u00e1vek.<\/p>\n\n\n<p>SkyPlanner podporuje upozorn\u011bn\u00ed na n\u00edzk\u00fd stav z\u00e1sob, kter\u00e9 v\u00e1s vyzve k vytvo\u0159en\u00ed objedn\u00e1vky na dopln\u011bn\u00ed. C\u00edlov\u00e9 hodnoty min\u2013max, dopl\u0148ovan\u00e9 mno\u017estv\u00ed a schvalov\u00e1n\u00ed dohodn\u011bte s odpov\u011bdn\u00fdm pl\u00e1nova\u010dem nebo je stanovte v syst\u00e9mu ERP\/MRP. Pot\u00e9 ve SkyPlanner napl\u00e1nujte schv\u00e1lenou v\u00fdrobu vedle z\u00e1kaznick\u00fdch zak\u00e1zek. Rozhodnut\u00ed o z\u00e1sob\u00e1ch se tak stane sou\u010d\u00e1st\u00ed spole\u010dn\u00e9ho v\u00fdrobn\u00edho pl\u00e1nu z\u00e1vodu.<\/p>\n\n\n<p>Pokud je zapnut\u00e9 pl\u00e1nov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1l\u016f a \u00fadaje o p\u0159\u00edslu\u0161n\u00fdch materi\u00e1lech jsou udr\u017eovan\u00e9, v\u00fdpo\u010det zohledn\u00ed tak\u00e9 jejich dostupnost v dob\u011b prov\u00e1d\u011bn\u00ed operac\u00ed, kter\u00e9 je spot\u0159ebov\u00e1vaj\u00ed. U nakupovan\u00fdch materi\u00e1l\u016f vych\u00e1z\u00ed pl\u00e1n z term\u00edn\u016f p\u0159\u00edjmu objednan\u00e9ho materi\u00e1lu. Zm\u011bn\u00ed-li se term\u00edn p\u0159\u00edjmu nebo priorita, p\u0159epo\u010d\u00edtejte spole\u010dn\u00fd pl\u00e1n a uvid\u00edte dopad zm\u011bny, ani\u017e byste museli ru\u010dn\u011b p\u0159esouvat ka\u017edou dot\u010denou operaci.<\/p>\n\n\n<p><strong>SkyPlanner lze prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API propojit s jak\u00fdmkoli syst\u00e9mem ERP nebo MES.<\/strong> M\u016f\u017eete si ponechat syst\u00e9m, ve kter\u00e9m spravujete pravidla dopl\u0148ov\u00e1n\u00ed z\u00e1sob, a jeho schv\u00e1len\u00e9 p\u0159\u00edkazy propojit s v\u00fdrobn\u00edm pl\u00e1nem, kter\u00fd zohled\u0148uje skute\u010dn\u00e9 kapacity.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Jak to vypad\u00e1 p\u0159i v\u00fdrob\u011b na sklad<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/opes-corporation\/\">Opes Corporation<\/a> vyr\u00e1b\u00ed na sklad podle p\u0159edv\u00eddateln\u00fdch odb\u011bratelsk\u00fdch z\u00e1vazk\u016f. P\u0159ed zaveden\u00edm SkyPlanner pou\u017e\u00edvala Excel a samostatnou skladovou aplikaci, tak\u017ee data byla na r\u016fzn\u00fdch m\u00edstech. Postupn\u00e9 propojen\u00ed se syst\u00e9mem Visma Nova spojilo tyto informace s pl\u00e1nov\u00e1n\u00edm v\u00fdroby.<\/p>\n\n\n<p>Podle zku\u0161enost\u00ed spole\u010dnosti d\u00e1v\u00e1 SkyPlanner t\u00fdmu jasn\u00fd p\u0159ehled o kapacit\u00e1ch. Kdy\u017e p\u0159ijdou urgentn\u00ed mal\u00e9 zak\u00e1zky nebo po\u017eadavky na v\u00fdvojov\u00e9 s\u00e9rie, aktualizovan\u00fd v\u00fdrobn\u00ed pl\u00e1n uk\u00e1\u017ee jejich dopad na dodac\u00ed term\u00edny. Zm\u011bny lze prov\u00e1d\u011bt rychleji a pl\u00e1nova\u010di vid\u00ed, jak do sebe jednotliv\u00e9 pr\u00e1ce zapadaj\u00ed.<\/p>\n\n\n<p>Pro dopl\u0148ov\u00e1n\u00ed z\u00e1sob z toho plyne d\u016fle\u017eit\u00fd poznatek: ani stabiln\u00ed pot\u0159eba v\u00fdroby na sklad neodstra\u0148uje nutnost \u0159e\u0161it v\u00fdjimky. Spole\u010dn\u00fd pl\u00e1n umo\u017e\u0148uje t\u00fdmu posoudit novou pr\u00e1ci ve vztahu ke st\u00e1vaj\u00edc\u00edm z\u00e1vazk\u016fm, m\u00edsto aby ka\u017edou frontu pr\u00e1ce \u0159\u00eddil odd\u011blen\u011b.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159te pravidla na jednom skute\u010dn\u00e9m dopln\u011bn\u00ed z\u00e1sob<\/h2>\n\n\n<p>Vyberte jednu polo\u017eku s opakovanou spot\u0159ebou. Ov\u011b\u0159te jej\u00ed pou\u017eitelnou skladovou z\u00e1sobu, dosud nep\u0159ijat\u00e9 dod\u00e1vky, zahrnut\u00e9 z\u00e1vazn\u00e9 pot\u0159eby a dobu dopln\u011bn\u00ed. Na tomto z\u00e1klad\u011b stanovte spou\u0161t\u011bc\u00ed minimum a c\u00edlovou hodnotu, vypo\u010d\u00edtejte rozd\u00edl a zkontrolujte, kdy je dan\u00e9 mno\u017estv\u00ed skute\u010dn\u011b pot\u0159eba.<\/p>\n\n\n<p>Na prezentaci SkyPlanner pak p\u0159ineste schv\u00e1len\u00fd po\u017eadavek na dopln\u011bn\u00ed z\u00e1sob a z\u00e1kaznickou zak\u00e1zku, kter\u00e1 s n\u00edm sout\u011b\u017e\u00ed o kapacitu. Nechte si uk\u00e1zat, jak jejich v\u00fdrobn\u00ed postupy sd\u00edlej\u00ed kapacity, kdy bude dopln\u011bn\u00ed dokon\u010deno a co se stane p\u0159i zpo\u017ed\u011bn\u00ed p\u0159\u00edjmu materi\u00e1lu. Uvid\u00edte tak, co krom\u011b samotn\u00e9ho v\u00fdpo\u010dtu z\u00e1sob zahrnuje rozhodnut\u00ed o dopln\u011bn\u00ed, kter\u00e9 lze skute\u010dn\u011b p\u0159ev\u00e9st do v\u00fdroby.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervujte si prezentaci SkyPlanner<\/a> a proberte situaci ve va\u0161em z\u00e1vod\u011b, nebo si nejprve <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>. C\u00edl je jednoduch\u00fd: doplnit pot\u0159ebn\u00e9 mno\u017estv\u00ed, neobjednat ho dvakr\u00e1t a za\u0159adit v\u00fdrobu do pl\u00e1nu, podle kter\u00e9ho m\u016f\u017ee v\u00e1\u0161 z\u00e1vod pracovat.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat Domov &raquo; Zdroje &raquo; Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat V z\u00e1sobn\u00edku doch\u00e1zej\u00ed d\u00edly, a tak n\u00e1kup\u010d\u00ed objedn\u00e1 dal\u0161\u00ed d\u00e1vku. Ve v\u00fdrob\u011b u\u017e ale mezit\u00edm b\u011b\u017e\u00ed p\u0159\u00edkaz na dopln\u011bn\u00ed stejn\u00e9 polo\u017eky. Ka\u017ed\u00e9 z t\u011bchto rozhodnut\u00ed samo o sob\u011b d\u00e1v\u00e1 smysl. Dohromady v\u0161ak vytvo\u0159\u00ed z\u00e1sobu, kterou z\u00e1vod nepot\u0159eboval. &#8230; <a title=\"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/\" aria-label=\"Read more about Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-111317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat<\/title>\n<meta name=\"description\" content=\"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\" \/>\n<meta property=\"og:description\" content=\"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T18:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T18:49:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:49:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/\"},\"wordCount\":3013,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/\",\"name\":\"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:49:36+00:00\",\"description\":\"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/min-max-rizeni-zasob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat","description":"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/","og_locale":"cs_CZ","og_type":"article","og_title":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat","og_description":"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T18:49:22+00:00","article_modified_time":"2026-10-27T18:49:36+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:49:36+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/"},"wordCount":3013,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/","name":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:49:36+00:00","description":"Nastavte min\u2013max \u00farovn\u011b z\u00e1sob bez dvoj\u00edho objedn\u00e1n\u00ed na stejnou pot\u0159ebu. Zjist\u011bte, co zapo\u010d\u00edtat, kolik doplnit a jak SkyPlanner pl\u00e1nuje schv\u00e1lenou v\u00fdrobu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","width":1672,"height":941,"caption":"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/min-max-rizeni-zasob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat Domov &raquo; Zdroje &raquo; Min-max \u0159\u00edzen\u00ed z\u00e1sob: Kdy a kolik objednat V z\u00e1sobn\u00edku doch\u00e1zej\u00ed d\u00edly, a tak n\u00e1kup\u010d\u00ed objedn\u00e1 dal\u0161\u00ed d\u00e1vku. Ve v\u00fdrob\u011b u\u017e ale mezit\u00edm b\u011b\u017e\u00ed p\u0159\u00edkaz na dopln\u011bn\u00ed stejn\u00e9 polo\u017eky. Ka\u017ed\u00e9 z t\u011bchto rozhodnut\u00ed samo o sob\u011b d\u00e1v\u00e1 smysl. Dohromady v\u0161ak vytvo\u0159\u00ed z\u00e1sobu, kterou z\u00e1vod nepot\u0159eboval.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=111317"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111317\/revisions"}],"predecessor-version":[{"id":111382,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/111317\/revisions\/111382"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/111344"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=111317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=111317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=111317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}