{"id":110948,"date":"2026-10-27T10:47:38","date_gmt":"2026-10-27T10:47:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110948"},"modified":"2026-10-27T10:47:53","modified_gmt":"2026-10-27T10:47:53","slug":"ukazatele-vykonnosti-dodavatelu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/","title":{"rendered":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Dodavatel m\u016f\u017ee m\u00edt za m\u011bs\u00edc dobr\u00e9 hodnocen\u00ed, a p\u0159itom jedin\u00e1 chyb\u011bj\u00edc\u00ed sou\u010d\u00e1st zdr\u017euje va\u0161i nejnal\u00e9hav\u011bj\u0161\u00ed zak\u00e1zku. N\u00e1kup vid\u00ed p\u0159ijateln\u00fd pr\u016fm\u011br. V\u00fdroba vid\u00ed \u010dekaj\u00edc\u00ed stroj, nedokon\u010denou sestavu a ohro\u017een\u00fd term\u00edn sl\u00edben\u00fd z\u00e1kazn\u00edkovi.<\/p>\n\n\n<p>Dob\u0159e zvolen\u00e9 ukazatele v\u00fdkonnosti dodavatel\u016f pom\u00e1haj\u00ed ob\u011bma t\u00fdm\u016fm l\u00e9pe rozhodovat. Ukazuj\u00ed, zda dodavatel\u00e9 pln\u00ed sv\u00e9 z\u00e1vazky, kde se jejich v\u00fdsledky zhor\u0161uj\u00ed a kter\u00e9 probl\u00e9my je t\u0159eba \u0159e\u0161it. \u010c\u00edsla v\u0161ak mus\u00ed vych\u00e1zet z jasn\u00e9 a jednotn\u00e9 metodiky m\u011b\u0159en\u00ed. A kdy\u017e materi\u00e1l pr\u00e1v\u011b chyb\u00ed, nelze s reakc\u00ed \u010dekat na dal\u0161\u00ed vyhodnocen\u00ed dodavatele.<\/p>\n\n\n<p>Pr\u00e1v\u011b zde se m\u011b\u0159en\u00ed propojuje s pl\u00e1nov\u00e1n\u00edm v\u00fdroby. Hodnocen\u00ed vyu\u017eijte ke zlep\u0161ov\u00e1n\u00ed v\u00fdkonnosti dodavatel\u016f a SkyPlanner APS k tomu, abyste z aktu\u00e1ln\u00edch \u00fadaj\u016f o dostupnosti materi\u00e1lu sestavili v\u00fdrobn\u00ed pl\u00e1n, kter\u00fd zohledn\u00ed i ostatn\u00ed zak\u00e1zky. Str\u00e1v\u00edte m\u00e9n\u011b \u010dasu \u00fapravami po\u0159ad\u00ed operac\u00ed u jednotliv\u00fdch stroj\u016f a d\u0159\u00edve uvid\u00edte dopady na term\u00edny dod\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co jsou ukazatele v\u00fdkonnosti dodavatel\u016f?<\/h2>\n\n\n<p>Ukazatele v\u00fdkonnosti dodavatel\u016f m\u011b\u0159\u00ed, jak dob\u0159e dodavatel pln\u00ed dohodnut\u00e9 po\u017eadavky na dod\u00e1vky, kvalitu, n\u00e1klady a slu\u017eby. Hodnotic\u00ed karta dodavatele spojuje vybran\u00e9 ukazatele, aby n\u00e1kup mohl v\u00fdkonnost posuzovat jednotn\u011b a dohodnout opat\u0159en\u00ed ke zlep\u0161en\u00ed.<\/p>\n\n\n<p>Ve v\u00fdrobn\u00edch podnic\u00edch jsou neju\u017eite\u010dn\u011bj\u0161\u00ed ukazatele, kter\u00e9 odpov\u00eddaj\u00ed na praktick\u00e9 ot\u00e1zky: Dorazilo po\u017eadovan\u00e9 mno\u017estv\u00ed v dohodnut\u00e9m term\u00ednu? Bylo pou\u017eiteln\u00e9 pro v\u00fdrobu? Dalo se spolehnout na sl\u00edbenou dodac\u00ed lh\u016ftu? A jak \u00fa\u010dinn\u011b dodavatel reagoval, kdy\u017e se n\u011bco zm\u011bnilo?<\/p>\n\n\n<p>Tyto ukazatele se t\u00fdkaj\u00ed dod\u00e1vek od va\u0161ich dodavatel\u016f. Li\u0161\u00ed se od <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/vcasnost-dodavek\/\">v\u010dasn\u00fdch dod\u00e1vek va\u0161eho z\u00e1vodu vlastn\u00edm z\u00e1kazn\u00edk\u016fm<\/a>, i kdy\u017e \u0161patn\u00e9 v\u00fdsledky dodavatel\u016f mohou ovlivnit i tento ukazatel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dn\u011bte ukazateli, kter\u00e9 maj\u00ed vliv na rozhodov\u00e1n\u00ed<\/h2>\n\n\n<p>Vyberte mal\u00fd soubor ukazatel\u016f podle toho, jak m\u016f\u017ee dodavatel naru\u0161it v\u00e1\u0161 provoz. N\u00e1sleduj\u00edc\u00ed p\u0159ehled poslou\u017e\u00ed n\u00e1kupu i v\u00fdrob\u011b jako u\u017eite\u010dn\u00fd v\u00fdchoz\u00ed bod.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ukazatel<\/th><th>Jasn\u00e1 metodika m\u011b\u0159en\u00ed<\/th><th>Na jakou ot\u00e1zku pom\u00e1h\u00e1 odpov\u011bd\u011bt<\/th><\/tr><\/thead><tbody><tr><td>V\u010dasn\u00e9 dod\u00e1vky od dodavatele<\/td><td>Dod\u00e1vkov\u00e9 polo\u017eky spl\u0148uj\u00edc\u00ed dohodnut\u00e9 \u010dasov\u00e9 rozmez\u00ed \u00f7 dod\u00e1vkov\u00e9 polo\u017eky s term\u00ednem v dan\u00e9m obdob\u00ed \u00d7 100<\/td><td>Kte\u0159\u00ed dodavatel\u00e9 opakovan\u011b nepln\u00ed sv\u00e9 z\u00e1vazky?<\/td><\/tr><tr><td>Dod\u00e1vky v\u010das a v pln\u00e9m mno\u017estv\u00ed<\/td><td>Dod\u00e1vkov\u00e9 polo\u017eky s term\u00ednem v dan\u00e9m obdob\u00ed p\u0159ijat\u00e9 v dohodnut\u00e9m \u010dasov\u00e9m rozmez\u00ed a v pln\u00e9m po\u017eadovan\u00e9m mno\u017estv\u00ed \u00f7 v\u0161echny polo\u017eky s term\u00ednem v dan\u00e9m obdob\u00ed \u00d7 100<\/td><td>Sta\u010d\u00ed p\u0159isl\u00edben\u00e9 mno\u017estv\u00ed k proveden\u00ed pl\u00e1novan\u00e9 pr\u00e1ce?<\/td><\/tr><tr><td>Kvalita vstupn\u00edch dod\u00e1vek<\/td><td>Po\u010det zam\u00edtnut\u00fdch kus\u016f \u00f7 po\u010det p\u0159ijat\u00fdch kus\u016f \u00d7 100, se samostatn\u00fdm p\u0159ehledem dosud neposouzen\u00e9ho materi\u00e1lu<\/td><td>Je dod\u00e1van\u00fd materi\u00e1l vhodn\u00fd pro v\u00fdrobu?<\/td><\/tr><tr><td>Skute\u010dn\u00e1 dodac\u00ed lh\u016fta a jej\u00ed kol\u00eds\u00e1n\u00ed<\/td><td>Doba od dohodnut\u00e9ho okam\u017eiku uvoln\u011bn\u00ed objedn\u00e1vky do p\u0159\u00edjmu, v\u017edy se stejn\u00fdm zp\u016fsobem po\u010d\u00edt\u00e1n\u00ed kalend\u00e1\u0159n\u00edch \u010di pracovn\u00edch dn\u016f<\/td><td>S jak\u00fdm p\u0159edstihem je skute\u010dn\u011b pot\u0159eba tento materi\u00e1l objedn\u00e1vat?<\/td><\/tr><tr><td>Reakce na mimo\u0159\u00e1dn\u00e9 situace<\/td><td>Doba od p\u0159edem vymezen\u00e9ho ozn\u00e1men\u00ed mimo\u0159\u00e1dn\u00e9 situace do obdr\u017een\u00ed odpov\u011bdi, podle n\u00ed\u017e lze napl\u00e1novat n\u00e1pravu<\/td><td>Mohou pl\u00e1nova\u010di v\u010das rozhodnout o n\u00e1pravn\u00e9m postupu?<\/td><\/tr><tr><td>N\u00e1klady na naru\u0161en\u00ed provozu zp\u016fsoben\u00e9 dodavatelem<\/td><td>Evidovan\u00e9 v\u00edcen\u00e1klady na dopravu, t\u0159\u00edd\u011bn\u00ed, p\u0159epracov\u00e1n\u00ed a dal\u0161\u00ed n\u00e1klady p\u0159i\u0159aditeln\u00e9 podle dohodnut\u00fdch pravidel<\/td><td>Neskr\u00fdv\u00e1 se za n\u00e1kupn\u00ed cenou n\u00e1kladn\u00fd probl\u00e9m v z\u00e1sobov\u00e1n\u00ed?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jde o n\u00e1vrhy definic, nikoli o univerz\u00e1ln\u00ed pravidla hodnocen\u00ed. Dohodn\u011bte metodiku s lidmi odpov\u011bdn\u00fdmi za data a seznamte s n\u00ed dodavatele. Dopl\u0148te ukazatele shody s po\u017eadavky, certifikace nebo dal\u0161\u00ed ukazatele specifick\u00e9 pro danou kategorii, pokud maj\u00ed vliv na schv\u00e1len\u00ed dodavatele nebo na pou\u017eitelnost materi\u00e1lu.<\/p>\n\n\n<p>Z\u00e1va\u017en\u00e9 nespln\u011bn\u00ed podm\u00ednek schv\u00e1len\u00ed mus\u00ed z\u016fstat viditeln\u00e9 samo o sob\u011b. N\u00edzk\u00e1 cena nesm\u00ed v celkov\u00e9m pr\u016fm\u011bru zakr\u00fdt nespln\u011bn\u00fd po\u017eadavek, kv\u016fli n\u011bmu\u017e je materi\u00e1l nep\u0159ijateln\u00fd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ne\u017e za\u010dnete dodavatele porovn\u00e1vat, ur\u010dete hodnocenou ud\u00e1lost a datum<\/h2>\n\n\n<p>Pod\u00edl v\u010dasn\u00fdch dod\u00e1vek mnoho ne\u0159ekne, dokud nen\u00ed jasn\u00e9, co se po\u010d\u00edt\u00e1 jako jedna ud\u00e1lost. N\u00e1kupn\u00ed objedn\u00e1vka m\u016f\u017ee obsahovat n\u011bkolik polo\u017eek s r\u016fzn\u00fdmi term\u00edny i d\u00edl\u010d\u00ed dod\u00e1vky. Pokud po\u010d\u00edt\u00e1te cel\u00e9 objedn\u00e1vky, z\u00edsk\u00e1te jin\u00fd v\u00fdsledek, ne\u017e kdy\u017e po\u010d\u00edt\u00e1te jednotliv\u00e9 pl\u00e1novan\u00e9 dod\u00e1vkov\u00e9 polo\u017eky nebo ka\u017ed\u00fd fyzick\u00fd p\u0159\u00edjem.<\/p>\n\n\n<p>Pro praktick\u00e9 hodnocen\u00ed dodavatel\u016f ve v\u00fdrob\u011b b\u00fdv\u00e1 vhodnou jednotkou pl\u00e1novan\u00e1 dod\u00e1vkov\u00e1 polo\u017eka: jeden d\u00edl, mno\u017estv\u00ed a term\u00edn dod\u00e1n\u00ed. Tuto polo\u017eku zachovejte jako jeden celek, i kdy\u017e dodavatel z\u00e1silku rozd\u011bl\u00ed. Jinak m\u016f\u017ee n\u011bkolik mal\u00fdch p\u0159\u00edjm\u016f vytvo\u0159it dojem n\u011bkolika \u00fasp\u011b\u0161n\u00fdch dod\u00e1vek, p\u0159esto\u017ee p\u016fvodn\u00ed z\u00e1vazek z\u016fst\u00e1v\u00e1 nespln\u011bn\u00fd.<\/p>\n\n\n<p>Jednotliv\u00e1 data rozli\u0161ujte:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Po\u017eadovan\u00fd term\u00edn ud\u00e1v\u00e1, kdy v\u00e1\u0161 podnik materi\u00e1l pot\u0159eboval.<\/li><li>P\u016fvodn\u011b potvrzen\u00fd term\u00edn zachycuje z\u00e1vazek, kter\u00fd dodavatel p\u0159ijal.<\/li><li>Naposledy potvrzen\u00fd term\u00edn je aktu\u00e1ln\u00ed p\u0159\u00edslib, z n\u011bho\u017e vych\u00e1z\u00ed pl\u00e1nov\u00e1n\u00ed n\u00e1pravn\u00fdch krok\u016f.<\/li><li>Skute\u010dn\u00e9 datum p\u0159\u00edjmu zaznamen\u00e1v\u00e1 p\u0159\u00edchod materi\u00e1lu na dohodnut\u00e9 m\u00edsto p\u0159\u00edjmu.<\/li><li>Datum dostupnosti pro v\u00fdrobu ud\u00e1v\u00e1, kdy lze po\u017eadovan\u00fd materi\u00e1l po p\u0159\u00edpadn\u00e9m nezbytn\u00e9m uvoln\u011bn\u00ed pou\u017e\u00edt ve v\u00fdrob\u011b.<\/li><\/ul>\n\n\n<p>Spolehlivost pln\u011bn\u00ed z\u00e1vazk\u016f m\u011b\u0159te v\u016f\u010di zachovan\u00e9mu v\u00fdchoz\u00edmu term\u00ednu, nap\u0159\u00edklad tomu p\u016fvodn\u011b potvrzen\u00e9mu. Je-li to d\u016fle\u017eit\u00e9, sledujte zvl\u00e1\u0161\u0165 i pln\u011bn\u00ed po\u017eadovan\u00e9ho term\u00ednu: dodavatel m\u016f\u017ee dodr\u017eet sv\u016fj slib, ale u\u017e p\u0159i potvrzen\u00ed nab\u00eddnout term\u00edn, kter\u00fd je pro v\u00e1s p\u0159\u00edli\u0161 pozdn\u00ed. V\u00fdchoz\u00ed term\u00edn p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b p\u0159\u00edslibu bez z\u00e1znamu nep\u0159episujte. Pokud se dohodnete na zm\u011bn\u011b term\u00ednu vyvolan\u00e9 z\u00e1kazn\u00edkem, zaznamenejte d\u016fvod a v\u00fdslovn\u011b ur\u010dete, jak se tato zm\u011bna prom\u00edtne do hodnocen\u00ed.<\/p>\n\n\n<p>V\u00fdroba mezit\u00edm pot\u0159ebuje co nejp\u0159esn\u011bj\u0161\u00ed aktu\u00e1ln\u00ed informace o dostupnosti. P\u016fvodn\u00ed p\u0159\u00edslib vysv\u011btluje nespln\u011bn\u00ed z\u00e1vazku; nejnov\u011bj\u0161\u00ed d\u016fv\u011bryhodn\u00fd term\u00edn dostupnosti materi\u00e1lu v\u00e1m pom\u016f\u017ee rozhodnout, co lze vyr\u00e1b\u011bt d\u00e1l.<\/p>\n\n\n<p>Ur\u010dete tak\u00e9 p\u0159ijateln\u00e9 \u010dasov\u00e9 rozmez\u00ed. P\u0159ed\u010dasn\u00e9 dod\u00e1vky mohou zp\u016fsobit probl\u00e9my s manipulac\u00ed a skladov\u00e1n\u00edm, tak\u017ee \u201ev\u010das\u201c automaticky neznamen\u00e1 kdykoli p\u0159ed term\u00ednem. Toleranci zvolte podle materi\u00e1lu a podm\u00ednek p\u0159\u00edjmu, nikoli podle \u00fadajn\u011b standardn\u00edho procenta nebo po\u010dtu dn\u016f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Posuzujte term\u00edny dod\u00e1vek spole\u010dn\u011b s kvalitou<\/h2>\n\n\n<p>Ukazatel v\u010dasn\u00fdch dod\u00e1vek \u0159\u00edk\u00e1, zda hodnocen\u00e1 dod\u00e1vka splnila stanoven\u00e9 pravidlo pro term\u00edn. Nemus\u00ed v\u0161ak vypov\u00eddat o tom, zda dorazilo dostate\u010dn\u00e9 mno\u017estv\u00ed pou\u017eiteln\u00e9ho materi\u00e1lu.<\/p>\n\n\n<p>U dod\u00e1vek v\u010das a v pln\u00e9m mno\u017estv\u00ed vy\u017eadujte spln\u011bn\u00ed term\u00ednu i p\u0159isl\u00edben\u00e9ho mno\u017estv\u00ed pro tut\u00e9\u017e hodnocenou ud\u00e1lost. Schv\u00e1len\u00ed materi\u00e1lu z hlediska kvality sledujte samostatn\u011b, nebo v\u00fdslovn\u011b definujte kombinovan\u00fd ukazatel, kter\u00fd vy\u017eaduje i toto schv\u00e1len\u00ed. Ozna\u010den\u00ed OTD, OTIF a schv\u00e1len\u00ed z hlediska kvality nepou\u017e\u00edvejte jako synonyma.<\/p>\n\n\n<p>P\u0159edstavte si polo\u017eku na 100 sou\u010d\u00e1st\u00ed. Osmdes\u00e1t doraz\u00ed v dohodnut\u00e9m \u010dasov\u00e9m rozmez\u00ed a zb\u00fdvaj\u00edc\u00edch 20 pozd\u011b. P\u0159i hodnocen\u00ed cel\u00e9 polo\u017eky tato dod\u00e1vka nespl\u0148uje podm\u00ednku dod\u00e1n\u00ed v\u010das a v pln\u00e9m mno\u017estv\u00ed. T\u011bchto 80 sou\u010d\u00e1st\u00ed m\u016f\u017ee p\u0159esto sta\u010dit na men\u0161\u00ed v\u00fdrobn\u00ed d\u00e1vku. To je ale rozhodnut\u00ed p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby, nikoli d\u016fvod ozna\u010dit p\u016fvodn\u00ed z\u00e1vazek za spln\u011bn\u00fd.<\/p>\n\n\n<p>Stejnou pe\u010dlivost vy\u017eaduje i kvalita vstupn\u00edch dod\u00e1vek. Pod\u00edl zam\u00edtnut\u00fdch kus\u016f m\u011b\u0159\u00ed n\u011bco jin\u00e9ho ne\u017e procento dod\u00e1vek s reklamac\u00ed. Jeden zam\u00edtnut\u00fd kus ani cel\u00e1 nepou\u017eiteln\u00e1 \u0161ar\u017ee se nesm\u011bj\u00ed ztratit za nedefinovan\u00fdm \u201ehodnocen\u00edm kvality\u201c. Ukazatel PPM, pokud je pro danou kategorii u\u017eite\u010dn\u00fd, vyjad\u0159uje po\u010det zam\u00edtnut\u00fdch kus\u016f na milion p\u0159ijat\u00fdch kus\u016f. Pou\u017e\u00edvejte p\u0159itom stejn\u00e9 jednotky a zachovejte srovnateln\u00fd rozsah kontroly.<\/p>\n\n\n<p>Materi\u00e1l \u010dekaj\u00edc\u00ed na kontrolu nen\u00ed automaticky p\u0159ijat\u00fd ani zam\u00edtnut\u00fd. Uv\u00e1d\u011bjte i dosud neuzav\u0159en\u00e1 posouzen\u00ed, aby zd\u00e1nliv\u011b dobr\u00fd v\u00fdsledek kvality neodr\u00e1\u017eel pouze nedokon\u010denou kontrolu. Pro v\u00fdrobu zjist\u011bte, kdy bude pot\u0159ebn\u00e9 mno\u017estv\u00ed skute\u010dn\u011b pou\u017eiteln\u00e9, nejen kdy se o\u010dek\u00e1v\u00e1 p\u0159\u00edjezd kamionu k br\u00e1n\u011b.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nehodno\u0165te dod\u00e1vky zp\u016fsobem, kter\u00fd p\u0159ehl\u00ed\u017e\u00ed ty nedodan\u00e9<\/h2>\n\n\n<p>Jmenovatel m\u016f\u017ee skr\u00fdt pr\u00e1v\u011b ten probl\u00e9m, kter\u00fd se sna\u017e\u00edte \u0159e\u0161it. Pokud po\u010d\u00edt\u00e1te jen p\u0159\u00edjmy uskute\u010dn\u011bn\u00e9 b\u011bhem m\u011bs\u00edce, z\u00e1silka, kter\u00e1 v\u016fbec nedorazila, se ve v\u00fdpo\u010dtu nemus\u00ed objevit.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee v dan\u00e9m m\u011bs\u00edci m\u011blo term\u00edn 20 dod\u00e1vkov\u00fdch polo\u017eek. Osmn\u00e1ct dorazilo do konce m\u011bs\u00edce a 16 splnilo dohodnut\u00e9 \u010dasov\u00e9 rozmez\u00ed. Zb\u00fdvaj\u00edc\u00ed dv\u011b st\u00e1le nebyly dodan\u00e9.<\/p>\n\n\n<p>P\u0159i v\u00fdpo\u010dtu ze v\u0161ech dodac\u00edch polo\u017eek s term\u00ednem v dan\u00e9m obdob\u00ed \u010din\u00ed OTD dodavatele <strong>16 \u00f7 20 \u00d7 100 = 80%<\/strong>. Pokud bychom po\u010d\u00edtali pouze p\u0159ijat\u00e9 polo\u017eky, v\u00fdsledek by byl <strong>16 \u00f7 18 \u00d7 100 = 88,9%<\/strong>, zaokrouhleno na jedno desetinn\u00e9 m\u00edsto. Oba v\u00fdpo\u010dty mohou popisovat vymezen\u00fd soubor polo\u017eek, ale ka\u017ed\u00fd odpov\u00edd\u00e1 na jinou ot\u00e1zku. Ukazatel zalo\u017een\u00fd pouze na p\u0159ijat\u00fdch polo\u017ek\u00e1ch ne\u0159\u00edk\u00e1, jak spolehliv\u011b dodavatel splnil v\u0161echny z\u00e1vazky s term\u00ednem v dan\u00e9m m\u011bs\u00edci.<\/p>\n\n\n<p>Neuzav\u0159en\u00e9 dodac\u00ed polo\u017eky po term\u00ednu ponechte v p\u0159ehledu v\u010detn\u011b d\u00e9lky prodlen\u00ed a p\u0159\u00edslu\u0161n\u00e9ho materi\u00e1lu. Pro zru\u0161en\u00e9 polo\u017eky, zm\u011bny a uz\u00e1v\u011brky obdob\u00ed pou\u017e\u00edvejte zdokumentovan\u00e9 pravidlo. Uplat\u0148ujte je stejn\u011b u v\u0161ech porovn\u00e1van\u00fdch dodavatel\u016f a uchov\u00e1vejte podkladov\u00e9 z\u00e1znamy o polo\u017ek\u00e1ch, aby bylo mo\u017en\u00e9 sporn\u00fd v\u00fdsledek zp\u011btn\u011b ov\u011b\u0159it.<\/p>\n\n\n<p>Vedle procentn\u00edho v\u00fdsledku uv\u00e1d\u011bjte tak\u00e9 po\u010det hodnocen\u00fdch p\u0159\u00edpad\u016f. Jedno nespln\u011bn\u00ed z n\u011bkolika dod\u00e1vek je t\u0159eba posuzovat jinak ne\u017e dlouhodob\u011b se opakuj\u00edc\u00ed probl\u00e9my u stovek dod\u00e1vek. Porovn\u00e1vejte podobn\u00e9 kategorie materi\u00e1lu a obdobn\u00e9 podm\u00ednky z\u00e1sobov\u00e1n\u00ed, m\u00edsto abyste \u0159adili v\u0161echny dodavatele do jednoho \u017eeb\u0159\u00ed\u010dku, jako by plnili stejn\u00fd \u00fakol.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sledujte spolehlivost dodac\u00edch lh\u016ft, reakce a skute\u010dn\u00e9 n\u00e1klady<\/h2>\n\n\n<p>Kr\u00e1tk\u00e1 nab\u00edzen\u00e1 dodac\u00ed lh\u016fta je l\u00e1kav\u00e1, ale v\u00fdrobn\u00ed pl\u00e1n z\u00e1vis\u00ed na skute\u010dn\u00e9m pr\u016fb\u011bhu dod\u00e1vek. Ur\u010dete po\u010d\u00e1te\u010dn\u00ed ud\u00e1lost, nap\u0159\u00edklad uvoln\u011bn\u00ed kompletn\u00ed n\u00e1kupn\u00ed objedn\u00e1vky, a m\u011b\u0159te dobu a\u017e do p\u0159\u00edjmu. D\u016fsledn\u011b p\u0159itom pou\u017e\u00edvejte bu\u010f kalend\u00e1\u0159n\u00ed, nebo pracovn\u00ed dny. Krom\u011b pr\u016fm\u011bru sledujte i rozptyl: stabiln\u00ed pr\u016fb\u011bh dod\u00e1vek nen\u00ed tot\u00e9\u017e co st\u0159\u00edd\u00e1n\u00ed v\u00fdrazn\u00fdch p\u0159edstih\u016f a velk\u00fdch zpo\u017ed\u011bn\u00ed.<\/p>\n\n\n<p>Sl\u00edbenou dodac\u00ed lh\u016ftu evidujte odd\u011blen\u011b od skute\u010dn\u00e9. Opakovan\u00e9 prodlu\u017eov\u00e1n\u00ed sl\u00edben\u00e9 lh\u016fty nesm\u00ed vytv\u00e1\u0159et zd\u00e1n\u00ed, \u017ee jsou dod\u00e1vky ve skute\u010dnosti spolehliv\u011bj\u0161\u00ed. Pokud doprava a vstupn\u00ed kontrola prodlu\u017euj\u00ed dobu, ne\u017e lze materi\u00e1l pou\u017e\u00edt ve v\u00fdrob\u011b, zviditeln\u011bte i tyto intervaly. Nep\u0159edpokl\u00e1dejte, \u017ee p\u0159\u00edjem automaticky znamen\u00e1 p\u0159ipravenost k pou\u017eit\u00ed.<\/p>\n\n\n<p>P\u0159i hodnocen\u00ed rychlosti reakce si ur\u010dete, co pova\u017eujete za u\u017eite\u010dnou odpov\u011b\u010f. Potvrzen\u00ed typu \u201eprov\u011b\u0159ujeme\u201c nen\u00ed tot\u00e9\u017e jako n\u00e1vrh n\u00e1pravy s \u00fadaji o mno\u017estv\u00ed a term\u00ednu, na kter\u00e9 se lze spolehnout. M\u011b\u0159te dobu do obdr\u017een\u00ed takov\u00e9 odpov\u011bdi a sledujte, zda jsou dohodnut\u00e1 n\u00e1pravn\u00e1 opat\u0159en\u00ed dokon\u010dena a zda funguj\u00ed. N\u00e1kup pot\u0159ebuje podklady pro dal\u0161\u00ed postup, ne jen doklad o tom, \u017ee n\u011bkdo odpov\u011bd\u011bl na e-mail.<\/p>\n\n\n<p>N\u00e1kladov\u00e9 ukazatele maj\u00ed pom\u00e1hat p\u0159i posuzov\u00e1n\u00ed kompromis\u016f. Jednotn\u011b evidujte v\u00edcen\u00e1klady na dopravu, t\u0159\u00edd\u011bn\u00ed, p\u0159epracov\u00e1n\u00ed a dal\u0161\u00ed relevantn\u00ed n\u00e1klady vyvolan\u00e9 naru\u0161en\u00edm dod\u00e1vek. Odd\u011blujte p\u0159itom probl\u00e9my zp\u016fsoben\u00e9 dodavatelem od zm\u011bn, kter\u00e9 iniciovala va\u0161e firma. Tyto n\u00e1klady posuzujte spolu s n\u00e1kupn\u00ed cenou. Levn\u011bj\u0161\u00ed sou\u010d\u00e1stka se m\u016f\u017ee st\u00e1t dra\u017e\u0161\u00ed volbou, pokud ka\u017ed\u00e1 dod\u00e1vka vy\u017eaduje nal\u00e9hav\u00e9 \u0159e\u0161en\u00ed probl\u00e9m\u016f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sestavte hodnocen\u00ed dodavatel\u016f, kter\u00e9 vede ke konkr\u00e9tn\u00edm krok\u016fm<\/h2>\n\n\n<p>U\u017eite\u010dn\u00fd p\u0159ehled hodnocen\u00ed dodavatele uv\u00e1d\u00ed u ka\u017ed\u00e9ho vybran\u00e9ho ukazatele aktu\u00e1ln\u00ed v\u00fdsledek, c\u00edl, trend a po\u010det hodnocen\u00fdch p\u0159\u00edpad\u016f. Obsahuje tak\u00e9 podklady dokl\u00e1daj\u00edc\u00ed probl\u00e9m, osobu odpov\u011bdnou za dal\u0161\u00ed krok a term\u00edn kontroly pokroku.<\/p>\n\n\n<p>Mezn\u00ed hodnoty stanovte podle kategori\u00ed a rizika pro v\u00fdrobu. Chyb\u011bj\u00edc\u00ed levn\u00e1 sou\u010d\u00e1stka od jedin\u00e9ho dostupn\u00e9ho dodavatele m\u016f\u017ee zastavit mont\u00e1\u017e; objem n\u00e1kup\u016f u dan\u00e9ho dodavatele proto nen\u00ed spolehliv\u00fdm m\u011b\u0159\u00edtkem tohoto rizika. Pokud pou\u017e\u00edv\u00e1te v\u00e1\u017een\u00e9 celkov\u00e9 sk\u00f3re, ponechte viditeln\u00e9 i d\u00edl\u010d\u00ed ukazatele a ur\u010dete kritick\u00e1 selh\u00e1n\u00ed, kter\u00e1 vy\u017eaduj\u00ed z\u00e1sah bez ohledu na pr\u016fm\u011br.<\/p>\n\n\n<p>Dohodn\u011bte pravideln\u00fd interval hodnocen\u00ed zam\u011b\u0159en\u00e9ho na rozvoj dodavatel\u016f. V\u011bt\u0161\u00ed pozornost v\u011bnujte t\u011bm, u nich\u017e to od\u016fvod\u0148uje riziko nebo zhor\u0161uj\u00edc\u00ed se v\u00fdsledky. P\u0159i hodnocen\u00ed hledejte opakuj\u00edc\u00ed se p\u0159\u00ed\u010diny a dohodn\u011bte konkr\u00e9tn\u00ed zlep\u0161en\u00ed: nap\u0159\u00edklad v\u010dasn\u011bj\u0161\u00ed upozorn\u011bn\u00ed na nedodr\u017een\u00fd term\u00edn expedice, \u00fapravu procesu potvrzov\u00e1n\u00ed nebo n\u00e1pravn\u00e9 opat\u0159en\u00ed k opakovan\u00fdm vad\u00e1m.<\/p>\n\n\n<p>S \u0159e\u0161en\u00edm aktu\u00e1ln\u00edho nedostatku materi\u00e1lu ale na tuto sch\u016fzku ne\u010dekejte. Hodnocen\u00ed dodavatele vysv\u011btluje dlouhodob\u011bj\u0161\u00ed pr\u016fb\u011bh. V\u00fdroba pot\u0159ebuje rozhodnut\u00ed, jak vy\u0159e\u0161it sou\u010dasn\u00fd probl\u00e9m.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Upravte v\u00fdrobn\u00ed pl\u00e1n tak, aby obst\u00e1l i p\u0159i probl\u00e9mu s dod\u00e1vkou<\/h2>\n\n\n<p>P\u0159i zm\u011bn\u011b dod\u00e1vky nejprve zjist\u011bte, kter\u00e9 sou\u010d\u00e1stky a jak\u00e9ho mno\u017estv\u00ed se zm\u011bna t\u00fdk\u00e1 a kdy lze v\u011brohodn\u011b o\u010dek\u00e1vat dostupnost. Ov\u011b\u0159te, kter\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy na materi\u00e1lu z\u00e1visej\u00ed a zda p\u0159ijat\u00e9 a schv\u00e1len\u00e9 d\u00edl\u010d\u00ed mno\u017estv\u00ed umo\u017en\u00ed pokra\u010dovat alespo\u0148 v \u010d\u00e1sti pr\u00e1ce. Pot\u00e9 sla\u010fte dot\u010den\u00e9 operace s ostatn\u00ed v\u00fdrobou v z\u00e1vod\u011b.<\/p>\n\n\n<p>Pro tento krok pl\u00e1nov\u00e1n\u00ed je spr\u00e1vn\u00fdm n\u00e1strojem SkyPlanner APS. U n\u00e1kupn\u00edch objedn\u00e1vek eviduje p\u0159edpokl\u00e1dan\u00e9 a potvrzen\u00e9 term\u00edny i data dod\u00e1n\u00ed a jejich polo\u017eky lze propojit s v\u00fdrobn\u00edmi p\u0159\u00edkazy. Pokud je nastaveno pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, vstupuj\u00ed pr\u016fb\u011b\u017en\u011b aktualizovan\u00e9 informace o p\u0159\u00edchodu materi\u00e1lu do v\u00fdpo\u010dtu pl\u00e1nu. Arcturus, um\u011bl\u00e1 inteligence pro pl\u00e1nov\u00e1n\u00ed v syst\u00e9mu SkyPlanner, rozvrhuje pr\u00e1ci s ohledem na materi\u00e1l, kapacity, priority a n\u00e1vaznosti operac\u00ed. V\u00fdsledn\u00e9 po\u0159ad\u00ed je p\u0159ehledn\u011b vid\u011bt v Ganttov\u011b diagramu.<\/p>\n\n\n<p>T\u00edm se m\u011bn\u00ed pr\u00e1ce pl\u00e1nova\u010de. M\u00edsto ru\u010dn\u00edho p\u0159esouv\u00e1n\u00ed ka\u017ed\u00e9 dot\u010den\u00e9 operace a n\u00e1sledn\u00fdch \u00faprav fronty na dal\u0161\u00edm stroji aktualizujete informace o materi\u00e1lu, <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">p\u0159epo\u010d\u00edt\u00e1te pl\u00e1n<\/a> a posoud\u00edte dopad na sl\u00edben\u00e9 term\u00edny dod\u00e1n\u00ed. Kontrolu si zachov\u00e1v\u00e1te prost\u0159ednictv\u00edm priorit a pravidel pl\u00e1nov\u00e1n\u00ed.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee se potvrzen\u00fd term\u00edn dod\u00e1n\u00ed opo\u017ed\u011bn\u00e9ho odlitku posune na pozd\u011bji. Jeho obr\u00e1b\u011bn\u00ed a mont\u00e1\u017e je nutn\u00e9 p\u0159esunout, stejn\u00e9 zdroje ale vyu\u017e\u00edvaj\u00ed i jin\u00e9 zak\u00e1zky. SkyPlanner zahrne do t\u00e9ho\u017e v\u00fdpo\u010dtu i toto soub\u011b\u017en\u00e9 zat\u00ed\u017een\u00ed, tak\u017ee sn\u00e1ze zjist\u00edte, kter\u00e9 pr\u00e1ce mohou pokra\u010dovat a kter\u00e9 sl\u00edben\u00e9 term\u00edny je t\u0159eba \u0159e\u0161it. Nov\u00fd term\u00edn od dodavatele se tak prom\u00edtne do pl\u00e1nu cel\u00e9ho z\u00e1vodu a nez\u016fstane jen samostatnou pozn\u00e1mkou u n\u00e1kupn\u00ed objedn\u00e1vky.<\/p>\n\n\n<p>O\u010dek\u00e1van\u00e1 dostupnost a fyzick\u00fd p\u0159\u00edjem z\u016fst\u00e1vaj\u00ed dv\u011bma odli\u0161n\u00fdmi ud\u00e1lostmi. V syst\u00e9mu SkyPlanner se potvrzen\u00edm n\u00e1kupn\u00ed objedn\u00e1vky jako dodan\u00e9 aktualizuj\u00ed skladov\u00e9 z\u00e1soby. Do dostupnosti pou\u017e\u00edvan\u00e9 pro pl\u00e1nov\u00e1n\u00ed prom\u00edtejte tak\u00e9 p\u0159\u00edpadnou dobu pot\u0159ebnou k uvoln\u011bn\u00ed materi\u00e1lu kontrolou kvality, aby pl\u00e1n nespol\u00e9hal na materi\u00e1l, kter\u00fd je st\u00e1le blokovan\u00fd.<\/p>\n\n\n<p>SkyPlanner <a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">lze propojit s libovoln\u00fdm syst\u00e9mem ERP nebo MES prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API<\/a>. St\u00e1vaj\u00edc\u00ed informace o n\u00e1kupu a v\u00fdrob\u011b tak m\u016f\u017eete propojit s pl\u00e1nov\u00e1n\u00edm s omezen\u00fdmi kapacitami, ani\u017e byste jen kv\u016fli lep\u0161\u00edmu pl\u00e1nu museli nahrazovat funguj\u00edc\u00ed ERP.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co ve spole\u010dnosti Eskomatic zm\u011bnil p\u0159ehled o materi\u00e1lu<\/h2>\n\n\n<p>Finsk\u00e1 spole\u010dnost Eskomatic, kter\u00e1 se zab\u00fdv\u00e1 zak\u00e1zkov\u00fdm obr\u00e1b\u011bn\u00edm, d\u0159\u00edve sestavovala fronty pr\u00e1ce p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b ve st\u00e1rnouc\u00edm syst\u00e9mu ERP a \u0159\u00edzen\u00ed v\u00fdroby. Nedostatek materi\u00e1lu se mohl projevit a\u017e t\u011bsn\u011b p\u0159ed pl\u00e1novan\u00fdm zah\u00e1jen\u00edm operace a t\u00fdm pak musel \u0159e\u0161it jeho n\u00e1sledky.<\/p>\n\n\n<p>D\u00edky vizu\u00e1ln\u00edm front\u00e1m pr\u00e1ce a automatizovan\u00e9mu pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed v syst\u00e9mu SkyPlanner z\u00edskala spole\u010dnost jasn\u011bj\u0161\u00ed p\u0159ehled o nadch\u00e1zej\u00edc\u00ed pr\u00e1ci. Eskomatic uv\u00e1d\u00ed p\u0159esn\u011bj\u0161\u00ed stanovov\u00e1n\u00ed dodac\u00edch term\u00edn\u016f a m\u00e9n\u011b p\u0159eru\u0161en\u00ed v\u00fdroby zp\u016fsoben\u00fdch nedostatkem materi\u00e1lu. Vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby Tommi M\u00e4nnist\u00f6 oce\u0148uje tento n\u00e1stroj zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.<\/p>\n\n\n<p>Pro hodnocen\u00ed dodavatel\u016f z toho plyne praktick\u00e9 pou\u010den\u00ed: odhalit nespolehliv\u00e9 dod\u00e1vky je cenn\u00e9, ale z\u00e1vodu pom\u00e1h\u00e1 reagovat a\u017e p\u0159ehled o jejich dopadu na skute\u010dnou pr\u00e1ci. <a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/eskomatic\/\">Zku\u0161enosti spole\u010dnosti Eskomatic<\/a> ukazuj\u00ed hodnotu propojen\u00ed p\u0159ehledu o materi\u00e1lu s pl\u00e1nov\u00e1n\u00edm.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zjist\u011bte, jak\u00fd dopad bude m\u00edt p\u0159\u00ed\u0161t\u00ed zpo\u017ed\u011bn\u00ed dodavatele<\/h2>\n\n\n<p>Za\u010dn\u011bte hodnocen\u00edm dodavatel\u016f, jeho\u017e definic\u00edm rozum\u011bj\u00ed n\u00e1kup\u010d\u00ed, dodavatel\u00e9 i pl\u00e1nova\u010di. Zachovejte p\u016fvodn\u00ed z\u00e1vazek, v\u016f\u010di n\u011bmu\u017e m\u011b\u0159\u00edte pln\u011bn\u00ed, ponechte v p\u0159ehledu ne\u00fapln\u00e9 dod\u00e1vky i nepou\u017eiteln\u00fd materi\u00e1l a ke ka\u017ed\u00e9 odchylce ur\u010dete dal\u0161\u00ed postup.<\/p>\n\n\n<p>Pot\u00e9 p\u0159ipravte pro v\u00fdrobu pl\u00e1n vych\u00e1zej\u00edc\u00ed z aktu\u00e1ln\u00ed situace. <a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervujte si uk\u00e1zku syst\u00e9mu SkyPlanner<\/a> a p\u0159ipravte si p\u0159\u00edklad jednoho zpo\u017ed\u011bn\u00e9ho materi\u00e1lu, jeho nov\u00fd potvrzen\u00fd term\u00edn a zak\u00e1zky, kter\u00e9 pot\u0159ebuj\u00ed stejn\u00e9 zdroje. Na tomto p\u0159\u00edkladu m\u016f\u017eete zjistit, jak m\u016f\u017ee SkyPlanner omezit ru\u010dn\u00ed p\u0159epl\u00e1nov\u00e1n\u00ed a uk\u00e1zat dopady na dodac\u00ed term\u00edny ve va\u0161em z\u00e1vod\u011b.<\/p>\n\n\n<p>Pokud si chcete pl\u00e1nov\u00e1n\u00ed nejprve sami prohl\u00e9dnout, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu Domov &raquo; Zdroje &raquo; Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu Dodavatel m\u016f\u017ee m\u00edt za m\u011bs\u00edc dobr\u00e9 hodnocen\u00ed, a p\u0159itom jedin\u00e1 chyb\u011bj\u00edc\u00ed sou\u010d\u00e1st zdr\u017euje va\u0161i nejnal\u00e9hav\u011bj\u0161\u00ed zak\u00e1zku. N\u00e1kup vid\u00ed p\u0159ijateln\u00fd pr\u016fm\u011br. V\u00fdroba vid\u00ed \u010dekaj\u00edc\u00ed stroj, nedokon\u010denou sestavu a ohro\u017een\u00fd term\u00edn sl\u00edben\u00fd z\u00e1kazn\u00edkovi. Dob\u0159e zvolen\u00e9 ukazatele v\u00fdkonnosti dodavatel\u016f pom\u00e1haj\u00ed ob\u011bma t\u00fdm\u016fm &#8230; <a title=\"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/\" aria-label=\"Read more about Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110975,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-110948","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu<\/title>\n<meta name=\"description\" content=\"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\" \/>\n<meta property=\"og:description\" content=\"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T10:47:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T10:47:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:47:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/\"},\"wordCount\":3392,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/\",\"name\":\"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:47:53+00:00\",\"description\":\"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/ukazatele-vykonnosti-dodavatelu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu","description":"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/","og_locale":"cs_CZ","og_type":"article","og_title":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu","og_description":"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T10:47:38+00:00","article_modified_time":"2026-10-27T10:47:53+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"17 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:47:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/"},"wordCount":3392,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/","name":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:47:53+00:00","description":"Zvolte srovnateln\u00e9 KPI dodavatel\u016f, sestavte u\u017eite\u010dn\u00e9 hodnocen\u00ed a se SkyPlanner prom\u011b\u0148te zpo\u017ed\u011bn\u00ed materi\u00e1lu v provediteln\u00fd v\u00fdrobn\u00ed pl\u00e1n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","width":1774,"height":887,"caption":"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/ukazatele-vykonnosti-dodavatelu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu Domov &raquo; Zdroje &raquo; Ukazatele v\u00fdkonnosti dodavatel\u016f, kter\u00e9 chr\u00e1n\u00ed v\u00fdrobu Dodavatel m\u016f\u017ee m\u00edt za m\u011bs\u00edc dobr\u00e9 hodnocen\u00ed, a p\u0159itom jedin\u00e1 chyb\u011bj\u00edc\u00ed sou\u010d\u00e1st zdr\u017euje va\u0161i nejnal\u00e9hav\u011bj\u0161\u00ed zak\u00e1zku. N\u00e1kup vid\u00ed p\u0159ijateln\u00fd pr\u016fm\u011br. V\u00fdroba vid\u00ed \u010dekaj\u00edc\u00ed stroj, nedokon\u010denou sestavu a ohro\u017een\u00fd term\u00edn sl\u00edben\u00fd z\u00e1kazn\u00edkovi. Dob\u0159e zvolen\u00e9 ukazatele v\u00fdkonnosti dodavatel\u016f pom\u00e1haj\u00ed ob\u011bma t\u00fdm\u016fm&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/110948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=110948"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/110948\/revisions"}],"predecessor-version":[{"id":111011,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/110948\/revisions\/111011"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/110975"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=110948"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=110948"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=110948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}