{"id":109387,"date":"2026-10-25T02:10:34","date_gmt":"2026-10-25T02:10:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=109387"},"modified":"2026-10-25T02:10:46","modified_gmt":"2026-10-25T02:10:46","slug":"tvorba-cenovych-nabidek-ve-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/","title":{"rendered":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>P\u0159i nab\u00edzen\u00e9 jednotkov\u00e9 cen\u011b m\u016f\u017ee zak\u00e1zka vypadat ziskov\u011b, a p\u0159esto nemus\u00ed b\u00fdt spr\u00e1vn\u00e9 ji p\u0159ijmout. Kalkulace m\u016f\u017ee po\u010d\u00edtat s jedn\u00edm se\u0159\u00edzen\u00edm, zat\u00edmco z\u00e1kazn\u00edk po\u017eaduje dv\u011b d\u00edl\u010d\u00ed dod\u00e1vky. M\u016f\u017ee v n\u00ed chyb\u011bt dokon\u010dovac\u00ed operace nebo m\u016f\u017ee nab\u00eddka slibovat term\u00edn, kter\u00fd se neobejde bez p\u0159es\u010das\u016f, s jejich\u017e cenou nikdo nepo\u010d\u00edtal.<\/p>\n\n\n<p>Dob\u0159e zvl\u00e1dnut\u00e1 <strong>tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b<\/strong> propojuje v\u0161echna tato rozhodnut\u00ed. Vymez\u00edte rozsah zak\u00e1zky, odhadnete pot\u0159ebn\u00e9 zdroje, stanov\u00edte cenu a ov\u011b\u0159\u00edte, zda v\u00fdroba dok\u00e1\u017ee sl\u00edben\u00e9 podm\u00ednky splnit. Z\u00e1kazn\u00edk dostane jasnou nab\u00eddku a v\u00e1\u0161 podnik zak\u00e1zku, u kter\u00e9 v\u00ed, jak ji za danou cenu dodat.<\/p>\n\n\n<p>SkyPlanner APS pom\u00e1h\u00e1 toto rozhodnut\u00ed podlo\u017eit z pohledu v\u00fdroby. Potenci\u00e1ln\u00ed zak\u00e1zky m\u016f\u017eete posoudit spole\u010dn\u011b s ji\u017e p\u0159ijat\u00fdmi z\u00e1vazky, ani\u017e by pl\u00e1nova\u010d musel poka\u017ed\u00e9 znovu sestavovat po\u0159ad\u00ed pr\u00e1ce na stroj\u00edch, kdy\u017e obchod pot\u0159ebuje zn\u00e1t term\u00edn. V\u00fdkazy v\u00fdrobn\u00edch \u010das\u016f pak pom\u00e1haj\u00ed zp\u0159es\u0148ovat p\u0159edpoklady pro dal\u0161\u00ed nab\u00eddky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co je tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b?<\/h2>\n\n\n<p>P\u0159i tvorb\u011b cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b p\u0159ev\u00e1d\u00edte z\u00e1kazn\u00edkovu popt\u00e1vku, ozna\u010dovanou tak\u00e9 jako RFQ, na nab\u00eddku dod\u00e1n\u00ed konkr\u00e9tn\u00edch v\u00fdrobk\u016f za stanovenou cenu, v dan\u00e9m mno\u017estv\u00ed, term\u00ednu a za ur\u010dit\u00fdch podm\u00ednek. Tento proces spojuje posouzen\u00ed technick\u00e9 proveditelnosti, odhad n\u00e1klad\u016f a obchodn\u00ed rozhodnut\u00ed, zda se vyplat\u00ed zak\u00e1zku p\u0159ijmout.<\/p>\n\n\n<p>Kalkulace je podkladem pro nab\u00eddku, nikoli celou nab\u00eddkou. Zachycuje p\u0159edpokl\u00e1dan\u00e9 n\u00e1klady a \u010das. Nab\u00eddka z\u00e1kazn\u00edkovi \u0159\u00edk\u00e1, co mu nab\u00edz\u00edte a z jak\u00fdch p\u0159edpoklad\u016f p\u0159itom vych\u00e1z\u00edte.<\/p>\n\n\n<p>P\u0159edb\u011b\u017en\u00fd cenov\u00fd odhad slou\u017e\u00ed jin\u00e9mu \u00fa\u010delu. Pokud specifikace nen\u00ed \u00fapln\u00e1, m\u016f\u017ee cenov\u00e9 rozp\u011bt\u00ed s jasn\u011b uveden\u00fdmi p\u0159edpoklady uk\u00e1zat, zda m\u00e1 smysl popt\u00e1vku d\u00e1le rozpracov\u00e1vat. Z\u0159eteln\u011b jej ozna\u010dte jako p\u0159edb\u011b\u017en\u00fd, uve\u010fte, co zb\u00fdv\u00e1 do\u0159e\u0161it, a nep\u0159edkl\u00e1dejte nejist\u00e9 rozp\u011bt\u00ed jako pln\u011b prov\u011b\u0159enou nab\u00eddku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dn\u011bte \u00fadaji v popt\u00e1vce, kter\u00e9 mohou ovlivnit va\u0161i nab\u00eddku<\/h2>\n\n\n<p>Ne\u017e str\u00e1v\u00edte hodiny podrobnou kalkulac\u00ed, ov\u011b\u0159te si, \u017ee m\u00e1te dost informac\u00ed k vymezen\u00ed zak\u00e1zky. Samotn\u00fd CAD model nemus\u00ed obsahovat po\u017eadavky na povrch, z\u00e1znamy z kontrol ani p\u0159\u00edpustn\u00e9 n\u00e1hrady.<\/p>\n\n\n<p>V obrobn\u011b nebo u zak\u00e1zkov\u00e9ho v\u00fdrobce si vyjasn\u011bte:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>V\u00fdrobek a revize:<\/strong> \u010d\u00edslo d\u00edlu, aktu\u00e1ln\u00ed v\u00fdkres a model a tak\u00e9 to, kter\u00e1 specifikace m\u00e1 p\u0159i jejich nesouladu p\u0159ednost.<\/li><li><strong>Materi\u00e1l a kvalita:<\/strong> jakost materi\u00e1lu, tolerance, po\u017eadavky na povrch, certifik\u00e1ty, kontroly a p\u0159\u00edpadn\u00e9 po\u017eadavky na schv\u00e1len\u00ed prvn\u00edho kusu.<\/li><li><strong>Mno\u017estv\u00ed a d\u00edl\u010d\u00ed dod\u00e1vky:<\/strong> po\u010det vyhovuj\u00edc\u00edch hotov\u00fdch kus\u016f, velikosti d\u00e1vek, rozd\u011blen\u00ed dod\u00e1vek a to, zda jsou opakovan\u00e9 odb\u011bry z\u00e1vazn\u011b potvrzen\u00e9, nebo jen mo\u017en\u00e9.<\/li><li><strong>Term\u00edny a rozsah dod\u00e1vky:<\/strong> po\u017eadovan\u00e9 datum p\u0159evzet\u00ed nebo expedice, kooperace, balen\u00ed, p\u0159eprava a polo\u017eky dod\u00e1van\u00e9 z\u00e1kazn\u00edkem.<\/li><\/ul>\n\n\n<p>Ptejte se na pou\u017eit\u00ed v\u00fdrobku, pokud to pom\u016f\u017ee vy\u0159e\u0161it v\u00fdrobn\u00ed ot\u00e1zku. \u00dazk\u00e1 tolerance u funk\u010dn\u00edho ulo\u017een\u00ed vy\u017eaduje jinou diskusi ne\u017e \u00fazk\u00e1 tolerance automaticky p\u0159edepsan\u00e1 u v\u0161ech rozm\u011br\u016f. Tam, kde to d\u00e1v\u00e1 smysl, navrhn\u011bte zm\u011bnu, ale nechte si ji schv\u00e1lit. Nekalkulujte cenu podle v\u00fdkladu, kter\u00fd z\u00e1kazn\u00edk neodsouhlasil.<\/p>\n\n\n<p>Posu\u010fte tak\u00e9, zda m\u00e1 smysl se popt\u00e1vkou zab\u00fdvat. Dok\u00e1\u017ee va\u0161e v\u00fdroba zajistit kl\u00ed\u010dov\u00e9 operace? Odpov\u00edd\u00e1 cenov\u00e1 p\u0159edstava z\u00e1kazn\u00edka alespo\u0148 p\u0159ibli\u017en\u011b p\u0159edpokl\u00e1dan\u00e9 n\u00e1ro\u010dnosti zak\u00e1zky? Rychl\u00e9 vyjasn\u011bn\u00ed nebo n\u00e1vrh alternativy je u\u017eite\u010dn\u011bj\u0161\u00ed ne\u017e podrobn\u00e1 nab\u00eddka na zak\u00e1zku, u n\u00ed\u017e nem\u016f\u017eete odpov\u011bdn\u011b sl\u00edbit dod\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kalkulujte podle v\u00fdrobn\u00edho postupu, ne jen podle podobn\u00e9ho d\u00edlu<\/h2>\n\n\n<p>P\u0159edchoz\u00ed zak\u00e1zka je u\u017eite\u010dn\u00fdm v\u00fdchoz\u00edm bodem, pokud jej\u00ed p\u0159edpoklady st\u00e1le plat\u00ed. Ne\u017e p\u0159evezmete jej\u00ed jednotkovou cenu, ov\u011b\u0159te rozd\u00edly v materi\u00e1lu, geometrii, mno\u017estv\u00ed, se\u0159izov\u00e1n\u00ed, kontrol\u00e1ch, extern\u00edch slu\u017eb\u00e1ch a aktu\u00e1ln\u00edch n\u00e1kupn\u00edch cen\u00e1ch.<\/p>\n\n\n<p>Sestavte p\u0159edpokl\u00e1dan\u00fd v\u00fdrobn\u00ed postup od vstupn\u00edho materi\u00e1lu a\u017e po vyhovuj\u00edc\u00ed hotov\u00fd d\u00edl. Zahr\u0148te programov\u00e1n\u00ed a p\u0159\u00edpravu, se\u0159izov\u00e1n\u00ed, v\u00fdrobn\u00ed operace, odjehlov\u00e1n\u00ed \u010di dokon\u010dov\u00e1n\u00ed, kontrolu i p\u0159\u00edpadn\u00e9 kooperace. Ov\u011b\u0159te, kter\u00e9 zdroje mohou pr\u00e1ci prov\u00e9st a jak na sebe operace navazuj\u00ed.<\/p>\n\n\n<p>Pot\u00e9 odd\u011blte n\u00e1klady na celou d\u00e1vku od n\u00e1klad\u016f, kter\u00e9 se opakuj\u00ed s ka\u017ed\u00fdm kusem.<\/p>\n\n\n<p><strong>Programov\u00e1n\u00ed, p\u0159\u00edprava upnut\u00ed a se\u0159\u00edzen\u00ed<\/strong> mohou b\u00fdt pro nab\u00edzenou v\u00fdrobn\u00ed d\u00e1vku p\u0159ev\u00e1\u017en\u011b jednor\u00e1zov\u00fdmi n\u00e1klady. Jejich v\u00fd\u0161e na jeden d\u00edl se m\u011bn\u00ed s mno\u017estv\u00edm. Opakovan\u00e1 objedn\u00e1vka je automaticky neodstra\u0148uje: jin\u00fd stroj, zm\u011bna v\u00fdkresu nebo rozd\u011blen\u00ed dod\u00e1vky mohou znamenat nutnost p\u0159\u00edpravu zopakovat.<\/p>\n\n\n<p><strong>N\u00e1klady na materi\u00e1l a zpracov\u00e1n\u00ed jednotliv\u00fdch kus\u016f<\/strong> se odv\u00edjej\u00ed od mno\u017estv\u00ed a zvolen\u00e9ho postupu. Zohledn\u011bte rozm\u011bry v\u00fdchoz\u00edho materi\u00e1lu, pro\u0159ez, re\u00e1lnou v\u00fdt\u011b\u017enost a minim\u00e1ln\u00ed odb\u011brov\u00e1 mno\u017estv\u00ed. Ujasn\u011bte si, zda odhad \u010dasu vyjad\u0159uje dobu obsazen\u00ed stroje, nebo po\u010det \u010dlov\u011bkohodin p\u0159\u00edm\u00e9 pr\u00e1ce. Cyklus bez obsluhy nemus\u00ed znamenat stejn\u00fd po\u010det hodin pr\u00e1ce oper\u00e1tora.<\/p>\n\n\n<p><strong>Kooperace a po\u017eadavky konkr\u00e9tn\u00ed zak\u00e1zky<\/strong> mohou zahrnovat tepeln\u00e9 zpracov\u00e1n\u00ed, povlakov\u00e1n\u00ed, speci\u00e1ln\u00ed n\u00e1stroje, zkou\u0161ky, certifik\u00e1ty a balen\u00ed. Krom\u011b cen za kus ov\u011b\u0159te i minim\u00e1ln\u00ed \u00fa\u010dtovan\u00e9 \u010d\u00e1stky. Cena a dodac\u00ed lh\u016fta dodavatele by m\u011bly odpov\u00eddat stejn\u00e9 d\u00e1vce a stejn\u00fdm po\u017eadavk\u016fm, jak\u00e9 nab\u00edz\u00edte z\u00e1kazn\u00edkovi.<\/p>\n\n\n<p>Pou\u017e\u00edvejte n\u00e1kladov\u00e9 sazby schv\u00e1len\u00e9 pro danou kalkulaci. Pokud souhrnn\u00e1 hodinov\u00e1 sazba ji\u017e zahrnuje p\u0159\u00edmou pr\u00e1ci a <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/vyrobni-rezie\/\">v\u00fdrobn\u00ed re\u017eii<\/a>, nep\u0159i\u010d\u00edtejte tyto n\u00e1klady znovu. Pokud jsou n\u00e1klady na pr\u00e1ci a stroj odd\u011blen\u00e9, pou\u017eijte ka\u017edou sazbu na odpov\u00eddaj\u00edc\u00ed po\u010det hodin. Ke kalkulaci ulo\u017ete tak\u00e9 datum sazeb a \u00fadaje o tom, co zahrnuj\u00ed, aby v\u00fdpo\u010dtu rozum\u011bl i jin\u00fd kalkulant.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159\u00edklad cenov\u00e9 nab\u00eddky ve v\u00fdrob\u011b: od n\u00e1klad\u016f na d\u00e1vku k prodejn\u00ed cen\u011b<\/h2>\n\n\n<p>P\u0159edstavte si, \u017ee obrobna p\u0159ipravuje nab\u00eddku na <strong>100 vyhovuj\u00edc\u00edch obroben\u00fdch d\u00edl\u016f<\/strong> vyroben\u00fdch v jedn\u00e9 d\u00e1vce. V\u00fdrobn\u00ed postup vy\u017eaduje jedno se\u0159\u00edzen\u00ed, 12 minut zpracov\u00e1n\u00ed na ka\u017ed\u00fd kus a dokon\u010dovac\u00ed operaci v kooperaci. \u010c\u00e1stky v tomto ilustrativn\u00edm p\u0159\u00edkladu jsou v americk\u00fdch dolarech a nep\u0159edstavuj\u00ed obvykl\u00e9 sazby v oboru.<\/p>\n\n\n<p>Obrobna pou\u017e\u00edv\u00e1 n\u00e1kladovou sazbu 80 $ za hodinu pro se\u0159izov\u00e1n\u00ed i zpracov\u00e1n\u00ed. V tomto p\u0159\u00edkladu sazba zahrnuje p\u0159\u00edslu\u0161n\u00e9 n\u00e1klady na pr\u00e1ci a v\u00fdrobn\u00ed re\u017eii; ani jedna z t\u011bchto polo\u017eek se ne\u00fa\u010dtuje zvl\u00e1\u0161\u0165. \u010cas na zpracov\u00e1n\u00ed je stanoven na jeden vyhovuj\u00edc\u00ed hotov\u00fd d\u00edl a zahrnuje o\u010dek\u00e1van\u00e9 b\u011b\u017en\u00e9 v\u00fdrobn\u00ed ztr\u00e1ty. Programov\u00e1n\u00ed, p\u0159\u00edprava, v\u00fdstupn\u00ed kontrola a balen\u00ed jsou zahrnuty v samostatn\u00e9 polo\u017ece n\u00ed\u017ee, kter\u00e1 se nep\u0159ekr\u00fdv\u00e1 s hodinami se\u0159izov\u00e1n\u00ed ani zpracov\u00e1n\u00ed.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>N\u00e1kladov\u00e1 polo\u017eka<\/th><th>Kalkulace nab\u00edzen\u00e9 d\u00e1vky<\/th><th>N\u00e1klady na d\u00e1vku<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1l v\u010detn\u011b pl\u00e1novan\u00e9 rezervy na pro\u0159ez a v\u00fdrobn\u00ed ztr\u00e1ty<\/td><td>Dostatek materi\u00e1lu na 100 vyhovuj\u00edc\u00edch hotov\u00fdch d\u00edl\u016f<\/td><td>700 $<\/td><\/tr><tr><td>Se\u0159\u00edzen\u00ed<\/td><td>3 hodiny \u00d7 80 $<\/td><td>240 $<\/td><\/tr><tr><td>Zpracov\u00e1n\u00ed jednotliv\u00fdch kus\u016f<\/td><td>100 \u00d7 12 minut = 20 hodin; 20 \u00d7 80 $<\/td><td>1 600 $<\/td><\/tr><tr><td>Dokon\u010dov\u00e1n\u00ed v kooperaci<\/td><td>Cena dodavatele za tuto d\u00e1vku<\/td><td>300 $<\/td><\/tr><tr><td>Ostatn\u00ed pr\u00e1ce pro tuto zak\u00e1zku<\/td><td>Programov\u00e1n\u00ed, p\u0159\u00edprava, v\u00fdstupn\u00ed kontrola a balen\u00ed<\/td><td>160 $<\/td><\/tr><tr><td><strong>Celkov\u00e9 odhadovan\u00e9 n\u00e1klady zak\u00e1zky<\/strong><\/td><td><strong>100 vyhovuj\u00edc\u00edch d\u00edl\u016f<\/strong><\/td><td><strong>3 000 $<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Odhadovan\u00e9 n\u00e1klady \u010din\u00ed <strong>30 $ na vyhovuj\u00edc\u00ed d\u00edl<\/strong>. Z\u00e1le\u017e\u00ed na tom, jak\u00fdm mno\u017estv\u00edm celkov\u00e9 n\u00e1klady d\u011bl\u00edte: p\u0159i d\u011blen\u00ed po\u010dtem nakoupen\u00fdch polotovar\u016f by n\u00e1klady na kusy, kter\u00e9 z\u00e1kazn\u00edk skute\u010dn\u011b obdr\u017e\u00ed, vy\u0161ly ni\u017e\u0161\u00ed, ne\u017e ve skute\u010dnosti jsou.<\/p>\n\n\n<p>P\u0159edpokl\u00e1dejme, \u017ee obrobna po\u017eaduje <strong>mar\u017ei 25 % z prodejn\u00ed ceny po ode\u010dten\u00ed uveden\u00fdch n\u00e1klad\u016f<\/strong>. V\u00fdpo\u010det je n\u00e1sleduj\u00edc\u00ed:<\/p>\n\n\n<p><strong>Prodejn\u00ed cena = odhadovan\u00e9 n\u00e1klady \u00f7 (1 \u2212 c\u00edlov\u00e1 mar\u017ee)<\/strong><\/p>\n\n\n<p>U t\u00e9to zak\u00e1zky vych\u00e1z\u00ed z v\u00fdpo\u010dtu 3 000 $ \u00f7 0,75 prodejn\u00ed cena d\u00e1vky <strong>4 000 $<\/strong>, tedy <strong>40 $ za kus<\/strong>. Po ode\u010dten\u00ed odhadovan\u00fdch n\u00e1klad\u016f zak\u00e1zky zb\u00fdv\u00e1 1 000 $. Nejde o \u010dist\u00fd zisk: z t\u00e9to \u010d\u00e1stky je st\u00e1le nutn\u00e9 pokr\u00fdt n\u00e1klady na prodej, administrativu a dal\u0161\u00ed firemn\u00ed v\u00fddaje, kter\u00e9 nejsou zahrnuty v\u00fd\u0161e. Dan\u011b a samostatn\u011b \u00fa\u010dtovan\u00e1 p\u0159eprava nejsou sou\u010d\u00e1st\u00ed tohoto p\u0159\u00edkladu.<\/p>\n\n\n<p>Nezam\u011b\u0148ujte mar\u017ei s p\u0159ir\u00e1\u017ekou. P\u0159i\u010dten\u00edm 25 % k n\u00e1klad\u016fm 30 $ z\u00edsk\u00e1te cenu 37,50 $, tak\u017ee na kus zb\u00fdv\u00e1 7,50 $. To odpov\u00edd\u00e1 <strong>mar\u017ei 20 % z tr\u017eeb<\/strong>, nikoli 25 %.<\/p>\n\n\n<p>V\u00fdpo\u010dtem z\u00edsk\u00e1te cenu vych\u00e1zej\u00edc\u00ed z n\u00e1klad\u016f, kterou je t\u0159eba posoudit. Nen\u00ed to d\u016fkaz, \u017ee z\u00e1kazn\u00edk nab\u00eddku p\u0159ijme ani \u017ee zak\u00e1zka p\u0159edstavuje nejlep\u0161\u00ed vyu\u017eit\u00ed va\u0161\u00ed v\u00fdroby. Porovnejte nab\u00eddku s pot\u0159ebami z\u00e1kazn\u00edka, konkuren\u010dn\u00edmi mo\u017enostmi a kapacitou, kterou by zak\u00e1zka zabrala. Pokud cena nevyhovuje, znovu posu\u010fte specifikaci, mno\u017estv\u00ed, v\u00fdrobn\u00ed postup nebo zp\u016fsob dod\u00e1n\u00ed. Ne\u0159e\u0161te to t\u00edm, \u017ee z kalkulace bez vysv\u011btlen\u00ed vy\u0159ad\u00edte nezbytn\u00e9 n\u00e1klady.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159ed schv\u00e1len\u00edm ceny ov\u011b\u0159te pl\u00e1n dod\u00e1n\u00ed<\/h2>\n\n\n<p>P\u0159\u00edklad p\u0159edpokl\u00e1d\u00e1 v\u00fdrobu v jedn\u00e9 nep\u0159eru\u0161en\u00e9 d\u00e1vce. Nyn\u00ed si p\u0159edstavte, \u017ee z\u00e1kazn\u00edk po\u017eaduje urychlen\u00e9 dod\u00e1n\u00ed prvn\u00ed \u010d\u00e1sti a zbytek a\u017e pozd\u011bji, p\u0159i\u010dem\u017e stroj mezi t\u011bmito d\u00e1vkami nem\u016f\u017ee z\u016fstat se\u0159\u00edzen\u00fd pro tuto zak\u00e1zku.<\/p>\n\n\n<p>Pokud kv\u016fli tomu bude nutn\u00e9 dal\u0161\u00ed t\u0159\u00edhodinov\u00e9 se\u0159\u00edzen\u00ed, odhadovan\u00e9 n\u00e1klady zak\u00e1zky vzrostou o 240 $ na <strong>3 240 $<\/strong>. P\u0159i stejn\u00e9 mar\u017ei 25 % pak cena d\u00e1vky dos\u00e1hne <strong>4 320 $<\/strong>, a to je\u0161t\u011b bez p\u0159\u00edpadn\u00fdch dodate\u010dn\u00fdch n\u00e1klad\u016f na dopravu, manipulaci \u010di poplatk\u016f dodavatel\u016f. Rozd\u011blen\u00e9 dod\u00e1n\u00ed m\u016f\u017ee st\u00e1le p\u0159in\u00e9st v\u00fdhodnou zak\u00e1zku, jde v\u0161ak o jinou nab\u00eddku, ne\u017e pro kterou vznikla p\u016fvodn\u00ed kalkulace.<\/p>\n\n\n<p>Tot\u00e9\u017e plat\u00ed pro term\u00edn. Dvacet hodin zpracov\u00e1n\u00ed neznamen\u00e1, \u017ee zak\u00e1zka bude hotov\u00e1 za dvacet hodin od zah\u00e1jen\u00ed. Pot\u0159ebn\u00fd stroj m\u016f\u017ee b\u00fdt obsazen\u00fd, materi\u00e1l m\u016f\u017ee dorazit pozd\u011bji a dokon\u010dovac\u00ed operace s kontrolou n\u00e1sleduj\u00ed a\u017e po obr\u00e1b\u011bn\u00ed, nikoli soub\u011b\u017en\u011b s n\u00edm.<\/p>\n\n\n<p>Pr\u00e1v\u011b zde d\u00e1v\u00e1 SkyPlanner kalkulantovi a pl\u00e1nova\u010di spolehliv\u011bj\u0161\u00ed spole\u010dn\u00fd podklad pro rozhodov\u00e1n\u00ed. Zadejte navrhovanou zak\u00e1zku v\u010detn\u011b mno\u017estv\u00ed, v\u00fdrobn\u00edho postupu, \u010das\u016f se\u0159\u00edzen\u00ed a d\u00e9lek operac\u00ed a zahr\u0148te ji do <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">rozvrhov\u00e1n\u00ed v\u00fdroby<\/a> je\u0161t\u011b p\u0159ed jej\u00edm potvrzen\u00edm. M\u016f\u017eete ji tak vyhodnotit d\u0159\u00edve, ne\u017e z obchodn\u00ed p\u0159\u00edle\u017eitosti ud\u011bl\u00e1te z\u00e1vaznou zak\u00e1zku.<\/p>\n\n\n<p>Arcturus, um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed v\u00fdroby ve SkyPlanner, vypo\u010d\u00edt\u00e1 rozvrh podle nastaven\u00fdch zdroj\u016f, sm\u011bn, n\u00e1vaznost\u00ed a priorit. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, ovliv\u0148uje v\u00fdpo\u010det i jeho dostupnost. Gantt\u016fv diagram zobraz\u00ed v\u00fdsledn\u00e9 po\u0159ad\u00ed vedle zak\u00e1zek, kter\u00e9 jste ji\u017e p\u0159isl\u00edbili.<\/p>\n\n\n<p>M\u00e9n\u011b \u010dasu str\u00e1v\u00edte domlouv\u00e1n\u00edm po\u0159ad\u00ed u jednotliv\u00fdch stroj\u016f a v\u00edce v\u00fdb\u011brem realizovateln\u00e9 nab\u00eddky. Pokud je pro d\u0159\u00edv\u011bj\u0161\u00ed dokon\u010den\u00ed navrhovan\u00e9 zak\u00e1zky nutn\u00e9 d\u00e1t j\u00ed p\u0159ednost, p\u0159epo\u010d\u00edtejte rozvrh a zkontrolujte, kter\u00e9 dal\u0161\u00ed zak\u00e1zky se posunou. Priority ur\u010dujete vy a sv\u00e1 rozhodnut\u00ed v rozvrhu chr\u00e1n\u00edte z\u00e1mky; samotn\u00fd v\u00fdpo\u010det rozvrhu zaji\u0161\u0165uje Arcturus.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/capable-to-promise\/\">Pokud po\u017eadovan\u00fd term\u00edn nelze splnit<\/a>, nab\u00eddn\u011bte obchodn\u00edmu odd\u011blen\u00ed pou\u017eitelnou alternativu:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Pozd\u011bj\u0161\u00ed dod\u00e1n\u00ed cel\u00e9 zak\u00e1zky, kter\u00e9 neohroz\u00ed st\u00e1vaj\u00edc\u00ed z\u00e1vazky.<\/li><li>D\u0159\u00edv\u011bj\u0161\u00ed dod\u00e1n\u00ed men\u0161\u00ed \u010d\u00e1sti, v jeho\u017e cen\u011b bude podle pot\u0159eby zahrnuto opakovan\u00e9 se\u0159\u00edzen\u00ed a manipulace.<\/li><li>Zm\u011bnu v\u00fdrobn\u00edho postupu nebo schv\u00e1len\u00e9 nav\u00fd\u0161en\u00ed kapacity s ov\u011b\u0159en\u00fdmi n\u00e1klady a \u010dasov\u00fdm dopadem.<\/li><li>V\u011bdom\u00e9 up\u0159ednostn\u011bn\u00ed zak\u00e1zky jako v\u00fdjimku, schv\u00e1lenou se znalost\u00ed dopad\u016f na ostatn\u00ed zak\u00e1zky.<\/li><\/ul>\n\n\n<p>Rozli\u0161ujte dokon\u010den\u00ed v\u00fdroby, expedici a p\u0159evzet\u00ed z\u00e1kazn\u00edkem. P\u0159i slibov\u00e1n\u00ed term\u00ednu po\u010d\u00edtejte s kontrolou, balen\u00edm, extern\u00edmi slu\u017ebami a dopravou, a\u0165 u\u017e jako s rozvr\u017een\u00fdmi \u010dinnostmi, nebo jako s v\u00fdslovn\u011b uveden\u00fdm \u010dasem nav\u00edc.<\/p>\n\n\n<p>SkyPlanner zviditeln\u00ed dopady na v\u00fdrobu; cenu a mar\u017ei schvaluje v\u00e1\u0161 t\u00fdm. Tato kombinace v\u00e1m pom\u00e1h\u00e1 vyhnout se situaci, kdy z\u00edsk\u00e1te zd\u00e1nliv\u011b atraktivn\u00ed zak\u00e1zku, ale do jej\u00ed ceny nezahrnete naru\u0161en\u00ed ostatn\u00ed v\u00fdroby, kter\u00e9 zp\u016fsob\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uve\u010fte v nab\u00eddce z\u00e1kazn\u00edkovi rozsah, p\u0159edpoklady a podm\u00ednky<\/h2>\n\n\n<p>Dob\u0159e zpracovan\u00e1 cenov\u00e1 nab\u00eddka v\u00fdroby nemus\u00ed odhalovat va\u0161e intern\u00ed hodinov\u00e9 sazby. Mus\u00ed ale jasn\u011b \u0159\u00edkat, co si z\u00e1kazn\u00edk m\u016f\u017ee objednat a jak\u00e9 zm\u011bny by vy\u017eadovaly \u00fapravu nab\u00eddky.<\/p>\n\n\n<p>Uve\u010fte identifikaci z\u00e1kazn\u00edka, \u010d\u00edslo a revizi nab\u00eddky, v\u00fdrobek a revizi v\u00fdkresu, mno\u017estv\u00ed, jednotkov\u00e9 i celkov\u00e9 ceny a p\u0159\u00edpadn\u00e9 samostatn\u011b \u00fa\u010dtovan\u00e9 jednor\u00e1zov\u00e9 polo\u017eky. Dopl\u0148te m\u011bnu a up\u0159esn\u011bte, jak jsou v nab\u00eddce \u0159e\u0161eny dan\u011b, p\u0159epravn\u00e9 a balen\u00ed.<\/p>\n\n\n<p>Pot\u00e9 p\u0159esn\u011b vymezte, k \u010demu se zavazujete. Znamen\u00e1 uveden\u00fd term\u00edn p\u0159ipravenost k vyzvednut\u00ed, expedici, nebo doru\u010den\u00ed? Pokud pr\u016fb\u011b\u017en\u00e1 doba v\u00fdroby za\u010d\u00edn\u00e1 b\u011b\u017eet a\u017e po schv\u00e1len\u00ed v\u00fdkresu, p\u0159ijet\u00ed materi\u00e1lu od z\u00e1kazn\u00edka nebo spln\u011bn\u00ed jin\u00e9 podm\u00ednky, tuto ud\u00e1lost v\u00fdslovn\u011b uve\u010fte. Dopl\u0148te platnost nab\u00eddky, platebn\u00ed podm\u00ednky, co nab\u00eddka zahrnuje a nezahrnuje a jak budete posuzovat zm\u011bny mno\u017estv\u00ed \u010di specifikace.<\/p>\n\n\n<p>U modelov\u00e9 zak\u00e1zky na 100 kus\u016f je d\u016fle\u017eit\u00fdm p\u0159edpokladem v\u00fdroba v jedn\u00e9 d\u00e1vce podle dohodnut\u00e9 revize. Pokud z\u00e1kazn\u00edk pozd\u011bji po\u017e\u00e1d\u00e1 o dv\u011b d\u00edl\u010d\u00ed dod\u00e1vky nebo dodate\u010dnou kontrolu, m\u00e1 kalkulant jasn\u00fd d\u016fvod znovu posoudit cenu i term\u00edn. Bez takov\u00e9ho z\u00e1znamu se z intern\u00edho p\u0159edpokladu m\u016f\u017ee po p\u0159ijet\u00ed objedn\u00e1vky st\u00e1t n\u00e1kladn\u00fd spor.<\/p>\n\n\n<p>Pro technick\u00e9, n\u00e1kupn\u00ed, v\u00fdrobn\u00ed i obchodn\u00ed v\u00fdjimky ur\u010dete konkr\u00e9tn\u00edho schvalovatele. Ne ka\u017ed\u00e1 opakovan\u00e1 nab\u00eddka vy\u017eaduje velkou poradu, ale nezn\u00e1m\u00fd materi\u00e1l, nepodlo\u017een\u00fd term\u00edn nebo cena pod c\u00edlovou \u00farovn\u00ed by nem\u011bly proj\u00edt bez pov\u0161imnut\u00ed rutinn\u00edm kliknut\u00edm na schv\u00e1len\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159i p\u0159echodu z nab\u00eddky na zak\u00e1zku zachovejte p\u016fvodn\u00ed kalkulaci<\/h2>\n\n\n<p>P\u0159ijet\u00edm nab\u00eddky se maj\u00ed do v\u00fdroby p\u0159en\u00e9st dohodnut\u00e9 po\u017eadavky, nikoli za\u010d\u00edt nov\u00fd v\u00fdklad popt\u00e1vky. Uchov\u00e1vejte pohromad\u011b p\u0159ijatou nab\u00eddku, specifikaci, p\u0159edpoklady v\u00fdrobn\u00edho postupu a p\u016fvodn\u00ed kalkulaci. Ov\u011b\u0159te, \u017ee jim objedn\u00e1vka odpov\u00edd\u00e1, v\u010detn\u011b mno\u017estv\u00ed v d\u00edl\u010d\u00edch dod\u00e1vk\u00e1ch a polo\u017eek dod\u00e1van\u00fdch z\u00e1kazn\u00edkem.<\/p>\n\n\n<p>Pokud z\u00e1kazn\u00edk nab\u00eddku p\u0159ijme a\u017e pot\u00e9, co se zm\u011bnilo vyt\u00ed\u017een\u00ed v\u00fdroby nebo dostupnost materi\u00e1lu, znovu zkontrolujte rozvrh. Voln\u00e1 kapacita, kterou jste vid\u011bli p\u0159i p\u0159\u00edprav\u011b nab\u00eddky, u\u017e nemus\u00ed umo\u017enit stejn\u00fd term\u00edn. U nepotvrzen\u00fdch zak\u00e1zek za\u0159azen\u00fdch do rozvrhu ur\u010dete odpov\u011bdnou osobu a term\u00edn prov\u011b\u0159en\u00ed, aby neaktu\u00e1ln\u00ed obchodn\u00ed p\u0159\u00edle\u017eitosti nezkreslovaly pl\u00e1n v\u00fdroby.<\/p>\n\n\n<p>SkyPlanner umo\u017e\u0148uje p\u0159ev\u00e9st nepotvrzenou zak\u00e1zku na z\u00e1vaznou. Prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API se tak\u00e9 <a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">propoj\u00ed s libovoln\u00fdm syst\u00e9mem ERP nebo MES<\/a>, tak\u017ee rozvrhov\u00e1n\u00ed v\u00fdroby m\u016f\u017ee spolupracovat se syst\u00e9my, kter\u00e9 ji\u017e pou\u017e\u00edv\u00e1te pro spr\u00e1vu zak\u00e1zek a kalkulace n\u00e1klad\u016f. P\u0159\u00ednosem je n\u00e1vaznost: pr\u00e1ce posouzen\u00e1 p\u0159i p\u0159\u00edprav\u011b nab\u00eddky se m\u016f\u017ee st\u00e1t z\u00e1kladem v\u00fdrobn\u00edho pl\u00e1nu, m\u00edsto aby vznikala nov\u00e1 sada vz\u00e1jemn\u011b neprov\u00e1zan\u00fdch odhad\u016f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eijte dokon\u010den\u00e9 zak\u00e1zky ke zp\u0159esn\u011bn\u00ed dal\u0161\u00edch nab\u00eddek<\/h2>\n\n\n<p>Po dokon\u010den\u00ed v\u00fdroby <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/zakazkova-kalkulace\/\">porovnejte p\u016fvodn\u011b kalkulovan\u00e9 hodnoty se skute\u010dnost\u00ed<\/a>. Za\u010dn\u011bte u operace nebo p\u0159edpokladu o materi\u00e1lu, kter\u00fd se od skute\u010dnosti li\u0161il, ne pouze u v\u00fdsledn\u00e9 mar\u017ee.<\/p>\n\n\n<p>P\u0159ehled Job Report v syst\u00e9mu SkyPlanner zobrazuje \u010das zaznamenan\u00fd u ka\u017ed\u00e9 operace, pracovn\u00edka a pracovi\u0161t\u011b. Pom\u00e1h\u00e1 tak porovnat pl\u00e1novanou a skute\u010dnou d\u00e9lku jednotliv\u00fdch krok\u016f v\u00fdrobn\u00edho postupu. P\u0159ehled Order Item Report nab\u00edz\u00ed pohled na jednotliv\u00e9 \u0159\u00e1dky zak\u00e1zky. Tyto z\u00e1znamy d\u00e1vaj\u00ed kalkulantovi lep\u0161\u00ed v\u00fdchoz\u00ed podklady ne\u017e dotazov\u00e1n\u00ed koleg\u016f, co si po n\u011bkolika m\u011bs\u00edc\u00edch pamatuj\u00ed z podobn\u00e9 zak\u00e1zky.<\/p>\n\n\n<p>Rozli\u0161ujte chybn\u00fd odhad, zm\u011bnu rozsahu a naru\u0161en\u00ed v\u00fdroby, kter\u00e9mu bylo mo\u017en\u00e9 p\u0159edej\u00edt. Opomenut\u00e9 odjehlov\u00e1n\u00ed pat\u0159\u00ed do p\u0159\u00ed\u0161t\u00edho v\u00fdrobn\u00edho postupu. Kontrola dopln\u011bn\u00e1 z\u00e1kazn\u00edkem mus\u00ed proj\u00edt \u0159\u00edzen\u00edm zm\u011bn. Opakovan\u00e9 se\u0159\u00edzen\u00ed zp\u016fsoben\u00e9 p\u0159eru\u0161en\u00edm v\u00fdroby m\u016f\u017ee vy\u017eadovat lep\u0161\u00ed po\u0159ad\u00ed operac\u00ed, nikoli trval\u00e9 nav\u00fd\u0161en\u00ed normovan\u00e9ho \u010dasu.<\/p>\n\n\n<p>Stejn\u011b d\u016fsledn\u011b vyhodnocujte i \u00fasp\u011b\u0161nost tvorby nab\u00eddek. Z\u00e1le\u017e\u00ed na rychlosti odpov\u011bdi, ale tak\u00e9 na tom, jak\u00fd pod\u00edl vhodn\u00fdch nab\u00eddek se prom\u011bn\u00ed v zak\u00e1zky, pro\u010d se nab\u00eddky upravuj\u00ed a jak se odhadovan\u00e9 n\u00e1klady li\u0161\u00ed od skute\u010dn\u00fdch. Rychlej\u0161\u00ed odpov\u011b\u010f m\u00e1 hodnotu tehdy, kdy\u017e v\u00e1m pom\u00e1h\u00e1 z\u00edskat zak\u00e1zky, kter\u00e9 se vyplat\u00ed realizovat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prov\u011b\u0159te se SkyPlanner jednu skute\u010dnou popt\u00e1vku<\/h2>\n\n\n<p>Vyberte nab\u00eddku, u kter\u00e9 je obt\u00ed\u017en\u00e9 dohodnout cenu a term\u00edn dod\u00e1n\u00ed: nap\u0159\u00edklad kv\u016fli sd\u00edlen\u00e9mu \u00fazk\u00e9mu m\u00edstu, mo\u017en\u00e9mu rozd\u011blen\u00ed dod\u00e1vky nebo po\u017eadavku z\u00e1kazn\u00edka na d\u0159\u00edv\u011bj\u0161\u00ed term\u00edn.<\/p>\n\n\n<p>P\u0159ipravte si revizi v\u00fdkresu, mno\u017estv\u00ed, v\u00fdrobn\u00ed postup a p\u0159edpoklady pro se\u0159\u00edzen\u00ed i zpracov\u00e1n\u00ed spolu s potvrzen\u00fdmi zak\u00e1zkami, kter\u00e9 pot\u0159ebuj\u00ed stejn\u00e9 zdroje. <strong><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku SkyPlanner<\/a><\/strong> a prozkoumejte, jak lze navrhovanou zak\u00e1zku za\u0159adit do v\u00fdroby, co se zm\u011bn\u00ed p\u0159i \u00faprav\u011b nab\u00eddky a jak by skute\u010dn\u00e1 v\u00fdrobn\u00ed data mohla zp\u0159esnit va\u0161i p\u0159\u00ed\u0161t\u00ed kalkulaci. Z\u00edsk\u00e1te konkr\u00e9tn\u00ed podklad pro rozhodnut\u00ed, jak by SkyPlanner mohl omezit ru\u010dn\u00ed pl\u00e1nov\u00e1n\u00ed p\u0159i p\u0159\u00edprav\u011b va\u0161ich nab\u00eddek.<\/p>\n\n\n<p>Pokud se chcete nejprve sezn\u00e1mit s prost\u0159ed\u00edm, <strong><a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a><\/strong>. C\u00edl je stejn\u00fd: stanovit cenu jasn\u011b vymezen\u00e9 zak\u00e1zky a zav\u00e1zat se k v\u00fdrob\u011b, kterou v\u00e1\u0161 provoz dok\u00e1\u017ee zajistit.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat Domov &raquo; Zdroje &raquo; Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat P\u0159i nab\u00edzen\u00e9 jednotkov\u00e9 cen\u011b m\u016f\u017ee zak\u00e1zka vypadat ziskov\u011b, a p\u0159esto nemus\u00ed b\u00fdt spr\u00e1vn\u00e9 ji p\u0159ijmout. Kalkulace m\u016f\u017ee po\u010d\u00edtat s jedn\u00edm se\u0159\u00edzen\u00edm, zat\u00edmco z\u00e1kazn\u00edk po\u017eaduje dv\u011b d\u00edl\u010d\u00ed dod\u00e1vky. M\u016f\u017ee v n\u00ed chyb\u011bt &#8230; <a title=\"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/\" aria-label=\"Read more about Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":109414,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-109387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te, co zvl\u00e1dnete dodat<\/title>\n<meta name=\"description\" content=\"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat\" \/>\n<meta property=\"og:description\" content=\"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T02:10:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T02:10:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"998\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat\",\"datePublished\":\"2026-10-25T02:10:34+00:00\",\"dateModified\":\"2026-10-25T02:10:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/\"},\"wordCount\":3374,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/\",\"name\":\"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te, co zvl\u00e1dnete dodat\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"datePublished\":\"2026-10-25T02:10:34+00:00\",\"dateModified\":\"2026-10-25T02:10:46+00:00\",\"description\":\"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"width\":1774,\"height\":998,\"caption\":\"A blank quotation connects material and cost inputs to a batch of finished machined parts\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/tvorba-cenovych-nabidek-ve-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te, co zvl\u00e1dnete dodat","description":"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/","og_locale":"cs_CZ","og_type":"article","og_title":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat","og_description":"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T02:10:34+00:00","article_modified_time":"2026-10-25T02:10:46+00:00","og_image":[{"width":1774,"height":998,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"17 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat","datePublished":"2026-10-25T02:10:34+00:00","dateModified":"2026-10-25T02:10:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/"},"wordCount":3374,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/","name":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te, co zvl\u00e1dnete dodat","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","datePublished":"2026-10-25T02:10:34+00:00","dateModified":"2026-10-25T02:10:46+00:00","description":"Op\u0159ete nab\u00eddku o re\u00e1ln\u00e9 n\u00e1klady, jasnou mar\u017ei a pl\u00e1n dod\u00e1n\u00ed. Prom\u011b\u0148te popt\u00e1vku v zak\u00e1zku, kterou va\u0161e v\u00fdroba dok\u00e1\u017ee p\u0159ijmout a dodat se ziskem.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","width":1774,"height":998,"caption":"A blank quotation connects material and cost inputs to a batch of finished machined parts"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/tvorba-cenovych-nabidek-ve-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png",1774,998,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png",1774,998,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat Domov &raquo; Zdroje &raquo; Tvorba cenov\u00fdch nab\u00eddek ve v\u00fdrob\u011b: Nace\u0148te zak\u00e1zku, kterou zvl\u00e1dnete dodat P\u0159i nab\u00edzen\u00e9 jednotkov\u00e9 cen\u011b m\u016f\u017ee zak\u00e1zka vypadat ziskov\u011b, a p\u0159esto nemus\u00ed b\u00fdt spr\u00e1vn\u00e9 ji p\u0159ijmout. Kalkulace m\u016f\u017ee po\u010d\u00edtat s jedn\u00edm se\u0159\u00edzen\u00edm, zat\u00edmco z\u00e1kazn\u00edk po\u017eaduje dv\u011b d\u00edl\u010d\u00ed dod\u00e1vky. M\u016f\u017ee v n\u00ed chyb\u011bt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/109387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=109387"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/109387\/revisions"}],"predecessor-version":[{"id":109451,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/109387\/revisions\/109451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/109414"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=109387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=109387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=109387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}