{"id":105880,"date":"2026-10-23T17:38:10","date_gmt":"2026-10-23T17:38:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105880"},"modified":"2026-10-23T17:38:23","modified_gmt":"2026-10-23T17:38:23","slug":"obratkovost-zasob","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/","title":{"rendered":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Hodnota va\u0161ich z\u00e1sob vzrostla, ale ve v\u00fdrob\u011b st\u00e1le chyb\u011bj\u00ed pot\u0159ebn\u00e9 d\u00edly. \u010c\u00e1st materi\u00e1lu le\u017e\u00ed bez vyu\u017eit\u00ed, rozpracovan\u00e9 zak\u00e1zky \u010dekaj\u00ed mezi stroji a hotov\u00e9 v\u00fdrobky zab\u00edraj\u00ed m\u00edsto, zat\u00edmco z\u00e1kazn\u00edci sh\u00e1n\u011bj\u00ed jin\u00e9 polo\u017eky. Plo\u0161n\u00e9 sn\u00ed\u017een\u00ed v\u0161ech z\u00e1sob by sice sn\u00ed\u017eilo jejich hodnotu, ale v\u00fdrobu by nutn\u011b nezlep\u0161ilo.<\/p>\n\n\n<p><strong>Obr\u00e1tkovost z\u00e1sob ud\u00e1v\u00e1, kolikr\u00e1t podnik za ur\u010dit\u00e9 obdob\u00ed prod\u00e1 a dopln\u00ed objem odpov\u00eddaj\u00edc\u00ed pr\u016fm\u011brn\u00e9 z\u00e1sob\u011b. Vypo\u010d\u00edt\u00e1te ji jako pod\u00edl n\u00e1klad\u016f na prodan\u00e9 v\u00fdrobky a pr\u016fm\u011brn\u00e9 hodnoty z\u00e1sob.<\/strong> Ve v\u00fdrobn\u00edm podniku tyto z\u00e1soby zahrnuj\u00ed materi\u00e1l, nedokon\u010denou v\u00fdrobu a hotov\u00e9 v\u00fdrobky.<\/p>\n\n\n<p>Po v\u00fdpo\u010dtu p\u0159ich\u00e1z\u00ed podstatn\u00e1 ot\u00e1zka: kter\u00e1 \u010d\u00e1st z\u00e1sob je zbyte\u010dn\u00e1 a pro\u010d se hromad\u00ed? Pokud z\u00e1soby rostou kv\u016fli p\u0159ed\u010dasn\u00e9mu zahajov\u00e1n\u00ed zak\u00e1zek a nekoordinovan\u00fdm front\u00e1m u stroj\u016f, SkyPlanner APS v\u00e1m pom\u016f\u017ee sladit materi\u00e1l, kapacity a priority zak\u00e1zek v jednom v\u00fdrobn\u00edm pl\u00e1nu. M\u00edsto ka\u017edodenn\u00edho sla\u010fov\u00e1n\u00ed odd\u011blen\u00fdch front tak m\u016f\u017eete sn\u00ed\u017eit mno\u017estv\u00ed zbyte\u010dn\u011b rozpracovan\u00e9 v\u00fdroby, kter\u00e1 \u010dek\u00e1 na dal\u0161\u00ed zpracov\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak vypo\u010d\u00edtat obr\u00e1tkovost z\u00e1sob<\/h2>\n\n\n<p>U obou vstup\u016f pou\u017eijte stejn\u00e9 obdob\u00ed a jednotn\u00e9 ocen\u011bn\u00ed v n\u00e1kladech:<\/p>\n\n\n<p><strong>Obr\u00e1tkovost z\u00e1sob = n\u00e1klady na prodan\u00e9 v\u00fdrobky \u00f7 pr\u016fm\u011brn\u00e1 hodnota z\u00e1sob<\/strong><\/p>\n\n\n<p>V\u00fdsledek se vyjad\u0159uje po\u010dtem obr\u00e1tek za dan\u00e9 obdob\u00ed, nikoli procentem. Pokud ro\u010dn\u00ed n\u00e1klady na prodan\u00e9 v\u00fdrobky vyd\u011bl\u00edte pr\u016fm\u011brnou hodnotou z\u00e1sob za tent\u00fd\u017e rok, z\u00edsk\u00e1te po\u010det obr\u00e1tek za rok.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pou\u017eijte n\u00e1klady na prodan\u00e9 v\u00fdrobky, nikoli tr\u017eby<\/h3>\n\n\n<p>N\u00e1klady na prodan\u00e9 v\u00fdrobky neboli COGS p\u0159edstavuj\u00ed n\u00e1klady p\u0159i\u0159azen\u00e9 v\u00fdrobk\u016fm prodan\u00fdm v dan\u00e9m obdob\u00ed. Ve v\u00fdrob\u011b zahrnuj\u00ed materi\u00e1l, p\u0159\u00edm\u00e9 mzdy a p\u0159id\u011blenou v\u00fdrobn\u00ed re\u017eii, kter\u00e9 jsou v t\u011bchto v\u00fdrobc\u00edch obsa\u017eeny. \u00dadaj p\u0159evezm\u011bte z dohodnut\u00fdch \u00fa\u010detn\u00edch podklad\u016f.<\/p>\n\n\n<p>Tr\u017eby zahrnuj\u00ed i prodejn\u00ed mar\u017ei, tak\u017ee jejich vyd\u011blen\u00edm z\u00e1sobami ocen\u011bn\u00fdmi v n\u00e1kladech z\u00edsk\u00e1te jin\u00fd ukazatel. N\u00e1hradou nejsou ani n\u00e1kupy: \u010d\u00e1st nakoupen\u00e9ho materi\u00e1lu m\u016f\u017ee st\u00e1le le\u017eet ve skladu. Stejn\u011b tak nelze zam\u011b\u0148ovat n\u00e1klady na vyroben\u00e9 v\u00fdrobky s COGS, proto\u017ee dokon\u010den\u00e9 v\u00fdrobky mohou z\u016fstat neprodan\u00e9 v z\u00e1sob\u00e1ch hotov\u00fdch v\u00fdrobk\u016f.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vypo\u010d\u00edtejte reprezentativn\u00ed pr\u016fm\u011br<\/h3>\n\n\n<p>Jednoduch\u00fdm v\u00fdchoz\u00edm v\u00fdpo\u010dtem je:<\/p>\n\n\n<p><strong>Pr\u016fm\u011brn\u00e1 hodnota z\u00e1sob = (po\u010d\u00e1te\u010dn\u00ed stav z\u00e1sob + kone\u010dn\u00fd stav z\u00e1sob) \u00f7 2<\/strong><\/p>\n\n\n<p>U sez\u00f3nn\u00ed v\u00fdroby nebo podniku, kter\u00fd p\u0159ij\u00edm\u00e1 velk\u00e9 dod\u00e1vky, nemus\u00ed dva okam\u017eikov\u00e9 stavy vystihnout v\u011bt\u0161inu roku. M\u00edsto toho vypo\u010d\u00edtejte pr\u016fm\u011br z pravideln\u00fdch stav\u016f na konci m\u011bs\u00edce. Pokud z\u00e1soby v\u00fdrazn\u011b kol\u00edsaj\u00ed, pou\u017eijte \u010dast\u011bj\u0161\u00ed m\u011b\u0159en\u00ed. P\u0159i porovn\u00e1v\u00e1n\u00ed obdob\u00ed zachovejte stejnou metodu zji\u0161\u0165ov\u00e1n\u00ed stav\u016f.<\/p>\n\n\n<p>Zahr\u0148te hodnotu z\u00e1sob ve v\u0161ech t\u0159ech f\u00e1z\u00edch v\u00fdroby a ka\u017edou polo\u017eku zapo\u010d\u00edtejte pouze jednou, podle jej\u00ed aktu\u00e1ln\u00ed f\u00e1ze. <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/nedokoncena-vyroba\/\">Nedokon\u010den\u00e1 v\u00fdroba zahrnuje dosud vynalo\u017een\u00e9 n\u00e1klady<\/a>, nikoli automaticky pln\u00e9 n\u00e1klady na hotov\u00fd v\u00fdrobek. Stavy odsouhlaste s finan\u010dn\u00edm odd\u011blen\u00edm, aby zm\u011bny ocen\u011bn\u00ed, chyb\u011bj\u00edc\u00ed p\u0159\u00edjemky nebo nezaevidovan\u00e1 dokon\u010den\u00ed v\u00fdroby nevypadaly jako zm\u011bny skute\u010dn\u00e9ho toku materi\u00e1lu a v\u00fdrobk\u016f.<\/p>\n\n\n<h3 class=\"wp-block-heading\">V\u017edy uv\u00e1d\u011bjte sledovan\u00e9 obdob\u00ed<\/h3>\n\n\n<p>Ro\u010dn\u00ed COGS porovn\u00e1vejte s pr\u016fm\u011brnou hodnotou z\u00e1sob za tent\u00fd\u017e rok, \u010dtvrtletn\u00ed COGS s pr\u016fm\u011brem za p\u0159\u00edslu\u0161n\u00e9 \u010dtvrtlet\u00ed. \u010ctvrtletn\u00ed ukazatel vyjad\u0159uje po\u010det obr\u00e1tek za dan\u00e9 \u010dtvrtlet\u00ed, nikoli za rok. Vyn\u00e1soben\u00ed v\u00fdsledku ze sez\u00f3nn\u00edho \u010dtvrtlet\u00ed \u010dty\u0159mi m\u016f\u017ee d\u00e1t zav\u00e1d\u011bj\u00edc\u00ed ro\u010dn\u00ed obraz.<\/p>\n\n\n<p>Skladov\u00e9 pohyby jsou zase n\u011bco jin\u00e9ho. P\u0159esun palety ze skladu na obr\u00e1b\u011bn\u00ed a pot\u00e9 na dokon\u010dovac\u00ed operace vytv\u00e1\u0159\u00ed skladov\u00e9 pohyby. Neznamen\u00e1 to ale, \u017ee podnik tyto z\u00e1soby t\u0159ikr\u00e1t prodal a doplnil.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159\u00edklad v\u00fdpo\u010dtu ve v\u00fdrobn\u00edm podniku<\/h2>\n\n\n<p>P\u0159edstavte si v\u00fdrobn\u00ed podnik s ro\u010dn\u00edmi COGS ve v\u00fd\u0161i <strong>3 600 000 $<\/strong>. Z pravideln\u011b zji\u0161\u0165ovan\u00fdch stav\u016f z\u00e1sob vych\u00e1zej\u00ed pro tent\u00fd\u017e rok tyto pr\u016fm\u011brn\u00e9 hodnoty:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Druh z\u00e1sob<\/th><th>Pr\u016fm\u011brn\u00e1 hodnota<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1l a nakupovan\u00e9 d\u00edly<\/td><td>300 000 $<\/td><\/tr><tr><td>Nedokon\u010den\u00e1 v\u00fdroba<\/td><td>420 000 $<\/td><\/tr><tr><td>Hotov\u00e9 v\u00fdrobky<\/td><td>180 000 $<\/td><\/tr><tr><td>Z\u00e1soby celkem<\/td><td>900 000 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>V\u00fdpo\u010det je n\u00e1sleduj\u00edc\u00ed:<\/p>\n\n\n<p><strong>3 600 000 $ \u00f7 900 000 $ = 4 obr\u00e1tky z\u00e1sob za rok<\/strong><\/p>\n\n\n<p>V n\u00e1kladov\u00e9m ocen\u011bn\u00ed za dan\u00fd rok podnik prodal objem odpov\u00eddaj\u00edc\u00ed \u010dty\u0159n\u00e1sobku pr\u016fm\u011brn\u00e9 hodnoty z\u00e1sob. To neznamen\u00e1, \u017ee se ka\u017ed\u00fd d\u00edl nebo v\u00fdrobek obr\u00e1til \u010dty\u0159ikr\u00e1t. Do stejn\u00e9ho podnikov\u00e9ho pr\u016fm\u011bru m\u016f\u017ee vstupovat \u010dasto pou\u017e\u00edvan\u00fd spojovac\u00ed materi\u00e1l i zastaral\u00e1 sestava.<\/p>\n\n\n<p>Stejn\u00fd vztah lze vyj\u00e1d\u0159it ve dnech:<\/p>\n\n\n<p><strong>Doba obratu z\u00e1sob = po\u010det dn\u00ed v obdob\u00ed \u00f7 obr\u00e1tkovost z\u00e1sob<\/strong><\/p>\n\n\n<p>P\u0159i pou\u017eit\u00ed roku o 365 dnech:<\/p>\n\n\n<p><strong>365 \u00f7 4 = 91,25 dne<\/strong><\/p>\n\n\n<p>Jde o souhrnn\u00fd ukazatel zalo\u017een\u00fd na n\u00e1kladech, kter\u00fd popisuje minulost. Nen\u00ed p\u0159\u00edslibem, \u017ee ka\u017ed\u00e1 zak\u00e1zka potrv\u00e1 91,25 dne ani \u017ee dne\u0161n\u00ed dostupn\u00e9 z\u00e1soby pokryj\u00ed popt\u00e1vku na p\u0159\u00ed\u0161t\u00edch 91,25 dne. Skute\u010dn\u00e1 pr\u016fb\u011b\u017en\u00e1 doba zak\u00e1zky a pokryt\u00ed budouc\u00ed popt\u00e1vky z\u00e1sobami odpov\u00eddaj\u00ed na jin\u00e9 ot\u00e1zky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jak\u00e1 obr\u00e1tkovost z\u00e1sob je dobr\u00e1?<\/h2>\n\n\n<p>Jedna spr\u00e1vn\u00e1 hodnota pro v\u0161echny v\u00fdrobce neexistuje. Pot\u0159ebnou v\u00fd\u0161i z\u00e1sob ovliv\u0148uje skladba v\u00fdrobk\u016f, dodac\u00ed lh\u016fty dodavatel\u016f, v\u00fdrobn\u00ed postupy, sez\u00f3nnost i \u00farove\u0148 slu\u017eeb, kterou slibujete z\u00e1kazn\u00edk\u016fm. V\u00fdrobce za\u0159\u00edzen\u00ed s dlouh\u00fdm v\u00fdrobn\u00edm postupem a v\u00fdrobce standardn\u00edho zbo\u017e\u00ed s kr\u00e1tkou \u017eivotnost\u00ed by nem\u011bli m\u00edt stejn\u00fd c\u00edl.<\/p>\n\n\n<p>Za\u010dn\u011bte srovn\u00e1n\u00edm vlastn\u00edch srovnateln\u00fdch obdob\u00ed a skupin v\u00fdrobk\u016f. Pot\u00e9 dopl\u0148te kontext porovn\u00e1n\u00edm s podobn\u00fdmi podniky v oboru a ov\u011b\u0159te, zda zahrnuj\u00ed stejn\u00e9 druhy z\u00e1sob a pou\u017e\u00edvaj\u00ed stejn\u00fd v\u00fdpo\u010det. Ukazatel zalo\u017een\u00fd pouze na hotov\u00fdch v\u00fdrobc\u00edch nelze p\u0159\u00edmo srovn\u00e1vat s ukazatelem, kter\u00fd zahrnuje i materi\u00e1l a nedokon\u010denou v\u00fdrobu.<\/p>\n\n\n<p>V\u00fdvoj obr\u00e1tkovosti posuzujte spole\u010dn\u011b s v\u010dasnost\u00ed dod\u00e1vek, nedostatkem polo\u017eek, objemem v\u00fdroby a st\u00e1\u0159\u00edm z\u00e1sob:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Ni\u017e\u0161\u00ed obr\u00e1tkovost p\u0159i rostouc\u00edch z\u00e1sob\u00e1ch a nezm\u011bn\u011bn\u00e9 popt\u00e1vce:<\/strong> prov\u011b\u0159te nadm\u011brn\u00e9 n\u00e1kupy, p\u0159ed\u010dasnou v\u00fdrobu, zablokovan\u00e9 zak\u00e1zky a v\u00fdrobky, kter\u00e9 se ji\u017e neprod\u00e1vaj\u00ed.<\/li><li><strong>Vy\u0161\u0161\u00ed obr\u00e1tkovost p\u0159i stabiln\u00edch dod\u00e1vk\u00e1ch a ni\u017e\u0161\u00ed pr\u016fm\u011brn\u00e9 hodnot\u011b z\u00e1sob:<\/strong> podnik mo\u017en\u00e1 dok\u00e1\u017ee uspokojovat popt\u00e1vku s men\u0161\u00edm objemem v\u00e1zan\u00e9ho kapit\u00e1lu.<\/li><li><strong>Vy\u0161\u0161\u00ed obr\u00e1tkovost p\u0159i \u010dast\u011bj\u0161\u00edm nedostatku polo\u017eek nebo mimo\u0159\u00e1dn\u00e9 p\u0159eprav\u011b:<\/strong> z\u00e1soby mo\u017en\u00e1 klesly pod \u00farove\u0148, p\u0159i n\u00ed\u017e m\u016f\u017ee v\u00fdrobn\u00ed proces spolehliv\u011b fungovat.<\/li><li><strong>Zm\u011bna ukazatele po v\u00fdrazn\u00e9 zm\u011bn\u011b n\u00e1klad\u016f nebo ocen\u011bn\u00ed:<\/strong> ov\u011b\u0159te, jakou \u010d\u00e1st zm\u011bny zp\u016fsobily \u00fa\u010detn\u00ed hodnoty, nikoli rychlej\u0161\u00ed tok z\u00e1sob.<\/li><\/ul>\n\n\n<p>I vysok\u00e1 celkov\u00e1 obr\u00e1tkovost m\u016f\u017ee skr\u00fdvat neobr\u00e1tkov\u00e9 z\u00e1soby v jedn\u00e9 skupin\u011b v\u00fdrobk\u016f a nedostatek v jin\u00e9. C\u00edlem je spolehliv\u011b z\u00e1sobovat z\u00e1kazn\u00edky s men\u0161\u00edm mno\u017estv\u00edm zbyte\u010dn\u00fdch z\u00e1sob, nikoli dos\u00e1hnout co nejvy\u0161\u0161\u00edho ukazatele.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hledejte p\u0159\u00ed\u010dinu v materi\u00e1lu, nedokon\u010den\u00e9 v\u00fdrob\u011b nebo hotov\u00fdch v\u00fdrobc\u00edch<\/h2>\n\n\n<p>Celkov\u00fd ukazatel napov\u00ed, kde za\u010d\u00edt kl\u00e1st ot\u00e1zky. Rozd\u011blen\u00ed z\u00e1sob podle jednotliv\u00fdch f\u00e1z\u00ed pom\u016f\u017ee ur\u010dit, kdo mus\u00ed zas\u00e1hnout.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kde se z\u00e1soby hromad\u00ed<\/th><th>Co prov\u011b\u0159it<\/th><th>Vhodn\u00fd prvn\u00ed krok<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1l<\/td><td>Nakupovan\u00e1 mno\u017estv\u00ed, term\u00edny dod\u00e1vek, zm\u011bny popt\u00e1vky, nepou\u017eiteln\u00e9 z\u00e1soby nebo opodstatn\u011bnou pojistnou z\u00e1sobu<\/td><td>P\u0159ed dal\u0161\u00edm n\u00e1kupem porovnejte nadch\u00e1zej\u00edc\u00ed pot\u0159eby s pou\u017eiteln\u00fdmi z\u00e1sobami a otev\u0159en\u00fdmi n\u00e1kupn\u00edmi objedn\u00e1vkami<\/td><\/tr><tr><td>Nedokon\u010den\u00e1 v\u00fdroba<\/td><td>P\u0159ed\u010dasn\u00e9 zahajov\u00e1n\u00ed zak\u00e1zek, p\u0159et\u00ed\u017een\u00e9 navazuj\u00edc\u00ed v\u00fdrobn\u00ed zdroje, chyb\u011bj\u00edc\u00ed d\u00edly nebo pozastaven\u00ed kv\u016fli kvalit\u011b<\/td><td>Projd\u011bte zb\u00fdvaj\u00edc\u00ed v\u00fdrobn\u00ed postup dlouho \u010dekaj\u00edc\u00ed zak\u00e1zky a zjist\u011bte, co br\u00e1n\u00ed proveden\u00ed dal\u0161\u00ed operace<\/td><\/tr><tr><td>Hotov\u00e9 v\u00fdrobky<\/td><td>V\u00fdrobu v p\u0159edstihu p\u0159ed popt\u00e1vkou, zru\u0161en\u00e9 po\u017eadavky, pozastavenou expedici nebo pomalu se prod\u00e1vaj\u00edc\u00ed v\u00fdrobky<\/td><td>P\u0159i\u0159a\u010fte hotov\u00e9 z\u00e1soby ke skute\u010dn\u00e9 popt\u00e1vce a p\u0159ehodno\u0165te jejich dal\u0161\u00ed dopl\u0148ov\u00e1n\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">Materi\u00e1l: odli\u0161te pojistnou z\u00e1sobu od p\u0159ebytk\u016f<\/h3>\n\n\n<p>I m\u00e1lo pou\u017e\u00edvan\u00fd d\u00edl m\u016f\u017ee b\u00fdt nezbytnou pojistkou pro spln\u011bn\u00ed d\u016fle\u017eit\u00e9ho z\u00e1vazku v\u016f\u010di z\u00e1kazn\u00edkovi. Ne\u017e jeho z\u00e1sobu sn\u00ed\u017e\u00edte, ov\u011b\u0159te d\u016fsledky p\u0159\u00edpadn\u00e9ho nedostatku a spolehlivost dopl\u0148ov\u00e1n\u00ed. Opodstatn\u011bn\u00e1 <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/bezpecnostni-zasoba\/\">bezpe\u010dnostn\u00ed z\u00e1soba<\/a> nen\u00ed tot\u00e9\u017e jako materi\u00e1l objednan\u00fd dvakr\u00e1t kv\u016fli chyb\u011bj\u00edc\u00edmu p\u0159ehledu o o\u010dek\u00e1van\u00fdch dod\u00e1vk\u00e1ch.<\/p>\n\n\n<p>P\u0159i v\u00fdpo\u010dtu obr\u00e1tkovosti pro konkr\u00e9tn\u00ed f\u00e1zi pou\u017eijte tok odpov\u00eddaj\u00edc\u00ed t\u00e9to f\u00e1zi. V na\u0161em ilustrativn\u00edm podniku vyd\u011bl\u00edme ro\u010dn\u00ed spot\u0159ebu materi\u00e1lu ve v\u00fd\u0161i 1 800 000 $ pr\u016fm\u011brnou hodnotou z\u00e1sob materi\u00e1lu 300 000 $ a z\u00edsk\u00e1me <strong>6 obr\u00e1tek materi\u00e1lu<\/strong>. Tento ukazatel m\u011b\u0159\u00ed spot\u0159ebu materi\u00e1lu do v\u00fdroby, nikoli prodej z\u00e1sob cel\u00e9ho podniku. Nenahrazuje celkovou obr\u00e1tkovost ve v\u00fd\u0161i 4.<\/p>\n\n\n<p>Ned\u011blte celkov\u00e9 COGS stavy z\u00e1sob v jednotliv\u00fdch f\u00e1z\u00edch s t\u00edm, \u017ee v\u00fdsledky budou p\u0159\u00edmo srovnateln\u00fdmi ukazateli jejich obr\u00e1tkovosti. Rozsah n\u00e1klad\u016f zahrnut\u00fdch v materi\u00e1lu, jeho zpracov\u00e1n\u00ed a hotov\u00e9m v\u00fdrobku se li\u0161\u00ed. Pokud m\u00e1te k dispozici odpov\u00eddaj\u00edc\u00ed toky pro jednotliv\u00e9 f\u00e1ze, pou\u017eijte je. Pro odhalen\u00ed provozn\u00edho probl\u00e9mu sledujte tak\u00e9 st\u00e1\u0159\u00ed z\u00e1sob a d\u016fvody \u010dek\u00e1n\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nedokon\u010den\u00e1 v\u00fdroba: zjist\u011bte, na co \u010dek\u00e1 dal\u0161\u00ed operace<\/h3>\n\n\n<p>Nedokon\u010den\u00e1 v\u00fdroba m\u00e1 v p\u0159\u00edkladu nejvy\u0161\u0161\u00ed pr\u016fm\u011brnou hodnotu z\u00e1sob, a proto si zaslou\u017e\u00ed pozornost. \u0158e\u0161en\u00edm ale nen\u00ed zastavit ve\u0161kerou novou pr\u00e1ci. Najd\u011bte zak\u00e1zky, kter\u00e9 \u010dekaj\u00ed nejd\u00e9le nebo v nich\u017e jsou u\u017e v\u00e1z\u00e1ny zna\u010dn\u00e9 n\u00e1klady, a ov\u011b\u0159te zb\u00fdvaj\u00edc\u00ed operace, pot\u0159ebu materi\u00e1lu a sl\u00edben\u00e9 term\u00edny dod\u00e1n\u00ed.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee obr\u00e1b\u011bn\u00ed dokon\u010d\u00ed d\u00e1vku v pond\u011bl\u00ed, ale pracovi\u0161t\u011b povrchov\u00e9 \u00fapravy ji m\u016f\u017ee p\u0159evz\u00edt a\u017e v p\u00e1tek. Jin\u00e1 zak\u00e1zka pot\u0159ebuje nakupovan\u00fd d\u00edl, kter\u00fd m\u00e1 dorazit a\u017e p\u0159\u00ed\u0161t\u00ed t\u00fdden. P\u0159ed\u010dasn\u00fdm zah\u00e1jen\u00edm obou zak\u00e1zek sice vyt\u00ed\u017e\u00edte prvn\u00ed stroj, ale z\u00e1rove\u0148 vytvo\u0159\u00edte nedokon\u010denou v\u00fdrobu, kter\u00e1 nem\u016f\u017ee pokra\u010dovat.<\/p>\n\n\n<p>Jde o probl\u00e9m koordinace. Pot\u0159ebujete pl\u00e1n pro cel\u00fd v\u00fdrobn\u00ed postup, ne samostatn\u00e9 pokyny, jejich\u017e c\u00edlem je jen to, aby ka\u017ed\u00fd stroj vypadal vyt\u00ed\u017een\u011b. Ur\u010dit\u00e1 z\u00e1soba pr\u00e1ce p\u0159ipraven\u00e9 ke zpracov\u00e1n\u00ed m\u016f\u017ee b\u00fdt pot\u0159ebn\u00e1, aby v\u00fdrobn\u00ed zdroj s omezenou kapacitou nemusel \u010dekat. Zbyte\u010dn\u00e1 je ale pr\u00e1ce uvoln\u011bn\u00e1 do v\u00fdroby bez smyslupln\u00e9 mo\u017enosti dal\u0161\u00edho postupu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hotov\u00e9 v\u00fdrobky: dokon\u010den\u00ed nen\u00ed tot\u00e9\u017e co prodej<\/h3>\n\n\n<p>P\u0159eveden\u00ed zak\u00e1zky z nedokon\u010den\u00e9 v\u00fdroby do hotov\u00fdch v\u00fdrobk\u016f m\u016f\u017ee zlep\u0161it vykazovan\u00e9 v\u00fdsledky v\u00fdroby, p\u0159esto\u017ee stejn\u00e9 v\u00fdrobky z\u016fst\u00e1vaj\u00ed ve skladu. Ne\u017e vyrob\u00edte dal\u0161\u00ed d\u00e1vku pro dopln\u011bn\u00ed z\u00e1sob, ov\u011b\u0159te, co u\u017e je hotov\u00e9 a zda dal\u0161\u00ed v\u00fdroba st\u00e1le odpov\u00edd\u00e1 popt\u00e1vce z\u00e1kazn\u00edk\u016f.<\/p>\n\n\n<p>Pokud hotov\u00e9 v\u00fdrobky le\u017e\u00ed ve skladu dlouho proto, \u017ee po nich zanikla popt\u00e1vka, mus\u00ed se \u0159e\u0161en\u00ed hledat v prodeji, v rozhodnut\u00edch o sortimentu nebo v dohodnut\u00e9m zp\u016fsobu vy\u0159azen\u00ed z\u00e1sob. P\u0159epl\u00e1nov\u00e1n\u00ed dal\u0161\u00ed v\u00fdroby chyb\u011bj\u00edc\u00ed popt\u00e1vku nevytvo\u0159\u00ed. Pokud v\u00fdrobky \u010dekaj\u00ed kv\u016fli zablokovan\u00e9 expedici nebo chyb\u011bj\u00edc\u00ed dokumentaci, odstra\u0148te tuto p\u0159ek\u00e1\u017eku, m\u00edsto abyste probl\u00e9m \u0159e\u0161ili jako nedostatek v\u00fdrobn\u00ed kapacity.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sla\u010fte pomoc\u00ed SkyPlanner dod\u00e1vky materi\u00e1lu s pot\u0159ebami v\u00fdroby<\/h2>\n\n\n<p>Pokud \u0161et\u0159en\u00ed uk\u00e1\u017ee na p\u0159ed\u010dasn\u00e9 zahajov\u00e1n\u00ed zak\u00e1zek nebo kolize ve front\u00e1ch pr\u00e1ce, sestavte ze zb\u00fdvaj\u00edc\u00ed pr\u00e1ce ve SkyPlanner <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">spole\u010dn\u00fd v\u00fdrobn\u00ed rozvrh<\/a>. Arcturus, um\u011bl\u00e1 inteligence syst\u00e9mu SkyPlanner pro rozvrhov\u00e1n\u00ed, vypo\u010d\u00edt\u00e1 po\u0159ad\u00ed pr\u00e1ce podle pracovi\u0161\u0165, sm\u011bn, obsluhy, d\u00e9lek operac\u00ed, n\u00e1vaznost\u00ed a va\u0161ich priorit. Gantt\u016fv diagram ukazuje, jak je pr\u00e1ce rozlo\u017eena mezi jednotliv\u00e9 v\u00fdrobn\u00ed zdroje.<\/p>\n\n\n<p>Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, ovliv\u0148uje v\u00fdpo\u010det tak\u00e9 dostupnost z\u00e1sob. Term\u00edny dod\u00e1n\u00ed na n\u00e1kupn\u00edch objedn\u00e1vk\u00e1ch p\u0159edstavuj\u00ed <strong>o\u010dek\u00e1vanou dostupnost materi\u00e1lu<\/strong>. Jakmile materi\u00e1l doraz\u00ed a objedn\u00e1vka je potvrzena jako dodan\u00e1, aktualizuje se stav z\u00e1sob. O\u010dek\u00e1van\u00e1 dod\u00e1vka tak slou\u017e\u00ed jako u\u017eite\u010dn\u00fd podklad pro pl\u00e1nov\u00e1n\u00ed, ani\u017e by se zam\u011b\u0148ovala za materi\u00e1l, kter\u00fd u\u017e je ve skladu.<\/p>\n\n\n<p>Pokud dodavatel zm\u011bn\u00ed term\u00edn, aktualizujte ho a nechte rozvrh p\u0159epo\u010d\u00edtat. Dot\u010den\u00e9 operace pak m\u016f\u017eete posoudit spole\u010dn\u011b s kapacitou a dal\u0161\u00edmi zak\u00e1zkami, kter\u00e9 pot\u0159ebuj\u00ed stejn\u00e9 v\u00fdrobn\u00ed zdroje, m\u00edsto abyste samostatn\u011b upravovali n\u00e1kupn\u00ed seznam a fronty pr\u00e1ce u n\u011bkolika stroj\u016f.<\/p>\n\n\n<p>U d\u00e1vky, kter\u00e1 m\u00e1 po obr\u00e1b\u011bn\u00ed \u010dekat, je podstatn\u00e9 rozhodnout, zda m\u00e1 jej\u00ed \u00favodn\u00ed operace prob\u011bhnout u\u017e nyn\u00ed, nebo zda m\u016f\u017ee jin\u00e1 zak\u00e1zka postupovat efektivn\u011bji. Priority ur\u010dujete vy; Arcturus vypo\u010d\u00edt\u00e1 rozvrh podle va\u0161ich pravidel. Sn\u00e1ze tak p\u0159edejdete tomu, abyste p\u0159\u00edli\u0161 brzy vkl\u00e1dali materi\u00e1l a pr\u00e1ci do nevhodn\u00fdch zak\u00e1zek, a z\u00e1rove\u0148 zajist\u00edte prostor pro zak\u00e1zky, kter\u00e9 je t\u0159eba expedovat.<\/p>\n\n\n<p>Odlo\u017een\u00edm zah\u00e1jen\u00ed v\u00fdroby u\u017e nakoupen\u00fd materi\u00e1l nezmiz\u00ed. Finan\u010dn\u00ed zlep\u0161en\u00ed p\u0159in\u00e1\u0161\u00ed uspokojov\u00e1n\u00ed popt\u00e1vky s men\u0161\u00edm mno\u017estv\u00edm zbyte\u010dn\u00fdch z\u00e1sob v cel\u00e9m v\u00fdrobn\u00edm toku, nikoli pouh\u00e9 p\u0159e\u0159azen\u00ed materi\u00e1lu do nedokon\u010den\u00e9 v\u00fdroby. Prov\u00e1zan\u00fd rozvrh v\u00e1m umo\u017en\u00ed tuto zm\u011bnu prakticky koordinovat a p\u0159edem posoudit jej\u00ed dopad na dod\u00e1vky.<\/p>\n\n\n<p>SkyPlanner se prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API propoj\u00ed s libovoln\u00fdm ERP nebo MES. St\u00e1vaj\u00edc\u00ed data o zak\u00e1zk\u00e1ch a v\u00fdrob\u011b tak m\u016f\u017eete vyu\u017e\u00edt p\u0159i rozvrhov\u00e1n\u00ed, m\u00edsto abyste udr\u017eovali dal\u0161\u00ed odd\u011blen\u00fd pl\u00e1n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co se zm\u011bnilo ve spole\u010dnosti Piristeel<\/h2>\n\n\n<p>Piristeel, v\u00fdrobce st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f a okapov\u00fdch syst\u00e9m\u016f, d\u0159\u00edve spol\u00e9hal na velk\u00e9 v\u00fdrobn\u00ed d\u00e1vky a vyrovn\u00e1vac\u00ed z\u00e1soby. V\u00fdroba mohla p\u016fsobit plynule, ale vysok\u00e1 hodnota z\u00e1sob a nedostate\u010dn\u00fd p\u0159ehled o d\u011bn\u00ed v ostatn\u00edch odd\u011blen\u00edch zt\u011b\u017eovaly zm\u011bny.<\/p>\n\n\n<p>Ve sv\u00e9 <a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/piristeel\/\">recenzi SkyPlanner<\/a> popisuje Piristeel detailn\u00ed rozvrhov\u00e1n\u00ed ve t\u0159ech v\u00fdrobn\u00edch odd\u011blen\u00edch, sd\u00edlen\u00fd Gantt\u016fv diagram a integraci se syst\u00e9mem Visma Nova. Spole\u010dnost z\u00edskala lep\u0161\u00ed koordinaci men\u0161\u00edch v\u00fdrobn\u00edch d\u00e1vek a p\u0159esn\u011bj\u0161\u00ed evidenci z\u00e1sob d\u00edky p\u0159enosu skladov\u00fdch pohyb\u016f do ERP v re\u00e1ln\u00e9m \u010dase. Velk\u00e9 vyrovn\u00e1vac\u00ed z\u00e1soby u\u017e nebyly podm\u00ednkou plynul\u00e9ho provozu.<\/p>\n\n\n<p>Pro obr\u00e1tkovost je podstatn\u00e1 zm\u011bna v \u0159\u00edzen\u00ed provozu: lep\u0161\u00ed p\u0159ehled a koordinace sn\u00ed\u017eily pot\u0159ebu pou\u017e\u00edvat z\u00e1soby jako n\u00e1hradu za pou\u017eiteln\u00fd v\u00fdrobn\u00ed pl\u00e1n. Pro z\u00e1vod, kter\u00fd nadm\u011brn\u00fdmi z\u00e1sobami kompenzuje nejistotu v na\u010dasov\u00e1n\u00ed v\u00fdroby, je to praktick\u00fd d\u016fvod k propojen\u00ed \u00fadaj\u016f o z\u00e1sob\u00e1ch s rozvrhov\u00e1n\u00edm.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159te, \u017ee se zlep\u0161en\u00ed prom\u00edtlo i do celkov\u00fdch z\u00e1sob<\/h2>\n\n\n<p>Vra\u0165me se k v\u00fdrobci z ilustra\u010dn\u00edho p\u0159\u00edkladu. P\u0159edpokl\u00e1dejme, \u017ee p\u0159i stejn\u00fdch ro\u010dn\u00edch n\u00e1kladech na prodan\u00e9 v\u00fdrobky (COGS) ve v\u00fd\u0161i $3 600 000 dosahuje pr\u016fm\u011brn\u00e1 hodnota nedokon\u010den\u00e9 v\u00fdroby $240 000 m\u00edsto $420 000 a pr\u016fm\u011brn\u00e9 hodnoty z\u00e1sob v ostatn\u00edch f\u00e1z\u00edch z\u016fst\u00e1vaj\u00ed beze zm\u011bny. Pr\u016fm\u011brn\u00e1 hodnota celkov\u00fdch z\u00e1sob pak \u010din\u00ed <strong>$720 000<\/strong>.<\/p>\n\n\n<p><strong>$3 600 000 \u00f7 $720 000 = 5 obr\u00e1tek za rok<\/strong><\/p>\n\n\n<p><strong>365 \u00f7 5 = 73 dn\u016f doby obratu z\u00e1sob<\/strong><\/p>\n\n\n<p>P\u0159i stejn\u00fdch n\u00e1kladech na prodan\u00e9 v\u00fdrobky je tedy <strong>pr\u016fm\u011brn\u00e1 hodnota z\u00e1sob o $180 000 ni\u017e\u0161\u00ed<\/strong>. Nejde o zisk ve v\u00fd\u0161i $180 000 ani o automatick\u00fd p\u0159\u00edjem pen\u011bz. Ov\u011b\u0159te, \u017ee jde o skute\u010dn\u00e9 sn\u00ed\u017een\u00ed, nikoli o p\u0159esun do jin\u00e9 kategorie z\u00e1sob nebo \u00fapravu ocen\u011bn\u00ed, a \u017ee dod\u00e1vky z\u016fst\u00e1vaj\u00ed spolehliv\u00e9.<\/p>\n\n\n<p>Pro prvn\u00ed zlep\u0161en\u00ed vyberte jednu skupinu v\u00fdrobk\u016f s pomalou obr\u00e1tkou. Zaznamenejte jej\u00ed z\u00e1soby podle jednotliv\u00fdch f\u00e1z\u00ed, d\u00e9lku a d\u016fvod \u010dek\u00e1n\u00ed, term\u00edny dod\u00e1vek materi\u00e1lu a zb\u00fdvaj\u00edc\u00ed v\u00fdrobn\u00ed postup. Dohodn\u011bte zm\u011bnu s lidmi odpov\u011bdn\u00fdmi za n\u00e1kup, v\u00fdrobu a z\u00e1vazky v\u016f\u010di z\u00e1kazn\u00edk\u016fm. Pot\u00e9 za srovnateln\u00e1 obdob\u00ed spole\u010dn\u011b vyhodnocujte obr\u00e1tkovost i \u00farove\u0148 obsluhy z\u00e1kazn\u00edk\u016f.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku SkyPlanner<\/a> a p\u0159ipravte si tento v\u00fdrobn\u00ed postup i ned\u00e1vn\u00fd p\u0159\u00edklad p\u0159ed\u010dasn\u011b zah\u00e1jen\u00e9 pr\u00e1ce. M\u016f\u017eete prozkoumat, jak se term\u00edny dod\u00e1vek materi\u00e1lu, zak\u00e1zky soupe\u0159\u00edc\u00ed o stejn\u00e9 zdroje a dostupn\u00e1 kapacita propoj\u00ed v jednom rozvrhu. Pokud si chcete syst\u00e9m nejprve prohl\u00e9dnout sami, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>. V\u00fdpo\u010det uk\u00e1\u017ee, kde je v\u00e1z\u00e1n kapit\u00e1l; prov\u00e1zan\u00fd pl\u00e1n v\u00e1m pom\u016f\u017ee zm\u011bnit zp\u016fsob pr\u00e1ce, kv\u016fli n\u011bmu\u017e tento kapit\u00e1l z\u016fst\u00e1v\u00e1 v z\u00e1sob\u00e1ch v\u00e1z\u00e1n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it Domov &raquo; Zdroje &raquo; Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it Hodnota va\u0161ich z\u00e1sob vzrostla, ale ve v\u00fdrob\u011b st\u00e1le chyb\u011bj\u00ed pot\u0159ebn\u00e9 d\u00edly. \u010c\u00e1st materi\u00e1lu le\u017e\u00ed bez vyu\u017eit\u00ed, rozpracovan\u00e9 zak\u00e1zky \u010dekaj\u00ed mezi stroji a hotov\u00e9 v\u00fdrobky zab\u00edraj\u00ed m\u00edsto, zat\u00edmco z\u00e1kazn\u00edci sh\u00e1n\u011bj\u00ed jin\u00e9 polo\u017eky. Plo\u0161n\u00e9 sn\u00ed\u017een\u00ed &#8230; <a title=\"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/\" aria-label=\"Read more about Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105907,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-105880","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it<\/title>\n<meta name=\"description\" content=\"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\" \/>\n<meta property=\"og:description\" content=\"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T17:38:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T17:38:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\",\"datePublished\":\"2026-10-23T17:38:10+00:00\",\"dateModified\":\"2026-10-23T17:38:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/\"},\"wordCount\":3198,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/\",\"name\":\"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"datePublished\":\"2026-10-23T17:38:10+00:00\",\"dateModified\":\"2026-10-23T17:38:23+00:00\",\"description\":\"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"width\":1672,\"height\":940,\"caption\":\"Metal blanks, trays of unfinished brackets waiting for coating, and finished goods show inventory across a factory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/obratkovost-zasob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it","description":"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/","og_locale":"cs_CZ","og_type":"article","og_title":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it","og_description":"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T17:38:10+00:00","article_modified_time":"2026-10-23T17:38:23+00:00","og_image":[{"width":1672,"height":940,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it","datePublished":"2026-10-23T17:38:10+00:00","dateModified":"2026-10-23T17:38:23+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/"},"wordCount":3198,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/","name":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","datePublished":"2026-10-23T17:38:10+00:00","dateModified":"2026-10-23T17:38:23+00:00","description":"Spo\u010d\u00edtejte obr\u00e1tkovost z\u00e1sob, zjist\u011bte, co v\u00e1\u017ee pen\u00edze v materi\u00e1lu, WIP \u010di hotov\u00fdch v\u00fdrobc\u00edch, a zlep\u0161ete tok v\u00fdroby bez zhor\u0161en\u00ed dod\u00e1vek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","width":1672,"height":940,"caption":"Metal blanks, trays of unfinished brackets waiting for coating, and finished goods show inventory across a factory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/obratkovost-zasob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png",1672,940,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png",1672,940,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it Domov &raquo; Zdroje &raquo; Obr\u00e1tkovost z\u00e1sob ve v\u00fdrob\u011b: jak ji vypo\u010d\u00edtat a zlep\u0161it Hodnota va\u0161ich z\u00e1sob vzrostla, ale ve v\u00fdrob\u011b st\u00e1le chyb\u011bj\u00ed pot\u0159ebn\u00e9 d\u00edly. \u010c\u00e1st materi\u00e1lu le\u017e\u00ed bez vyu\u017eit\u00ed, rozpracovan\u00e9 zak\u00e1zky \u010dekaj\u00ed mezi stroji a hotov\u00e9 v\u00fdrobky zab\u00edraj\u00ed m\u00edsto, zat\u00edmco z\u00e1kazn\u00edci sh\u00e1n\u011bj\u00ed jin\u00e9 polo\u017eky. Plo\u0161n\u00e9 sn\u00ed\u017een\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=105880"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105880\/revisions"}],"predecessor-version":[{"id":106028,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105880\/revisions\/106028"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/105907"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=105880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=105880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=105880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}