{"id":105697,"date":"2026-10-22T05:45:06","date_gmt":"2026-10-22T05:45:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105697"},"modified":"2026-10-22T05:45:20","modified_gmt":"2026-10-22T05:45:20","slug":"zmetkovitost-ve-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/","title":{"rendered":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>D\u00e1vka je hotov\u00e1, ale zak\u00e1zka ne. Kontrola vy\u0159adila d\u00edly, kter\u00e9 u\u017e nelze opravit, materi\u00e1l je spot\u0159ebovan\u00fd a z\u00e1kazn\u00edk st\u00e1le o\u010dek\u00e1v\u00e1 cel\u00e9 mno\u017estv\u00ed v p\u00e1tek.<\/p>\n\n\n<p><strong>Zmetkovitost ve v\u00fdrob\u011b vyjad\u0159uje, kolik procent z vymezen\u00e9ho vyroben\u00e9ho mno\u017estv\u00ed bylo definitivn\u011b vy\u0159azeno jako nezp\u016fsobil\u00e9 k zam\u00fd\u0161len\u00e9mu pou\u017eit\u00ed.<\/strong> U uzav\u0159en\u00e9 skupiny srovnateln\u00fdch kus\u016f ji vypo\u010d\u00edt\u00e1te takto:<\/p>\n\n\n<p><strong>Zmetkovitost (%) = Po\u010det definitivn\u011b vy\u0159azen\u00fdch kus\u016f \u00f7 Celkov\u00fd po\u010det kus\u016f ve stejn\u00e9 v\u00fdrobn\u00ed skupin\u011b \u00d7 100<\/strong><\/p>\n\n\n<p>Jmenovatel zahrnuje shodn\u00e9 i definitivn\u011b vy\u0159azen\u00e9 kusy. D\u00edly, kter\u00e9 se poda\u0159ilo opravit, pat\u0159\u00ed mezi shodn\u00e9 v\u00fdrobky, nikoli mezi definitivn\u00ed zmetky.<\/p>\n\n\n<p>Spolehliv\u011b stanoven\u00e9 procento v\u00e1m pom\u016f\u017ee odhalit opakuj\u00edc\u00ed se ztr\u00e1ty. Reakce na n\u011b ale vy\u017eaduje tak\u00e9 zp\u0159esnit p\u0159ehled o materi\u00e1lu a naj\u00edt kapacitu pro p\u0159\u00edpadnou n\u00e1hradn\u00ed v\u00fdrobu. SkyPlanner podporuje vykazov\u00e1n\u00ed zmetk\u016f prost\u0159ednictv\u00edm z\u00e1znam\u016f o vadn\u00fdch kusech. Pokud je nakonfigurov\u00e1no sledov\u00e1n\u00ed materi\u00e1lu, zohled\u0148uje i jejich spot\u0159ebu materi\u00e1lu. Pl\u00e1nov\u00e1n\u00ed s um\u011blou inteligenc\u00ed pak pom\u00e1h\u00e1 za\u0159adit schv\u00e1len\u00e9 operace n\u00e1hradn\u00ed v\u00fdroby do spole\u010dn\u00e9ho pl\u00e1nu se zak\u00e1zkami, jejich\u017e dod\u00e1n\u00ed u\u017e bylo p\u0159isl\u00edbeno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zmetkovitost po\u010d\u00edtejte podle kone\u010dn\u00e9ho stavu kus\u016f, ne podle ka\u017ed\u00e9 ne\u00fasp\u011b\u0161n\u00e9 kontroly<\/h2>\n\n\n<p>P\u0159edstavte si d\u00e1vku 1 000 obr\u00e1b\u011bn\u00fdch d\u00edl\u016f. P\u016fvodn\u00ed d\u00edly sledujete p\u0159i kontrole i p\u0159\u00edpadn\u00fdch povolen\u00fdch oprav\u00e1ch, dokud nen\u00ed u ka\u017ed\u00e9ho zn\u00e1m kone\u010dn\u00fd stav:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kone\u010dn\u00fd stav kus\u016f z p\u016fvodn\u00ed d\u00e1vky<\/th><th>Po\u010det d\u00edl\u016f<\/th><th>Zapo\u010dten\u00ed do kone\u010dn\u00e9 zmetkovitosti<\/th><\/tr><\/thead><tbody><tr><td>Shodn\u00e9 p\u0159i prvn\u00edm pr\u016fchodu<\/td><td>920<\/td><td>Shodn\u00e9 v\u00fdrobky<\/td><\/tr><tr><td>Shodn\u00e9 po oprav\u011b<\/td><td>30<\/td><td>Shodn\u00e9 v\u00fdrobky, pr\u00e1ce nav\u00edc se eviduje samostatn\u011b<\/td><\/tr><tr><td>Definitivn\u011b vy\u0159azen\u00e9<\/td><td>50<\/td><td>\u010citatel v\u00fdpo\u010dtu zmetkovitosti<\/td><\/tr><tr><td>Celkov\u00fd po\u010det p\u016fvodn\u00edch kus\u016f<\/td><td>1 000<\/td><td>Jmenovatel<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kone\u010dn\u00e1 zmetkovitost je <strong>50 \u00f7 1 000 \u00d7 100 = 5 %<\/strong>. Shodn\u00fdch d\u00edl\u016f je 950, tak\u017ee kone\u010dn\u00e1 v\u00fdt\u011b\u017enost dosahuje 95 %.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/vyteznost-prvniho-pruchodu\/\">V\u00fdt\u011b\u017enost prvn\u00edho pr\u016fchodu<\/a> odpov\u00edd\u00e1 na jinou ot\u00e1zku. Napoprv\u00e9 pro\u0161lo pouze 920 d\u00edl\u016f, kter\u00e9 nevy\u017eadovaly opravu, co\u017e znamen\u00e1 <strong>FPY 92 %<\/strong>. Zb\u00fdvaj\u00edc\u00edch 8 % netvo\u0159ily jen zmetky: 30 d\u00edl\u016f se poda\u0159ilo opravit. Oprava zab\u00edr\u00e1 \u010das, ale nemus\u00ed znamenat spot\u0159ebu dal\u0161\u00edho cel\u00e9ho polotovaru ani zni\u010den\u00ed p\u016fvodn\u00edho d\u00edlu.<\/p>\n\n\n<p>Podobn\u011b p\u0159i vyd\u011blen\u00ed 50 vy\u0159azen\u00fdch d\u00edl\u016f po\u010dtem 950 shodn\u00fdch d\u00edl\u016f z\u00edsk\u00e1te p\u0159ibli\u017en\u011b 5,26 %, nikoli 5 %, kter\u00e1 vyjad\u0159uj\u00ed pod\u00edl ztracen\u00fdch kus\u016f z p\u016fvodn\u00ed v\u00fdroby. Pom\u011br zmetk\u016f ke shodn\u00fdm v\u00fdrobk\u016fm m\u016f\u017ee b\u00fdt u\u017eite\u010dn\u00fd pro samostatnou n\u00e1kladovou kalkulaci, ale je pot\u0159eba ho tak ozna\u010dit. Nesrovn\u00e1vejte ho s procentn\u00edm pod\u00edlem zmetk\u016f na celkov\u00e9 v\u00fdrob\u011b.<\/p>\n\n\n<p>Kdy\u017e vyrob\u00edte n\u00e1hradn\u00ed kusy, evidujte je tak, aby je bylo mo\u017en\u00e9 od p\u016fvodn\u00ed v\u00fdroby odli\u0161it. Jde o nov\u00e9 kusy, nikoli o dal\u0161\u00ed kontroly p\u016fvodn\u00ed d\u00e1vky. Pokud vykazujete souhrnn\u00fd v\u00fdsledek, kter\u00fd je zahrnuje, zapo\u010d\u00edtejte do stejn\u00e9 skupiny jak shodn\u00e9 n\u00e1hradn\u00ed kusy, tak p\u0159\u00edpadn\u00e9 dal\u0161\u00ed zmetky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stanovte pravidla po\u010d\u00edt\u00e1n\u00ed, kter\u00e1 t\u00fdm dok\u00e1\u017ee dodr\u017eovat jednotn\u011b<\/h2>\n\n\n<p>Jasn\u00e1 definice m\u011b\u0159en\u00ed zabr\u00e1n\u00ed tomu, aby se v\u00fdsledek m\u011bnil jen proto, \u017ee ka\u017ed\u00e1 sm\u011bna eviduje vady jinak. Ne\u017e za\u010dnete vyhodnocovat trend, sjedno\u0165te skupinu v\u00fdrobk\u016f, rozsah sledovan\u00e9ho procesu, z\u00e1klad v\u00fdpo\u010dtu i pravidlo pro ur\u010den\u00ed kone\u010dn\u00e9ho stavu kus\u016f.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159i\u0159a\u010fte vy\u0159azen\u00e9 kusy k v\u00fdrob\u011b, ze kter\u00e9 poch\u00e1zej\u00ed<\/h3>\n\n\n<p>Za\u010dn\u011bte d\u00e1vkou nebo zak\u00e1zkou, jej\u00ed\u017e kusy lze dohledat a u n\u00ed\u017e lze ov\u011b\u0159it, \u017ee sou\u010det kus\u016f ve v\u0161ech kone\u010dn\u00fdch stavech odpov\u00edd\u00e1 p\u016fvodn\u00edmu mno\u017estv\u00ed. Pokud kontrola nebo opravy trvaj\u00ed n\u011bkolik dn\u00ed, m\u016f\u017eete p\u0159i d\u011blen\u00ed po\u010dtu dnes definitivn\u011b vy\u0159azen\u00fdch kus\u016f po\u010dtem kus\u016f, jejich\u017e v\u00fdroba dnes za\u010dala, sm\u00edchat r\u016fzn\u00e9 skupiny.<\/p>\n\n\n<p>Pro pravideln\u00e9 vykazov\u00e1n\u00ed za jednotliv\u00e1 obdob\u00ed ur\u010dete, kam se p\u0159i\u0159azuj\u00ed pozd\u011bj\u0161\u00ed rozhodnut\u00ed a jak se vykazuj\u00ed kusy s dosud neuzav\u0159en\u00fdm stavem. Pokud 20 d\u00edl\u016f st\u00e1le \u010dek\u00e1 na rozhodnut\u00ed o dal\u0161\u00edm nakl\u00e1d\u00e1n\u00ed, nejde ani o potvrzen\u00e9 shodn\u00e9 v\u00fdrobky, ani o definitivn\u00ed zmetky. Vykazujte je jako nerozhodnut\u00e9 a v\u00fdsledek uzav\u0159ete, a\u017e bude uzav\u0159en\u00e1 cel\u00e1 skupina. Nevynech\u00e1vejte je jen proto, aby procento vypadalo l\u00e9pe.<\/p>\n\n\n<p>V r\u00e1mci zvolen\u00e9ho rozsahu m\u011b\u0159en\u00ed zapo\u010d\u00edtejte ka\u017ed\u00fd p\u016fvodn\u00ed kus pouze jednou. D\u00edl vy\u0159azen\u00fd p\u0159i obr\u00e1b\u011bn\u00ed, kter\u00fd se znovu objev\u00ed v protokolu v\u00fdstupn\u00ed kontroly, nep\u0159edstavuje dva zmetky. Ani n\u011bkolik vad na jednom d\u00edlu neznamen\u00e1 v\u00edce ne\u017e jeden ztracen\u00fd kus, p\u0159esto\u017ee pro \u0161et\u0159en\u00ed m\u016f\u017ee b\u00fdt d\u016fle\u017eit\u00e1 ka\u017ed\u00e1 vada.<\/p>\n\n\n<p>V\u00fdsledky za jednotliv\u00e9 operace a za cel\u00fd v\u00fdrobn\u00ed postup vy\u017eaduj\u00ed samostatn\u00e9 definice. Zmetkovitost p\u0159i obr\u00e1b\u011bn\u00ed vych\u00e1z\u00ed z po\u010dtu kus\u016f vstupuj\u00edc\u00edch do t\u00e9to operace, zat\u00edmco zmetkovitost za cel\u00fd postup sleduje p\u016fvodn\u00ed skupinu kus\u016f nap\u0159\u00ed\u010d v\u00fdrobou. Se\u010dten\u00edm procent za jednotliv\u00e9 operace spolehlivou zmetkovitost cel\u00e9ho z\u00e1vodu nez\u00edsk\u00e1te.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Rozli\u0161ujte definitivn\u00ed zmetky, opravy a materi\u00e1lov\u00fd odpad<\/h3>\n\n\n<p>Ne\u00fasp\u011b\u0161n\u00e1 kontrola je podn\u011btem k rozhodnut\u00ed o dal\u0161\u00edm postupu. D\u00edl m\u016f\u017ee b\u00fdt opraven, zadr\u017een k pro\u0161et\u0159en\u00ed nebo definitivn\u011b vy\u0159azen. Toto rozli\u0161en\u00ed zachovejte i v z\u00e1znamech, ze kter\u00fdch se po\u010d\u00edt\u00e1 KPI.<\/p>\n\n\n<p>Rozli\u0161ujte tak\u00e9 vy\u0159azen\u00e9 v\u00fdrobky a o\u010dek\u00e1van\u00fd technologick\u00fd odpad. T\u0159\u00edsky z obr\u00e1b\u011bn\u00ed, od\u0159ezky a materi\u00e1l spot\u0159ebovan\u00fd p\u0159i rozb\u011bhu mohou pat\u0159it do ukazatele materi\u00e1lov\u00fdch ztr\u00e1t, i kdy\u017e v\u0161echny hotov\u00e9 d\u00edly projdou kontrolou. Pokud je sm\u00edch\u00e1te s po\u010dtem vy\u0159azen\u00fdch kus\u016f, bude obt\u00ed\u017en\u00e9 v\u00fdsledek spr\u00e1vn\u011b interpretovat.<\/p>\n\n\n<p>Pokud materi\u00e1lov\u00fd odpad m\u011b\u0159\u00edte podle hmotnosti, pou\u017eijte hmotnost v \u010ditateli i jmenovateli. P\u0159edstavte si nap\u0159\u00edklad uzav\u0159enou d\u00e1vku d\u011blen\u00ed materi\u00e1lu se vstupem 500 kg, ze kter\u00fdch je 40 kg za\u0159azeno jako odpad a zb\u00fdvaj\u00edc\u00edch 460 kg je vyk\u00e1z\u00e1no jako vyu\u017eiteln\u00fd v\u00fdstup. Pod\u00edl materi\u00e1lov\u00e9ho odpadu je <strong>40 \u00f7 500 \u00d7 100 = 8 %<\/strong>. Uve\u010fte, zda tento odpad zahrnuje b\u011b\u017en\u00e9 od\u0159ezky, nestandardn\u00ed ztr\u00e1ty zp\u016fsoben\u00e9 vadami, nebo oboj\u00ed. Op\u011btovn\u011b pou\u017eiteln\u00e9 zbytky a materi\u00e1l v rozpracovan\u00e9 v\u00fdrob\u011b evidujte samostatn\u011b.<\/p>\n\n\n<p>T\u011bchto 8 % nelze p\u0159\u00edmo srovn\u00e1vat s 5% zmetkovitost\u00ed d\u00e1vky po\u010d\u00edtanou podle kus\u016f. Jde o r\u016fzn\u00e9 druhy ztr\u00e1t. T\u011b\u017ek\u00fd vy\u0159azen\u00fd odlitek m\u016f\u017ee m\u00edt na spot\u0159ebu materi\u00e1lu mnohem v\u011bt\u0161\u00ed dopad ne\u017e drobn\u00e1 vy\u0159azen\u00e1 tvarovka.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u010d\u00edtejte mno\u017estv\u00ed, ne nesouvisej\u00edc\u00ed procenta<\/h3>\n\n\n<p>U srovnateln\u00fdch v\u00fdrobk\u016f m\u011b\u0159en\u00fdch na stejn\u00e9m z\u00e1klad\u011b nejprve se\u010dt\u011bte vy\u0159azen\u00e1 mno\u017estv\u00ed a celkov\u00e1 mno\u017estv\u00ed a teprve potom d\u011blte. Pokud se velikosti d\u00e1vek li\u0161\u00ed, nepou\u017e\u00edvejte prost\u00fd pr\u016fm\u011br jejich procent zmetkovitosti.<\/p>\n\n\n<p>Pokud se v\u00fdrobky li\u0161\u00ed hodnotou materi\u00e1lu, v\u00fdrobn\u00edm postupem nebo dopady vy\u0159azen\u00ed, vykazujte jejich v\u00fdsledky odd\u011blen\u011b. Pr\u016fm\u011br z\u00e1vodu m\u016f\u017ee klesnout jen proto, \u017ee se vyrobilo v\u00edce jednodu\u0161\u0161\u00edho v\u00fdrobku. Ne\u017e dosp\u011bjete k z\u00e1v\u011bru, \u017ee se proces zlep\u0161il, posuzujte zmetkovitost spolu s konkr\u00e9tn\u00edmi mno\u017estv\u00edmi, v\u00fdrobkov\u00fdm mixem a n\u00e1klady na ztr\u00e1ty.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vy\u010d\u00edslete hodnotu ztr\u00e1ty<\/h2>\n\n\n<p>Zmetkovitost vyjad\u0159uje mno\u017estv\u00ed, nikoli cel\u00fd finan\u010dn\u00ed dopad. D\u00edl vy\u0159azen\u00fd po n\u011bkolika operac\u00edch u\u017e spot\u0159eboval v\u00edce pr\u00e1ce ne\u017e d\u00edl vy\u0159azen\u00fd p\u0159ed za\u010d\u00e1tkem obr\u00e1b\u011bn\u00ed.<\/p>\n\n\n<p>Vra\u0165me se k p\u0159\u00edkladu s 50 vy\u0159azen\u00fdmi d\u00edly. P\u0159edpokl\u00e1dejme, \u017ee ka\u017ed\u00fd obsahuje materi\u00e1l za $12 a do okam\u017eiku vy\u0159azen\u00ed na n\u011bj p\u0159ipadly zpracovac\u00ed n\u00e1klady ve v\u00fd\u0161i $8. Ztr\u00e1ta materi\u00e1lu \u010din\u00ed <strong>$600<\/strong> a dosud vynalo\u017een\u00e9 zpracovac\u00ed n\u00e1klady <strong>$400<\/strong>. Pokud zpen\u011b\u017een\u00ed odpadn\u00edho materi\u00e1lu p\u0159inese $2 na ka\u017ed\u00fd vy\u0159azen\u00fd d\u00edl, \u010dist\u00e1 evidovan\u00e1 ztr\u00e1ta p\u0159i tomto zjednodu\u0161en\u00e9m v\u00fdpo\u010dtu je:<\/p>\n\n\n<p><strong>50 \u00d7 ($12 + $8 \u2212 $2) = $900<\/strong><\/p>\n\n\n<p>P\u0159i stanoven\u00ed n\u00e1klad\u016f vynalo\u017een\u00fdch do okam\u017eiku vy\u0159azen\u00ed pou\u017eijte vlastn\u00ed kalkula\u010dn\u00ed pravidla. V\u00fdnos z recyklace m\u016f\u017ee sn\u00ed\u017eit \u010distou finan\u010dn\u00ed ztr\u00e1tu, ale neud\u011bl\u00e1 z vy\u0159azen\u00fdch d\u00edl\u016f znovu v\u00fdrobky k dod\u00e1n\u00ed ani nevr\u00e1t\u00ed v\u00fdrobn\u00ed \u010das, kter\u00fd u\u017e spot\u0159ebovaly.<\/p>\n\n\n<p>Ji\u017e vzniklou ztr\u00e1tu odd\u011blte od budouc\u00edch n\u00e1klad\u016f na n\u00e1hradn\u00ed v\u00fdrobu. V\u00fdroba n\u00e1hradn\u00edch d\u00edl\u016f vy\u017eaduje dal\u0161\u00ed materi\u00e1l a operace. Bez vysv\u011btlen\u00ed rozsahu kalkulace nezapo\u010d\u00edt\u00e1vejte tuto budouc\u00ed pr\u00e1ci dvakr\u00e1t \u2014 jednou do ztr\u00e1ty v pln\u00fdch n\u00e1kladech a podruh\u00e9 do samostatn\u00e9ho odhadu n\u00e1klad\u016f na n\u00e1hradu.<\/p>\n\n\n<p>Pro aktu\u00e1ln\u00ed rozhodnut\u00ed ur\u010dete, co se skute\u010dn\u011b zm\u011bn\u00ed: nap\u0159\u00edklad dodate\u010dn\u00e9 n\u00e1kupy materi\u00e1lu, p\u0159es\u010dasy, kooperace nebo expresn\u00ed doprava. Uvoln\u011bn\u00fd strojn\u00ed \u010das m\u016f\u017ee m\u00edt hodnotu, i kdy\u017e okam\u017eit\u011b nesn\u00ed\u017e\u00ed v\u00fddaje na mzdy \u010di za\u0159\u00edzen\u00ed. Pokud ka\u017ed\u00e9 sn\u00ed\u017een\u00ed n\u00e1klad\u016f na zmetky pova\u017eujete za okam\u017eitou pen\u011b\u017en\u00ed \u00fasporu, v\u00fdsledek nadhodnocujete.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prom\u00edtn\u011bte chyb\u011bj\u00edc\u00ed kusy do pl\u00e1nu, kter\u00fd je\u0161t\u011b umo\u017en\u00ed dod\u00e1n\u00ed<\/h2>\n\n\n<p>V na\u0161em p\u0159\u00edkladu vzniklo z 1 000 p\u016fvodn\u00edch kus\u016f jen 950 shodn\u00fdch d\u00edl\u016f. Pokud z\u00e1kazn\u00edk pot\u0159ebuje 1 000 kus\u016f a nejsou k dispozici vhodn\u00e9 skladov\u00e9 z\u00e1soby, zb\u00fdv\u00e1 dodat 50 shodn\u00fdch d\u00edl\u016f. Nejde tedy jen o v\u00fdsledek kvality, ale i o rozhodnut\u00ed, jak zajistit dod\u00e1n\u00ed.<\/p>\n\n\n<p>Nejprve zjist\u011bte, jak\u00fd materi\u00e1l je pro tuto pr\u00e1ci skute\u010dn\u011b k dispozici. Pot\u00e9 schvalte v\u00fdrobn\u00ed postup n\u00e1hradn\u00edch kus\u016f, mno\u017estv\u00ed a po\u017eadovan\u00e9 kontroly. Pou\u017eijte re\u00e1ln\u00e9 doby operac\u00ed a zapo\u010d\u00edtejte se\u0159\u00edzen\u00ed. Pokud o\u010dek\u00e1v\u00e1te dal\u0161\u00ed ztr\u00e1ty v\u00fdt\u011b\u017enosti, v\u00fdslovn\u011b stanovte mno\u017estv\u00ed nav\u00edc m\u00edsto p\u0159edpokladu, \u017ee ka\u017ed\u00fd n\u00e1hradn\u00ed kus projde kontrolou.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee schv\u00e1len\u00e1 n\u00e1hradn\u00ed v\u00fdroba vy\u017eaduje \u0161est minut obr\u00e1b\u011bn\u00ed na d\u00edl. Pro tento p\u0159\u00edklad p\u0159edpokl\u00e1dejme, \u017ee u\u017e nevzniknou \u017e\u00e1dn\u00e9 dal\u0161\u00ed zmetky. Na 50 d\u00edl\u016f je pot\u0159eba <strong>300 minut obr\u00e1b\u011bn\u00ed, tedy p\u011bt hodin<\/strong>, a to je\u0161t\u011b bez dodate\u010dn\u00e9ho \u010dasu na se\u0159\u00edzen\u00ed a kontrolu. Pokud m\u00e1 stroj p\u0159ed nutn\u00fdm zah\u00e1jen\u00edm n\u00e1sleduj\u00edc\u00ed operace voln\u00e9 pouze t\u0159i hodiny, n\u00e1hradn\u00ed v\u00fdroba se do tohoto \u00faseku podle pl\u00e1nu nevejde.<\/p>\n\n\n<p>Za\u0159azen\u00edm do neofici\u00e1ln\u00ed fronty urgentn\u00edch prac\u00ed konflikt jen skryjete, chyb\u011bj\u00edc\u00ed kapacitu t\u00edm nevytvo\u0159\u00edte. Mus\u00edte rozhodnout, zda m\u016f\u017ee pomoci jin\u00fd vhodn\u00fd stroj, zda se vyplat\u00ed p\u0159idat kapacitu, zda lze posunout jinou zak\u00e1zku, nebo zda je nutn\u00e9 zm\u011bnit p\u0159isl\u00edben\u00fd term\u00edn dod\u00e1n\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Propojte spot\u0159ebu materi\u00e1lu s n\u00e1hradn\u00ed v\u00fdrobou v syst\u00e9mu SkyPlanner<\/h3>\n\n\n<p>SkyPlanner umo\u017e\u0148uje obsluze vyk\u00e1zat zmetky jako <strong>vadn\u00e9 kusy p\u0159i zastaven\u00ed \u010dasova\u010de operace<\/strong>. Pokud je nakonfigurov\u00e1no sledov\u00e1n\u00ed materi\u00e1lu, zapo\u010d\u00edt\u00e1 se do spot\u0159eby i materi\u00e1l pou\u017eit\u00fd na tyto vadn\u00e9 kusy a aktualizuj\u00ed se skladov\u00e9 z\u016fstatky. To pom\u00e1h\u00e1 p\u0159edej\u00edt tomu, aby n\u00e1sleduj\u00edc\u00ed operace po\u010d\u00edtala s polotovary, kter\u00e9 u\u017e byly spot\u0159ebov\u00e1ny na vy\u0159azen\u00e9 d\u00edly.<\/p>\n\n\n<p>Pokud se nap\u0159\u00edklad na osm dobr\u00fdch kus\u016f spot\u0159ebuje deset polotovar\u016f, proto\u017ee dva kusy skon\u010d\u00ed jako zmetky, mus\u00ed evidence materi\u00e1lu zachytit deset polotovar\u016f, nikoli osm. V tomto p\u0159\u00edpad\u011b jsou oba vadn\u00e9 kusy potvrzen\u00fdmi definitivn\u011b vy\u0159azen\u00fdmi zmetky. P\u0159i vyhodnocov\u00e1n\u00ed kone\u010dn\u00e9 zmetkovitosti evidujte odd\u011blen\u011b opraviteln\u00e9 d\u00edly a d\u00edly zadr\u017een\u00e9 kv\u016fli kvalit\u011b, o jejich\u017e dal\u0161\u00edm osudu je\u0161t\u011b nebylo rozhodnuto. Samotn\u00fd souhrnn\u00fd po\u010det kus\u016f, kter\u00e9 nepro\u0161ly kontrolou kvality, nevypov\u00edd\u00e1 o kone\u010dn\u00e9m stavu ka\u017ed\u00e9ho d\u00edlu.<\/p>\n\n\n<p>Pot\u00e9 za\u0159a\u010fte schv\u00e1len\u00e9 operace pro v\u00fdrobu n\u00e1hradn\u00edch kus\u016f do <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">spole\u010dn\u00e9ho v\u00fdrobn\u00edho pl\u00e1nu<\/a> v syst\u00e9mu SkyPlanner. <strong>Arcturus, um\u011bl\u00e1 inteligence syst\u00e9mu SkyPlanner pro rozvrhov\u00e1n\u00ed v\u00fdroby, vypo\u010d\u00edt\u00e1 jejich za\u0159azen\u00ed podle nastaven\u00fdch kapacit, n\u00e1vaznost\u00ed operac\u00ed a priorit.<\/strong> \u010casov\u00e1 osa Gantt zobraz\u00ed v\u00fdsledn\u00e9 po\u0159ad\u00ed a term\u00edny dokon\u010den\u00ed spole\u010dn\u011b s ostatn\u00edmi zak\u00e1zkami, kter\u00e9 vyu\u017e\u00edvaj\u00ed stejn\u00e9 zdroje. Pokud je zapnut\u00e9 rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, vstupuje do v\u00fdpo\u010dtu tak\u00e9 jeho dostupnost.<\/p>\n\n\n<p>U p\u011btihodinov\u00e9 v\u00fdroby n\u00e1hradn\u00edch kus\u016f m\u016f\u017eete posoudit dopad na zb\u00fdvaj\u00edc\u00ed operace a dal\u0161\u00ed z\u00e1kaznick\u00e9 zak\u00e1zky je\u0161t\u011b p\u0159edt\u00edm, ne\u017e p\u0159isl\u00edb\u00edte term\u00edn n\u00e1pravy. Priority i rozhodnut\u00ed, kter\u00e1 m\u00e1 pl\u00e1n zachovat, m\u00e1te pod kontrolou vy. Arcturus p\u0159epo\u010d\u00edt\u00e1 v\u0161echny souvisej\u00edc\u00ed \u010d\u00e1sti pl\u00e1nu, tak\u017ee nemus\u00edte ru\u010dn\u011b sestavovat nov\u00e9 po\u0159ad\u00ed pr\u00e1ce na ka\u017ed\u00e9m dot\u010den\u00e9m stroji.<\/p>\n\n\n<p>Pokud zmetky opakovan\u011b naru\u0161uj\u00ed v\u00fdrobu, je proto SkyPlanner u\u017eite\u010dn\u00fdm dal\u0161\u00edm krokem: zaznamenan\u00e1 ztr\u00e1ta, spot\u0159ebovan\u00fd materi\u00e1l i zb\u00fdvaj\u00edc\u00ed pr\u00e1ce se prom\u00edtnou do \u00faprav pl\u00e1nu. Nez\u016fst\u00e1vaj\u00ed jen odd\u011blen\u00fdmi \u00fadaji, kter\u00e9 by pozd\u011bji museli sla\u010fovat pracovn\u00edci kvality, skladu a mistr. SkyPlanner se prost\u0159ednictv\u00edm otev\u0159en\u00e9ho rozhran\u00ed REST API propoj\u00ed s jak\u00fdmkoli syst\u00e9mem ERP nebo MES, tak\u017ee st\u00e1vaj\u00edc\u00ed z\u00e1znamy o zak\u00e1zk\u00e1ch a kvalit\u011b mohou z\u016fstat sou\u010d\u00e1st\u00ed propojen\u00e9ho pracovn\u00edho postupu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Co ve spole\u010dnosti Eskomatic zm\u011bnil lep\u0161\u00ed p\u0159ehled o materi\u00e1lu<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/eskomatic\/\">Spole\u010dnost Eskomatic, kter\u00e1 se zab\u00fdv\u00e1 zak\u00e1zkov\u00fdm obr\u00e1b\u011bn\u00edm,<\/a> d\u0159\u00edve sestavovala po\u0159ad\u00ed pr\u00e1ce p\u0159ev\u00e1\u017en\u011b ru\u010dn\u011b ve star\u0161\u00edm ERP a syst\u00e9mu \u0159\u00edzen\u00ed v\u00fdroby. Kv\u016fli omezen\u00e9mu p\u0159ehledu o materi\u00e1lu se mohlo st\u00e1t, \u017ee jeho nedostatek vy\u0161el najevo a\u017e t\u011bsn\u011b p\u0159ed pl\u00e1novan\u00fdm zah\u00e1jen\u00edm operace.<\/p>\n\n\n<p>Po propojen\u00ed syst\u00e9mu SkyPlanner se st\u00e1vaj\u00edc\u00edm ERP z\u00edskala spole\u010dnost p\u0159ehledn\u011bj\u0161\u00ed po\u0159ad\u00ed pr\u00e1ce v diagramu Gantt, p\u0159ehled o chyb\u011bj\u00edc\u00edm materi\u00e1lu a automatick\u00e9 rozvrhov\u00e1n\u00ed kapacitn\u00ed z\u00e1t\u011b\u017ee. Eskomatic uv\u00e1d\u00ed, \u017ee nyn\u00ed stanovuje dodac\u00ed term\u00edny p\u0159esn\u011bji a zaznamen\u00e1v\u00e1 m\u00e9n\u011b p\u0159eru\u0161en\u00ed v\u00fdroby kv\u016fli chyb\u011bj\u00edc\u00edmu materi\u00e1lu.<\/p>\n\n\n<p>Jej\u00ed zku\u0161enost ukazuje praktick\u00fd p\u0159\u00ednos slad\u011bn\u00ed dostupnosti materi\u00e1lu s po\u0159ad\u00edm pr\u00e1ce: m\u00e9n\u011b p\u0159ekvapen\u00ed t\u011bsn\u011b p\u0159ed zah\u00e1jen\u00edm v\u00fdroby a spolehliv\u011bj\u0161\u00ed podklady pro term\u00edn sd\u011blen\u00fd z\u00e1kazn\u00edkovi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sni\u017eujte zmetkovitost odstran\u011bn\u00edm prok\u00e1zan\u00e9 p\u0159\u00ed\u010diny<\/h2>\n\n\n<p>Neexistuje jedin\u00e9 procento zmetkovitosti, kter\u00e9 by bylo p\u0159ijateln\u00e9 pro v\u0161echny v\u00fdrobn\u00ed procesy. Opakovan\u00e1 v\u00fdroba na vyhrazen\u00e9m pracovi\u0161ti, rozjezd nov\u00e9ho v\u00fdrobku a obr\u00e1b\u011bn\u00ed d\u00edl\u016f s vysokou hodnotou se li\u0161\u00ed charakterem ztr\u00e1t. C\u00edl stanovujte podle srovnateln\u00e9 v\u00fdroby, po\u017eadavk\u016f z\u00e1kazn\u00edka a d\u016fsledk\u016f neshod, nikoli podle univerz\u00e1ln\u00ed hranice, jako je 5 %.<\/p>\n\n\n<p>Podle z\u00e1znam\u016f, z nich\u017e se zmetkovitost po\u010d\u00edt\u00e1, vyberte probl\u00e9m k pro\u0161et\u0159en\u00ed. Rozt\u0159i\u010fte ztr\u00e1ty podle v\u00fdrobku, operace, materi\u00e1lov\u00e9 \u0161ar\u017ee a potvrzen\u00e9 p\u0159\u00ed\u010diny, pokud jsou tyto \u00fadaje k dispozici. Probl\u00e9my se\u0159a\u010fte podle ztracen\u00e9ho mno\u017estv\u00ed, n\u00e1klad\u016f a dopadu na dod\u00e1vky. Nejv\u011bt\u0161\u00ed hromada zmetk\u016f nemus\u00ed b\u00fdt nejnal\u00e9hav\u011bj\u0161\u00edm probl\u00e9mem v\u00fdroby.<\/p>\n\n\n<p>Konkr\u00e9tn\u00ed opat\u0159en\u00ed volte podle zji\u0161t\u011bn\u00fdch skute\u010dnost\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Opakovan\u00e9 vy\u0159azov\u00e1n\u00ed kv\u016fli rozm\u011br\u016fm:<\/strong> zkontrolujte stav n\u00e1stroj\u016f, p\u0159\u00edpravky, korekce a nastaven\u00ed procesu s ohledem na konkr\u00e9tn\u00ed nespln\u011bn\u00fd po\u017eadavek.<\/li><li><strong>Ztr\u00e1ty soust\u0159ed\u011bn\u00e9 do jedn\u00e9 materi\u00e1lov\u00e9 \u0161ar\u017ee:<\/strong> ne\u017e p\u0159isoud\u00edte p\u0159\u00ed\u010dinu stroji nebo obsluze, prov\u011b\u0159te vstupn\u00ed materi\u00e1l a podklady od dodavatele.<\/li><li><strong>Neshodn\u00e9 kusy p\u0159i rozjezdu nebo p\u0159etypov\u00e1n\u00ed:<\/strong> p\u0159ed spu\u0161t\u011bn\u00edm cel\u00e9 d\u00e1vky ov\u011b\u0159te se\u0159\u00edzen\u00ed a schv\u00e1len\u00ed prvn\u00edho kusu.<\/li><li><strong>Po\u0161kozen\u00ed mezi operacemi:<\/strong> prov\u011b\u0159te manipulaci, skladov\u00e1n\u00ed a ochranu d\u00edl\u016f v m\u00edst\u011b, kde k po\u0161kozen\u00ed doch\u00e1z\u00ed.<\/li><\/ul>\n\n\n<p>Ur\u010dete osobu odpov\u011bdnou za n\u00e1pravn\u00e9 opat\u0159en\u00ed a n\u00e1sleduj\u00edc\u00ed srovnateln\u00e9 d\u00e1vky kontrolujte podle stejn\u00fdch p\u0159ej\u00edmac\u00edch krit\u00e9ri\u00ed. D\u0159\u00edv\u011bj\u0161\u00ed kontrola m\u016f\u017ee zabr\u00e1nit dal\u0161\u00edmu zpracov\u00e1n\u00ed ji\u017e vadn\u00e9ho d\u00edlu, a to je\u0161t\u011b p\u0159ed odstran\u011bn\u00edm p\u0159\u00ed\u010diny vady. Pokud ni\u017e\u0161\u00ed zmetkovitost vypl\u00fdv\u00e1 jen z m\u00edrn\u011bj\u0161\u00ed kontroly nebo z neevidovan\u00fdch neshodn\u00fdch kus\u016f, nejde o zlep\u0161en\u00ed.<\/p>\n\n\n<p>Zlep\u0161ov\u00e1n\u00ed kvality p\u0159edch\u00e1z\u00ed dal\u0161\u00edm ztr\u00e1t\u00e1m. Realistick\u00fd pl\u00e1n materi\u00e1lu a kapacit pom\u00e1h\u00e1 zvl\u00e1dnout ztr\u00e1ty, kter\u00e9 u\u017e vznikly. Kdy\u017e se soub\u011b\u017en\u011b v\u011bnujete ob\u011bma oblastem, st\u00e1v\u00e1 se z procentn\u00edho ukazatele n\u00e1stroj lep\u0161\u00edho \u0159\u00edzen\u00ed v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zjist\u011bte, jak vy\u0159azen\u00e1 d\u00e1vka ovlivn\u00ed va\u0161i p\u0159\u00ed\u0161t\u00ed dod\u00e1vku<\/h2>\n\n\n<p>Na uk\u00e1zku syst\u00e9mu SkyPlanner si p\u0159ipravte jeden ned\u00e1vn\u00fd p\u0159\u00edpad kone\u010dn\u00e9ho vy\u0159azen\u00ed zmetk\u016f: p\u016fvodn\u00ed mno\u017estv\u00ed a mno\u017estv\u00ed uznan\u00e9 za vyhovuj\u00edc\u00ed, spot\u0159ebovan\u00fd materi\u00e1l, schv\u00e1len\u00e9 operace pro v\u00fdrobu n\u00e1hradn\u00edch kus\u016f a z\u00e1kaznickou zak\u00e1zku, kterou ztr\u00e1ta ovlivnila.<\/p>\n\n\n<p>Na tomto p\u0159\u00edpadu si projd\u011bte konkr\u00e9tn\u00ed pl\u00e1n n\u00e1pravy. Zohledn\u011bte chyb\u011bj\u00edc\u00ed materi\u00e1l, za\u0159a\u010fte pr\u00e1ci s ohledem na st\u00e1vaj\u00edc\u00ed z\u00e1vazky a zjist\u011bte, co je t\u0159eba rozhodnout ohledn\u011b dod\u00e1vek, je\u0161t\u011b ne\u017e se na n\u011b z\u00e1kazn\u00edk s\u00e1m zept\u00e1.<\/p>\n\n\n<p><strong><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku syst\u00e9mu SkyPlanner<\/a><\/strong> a proberte s n\u00e1mi svou v\u00fdrobu, nebo si nejprve <strong><a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a><\/strong>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu Domov &raquo; Zdroje &raquo; Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu D\u00e1vka je hotov\u00e1, ale zak\u00e1zka ne. Kontrola vy\u0159adila d\u00edly, kter\u00e9 u\u017e nelze opravit, materi\u00e1l je spot\u0159ebovan\u00fd a z\u00e1kazn\u00edk st\u00e1le o\u010dek\u00e1v\u00e1 cel\u00e9 mno\u017estv\u00ed v p\u00e1tek. Zmetkovitost ve v\u00fdrob\u011b vyjad\u0159uje, kolik procent z vymezen\u00e9ho vyroben\u00e9ho mno\u017estv\u00ed bylo definitivn\u011b vy\u0159azeno jako nezp\u016fsobil\u00e9 &#8230; <a title=\"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/\" aria-label=\"Read more about Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-105697","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu<\/title>\n<meta name=\"description\" content=\"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\" \/>\n<meta property=\"og:description\" content=\"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T05:45:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:45:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:45:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/\"},\"wordCount\":3140,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/\",\"name\":\"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:45:20+00:00\",\"description\":\"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/zmetkovitost-ve-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu","description":"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/","og_locale":"cs_CZ","og_type":"article","og_title":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu","og_description":"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T05:45:06+00:00","article_modified_time":"2026-10-22T05:45:20+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:45:20+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/"},"wordCount":3140,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/","name":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:45:20+00:00","description":"Zmetky nestoj\u00ed jen materi\u00e1l. Spo\u010d\u00edtejte spolehliv\u011b zmetkovitost, zohledn\u011bte \u00fabytek z\u00e1sob a za\u0159a\u010fte n\u00e1hradn\u00ed v\u00fdrobu do re\u00e1ln\u00e9ho pl\u00e1nu dod\u00e1vek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","width":1776,"height":999,"caption":"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/zmetkovitost-ve-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu Domov &raquo; Zdroje &raquo; Zmetkovitost ve v\u00fdrob\u011b: spo\u010d\u00edtejte skute\u010dnou ztr\u00e1tu D\u00e1vka je hotov\u00e1, ale zak\u00e1zka ne. Kontrola vy\u0159adila d\u00edly, kter\u00e9 u\u017e nelze opravit, materi\u00e1l je spot\u0159ebovan\u00fd a z\u00e1kazn\u00edk st\u00e1le o\u010dek\u00e1v\u00e1 cel\u00e9 mno\u017estv\u00ed v p\u00e1tek. Zmetkovitost ve v\u00fdrob\u011b vyjad\u0159uje, kolik procent z vymezen\u00e9ho vyroben\u00e9ho mno\u017estv\u00ed bylo definitivn\u011b vy\u0159azeno jako nezp\u016fsobil\u00e9&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105697","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=105697"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105697\/revisions"}],"predecessor-version":[{"id":105759,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/105697\/revisions\/105759"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/105729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=105697"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=105697"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=105697"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}