{"id":101791,"date":"2026-10-20T00:44:37","date_gmt":"2026-10-20T00:44:37","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101791"},"modified":"2026-10-20T00:44:50","modified_gmt":"2026-10-20T00:44:50","slug":"planovani-vyroby-behem-udrzby","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/","title":{"rendered":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Obr\u00e1b\u011bc\u00ed centrum bude znovu v provozu ve \u010dtvrtek. Zak\u00e1zka pro z\u00e1kazn\u00edka se expeduje v p\u00e1tek. Zd\u00e1 se, \u017ee se v\u0161e stihne. Pak ale zjist\u00edte, \u017ee kontrola pot\u0159ebuje obroben\u00e9 d\u00edly u\u017e ve \u010dtvrtek r\u00e1no, tedy d\u0159\u00edve, ne\u017e je stroj po obnoven\u00ed provozu dok\u00e1\u017ee dokon\u010dit.<\/p>\n\n\n<p>Rozvrhov\u00e1n\u00ed v\u00fdroby s ohledem na \u00fadr\u017ebu znamen\u00e1 rozvrhnout operace zak\u00e1zek p\u0159ed dohodnutou odst\u00e1vku stroje \u010di n\u00e1stroje a po n\u00ed tak, aby ostatn\u00ed v\u00fdroba mohla pokra\u010dovat. Rozhoduj\u00edc\u00ed je postupovat zp\u011btn\u011b od operac\u00ed nutn\u00fdch k dod\u00e1n\u00ed, nikoli jen posunout frontu pr\u00e1ce nedostupn\u00e9ho v\u00fdrobn\u00edho zdroje na den jeho n\u00e1vratu do provozu.<\/p>\n\n\n<p>SkyPlanner APS propojuje toto rozhodnut\u00ed s cel\u00fdm v\u00fdrobn\u00edm rozvrhem. Vy zad\u00e1te dobu \u00fadr\u017eby a priority. Arcturus, um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed v\u00fdroby, pak vypo\u010d\u00edt\u00e1 rozvrh podle dostupn\u00fdch kapacit a vazeb mezi operacemi. V\u00fdsledek uvid\u00edte v diagramu Gantt, tak\u017ee m\u016f\u017eete posoudit term\u00edny dod\u00e1vek, ani\u017e byste ru\u010dn\u011b p\u0159estavovali frontu pr\u00e1ce ka\u017ed\u00e9ho dot\u010den\u00e9ho stroje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pl\u00e1n \u00fadr\u017eby je\u0161t\u011b nen\u00ed pl\u00e1n v\u00fdroby<\/h2>\n\n\n<p>\u00dadr\u017eba u\u017e m\u016f\u017ee m\u00edt jasno v tom, jak\u00e9 \u00fakoly, pracovn\u00edky a d\u00edly bude z\u00e1sah vy\u017eadovat. V\u00fdroba v\u0161ak st\u00e1le pot\u0159ebuje odpov\u011b\u010f na jinou ot\u00e1zku: co m\u00e1 z\u00e1vod vyr\u00e1b\u011bt, kdy\u017e tento v\u00fdrobn\u00ed zdroj nebude k dispozici?<\/p>\n\n\n<p>Z\u00e1znam v kalend\u00e1\u0159i \u00fadr\u017eby na tuto ot\u00e1zku neodpov\u00ed. Nesta\u010d\u00ed ani ode\u010d\u00edst ztracen\u00e9 hodiny od celkov\u00e9 t\u00fddenn\u00ed kapacity. Stejn\u00fd v\u00fdpadek kapacity m\u016f\u017ee b\u00fdt zvl\u00e1dnuteln\u00fd u zak\u00e1zky s term\u00ednem p\u0159\u00ed\u0161t\u00ed t\u00fdden, ale kritick\u00fd u zak\u00e1zky, jej\u00ed\u017e dal\u0161\u00ed operace mus\u00ed za\u010d\u00edt je\u0161t\u011b p\u0159ed n\u00e1vratem stroje do provozu.<\/p>\n\n\n<p>Nejprve se s \u00fadr\u017ebou dohodn\u011bte na p\u0159esn\u00e9m obdob\u00ed nedostupnosti v\u010detn\u011b okam\u017eiku, kdy bude v\u00fdrobn\u00ed zdroj op\u011bt p\u0159ipraven k v\u00fdrob\u011b. Zahr\u0148te do n\u011bj i p\u0159\u00edpadn\u00e9 po\u017eadovan\u00e9 kontroly nebo p\u0159\u00edpravu na op\u011btovn\u00e9 spu\u0161t\u011bn\u00ed. Pot\u00e9 ur\u010dete, co p\u0159esn\u011b nebude k dispozici: jeden stroj, fyzick\u00fd n\u00e1stroj pou\u017e\u00edvan\u00fd na v\u00edce stroj\u00edch, nebo skupina v\u00fdrobn\u00edch zdroj\u016f se spole\u010dnou odst\u00e1vkou.<\/p>\n\n\n<p>Ve SkyPlanner lze dobu \u00fadr\u017eby stroje zadat jako v\u00fdjimku z dostupnosti pracovi\u0161t\u011b. N\u00e1stroj m\u00e1 vlastn\u00ed term\u00edny \u00fadr\u017eby. Oboj\u00ed se prom\u00edt\u00e1 do <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>. Dohodnut\u00e1 odst\u00e1vka je tak sou\u010d\u00e1st\u00ed stejn\u00e9ho pl\u00e1nu jako ostatn\u00ed pr\u00e1ce, pro kterou je pot\u0159eba rozd\u011blit zb\u00fdvaj\u00edc\u00ed kapacitu. Nemus\u00edte tedy sla\u010fovat dva odd\u011blen\u00e9 kalend\u00e1\u0159e.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozhodn\u011bte, co mus\u00ed b\u00fdt hotov\u00e9 p\u0159ed odst\u00e1vkou<\/h2>\n\n\n<p>Za\u010dn\u011bte zak\u00e1zkami, jejich\u017e v\u00fdrobn\u00ed postup vyu\u017e\u00edv\u00e1 dot\u010den\u00fd v\u00fdrobn\u00ed zdroj. U ka\u017ed\u00e9 projd\u011bte zb\u00fdvaj\u00edc\u00ed operace a\u017e po expedici. Rozhoduj\u00edc\u00ed je nejzaz\u0161\u00ed okam\u017eik, kdy m\u016f\u017ee dot\u010den\u00e1 operace skon\u010dit, aby bylo st\u00e1le re\u00e1ln\u00e9 stihnout v\u0161echny dal\u0161\u00ed kroky a zak\u00e1zku v\u010das dodat.<\/p>\n\n\n<p>Tento mezn\u00ed term\u00edn m\u016f\u017ee p\u0159ipadat je\u0161t\u011b p\u0159ed \u00fadr\u017ebu, i kdy\u017e je dod\u00e1n\u00ed napl\u00e1nov\u00e1no a\u017e po n\u00ed. Takov\u00e9 operace ur\u010dete jako prvn\u00ed. Pr\u00e1v\u011b ty m\u00e1 smysl prov\u00e9st d\u0159\u00edve, pokud budou v\u010das hotov\u00e9 p\u0159edchoz\u00ed operace a budou p\u0159ipraven\u00e9 materi\u00e1ly i pot\u0159ebn\u00e9 v\u00fdrobn\u00ed zdroje.<\/p>\n\n\n<p>Nep\u0159esouvejte ale dop\u0159edu v\u0161echny dot\u010den\u00e9 zak\u00e1zky. P\u0159ed\u010dasn\u00e1 v\u00fdroba d\u00edl\u016f na p\u0159\u00ed\u0161t\u00ed m\u011bs\u00edc m\u016f\u017ee spot\u0159ebovat pr\u00e1v\u011b tu kapacitu, kterou pot\u0159ebujete pro z\u00e1vazky tohoto t\u00fddne. Nav\u00edc zv\u00fd\u0161\u00ed objem rozpracovan\u00e9 v\u00fdroby, kter\u00e1 zat\u00edm nem\u00e1 kam smyslupln\u011b pokra\u010dovat. C\u00edlem je dokon\u010dit tolik pr\u00e1ce, aby pot\u0159ebn\u00e9 navazuj\u00edc\u00ed operace mohly b\u011b\u017eet i b\u011bhem odst\u00e1vky.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159\u00edklad: p\u00e1te\u010dn\u00ed dod\u00e1vka vy\u017eaduje obr\u00e1b\u011bn\u00ed u\u017e v pond\u011bl\u00ed<\/h3>\n\n\n<p>P\u0159edstavte si zak\u00e1zkov\u00e9ho v\u00fdrobce, kter\u00fd m\u00e1 napl\u00e1novanou \u00fadr\u017ebu obr\u00e1b\u011bc\u00edho centra od \u00fatern\u00edho r\u00e1na do \u010dtvrte\u010dn\u00edho r\u00e1na. Zak\u00e1zka s p\u00e1te\u010dn\u00ed expedic\u00ed vy\u017eaduje obr\u00e1b\u011bn\u00ed, kontrolu a kone\u010dnou mont\u00e1\u017e. Dostupn\u00fd term\u00edn kontroly je ve \u010dtvrtek r\u00e1no a mont\u00e1\u017e m\u00e1 n\u00e1sledovat je\u0161t\u011b t\u00e9ho\u017e odpoledne.<\/p>\n\n\n<p>Pokud by se s obr\u00e1b\u011bn\u00edm \u010dekalo na n\u00e1vrat centra do provozu, term\u00edn kontroly by se nestihl. Pl\u00e1nova\u010d proto pot\u0159ebuje dokon\u010dit obr\u00e1b\u011bn\u00ed p\u0159ed \u00fatern\u00ed odst\u00e1vkou. V\u010das mus\u00ed skon\u010dit i p\u0159edchoz\u00ed p\u0159\u00edprava, aby to bylo mo\u017en\u00e9.<\/p>\n\n\n<p>Druh\u00e1 zak\u00e1zka m\u00e1 term\u00edn dod\u00e1n\u00ed a\u017e n\u00e1sleduj\u00edc\u00ed t\u00fdden, tak\u017ee jej\u00ed obr\u00e1b\u011bn\u00ed m\u016f\u017ee po\u010dkat na \u010dtvrte\u010dn\u00ed obnoven\u00ed provozu. Jin\u00e9 obr\u00e1b\u011bc\u00ed centrum mezit\u00edm m\u016f\u017ee pokra\u010dovat ve vhodn\u00e9 pr\u00e1ci, kter\u00e1 nedostupn\u00fd v\u00fdrobn\u00ed zdroj nepot\u0159ebuje.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Posuzovan\u00e1 pr\u00e1ce<\/th><th>Rozhodnut\u00ed o v\u00fdrob\u011b<\/th><th>Co ov\u011b\u0159it<\/th><\/tr><\/thead><tbody><tr><td>Zak\u00e1zka s p\u00e1te\u010dn\u00ed expedic\u00ed<\/td><td>Dokon\u010dit obr\u00e1b\u011bn\u00ed p\u0159ed odst\u00e1vkou<\/td><td>Dokon\u010denou p\u0159\u00edpravu a p\u0159ipravenost materi\u00e1lu, pot\u00e9 kapacitu kontroly a mont\u00e1\u017ee<\/td><\/tr><tr><td>Zak\u00e1zka na n\u00e1sleduj\u00edc\u00ed t\u00fdden<\/td><td>Ponechat obr\u00e1b\u011bn\u00ed po obnoven\u00ed provozu, pokud se st\u00e1le stihne cel\u00fd v\u00fdrobn\u00ed postup<\/td><td>Frontu pr\u00e1ce po obnoven\u00ed provozu a zb\u00fdvaj\u00edc\u00ed \u010das do dod\u00e1n\u00ed<\/td><\/tr><tr><td>Nez\u00e1visl\u00e1 pr\u00e1ce<\/td><td>Pokra\u010dovat b\u011bhem \u00fadr\u017eby<\/td><td>Dostupnost p\u0159\u00edslu\u0161n\u00e9ho stroje, obsluhy a n\u00e1stroj\u016f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Rozd\u00edl je jednoduch\u00fd: <strong>samotn\u00e1 priorita dod\u00e1vky neur\u010duje, kter\u00e1 operace mus\u00ed skon\u010dit p\u0159ed \u00fadr\u017ebou. To ur\u010duje zb\u00fdvaj\u00edc\u00ed v\u00fdrobn\u00ed postup.<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">Udr\u017ete ostatn\u00ed v\u00fdrobu v chodu, ale po\u010d\u00edtejte jen se skute\u010dnou n\u00e1hradn\u00ed kapacitou<\/h2>\n\n\n<p>Pl\u00e1novan\u00e1 odst\u00e1vka neznamen\u00e1, \u017ee se mus\u00ed zastavit cel\u00e9 odd\u011blen\u00ed. Stroje, kter\u00fdch se net\u00fdk\u00e1, ponechte k dispozici a ur\u010dete, jakou pr\u00e1ci na nich lze skute\u010dn\u011b prov\u00e1d\u011bt. Pokud proch\u00e1z\u00ed \u00fadr\u017ebou jen jeden n\u00e1stroj, mohou na stejn\u00e9m stroji d\u00e1l b\u011b\u017eet jin\u00e9 operace vyu\u017e\u00edvaj\u00edc\u00ed odli\u0161n\u00e9 n\u00e1stroje.<\/p>\n\n\n<p>Pomoci m\u016f\u017ee i n\u00e1hradn\u00ed stroj, ale pouze tehdy, pokud na n\u011bm lze operaci prov\u00e9st s pot\u0159ebn\u00fdmi n\u00e1stroji, obsluhou a v dostupn\u00e9m \u010dase. Prov\u011b\u0159te tak\u00e9 zak\u00e1zky, kter\u00e9 u\u017e jsou na n\u011bm napl\u00e1novan\u00e9. P\u0159esun d\u00e1vky m\u016f\u017ee zachr\u00e1nit term\u00edn jedn\u00e9 dod\u00e1vky za cenu zpo\u017ed\u011bn\u00ed jin\u00e9.<\/p>\n\n\n<p>Zvl\u00e1\u0161tn\u00ed pozornost vy\u017eaduje \u00fadr\u017eba n\u00e1stroj\u016f. Pokud dva stroje pot\u0159ebuj\u00ed tent\u00fd\u017e fyzick\u00fd p\u0159\u00edpravek, p\u0159esun operace na druh\u00fd stroj nepom\u016f\u017ee, dokud je p\u0159\u00edpravek na \u00fadr\u017eb\u011b. Omezen\u00ed je v\u00e1zan\u00e9 na n\u00e1stroj, nikoli na stroj. Jin\u00fd vhodn\u00fd n\u00e1stroj je alternativou pouze tehdy, pokud skute\u010dn\u011b existuje a je k dispozici.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/vyrobni-postup\/\">Operace v\u00fdrobn\u00edho postupu<\/a> ve SkyPlanner ur\u010duj\u00ed zp\u016fsobil\u00e1 pracovi\u0161t\u011b, doby trv\u00e1n\u00ed a vz\u00e1jemn\u00e9 vazby. Do rozvrhov\u00e1n\u00ed se prom\u00edt\u00e1 i dostupnost n\u00e1stroj\u016f. D\u00edky t\u011bmto vazb\u00e1m m\u016f\u017ee Arcturus p\u0159i v\u00fdpo\u010dtu pracovat s pou\u017eiteln\u00fdmi alternativami, m\u00edsto aby ka\u017ed\u00fd voln\u00fd \u010dasov\u00fd \u00fasek na libovoln\u00e9m stroji pova\u017eoval za zam\u011bnitelnou kapacitu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nechte SkyPlanner vypo\u010d\u00edtat rozvrh navazuj\u00edc\u00edch operac\u00ed<\/h2>\n\n\n<p>Jakmile m\u00e1te aktu\u00e1ln\u00ed term\u00edn \u00fadr\u017eby i p\u0159\u00edslu\u0161n\u00e9 v\u00fdrobn\u00ed \u00fadaje, p\u0159epo\u010d\u00edtejte rozvrh. Tla\u010d\u00edtko pro p\u0159epl\u00e1nov\u00e1n\u00ed v\u0161ech operac\u00ed ve SkyPlanner, p\u0159ezd\u00edvan\u00e9 King Button, spust\u00ed Arcturus. Ten zohledn\u00ed zadan\u00e1 obdob\u00ed nedostupnosti a pou\u017eije nastaven\u00e9 v\u00fdrobn\u00ed zdroje, vazby, priority a pravidla. V\u00fdsledn\u00e9 p\u0159i\u0159azen\u00ed operac\u00ed a jejich na\u010dasov\u00e1n\u00ed zobraz\u00ed diagram Gantt.<\/p>\n\n\n<p>V p\u0159\u00edkladu s obr\u00e1b\u011bn\u00edm nejde jen o pr\u00e1zdn\u00e9 \u00fater\u00fd a st\u0159edu v kalend\u00e1\u0159i centra. M\u016f\u017eete ov\u011b\u0159it, zda obr\u00e1b\u011bn\u00ed p\u00e1te\u010dn\u00ed zak\u00e1zky skon\u010d\u00ed p\u0159ed odst\u00e1vkou, zda se st\u00e1le stihne kontrola a mont\u00e1\u017e a jak bude po \u010dtvrte\u010dn\u00edm obnoven\u00ed provozu prob\u00edhat pr\u00e1ce na zak\u00e1zce pro n\u00e1sleduj\u00edc\u00ed t\u00fdden. Pokud \u010d\u00e1st pr\u00e1ce p\u0159evezme zp\u016fsobil\u00fd n\u00e1hradn\u00ed stroj, posuzujete z\u00e1rove\u0148 i jeho ostatn\u00ed zak\u00e1zky.<\/p>\n\n\n<p>Pr\u00e1v\u011b proto m\u00e1 smysl pou\u017e\u00edvat SkyPlanner m\u00edsto odd\u011blen\u00e9ho veden\u00ed front pr\u00e1ce pro jednotliv\u00e9 stroje. Zm\u011bna u jednoho v\u00fdrobn\u00edho zdroje ovliv\u0148uje i ostatn\u00ed. Arcturus vypo\u010d\u00edt\u00e1 rozvrh se v\u0161emi vazbami, zat\u00edmco vy rozhodujete, kter\u00e9 z\u00e1vazky maj\u00ed p\u0159ednost.<\/p>\n\n\n<p>V\u00fdsledek posu\u010fte ve t\u0159ech obdob\u00edch:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>P\u0159ed odst\u00e1vkou:<\/strong> skon\u010d\u00ed pot\u0159ebn\u00e1 pr\u00e1ce v\u010das a budou pro ni dokon\u010den\u00e9 p\u0159edchoz\u00ed operace i p\u0159ipraven\u00fd materi\u00e1l?<\/li><li><strong>B\u011bhem odst\u00e1vky:<\/strong> maj\u00ed navazuj\u00edc\u00ed operace pot\u0159ebn\u00e9 d\u00edly a m\u016f\u017ee nez\u00e1visl\u00e1 v\u00fdroba pokra\u010dovat?<\/li><li><strong>Po obnoven\u00ed provozu:<\/strong> je napl\u00e1novan\u00e9 po\u0159ad\u00ed pr\u00e1ce provediteln\u00e9 a umo\u017e\u0148uj\u00ed zb\u00fdvaj\u00edc\u00ed operace dodr\u017eet term\u00edny dod\u00e1vek?<\/li><\/ul>\n\n\n<p>Pokud d\u016fle\u017eit\u00e1 zak\u00e1zka st\u00e1le nevych\u00e1z\u00ed v term\u00ednu, je nutn\u00e9 rozhodnout o konkr\u00e9tn\u00ed zm\u011bn\u011b ve v\u00fdrob\u011b. Pomoci m\u016f\u017ee vhodn\u00e1 alternativa, schv\u00e1len\u00e9 prodlou\u017een\u00ed pracovn\u00ed doby se zaji\u0161t\u011bnou obsluhou nebo v\u011bdom\u00e1 zm\u011bna priorit. U ka\u017ed\u00e9 zm\u011bny posu\u010fte dopad na ostatn\u00ed zak\u00e1zky. Pokud st\u00e1le neexistuje provediteln\u00fd postup, dohodn\u011bte nov\u00fd term\u00edn v\u010das, m\u00edsto abyste chyb\u011bj\u00edc\u00ed kapacitu odhalili a\u017e p\u0159i expedici.<\/p>\n\n\n<p>Dodr\u017ete term\u00edn odst\u00e1vky dohodnut\u00fd s odpov\u011bdn\u00fdm t\u00fdmem. Pln\u00e1 fronta pr\u00e1ce nen\u00ed d\u016fvodem p\u0159edpokl\u00e1dat, \u017ee stroj nebo n\u00e1stroj m\u016f\u017ee bezpe\u010dn\u011b z\u016fstat v provozu d\u00e9le.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e9n\u011b \u00faprav front pr\u00e1ce, v\u00edce kontroly nad v\u00fdrobou<\/h2>\n\n\n<p>Ve spole\u010dnosti Mamec, finsk\u00e9m v\u00fdrobci pr\u016fmyslov\u00fdch m\u00edchadel a technologicky vysp\u011bl\u00fdch produkt\u016f na zak\u00e1zku, dob\u0159e v\u011bd\u00ed, kolik pr\u00e1ce stoj\u00ed udr\u017eet navazuj\u00edc\u00ed operace ve spr\u00e1vn\u00e9m po\u0159ad\u00ed. P\u0159ed zaveden\u00edm SkyPlanner ur\u010dovali mist\u0159i priority podle term\u00edn\u016f dod\u00e1n\u00ed na pap\u00edrov\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkazech. Vz\u00e1jemn\u00e9 vazby tis\u00edc\u016f operac\u00ed bylo obt\u00ed\u017en\u00e9 \u0159\u00eddit ru\u010dn\u011b a chyb\u011bl jasn\u00fd p\u0159ehled o celkov\u00e9m vyt\u00ed\u017een\u00ed.<\/p>\n\n\n<p>Mamec propojil SkyPlanner se sv\u00fdm syst\u00e9mem Oscar ERP a zavedl jej jako hlavn\u00ed platformu pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby. Z\u00e1klad tvo\u0159\u00ed rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami vyu\u017e\u00edvaj\u00edc\u00ed um\u011blou inteligenci. D\u00edky sd\u00edlen\u00e9mu p\u0159ehledu zam\u011bstnanci vid\u00ed, v jak\u00e9m stavu se zak\u00e1zka nach\u00e1z\u00ed. <a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/mamec\/\">Mamec uv\u00e1d\u00ed<\/a>, \u017ee pl\u00e1nov\u00e1n\u00ed nyn\u00ed vy\u017eaduje z\u0159eteln\u011b m\u00e9n\u011b pr\u00e1ce a v\u010dasnost dod\u00e1vek se zlep\u0161ila.<\/p>\n\n\n<p>Tato zku\u0161enost ukazuje p\u0159\u00ednos rozvrhov\u00e1n\u00ed, kter\u00e9 zohled\u0148uje vz\u00e1jemn\u00e9 vazby: pl\u00e1nova\u010d m\u016f\u017ee posoudit d\u016fsledky zm\u011bny, ani\u017e by musel z odd\u011blen\u00fdch seznam\u016f operac\u00ed znovu sestavovat po\u0159ad\u00ed v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159ipravte obnoven\u00ed provozu je\u0161t\u011b p\u0159ed odst\u00e1vkou<\/h2>\n\n\n<p>Je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm \u00fadr\u017eby p\u0159edejte mistrovi jasn\u00e9 po\u0159ad\u00ed pr\u00e1ce: co mus\u00ed skon\u010dit p\u0159ed odst\u00e1vkou, co bude pokra\u010dovat jinde a kter\u00e9 operace jsou napl\u00e1novan\u00e9 jako prvn\u00ed po obnoven\u00ed provozu. Ov\u011b\u0159te, \u017ee pro op\u011btovn\u00e9 spu\u0161t\u011bn\u00ed budou p\u0159ipraven\u00e9 n\u00e1stroje, materi\u00e1ly i obsluha. Vyhn\u011bte se front\u011b, ve kter\u00e9 maj\u00ed v\u0161echny operace na pap\u00ed\u0159e za\u010d\u00edt ihned, jakmile bude stroj op\u011bt k dispozici.<\/p>\n\n\n<p>Tak\u00e9 obchodn\u00edmu odd\u011blen\u00ed poskytn\u011bte jednotn\u00fd p\u0159ehled o dot\u010den\u00fdch z\u00e1vazc\u00edch. Informace o zak\u00e1zk\u00e1ch, kter\u00e9 se st\u00e1le stihnou, o t\u011bch, kter\u00e9 vy\u017eaduj\u00ed rozhodnut\u00ed, i o p\u0159\u00edpadn\u00fdch zm\u011bn\u00e1ch term\u00edn\u016f mus\u00ed vych\u00e1zet ze stejn\u00e9ho v\u00fdrobn\u00edho pl\u00e1nu.<\/p>\n\n\n<p>Pokud se b\u011bhem \u00fadr\u017eby zm\u011bn\u00ed o\u010dek\u00e1van\u00fd \u010das n\u00e1vratu do provozu, upravte zadanou dostupnost a p\u0159epo\u010d\u00edtejte rozvrh. Ne\u017e sl\u00edb\u00edte nov\u00e9 term\u00edny, znovu posu\u010fte navazuj\u00edc\u00ed pr\u00e1ci i frontu operac\u00ed po obnoven\u00ed provozu. Se SkyPlanner vy\u017eaduje tato \u00faprava m\u00e9n\u011b ru\u010dn\u00ed pr\u00e1ce, proto\u017ee vazby mezi v\u00fdrobn\u00edmi zdroji u\u017e jsou sou\u010d\u00e1st\u00ed rozvrhu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Napl\u00e1nujte v\u00fdrobu kolem p\u0159\u00ed\u0161t\u00ed odst\u00e1vky se SkyPlanner<\/h2>\n\n\n<p>Dohodnut\u00fd term\u00edn \u00fadr\u017eby v\u00e1m d\u00e1v\u00e1 p\u0159\u00edle\u017eitost rozhodnout o v\u00fdrob\u011b d\u0159\u00edv, ne\u017e se dostanete pod tlak. SkyPlanner tuto dobu zohledn\u00ed jako omezen\u00ed p\u0159i rozvrhov\u00e1n\u00ed, propoj\u00ed ji s v\u00fdrobn\u00edmi postupy va\u0161ich zak\u00e1zek a v\u00fdsledn\u00fd rozvrh zobraz\u00ed v Ganttov\u011b diagramu. M\u00e9n\u011b \u010dasu str\u00e1v\u00edte \u00fapravami front operac\u00ed a v\u00edce ho budete m\u00edt na dodr\u017een\u00ed kl\u00ed\u010dov\u00fdch z\u00e1vazk\u016f.<\/p>\n\n\n<p>Sv\u016fj st\u00e1vaj\u00edc\u00ed podnikov\u00fd syst\u00e9m m\u016f\u017eete pou\u017e\u00edvat d\u00e1l: SkyPlanner <a href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">lze propojit s libovoln\u00fdm ERP nebo MES<\/a> prost\u0159ednictv\u00edm otev\u0159en\u00e9ho rozhran\u00ed REST API.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku SkyPlanner<\/a> zam\u011b\u0159enou na va\u0161i p\u0159\u00ed\u0161t\u00ed pl\u00e1novanou odst\u00e1vku kv\u016fli \u00fadr\u017eb\u011b. P\u0159ipravte si informace o dot\u010den\u00e9m stroji \u010di n\u00e1stroji, v\u00fdrobn\u00ed postup zak\u00e1zky a dod\u00e1vky s term\u00ednem kolem jeho n\u00e1vratu do provozu. Nechte si uk\u00e1zat, kter\u00e9 operace je nutn\u00e9 dokon\u010dit p\u0159ed odst\u00e1vkou, co m\u016f\u017ee pokra\u010dovat b\u011bhem n\u00ed a jak op\u011btovn\u00e9 spu\u0161t\u011bn\u00ed ovlivn\u00ed zb\u00fdvaj\u00edc\u00ed zak\u00e1zky.<\/p>\n\n\n<p>Pokud se chcete nejprve sezn\u00e1mit se zp\u016fsobem rozvrhov\u00e1n\u00ed, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek Domov &raquo; Zdroje &raquo; Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek Obr\u00e1b\u011bc\u00ed centrum bude znovu v provozu ve \u010dtvrtek. Zak\u00e1zka pro z\u00e1kazn\u00edka se expeduje v p\u00e1tek. Zd\u00e1 se, \u017ee se v\u0161e stihne. Pak ale zjist\u00edte, \u017ee kontrola pot\u0159ebuje obroben\u00e9 d\u00edly u\u017e ve \u010dtvrtek r\u00e1no, tedy d\u0159\u00edve, ne\u017e je &#8230; <a title=\"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/\" aria-label=\"Read more about Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101818,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-101791","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek<\/title>\n<meta name=\"description\" content=\"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\" \/>\n<meta property=\"og:description\" content=\"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T00:44:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T00:44:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\",\"datePublished\":\"2026-10-20T00:44:37+00:00\",\"dateModified\":\"2026-10-20T00:44:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/\"},\"wordCount\":2381,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/\",\"name\":\"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"datePublished\":\"2026-10-20T00:44:37+00:00\",\"dateModified\":\"2026-10-20T00:44:50+00:00\",\"description\":\"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Machined components on a rack beside a machining centre, a wrench and an inspection bench.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/planovani-vyroby-behem-udrzby\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek","description":"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek","og_description":"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T00:44:37+00:00","article_modified_time":"2026-10-20T00:44:50+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek","datePublished":"2026-10-20T00:44:37+00:00","dateModified":"2026-10-20T00:44:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/"},"wordCount":2381,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/","name":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","datePublished":"2026-10-20T00:44:37+00:00","dateModified":"2026-10-20T00:44:50+00:00","description":"Odst\u00e1vka kv\u016fli \u00fadr\u017eb\u011b je dohodnut\u00e1. Rozhodn\u011bte, co vyrobit p\u0159ed n\u00ed a co po\u010dk\u00e1. Se SkyPlanner budete m\u00edt p\u0159ehled o navazuj\u00edc\u00edch zak\u00e1zk\u00e1ch i term\u00ednech dod\u00e1vek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","width":1776,"height":999,"caption":"Machined components on a rack beside a machining centre, a wrench and an inspection bench."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/planovani-vyroby-behem-udrzby\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek Domov &raquo; Zdroje &raquo; Pl\u00e1nov\u00e1n\u00ed v\u00fdroby b\u011bhem \u00fadr\u017eby: dodr\u017ete term\u00edny dod\u00e1vek Obr\u00e1b\u011bc\u00ed centrum bude znovu v provozu ve \u010dtvrtek. Zak\u00e1zka pro z\u00e1kazn\u00edka se expeduje v p\u00e1tek. Zd\u00e1 se, \u017ee se v\u0161e stihne. Pak ale zjist\u00edte, \u017ee kontrola pot\u0159ebuje obroben\u00e9 d\u00edly u\u017e ve \u010dtvrtek r\u00e1no, tedy d\u0159\u00edve, ne\u017e je&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101791"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101791\/revisions"}],"predecessor-version":[{"id":101856,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101791\/revisions\/101856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/101818"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=101791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=101791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}