{"id":101424,"date":"2026-10-17T17:00:34","date_gmt":"2026-10-17T17:00:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101424"},"modified":"2026-10-17T17:00:46","modified_gmt":"2026-10-17T17:00:46","slug":"mereni-prace-ve-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/","title":{"rendered":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b sleduje p\u0159esn\u011b vymezenou pr\u00e1ci, abyste mohli ur\u010dit, jak dlouho m\u00e1 za stanoven\u00fdch podm\u00ednek trvat. P\u0159i p\u0159\u00edm\u00e9m m\u011b\u0159en\u00ed stopkami rozd\u011bl\u00edte pr\u00e1ci na d\u00edl\u010d\u00ed \u00fakony, zm\u011b\u0159\u00edte jejich trv\u00e1n\u00ed, tam, kde je to relevantn\u00ed, zohledn\u00edte norm\u00e1ln\u00ed pracovn\u00ed tempo a p\u0159id\u00e1te od\u016fvodn\u011bn\u00e9 \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Tak z\u00edsk\u00e1te normovan\u00fd \u010das.<\/p>\n\n\n<p>D\u016fle\u017eit\u00e9 je slovo <strong>vymezenou<\/strong>. Pr\u016fm\u011br z \u010dasov\u00fdch z\u00e1znam\u016f operac\u00ed za minul\u00fd m\u011bs\u00edc m\u016f\u017ee sm\u011b\u0161ovat r\u016fzn\u00e9 pracovn\u00ed postupy, \u010dek\u00e1n\u00ed na materi\u00e1l i dobu zapracov\u00e1n\u00ed. Zm\u011b\u0159en\u00edm nejrychlej\u0161\u00edho oper\u00e1tora z\u00edsk\u00e1te jin\u00e9 \u010d\u00edslo, ale ne nutn\u011b lep\u0161\u00ed normu.<\/p>\n\n\n<p>V\u00fdsledkem u\u017eite\u010dn\u00e9ho m\u011b\u0159en\u00ed je \u010das, kter\u00fd dok\u00e1\u017eete zd\u016fvodnit, ov\u011b\u0159it a p\u0159i zm\u011bn\u011b pr\u00e1ce aktualizovat. SkyPlanner v\u00e1m pak pom\u016f\u017ee vyu\u017e\u00edt realistick\u00e9 doby trv\u00e1n\u00ed operac\u00ed p\u0159i pl\u00e1nov\u00e1n\u00ed v\u0161ech nevy\u0159\u00edzen\u00fdch zak\u00e1zek. Nemus\u00edte tak jen opravit \u010d\u00edslo v ERP a ru\u010dn\u011b znovu sestavovat po\u0159ad\u00ed operac\u00ed na ka\u017ed\u00e9m dot\u010den\u00e9m stroji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nam\u011b\u0159en\u00fd \u010das, norm\u00e1ln\u00ed \u010das a normovan\u00fd \u010das<\/h2>\n\n\n<p>Tyto t\u0159i hodnoty odpov\u00eddaj\u00ed na r\u016fzn\u00e9 ot\u00e1zky:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u010cas<\/th><th>Co vyjad\u0159uje<\/th><th>Co je t\u0159eba zn\u00e1t<\/th><\/tr><\/thead><tbody><tr><td>Nam\u011b\u0159en\u00fd \u010das<\/td><td>Jak dlouho sledovan\u00e1 pr\u00e1ce skute\u010dn\u011b trvala<\/td><td>Pracovn\u00ed postup, okam\u017eik zah\u00e1jen\u00ed a ukon\u010den\u00ed m\u011b\u0159en\u00ed a podm\u00ednky p\u0159i pozorov\u00e1n\u00ed<\/td><\/tr><tr><td>Norm\u00e1ln\u00ed \u010das<\/td><td>\u010cas pot\u0159ebn\u00fd na vymezenou pr\u00e1ci p\u0159i referen\u010dn\u00edm pracovn\u00edm tempu<\/td><td>Od\u016fvodn\u011bn\u00e9 hodnocen\u00ed pracovn\u00edho tempa u ru\u010dn\u00ed pr\u00e1ce, jej\u00ed\u017e trv\u00e1n\u00ed z\u00e1vis\u00ed na tempu<\/td><\/tr><tr><td>Normovan\u00fd \u010das<\/td><td>Norm\u00e1ln\u00ed \u010das v\u010detn\u011b p\u0159\u00edslu\u0161n\u00fdch \u010dasov\u00fdch p\u0159ir\u00e1\u017eek<\/td><td>Kter\u00e9 p\u0159ir\u00e1\u017eky se uplat\u0148uj\u00ed a jak se po\u010d\u00edtaj\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Normovan\u00fd \u010das nen\u00ed rychlostn\u00ed rekord. Odpov\u00edd\u00e1 pr\u00e1ci podle vymezen\u00e9ho postupu, kterou vykon\u00e1v\u00e1 za\u0161kolen\u00fd a zru\u010dn\u00fd pracovn\u00edk referen\u010dn\u00edm tempem, a zahrnuje nezbytn\u00e9 \u010dasov\u00e9 p\u0159ir\u00e1\u017eky.<\/p>\n\n\n<p>Ani norma \u010dasu lidsk\u00e9 pr\u00e1ce automaticky neur\u010duje dobu, po kterou je nutn\u00e9 rezervovat stroj. Stroj m\u016f\u017ee b\u011b\u017eet, zat\u00edmco jeho obsluha kontroluje p\u0159edchoz\u00ed d\u00edl. Tento rozd\u00edl m\u011bjte na pam\u011bti po celou dobu m\u011b\u0159en\u00ed: nejprve stanovujete rozsah pr\u00e1ce a teprve potom rozhodujete, jak zat\u00ed\u017e\u00ed jednotliv\u00e9 v\u00fdrobn\u00ed zdroje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zvolte metodu m\u011b\u0159en\u00ed podle charakteru pr\u00e1ce<\/h2>\n\n\n<p>P\u0159\u00edm\u00e9 m\u011b\u0159en\u00ed stopkami se hod\u00ed pro ust\u00e1lenou, opakovanou pr\u00e1ci, jej\u00ed\u017e d\u00edl\u010d\u00ed \u00fakony lze pozorovat. Je dobrou volbou, kdy\u017e pot\u0159ebujete pochopit, pro\u010d je st\u00e1vaj\u00edc\u00ed norma chybn\u00e1, a nechcete ji jen nahradit dal\u0161\u00edm odhadem.<\/p>\n\n\n<p>Jin\u00e9 situace vy\u017eaduj\u00ed odli\u0161n\u00fd p\u0159\u00edstup:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Podobn\u00e9 operace vyu\u017e\u00edvaj\u00ed ji\u017e zn\u00e1m\u00e9 d\u00edl\u010d\u00ed \u00fakony.<\/strong> Ov\u011b\u0159en\u00fd syst\u00e9m \u010dasov\u00fdch normativ\u016f umo\u017e\u0148uje kombinovat stanoven\u00e9 \u010dasy d\u00edl\u010d\u00edch \u00fakon\u016f, pokud se shoduj\u00ed pracovn\u00ed postup i ovliv\u0148uj\u00edc\u00ed faktory. Neslu\u010dujte \u010dasy pro odli\u0161n\u00e9 v\u00fdrobky do jednoho pr\u016fm\u011bru.<\/li><li><strong>Postup ru\u010dn\u00ed pr\u00e1ce se navrhuje je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm v\u00fdroby.<\/strong> Syst\u00e9m p\u0159edem ur\u010den\u00fdch \u010das\u016f pohyb\u016f umo\u017e\u0148uje sestavit v\u00fdsledn\u00fd \u010das z definovan\u00fdch pohyb\u016f. Vy\u017eaduje v\u0161ak odborn\u00e9 pou\u017eit\u00ed zvolen\u00e9ho syst\u00e9mu, nikoli odhad hodnocen\u00ed tempa pro m\u011b\u0159en\u00ed stopkami.<\/li><li><strong>Pot\u0159ebujete zjistit, \u010d\u00edm se vypln\u00ed sm\u011bna.<\/strong> Metoda momentov\u00e9ho pozorov\u00e1n\u00ed odhaduje pod\u00edl \u010dasu v\u011bnovan\u00e9ho jednotliv\u00fdm \u010dinnostem nebo prostoj\u016fm. M\u016f\u017ee pomoci p\u0159i stanoven\u00ed \u010dasov\u00fdch p\u0159ir\u00e1\u017eek, sama o sob\u011b v\u0161ak neur\u010d\u00ed podrobn\u00fd \u010das ka\u017ed\u00e9ho kr\u00e1tk\u00e9ho \u00fakonu.<\/li><li><strong>Dobu trv\u00e1n\u00ed ur\u010duje technologick\u00fd proces.<\/strong> Vypo\u010d\u00edtejte nebo ov\u011b\u0159te strojn\u00ed \u010das podle programu \u010di parametr\u016f procesu a pr\u00e1ci obsluhy m\u011b\u0159te samostatn\u011b.<\/li><\/ul>\n\n\n<p>Historick\u00e9 z\u00e1znamy operac\u00ed z\u016fst\u00e1vaj\u00ed u\u017eite\u010dn\u00fdm podkladem. Ne\u017e je za\u010dnete pova\u017eovat za normu, ov\u011b\u0159te, co obsahuj\u00ed. Z\u00e1znam celkov\u00e9 uplynul\u00e9 doby, kter\u00fd zahrnuje \u010dek\u00e1n\u00ed na chyb\u011bj\u00edc\u00ed materi\u00e1l, s\u00e1m o sob\u011b neukazuje norm\u00e1ln\u00ed \u010das pot\u0159ebn\u00fd na ru\u010dn\u00ed pr\u00e1ci.<\/p>\n\n\n<p>N\u00e1sleduj\u00edc\u00ed postup se zam\u011b\u0159uje na p\u0159\u00edm\u00e9 m\u011b\u0159en\u00ed opakovan\u00e9 pr\u00e1ce.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. Ne\u017e spust\u00edte stopky, vymezte pracovn\u00ed postup<\/h2>\n\n\n<p>Vyberte operaci, u n\u00ed\u017e v\u011brohodn\u011bj\u0161\u00ed norma ovlivn\u00ed skute\u010dn\u00e9 rozhodov\u00e1n\u00ed: nap\u0159\u00edklad siln\u011b vyt\u00ed\u017een\u00e9 mont\u00e1\u017en\u00ed pracovi\u0161t\u011b nebo opakovanou operaci, jej\u00ed\u017e d\u00e9lka pl\u00e1nova\u010de pravideln\u011b p\u0159ekvapuje.<\/p>\n\n\n<p>Popi\u0161te v\u00fdrobek a jeho revizi, za\u0159\u00edzen\u00ed, n\u00e1stroje a p\u0159\u00edpravky, zp\u016fsob p\u0159istaven\u00ed materi\u00e1lu, sled \u00fakon\u016f i po\u017eadovan\u00e9 kontroly kvality. Ur\u010dete, jakou ud\u00e1lost\u00ed m\u011b\u0159en\u00ed za\u010d\u00edn\u00e1 a kon\u010d\u00ed. Jasn\u011b uve\u010fte, zda se v\u00fdsledek vztahuje na kus, cyklus, nebo d\u00e1vku, a jednor\u00e1zov\u00e9 se\u0159\u00edzen\u00ed evidujte odd\u011blen\u011b.<\/p>\n\n\n<p>Projd\u011bte tento popis s lidmi, kte\u0159\u00ed operaci prov\u00e1d\u011bj\u00ed. Vysv\u011btlete jim, pro\u010d se m\u011b\u0159en\u00ed d\u011bl\u00e1 a jak budou v\u00fdsledky vyu\u017eity. Jejich zku\u0161enosti \u010dasto odhal\u00ed nezbytnou pr\u00e1ci, kterou st\u00e1vaj\u00edc\u00ed odhad opom\u00edj\u00ed, nap\u0159\u00edklad dopln\u011bn\u00ed p\u0159\u00edpravku nebo pravidelnou kontrolu.<\/p>\n\n\n<p>Pozorujte za\u0161kolen\u00e9ho oper\u00e1tora, kter\u00fd pracuje zaveden\u00fdm a bezpe\u010dn\u00fdm postupem. Pokud se p\u0159\u00edpravek je\u0161t\u011b upravuje nebo se oper\u00e1tor teprve u\u010d\u00ed sled \u00fakon\u016f, nejprve pracovn\u00ed postup ustalte. Ani v\u011bt\u0161\u00ed po\u010det m\u011b\u0159en\u00ed stopkami neud\u011bl\u00e1 z neust\u00e1len\u00e9ho procesu spolehlivou normu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. Zaznamen\u00e1vejte d\u00edl\u010d\u00ed \u00fakony, jejich \u010detnost a v\u00fdjimky<\/h2>\n\n\n<p>Rozd\u011blte operaci podle jasn\u011b pozorovateln\u00fdch ud\u00e1lost\u00ed: t\u011bleso usazeno v p\u0159\u00edpravku, spojovac\u00ed prvky dota\u017eeny, kontrola dokon\u010dena. Odd\u011blte ru\u010dn\u00ed pr\u00e1ci z\u00e1vislou na tempu od \u010dasu ur\u010dovan\u00e9ho strojem. U pr\u00e1ce, kter\u00e1 se prov\u00e1d\u00ed jen ob\u010das, nap\u0159\u00edklad p\u0159i v\u00fdm\u011bn\u011b p\u0159epravky, zaznamenejte \u010detnost. Nezapo\u010d\u00edt\u00e1vejte ji, jako by se opakovala u ka\u017ed\u00e9ho kusu.<\/p>\n\n\n<p>U ka\u017ed\u00e9ho pozorov\u00e1n\u00ed uchovejte \u010das d\u00edl\u010d\u00edho \u00fakonu, relevantn\u00ed podm\u00ednky a p\u0159\u00edpadn\u00e9 hodnocen\u00ed pracovn\u00edho tempa. P\u0159eru\u0161en\u00ed zaznamen\u00e1vejte v okam\u017eiku, kdy nastanou. Chyb\u00ed-li sou\u010d\u00e1st nebo se zlom\u00ed n\u00e1stroj, zapi\u0161te ud\u00e1lost i jej\u00ed trv\u00e1n\u00ed samostatn\u011b. Dlouh\u00fd nam\u011b\u0159en\u00fd \u010das bez vysv\u011btlen\u00ed nema\u017ete ani jej neschov\u00e1vejte do pr\u016fm\u011bru b\u011b\u017en\u00e9 pr\u00e1ce.<\/p>\n\n\n<p>Sb\u00edrejte pozorov\u00e1n\u00ed z reprezentativn\u00edho pr\u016fb\u011bhu v\u00fdroby, ne jen z jedn\u00e9 vhodn\u011b zvolen\u00e9 nep\u0159eru\u0161en\u00e9 s\u00e9rie. Ov\u011b\u0159te, zda stejn\u00fd postup za stejn\u00fdch podm\u00ednek vede k p\u0159im\u011b\u0159en\u011b st\u00e1l\u00fdm \u010das\u016fm d\u00edl\u010d\u00edch \u00fakon\u016f. Pokud ne, zjist\u011bte p\u0159\u00ed\u010dinu: jin\u00fd zp\u016fsob p\u0159istaven\u00ed materi\u00e1lu m\u016f\u017ee vy\u017eadovat samostatn\u00fd pracovn\u00ed postup, zat\u00edmco ojedin\u011bl\u00e1 chyba m\u011b\u0159en\u00ed pot\u0159ebuje zdokumentovanou opravu.<\/p>\n\n\n<p><strong>Neexistuje univerz\u00e1ln\u00ed po\u010det cykl\u016f, kter\u00fd by zaru\u010dil dostate\u010dn\u00e9 m\u011b\u0159en\u00ed.<\/strong> Po\u010det pozorov\u00e1n\u00ed z\u00e1vis\u00ed na variabilit\u011b, po\u017eadovan\u00e9 p\u0159esnosti a rozhodnut\u00ed, pro kter\u00e9 bude norma slou\u017eit. Na \u00favodn\u00edm souboru m\u011b\u0159en\u00ed posu\u010fte rozptyl a pot\u00e9 stanovte pot\u0159ebnou velikost vzorku podle zvolen\u00fdch krit\u00e9ri\u00ed spolehlivosti a p\u0159esnosti. Toto posouzen\u00ed m\u016f\u017ee prov\u00e9st vy\u0161kolen\u00fd odborn\u00edk na m\u011b\u0159en\u00ed pr\u00e1ce. Deset t\u00e9m\u011b\u0159 shodn\u00fdch m\u011b\u0159en\u00ed z jedn\u00e9 neobvykl\u00e9 s\u00e9rie nenahrad\u00ed reprezentativn\u00ed podklady.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. P\u0159eve\u010fte nam\u011b\u0159en\u00e9 \u010dasy ru\u010dn\u00ed pr\u00e1ce na norm\u00e1ln\u00ed \u010das<\/h2>\n\n\n<p>Pro ka\u017ed\u00fd d\u00edl\u010d\u00ed \u00fakon vypo\u010d\u00edtejte ze srovnateln\u00fdch m\u011b\u0159en\u00ed reprezentativn\u00ed nam\u011b\u0159en\u00fd \u010das, obvykle jako aritmetick\u00fd pr\u016fm\u011br. Uchovejte d\u016fvody pro vy\u0159azen\u00ed ka\u017ed\u00e9ho m\u011b\u0159en\u00ed. Pokud se tempo mezi pozorov\u00e1n\u00edmi li\u0161\u00ed, p\u0159eve\u010fte p\u0159\u00edslu\u0161n\u00e9 nam\u011b\u0159en\u00e9 \u010dasy na norm\u00e1ln\u00ed \u010das je\u0161t\u011b p\u0159ed jejich slou\u010den\u00edm. Nepou\u017e\u00edvejte pr\u016fm\u011brn\u00e9 hodnocen\u00ed tempa, kter\u00e9 jednotliv\u00fdm m\u011b\u0159en\u00edm neodpov\u00edd\u00e1.<\/p>\n\n\n<p>Hodnocen\u00ed pracovn\u00edho tempa porovn\u00e1v\u00e1 pozorovan\u00e9 tempo ru\u010dn\u00ed pr\u00e1ce s definovan\u00fdm referen\u010dn\u00edm tempem. Na stupnici, kde norm\u00e1ln\u00ed tempo odpov\u00edd\u00e1 100 %, plat\u00ed tento v\u00fdpo\u010det:<\/p>\n\n\n<p><strong>Norm\u00e1ln\u00ed \u010das ru\u010dn\u00ed pr\u00e1ce = nam\u011b\u0159en\u00fd \u010das ru\u010dn\u00ed pr\u00e1ce \u00d7 koeficient hodnocen\u00ed tempa<\/strong><\/p>\n\n\n<p>Hodnocen\u00ed 110 % odpov\u00edd\u00e1 koeficientu 1,10. Znamen\u00e1 to, \u017ee pozorovan\u00e1 pr\u00e1ce prob\u00edhala rychleji ne\u017e referen\u010dn\u00edm tempem, a proto je jej\u00ed norm\u00e1ln\u00ed \u010das del\u0161\u00ed ne\u017e nam\u011b\u0159en\u00fd \u010das. Hodnocen\u00ed pod 100 % vede k opa\u010dn\u00e9 \u00faprav\u011b.<\/p>\n\n\n<p>Hodnocen\u00ed tempa nen\u00ed procento zvolen\u00e9 tak, aby v\u00fdsledek odpov\u00eddal star\u00e9 norm\u011b v ERP. Vy\u017eaduje vy\u0161kolen\u00e9ho hodnotitele, jednotn\u00fd referen\u010dn\u00ed z\u00e1klad a posouzen\u00ed p\u0159\u00edmo p\u0159i pozorov\u00e1n\u00ed pr\u00e1ce. Pokud hodnocen\u00ed nedok\u00e1\u017eete od\u016fvodnit, ponechte v\u00fdsledek jako nam\u011b\u0159en\u00fd \u00fadaj a nevyd\u00e1vejte jej za normu pro norm\u00e1ln\u00ed pracovn\u00ed tempo.<\/p>\n\n\n<p>Hodnocen\u00ed tempa uplat\u0148ujte na p\u0159\u00edslu\u0161n\u00e9 ru\u010dn\u00ed \u00fakony, nikoli plo\u0161n\u011b na celou dobu operace. Automatick\u00fd t\u0159\u00edminutov\u00fd oh\u0159ev se neprodlou\u017e\u00ed jen proto, \u017ee obsluha p\u0159i zakl\u00e1d\u00e1n\u00ed pracovala tempem 110 %. Pokud se tempo mezi pozorov\u00e1n\u00edmi m\u011bn\u00ed, uchov\u00e1vejte p\u0159\u00edslu\u0161n\u00fd \u010das spole\u010dn\u011b s jeho hodnocen\u00edm, aby v\u00fdpo\u010det odr\u00e1\u017eel skute\u010dn\u011b pozorovanou pr\u00e1ci.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. P\u0159idejte \u010dasov\u00e9 p\u0159ir\u00e1\u017eky s jasn\u011b stanoven\u00fdm z\u00e1kladem<\/h2>\n\n\n<p>Samotn\u00fd norm\u00e1ln\u00ed \u010das pr\u00e1ce nepokr\u00fdv\u00e1 v\u0161echny opr\u00e1vn\u011bn\u00e9 \u010dasov\u00e9 n\u00e1roky b\u011bhem pracovn\u00edho dne. Je t\u0159eba vhodn\u011b zohlednit osobn\u00ed pot\u0159eby, zotaven\u00ed z pracovn\u00ed z\u00e1t\u011b\u017ee a p\u0159\u00edslu\u0161n\u00e1 nevyhnuteln\u00e1 zdr\u017een\u00ed.<\/p>\n\n\n<p>Tyto p\u0159ir\u00e1\u017eky stanovte podle podm\u00ednek dan\u00e9 pr\u00e1ce, pou\u017eit\u00e9 metody m\u011b\u0159en\u00ed a podklad\u016f o p\u0159\u00edslu\u0161n\u00fdch \u010dinnostech \u010di p\u0159eru\u0161en\u00edch. Rozs\u00e1hlej\u0161\u00ed pozorov\u00e1n\u00ed nebo metoda momentov\u00e9ho pozorov\u00e1n\u00ed mohou pomoci ur\u010dit \u010das na opakovan\u00e9 podp\u016frn\u00e9 \u010dinnosti a zdr\u017een\u00ed. Pot\u0159ebu zotaven\u00ed je nutn\u00e9 posoudit podle pr\u00e1ce a jej\u00edch podm\u00ednek. Procento p\u0159evzat\u00e9 z jin\u00e9 tov\u00e1rny takov\u00e9 posouzen\u00ed nenahrad\u00ed.<\/p>\n\n\n<p>Nezapom\u00ednejte na nezbytnou pr\u00e1ci, kter\u00e1 se prov\u00e1d\u00ed jen ob\u010das. Pokud je pravideln\u00e1 v\u00fdm\u011bna p\u0159epravky ji\u017e zahrnuta jako d\u00edl\u010d\u00ed \u00fakon, nezapo\u010d\u00edt\u00e1vejte ji znovu do obecn\u00e9 p\u0159ir\u00e1\u017eky na zdr\u017een\u00ed. Stejn\u011b tak nep\u0159ev\u00e1d\u011bjte ka\u017edou odstranitelnou poruchu nebo \u010dek\u00e1n\u00ed na chyb\u011bj\u00edc\u00ed materi\u00e1l na trvalou sou\u010d\u00e1st pracovn\u00ed n\u00e1pln\u011b. Tyto ztr\u00e1ty zaznamen\u00e1vejte, aby je bylo mo\u017en\u00e9 \u0159e\u0161it, a jasn\u011b stanovte, jak se zohled\u0148uj\u00ed v pl\u00e1nov\u00e1n\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159\u00edklad v\u00fdpo\u010dtu: od nam\u011b\u0159en\u00fdch \u010das\u016f k norm\u011b<\/h3>\n\n\n<p>P\u0159edstavte si ust\u00e1lenou ru\u010dn\u00ed mont\u00e1\u017en\u00ed operaci. N\u00e1sleduj\u00edc\u00ed hodnoty slou\u017e\u00ed k ilustraci v\u00fdpo\u010dtu; hodnocen\u00ed tempa ani p\u0159ir\u00e1\u017eka nejsou doporu\u010den\u00edm pro v\u00e1\u0161 z\u00e1vod. P\u0159edpokl\u00e1dejme, \u017ee uveden\u00e9 \u00fakony prob\u00edhaj\u00ed postupn\u011b, ka\u017ed\u00fd jednou na sestavu, a odborn\u00edk podlo\u017eil hodnocen\u00ed pozorovan\u00e9 ru\u010dn\u00ed pr\u00e1ce na \u00farovni 110 %.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ru\u010dn\u00ed \u00fakon<\/th><th>Zvolen\u00fd nam\u011b\u0159en\u00fd \u010das<\/th><th>Koeficient hodnocen\u00ed tempa<\/th><th>Norm\u00e1ln\u00ed \u010das<\/th><\/tr><\/thead><tbody><tr><td>Osazen\u00ed t\u011blesa<\/td><td>30 sekund<\/td><td>1,10<\/td><td>33 sekund<\/td><\/tr><tr><td>Spojen\u00ed sestavy<\/td><td>40 sekund<\/td><td>1,10<\/td><td>44 sekund<\/td><\/tr><tr><td>Kontrola a ulo\u017een\u00ed do prolo\u017eky<\/td><td>20 sekund<\/td><td>1,10<\/td><td>22 sekund<\/td><\/tr><tr><td>Opakovan\u00e1 pr\u00e1ce celkem<\/td><td>90 sekund<\/td><td><\/td><td>99 sekund<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Po ka\u017ed\u00fdch 20 sestav\u00e1ch je nav\u00edc nutn\u00e9 vym\u011bnit p\u0159epravku. Samostatn\u011b stanoven\u00fd norm\u00e1ln\u00ed \u010das t\u00e9to v\u00fdm\u011bny je 60 sekund, tak\u017ee na jednu sestavu p\u0159ipad\u00e1 60 \u00f7 20 = 3 sekundy. Celkov\u00fd norm\u00e1ln\u00ed \u010das pr\u00e1ce tedy \u010din\u00ed <strong>102 sekund na sestavu<\/strong>.<\/p>\n\n\n<p>Nyn\u00ed p\u0159edpokl\u00e1dejme, \u017ee m\u011b\u0159en\u00edm byla stanovena \u010dasov\u00e1 p\u0159ir\u00e1\u017eka ve v\u00fd\u0161i 15 % norm\u00e1ln\u00edho \u010dasu:<\/p>\n\n\n<p><strong>Normovan\u00fd \u010das = norm\u00e1ln\u00ed \u010das \u00d7 (1 + \u010dasov\u00e1 p\u0159ir\u00e1\u017eka)<\/strong><\/p>\n\n\n<p>102 \u00d7 1,15 = <strong>117,3 sekundy na sestavu<\/strong>.<\/p>\n\n\n<p>Z\u00e1le\u017e\u00ed na z\u00e1kladu, ze kter\u00e9ho se p\u0159ir\u00e1\u017eka po\u010d\u00edt\u00e1. Pokud je vyj\u00e1d\u0159ena jako 15 % celkov\u00e9ho normovan\u00e9ho \u010dasu, pou\u017eijte:<\/p>\n\n\n<p><strong>Normovan\u00fd \u010das = norm\u00e1ln\u00ed \u010das \u00f7 (1 \u2212 \u010dasov\u00e1 p\u0159ir\u00e1\u017eka)<\/strong><\/p>\n\n\n<p>102 \u00f7 0,85 = <strong>120 sekund na sestavu<\/strong>.<\/p>\n\n\n<p>V\u00fdsledky se li\u0161\u00ed, proto\u017ee \u201e15 %\u201c vyjad\u0159uje dva r\u016fzn\u00e9 pom\u011bry. Zaznamenejte, z jak\u00e9ho z\u00e1kladu se p\u0159ir\u00e1\u017eka ve va\u0161\u00ed norm\u011b po\u010d\u00edt\u00e1. Pl\u00e1nova\u010d, kter\u00fd s n\u00ed bude pracovat pozd\u011bji, by to nem\u011bl muset zp\u011btn\u011b odvozovat z v\u00fdsledn\u00e9ho \u010d\u00edsla.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. Ov\u011b\u0159te a schvalte normu, kterou lze pr\u016fb\u011b\u017en\u011b udr\u017eovat<\/h2>\n\n\n<p>Ne\u017e nahrad\u00edte st\u00e1vaj\u00edc\u00ed normu, ov\u011b\u0159te v\u00fdsledek p\u0159i dal\u0161\u00edch v\u00fdrobn\u00edch b\u011bz\u00edch se stejn\u00fdm pracovn\u00edm postupem a za stejn\u00fdch podm\u00ednek. Porovn\u00e1vejte odpov\u00eddaj\u00edc\u00ed mno\u017estv\u00ed a stejn\u011b vymezen\u00e9 \u010dasov\u00e9 \u00faseky, v\u010detn\u011b periodick\u00fdch \u010dinnost\u00ed a \u010dasov\u00fdch p\u0159ir\u00e1\u017eek zahrnut\u00fdch v norm\u011b. To, \u017ee jeden cyklus skon\u010d\u00ed d\u0159\u00edve, ne\u017e stanovuje norma s p\u0159ir\u00e1\u017ekami, nen\u00ed d\u016fvodem k jejich odstran\u011bn\u00ed.<\/p>\n\n\n<p>Nevysv\u011btlen\u00e9 rozd\u00edly projd\u011bte s oper\u00e1torem a pracovn\u00edkem odpov\u011bdn\u00fdm za pracovn\u00ed postup. Pokud v\u00fdsledek neobstoj\u00ed kv\u016fli chyb\u011bj\u00edc\u00edmu podstatn\u00e9mu prvku pr\u00e1ce, opravte m\u011b\u0159en\u00ed. Pokud se pracovn\u00ed postup li\u0161\u00ed, vymezte jeho varianty. Nezvy\u0161ujte normovan\u00fd \u010das jen proto, aby se do n\u011bj ve\u0161ly v\u0161echny d\u0159\u00edve vyk\u00e1zan\u00e9 \u010dasy.<\/p>\n\n\n<p>Uchov\u00e1vejte dohledateln\u00fd z\u00e1znam, kter\u00fd obsahuje:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>V\u00fdrobek, operaci, revizi pracovn\u00edho postupu a provozn\u00ed podm\u00ednky v\u00fdrobn\u00edch zdroj\u016f, pro kter\u00e9 norma plat\u00ed.<\/li><li>P\u016fvodn\u00ed m\u011b\u0159en\u00ed, \u010detnosti jednotliv\u00fdch prvk\u016f pr\u00e1ce a zp\u016fsob zpracov\u00e1n\u00ed v\u00fdjimek.<\/li><li>Pou\u017eitou stupnici hodnocen\u00ed pracovn\u00edho tempa, vlastn\u00ed hodnocen\u00ed a v\u00fdpo\u010det norm\u00e1ln\u00edho \u010dasu.<\/li><li>Druhy \u010dasov\u00fdch p\u0159ir\u00e1\u017eek, podklady pro jejich stanoven\u00ed, z\u00e1klad v\u00fdpo\u010dtu a v\u00fdsledn\u00fd normovan\u00fd \u010das.<\/li><li>V\u00fdsledek ov\u011b\u0159en\u00ed, odpov\u011bdn\u00e9ho posuzovatele, datum \u00fa\u010dinnosti a podn\u011bty k revizi.<\/li><\/ul>\n\n\n<p>Normu uvoln\u011bte k pou\u017e\u00edv\u00e1n\u00ed podle sv\u00e9ho schvalovac\u00edho postupu v r\u00e1mci technick\u00e9 p\u0159\u00edpravy v\u00fdroby. Schv\u00e1len\u00ed potvrzuje, \u017ee podklady a rozsah platnosti jsou pro dan\u00e9 pou\u017eit\u00ed vhodn\u00e9; nenahrazuje m\u011b\u0159en\u00ed dohodnut\u00fdm \u010d\u00edslem.<\/p>\n\n\n<p>Normu znovu posu\u010fte p\u0159i zm\u011bn\u011b n\u00e1stroj\u016f, materi\u00e1lu, konstrukce, po\u017eadavk\u016f na kontrolu nebo pracovn\u00edho postupu a tak\u00e9 tehdy, kdy\u017e srovnateln\u00e9 skute\u010dn\u00e9 \u010dasy vykazuj\u00ed trval\u00fd nevysv\u011btlen\u00fd rozd\u00edl. Uchovejte p\u0159edchoz\u00ed verzi, abyste mohli odli\u0161it skute\u010dn\u00e9 zlep\u0161en\u00ed pracovn\u00edho postupu od zm\u011bny ve zp\u016fsobu evidence \u010dasu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0159eve\u010fte normovan\u00fd \u010das na spr\u00e1vn\u00e9 zat\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f<\/h2>\n\n\n<p>Ne\u017e v\u00fdsledek zad\u00e1te do pl\u00e1novac\u00edho modelu, polo\u017ete si ot\u00e1zku: <strong>kapacitu \u010deho tento \u010das rezervuje?<\/strong><\/p>\n\n\n<p>V p\u0159\u00edkladu s \u010dist\u011b ru\u010dn\u00ed prac\u00ed popisuje normovan\u00fd \u010das mont\u00e1\u017e na jednom pracovi\u0161ti. P\u0159i obr\u00e1b\u011bn\u00ed se v\u0161ak pr\u00e1ce oper\u00e1tora, automatick\u00fd chod stroje a kontrola mohou p\u0159ekr\u00fdvat. Jejich prost\u00fd sou\u010det by nadhodnotil dobu obsazen\u00ed stroje. Samotn\u00fd \u0159ezn\u00fd \u010das by naopak mohl opomenout zakl\u00e1d\u00e1n\u00ed obrobku, bez kter\u00e9ho nelze spustit dal\u0161\u00ed cyklus.<\/p>\n\n\n<p>Pokud je p\u0159ekr\u00fdv\u00e1n\u00ed \u010dinnost\u00ed podstatn\u00e9, zakreslete \u010dinnosti oper\u00e1tora a stroje do soub\u011b\u017en\u00fdch \u010dasov\u00fdch os. Ur\u010dete, kdy je ka\u017ed\u00fd v\u00fdrobn\u00ed zdroj obsazen\u00fd a zda oper\u00e1tor b\u011bhem automatick\u00e9ho chodu skute\u010dn\u011b m\u016f\u017ee obsluhovat jinou operaci. Nep\u0159edpokl\u00e1dejte, \u017ee chod bez obsluhy znamen\u00e1 neomezenou dostupnost oper\u00e1tora.<\/p>\n\n\n<p>Sla\u010fte tak\u00e9 \u010dasov\u00e9 p\u0159ir\u00e1\u017eky s kalend\u00e1\u0159em v\u00fdrobn\u00edho zdroje. P\u0159est\u00e1vka, kter\u00e1 u\u017e byla ode\u010dtena z dostupn\u00e9 pracovn\u00ed doby, nesm\u00ed kapacitu sn\u00ed\u017eit podruh\u00e9 prost\u0159ednictv\u00edm p\u0159ir\u00e1\u017eky za tut\u00e9\u017e p\u0159est\u00e1vku. Normovan\u00fd \u010das stanoven\u00fd m\u011b\u0159en\u00edm zachovejte, ale zdokumentujte, jak se jeho slo\u017eky prom\u00edtaj\u00ed do pl\u00e1novan\u00e9 doby trv\u00e1n\u00ed a dostupn\u00e9 kapacity.<\/p>\n\n\n<p>V\u00fdpo\u010dty \u010dasu na kus a samostatn\u00e9 zohledn\u011bn\u00ed \u010dasu se\u0159\u00edzen\u00ed p\u0159i r\u016fzn\u00fdch velikostech zak\u00e1zek najdete v na\u0161em <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/cas-cyklu-ve-vyrobe\/\">pr\u016fvodci \u010dasem cyklu ve v\u00fdrob\u011b<\/a>. Zde v\u0161ak \u0159e\u0161\u00edme p\u0159edchoz\u00ed krok: zda v\u00fdchoz\u00ed normovan\u00fd \u010das v\u016fbec odpov\u00edd\u00e1 vymezen\u00e9 pr\u00e1ci.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eijte p\u0159esn\u011bj\u0161\u00ed \u010dasy v pl\u00e1nov\u00e1n\u00ed se SkyPlanner<\/h2>\n\n\n<p>Opraven\u00e1 doba trv\u00e1n\u00ed m\u00e1 dopad i mimo m\u011b\u0159enou operaci. M\u011bn\u00ed \u010das, kter\u00fd operace zabere v rozvrhu stroje, okam\u017eik zah\u00e1jen\u00ed navazuj\u00edc\u00edch prac\u00ed i to, jak ostatn\u00ed zak\u00e1zky soupe\u0159\u00ed o stejnou kapacitu. Aktualizac\u00ed jedn\u00e9 hodnoty v kmenov\u00fdch datech tato pl\u00e1novac\u00ed pr\u00e1ce teprve za\u010d\u00edn\u00e1.<\/p>\n\n\n<p>SkyPlanner umo\u017e\u0148uje definovat doby trv\u00e1n\u00ed jednotliv\u00fdch operac\u00ed, \u010dasy se\u0159\u00edzen\u00ed a ukon\u010dovac\u00edch prac\u00ed, zp\u016fsobil\u00e1 pracovi\u0161t\u011b i vz\u00e1jemn\u00e9 n\u00e1vaznosti. Arcturus, jeho um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed, <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">vypo\u010d\u00edt\u00e1 v\u00fdrobn\u00ed pl\u00e1n<\/a> podle nastaven\u00fdch v\u00fdrobn\u00edch zdroj\u016f a priorit. V\u00fdsledek uvid\u00edte v Ganttov\u011b diagramu. Dopady realisti\u010dt\u011bj\u0161\u00edch \u010das\u016f tak m\u016f\u017eete posoudit nap\u0159\u00ed\u010d nevy\u0159\u00edzen\u00fdmi zak\u00e1zkami, m\u00edsto abyste ru\u010dn\u011b p\u0159estavovali ka\u017ed\u00fd dot\u010den\u00fd po\u0159adn\u00edk. Priority ur\u010dujete vy a sv\u00e1 rozhodnut\u00ed chr\u00e1n\u00edte pravidly a z\u00e1mky.<\/p>\n\n\n<p>N\u00e1stroje Timer a ShopFloor v syst\u00e9mu SkyPlanner podporuj\u00ed evidenci \u010dasu a mno\u017estv\u00ed, tak\u017ee pro n\u00e1sledn\u00e1 posouzen\u00ed z\u00edsk\u00e1te podklady ze skute\u010dn\u00e9 v\u00fdroby. SkyPlanner nab\u00edz\u00ed tak\u00e9 predikci doby trv\u00e1n\u00ed operac\u00ed na z\u00e1klad\u011b historick\u00fdch \u010dasov\u00fdch z\u00e1znam\u016f. Pl\u00e1novac\u00ed odhady tak m\u016f\u017eete op\u00edrat o zku\u0161enosti z praxe. M\u011b\u0159en\u00ed pr\u00e1ce ur\u010duje, kolik \u010dasu by vymezen\u00e1 pr\u00e1ce m\u011bla vy\u017eadovat p\u0159i norm\u00e1ln\u00edm tempu; predikce z historick\u00fdch dat pom\u00e1h\u00e1 odhadnout dobu trv\u00e1n\u00ed podle zaznamenan\u00e9ho pr\u016fb\u011bhu v\u00fdroby. P\u0159i volb\u011b vstupn\u00edch \u00fadaj\u016f tyto dva \u00fa\u010dely rozli\u0161ujte.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/mamec\/\">Zku\u0161enosti spole\u010dnosti Mamec<\/a> ukazuj\u00ed, pro\u010d je koordinovan\u00e9 rozvrhov\u00e1n\u00ed d\u016fle\u017eit\u00e9. Tento finsk\u00fd v\u00fdrobce m\u011bl tis\u00edce vz\u00e1jemn\u011b prov\u00e1zan\u00fdch pracovn\u00edch p\u0159\u00edkaz\u016f a jejich priority \u0159\u00eddil podle term\u00edn\u016f dod\u00e1n\u00ed na pap\u00edrov\u00fdch p\u0159\u00edkazech. SkyPlanner byl propojen s jeho syst\u00e9mem Oscar ERP a stal se hlavn\u00ed platformou pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby. Mamec uv\u00e1d\u00ed, \u017ee z\u00edskal sd\u00edlen\u00fd p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase a v\u00fdrazn\u011b sn\u00ed\u017eil pracnost pl\u00e1nov\u00e1n\u00ed. Jeho p\u0159\u00edb\u011bh ukazuje hodnotu \u0159\u00edzen\u00ed cel\u00e9ho pl\u00e1nu nam\u00edsto samostatn\u00e9ho ru\u010dn\u00edho rozhodov\u00e1n\u00ed o ka\u017ed\u00e9m po\u0159adn\u00edku.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, kdy\u017e chcete p\u0159esn\u011bj\u0161\u00ed \u010dasy operac\u00ed prom\u011bnit v lep\u0161\u00ed v\u00fdrobn\u00ed pl\u00e1n.<\/strong> Prost\u0159ednictv\u00edm otev\u0159en\u00e9ho REST API jej lze propojit s jak\u00fdmkoli ERP nebo MES. M\u016f\u017eete tak zachovat st\u00e1vaj\u00edc\u00ed syst\u00e9my a z\u00e1rove\u0148 vyu\u017e\u00edt realistick\u00e9 doby trv\u00e1n\u00ed p\u0159i rozvrhov\u00e1n\u00ed s omezen\u00fdmi kapacitami.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Objednejte si uk\u00e1zku SkyPlanner<\/a> a p\u0159ipravte si aktu\u00e1ln\u00ed normovan\u00fd \u010das jedn\u00e9 operace, z\u00e1znam z jej\u00edho m\u011b\u0159en\u00ed, ned\u00e1vn\u00e9 skute\u010dn\u00e9 \u010dasy a typick\u00fd v\u00fdrobn\u00ed postup zak\u00e1zky. Z\u00edsk\u00e1te tak konkr\u00e9tn\u00ed v\u00fdchoz\u00ed bod pro posouzen\u00ed, jak m\u016f\u017ee podlo\u017een\u00fd \u010das zlep\u0161it pl\u00e1n, podle kter\u00e9ho va\u0161e v\u00fdroba pracuje. Pokud se chcete nejprve porozhl\u00e9dnout sami, <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das Domov &raquo; Zdroje &raquo; M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b sleduje p\u0159esn\u011b vymezenou pr\u00e1ci, abyste mohli ur\u010dit, jak dlouho m\u00e1 za stanoven\u00fdch podm\u00ednek trvat. P\u0159i p\u0159\u00edm\u00e9m m\u011b\u0159en\u00ed stopkami rozd\u011bl\u00edte pr\u00e1ci na d\u00edl\u010d\u00ed \u00fakony, zm\u011b\u0159\u00edte jejich trv\u00e1n\u00ed, tam, kde je to relevantn\u00ed, &#8230; <a title=\"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/\" aria-label=\"Read more about M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2546,303],"tags":[],"class_list":["post-101424","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das<\/title>\n<meta name=\"description\" content=\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\" \/>\n<meta property=\"og:description\" content=\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T17:00:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T17:00:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:00:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/\"},\"wordCount\":3260,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/\",\"name\":\"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:00:46+00:00\",\"description\":\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/mereni-prace-ve-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das","description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/","og_locale":"cs_CZ","og_type":"article","og_title":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das","og_description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T17:00:34+00:00","article_modified_time":"2026-10-17T17:00:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:00:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/"},"wordCount":3260,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/","name":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:00:46+00:00","description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasem. Poznejte m\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b, hodnocen\u00ed tempa a \u010dasov\u00e9 p\u0159ir\u00e1\u017eky. Pl\u00e1nujte se SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","width":1672,"height":941,"caption":"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/mereni-prace-ve-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das Domov &raquo; Zdroje &raquo; M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b: stanovte pou\u017eiteln\u00fd normovan\u00fd \u010das M\u011b\u0159en\u00ed pr\u00e1ce ve v\u00fdrob\u011b sleduje p\u0159esn\u011b vymezenou pr\u00e1ci, abyste mohli ur\u010dit, jak dlouho m\u00e1 za stanoven\u00fdch podm\u00ednek trvat. P\u0159i p\u0159\u00edm\u00e9m m\u011b\u0159en\u00ed stopkami rozd\u011bl\u00edte pr\u00e1ci na d\u00edl\u010d\u00ed \u00fakony, zm\u011b\u0159\u00edte jejich trv\u00e1n\u00ed, tam, kde je to relevantn\u00ed,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101424"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101424\/revisions"}],"predecessor-version":[{"id":101487,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/101424\/revisions\/101487"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/101453"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=101424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=101424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}