{"id":100150,"date":"2026-10-16T17:01:26","date_gmt":"2026-10-16T17:01:26","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100150"},"modified":"2026-10-16T17:01:38","modified_gmt":"2026-10-16T17:01:38","slug":"nevyrizene-zakazky","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/","title":{"rendered":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/cs\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/\">Zdroje<\/a> &raquo; Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010dten\u00ed: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky jsou p\u0159ijat\u00e9 z\u00e1kaznick\u00e9 objedn\u00e1vky, kter\u00e9 dosud nebyly spln\u011bny.<\/strong> Ve v\u00fdrob\u011b se t\u00edm obvykle rozum\u00ed zak\u00e1zky, mno\u017estv\u00ed nebo hodnota objedn\u00e1vek, kter\u00e9 je\u0161t\u011b zb\u00fdv\u00e1 dodat. Na n\u011bkter\u00fdch se je\u0161t\u011b neza\u010dalo pracovat, jin\u00e9 u\u017e mohou b\u00fdt ve v\u00fdrob\u011b nebo \u010dekat na expedici.<\/p>\n\n\n<p>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky samy o sob\u011b nejsou probl\u00e9m. Mohou znamenat zdravou z\u00e1sobu pr\u00e1ce do budoucna. Pro v\u00fdrobu je podstatn\u00e9, zda dok\u00e1\u017eete zb\u00fdvaj\u00edc\u00ed pr\u00e1ci dokon\u010dit tak, abyste dodr\u017eeli ji\u017e sl\u00edben\u00e9 term\u00edny dod\u00e1n\u00ed.<\/p>\n\n\n<p>Samotn\u00fd celkov\u00fd objem na tuto ot\u00e1zku neodpov\u00ed. SkyPlanner APS propojuje v\u00fdrobn\u00ed pr\u00e1ci pot\u0159ebnou k vy\u0159\u00edzen\u00ed zak\u00e1zek s dostupnou kapacitou. Z\u00edsk\u00e1te tak spole\u010dn\u00fd v\u00fdrobn\u00ed pl\u00e1n m\u00edsto dal\u0161\u00edho seznamu, kter\u00fd mus\u00edte p\u0159epracovat poka\u017ed\u00e9, kdy\u017e z\u00e1kazn\u00edk po\u017e\u00e1d\u00e1 o d\u0159\u00edv\u011bj\u0161\u00ed dod\u00e1n\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co pat\u0159\u00ed mezi nevy\u0159\u00edzen\u00e9 zak\u00e1zky?<\/h2>\n\n\n<p>Zahr\u0148te sem p\u0159ijat\u00e9 objedn\u00e1vky, u nich\u017e je\u0161t\u011b zb\u00fdv\u00e1 splnit z\u00e1vazek dod\u00e1n\u00ed, v\u010detn\u011b nedodan\u00e9ho zbytku \u010d\u00e1ste\u010dn\u011b vy\u0159\u00edzen\u00e9 objedn\u00e1vky. Nab\u00eddky, popt\u00e1vky a nepotvrzen\u00e9 obchodn\u00ed p\u0159\u00edle\u017eitosti evidujte zvl\u00e1\u0161\u0165. Mohou b\u00fdt d\u016fle\u017eit\u00e9 pro pl\u00e1nov\u00e1n\u00ed do budoucna, ale nejsou tot\u00e9\u017e co z\u00e1vazn\u00e9 z\u00e1kaznick\u00e9 objedn\u00e1vky.<\/p>\n\n\n<p>P\u0159edstavte si, \u017ee si z\u00e1kazn\u00edk objedn\u00e1 100 sk\u0159\u00edn\u00ed a vy jich dod\u00e1te 40. Z t\u00e9to zak\u00e1zky zb\u00fdv\u00e1 dodat 60 sk\u0159\u00edn\u00ed, nikoli p\u016fvodn\u00edch 100. Samotn\u00e1 v\u00fdroba zb\u00fdvaj\u00edc\u00edch 60 kus\u016f je\u0161t\u011b neznamen\u00e1, \u017ee jste splnili z\u00e1vazek dod\u00e1n\u00ed. St\u00e1le m\u016f\u017ee b\u00fdt nutn\u00e1 kontrola, balen\u00ed nebo expedice.<\/p>\n\n\n<p>P\u0159i jednotn\u00e9m vykazov\u00e1n\u00ed mno\u017estv\u00ed plat\u00ed tato bilance:<\/p>\n\n\n<p><strong>Kone\u010dn\u00fd stav nevy\u0159\u00edzen\u00fdch zak\u00e1zek = po\u010d\u00e1te\u010dn\u00ed stav nevy\u0159\u00edzen\u00fdch zak\u00e1zek + nov\u011b p\u0159ijat\u00e9 mno\u017estv\u00ed \u2212 dodan\u00e9 mno\u017estv\u00ed \u2212 zru\u0161en\u00e9 mno\u017estv\u00ed<\/strong>. Ostatn\u00ed dohodnut\u00e9 zm\u011bny objedn\u00e1vek se prom\u00edtnou jako \u00fapravy.<\/p>\n\n\n<p>Tuto bilanci pou\u017e\u00edvejte pro konkr\u00e9tn\u00ed v\u00fdrobek nebo jinou smysluplnou spole\u010dnou jednotku. Sou\u010det kus\u016f r\u016fznorod\u00fdch v\u00fdrobk\u016f m\u016f\u017ee v\u00edce zakr\u00fdt ne\u017e objasnit. Hodnota nevy\u0159\u00edzen\u00fdch zak\u00e1zek poskytuje veden\u00ed obchodn\u00ed pohled, nevyjad\u0159uje v\u0161ak po\u010det strojn\u00edch hodin, kter\u00e9 budou je\u0161t\u011b pot\u0159eba.<\/p>\n\n\n<p>Jasn\u011b stanovte, co se ve va\u0161em p\u0159ehledu pova\u017euje za spln\u011bn\u00ed objedn\u00e1vky, nap\u0159\u00edklad odesl\u00e1n\u00ed nebo doru\u010den\u00ed z\u00e1kazn\u00edkovi, a tuto definici dodr\u017eujte. Jinak m\u016f\u017ee vznikat dojem, \u017ee se obchod a v\u00fdroba neshoduj\u00ed, i kdy\u017e jen ka\u017ed\u00fd po\u010d\u00edt\u00e1 n\u011bco jin\u00e9ho.<\/p>\n\n\n<p>Pro spr\u00e1vnou interpretaci nevy\u0159\u00edzen\u00fdch zak\u00e1zek je d\u016fle\u017eit\u00e9 rozli\u0161ovat t\u0159i v\u011bci:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky a zak\u00e1zky po term\u00ednu:<\/strong> zak\u00e1zka s dod\u00e1n\u00edm p\u0159\u00ed\u0161t\u00ed m\u011bs\u00edc m\u016f\u017ee b\u00fdt nevy\u0159\u00edzen\u00e1, ani\u017e by byla opo\u017ed\u011bn\u00e1. Zak\u00e1zky po term\u00ednu tvo\u0159\u00ed tu \u010d\u00e1st, u n\u00ed\u017e ji\u017e uplynul dohodnut\u00fd term\u00edn spln\u011bn\u00ed.<\/li><li><strong>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky a rozpracovan\u00e1 v\u00fdroba:<\/strong> WIP ozna\u010duje pr\u00e1ci, kter\u00e1 ji\u017e za\u010dala, ale je\u0161t\u011b nebyla dokon\u010dena. Mezi nevy\u0159\u00edzen\u00e9 zak\u00e1zky mohou pat\u0159it i dosud nezah\u00e1jen\u00e9 zak\u00e1zky a hotov\u00e9 v\u00fdrobky \u010dekaj\u00edc\u00ed na dod\u00e1n\u00ed. V\u00fdroba na sklad m\u016f\u017ee b\u00fdt rozpracovan\u00e1, ani\u017e by pat\u0159ila k nevy\u0159\u00edzen\u00fdm zak\u00e1zk\u00e1m potvrzen\u00fdm z\u00e1kazn\u00edkem.<\/li><li><strong>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky a objedn\u00e1vky \u010dekaj\u00edc\u00ed na naskladn\u011bn\u00ed:<\/strong> objedn\u00e1vka \u010dekaj\u00edc\u00ed na naskladn\u011bn\u00ed obvykle ozna\u010duje objedn\u00e1vku, kterou moment\u00e1ln\u011b nelze pokr\u00fdt z dostupn\u00fdch z\u00e1sob. Nevy\u0159\u00edzen\u00e9 zak\u00e1zky jsou \u0161ir\u0161\u00ed pojem: zahrnuj\u00ed i objedn\u00e1vky p\u0159ijat\u00e9 k b\u011b\u017en\u00e9mu dod\u00e1n\u00ed v budoucnu.<\/li><\/ul>\n\n\n<p>Ke sn\u00ed\u017een\u00ed objemu nevy\u0159\u00edzen\u00fdch zak\u00e1zek proto nesta\u010d\u00ed jen zahajovat dal\u0161\u00ed operace. Mus\u00edte dokon\u010dit a dodat ty spr\u00e1vn\u00e9 zak\u00e1zky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pro\u010d m\u016f\u017ee stejn\u00fd objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek znamenat velmi rozd\u00edln\u00e9 zat\u00ed\u017een\u00ed v\u00fdroby<\/h2>\n\n\n<p>P\u0159edstavte si, \u017ee ve va\u0161\u00ed tov\u00e1rn\u011b zb\u00fdvaj\u00ed t\u0159i nevy\u0159\u00edzen\u00e9 zak\u00e1zky na sk\u0159\u00edn\u011b. Podle jejich stavu se li\u0161\u00ed i pr\u00e1ce, kterou mus\u00ed v\u00fdroba je\u0161t\u011b odv\u00e9st.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Stav zak\u00e1zky<\/th><th>Co zb\u00fdv\u00e1 ud\u011blat<\/th><th>Ot\u00e1zka pro pl\u00e1nov\u00e1n\u00ed<\/th><\/tr><\/thead><tbody><tr><td>P\u0159ijat\u00e1, dosud nezah\u00e1jen\u00e1<\/td><td>\u0158ez\u00e1n\u00ed, oh\u00fdb\u00e1n\u00ed, lakov\u00e1n\u00ed a mont\u00e1\u017e<\/td><td>Kam lze za\u0159adit cel\u00fd v\u00fdrobn\u00ed postup s ohledem na ji\u017e p\u0159ijat\u00e9 z\u00e1vazky?<\/td><\/tr><tr><td>\u010c\u00e1ste\u010dn\u011b vyroben\u00e1<\/td><td>Lakov\u00e1n\u00ed a mont\u00e1\u017e<\/td><td>Kdy bude voln\u00e1 kapacita lakovny a stihne na ni mont\u00e1\u017e v\u010das nav\u00e1zat?<\/td><\/tr><tr><td>V\u00fdroba dokon\u010dena<\/td><td>Balen\u00ed a expedice<\/td><td>Co br\u00e1n\u00ed odesl\u00e1n\u00ed hotov\u00e9 zak\u00e1zky?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>V\u0161echny t\u0159i pat\u0159\u00ed mezi dosud nedodan\u00e9 zak\u00e1zky. Ne v\u0161echny ale musej\u00ed znovu proj\u00edt cel\u00fdm v\u00fdrobn\u00edm postupem. Kdybyste znovu napl\u00e1novali p\u016fvodn\u00ed objem pr\u00e1ce, po\u017eadavky na v\u00fdrobu byste nadhodnotili. Pokud byste naopak vynechali nezah\u00e1jenou zak\u00e1zku, podhodnotili byste je.<\/p>\n\n\n<p>Nyn\u00ed z\u00e1kazn\u00edk s \u010d\u00e1ste\u010dn\u011b vyrobenou zak\u00e1zkou po\u017e\u00e1d\u00e1 o d\u0159\u00edv\u011bj\u0161\u00ed dod\u00e1n\u00ed. P\u0159esun na za\u010d\u00e1tek fronty v lakovn\u011b vypad\u00e1 jako dobr\u00e9 \u0159e\u0161en\u00ed. Jen\u017ee tent\u00fd\u017e v\u00fdrobn\u00ed zdroj bude pozd\u011bji pot\u0159ebovat i dosud nezah\u00e1jen\u00e1 zak\u00e1zka, kter\u00e1 pak mus\u00ed stihnout mont\u00e1\u017e p\u0159ed vlastn\u00edm sl\u00edben\u00fdm term\u00ednem.<\/p>\n\n\n<p>Pot\u0159ebujete vid\u011bt dopady na ob\u011b zak\u00e1zky, nejen to, zda se do lakovny je\u0161t\u011b vejde jedna d\u00e1vka. U hotov\u00e9 zak\u00e1zky \u010dekaj\u00edc\u00ed na expedici p\u0159itom urychlen\u00ed v\u00fdroby nepom\u016f\u017ee v\u016fbec.<\/p>\n\n\n<p><strong>\u0158i\u010fte z\u00e1vazky v\u016f\u010di z\u00e1kazn\u00edk\u016fm spole\u010dn\u011b se zb\u00fdvaj\u00edc\u00ed prac\u00ed.<\/strong> Tak zjist\u00edte, zda m\u00e1 b\u00fdt dal\u0161\u00edm krokem zm\u011bna rozvrhu, rozhodnut\u00ed o kapacit\u011b, nebo prost\u011b odesl\u00e1n\u00ed hotov\u00e9 zak\u00e1zky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prom\u011b\u0148te nevy\u0159\u00edzen\u00e9 zak\u00e1zky ve v\u00fdrobn\u00ed pl\u00e1n se SkyPlanner<\/h2>\n\n\n<p>Z\u00e1kaznick\u00e9 objedn\u00e1vky a dod\u00e1vky m\u016f\u017eete d\u00e1l spravovat ve sv\u00e9m ERP. SkyPlanner se prost\u0159ednictv\u00edm sv\u00e9ho otev\u0159en\u00e9ho REST API propoj\u00ed s libovoln\u00fdm ERP nebo MES a napoj\u00ed st\u00e1vaj\u00edc\u00ed data o objedn\u00e1vk\u00e1ch a v\u00fdrob\u011b na <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/co-je-planovani-vyroby\/\">detailn\u00ed rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>. Z\u00edsk\u00e1te tak mo\u017enost pl\u00e1novat pr\u00e1ci, ani\u017e byste museli nahrazovat syst\u00e9m, v n\u011bm\u017e evidujete obchodn\u00ed z\u00e1vazky.<\/p>\n\n\n<p>Vstupn\u00ed data pro rozvrhov\u00e1n\u00ed popisuj\u00ed, co je\u0161t\u011b zb\u00fdv\u00e1 ud\u011blat: jednotliv\u00e9 operace, jejich po\u0159ad\u00ed a d\u00e9lku, vhodn\u00e1 pracovi\u0161t\u011b, pracovn\u00ed sm\u011bny, obsluhu a priority. Arcturus, um\u011bl\u00e1 inteligence pro rozvrhov\u00e1n\u00ed ve SkyPlanner, za\u0159ad\u00ed tuto pr\u00e1ci do pl\u00e1nu podle nastaven\u00fdch kapacit a n\u00e1vaznost\u00ed. Pokud zapnete rozvrhov\u00e1n\u00ed se zohledn\u011bn\u00edm materi\u00e1lu, do v\u00fdpo\u010dtu vstoup\u00ed tak\u00e9 jeho dostupnost.<\/p>\n\n\n<p>Pro v\u00fdrobce sk\u0159\u00edn\u00ed to znamen\u00e1 napl\u00e1novat \u0159ez\u00e1n\u00ed, oh\u00fdb\u00e1n\u00ed, lakov\u00e1n\u00ed a mont\u00e1\u017e, kter\u00e9 je\u0161t\u011b zb\u00fdvaj\u00ed u p\u0159ijat\u00fdch zak\u00e1zek. M\u00edsto odhadu dod\u00e1n\u00ed podle celkov\u00e9ho objemu objedn\u00e1vek m\u016f\u017eete sledovat napl\u00e1novanou pr\u00e1ci a\u017e k jej\u00edmu p\u0159edpokl\u00e1dan\u00e9mu dokon\u010den\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Za\u0159a\u010fte dosud nenapl\u00e1novanou pr\u00e1ci<\/h3>\n\n\n<p>P\u0159ijat\u00e1 zak\u00e1zka nemus\u00ed b\u00fdt nutn\u011b napl\u00e1novan\u00e1. M\u011bjte p\u0159ehled i o pr\u00e1ci, kterou jste do pl\u00e1nu je\u0161t\u011b neza\u0159adili. Jinak m\u016f\u017ee p\u0159ehledn\u00fd Gantt\u016fv diagram vytv\u00e1\u0159et klamn\u00fd dojem, proto\u017ee nezobrazuje z\u00e1vazky, kter\u00e9 na napl\u00e1nov\u00e1n\u00ed teprve \u010dekaj\u00ed.<\/p>\n\n\n<p>SkyPlanner umo\u017e\u0148uje napl\u00e1novat vybran\u00e9 dosud nenapl\u00e1novan\u00e9 operace. Akci pro jejich napl\u00e1nov\u00e1n\u00ed nab\u00edz\u00ed tak\u00e9 jeho Asistent. Po za\u0159azen\u00ed se stanou sou\u010d\u00e1st\u00ed v\u00fdrobn\u00edho rozvrhu, kde je m\u016f\u017eete posuzovat spole\u010dn\u011b s ji\u017e napl\u00e1novan\u00fdmi operacemi.<\/p>\n\n\n<p>To je jin\u00fd \u00fakon ne\u017e <strong>P\u0159epl\u00e1novat v\u0161e<\/strong>, kter\u00fd p\u0159epo\u010d\u00edt\u00e1 operace ji\u017e um\u00edst\u011bn\u00e9 na \u010dasov\u00e9 ose. Prvotn\u00edm rozvr\u017een\u00edm za\u0159ad\u00edte pr\u00e1ci do pl\u00e1nu, zat\u00edmco p\u0159epl\u00e1nov\u00e1n\u00edm p\u0159izp\u016fsob\u00edte ji\u017e napl\u00e1novanou pr\u00e1ci zm\u011bn\u011bn\u00fdm podm\u00ednk\u00e1m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sledujte dopad na dod\u00e1n\u00ed, ne jen nejbli\u017e\u0161\u00ed voln\u00fd term\u00edn<\/h3>\n\n\n<p>Gantt\u016fv diagram ukazuje, kde a kdy jsou operace napl\u00e1nov\u00e1ny. <a href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/kapacitni-planovani-vyroby\/\">P\u0159ehled o kapacit\u011b a vyt\u00ed\u017een\u00ed<\/a> v\u00e1m pom\u016f\u017ee zjistit, kter\u00e9 v\u00fdrobn\u00ed zdroje jsou ji\u017e obsazen\u00e9 a kde zb\u00fdvaj\u00edc\u00ed pr\u00e1ce soupe\u0159\u00ed o dostupn\u00fd \u010das.<\/p>\n\n\n<p>V p\u0159\u00edkladu se sk\u0159\u00edn\u011bmi sledujte n\u00e1vaznost od lakov\u00e1n\u00ed a\u017e po mont\u00e1\u017e. D\u0159\u00edv\u011bj\u0161\u00ed term\u00edn lakov\u00e1n\u00ed pom\u016f\u017ee jen tehdy, kdy\u017e po\u017eadovan\u00e9 dokon\u010den\u00ed umo\u017en\u00ed i zbytek v\u00fdrobn\u00edho postupu. Ne\u017e z\u00e1kazn\u00edkovi potvrd\u00edte term\u00edn dod\u00e1n\u00ed, zapo\u010d\u00edtejte tak\u00e9 balen\u00ed, dopravu a ve\u0161ker\u00e9 dal\u0161\u00ed povinnosti, kter\u00e9 n\u00e1sleduj\u00ed po v\u00fdrob\u011b.<\/p>\n\n\n<p>Obchod a v\u00fdroba pak mohou jednat nad vypo\u010dten\u00fdm pl\u00e1nem m\u00edsto toho, aby si vym\u011b\u0148ovaly vlastn\u00ed odhady, jak vyt\u00ed\u017een\u00e1 tov\u00e1rna asi je.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0159epo\u010d\u00edtejte pl\u00e1n m\u00edsto ru\u010dn\u00edch \u00faprav<\/h3>\n\n\n<p>Kdy\u017e z\u00e1kazn\u00edk po\u017e\u00e1d\u00e1 o d\u0159\u00edv\u011bj\u0161\u00ed term\u00edn, upravte p\u0159\u00edslu\u0161nou prioritu a nechte Arcturus p\u0159epo\u010d\u00edtat napl\u00e1novanou pr\u00e1ci. Ne\u017e sl\u00edb\u00edte nov\u00fd term\u00edn, zkontrolujte dot\u010den\u00e9 term\u00edny dokon\u010den\u00ed. V\u00fdpo\u010det se \u0159\u00edd\u00ed va\u0161imi prioritami a uzam\u010den\u00fdmi polo\u017ekami, zat\u00edmco software zpracuje souvisej\u00edc\u00ed zm\u011bny rozvrhu.<\/p>\n\n\n<p>Pr\u016fb\u011b\u017en\u011b aktualizujte tak\u00e9 stav v\u00fdroby. Dokon\u010den\u00e9 operace a zm\u011bny dostupn\u00e9 kapacity ovliv\u0148uj\u00ed, co je je\u0161t\u011b mo\u017en\u00e9 stihnout. Pokud je zapnut\u00fd Autopilot, mohou p\u0159epl\u00e1nov\u00e1n\u00ed spou\u0161t\u011bt nastaven\u00e9 ud\u00e1losti nebo \u010dasovan\u00e9 b\u011bhy bez neust\u00e1l\u00fdch ru\u010dn\u00edch z\u00e1sah\u016f.<\/p>\n\n\n<p>M\u00e9n\u011b \u010dasu tak str\u00e1v\u00edte p\u0159esouv\u00e1n\u00edm operac\u00ed mezi frontami a v\u00edce ho z\u00edsk\u00e1te na rozhodov\u00e1n\u00ed, jak s v\u00fdsledkem nalo\u017eit. Na po\u017eadavek ohledn\u011b dod\u00e1n\u00ed m\u016f\u017eete odpov\u011bd\u011bt je\u0161t\u011b b\u011bhem \u010dek\u00e1n\u00ed z\u00e1kazn\u00edka, ani\u017e byste museli nejprve prov\u00e9st dal\u0161\u00ed kolo ru\u010dn\u00edch v\u00fdpo\u010dt\u016f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fredman: odpov\u011bdi na dotazy o dod\u00e1n\u00ed d\u00edky p\u0159ehledu o kapacit\u011b<\/h2>\n\n\n<p>S rostouc\u00edm objemem zak\u00e1zek se s t\u00edmto probl\u00e9mem pot\u00fdkala spole\u010dnost Fredman Operations, finsk\u00fd v\u00fdrobce kuchy\u0148sk\u00fdch a obalov\u00fdch \u0159e\u0161en\u00ed vhodn\u00fdch pro styk s potravinami. Pracovn\u00ed karty se ru\u010dn\u011b p\u0159en\u00e1\u0161ely mezi jej\u00edm ERP L7 a softwarem LTR pro \u0159\u00edzen\u00ed v\u00fdroby. Pl\u00e1nova\u010d nem\u011bl p\u0159esn\u00fd p\u0159ehled o tom, kdy se uvoln\u00ed stroje a jak\u00e1 kapacita bude k dispozici v jednotliv\u00fdch sm\u011bn\u00e1ch. Urgentn\u00ed p\u0159epl\u00e1nov\u00e1n\u00ed mohlo zabrat hodinu i d\u00e9le.<\/p>\n\n\n<p>D\u00edky SkyPlanner m\u00e1 Fredman v Ganttov\u011b diagramu spole\u010dn\u00fd p\u0159ehled o stroj\u00edch, voln\u00e9 i obsazen\u00e9 kapacit\u011b a pr\u016fb\u011bhu operac\u00ed. Kapacita sm\u011bn vstupuje do ka\u017edodenn\u00edho pl\u00e1nov\u00e1n\u00ed a v\u00fdrobn\u00ed t\u00fdm vid\u00ed pl\u00e1novan\u00fd za\u010d\u00e1tek i konec ka\u017ed\u00e9 operace.<\/p>\n\n\n<p>Fredman uv\u00e1d\u00ed, \u017ee obchodn\u00edci mohou na z\u00e1klad\u011b kapacitn\u00edch dat slibovat term\u00edny dod\u00e1n\u00ed a\u017e \u0161est m\u011bs\u00edc\u016f dop\u0159edu a odpov\u011bdi na po\u017eadavky na zm\u011bnu rozvrhu z\u00edsk\u00e1vaj\u00ed v \u0159\u00e1du sekund m\u00edsto hodin. Spole\u010dnost tak\u00e9 uv\u00e1d\u00ed, \u017ee se sn\u00ed\u017eila pot\u0159eba p\u0159es\u010das\u016f.<\/p>\n\n\n<p>Jejich zku\u0161enost ukazuje praktick\u00fd p\u0159\u00ednos propojen\u00ed objedn\u00e1vek s v\u00fdrobou: rychlej\u0161\u00ed odpov\u011b\u010f, sd\u00edlenou nap\u0159\u00ed\u010d t\u00fdmy, na ot\u00e1zku, jakou pr\u00e1ci m\u016f\u017ee v\u00fdroba p\u0159ijmout a kdy. Podrobnosti ze zku\u0161enost\u00ed t\u00fdmu najdete v <a href=\"https:\/\/skyplanner.ai\/cs\/pribehy-zakazniku\/fredman-operations\/\">\u00fapln\u00e9 recenzi SkyPlanner od spole\u010dnosti Fredman Operations<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Co d\u011blat, kdy\u017e na nevy\u0159\u00edzen\u00e9 zak\u00e1zky nesta\u010d\u00ed kapacita<\/h2>\n\n\n<p>Lep\u0161\u00ed rozvrh pom\u016f\u017ee efektivn\u011bji vyu\u017e\u00edt st\u00e1vaj\u00edc\u00ed kapacitu. P\u0159et\u00ed\u017een\u00e9 lakovac\u00ed lince ale neomezen\u00fd po\u010det hodin nep\u0159id\u00e1.<\/p>\n\n\n<p>Z pl\u00e1nu zjist\u011bte, kter\u00e9 sl\u00edben\u00e9 dod\u00e1vky jsou ohro\u017een\u00e9 a co br\u00e1n\u00ed jejich v\u010dasn\u00e9mu za\u0159azen\u00ed. Pak zvolte c\u00edlen\u00e9 opat\u0159en\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Zm\u011b\u0148te priority tam, kde je to z obchodn\u00edho hlediska opodstatn\u011bn\u00e9, a ov\u011b\u0159te dopad na ostatn\u00ed zak\u00e1zky.<\/li><li>Prodlu\u017ete provozn\u00ed dobu nebo vyu\u017eijte schv\u00e1len\u00fd alternativn\u00ed v\u00fdrobn\u00ed zdroj tam, kde to skute\u010dn\u011b uvoln\u00ed \u00fazk\u00e9 m\u00edsto.<\/li><li>\u0158e\u0161te chyb\u011bj\u00edc\u00ed materi\u00e1l nebo jin\u00e9 p\u0159ek\u00e1\u017eky zah\u00e1jen\u00ed pr\u00e1ce m\u00edsto opakovan\u00e9ho p\u0159esouv\u00e1n\u00ed zablokovan\u00fdch operac\u00ed.<\/li><li>Pokud p\u016fvodn\u00ed z\u00e1vazek ji\u017e nelze splnit, dohodn\u011bte se z\u00e1kazn\u00edkem nov\u00fd term\u00edn dod\u00e1n\u00ed nebo \u010d\u00e1ste\u010dnou dod\u00e1vku, kter\u00e1 pro n\u011bj bude m\u00edt smysl.<\/li><\/ul>\n\n\n<p>Zak\u00e1zky po term\u00ednu posuzujte odd\u011blen\u011b od t\u011bch, jejich\u017e term\u00edn dod\u00e1n\u00ed teprve nastane. I kdy\u017e celkov\u00fd objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek kles\u00e1, m\u016f\u017ee se za t\u00edm skr\u00fdvat st\u00e1le v\u011bt\u0161\u00ed zpo\u017ed\u011bn\u00ed dod\u00e1vky pro jednoho z\u00e1kazn\u00edka. Naopak rostouc\u00ed objem m\u016f\u017ee b\u00fdt zvl\u00e1dnuteln\u00fd, pokud se zb\u00fdvaj\u00edc\u00ed pr\u00e1ce vejde do budouc\u00edch kapacit.<\/p>\n\n\n<p>C\u00edlem nen\u00ed m\u00edt co nejm\u00e9n\u011b p\u0159ijat\u00fdch zak\u00e1zek. C\u00edlem je m\u00edt jasno v tom, k \u010demu jste se zav\u00e1zali, a dok\u00e1zat tyto z\u00e1vazky splnit se ziskem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zjist\u011bte, jak\u00e9 term\u00edny m\u016f\u017eete u nevy\u0159\u00edzen\u00fdch zak\u00e1zek sl\u00edbit<\/h2>\n\n\n<p>Pokud se v\u00e1\u0161 pl\u00e1nova\u010d p\u0159i ka\u017ed\u00e9m po\u017eadavku na d\u0159\u00edv\u011bj\u0161\u00ed dod\u00e1n\u00ed st\u00e1le mus\u00ed vracet k tabulk\u00e1m, SkyPlanner je praktick\u00fdm dal\u0161\u00edm krokem. Propojuje zb\u00fdvaj\u00edc\u00ed pr\u00e1ci ve v\u00fdrob\u011b, kapacity a priority do rozvrhu, o kter\u00fd se v\u00e1\u0161 t\u00fdm m\u016f\u017ee op\u0159\u00edt p\u0159i dal\u0161\u00edm rozhodov\u00e1n\u00ed o dod\u00e1vk\u00e1ch.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Domluvte si uk\u00e1zku SkyPlanner<\/a> a p\u0159ipravte si typickou zak\u00e1zku, v\u00fdrobn\u00ed zdroj, o jeho\u017e kapacitu se d\u011bl\u00ed s dal\u0161\u00edmi zak\u00e1zkami, a ned\u00e1vn\u00fd po\u017eadavek na d\u0159\u00edv\u011bj\u0161\u00ed dod\u00e1n\u00ed. Na t\u011bchto p\u0159\u00edkladech dob\u0159e uvid\u00edte, jak se pl\u00e1n m\u011bn\u00ed a kter\u00fdch dal\u0161\u00edch z\u00e1vazk\u016f se zm\u011bny dotknou. Nebo si nejprve <a href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner s uk\u00e1zkov\u00fdmi daty<\/a> a seznamte se s prost\u0159ed\u00edm pro rozvrhov\u00e1n\u00ed v\u00fdroby.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu Domov &raquo; Zdroje &raquo; Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu Nevy\u0159\u00edzen\u00e9 zak\u00e1zky jsou p\u0159ijat\u00e9 z\u00e1kaznick\u00e9 objedn\u00e1vky, kter\u00e9 dosud nebyly spln\u011bny. Ve v\u00fdrob\u011b se t\u00edm obvykle rozum\u00ed zak\u00e1zky, mno\u017estv\u00ed nebo hodnota objedn\u00e1vek, kter\u00e9 je\u0161t\u011b zb\u00fdv\u00e1 dodat. Na n\u011bkter\u00fdch se je\u0161t\u011b neza\u010dalo pracovat, jin\u00e9 u\u017e mohou b\u00fdt ve v\u00fdrob\u011b &#8230; <a title=\"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/\" aria-label=\"Read more about Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":100177,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2518,303],"tags":[],"class_list":["post-100150","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovani","category-zdroje","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu<\/title>\n<meta name=\"description\" content=\"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\" \/>\n<meta property=\"og:description\" content=\"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T17:01:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T17:01:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/\"},\"wordCount\":2465,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"articleSection\":[\"APS a rozvrhov\u00e1n\u00ed\",\"zdroje\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/\",\"name\":\"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:01:38+00:00\",\"description\":\"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/zdroje\\\/nevyrizene-zakazky\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu","description":"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/","og_locale":"cs_CZ","og_type":"article","og_title":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu","og_description":"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.","og_url":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T17:01:26+00:00","article_modified_time":"2026-10-16T17:01:38+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Jussi M\u00e4ntyl\u00e4","Odhadovan\u00e1 doba \u010dten\u00ed":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/"},"wordCount":2465,"publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","articleSection":["APS a rozvrhov\u00e1n\u00ed","zdroje"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/","url":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/","name":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:01:38+00:00","description":"Rostouc\u00ed objem nevy\u0159\u00edzen\u00fdch zak\u00e1zek nen\u00ed pl\u00e1n dod\u00e1vek. Zjist\u011bte, co zb\u00fdv\u00e1 ud\u011blat a jak SkyPlanner propojuje p\u0159ijat\u00e9 zak\u00e1zky s kapacitou a re\u00e1ln\u00fdmi term\u00edny.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","width":1672,"height":941,"caption":"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/zdroje\/nevyrizene-zakazky\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu Domov &raquo; Zdroje &raquo; Nevy\u0159\u00edzen\u00e9 zak\u00e1zky: Co znamenaj\u00ed pro va\u0161i v\u00fdrobu Nevy\u0159\u00edzen\u00e9 zak\u00e1zky jsou p\u0159ijat\u00e9 z\u00e1kaznick\u00e9 objedn\u00e1vky, kter\u00e9 dosud nebyly spln\u011bny. Ve v\u00fdrob\u011b se t\u00edm obvykle rozum\u00ed zak\u00e1zky, mno\u017estv\u00ed nebo hodnota objedn\u00e1vek, kter\u00e9 je\u0161t\u011b zb\u00fdv\u00e1 dodat. Na n\u011bkter\u00fdch se je\u0161t\u011b neza\u010dalo pracovat, jin\u00e9 u\u017e mohou b\u00fdt ve v\u00fdrob\u011b&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/100150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=100150"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/100150\/revisions"}],"predecessor-version":[{"id":100212,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/posts\/100150\/revisions\/100212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/100177"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=100150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/categories?post=100150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/tags?post=100150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}