{"id":4585,"date":"2022-04-21T17:29:20","date_gmt":"2022-04-21T17:29:20","guid":{"rendered":"https:\/\/skyplanner.ai\/funkce\/"},"modified":"2026-09-22T12:39:02","modified_gmt":"2026-09-22T12:39:02","slug":"funkce","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/funkce\/","title":{"rendered":"Funkce"},"content":{"rendered":"\n<div class=\"wp-block-group sp-features-v2 sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\" data-screen-label=\"Hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-hero__grid\">\n      <div class=\"fx-hero__copy sp-min0\">\n<p class=\"fx-eyebrow\">AI pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobce<\/p>\n<h1 class=\"wp-block-heading fx-hero__title\">Napl\u00e1nov\u00e1no b\u011bhem n\u011bkolika sekund. <span class=\"hl\">Kontrola z\u016fst\u00e1v\u00e1 ve va\u0161ich rukou.<\/span><\/h1>\n<p class=\"fx-hero__sub\">SkyPlanner APS prom\u011bn\u00ed va\u0161e objedn\u00e1vky, kapacity, materi\u00e1ly a priority v realistick\u00fd pl\u00e1n respektuj\u00edc\u00ed omezen\u00e9 kapacity. Arcturus, n\u00e1\u0161 vlastn\u00ed AI engine, ho spo\u010d\u00edt\u00e1 b\u011bhem n\u011bkolika sekund a p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b ho udr\u017euje aktu\u00e1ln\u00ed. Vy rozhodujete, co se zamkne, co se posune a co se schv\u00e1l\u00ed.<\/p>\n\n        <div class=\"fx-hero__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Spustit bezplatnou zku\u0161ebn\u00ed verzi<\/a>\n          <a class=\"sp-btn sp-btn--outline sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervovat \u017eiv\u00e9 demo<\/a>\n        <\/div>\n      <\/div>\n\n      <div class=\"fx-hero__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u010casov\u00e1 osa SkyPlanner Gantt zobrazuj\u00edc\u00ed napl\u00e1novan\u00e9 v\u00fdrobn\u00ed \u00falohy v pruz\u00edch v\u00fdrobn\u00edch pracovi\u0161\u0165, se \u0161ipkami z\u00e1vislost\u00ed propojuj\u00edc\u00edmi kroky procesu a seznamem objedn\u00e1vek n\u00ed\u017ee.\">\n        <\/figure>\n        <div class=\"fx-hero__badge\">\n          <span class=\"ico ico--crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n          <div><b>Jedno kliknut\u00ed p\u0159epl\u00e1nuje v\u0161e<\/b><small>King button, poh\u00e1n\u011bn\u00fd enginem Arcturus<\/small><\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n    <div class=\"fxv-herometa\">\n<p class=\"fxv-heromicro\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Zdarma na 30 dn\u00ed. Bez kreditn\u00ed karty.<\/p>\n<p class=\"fx-hero__devices\">\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M9 20h6M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"4\" y=\"2.5\" width=\"16\" height=\"19\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        <svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"7\" y=\"2.5\" width=\"10\" height=\"19\" rx=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/rect><path d=\"M10.5 18.5h3\" stroke=\"currentColor\" stroke-width=\"1.7\" stroke-linecap=\"round\"><\/path><\/svg>\n        Desktop, tablet a telefon.\n      <\/p>\n    <\/div>\n<ul class=\"wp-block-list fx-micro\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>AI pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\u010casov\u00e1 osa Gantt<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Integrace ERP &amp; REST API<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>29 podporovan\u00fdch jazyk\u016f<\/li>\n    <\/ul>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group fxv-proof\" data-screen-label=\"Proof strip\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-proof__row\">\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"90\" data-suffix=\"%\">90%<\/span><\/span><span class=\"fxv-proof__lab\">efektivn\u011bj\u0161\u00ed v\u00fdroba, Laboratory &amp; Allied<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"99.2\" data-suffix=\"%\">99.2%<\/span><\/span><span class=\"fxv-proof__lab\">spolehlivost dod\u00e1vek, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"4\" data-prefix=\"\" data-suffix=\" hours\">4 hodiny<\/span><\/span><span class=\"fxv-proof__lab\">pl\u00e1novac\u00ed pr\u00e1ce u\u0161et\u0159en\u00e9 denn\u011b, Piristeel<\/span><\/div>\n      <div class=\"fxv-proof__item\"><span class=\"fxv-proof__big\">B\u011bhem n\u011bkolika sekund<\/span><span class=\"fxv-proof__lab\">urgentn\u00ed p\u0159epl\u00e1nov\u00e1n\u00ed, kter\u00e1 d\u0159\u00edve trvala hodinu, Fredman Operations<\/span><\/div>\n    <\/div>\n<p class=\"fxv-proof__note\">V\u00fdsledky uv\u00e1d\u011bn\u00e9 z\u00e1kazn\u00edky SkyPlanner Laboratory &amp; Allied, Piristeel a Fredman Operations. Ka\u017ed\u00e1 tov\u00e1rna je jin\u00e1.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<div class=\"wp-block-group fx-subnav\" role=\"navigation\" aria-label=\"On this page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-subnav__row\">\n      <a href=\"#why\" data-target=\"why\">Pro\u010d APS<\/a>\n      <a href=\"#how\" data-target=\"how\">Jak to funguje<\/a>\n      <a href=\"#visibility\" data-target=\"visibility\">P\u0159ehlednost<\/a>\n      <a href=\"#autopilot\" data-target=\"autopilot\">Autopilot<\/a>\n      <a href=\"#priorities\" data-target=\"priorities\">Priority<\/a>\n      <a href=\"#similar-jobs\" data-target=\"similar-jobs\">Podobn\u00e9 zak\u00e1zky<\/a>\n      <a href=\"#routing\" data-target=\"routing\">Editor postup\u016f<\/a>\n      <a href=\"#mobile\" data-target=\"mobile\">D\u00edlna<\/a>\n      <a href=\"#dashboards\" data-target=\"dashboards\">Reporty<\/a>\n      <a href=\"#capacity\" data-target=\"capacity\">Kapacita &amp; materi\u00e1ly<\/a>\n      <a href=\"#delivery\" data-target=\"delivery\">Term\u00edny dod\u00e1n\u00ed<\/a>\n      <a href=\"#roles\" data-target=\"roles\">Pro v\u00e1\u0161 t\u00fdm<\/a>\n      <a href=\"#assistant\" data-target=\"assistant\">AI agent<\/a>\n      <a href=\"#integrations\" data-target=\"integrations\">Integrace<\/a>\n      <a href=\"#compare\" data-target=\"compare\">Porovnat<\/a>\n      <a href=\"#allfeatures\" data-target=\"allfeatures\">V\u0161echny funkce<\/a>\n      <a href=\"#faq\" data-target=\"faq\">FAQ<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/div>\n\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"why\" data-screen-label=\"Why planning breaks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Pro\u010d se pl\u00e1nov\u00e1n\u00ed v\u00fdroby rozpad\u00e1<\/p>\n<h2 class=\"wp-block-heading\">Skute\u010dn\u00e9 tov\u00e1rny se ne\u0159\u00edd\u00ed pevn\u00fdm pl\u00e1nem<\/h2>\n<p>Harmonogram, kter\u00fd v\u010dera vypadal spr\u00e1vn\u011b, m\u016f\u017ee b\u00fdt dnes \u0161patn\u00fd. V\u011bt\u0161ina pl\u00e1novac\u00edch n\u00e1stroj\u016f nedok\u00e1\u017ee reagovat dost rychle, kdy\u017e se v\u00fdroba zm\u011bn\u00ed.<\/p>\n    <\/div>\n    <div class=\"fx-pain\">\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M13 2L4.5 13.5H11l-1 8.5L19.5 10H13z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">P\u0159ich\u00e1zej\u00ed urgentn\u00ed objedn\u00e1vky<\/p>\n<p class=\"fx-pain__b\">Uprost\u0159ed t\u00fddne doraz\u00ed prioritn\u00ed objedn\u00e1vka a v\u0161echny pozd\u011bj\u0161\u00ed zak\u00e1zky se j\u00ed mus\u00ed p\u0159izp\u016fsobit.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 8l9-5 9 5v8l-9 5-9-5z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M3 8l9 5 9-5M12 13v8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Chyb\u00ed materi\u00e1ly<\/p>\n<p class=\"fx-pain__b\">Zak\u00e1zka je napl\u00e1novan\u00e1, ale materi\u00e1l nebo n\u00e1kupn\u00ed objedn\u00e1vka je\u0161t\u011b nedorazily, tak\u017ee ve skute\u010dnosti nem\u016f\u017ee b\u011b\u017eet.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 21V3m0 0l11 3.5L6 10\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Priority se neust\u00e1le m\u011bn\u00ed<\/p>\n<p class=\"fx-pain__b\">Tlaky z\u00e1kazn\u00edk\u016f, term\u00edn\u016f a pr\u016fb\u011b\u017en\u00fdch dob se neust\u00e1le m\u011bn\u00ed a pl\u00e1n mus\u00ed sv\u00e9 v\u00e1hy p\u0159izp\u016fsobovat spolu s nimi.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 17h4v4H3zm7-6h4v10h-4zm7-7h4v17h-4z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">V\u00fdrobn\u00ed pracovi\u0161t\u011b se p\u0159et\u011b\u017euj\u00ed<\/p>\n<p class=\"fx-pain__b\">Dv\u011b zak\u00e1zky pot\u0159ebuj\u00ed stejn\u00fd stroj najednou a nikdo konflikt nevid\u00ed, dokud v\u00fdroba nenabere zpo\u017ed\u011bn\u00ed.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"3\" width=\"18\" height=\"18\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 9h18M9 3v18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Excel &amp; ERP nar\u00e1\u017eej\u00ed na sv\u00e9 limity<\/p>\n<p class=\"fx-pain__b\">Tabulky neum\u011bj\u00ed pl\u00e1novat s omezen\u00fdmi kapacitami. ERP a MES sleduj\u00ed objedn\u00e1vky, ale podle skute\u010dn\u00fdch omezen\u00ed v\u00fdrobu pl\u00e1nuj\u00ed jen z\u0159\u00eddka.<\/p>\n<\/article>\n      <article class=\"fx-pain__card\"><span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-pain__t\">Z\u00e1vislosti se ztr\u00e1cej\u00ed<\/p>\n<p class=\"fx-pain__b\">Procesn\u00ed kroky, \u010dasy se\u0159\u00edzen\u00ed a technologick\u00e9 postupy maj\u00ed sv\u00e9 po\u0159ad\u00ed. Kdy\u017e ho poru\u0161\u00edte, zpozd\u00ed se cel\u00e1 zak\u00e1zka.<\/p>\n<\/article>\n    <\/div>\n    <div class=\"fx-pain__foot\">\n      <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a10 10 0 100 20 10 10 0 000-20zm0 6v5m0 3h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg>\n<p><b>P\u0159esn\u011b pro tyto situace je SkyPlanner stvo\u0159en.<\/b> Arcturus ve chv\u00edli, kdy se realita zm\u011bn\u00ed, p\u0159epo\u010d\u00edt\u00e1 pl\u00e1n s omezen\u00fdmi kapacitami podle materi\u00e1l\u016f, kapacit a priorit a pl\u00e1nova\u010d rozhodne, co p\u0159ijme.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"how\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"How it works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Jak to funguje<\/p>\n<h2 class=\"wp-block-heading\">T\u0159i kroky k \u017eiv\u00e9mu harmonogramu<\/h2>\n<p>P\u0159\u00ednos uvid\u00edte i bez velk\u00e9ho projektu. Jednou popi\u0161te svou v\u00fdrobu, nechte objedn\u00e1vky d\u00e1l p\u0159ich\u00e1zet a o pl\u00e1nov\u00e1n\u00ed se postar\u00e1 Arcturus.<\/p>\n    <\/div>\n\n    <div class=\"fxv-how\">\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">1<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Jednou popi\u0161te svou v\u00fdrobu<\/h3>\n<p class=\"fxv-how__b\">Va\u0161e pracovi\u0161t\u011b, sm\u011bny a produkty s jejich procesn\u00edmi kroky. Pr\u00e1v\u011b tady v\u00e1m nejv\u00edc pom\u016f\u017ee n\u00e1\u0161 vizu\u00e1ln\u00ed editor, v\u00fdukov\u00e1 videa a vestav\u011bn\u00fd AI agent. V\u011bt\u0161ina tov\u00e1ren za\u010d\u00edn\u00e1 s jednou produktovou \u0159adou, ne s cel\u00fdm z\u00e1vodem.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1280\" height=\"586\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/21-5c990f2c-7c1f-4d7d-9980-ad09b5003c75.png\" alt=\"Vizu\u00e1ln\u00ed editor technologick\u00fdch postup\u016f SkyPlanner: karty procesn\u00edch krok\u016f Sva\u0159ov\u00e1n\u00ed a Balen\u00ed pro t\u0159i d\u00edl\u010d\u00ed produkty propojen\u00e9 \u0161ipkami, kter\u00e9 se sb\u00edhaj\u00ed do kroku \u0158ez\u00e1n\u00ed a pot\u00e9 Obr\u00e1b\u011bn\u00ed, ukazuj\u00edc\u00ed, jak d\u00edl\u010d\u00ed produkty plynou do hotov\u00e9ho produktu.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">2<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Nechte objedn\u00e1vky p\u0159ich\u00e1zet<\/h3>\n<p class=\"fxv-how__b\">Zadejte je ru\u010dn\u011b, importujte CSV nebo pozd\u011bji p\u0159ipojte sv\u00e9 ERP. Ka\u017ed\u00e1 objedn\u00e1vka zn\u00e1 sv\u016fj produkt, mno\u017estv\u00ed a term\u00edn dod\u00e1n\u00ed. To je v\u0161e, co Arcturus pot\u0159ebuje.<\/p>\n        <div class=\"fxv-how__slot\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n          <div class=\"fxv-src\" role=\"img\" aria-label=\"Orders enter SkyPlanner by manual entry, CSV import, or ERP and API connection\">\n            <div class=\"fxv-src__in\">\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h9l3 3v11H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M7 9h6M7 12h6\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linecap=\"round\"><\/path><\/svg><b>Ru\u010dn\u011b<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 3h8l4 4v10H4z\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><path d=\"M6.5 13.5l1.5-3 1.5 2 1.3-2.5 1.7 3.5\" stroke=\"currentColor\" stroke-width=\"1.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><b>CSV<\/b><\/span>\n              <span class=\"fxv-src__chip\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><rect x=\"3\" y=\"11\" width=\"14\" height=\"5\" rx=\"1.4\" stroke=\"currentColor\" stroke-width=\"1.6\"><\/rect><path d=\"M6 6.5h.01M6 13.5h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><b>ERP \/ API<\/b><\/span>\n            <\/div>\n            <svg class=\"fxv-src__merge\" width=\"20\" height=\"18\" viewBox=\"0 0 20 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M10 1v12m0 0l-5-5m5 5l5-5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n            <div class=\"fxv-src__out\">\n              <svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3.5 7.5L12 3l8.5 4.5M3.5 7.5L12 12m-8.5-4.5v9L12 21m0-9l8.5-4.5M12 12v9m8.5-13.5v9L12 21\" stroke=\"currentColor\" stroke-width=\"1.6\" stroke-linejoin=\"round\"><\/path><\/svg>\n              <b>Objedn\u00e1vky<\/b>\n            <\/div>\n          <\/div>\n        <\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n      <div class=\"fxv-how__step\">\n        <div class=\"fxv-how__num\">3<\/div>\n<h3 class=\"wp-block-heading fxv-how__t\">Arcturus pl\u00e1nuje, vy \u0159\u00edd\u00edte<\/h3>\n<p class=\"fxv-how__b\">Engine b\u011bhem okam\u017eiku sestav\u00ed pl\u00e1n s omezen\u00fdmi kapacitami v r\u00e1mci va\u0161ich skute\u010dn\u00fdch limit\u016f: kapacit, sm\u011bn, materi\u00e1l\u016f, \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroj\u016f a z\u00e1vislost\u00ed. Vy uprav\u00edte priority, zamknete, co se nesm\u00ed posunout, a pl\u00e1n schv\u00e1l\u00edte. Kdy\u017e se n\u011bco zm\u011bn\u00ed, engine p\u0159epl\u00e1nuje.<\/p>\n        <div class=\"fxv-how__slot\"><img decoding=\"async\" loading=\"lazy\" width=\"1204\" height=\"674\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/22-be3a6ec5-5d91-47ee-9dde-f5e8c10e9461.png\" alt=\"Detail \u010dasov\u00e9 osy Gantt ve SkyPlanner: barevn\u011b odli\u0161en\u00e9 pruhy v\u00fdrobn\u00edch \u00faloh (opo\u017ed\u011bn\u00e9 \u00falohy \u010derven\u011b, vybran\u00e1 \u00faloha oran\u017eov\u011b, napl\u00e1novan\u00e9 \u00falohy tmav\u011b mod\u0159e) se \u0161ipkou z\u00e1vislosti propojuj\u00edc\u00ed v\u00fdrobn\u00ed \u00falohu s jej\u00edm dal\u0161\u00edm procesn\u00edm krokem, ukazuj\u00edc\u00ed \u017eiv\u00fd harmonogram v\u00fdroby.\"><\/div>\n        <svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      <\/div>\n    <\/div>\n\n<p class=\"fxv-howline\">\n      <svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n      Pro za\u010d\u00e1tek nen\u00ed pot\u0159eba \u017e\u00e1dn\u00e9 ERP. \u017d\u00e1dn\u00e9 tr\u00e9nov\u00e1n\u00ed model\u016f um\u011bl\u00e9 inteligence na va\u0161ich datech. V\u00e1\u0161 prvn\u00ed harmonogram m\u016f\u017ee na uk\u00e1zkov\u00fdch datech b\u011b\u017eet b\u011bhem n\u011bkolika minut.\n    <\/p>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Efektivita ve v\u00fdrob\u011b vzrostla o 90 %. Kontrola z\u00e1sob se zlep\u0161ila a prodejn\u00ed z\u00e1vazky, doru\u010dov\u00e1n\u00ed zbo\u017e\u00ed v\u010das a v\u010dasn\u00e9 reportov\u00e1n\u00ed z\u00e1kazn\u00edkovi se ve skute\u010dnosti zlep\u0161ily o 50 %.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Abdul Rucyinga<\/b>, vedouc\u00ed IT, Laboratory &amp; Allied Limited<span class=\"fxv-quote__ctx\">Nejv\u011bt\u0161\u00ed farmaceutick\u00fd v\u00fdrobce v Keni, ~1 000 zam\u011bstnanc\u016f, Nairobi<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"visibility\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Production visibility\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Vid\u00edte v\u00fdrobu, nemus\u00edte ji odhadovat<\/p>\n<h2 class=\"wp-block-heading\">Cel\u00e1 v\u00fdroba v jednom pohledu<\/h2>\n<p>Co pr\u00e1v\u011b prob\u00edh\u00e1, kde jsou \u00fazk\u00e1 m\u00edsta, co je opo\u017ed\u011bn\u00e9 a jak\u00e1 kapacita je voln\u00e1. Jeden pohled uk\u00e1\u017ee v\u0161e, v\u010detn\u011b toho, jak se zm\u011bna prom\u00edtne do pl\u00e1nu, tak\u017ee m\u016f\u017eete reagovat hned, m\u00edsto abyste to zjistili p\u0159\u00edli\u0161 pozd\u011b.<\/p>\n    <\/div>\n\n    <div class=\"fx-vis\">\n      <div class=\"fx-vis__copy sp-min0\">\n<ul class=\"wp-block-list fx-vis__list\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12a9 9 0 1018 0 9 9 0 00-18 0zm9-5v5l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Co pr\u00e1v\u011b prob\u00edh\u00e1<\/b><span class=\"t\">Ka\u017ed\u00e1 b\u011b\u017e\u00edc\u00ed zak\u00e1zka a jej\u00ed procesn\u00ed krok, \u017eiv\u011b nap\u0159\u00ed\u010d cel\u00fdm provozem.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 18V9m5 9V5m5 13v-6m5 6V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Kde jsou \u00fazk\u00e1 m\u00edsta<\/b><span class=\"t\">P\u0159et\u00ed\u017een\u00e1 v\u00fdrobn\u00ed pracovi\u0161t\u011b jsou viditeln\u00e1 d\u0159\u00edve, ne\u017e zp\u016fsob\u00ed zpo\u017ed\u011bn\u00ed.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3a9 9 0 109 9\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><path d=\"M12 7v5l4 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Co je opo\u017ed\u011bn\u00e9<\/b><span class=\"t\">Zak\u00e1zky, u kter\u00fdch hroz\u00ed nedodr\u017een\u00ed term\u00ednu, jsou zv\u00fdrazn\u011bn\u00e9, ne schovan\u00e9.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3\" y=\"4\" width=\"18\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 10h18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n            <span><b>Jak\u00e1 kapacita je voln\u00e1<\/b><span class=\"t\">Voln\u00fd \u010das na ka\u017ed\u00e9m pracovi\u0161ti, tak\u017ee v\u00edte, co je\u0161t\u011b m\u016f\u017eete p\u0159ijmout.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 7h11m0 0l-4-4m4 4l-4 4M21 17H10m0 0l4-4m-4 4l4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Jak se zm\u011bna \u0161\u00ed\u0159\u00ed pl\u00e1nem<\/b><span class=\"t\">P\u0159esu\u0148te jednu zak\u00e1zku a okam\u017eit\u011b uvid\u00edte dopad na cel\u00fd pl\u00e1n.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-vis__media sp-min0\">\n<figure class=\"fx-vis__frame\">\n          <img fetchpriority=\"high\" decoding=\"sync\" loading=\"eager\" width=\"2182\" height=\"1310\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/23-ad101a05-aabc-4460-81fe-4472d2f225ba.png\" alt=\"Pohled na pl\u00e1nov\u00e1n\u00ed v\u00fdroby ve SkyPlanner: cel\u00e1 aplikace s levou naviga\u010dn\u00ed li\u0161tou, pruhy v\u00fdrobn\u00edch pracovi\u0161\u0165 (Pila, CNC stroj, Sva\u0159ov\u00e1n\u00ed a Balen\u00ed) a barevn\u011b odli\u0161en\u00fdmi pruhy v\u00fdrobn\u00edch \u00faloh, \u0161ipkami z\u00e1vislost\u00ed ukazuj\u00edc\u00edmi, jak se p\u0159epl\u00e1novan\u00e1 v\u00fdrobn\u00ed \u00faloha p\u0159esouv\u00e1 mezi stanovi\u0161ti, a ovl\u00e1dac\u00edmi prvky Reschedule all a Autopilot dole, cel\u00fd pl\u00e1n v\u00fdroby v jednom pohledu.\">\n        <\/figure>\n<p class=\"fx-cap\">Jeden pohled: vyt\u00ed\u017een\u00ed pracovi\u0161\u0165, stav zak\u00e1zek a tok pr\u00e1ce od kroku ke kroku.<\/p>\n      <\/div>\n\n<p class=\"fx-vis__note fx-vis__note--full\">U\u017e \u017e\u00e1dn\u00e9 odhadov\u00e1n\u00ed stavu v\u00fdroby. <b>Vid\u00edte ho a m\u016f\u017eete reagovat.<\/b><\/p>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner d\u00e1v\u00e1 z\u00e1klad cel\u00e9mu pl\u00e1nu. Ka\u017ed\u00fd ve firm\u011b vid\u00ed, jak na tom v\u00fdroba je: jak\u00e9 jsou kapacity, kolik je hotovo a jak\u00e9 je vyt\u00ed\u017een\u00ed.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Anu J\u00e4rvinen<\/b>, mana\u017eerka v\u00fdroby, Fredman Operations Oy<span class=\"fxv-quote__ctx\">V\u00fdrobce potravin\u00e1\u0159sk\u00fdch obal\u016f, Rauma, Finsko<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"autopilot\" data-screen-label=\"Reschedule all &amp; Autopilot\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-king\">\n      <div class=\"fx-king__copy sp-min0\">\n<p class=\"fx-eyebrow\">Reschedule all &amp; Autopilot<\/p>\n<h2 class=\"wp-block-heading\">P\u0159epl\u00e1nujte v\u0161e jedn\u00edm kliknut\u00edm. Nebo Autopilot.<\/h2>\n<p class=\"fx-king__lead\">Kdy\u017e se n\u011bco zm\u011bn\u00ed, stiskn\u011bte <b>Reschedule all<\/b>. Arcturus b\u011bhem sekund p\u0159epo\u010d\u00edt\u00e1 cel\u00fd pl\u00e1n, znovu ho slad\u00ed s va\u0161imi prioritami a ka\u017ed\u00fd oper\u00e1tor vid\u00ed, co m\u00e1 d\u011blat d\u00e1l.<\/p>\n<ul class=\"wp-block-list fx-king__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Jedno stisknut\u00ed a cel\u00fd pl\u00e1n je aktu\u00e1ln\u00ed<\/b><span class=\"t\">Zm\u011bna se prom\u00edtne do ka\u017ed\u00e9ho v\u00fdrobn\u00edho pracovi\u0161t\u011b; Arcturus b\u011bhem sekund znovu vyv\u00e1\u017e\u00ed harmonogram.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2l2.4 5 5.5.5-4.2 3.6 1.3 5.4L10 18.6 4.9 16l1.3-5.4L2 7l5.5-.5z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Autopilot udr\u017euje pl\u00e1n aktu\u00e1ln\u00ed za v\u00e1s<\/b><span class=\"t\">Zapn\u011bte ho a Arcturus posoud\u00ed situaci p\u0159i ka\u017ed\u00e9 v\u00fdznamn\u00e9 zm\u011bn\u011b: nov\u00e9 objedn\u00e1vky, dokon\u010den\u00e1 pr\u00e1ce, v\u00fdpadky kapacity, zpo\u017ed\u011bn\u00ed materi\u00e1lu. Kdy\u017e se nic nezm\u011bnilo, nic se nep\u0159esune. Kdy\u017e se n\u011bco zm\u011bnilo, prob\u011bhne c\u00edlen\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed, i ve 2 hodiny r\u00e1no, zat\u00edmco sp\u00edte.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6v2H3v8h14v-8h-1V8a6 6 0 0 0-6-6zm-4 8V8a4 4 0 0 1 8 0v2H6z\" fill=\"currentColor\"><\/path><\/svg><\/span>\n            <span><b>Va\u0161e limity, va\u0161e kontrola<\/b><span class=\"t\">Zmrazte dal\u0161\u00ed sm\u011bnu nebo chra\u0148te konkr\u00e9tn\u00ed objedn\u00e1vky. Va\u0161e z\u00e1mky a pravidla v\u017edy plat\u00ed, i kdy\u017e je Autopilot zapnut\u00fd.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-king__fact\">V Laboratory &amp; Allied je t\u0159\u00edm\u011bs\u00ed\u010dn\u00ed pl\u00e1n pro p\u0159ibli\u017en\u011b 50 v\u00fdrobn\u00edch pracovi\u0161\u0165 hotov\u00fd za m\u00e9n\u011b ne\u017e p\u016fl hodiny, od zad\u00e1n\u00ed objedn\u00e1vek a\u017e po dokon\u010den\u00fd optimalizovan\u00fd harmonogram.<\/p>\n      <\/div>\n\n      <div class=\"fx-king__visual sp-min0\">\n        <div class=\"apx-card\">\n          <div class=\"apx-card__glow\"><\/div>\n          <span class=\"apx-tag\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg>King button<\/span>\n\n          <div class=\"apx-stage\">\n            <div class=\"kbtn\" role=\"img\" aria-label=\"Reschedule all button on the Gantt timeline\">\n              <span class=\"kbtn__main\">\n                <span class=\"kbtn__crown\"><svg viewBox=\"0 0 54 44\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\"><g transform=\"translate(0,-7.165)\" fill=\"#303AF2\"><path d=\"M50.6,16.5L50.6,16.5c-2.5-1.4-5.7-0.6-7.1,1.9c-1.4,2.5-0.6,5.7,1.9,7.1c2.5,1.4,5.7,0.6,7.1-1.9c0,0,0,0,0,0C53.9,21.1,53,17.9,50.6,16.5z\"><\/path><path d=\"M9.7,18.4c-1.4-2.5-4.6-3.3-7.1-1.9c-2.5,1.4-3.3,4.6-1.9,7.1s4.6,3.3,7.1,1.9c1.2-0.7,2.1-1.8,2.4-3.1C10.5,21,10.4,19.6,9.7,18.4z\"><\/path><circle cx=\"26.5\" cy=\"14.4\" r=\"5.2\"><\/circle><path d=\"M44.2,27.6c-2.5-1.4-5.7-0.6-7.1,1.9c0,0,0,0,0,0l-1.8,3l-4.2-7.2c-0.9-1.6-2.7-2.6-4.5-2.6h-0.1c-1.9,0-3.6,1-4.5,2.6l-4.1,7.2l-1.8-3c-1.4-2.5-4.6-3.3-7.1-1.9c0,0,0,0,0,0l0,0c-2.5,1.4-3.3,4.6-1.9,7.1c0,0,0,0,0,0l4.7,8.2l0,0l1.5,2.6c0.1,0.2,0.2,0.3,0.3,0.5l0.1,0.1c0.1,0.1,0.2,0.2,0.3,0.3l0.1,0.1c0.1,0.1,0.2,0.2,0.4,0.3l0.1,0.1c0.1,0.1,0.3,0.2,0.5,0.3l0,0c0.4,0.2,0.8,0.4,1.2,0.6h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c2.3-1,4.7-1.6,7.2-1.7c2.4,0.1,4.8,0.7,7,1.7h0c0.1,0,0.3,0.1,0.4,0.1l0.1,0l0.3,0.1l0.2,0h1l0.2,0l0.3-0.1l0.1,0c0.1,0,0.3-0.1,0.4-0.1h0c0.4-0.1,0.8-0.3,1.2-0.6l0,0c0.2-0.1,0.3-0.2,0.5-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3l0.1-0.1c0.1-0.1,0.2-0.2,0.3-0.3c0,0,0.1-0.1,0.1-0.1c0.1-0.2,0.2-0.3,0.4-0.5l0,0l1.5-2.6l0,0l4.8-8.2C47.5,32.2,46.6,29,44.2,27.6L44.2,27.6z\"><\/path><\/g><\/svg><\/span>\n                <span class=\"kbtn__label\">Reschedule all<\/span>\n              <\/span>\n              <span class=\"kbtn__sep\"><\/span>\n              <span class=\"kbtn__time\">\n                <span class=\"kbtn__clock\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n                <span class=\"kbtn__spin\"><svg viewBox=\"0 0 13 18\" fill=\"none\" aria-hidden=\"true\"><path d=\"M3 6l3.5-3.5L10 6M3 12l3.5 3.5L10 12\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n              <\/span>\n            <\/div>\n          <\/div>\n<p class=\"apx-hint\">Jedno stisknut\u00ed a Arcturus p\u0159epo\u010d\u00edt\u00e1 <b>cel\u00fd pl\u00e1n b\u011bhem sekund<\/b>.<\/p>\n\n          <div class=\"apx-or\"><span>nebo nastavte a nechte b\u011b\u017eet<\/span><\/div>\n\n          <div class=\"apx-auto\">\n            <span class=\"apx-auto__ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"9\" fill=\"currentColor\"><\/circle><path d=\"M12 7.2v5l3.2 2\" stroke=\"#fff\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <div class=\"apx-auto__txt\">\n              <b>Autopilot<\/b>\n              <span>Zapn\u011bte ho pomoc\u00ed ikony \u010dasova\u010de u Reschedule&nbsp;all. Pot\u00e9 automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 v r\u00e1mci va\u0161ich limit\u016f.<\/span>\n            <\/div>\n            <span class=\"apx-switch\" role=\"img\" aria-label=\"Autopilot je zapnut\u00fd\"><span class=\"apx-switch__knob\"><\/span><\/span>\n          <\/div>\n<p class=\"apx-card__cap\"><span class=\"apx-on\">Zapnuto.<\/span> Arcturus udr\u017euje va\u0161i v\u00fdrobu optimalizovanou, i kdy\u017e jste pry\u010d.<\/p>\n        <\/div>\n      <\/div>\n    <\/div>\n<p class=\"fx-king__tag fx-king__tag--below\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby je p\u0159\u00edjemn\u00e9 jen tehdy, kdy\u017e ho nemus\u00edte d\u011blat ru\u010dn\u011b.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"priorities\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Priority weighting\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-prio\">\n      <div class=\"fx-prio__copy sp-min0\">\n<p class=\"fx-eyebrow\">Priority, kter\u00e9 vedou um\u011blou inteligenci<\/p>\n<h2 class=\"wp-block-heading\">Vy nastav\u00edte priority, Arcturus pl\u00e1nuje tak, aby jim vyhov\u011bl.<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">SkyPlanner pou\u017e\u00edv\u00e1 v\u00edce\u00farov\u0148ov\u00fd syst\u00e9m priorit, ve kter\u00e9m maj\u00ed i samotn\u00e9 priority sv\u00e9 priority. Sami ur\u010dujete v\u00e1hu toho, na \u010dem z\u00e1le\u017e\u00ed: pr\u016fb\u011b\u017en\u00e1 doba, term\u00edny dokon\u010den\u00ed, priorita z\u00e1kazn\u00edka, priorita zak\u00e1zky, udr\u017een\u00ed <a href=\"#similar-jobs\">podobn\u00fdch zak\u00e1zek pohromad\u011b<\/a>. Arcturus pak hled\u00e1 pl\u00e1n, kter\u00fd nejl\u00e9pe odpov\u00edd\u00e1 v\u00e1mi nastaven\u00e9 rovnov\u00e1ze.<\/p>\n<ul class=\"wp-block-list fx-prio__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 14V8m6 6V4m6 12v-8\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>V\u00e1\u017een\u00e9, ne jen zapnuto nebo vypnuto<\/b><span class=\"t\">Ka\u017ed\u00e9 pravidlo m\u00e1 svou s\u00edlu, tak\u017ee m\u00edsto p\u0159ep\u00edn\u00e1n\u00ed funkc\u00ed lad\u00edte kompromisy.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2v9m0 0l3.5-3.5M10 11L6.5 7.5M4 16h12\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Pl\u00e1nova\u010d vede, AI n\u00e1sleduje<\/b><span class=\"t\">Va\u0161e priority ur\u010duj\u00ed, jak Arcturus rozvrhuje, ne naopak.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Zm\u011b\u0148te prioritu, okam\u017eit\u011b p\u0159epl\u00e1nujte<\/b><span class=\"t\">Upravte v\u00e1hy a Arcturus pro v\u00e1s p\u0159epo\u010d\u00edt\u00e1 harmonogram.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-prio__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>Glob\u00e1ln\u00ed pravidla \u00b7 priority pl\u00e1nov\u00e1n\u00ed<\/span><\/div>\n          <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/24-a92f8f0b-9f2d-43d3-a50a-d2d6cccaab86.png\" alt=\"Panel glob\u00e1ln\u00edch pravidel SkyPlanner: seznam priorit rozvrhov\u00e1n\u00ed, pr\u016fb\u011b\u017en\u00e1 doba, v\u00fdrobn\u00ed \u00falohy se\u0159azen\u00e9 podle data dokon\u010den\u00ed, ka\u017ed\u00e1 \u00faloha dokon\u010dena v\u010das, priority z\u00e1kazn\u00edk\u016f, priority \u00faloh, podobn\u00e9 \u00falohy za sebou, ka\u017ed\u00e1 s vlastn\u00edm posuvn\u00edkem v\u00e1hy nastaven\u00fdm na jinou s\u00edlu.\">\n        <\/figure>\n<p class=\"fx-cap\">Ka\u017ed\u00e1 priorita pl\u00e1nov\u00e1n\u00ed m\u00e1 vlastn\u00ed posuvn\u00edk v\u00e1hy. Zvy\u0161te nebo sni\u017ete jednu z nich a p\u0159\u00ed\u0161t\u00ed pl\u00e1n bude odr\u00e1\u017eet novou rovnov\u00e1hu.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"CTA band\" style=\"padding-block:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fxv-ctaband\">\n      <div class=\"fxv-ctaband__lead\">\n<p class=\"fxv-ctaband__t\">Pod\u00edvejte se, jak se takto pl\u00e1nuj\u00ed va\u0161e vlastn\u00ed zak\u00e1zky. <span>Za\u010dn\u011bte b\u011bhem minut na demo datech.<\/span><\/p>\n<p class=\"fxv-ctaband__micro\">Zdarma na 30 dn\u00ed. Bez kreditn\u00ed karty. Za\u010dn\u011bte na desktopu.<\/p>\n      <\/div>\n      <div class=\"fxv-ctaband__actions\">\n        <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Spustit bezplatnou zku\u0161ebn\u00ed verzi<\/a>\n        <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervovat demo<\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"similar-jobs\" data-screen-label=\"Similar jobs in succession\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Podobn\u00e9 zak\u00e1zky za sebou<\/p>\n<h2 class=\"wp-block-heading\">\u010cas se\u0159\u00edzen\u00ed nic nevyr\u00e1b\u00ed. Napl\u00e1nujte ho co nejm\u00e9n\u011b.<\/h2>\n<p>Ka\u017ed\u00e9 myt\u00ed, zm\u011bna barvy a v\u00fdm\u011bna n\u00e1stroje je placen\u00fd \u010das s nulov\u00fdm v\u00fdstupem. Ozna\u010dte sv\u00e9 produkty vlastnostmi, jako je barva, materi\u00e1l, n\u00e1stroj nebo rozm\u011br, a Arcturus za\u0159ad\u00ed zak\u00e1zky se spole\u010dnou vlastnost\u00ed jednu za druhou. Lakovac\u00ed linka jede modrou po modr\u00e9, m\u00edsto aby se mezi ka\u017edou zak\u00e1zkou mylo, a lis si nech\u00e1 stejn\u00fd n\u00e1stroj pro celou skupinu.<\/p>\n    <\/div>\n\n    <div class=\"fx-shift__points\" style=\"margin-bottom:38px\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 12.5V5a2 2 0 0 1 2-2h7.5L21 11.5a2 2 0 0 1 0 2.8l-6.7 6.7a2 2 0 0 1-2.8 0L3 12.5z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><circle cx=\"8\" cy=\"8\" r=\"1.6\" fill=\"currentColor\"><\/circle><\/svg><\/span>\n        <b>Vy ur\u010dujete, co znamen\u00e1 podobn\u00e9<\/b>\n        <span>P\u0159idejte ke sv\u00fdm produkt\u016fm vlastnosti: barva, materi\u00e1l, n\u00e1stroj, forma, rozm\u011br. Ka\u017ed\u00e9 pracovi\u0161t\u011b seskupuje podle vlastnosti, na kter\u00e9 na n\u011bm z\u00e1le\u017e\u00ed, s vlastn\u00edm \u010dasem p\u0159estavby mezi rozd\u00edln\u00fdmi zak\u00e1zkami.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3v18M5 7h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><path d=\"M5 7l-2.5 5.5a3 3 0 0 0 5 0L5 7zm14 0l-2.5 5.5a3 3 0 0 0 5 0L19 7z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M9 21h6\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>V\u00e1\u017een\u00e9 v\u016f\u010di va\u0161im term\u00edn\u016fm<\/b>\n        <span>Podobn\u00e9 zak\u00e1zky za sebou jsou jednou z dynamick\u00fdch priorit, ne tup\u00fdm pravidlem pro d\u00e1vkov\u00e1n\u00ed. Arcturus v\u00e1\u017e\u00ed u\u0161et\u0159en\u00fd \u010das se\u0159\u00edzen\u00ed proti term\u00edn\u016fm dod\u00e1n\u00ed, priorit\u00e1m z\u00e1kazn\u00edk\u016f a v\u0161emu ostatn\u00edmu, co jste nastavili, tak\u017ee seskupov\u00e1n\u00ed nikdy potichu neovl\u00e1dne cel\u00fd pl\u00e1n.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 20V10m5 10V4m5 16v-7m5 7V8\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>V\u00edce kapacity ze stejn\u00fdch stroj\u016f<\/b>\n        <span>Ka\u017ed\u00e1 p\u0159estavba, kter\u00e9 se vyhnete, vrac\u00ed minuty zp\u011bt do v\u00fdroby. Za t\u00fdden se myt\u00ed a v\u00fdm\u011bny n\u00e1stroj\u016f, kter\u00e9 jste nemuseli d\u011blat, se\u010dtou do skute\u010dn\u00e9 kapacity, ani\u017e byste koupili jedin\u00fd nov\u00fd stroj.<\/span>\n      <\/div>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u010casov\u00e1 osa v\u00fdrobn\u00edho pracovi\u0161t\u011b<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/25-dd3d0a31-f2d8-4ba9-98fe-1e65ad7efacd.png\" alt=\"\u010casov\u00e1 osa SkyPlanner Gantt zobrazuj\u00edc\u00ed podobn\u00e9 v\u00fdrobn\u00ed \u00falohy napl\u00e1novan\u00e9 za sebou na v\u00fdrobn\u00edm pracovi\u0161ti, seskupen\u00e9 podle sd\u00edlen\u00e9 vlastnosti.\">\n    <\/figure>\n    <div class=\"fxv-capwrap\">\n<p class=\"fx-cap\" style=\"display:inline-flex\">Stejn\u00e1 barva, stejn\u00fd n\u00e1stroj, stejn\u00fd materi\u00e1l: Arcturus je se\u0159ad\u00ed tak, aby se v\u00fdrobn\u00ed pracovi\u0161t\u011b p\u0159estavovalo jednou, ne p\u011btkr\u00e1t.<\/p>\n      <div>\n        <a class=\"fxv-watchlink\" href=\"https:\/\/www.youtube.com\/watch?v=rW8g5D3ALs4\" target=\"_blank\" rel=\"noopener\">\n          <svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"8\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M8 6.5l5 3.5-5 3.5z\" fill=\"currentColor\"><\/path><\/svg>\n          Sledovat: Podobn\u00e9 zak\u00e1zky za sebou (5 min)\n        <\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"routing\" data-screen-label=\"Visual routing editor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-routing__head\">\n<p class=\"fx-eyebrow\">Vizu\u00e1ln\u00ed modelov\u00e1n\u00ed produkt\u016f a projekt\u016f<\/p>\n<h2 class=\"wp-block-heading\">Vytv\u00e1\u0159ejte produkty a projekty tak, jak si je p\u0159edstavujete<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">Vizu\u00e1ln\u00ed editor SkyPlanner v\u00e1m umo\u017en\u00ed zmapovat, jak se produkt skute\u010dn\u011b vyr\u00e1b\u00ed (polotovary, procesn\u00ed kroky a jejich po\u0159ad\u00ed), jako propojen\u00fd tok. Co nakresl\u00edte, stane se technologick\u00fdm postupem, podle kter\u00e9ho Arcturus pl\u00e1nuje. Stejn\u00fd editor zvl\u00e1dne i cel\u00e9 projekty, nejen jednotliv\u00e9 zak\u00e1zky, tak\u017ee v\u00edcestup\u0148ov\u00e1 pr\u00e1ce s mnoha z\u00e1vislostmi z\u016fst\u00e1v\u00e1 p\u0159ehledn\u00e1 a snadno se navrhuje.<\/p>\n      <div class=\"fx-routing__chips\">\n        <span class=\"fx-chip\">Produkty &amp; cel\u00e9 projekty<\/span>\n        <span class=\"fx-chip\">Polotovary &amp; sestavy<\/span>\n        <span class=\"fx-chip\">Procesn\u00ed kroky v po\u0159ad\u00ed<\/span>\n        <span class=\"fx-chip\">Doby trv\u00e1n\u00ed krok\u016f &amp; \u010dasy se\u0159\u00edzen\u00ed<\/span>\n        <span class=\"fx-chip\">Z\u00e1vislosti mezi kroky<\/span>\n        <span class=\"fx-chip\">Kontrola p\u0159ed pl\u00e1nov\u00e1n\u00edm<\/span>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-routing__shot\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n        <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Vizu\u00e1ln\u00ed editor \u00b7 postup projektu<\/span><\/div>\n        <img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/26-a17c38a6-0df3-418d-805d-3c293086ebaf.png\" alt=\"Vizu\u00e1ln\u00ed editor SkyPlanner pro Project 1001: mnoho karet procesn\u00edch krok\u016f, nap\u0159\u00edklad \u0158ez\u00e1n\u00ed, Obr\u00e1b\u011bn\u00ed, Sva\u0159ov\u00e1n\u00ed a Balen\u00ed, propojen\u00fdch \u0161ipkami, s d\u00edl\u010d\u00edmi produkty vlevo, kter\u00e9 se p\u0159es n\u011bkolik f\u00e1z\u00ed spojuj\u00ed do hotov\u00e9ho projektu vpravo. Ka\u017ed\u00e1 karta zobrazuje \u010d\u00edslo kroku a pl\u00e1novanou dobu trv\u00e1n\u00ed.\">\n      <\/figure>\n<p class=\"fx-cap\">Cel\u00fd projekt v jednom pohledu: ka\u017ed\u00e1 karta je procesn\u00ed krok a \u0161ipky ur\u010duj\u00ed po\u0159ad\u00ed, kter\u00e9 mus\u00ed polotovary a f\u00e1ze dodr\u017eet, ne\u017e je projekt hotov\u00fd.<\/p>\n    <\/div>\n\n    <div class=\"fx-routing__legend\">\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Nakresleno va\u0161\u00edm t\u00fdmem, ne um\u011blou inteligenc\u00ed.<\/b> Postupy odr\u00e1\u017eej\u00ed, jak va\u0161e tov\u00e1rna produkt skute\u010dn\u011b vyr\u00e1b\u00ed, a vy m\u00e1te model pod kontrolou.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Polotovary vstupuj\u00ed do hlavn\u00edho produktu.<\/b> V\u011btve se slu\u010duj\u00ed ve spr\u00e1vn\u00e9m po\u0159ad\u00ed, tak\u017ee mont\u00e1\u017en\u00ed celky a z\u00e1vislosti jsou explicitn\u00ed.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Zkontrolov\u00e1no p\u0159ed napl\u00e1nov\u00e1n\u00edm.<\/b> Zkontrolujte postup vizu\u00e1ln\u011b a pot\u00e9 nechte Arcturus podle n\u011bj pl\u00e1novat.<\/span><\/div>\n      <div class=\"fx-routing__leg\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Skv\u011bl\u00e9 pro projekty, nejen pro objedn\u00e1vky.<\/b> Pl\u00e1nujte v\u00edcestup\u0148ovou projektovou pr\u00e1ci stejn\u00fdm vizu\u00e1ln\u00edm zp\u016fsobem, a kdy\u017e se jeden krok zm\u011bn\u00ed, Arcturus p\u0159epl\u00e1nuje podle z\u00e1vislost\u00ed, tak\u017ee dopad na cel\u00fd projekt z\u016fst\u00e1v\u00e1 viditeln\u00fd.<\/span><\/div>\n    <\/div>\n\n<p class=\"fx-model__note\" style=\"margin-top:30px\">Tohoto kroku se nov\u00ed u\u017eivatel\u00e9 boj\u00ed nejv\u00edc. V praxi ho prost\u011b nakresl\u00edte: karty jsou procesn\u00ed kroky, \u0161ipky jejich po\u0159ad\u00ed. Prvn\u00edm produktem v\u00e1s provede AI agent a na\u0161e v\u00fdukov\u00e1 videa, a pokud chcete, aby to s v\u00e1mi ud\u011blal odborn\u00edk, je tu asistovan\u00fd onboarding.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"mobile\" style=\"background:var(--sp-surface-blue)\" data-screen-label=\"Shop-floor devices\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-dev\">\n      <div class=\"fx-dev__copy sp-min0\">\n<p class=\"fx-eyebrow\">Na v\u00fdrobn\u00ed hale<\/p>\n<h2 class=\"wp-block-heading\">Oper\u00e1to\u0159i ho pou\u017e\u00edvaj\u00ed z telefonu nebo tabletu<\/h2>\n<p style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0\">Zobrazen\u00ed Time Logs d\u00e1v\u00e1 ka\u017ed\u00e9mu oper\u00e1torovi vlastn\u00ed pracovn\u00ed frontu a \u010dasova\u010d na jedno klepnut\u00ed, tak\u017ee spou\u0161t\u00ed, zastavuj\u00ed a potvrzuj\u00ed pr\u00e1ci p\u0159\u00edmo u stroje, na jak\u00e9koli obrazovce, kter\u00e1 je na hale.<\/p>\n<ul class=\"wp-block-list fx-dev__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 5h14M3 10h10M3 15h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Pracovn\u00ed fronta pro ka\u017ed\u00e9 v\u00fdrobn\u00ed pracovi\u0161t\u011b<\/b><span class=\"t\">Ka\u017ed\u00fd oper\u00e1tor vid\u00ed jen zak\u00e1zky pro sv\u00e1 pracovi\u0161t\u011b, v napl\u00e1novan\u00e9m po\u0159ad\u00ed.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"11\" r=\"6.5\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M10 8v3M8 2.5h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>\u010casova\u010d na jedno klepnut\u00ed &amp; rychl\u00fd z\u00e1znam<\/b><span class=\"t\">Spou\u0161t\u011bjte, zastavujte a potvrzujte mno\u017estv\u00ed p\u0159\u00edmo u stroje.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 10a7 7 0 0 1 12-5m1-3v4h-4M17 10a7 7 0 0 1-12 5m-1 3v-4h4\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Stav se vrac\u00ed zp\u011bt do pl\u00e1nov\u00e1n\u00ed<\/b><span class=\"t\">Ka\u017ed\u00fd z\u00e1znam aktualizuje postup a rozvrh v re\u00e1ln\u00e9m \u010dase.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M3 16l4-4 3 3 6-7\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><path d=\"M3 19h14\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Zaznamenan\u00e9 hodiny u\u010d\u00ed syst\u00e9m<\/b><span class=\"t\">SkyPlanner p\u0159edpov\u00edd\u00e1 trv\u00e1n\u00ed procesn\u00edch krok\u016f z va\u0161\u00ed vlastn\u00ed historie, tak\u017ee odhady jsou \u010dasem st\u00e1le realisti\u010dt\u011bj\u0161\u00ed.<\/span><\/span>\n          <\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-dev__media sp-min0\">\n        <div class=\"fx-dev__stage\">\n          <div class=\"fx-phone\">\n            <span class=\"fx-phone__island\"><\/span>\n            <div class=\"fx-phone__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/27-39dbe9c1-81b6-4bc8-ad9c-4ad9e35e26c8.png\" alt=\"SkyPlanner Time Logs na telefonu: pracovn\u00ed fronta \u0159ez\u00e1n\u00ed s velk\u00fdm tla\u010d\u00edtkem pro spu\u0161t\u011bn\u00ed \u010dasova\u010de a kartami \u00faloh zobrazuj\u00edc\u00edmi z\u00e1kazn\u00edka, \u010d\u00edslo pr\u00e1ce, napl\u00e1novan\u00e9 hodiny a mno\u017estv\u00ed.\">\n            <\/div>\n          <\/div>\n          <div class=\"fx-tablet\">\n            <span class=\"fx-tablet__cam\"><\/span>\n            <div class=\"fx-tablet__screen\">\n              <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/28-f84ab9ff-d5c6-40a2-bb24-0241eda4a6a8.png\" alt=\"SkyPlanner Time Logs na tabletu: dvousloupcov\u00e1 m\u0159\u00ed\u017eka karet \u00faloh, z nich\u017e ka\u017ed\u00e1 zobrazuje procesn\u00ed krok, z\u00e1kazn\u00edka, \u010d\u00edslo pr\u00e1ce a tla\u010d\u00edtko pro spu\u0161t\u011bn\u00ed \u010dasova\u010de.\">\n            <\/div>\n          <\/div>\n        <\/div>\n<p class=\"fx-dev__cap fx-cap\" style=\"justify-content:center\">Stejn\u00e9 zobrazen\u00ed Time Logs, p\u0159izp\u016fsoben\u00e9 obrazovce, kterou m\u00e1 ka\u017ed\u00fd oper\u00e1tor po ruce.<\/p>\n      <\/div>\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">SkyPlanner zlep\u0161il p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase a v\u00fdrazn\u011b omezil pracovn\u00ed \u010das ztracen\u00fd zapisov\u00e1n\u00edm a vykazov\u00e1n\u00edm pr\u00e1ce ve v\u00fdrob\u011b. V\u00fdznamn\u011b tak\u00e9 zlep\u0161il p\u0159esnost na\u0161ich skladov\u00fdch z\u00e1sob a odstranil mo\u017enost lidsk\u00e9 chyby v \u0159\u00edzen\u00ed v\u00fdroby.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Jussi Yli-Renko<\/b>, mana\u017eer pl\u00e1nov\u00e1n\u00ed v\u00fdroby, Piristeel Oy<span class=\"fxv-quote__ctx\">V\u00fdrobce st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f, Kauhava, Finsko<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"dashboards\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Reports &amp; dashboards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Reporty &amp; dashboardy<\/p>\n<h2 class=\"wp-block-heading\">Vytvo\u0159te si v\u00fdrobn\u00ed pohledy, kter\u00e9 skute\u010dn\u011b chcete<\/h2>\n<p>Dashboard s p\u0159etahov\u00e1n\u00edm widget\u016f prom\u011bn\u00ed data syst\u00e9mu SkyPlanner ve v\u00fdrobn\u00ed reporty, kter\u00e9 v\u00e1s zaj\u00edmaj\u00ed (vyt\u00ed\u017een\u00ed, zpo\u017ed\u011bn\u00ed, efektivita, spolehlivost dod\u00e1vek a dal\u0161\u00ed), uspo\u0159\u00e1dan\u00e9 tak, jak je v\u00e1\u0161 t\u00fdm \u010dte.<\/p>\n    <\/div>\n\n<figure class=\"fx-shot\" style=\"margin:0 0 28px\">\n      <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Reportingov\u00fd dashboard<\/span><\/div>\n      <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/29-431a8fa8-41b2-437c-9428-38233a3c2dda.png\" alt=\"Reportingov\u00fd dashboard SkyPlanner s ovl\u00e1dac\u00edmi prvky filtr\u016f a widgety: karty hodin kapacity a zat\u00ed\u017een\u00ed, ukazatel faktoru zat\u00ed\u017een\u00ed, zah\u00e1jen\u00e9\/dokon\u010den\u00e9 \u00falohy, ukazatele zaznamenan\u00e9ho \u010dasu vs kapacita a aktivn\u00edch \u00faloh a sloupcov\u00fd graf faktoru zat\u00ed\u017een\u00ed podle data.\">\n    <\/figure>\n\n    <div class=\"fx-chips\" style=\"margin-bottom:8px\">\n      <span class=\"fx-chip\">Vyt\u00ed\u017een\u00ed &amp; kapacita<\/span><span class=\"fx-chip\">Zpo\u017ed\u011bn\u00e9 zak\u00e1zky<\/span><span class=\"fx-chip\">Efektivita: pl\u00e1n vs skute\u010dnost<\/span><span class=\"fx-chip\">Spolehlivost dod\u00e1vek<\/span><span class=\"fx-chip\">Rozpracovan\u00e9 zak\u00e1zky<\/span><span class=\"fx-chip\">OEE<\/span><span class=\"fx-chip\">Reporty kvality<\/span>\n    <\/div>\n\n    <div class=\"fx-shift__points\">\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"3.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"3.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"13.5\" y=\"11.5\" width=\"7\" height=\"9\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><rect x=\"3.5\" y=\"15.5\" width=\"7\" height=\"5\" rx=\"1.5\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><\/svg><\/span>\n        <b>Drag-and-drop widgety<\/b>\n        <span>Vyberte si ze \u0161irok\u00e9 knihovny widget\u016f a uspo\u0159\u00e1dejte ka\u017ed\u00fd dashboard p\u0159eta\u017een\u00edm, pro jak\u00e9koli obdob\u00ed.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Dashboard pro ka\u017edou osobu<\/b>\n        <span>Ka\u017ed\u00fd u\u017eivatel m\u00e1 sv\u016fj vlastn\u00ed a m\u016f\u017eete vytvo\u0159it tolik r\u016fzn\u00fdch dashboard\u016f, kolik pot\u0159ebujete.<\/span>\n      <\/div>\n      <div class=\"fx-shift__pt\">\n        <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"2.5\" y=\"4\" width=\"19\" height=\"12\" rx=\"1.8\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M8 20h8M12 16v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n        <b>Zobrazte ho na v\u00fdrobn\u00ed obrazovce<\/b>\n        <span>Zobrazte dashboard na televizi ve v\u00fdrob\u011b jako \u017eiv\u00fd, sd\u00edlen\u00fd p\u0159ehled o stavu v\u00fdroby.<\/span>\n      <\/div>\n    <\/div>\n\n<p class=\"fx-shift__note\">Vlastn\u00ed reporty, vlastn\u00ed obdob\u00ed, vlastn\u00ed rozvr\u017een\u00ed. <b>P\u0159ehled o v\u00fdrob\u011b, kter\u00fd si nastav\u00edte sami<\/b>, bez \u010dek\u00e1n\u00ed, a\u017e v\u00e1m n\u011bkdo report vytvo\u0159\u00ed.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"capacity\" data-screen-label=\"Model your factory\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Kapacita &amp; materi\u00e1ly<\/p>\n<h2 class=\"wp-block-heading\">Limity, v jejich\u017e r\u00e1mci Arcturus pl\u00e1nuje<\/h2>\n<p>Skute\u010dn\u00e9 sm\u011bny a skute\u010dn\u00e9 materi\u00e1ly ur\u010duj\u00ed, co m\u016f\u017eete opravdu vyrobit. Jednou namodelujte oboj\u00ed a stanou se z nich omezen\u00ed, kter\u00e1 respektuje ka\u017ed\u00fd harmonogram.<\/p>\n    <\/div>\n\n    <div class=\"fx-model\">\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Pl\u00e1nov\u00e1n\u00ed v\u00fdrobn\u00edch pracovi\u0161\u0165<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/30-6ad607aa-dea2-49ba-b035-25d3a4545b66.png\" alt=\"Kalend\u00e1\u0159 pl\u00e1nov\u00e1n\u00ed v\u00fdrobn\u00edch pracovi\u0161\u0165 SkyPlanner: t\u00fddenn\u00ed zobrazen\u00ed s \u0159\u00e1dky pro stanice Pila, CNC, Sva\u0159ov\u00e1n\u00ed a Balen\u00ed, ka\u017ed\u00fd den zobrazuje blok rann\u00ed a ve\u010dern\u00ed sm\u011bny.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><rect x=\"3.5\" y=\"5\" width=\"17\" height=\"16\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"1.9\"><\/rect><path d=\"M3.5 9h17M8 3v4m8-4v4\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Sm\u011bny &amp; kapacita<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Opakuj\u00edc\u00ed se sm\u011bny, nastaven\u00e9 jednou:<\/b> rann\u00ed a ve\u010dern\u00ed sm\u011bny se opakuj\u00ed v t\u00fddenn\u00edm cyklu, nic nezad\u00e1v\u00e1te znovu.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>V\u00fdjimky v kalend\u00e1\u0159i:<\/b> p\u0159id\u00e1vejte, upravujte nebo odstra\u0148ujte sm\u011bny pro sv\u00e1tky, p\u0159es\u010dasy nebo poruchu.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>P\u0159i\u0159a\u010fte lidi, z\u00edskejte rozpisy:<\/b> vyberte, kdo pracuje na ka\u017ed\u00e9 sm\u011bn\u011b, a rozpisy lid\u00ed a stroj\u016f se vytvo\u0159\u00ed automaticky.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n      <div class=\"fx-model__col\">\n<figure class=\"fx-shot\" style=\"margin:0 0 22px\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Sklad<\/span><\/div>\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/31-d5ae0129-5aed-432b-afeb-e7c30c7842c1.png\" alt=\"Seznam produkt\u016f a materi\u00e1l\u016f ve skladu SkyPlanner se sloupcem Stock zobrazuj\u00edc\u00edm kumulovan\u00e9 z\u016fstatky, v\u011bt\u0161ina \u0159\u00e1dk\u016f je zelen\u00e1, dva z\u00e1porn\u00e9 \u0159\u00e1dky jsou zv\u00fdrazn\u011bny \u010derven\u011b.\">\n        <\/figure>\n        <div class=\"fx-model__sub\">\n          <span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M4 7l8-4 8 4v10l-8 4-8-4z\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><path d=\"M4 7l8 4 8-4M12 11v10\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading\">Materi\u00e1ly &amp; z\u00e1soby<\/h3>\n        <\/div>\n<ul class=\"wp-block-list fx-model__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Stavy z\u00e1sob, minim\u00e1ln\u00ed hladiny a n\u00e1kup:<\/b> kumulativn\u00ed stavy z\u00e1sob, hladiny pro upozorn\u011bn\u00ed a n\u00e1kupn\u00ed objedn\u00e1vky na jednom m\u00edst\u011b.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Budouc\u00ed stav z\u00e1sob, nasimulovan\u00fd:<\/b> pl\u00e1n prom\u00edt\u00e1 budouc\u00ed stavy z\u00e1sob ze skladu, n\u00e1kupn\u00edch objedn\u00e1vek, rezervac\u00ed a spot\u0159eby.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span><b>Reaguje na zpo\u017ed\u011bn\u00ed materi\u00e1lu:<\/b> pokud se dod\u00e1vka opozd\u00ed, Arcturus p\u0159esune zak\u00e1zku na dobu, kdy bude materi\u00e1l k dispozici.<\/span><\/li>\n        <\/ul>\n      <\/div>\n\n<p class=\"fx-model__note\">Kapacita a materi\u00e1ly spole\u010dn\u011b tvo\u0159\u00ed limity, <b>v jejich\u017e r\u00e1mci Arcturus pl\u00e1nuje<\/b>, tak\u017ee jedna zkr\u00e1cen\u00e1 sm\u011bna nebo jedna opo\u017ed\u011bn\u00e1 dod\u00e1vka nespust\u00ed dominov\u00fd efekt nap\u0159\u00ed\u010d pl\u00e1nem.<\/p>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"delivery\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Delivery dates\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Prodej a v\u00fdroba, jeden harmonogram<\/p>\n<h2 class=\"wp-block-heading\">Slibujte term\u00edny dod\u00e1n\u00ed, kter\u00e9 m\u016f\u017eete dodr\u017eet<\/h2>\n<p>P\u0159idejte obchodn\u00ed p\u0159\u00edle\u017eitost jako simulovanou objedn\u00e1vku a Arcturus ji napl\u00e1nuje proti va\u0161emu skute\u010dn\u00e9mu vyt\u00ed\u017een\u00ed, kapacit\u00e1m a materi\u00e1l\u016fm. Obchod vid\u00ed realistick\u00fd term\u00edn dod\u00e1n\u00ed d\u0159\u00edv, ne\u017e cokoli sl\u00edb\u00ed, a pokud chcete, m\u016f\u017ee si pro ni rezervovat kapacitu. Kdy\u017e je obchod uzav\u0159en\u00fd, p\u0159\u00edle\u017eitost se jednou zm\u011bnou stavu zm\u011bn\u00ed ve v\u00fdrobn\u00ed zak\u00e1zku. Ve Fredman Operations dnes obchod potvrzuje term\u00edny dod\u00e1n\u00ed s p\u0159ehledem o kapacit\u00e1ch na \u0161est m\u011bs\u00edc\u016f dop\u0159edu a p\u0159epo\u010det nab\u00eddky, kter\u00fd d\u0159\u00edv zabral hodinu ru\u010dn\u00edho po\u010d\u00edt\u00e1n\u00ed, dostane ze syst\u00e9mu b\u011bhem sekund.<\/p>\n    <\/div>\n    <div class=\"fxv-deliver\">\n      <div class=\"fxv-deliver__copy sp-min0\">\n<ul class=\"wp-block-list fxv-deliver__bul\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Nab\u00edzejte term\u00edny podle skute\u010dn\u00e9ho harmonogramu, ne podle odhad\u016f.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Pod\u00edvejte se, co p\u0159ijet\u00ed urgentn\u00ed objedn\u00e1vky ud\u011bl\u00e1 s ka\u017ed\u00fdm dal\u0161\u00edm z\u00e1vazkem.<\/span><\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><span>Spolehlivost dod\u00e1vek je v\u00fdsledek, kter\u00e9ho si z\u00e1kazn\u00edci v\u0161imnou jako prvn\u00edho.<\/span><\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fxv-deliver__media sp-min0\">\n<figure class=\"fx-shot\" style=\"margin:0\">\n          <div class=\"fx-shot__bar\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Pl\u00e1nov\u00e1n\u00ed obchodn\u00edch p\u0159\u00edle\u017eitost\u00ed<\/span><\/div>\n          <img decoding=\"sync\" loading=\"lazy\" width=\"2056\" height=\"890\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/32-08986976-4342-44ff-a97f-fa730beb26c8.png\" alt=\"\u010casov\u00e1 osa Gantt ve SkyPlanner s potenci\u00e1ln\u00ed zak\u00e1zkou napl\u00e1novanou jako simulovan\u00e1 objedn\u00e1vka: \u0159\u00e1dky v\u00fdrobn\u00edch pracovi\u0161\u0165 pro Pila, CNC, Sva\u0159ov\u00e1n\u00ed a Balen\u00ed ukazuj\u00ed pruhy napl\u00e1novan\u00fdch v\u00fdrobn\u00edch \u00faloh, opo\u017ed\u011bn\u00e9 \u00falohy jsou ozna\u010deny \u010derven\u011b a zv\u00fdrazn\u011bn\u00e1 simulovan\u00e1 \u00faloha mod\u0159e ukazuje, kam by v pl\u00e1nu zapadla.\">\n        <\/figure>\n      <\/div>\n    <\/div>\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Hodnota, kterou n\u00e1m SkyPlanner p\u0159in\u00e1\u0161\u00ed, je v tom, \u017ee jde o n\u00e1stroj, kter\u00fd funguje p\u0159i ka\u017edodenn\u00edm pou\u017e\u00edv\u00e1n\u00ed, zejm\u00e9na pro stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, mana\u017eer pl\u00e1nov\u00e1n\u00ed v\u00fdroby, Eskomatic Oy<span class=\"fxv-quote__ctx\">Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed, Turku, Finsko<\/span><\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"roles\" data-screen-label=\"Role value\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Vytvo\u0159eno pro ka\u017ed\u00fd t\u00fdm, kter\u00fd s pl\u00e1nem pracuje<\/p>\n<h2 class=\"wp-block-heading\">Jeden harmonogram pro ka\u017ed\u00fd zapojen\u00fd t\u00fdm<\/h2>\n<p>\u010cty\u0159i t\u00fdmy se \u010dty\u0159mi r\u016fzn\u00fdmi c\u00edli (pl\u00e1nov\u00e1n\u00ed, dohled, realizace a integrace) pracuj\u00ed se stejn\u00fdm harmonogramem.<\/p>\n    <\/div>\n    <div class=\"fx-roles\">\n\n      <article class=\"fx-role\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 5h18M3 12h12M3 19h7\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><circle cx=\"19\" cy=\"17\" r=\"3\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><\/svg><\/span>\n<p class=\"fx-role__role\">Pl\u00e1nova\u010d v\u00fdroby<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Vytvo\u0159te realistick\u00fd pl\u00e1n, p\u0159epl\u00e1nujte, kdy\u017e se realita zm\u011bn\u00ed, a udr\u017ete kontrolu nad prioritami a z\u00e1mky.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\u00dapravy Gantt p\u0159eta\u017een\u00edm<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Dynamick\u00e9 priority &amp; z\u00e1mky \u00fakol\u016f<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Porovnejte a p\u0159ijm\u011bte nov\u00e9 pl\u00e1ny<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Zobrazit pracovn\u00ed postup pl\u00e1nova\u010de <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--green\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M3 20V10m6 10V4m6 16v-7m6 7V8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Provozn\u00ed mana\u017eer<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Sledujte vyt\u00ed\u017een\u00ed, zpo\u017ed\u011bn\u00ed, \u00fazk\u00e1 m\u00edsta a zm\u011bny pl\u00e1nu d\u0159\u00edve, ne\u017e zp\u016fsob\u00ed probl\u00e9my.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>P\u0159ehled o kapacit\u011b a vyu\u017eit\u00ed<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Stav zpo\u017ed\u011bno \/ napl\u00e1nov\u00e1no \/ nenapl\u00e1nov\u00e1no<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Rychlej\u0161\u00ed reakce na v\u00fdpadky a zm\u011bny<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#visibility\">Zobrazit p\u0159ehled o v\u00fdrob\u011b <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--orange\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"12\" cy=\"12\" r=\"8\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M12 8v4l3 2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">T\u00fdm ve v\u00fdrob\u011b<\/p>\n        <\/div>\n<p class=\"fx-role__out\">V\u011bd\u011bt, co d\u011blat d\u00e1l, spou\u0161t\u011bt a zastavovat pr\u00e1ci a udr\u017eovat stav aktu\u00e1ln\u00ed.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Jasn\u00e1 pracovn\u00ed fronta dal\u0161\u00edch \u00fakol\u016f<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\u010casova\u010d v\u00fdroby a rychl\u00e9 z\u00e1znamy<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Zp\u011btn\u00e1 vazba o pr\u016fb\u011bhu v re\u00e1ln\u00e9m \u010dase<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#mobile\">Zobrazit tok pr\u00e1ce ve v\u00fdrob\u011b <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n      <article class=\"fx-role fx-role--purple\">\n        <div class=\"fx-role__top\">\n          <span class=\"fx-role__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M9 6a3 3 0 11-6 0 3 3 0 016 0zm12 12a3 3 0 11-6 0 3 3 0 016 0zM6 9v3a3 3 0 003 3h6\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<p class=\"fx-role__role\">Vlastn\u00edk IT \/ ERP<\/p>\n        <\/div>\n<p class=\"fx-role__out\">Propojte pl\u00e1nov\u00e1n\u00ed se st\u00e1vaj\u00edc\u00edmi syst\u00e9my, aby se SkyPlanner nestal dal\u0161\u00edm pl\u00e1novac\u00edm silem.<\/p>\n<ul class=\"wp-block-list fx-role__list\">\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>REST API &amp; webhooky<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Import CSV \/ dat<\/li>\n<li><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Integra\u010dn\u00ed slu\u017eby na m\u00edru projektu<\/li>\n        <\/ul>\n        <a class=\"fx-role__link\" href=\"#integrations\">Zobrazit tok integrace <svg width=\"16\" height=\"16\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8h9m0 0l-4-4m4 4l-4 4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/a>\n      <\/article>\n\n    <\/div>\n\n<figure class=\"fxv-quote\">\n      <div class=\"fxv-quote__mark\">\u201c<\/div>\n<blockquote class=\"fxv-quote__txt\">Spolehlivost dod\u00e1vek, intern\u00ed i extern\u00ed, se od zaveden\u00ed SkyPlanner v\u00fdrazn\u011b zlep\u0161ila. SkyPlanner zp\u0159ehlednil celou v\u00fdrobu prakticky ve v\u0161ech ohledech.<\/blockquote>\n<figcaption class=\"fxv-quote__who\">\u2014 <b>Mikko Jokitalo<\/b>, pl\u00e1nova\u010d v\u00fdroby, Piristeel Oy<span class=\"fxv-quote__ctx\">V\u00fdrobce st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f, Kauhava, Finsko<\/span><\/figcaption>\n    <\/figure>\n\n    <div class=\"sp-btn-toolbar\" style=\"margin-top:36px\">\n      <a class=\"sp-btn sp-btn--green\" href=\"#start\">Spustit bezplatnou zku\u0161ebn\u00ed verzi<\/a>\n      <a class=\"sp-btn sp-btn--outline\" href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervovat \u017eiv\u00e9 demo<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"cases\" data-screen-label=\"In daily use\" style=\"padding-block:var(--sp-space-20)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">V ka\u017edodenn\u00edm pou\u017e\u00edv\u00e1n\u00ed<\/p>\n<h2 class=\"wp-block-heading\">V\u00fdrobci, kte\u0159\u00ed pou\u017e\u00edvaj\u00ed SkyPlanner<\/h2>\n<p>Od rodinn\u00fdch stroj\u00edrensk\u00fdch d\u00edlen ve Finsku a\u017e po nejv\u011bt\u0161\u00edho farmaceutick\u00e9ho v\u00fdrobce v Keni.<\/p>\n    <\/div>\n    <div class=\"fxv-cases__grid fxv-cases__grid--four\">\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Laboratory &amp; Allied Limited<\/p>\n<p class=\"fxv-case__meta\">Farmaceutick\u00fd pr\u016fmysl \u00b7 ~1 000 zam\u011bstnanc\u016f \u00b7 SkyPlanner od 2025<\/p>\n<p class=\"fxv-case__body\">O 90 % efektivn\u011bj\u0161\u00ed v\u00fdroba a o 50 % lep\u0161\u00ed v\u010dasn\u00e9 dod\u00e1vky.<\/p>\n        <span class=\"fxv-vh\">P\u0159e\u010d\u00edst p\u0159\u00edb\u011bh<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Piristeel Oy<\/p>\n<p class=\"fxv-case__meta\">St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky \u00b7 ~100 zam\u011bstnanc\u016f \u00b7 SkyPlanner od 2023<\/p>\n<p class=\"fxv-case__body\">99,2% spolehlivost dod\u00e1vek a a\u017e \u010dty\u0159i hodiny pl\u00e1novac\u00ed pr\u00e1ce u\u0161et\u0159en\u00e9 ka\u017ed\u00fd den.<\/p>\n        <span class=\"fxv-vh\">P\u0159e\u010d\u00edst p\u0159\u00edb\u011bh<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Eskomatic Oy<\/p>\n<p class=\"fxv-case__meta\">Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed \u00b7 88 zam\u011bstnanc\u016f \u00b7 SkyPlanner od 2021<\/p>\n<p class=\"fxv-case__body\">M\u00e9n\u011b zastaven\u00ed kv\u016fli nedostatku materi\u00e1lu a p\u0159esn\u011bj\u0161\u00ed term\u00edny dod\u00e1n\u00ed pro z\u00e1kazn\u00edky.<\/p>\n        <span class=\"fxv-vh\">P\u0159e\u010d\u00edst p\u0159\u00edb\u011bh<\/span>\n      <\/article>\n      <article class=\"fxv-case\" data-story-href>\n<p class=\"fxv-case__name\">Fredman Operations Oy<\/p>\n<p class=\"fxv-case__meta\">Potravin\u00e1\u0159sk\u00e9 obaly \u00b7 ~70 zam\u011bstnanc\u016f \u00b7 SkyPlanner od 2025<\/p>\n<p class=\"fxv-case__body\">Obchod potvrzuje term\u00edny dod\u00e1n\u00ed s p\u0159ehledem o kapacit\u00e1ch na \u0161est m\u011bs\u00edc\u016f dop\u0159edu.<\/p>\n        <span class=\"fxv-vh\">P\u0159e\u010d\u00edst p\u0159\u00edb\u011bh<\/span>\n      <\/article>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"assistant\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"SkyPlanner Agent\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-assist\">\n      <div class=\"fx-assist__copy sp-min0\">\n<p class=\"fx-eyebrow\">SkyPlanner Agent<span class=\"fx-assist__beta\">BETA<\/span><\/p>\n<h2 class=\"wp-block-heading\">Ovl\u00e1dejte SkyPlanner jednodu\u0161e t\u00edm, \u017ee se zept\u00e1te<\/h2>\n<p class=\"fx-head__lead\" style=\"font:var(--sp-body-lg);color:var(--sp-text-muted);margin:0 0 24px\">Po\u017e\u00e1dejte agenta b\u011b\u017en\u00fdmi slovy, aby vytvo\u0159il objedn\u00e1vku, zkontroloval stav v\u00fdroby nebo napl\u00e1noval nenapl\u00e1novan\u00e9 zak\u00e1zky. \u00dakol provede a p\u0159esn\u011b v\u00e1m uk\u00e1\u017ee, co ud\u011blal. Vysv\u011btl\u00ed tak\u00e9, jak SkyPlanner funguje, a pom\u016f\u017ee v\u00e1m ho nastavit, tak\u017ee software ovl\u00e1d\u00e1te ptan\u00edm, ne hled\u00e1n\u00edm v menu.<\/p>\n<ul class=\"wp-block-list fx-assist__points\">\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Na po\u017e\u00e1d\u00e1n\u00ed vykon\u00e1v\u00e1 skute\u010dnou pr\u00e1ci<\/b><span class=\"t\">Vytv\u00e1\u0159ejte objedn\u00e1vky, kontrolujte stav, pl\u00e1nujte zak\u00e1zky. Agent \u00fakol provede a pak ohl\u00e1s\u00ed, co zm\u011bnil.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 10a3 3 0 1 0 0-6 3 3 0 0 0 0 6zM3 17a7 7 0 0 1 14 0\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n            <span><b>Pro v\u0161echny, nejen pro ka\u017edodenn\u00ed u\u017eivatele<\/b><span class=\"t\">Mana\u017ee\u0159i a vedouc\u00ed pracovn\u00edci se mohou pt\u00e1t p\u0159\u00edmo, m\u00edsto aby se u\u010dili ka\u017ed\u00e9 menu a nastaven\u00ed.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M10 2a6 6 0 0 0-6 6c0 4 6 10 6 10s6-6 6-10a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/path><circle cx=\"10\" cy=\"8\" r=\"2\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><\/svg><\/span>\n            <span><b>U\u010d\u00ed v\u00e1s a nastavuje za chodu<\/b><span class=\"t\">Expert, kter\u00fd vysv\u011btluje SkyPlanner, pom\u00e1h\u00e1 v\u00e1m jej nastavit a usnad\u0148uje onboarding nov\u00fdch u\u017eivatel\u016f.<\/span><\/span>\n          <\/li>\n<li>\n            <span class=\"ic\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><circle cx=\"10\" cy=\"10\" r=\"7.5\" stroke=\"currentColor\" stroke-width=\"1.7\"><\/circle><path d=\"M10 6v4l2.5 2\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n            <span><b>Dostupn\u00fd nep\u0159etr\u017eit\u011b, ve va\u0161em jazyce<\/b><span class=\"t\">Pamatuje si v\u00e1\u0161 v\u00fdrobn\u00ed kontext a odpov\u00edd\u00e1 v jazyce, kter\u00fdm mluv\u00ed v\u00e1\u0161 t\u00fdm, 24\/7.<\/span><\/span>\n          <\/li>\n        <\/ul>\n<p class=\"fx-assist__guard\">Agent jedn\u00e1 na va\u0161i \u017e\u00e1dost a ukazuje, co ud\u011blal, tak\u017ee kontrola z\u016fst\u00e1v\u00e1 ve va\u0161ich rukou. Podporuje v\u00e1\u0161 t\u00fdm. Ne\u0159\u00edd\u00ed tov\u00e1rnu s\u00e1m.<\/p>\n      <\/div>\n\n      <div class=\"fx-assist__panel-wrap sp-min0\">\n        <div class=\"fx-assist__shot\">\n          <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/33-0298ed80-92e8-41bf-aaf2-843615249f53.png\" alt=\"Chatovac\u00ed panel SkyPlanner Agent. U\u017eivatel se pt\u00e1: \u201eM\u016f\u017eete zadat novou objedn\u00e1vku na produkt P-2 pro z\u00e1kazn\u00edka ACME Ltd s dodac\u00ed lh\u016ftou dva t\u00fddny?\u201c Agent odpov\u00edd\u00e1, \u017ee objedn\u00e1vku vytvo\u0159il, uv\u00e1d\u00ed \u010d\u00edslo objedn\u00e1vky, z\u00e1kazn\u00edka, produkt, datum dod\u00e1n\u00ed a \u017ee procesn\u00ed kroky a d\u00edl\u010d\u00ed polo\u017eky byly p\u0159id\u00e1ny automaticky, a pot\u00e9 nab\u00edz\u00ed kontrolu detail\u016f objedn\u00e1vky nebo jej\u00ed p\u0159\u00edpravu k pl\u00e1nov\u00e1n\u00ed.\">\n        <\/div>\n<p class=\"fx-cap\" style=\"text-align:center;max-width:384px;margin-left:auto;margin-right:auto\">Ptejte se b\u011b\u017en\u00fdmi slovy. Zde agent vytvo\u0159\u00ed novou objedn\u00e1vku a p\u0159esn\u011b vyp\u00ed\u0161e, co nastavil.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"integrations\" data-screen-label=\"Integration dataflow\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Datov\u00fd tok integrace<\/p>\n<h2 class=\"wp-block-heading\">U\u017e \u017e\u00e1dn\u00e9 dal\u0161\u00ed pl\u00e1novac\u00ed silo<\/h2>\n<p>Pou\u017e\u00edvejte jej samostatn\u011b, s importovan\u00fdmi daty, nebo propojen\u00fd se st\u00e1vaj\u00edc\u00edmi syst\u00e9my p\u0159es REST API, webhooky, import dat a integra\u010dn\u00ed slu\u017eby na m\u00edru projektu. Laboratory &amp; Allied propojila SkyPlanner se <a href=\"\/cs\/integrace\/erp\/sap-business-one\/\">SAP Business One<\/a> na HANA a Power BI z velk\u00e9 \u010d\u00e1sti vlastn\u00edmi silami; zmapov\u00e1n\u00ed datov\u00fdch tok\u016f \u0161lo jejich IT t\u00fdmu rychle od ruky.<\/p>\n    <\/div>\n\n    <div class=\"fx-data\">\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">Vstupn\u00ed zdroje<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 MES \u00b7 CSV \u00b7 Ru\u010dn\u011b<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Objedn\u00e1vky &amp; popt\u00e1vka<\/li>\n<li>Produkty &amp; struktury<\/li>\n<li>Materi\u00e1ly &amp; z\u00e1soby<\/li>\n<li>Z\u00e1kazn\u00edci &amp; term\u00edny dod\u00e1n\u00ed<\/li>\n        <\/ul>\n      <\/div>\n      <div class=\"fx-data__col fx-data__col--mid\">\n<p class=\"fx-data__lab\">SkyPlanner APS<\/p>\n<h3 class=\"wp-block-heading\">Pl\u00e1nuje v\u00fdrobu<\/h3>\n        <div class=\"fx-data__chips\">\n          <span>Objedn\u00e1vky<\/span><span>Produkty<\/span><span>Materi\u00e1ly<\/span><span>Pracovi\u0161t\u011b<\/span><span>Procesn\u00ed kroky<\/span><span>Kapacita<\/span><span>Priority<\/span><span>Harmonogram<\/span>\n        <\/div>\n      <\/div>\n      <div class=\"fx-data__col\">\n<p class=\"fx-data__lab\">V\u00fdstupy a p\u0159ehledy<\/p>\n<h3 class=\"wp-block-heading\">ERP \u00b7 Reporty \u00b7 \u0158\u00edzen\u00ed<\/h3>\n<ul class=\"wp-block-list fx-data__items\">\n<li>Pl\u00e1novan\u00e9 \u010dasy zah\u00e1jen\u00ed &amp; ukon\u010den\u00ed<\/li>\n<li>Time Logs<\/li>\n<li>Pr\u016fb\u011bh &amp; stav<\/li>\n<li>Aktualizace harmonogramu &amp; reportov\u00e1n\u00ed<\/li>\n        <\/ul>\n      <\/div>\n    <\/div>\n\n    <div class=\"fx-data__methods\">\n      <span>REST API<\/span><span>Webhooky<\/span><span>CSV \/ import dat<\/span><span>Integra\u010dn\u00ed slu\u017eby na m\u00edru projektu<\/span>\n    <\/div>\n\n    <div class=\"fx-logos\">\n<p class=\"fx-logos__lab\">P\u0159\u00edklady syst\u00e9m\u016f, kter\u00e9 v\u00fdrobci provozuj\u00ed vedle SkyPlanner. Integrace se \u0159e\u0161\u00ed projektov\u011b; nejde o certifikovan\u00fd nativn\u00ed konektor pro ka\u017ed\u00fd syst\u00e9m.<\/p>\n      <div class=\"fx-logos__row\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/03-7588ca1b-9f98-41a8-afd1-d0ff541ae494.png\" alt=\"SAP\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/04-feb7074e-04ff-4289-8ddc-738277a8e35a.png\" alt=\"Microsoft Dynamics 365\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/08-f0ebc421-8270-403b-95ef-baaf46819cc2.png\" alt=\"Odoo\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/06-3fd1befa-779f-4179-9c01-91c641a429ec.png\" alt=\"Epicor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/05-6211607b-8b7f-45d4-b974-3ee857676e36.png\" alt=\"Infor\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/07-e69be7b0-1bb8-4540-836f-b148c41d60db.png\" alt=\"Sage\">\n      <\/div>\n<p class=\"fx-logos__note\">N\u00e1zvy a loga t\u0159et\u00edch stran jsou zobrazena pouze jako faktick\u00fd kontext integrace \/ kompatibility. Neznamenaj\u00ed partnerstv\u00ed, certifikaci ani doporu\u010den\u00ed.<\/p>\n    <\/div>\n\n    <div style=\"text-align:center;margin-top:36px\">\n      <a class=\"sp-btn sp-btn--blue\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/\">Prozkoumat integrace<\/a>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"compare\" style=\"background:var(--sp-bg-alt)\" data-screen-label=\"Comparison\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head\">\n<p class=\"fx-eyebrow\">Pro\u010d prost\u011b nepl\u00e1novat v Excelu, ERP nebo projektov\u00e9m n\u00e1stroji?<\/p>\n<h2 class=\"wp-block-heading\">Postaveno pro pl\u00e1nov\u00e1n\u00ed, ne jen pro sledov\u00e1n\u00ed<\/h2>\n<p>Tabulky, ERP\/MES i projektov\u00e9 n\u00e1stroje odv\u00e1d\u011bj\u00ed kus pr\u00e1ce. SkyPlanner je ale od z\u00e1kladu postaven\u00fd pro pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami a ohledem na materi\u00e1ly, na kter\u00e9 tyto n\u00e1stroje navr\u017een\u00e9 nebyly.<\/p>\n    <\/div>\n\n    <div class=\"fx-compare-wrap\">\n<table class=\"fx-compare\">\n<thead>\n<tr>\n            <th><\/th>\n            <th>Excel \/ tabulky<\/th>\n            <th>ERP \/ MES<\/th>\n            <th>Projektov\u00e9 n\u00e1stroje<\/th>\n            <th class=\"fx-compare__sp\"><span class=\"fx-compare__sp-name\">SkyPlanner APS<\/span><span class=\"fx-compare__sp-tag\">Postaveno p\u0159\u00edmo pro pl\u00e1nov\u00e1n\u00ed<\/span><\/th>\n          <\/tr>\n        <\/thead>\n<tbody>\n<tr>\n            <th>Pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami <span style=\"font-weight:400;color:var(--sp-text-muted)\">(kapacity se nikdy nep\u0159et\u00ed\u017e\u00ed)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Omezen\u00e9<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Reaguje na zm\u011bny <span style=\"font-weight:400;color:var(--sp-text-muted)\">(p\u0159epl\u00e1nov\u00e1n\u00ed b\u011bhem sekund, ne ru\u010dn\u00ed p\u0159epracov\u00e1n\u00ed)<\/span><\/th>\n            <td><span class=\"fx-part\">Ru\u010dn\u00ed<\/span><\/td>\n            <td><span class=\"fx-part\">V d\u00e1vk\u00e1ch<\/span><\/td>\n            <td><span class=\"fx-part\">Ru\u010dn\u00ed<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Pl\u00e1nov\u00e1n\u00ed s ohledem na materi\u00e1l <span style=\"font-weight:400;color:var(--sp-text-muted)\">(sklad, n\u00e1kupn\u00ed objedn\u00e1vky, budouc\u00ed stavy z\u00e1sob)<\/span><\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Pouze sklad<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Zp\u011btn\u00e1 vazba z v\u00fdroby aktualizuje pl\u00e1n v re\u00e1ln\u00e9m \u010dase<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Li\u0161\u00ed se<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>V\u00e1\u017een\u00e9 priority a kompromisy<\/th>\n            <td><span class=\"fx-part\">Ru\u010dn\u00ed<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">Z\u00e1kladn\u00ed<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Namodelovan\u00e9 \u010dasy se\u0159\u00edzen\u00ed, n\u00e1stroje, subdodavatel\u00e9 a d\u00e1vkov\u00e9 zak\u00e1zky<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td><span class=\"fx-part\">\u010c\u00e1ste\u010dn\u011b<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>Simulace term\u00ednu dod\u00e1n\u00ed pro obchodn\u00ed p\u0159\u00edle\u017eitosti<\/th>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-ico-cell\"><span class=\"fx-no\">\u2014<\/span><\/td>\n            <td class=\"fx-compare__sp\"><svg class=\"fx-yes\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M5 12.5l4.5 4.5L19 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/td>\n          <\/tr>\n<tr>\n            <th>\u010cas do prvn\u00edho harmonogramu <span style=\"font-weight:400;color:var(--sp-text-muted)\">(minuty s demo daty, ne m\u011bs\u00edce trvaj\u00edc\u00ed projekt)<\/span><\/th>\n            <td><span class=\"fx-part\">Rychl\u00e9, manu\u00e1ln\u00ed<\/span><\/td>\n            <td><span class=\"fx-part\">M\u011bs\u00edce<\/span><\/td>\n            <td><span class=\"fx-part\">Dny<\/span><\/td>\n            <td class=\"fx-compare__sp\"><span style=\"font-family:var(--sp-font-medium)\">Minuty<\/span><\/td>\n          <\/tr>\n        <\/tbody>\n      <\/table>\n    <\/div>\n<p class=\"fx-compare__hint\">Na mal\u00fdch obrazovk\u00e1ch posu\u0148te tabulku do strany. Srovn\u00e1n\u00ed odr\u00e1\u017e\u00ed typick\u00e9 pou\u017eit\u00ed, nikoli konkr\u00e9tn\u00ed produkt.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"allfeatures\" data-screen-label=\"Every capability\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<h2 class=\"wp-block-heading\">Co SkyPlanner um\u00ed<\/h2>\n<p>Stru\u010dn\u00fd seznam. Pokud tu nevid\u00edte, co pot\u0159ebujete, zeptejte se n\u00e1s. V\u0161echno se na jednu str\u00e1nku nevejde.<\/p>\n    <\/div>\n    <div class=\"fxv-az\">\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Alternativn\u00ed pracovi\u0161t\u011b.<\/b><span class=\"az-d\">Zak\u00e1zka m\u016f\u017ee b\u011b\u017eet na kter\u00e9mkoli vhodn\u00e9m pracovi\u0161ti, tak\u017ee Arcturus vyu\u017eije to, kter\u00e9 se uvoln\u00ed prvn\u00ed.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>P\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot.<\/b><span class=\"az-d\">Pl\u00e1n se aktualizuje p\u0159i ka\u017ed\u00e9 v\u00fdznamn\u00e9 zm\u011bn\u011b, v r\u00e1mci va\u0161ich limit\u016f.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pl\u00e1nov\u00e1n\u00ed d\u00e1vkov\u00fdch zak\u00e1zek.<\/b><span class=\"az-d\">D\u00edly z n\u011bkolika objedn\u00e1vek, kter\u00e9 b\u011b\u017e\u00ed spole\u010dn\u011b, se napl\u00e1nuj\u00ed jako jedna zak\u00e1zka.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Bulldozer.<\/b><span class=\"az-d\">Nezah\u00e1jenou pr\u00e1ci nenech\u00e1v\u00e1 v minulosti, posune ji vp\u0159ed na aktu\u00e1ln\u00ed \u010das.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pl\u00e1nov\u00e1n\u00ed kapacity a opakuj\u00edc\u00ed se sm\u011bny.<\/b><span class=\"az-d\">Sm\u011bny se opakuj\u00ed v t\u00fddenn\u00edm cyklu a ur\u010duj\u00ed, kolik m\u016f\u017eete vyrobit.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Porovn\u00e1n\u00ed harmonogram\u016f.<\/b><span class=\"az-d\">P\u0159ed p\u0159ijet\u00edm si navrhovan\u00fd pl\u00e1n prohl\u00e9dn\u011bte vedle aktu\u00e1ln\u00edho pl\u00e1nu.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>CSV a import dat.<\/b><span class=\"az-d\">Na\u010dt\u011bte objedn\u00e1vky, produkty a materi\u00e1ly bez integra\u010dn\u00edho projektu.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Vlastn\u00ed dashboardy a reporty.<\/b><span class=\"az-d\">Vytvo\u0159te si po\u017eadovan\u00e9 v\u00fdrobn\u00ed pohledy pomoc\u00ed widget\u016f drag-and-drop.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>\u010casov\u00e1 osa Gantt s drag-and-drop.<\/b><span class=\"az-d\">P\u0159esouvejte, zamykejte a upravujte zak\u00e1zky ru\u010dn\u011b p\u0159\u00edmo na \u010dasov\u00e9 ose.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Predikce d\u00e9lky trv\u00e1n\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f.<\/b><span class=\"az-d\">Odhadovan\u00e9 \u010dasy krok\u016f se zp\u0159es\u0148uj\u00ed na z\u00e1klad\u011b va\u0161\u00ed vlastn\u00ed historie.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Dynamick\u00e9 v\u00edce\u00farov\u0148ov\u00e9 priority.<\/b><span class=\"az-d\">P\u0159i\u0159a\u010fte v\u00e1hy pr\u016fb\u011b\u017en\u00e9 dob\u011b, term\u00edn\u016fm dod\u00e1n\u00ed, z\u00e1kazn\u00edk\u016fm i zak\u00e1zk\u00e1m a nasm\u011brujte t\u00edm pl\u00e1n.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Koeficienty efektivity.<\/b><span class=\"az-d\">Nastavte tempo pro pracovi\u0161t\u011b, pracovn\u00edka nebo sm\u011bnu, aby pl\u00e1n odpov\u00eddal realit\u011b.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pl\u00e1nov\u00e1n\u00ed s ohledem na materi\u00e1l.<\/b><span class=\"az-d\">Sklad, n\u00e1kupn\u00ed objedn\u00e1vky a budouc\u00ed stavy z\u00e1sob ur\u010duj\u00ed, kdy m\u016f\u017ee zak\u00e1zka b\u011b\u017eet.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Mobiln\u00ed z\u00e1znam \u010dasu.<\/b><span class=\"az-d\">Oper\u00e1to\u0159i spou\u0161t\u011bj\u00ed, zastavuj\u00ed a potvrzuj\u00ed pr\u00e1ci z telefonu nebo tabletu.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Sm\u011bry pl\u00e1nov\u00e1n\u00ed objedn\u00e1vek.<\/b><span class=\"az-d\">Pl\u00e1nujte dop\u0159edu od dne\u0161ka nebo zp\u011bt od term\u00ednu dod\u00e1n\u00ed.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Stupe\u0148 dokon\u010den\u00ed procesn\u00edho kroku.<\/b><span class=\"az-d\">Spus\u0165te dal\u0161\u00ed krok nap\u0159\u00edklad p\u0159i 10% dokon\u010den\u00ed p\u0159edchoz\u00edho.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>REST API a webhooky.<\/b><span class=\"az-d\">Propojte SkyPlanner se sv\u00fdmi vlastn\u00edmi syst\u00e9my v obou sm\u011brech.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pr\u016fb\u011b\u017en\u00fd \u010dasov\u00fd z\u00e1mek.<\/b><span class=\"az-d\">Zmrazte n\u00e1sleduj\u00edc\u00ed hodiny pl\u00e1nu, aby z\u016fstaly na m\u00edst\u011b.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pl\u00e1nov\u00e1n\u00ed obchodn\u00edch p\u0159\u00edle\u017eitost\u00ed.<\/b><span class=\"az-d\">Simulujte nab\u00eddku v\u016f\u010di skute\u010dn\u00e9mu vyt\u00ed\u017een\u00ed, abyste mohli sl\u00edbit term\u00edn, kter\u00fd dok\u00e1\u017eete dodr\u017eet.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Optimalizace \u010das\u016f se\u0159\u00edzen\u00ed a ukon\u010den\u00ed.<\/b><span class=\"az-d\">Se\u0159a\u010fte zak\u00e1zky tak, abyste zkr\u00e1tili \u010dasy p\u0159estavby mezi nimi.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Podobn\u00e9 zak\u00e1zky za sebou.<\/b><span class=\"az-d\">Seskupujte zak\u00e1zky se stejnou barvou, n\u00e1strojem nebo materi\u00e1lem a omezte p\u0159estavby.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>SkyPlanner Agent (BETA).<\/b><span class=\"az-d\">Po\u017e\u00e1dejte b\u011b\u017en\u00fdmi slovy o proveden\u00ed \u00fakol\u016f, kontrolu stavu nebo vysv\u011btlen\u00ed softwaru.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Pl\u00e1nov\u00e1n\u00ed subdodavatel\u016f.<\/b><span class=\"az-d\">Pr\u00e1ce v kooperaci se pl\u00e1nuje jako kter\u00e9koli jin\u00e9 pracovi\u0161t\u011b v toku.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Z\u00e1mky \u00fakol\u016f a objedn\u00e1vek.<\/b><span class=\"az-d\">P\u0159ipn\u011bte v\u0161e, co se nesm\u00ed p\u0159esunout, a pl\u00e1n se tomu p\u0159izp\u016fsob\u00ed.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>Spr\u00e1va n\u00e1stroj\u016f a forem.<\/b><span class=\"az-d\">Sd\u00edlen\u00fd n\u00e1stroj nebo forma nem\u016f\u017ee b\u00fdt na dvou m\u00edstech najednou.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>U\u017eivatelsk\u00e9 role a opr\u00e1vn\u011bn\u00ed.<\/b><span class=\"az-d\">Dejte ka\u017ed\u00e9 osob\u011b p\u0159\u00edstup, kter\u00fd jej\u00ed pr\u00e1ce vy\u017eaduje.<\/span><\/div><\/div>\n      <div class=\"fxv-az__item\"><svg viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M3 8.5l3 3 7-7.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><div><b>29 jazyk\u016f.<\/b><span class=\"az-d\">V\u00e1\u0161 t\u00fdm pracuje v jazyce, kter\u00fdm mluv\u00ed.<\/span><\/div><\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"start\" data-screen-label=\"Implementation ladder\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Za\u010dn\u011bte jednodu\u0161e, roz\u0161i\u0159ujte, a\u017e se prok\u00e1\u017ee hodnota<\/p>\n<h2 class=\"wp-block-heading\">Za\u010dn\u011bte v mal\u00e9m, propojte, a\u017e budete p\u0159ipraveni<\/h2>\n<p>SkyPlanner m\u016f\u017ee za\u010d\u00edt jako samostatn\u00e9 pl\u00e1novac\u00ed prost\u0159ed\u00ed a postupn\u011b se rozr\u016fst v propojen\u00fd proces pl\u00e1nov\u00e1n\u00ed v\u00fdroby.<\/p>\n    <\/div>\n\n    <div class=\"fx-ladder\">\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">1<\/div>\n<p class=\"fx-rung__t\">Vyzkou\u0161ejte s demo daty<\/p>\n<p class=\"fx-rung__b\">Pod\u00edvejte se na \u010dasovou osu Gantt s uk\u00e1zkov\u00fdmi objedn\u00e1vkami.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">2<\/div>\n<p class=\"fx-rung__t\">Modelujte pracovi\u0161t\u011b &amp; kroky<\/p>\n<p class=\"fx-rung__b\">Popi\u0161te sv\u00e1 skute\u010dn\u00e1 pracovi\u0161t\u011b a procesn\u00ed tok.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">3<\/div>\n<p class=\"fx-rung__t\">Vytvo\u0159te nebo importujte objedn\u00e1vky<\/p>\n<p class=\"fx-rung__b\">P\u0159idejte ru\u010dn\u011b nebo importujte z CSV.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">4<\/div>\n<p class=\"fx-rung__t\">Napl\u00e1nujte &amp; zkontrolujte<\/p>\n<p class=\"fx-rung__b\">Spus\u0165te Arcturus, zkontrolujte a upravte pl\u00e1n.<\/p>\n<\/div>\n      <div class=\"fx-rung\"><div class=\"fx-rung__dot\">5<\/div>\n<p class=\"fx-rung__t\">P\u0159idejte hloubku<\/p>\n<p class=\"fx-rung__b\">Materi\u00e1ly, n\u00e1stroje, priority a z\u00e1znamy z v\u00fdroby.<\/p>\n<\/div>\n      <div class=\"fx-rung fx-rung--last\"><div class=\"fx-rung__dot\">6<\/div>\n<p class=\"fx-rung__t\">P\u0159ipojte ERP \/ MES<\/p>\n<p class=\"fx-rung__b\">Integrujte, a\u017e budete p\u0159ipraveni, ne d\u0159\u00edve.<\/p>\n<\/div>\n    <\/div>\n\n    <div class=\"fxv-paths\">\n      <div class=\"fxv-path fxv-path--primary\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 3l8 4.5v9L12 21l-8-4.5v-9L12 3z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><path d=\"M12 12l8-4.5M12 12v9M12 12L4 7.5\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Ud\u011blejte to sami<\/h3>\n<p class=\"fxv-path__b\">Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed se samoobslu\u017en\u00fdm onboardingem a\u017e pro 20 pracovi\u0161\u0165. Demo data, videa i AI agent jsou sou\u010d\u00e1st\u00ed.<\/p>\n        <a class=\"sp-btn sp-btn--green fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/cs\/zkusebni-verze\/\">Spustit bezplatnou zku\u0161ebn\u00ed verzi<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><path d=\"M3.5 19a5.5 5.5 0 0 1 11 0M16 6.5a3 3 0 0 1 0 5.4M16.5 19a5.5 5.5 0 0 0-1.6-3.9\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Ud\u011blejte to s n\u00e1mi<\/h3>\n<p class=\"fxv-path__b\">Asistovan\u00fd onboarding: odborn\u00edk s v\u00e1mi napl\u00e1nuje nastaven\u00ed, naimportuje data a za\u0161kol\u00ed v\u00e1\u0161 t\u00fdm. Nej\u010dast\u011bj\u0161\u00ed cesta pro v\u011bt\u0161\u00ed v\u00fdroby.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/cs\/asistovane-nasazeni\/\">Zobrazit asistovan\u00fd onboarding<\/a>\n      <\/div>\n      <div class=\"fxv-path\">\n        <span class=\"fxv-path__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M12 2a6 6 0 0 0-6 6c0 4.5 6 12 6 12s6-7.5 6-12a6 6 0 0 0-6-6z\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linejoin=\"round\"><\/path><circle cx=\"12\" cy=\"8\" r=\"2.2\" stroke=\"currentColor\" stroke-width=\"1.8\"><\/circle><\/svg><\/span>\n<h3 class=\"wp-block-heading fxv-path__t\">Ud\u011blejte to s m\u00edstn\u00edm partnerem<\/h3>\n<p class=\"fxv-path__b\">Partne\u0159i a odborn\u00edci SkyPlanner jsou k dispozici ve v\u00edce ne\u017e 30 zem\u00edch.<\/p>\n        <a class=\"sp-btn sp-btn--outline fxv-path__btn\" href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Po\u017e\u00e1dat o m\u00edstn\u00edho partnera<\/a>\n      <\/div>\n    <\/div>\n<p class=\"fxv-pathnote\">Zdarma na 30 dn\u00ed. Bez kreditn\u00ed karty. Za\u010dn\u011bte na desktopu. Samoobslu\u017en\u00fd onboarding pokr\u00fdv\u00e1 a\u017e 20 pracovi\u0161\u0165; v\u011bt\u0161\u00ed v\u00fdroby jdou p\u0159es asistovan\u00fd onboarding.<\/p>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\" data-screen-label=\"FAQ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-head fx-head--center\">\n<p class=\"fx-eyebrow fx-eyebrow--center\">Na co se kupuj\u00edc\u00ed ptaj\u00ed<\/p>\n<h2 class=\"wp-block-heading\">Ot\u00e1zky, na kter\u00e9 se vyplat\u00ed odpov\u011bd\u011bt v\u010das<\/h2>\n    <\/div>\n    <div class=\"sp-faq fx-faq\">\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Pot\u0159ebujeme pro za\u010d\u00e1tek integraci ERP?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ne. SkyPlanner funguje samostatn\u011b. Objedn\u00e1vky m\u016f\u017eete zad\u00e1vat ru\u010dn\u011b nebo je importovat z CSV a sv\u00e9 ERP p\u0159ipojit pozd\u011bji p\u0159es REST API, webhooky nebo integra\u010dn\u00ed projekt. Mnoho z\u00e1kazn\u00edk\u016f funguje prvn\u00ed m\u011bs\u00edce bez jak\u00e9koli integrace.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Za jak dlouho uvid\u00edme napl\u00e1novanou vlastn\u00ed v\u00fdrobu?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">S demo daty za p\u00e1r minut. S vlastn\u00edmi daty spo\u010d\u00edv\u00e1 pr\u00e1ce v popisu va\u0161ich pracovi\u0161\u0165, sm\u011bn a produkt\u016f s jejich procesn\u00edmi kroky. Jednoduchou v\u00fdrobu zvl\u00e1dnete za den, slo\u017eit\u011bj\u0161\u00ed nastaven\u00ed trvaj\u00ed d\u00e9le. Provede v\u00e1s t\u00edm vestav\u011bn\u00fd AI agent, v\u00fdukov\u00e1 videa a pr\u016fvodce Getting Started, a pokud to rad\u011bji ud\u011bl\u00e1te s odborn\u00edkem, je k dispozici asistovan\u00fd onboarding.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Zm\u011bn\u00ed um\u011bl\u00e1 inteligence m\u016fj pl\u00e1n bez zept\u00e1n\u00ed?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Pouze v r\u00e1mci limit\u016f, kter\u00e9 nastav\u00edte. M\u016f\u017eete uzamknout jak\u00fdkoli \u00fakol nebo objedn\u00e1vku, zmrazit nejbli\u017e\u0161\u00ed hodiny nebo sm\u011bny pomoc\u00ed pr\u016fb\u011b\u017en\u00e9ho \u010dasov\u00e9ho z\u00e1mku a porovnat nov\u00fd pl\u00e1n p\u0159ed jeho p\u0159ijet\u00edm. Autopilot je voliteln\u00fd a i kdy\u017e je zapnut\u00fd, va\u0161e z\u00e1mky a pravidla v\u017edy plat\u00ed.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Jak Arcturus v\u00ed, co na\u0161e v\u00fdroba m\u016f\u017ee a nem\u016f\u017ee d\u011blat?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Jednou to pop\u00ed\u0161ete: v\u00fdrobn\u00ed pracovi\u0161t\u011b, sm\u011bny, procesn\u00ed kroky a jejich po\u0159ad\u00ed, \u010dasy se\u0159\u00edzen\u00ed a ukon\u010den\u00ed, materi\u00e1ly, n\u00e1stroje a subdodavatele. Arcturus s t\u00edm v\u0161\u00edm pracuje jako s pevn\u00fdmi limity a pl\u00e1nuje uvnit\u0159 nich.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kolik SkyPlanner stoj\u00ed?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Pl\u00e1ny za\u010d\u00ednaj\u00ed na 199&nbsp;\u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuj\u00ed 5 v\u00fdrobn\u00edch pracovi\u0161\u0165. Aktu\u00e1ln\u00ed tarify, co ka\u017ed\u00fd zahrnuje, a cenu dal\u0161\u00edch v\u00fdrobn\u00edch pracovi\u0161\u0165 najdete na str\u00e1nce s cen\u00edkem.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Pou\u017e\u00edvaj\u00ed se na\u0161e v\u00fdrobn\u00ed data k tr\u00e9nov\u00e1n\u00ed model\u016f um\u011bl\u00e9 inteligence?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ne. Arcturus nevy\u017eaduje tr\u00e9nov\u00e1n\u00ed na va\u0161ich datech a b\u011bhem provozu se znovu netr\u00e9nuje na z\u00e1kaznick\u00fdch datech. Pl\u00e1nov\u00e1n\u00ed b\u011b\u017e\u00ed na va\u0161em vlastn\u00edm v\u00fdrobn\u00edm modelu a pravidlech.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Na\u0161e v\u00fdroba je slo\u017eit\u00e1. Subdodavatel\u00e9, sd\u00edlen\u00e9 formy, d\u00e1vkov\u00e9 zak\u00e1zky. Zvl\u00e1dne to SkyPlanner?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ano, jde o plnohodnotn\u00e9 funkce, ne o obezli\u010dky. Subdodavatel\u00e9 se pl\u00e1nuj\u00ed jako pracovi\u0161t\u011b, n\u00e1stroje a formy nemohou b\u00fdt na dvou m\u00edstech najednou a d\u00e1vkov\u00e9 zak\u00e1zky kombinuj\u00edc\u00ed d\u00edly z n\u011bkolika objedn\u00e1vek se napl\u00e1nuj\u00ed jako jedna.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Co je zahrnuto v bezplatn\u00e9 zku\u0161ebn\u00ed verzi?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">30 dn\u00ed, zdarma, bez kreditn\u00ed karty. Samoobslu\u017en\u00fd onboarding pokr\u00fdv\u00e1 a\u017e 20 v\u00fdrobn\u00edch pracovi\u0161\u0165. Pokud va\u0161e v\u00fdroba pot\u0159ebuje v\u00edce, doporu\u010d\u00edme asistovan\u00fd onboarding, aby bylo nastaven\u00ed spr\u00e1vn\u011b provedeno od prvn\u00edho dne.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Kdo vyv\u00edj\u00ed SkyPlanner?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Skycode Oy, finsk\u00e1 softwarov\u00e1 spole\u010dnost z Vaasy, vyv\u00edj\u00ed SkyPlanner od roku 2018. SkyPlanner se prod\u00e1v\u00e1 a pou\u017e\u00edv\u00e1 ve v\u00fdrobn\u00edch firm\u00e1ch po cel\u00e9m sv\u011bt\u011b, podporuje 29 jazyk\u016f a m\u00e1 partnery a odborn\u00edky ve v\u00edce ne\u017e 30 zem\u00edch.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">M\u016f\u017ee SkyPlanner zkr\u00e1tit \u010dasy se\u0159\u00edzen\u00ed a p\u0159estaveb?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Ano. Produkt\u016fm p\u0159i\u0159ad\u00edte vlastnosti, jako je barva, materi\u00e1l nebo n\u00e1stroj, a ka\u017ed\u00e9 pracovi\u0161t\u011b pak m\u016f\u017ee seskupovat zak\u00e1zky se spole\u010dnou vlastnost\u00ed, tak\u017ee p\u0159estavba prob\u011bhne jednou za skupinu, ne mezi ka\u017edou zak\u00e1zkou. Jde o v\u00e1\u017eenou prioritu: Arcturus vyva\u017euje u\u0161et\u0159en\u00fd \u010das se\u0159\u00edzen\u00ed proti term\u00edn\u016fm dod\u00e1n\u00ed a va\u0161im dal\u0161\u00edm priorit\u00e1m. Mnoho tov\u00e1ren to vyu\u017e\u00edv\u00e1 pro lakovac\u00ed linky, v\u00fdm\u011bny n\u00e1stroj\u016f a forem nebo myt\u00ed mezi r\u016fzn\u00fdmi materi\u00e1ly.<\/p>\n      <\/div>\n      <div class=\"sp-faq__item\">\n<h3 class=\"wp-block-heading sp-faq__q\">Co se stane, kdy\u017e zku\u0161ebn\u00ed verze skon\u010d\u00ed?<svg class=\"sp-faq__chev\" viewBox=\"0 0 16 16\" fill=\"none\"><path d=\"M4 6l4 4 4-4\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/h3>\n<p class=\"sp-faq__a\">Nic se ne\u00fa\u010dtuje, proto\u017ee jsme nikdy nepo\u017eadovali kartu. Pokud chcete pokra\u010dovat, vyberte si pl\u00e1n na str\u00e1nce s cen\u00edkem. Pokud ne, zku\u0161ebn\u00ed verze jednodu\u0161e skon\u010d\u00ed.<\/p>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Closing quote\" style=\"padding-bottom:0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n<figure class=\"fxv-closequote\">\n<blockquote>\u201eEfektivita SkyPlanner pramen\u00ed z toho, \u017ee syst\u00e9m prost\u011b funguje. \u017d\u00e1dn\u00e9 z\u00e1drhele, jejich\u017e \u0159e\u0161en\u00edm byste ztr\u00e1celi \u010das.\u201c<\/blockquote>\n<figcaption>\u2014 <b>Tommi M\u00e4nnist\u00f6<\/b>, mana\u017eer pl\u00e1nov\u00e1n\u00ed v\u00fdroby, Eskomatic Oy<\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div><\/section>\n\n\n\n<section class=\"wp-block-group sp-section\" data-screen-label=\"Final CTA\" style=\"padding-bottom:var(--sp-space-30)\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  <div class=\"sp-container\">\n    <div class=\"fx-final\">\n      <div class=\"fx-final__body\">\n<h2 class=\"wp-block-heading\">Pod\u00edvejte se, jak bude vypadat va\u0161e napl\u00e1novan\u00e1 v\u00fdroba<\/h2>\n<p>P\u0159ij\u010fte se sv\u00fdmi skute\u010dn\u00fdmi pl\u00e1novac\u00edmi probl\u00e9my na \u017eiv\u00e9 demo a my v\u00e1m uk\u00e1\u017eeme, jak se objedn\u00e1vky, kapacity, materi\u00e1ly a priority spoj\u00ed do jednoho harmonogramu, kter\u00fd m\u00e1te pod kontrolou. Nebo demo p\u0159esko\u010dte a vyzkou\u0161ejte si to sami je\u0161t\u011b dnes.<\/p>\n        <div class=\"fx-final__actions\">\n          <a class=\"sp-btn sp-btn--green sp-btn--lg\" href=\"#start\">Spustit bezplatnou zku\u0161ebn\u00ed verzi<\/a>\n          <a class=\"sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/cs\/kontaktni-prodej\/\">Rezervovat demo<\/a>\n          <a class=\"sp-btn sp-btn--ghost-onblue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/cs\/videa\/#fulldemo\">Nejprve zhl\u00e9dnout 50 min prohl\u00eddku produktu<\/a>\n        <\/div>\n<p class=\"fxv-heromicro\" style=\"color:rgba(255,255,255,0.72)\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10.5l4 4 8-9\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>Zdarma na 30 dn\u00ed. Bez kreditn\u00ed karty. Za\u010dn\u011bte na desktopu.<\/p>\n      <\/div>\n      <div class=\"fx-final__media\">\n        <img decoding=\"sync\" loading=\"eager\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/34-5e9142a1-876e-46ad-a3e8-eb31a25e2093.png\" alt=\"\u010casov\u00e1 osa rozvrhov\u00e1n\u00ed v\u00fdroby SkyPlanner se seznamem zak\u00e1zek, p\u0159edstavuj\u00edc\u00ed skute\u010dn\u00fd pl\u00e1n z\u00e1kazn\u00edka.\">\n      <\/div>\n    <\/div>\n  <\/div>\n<\/div><\/section>\n\n<\/div><\/div>\n\n\n","protected":false},"excerpt":{"rendered":"<p>AI pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobce Napl\u00e1nov\u00e1no b\u011bhem n\u011bkolika sekund. Kontrola z\u016fst\u00e1v\u00e1 ve va\u0161ich rukou. SkyPlanner APS prom\u011bn\u00ed va\u0161e objedn\u00e1vky, kapacity, materi\u00e1ly a priority v realistick\u00fd pl\u00e1n respektuj\u00edc\u00ed omezen\u00e9 kapacity. Arcturus, n\u00e1\u0161 vlastn\u00ed AI engine, ho spo\u010d\u00edt\u00e1 b\u011bhem n\u011bkolika sekund a p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b ho udr\u017euje aktu\u00e1ln\u00ed. Vy rozhodujete, co se zamkne, co se posune &#8230; <a title=\"Funkce\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/funkce\/\" aria-label=\"Read more about Funkce\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":4525,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-4585","page","type-page","status-publish","has-post-thumbnail"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI, Gantt, Autopilot a dal\u0161\u00ed<\/title>\n<meta name=\"description\" content=\"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/funkce\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Funkce\" \/>\n<meta property=\"og:description\" content=\"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/funkce\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-22T12:39:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png\" \/>\n\t<meta property=\"og:image:width\" content=\"956\" \/>\n\t<meta property=\"og:image:height\" content=\"653\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/\",\"name\":\"Funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI, Gantt, Autopilot a dal\u0161\u00ed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"datePublished\":\"2022-04-21T17:29:20+00:00\",\"dateModified\":\"2026-09-22T12:39:02+00:00\",\"description\":\"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Staright-old-production-planning.png\",\"width\":956,\"height\":653},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/funkce\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Funkce\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI, Gantt, Autopilot a dal\u0161\u00ed","description":"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/funkce\/","og_locale":"cs_CZ","og_type":"article","og_title":"Funkce","og_description":"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.","og_url":"https:\/\/skyplanner.ai\/cs\/funkce\/","og_site_name":"SkyPlanner","article_modified_time":"2026-09-22T12:39:02+00:00","og_image":[{"width":956,"height":653,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/funkce\/","url":"https:\/\/skyplanner.ai\/cs\/funkce\/","name":"Funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s AI, Gantt, Autopilot a dal\u0161\u00ed","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/funkce\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/funkce\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","datePublished":"2022-04-21T17:29:20+00:00","dateModified":"2026-09-22T12:39:02+00:00","description":"Prohl\u00e9dn\u011bte si v\u0161echny funkce SkyPlanner APS: pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami s AI a Arcturus, \u017eiv\u00e1 \u010dasov\u00e1 osa Gantt, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed Autopilot, pl\u00e1nov\u00e1n\u00ed zohled\u0148uj\u00edc\u00ed materi\u00e1l, evidence na d\u00edln\u011b a integrace ERP. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/funkce\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/funkce\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/funkce\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png","width":956,"height":653},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/funkce\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Funkce"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-300x205.png",300,205,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning-768x525.png",768,525,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",956,653,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/03\/Staright-old-production-planning.png",360,246,false]},"uagb_author_info":{"display_name":"skyplanner","author_link":"https:\/\/skyplanner.ai\/cs\/author\/skyplanner\/"},"uagb_comment_info":0,"uagb_excerpt":"AI pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobce Napl\u00e1nov\u00e1no b\u011bhem n\u011bkolika sekund. Kontrola z\u016fst\u00e1v\u00e1 ve va\u0161ich rukou. SkyPlanner APS prom\u011bn\u00ed va\u0161e objedn\u00e1vky, kapacity, materi\u00e1ly a priority v realistick\u00fd pl\u00e1n respektuj\u00edc\u00ed omezen\u00e9 kapacity. Arcturus, n\u00e1\u0161 vlastn\u00ed AI engine, ho spo\u010d\u00edt\u00e1 b\u011bhem n\u011bkolika sekund a p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b ho udr\u017euje aktu\u00e1ln\u00ed. Vy rozhodujete, co se zamkne, co se posune&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/4585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=4585"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/4585\/revisions"}],"predecessor-version":[{"id":95807,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/4585\/revisions\/95807"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media\/4525"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=4585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}