{"id":107857,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/karat\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ KARAT<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed KARAT <span class=\"hl\">se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed KARAT ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit IS KARAT se SkyPlanner APS. SkyPlanner se syst\u00e9mem KARAT komunikuje obousm\u011brn\u011b prost\u0159ednictv\u00edm jeho vlastn\u00edch rozhran\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy a v\u00fdrobn\u00ed zak\u00e1zky v\u010detn\u011b operac\u00ed, karty polo\u017eek, kusovn\u00edky, technologick\u00e9 postupy, stroje, pracovi\u0161t\u011b, lidsk\u00e9 zdroje, skladov\u00e9 z\u00e1soby a vydan\u00e9 objedn\u00e1vky.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed zp\u011bt do v\u00fdrobn\u00edch dat v syst\u00e9mu KARAT.<\/li>\n\n\n<li>Pokud se tak rozhodnete, lze \u010dasov\u00e9 z\u00e1znamy oper\u00e1tor\u016f zapisovat zp\u011bt prost\u0159ednictv\u00edm termin\u00e1lov\u00e9ho odv\u00e1d\u011bn\u00ed v syst\u00e9mu KARAT.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161\u00ed konfiguraci syst\u00e9mu KARAT a zaji\u0161\u0165uje jej\u00ed podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm KARAT, kte\u0159\u00ed se cht\u011bj\u00ed do integrace zapojit nebo ji sami postavit na zdokumentovan\u00e9m REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"karat-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed syst\u00e9mu KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Dohodnut\u00e9 datov\u00e9 rozhran\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software uv\u00e1d\u00ed, \u017ee otev\u0159enost ERP KARAT umo\u017e\u0148uje propojen\u00ed s dal\u0161\u00edmi extern\u00edmi informa\u010dn\u00edmi syst\u00e9my a \u017ee syst\u00e9m podporuje elektronickou v\u00fdm\u011bnu dat ve form\u00e1tech XML, EDI, ISDOC a ISDS (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/vyvoj-software-a-aplikaci\/\">v\u00fdvoj softwaru KARAT<\/a>). Pro pl\u00e1nova\u010de to znamen\u00e1 rozhran\u00ed dohodnut\u00e9 pro konkr\u00e9tn\u00ed instalaci, kter\u00e9 exportuje otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy, technologick\u00e9 postupy, v\u00fdrobn\u00ed zdroje, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky a importuje pl\u00e1novan\u00e9 term\u00edny.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Rozhran\u00ed termin\u00e1lov\u00e9ho odv\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">Modul termin\u00e1lov\u00e9ho odv\u00e1d\u011bn\u00ed v syst\u00e9mu KARAT p\u0159ipravuje data pro export do extern\u00edho syst\u00e9mu a p\u0159ij\u00edm\u00e1 importovan\u00e1 data podle dohodnut\u00e9ho rozhran\u00ed (<a href=\"https:\/\/www.karatsoftware.cz\/erp-karat\/terminalove-odvadeni\/\">termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed<\/a>). Zpracov\u00e1v\u00e1 zah\u00e1jen\u00ed, p\u0159eru\u0161en\u00ed a ukon\u010den\u00ed pr\u00e1ce, p\u0159ed\u00e1v\u00e1n\u00ed operac\u00ed, v\u00fddej materi\u00e1lu do v\u00fdroby a p\u0159\u00edjem hotov\u00fdch v\u00fdrobk\u016f. Je proto p\u0159irozenou cestou pro p\u0159enos z\u00e1znam\u016f o pr\u00e1ci ze SkyPlanner.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Slu\u017eba syst\u00e9mov\u00e9 integrace.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software nab\u00edz\u00ed jako slu\u017ebu propojen\u00ed IS KARAT se sb\u011brem dat z v\u00fdroby, automatizovan\u00fdmi sklady, CAD\/CAM a dal\u0161\u00edmi specializovan\u00fdmi aplikacemi (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/systemova-integrace\/\">syst\u00e9mov\u00e1 integrace<\/a>). T\u00fdm SkyPlanner dohodne rozhran\u00ed s KARAT Software nebo s va\u0161\u00edm partnerem KARAT p\u0159i vymezen\u00ed rozsahu projektu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Excel a CSV.<\/p>\n\n\n<p class=\"fx-pain__b\">Pro zku\u0161ebn\u00ed na\u010dten\u00ed sta\u010d\u00ed otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy exportovan\u00e9 do Excelu nebo CSV.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentizace a licence<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Integra\u010dn\u00ed u\u017eivatel.<\/strong> Rozhran\u00ed b\u011b\u017e\u00ed pod u\u017eivatelsk\u00fdm \u00fa\u010dtem KARAT s opr\u00e1vn\u011bn\u00edmi k v\u00fdrobn\u00edm, skladov\u00fdm a n\u00e1kupn\u00edm dat\u016fm, kter\u00e1 \u010dte a zapisuje. P\u0159\u00edstupov\u00e1 pr\u00e1va v syst\u00e9mu KARAT lze nastavit a\u017e na \u00farove\u0148 jednotliv\u00fdch kl\u00ed\u010d\u016f tabulek, proto je omezte jen na nezbytn\u00fd rozsah.<\/li>\n\n\n<li><strong>Provoz syst\u00e9mu.<\/strong> IS KARAT lze provozovat ve vlastn\u00ed infrastruktu\u0159e, formou outsourcingu nebo jako SaaS. Zp\u016fsob p\u0159enosu dat p\u0159es dohodnut\u00e9 rozhran\u00ed (v\u00fdm\u011bna soubor\u016f nebo koncov\u00fd bod slu\u017eby) se p\u0159i vymezen\u00ed rozsahu projektu nastav\u00ed podle va\u0161eho zp\u016fsobu provozu.<\/li>\n\n\n<li><strong>Licence.<\/strong> Dohodnut\u00e9 rozhran\u00ed i p\u0159\u00edpadn\u00e9 pr\u00e1ce spole\u010dnosti KARAT Software si sjedn\u00e1te s KARAT Software nebo se sv\u00fdm partnerem.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner pou\u017e\u00edv\u00e1 REST API k autentizaci API token v hlavi\u010dce Authorization-Token (SkyPlanner Settings &gt; API). Dokumentace je k dispozici ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 na\u010d\u00edt\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner na\u010d\u00edt\u00e1 data ze syst\u00e9mu KARAT v nastaven\u00fdch intervalech. Nov\u00e9 v\u00fdrobn\u00ed \u00fakoly p\u0159eb\u00edr\u00e1 prost\u0159ednictv\u00edm pravideln\u00fdch export\u016f nebo \u010dten\u00ed p\u0159es dohodnut\u00e9 rozhran\u00ed s filtrem na otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy a posledn\u00ed zm\u011bny. Frekvence se nastavuje pro ka\u017ed\u00fd z\u00e1vod zvl\u00e1\u0161\u0165: od n\u011bkolika minut u v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f po hodinu u skladov\u00fdch z\u00e1sob.<\/p>\n\n\n<p>P\u0159i zm\u011bn\u011b stavu nebo pl\u00e1nu SkyPlanner odes\u00edl\u00e1 webhooky, tak\u017ee zp\u011btn\u00fd z\u00e1pis spou\u0161t\u011bj\u00ed ud\u00e1losti.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt v syst\u00e9mu KARAT<\/th><th>Objekt ve SkyPlanner<\/th><th>Sm\u011br<\/th><th>Frekvence<\/th><\/tr><\/thead><tbody><tr><td>Karty polo\u017eek, m\u011brn\u00e9 jednotky<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u011b<\/td><\/tr><tr><td>Kusovn\u00edky<\/td><td>Struktura v\u00fdrobku, podv\u00fdrobky, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Technologick\u00e9 postupy, operace a \u010dasy<\/td><td>Kroky postupu s dobami trv\u00e1n\u00ed, p\u0159\u00edpravn\u00fdmi a zakon\u010dovac\u00edmi \u010dasy<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>V\u00fdrobn\u00ed zdroje: stroje, pracovi\u0161t\u011b<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, alternativn\u00ed pracovi\u0161t\u011b<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen v\u00fdjime\u010dn\u011b<\/td><\/tr><tr><td>Lidsk\u00e9 zdroje<\/td><td>Pracovn\u00edci a po\u010dty oper\u00e1tor\u016f pro jednotliv\u00e9 operace<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy, v\u00fdrobn\u00ed zak\u00e1zky, operace, materi\u00e1l<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi pot\u0159ebami<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Na\u010d\u00edt\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Skladov\u00e9 z\u00e1soby<\/td><td>Stavy z\u00e1sob<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Na\u010d\u00edt\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Vydan\u00e9 objedn\u00e1vky s term\u00edny dod\u00e1n\u00ed<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Na\u010d\u00edt\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed jednotliv\u00fdch operac\u00ed p\u0159\u00edkazu (dohodnut\u00fd import)<\/td><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed jednotliv\u00fdch operac\u00ed<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>P\u0159i zm\u011bn\u011b pl\u00e1nu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed: zah\u00e1jen\u00ed, zastaven\u00ed, p\u0159ed\u00e1n\u00ed, mno\u017estv\u00ed<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Nen\u00ed v syst\u00e9mu KARAT<\/td><td>Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje jako zdroje s omezenou kapacitou, operace s v\u00edce oper\u00e1tory<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte karty polo\u017eek, kusovn\u00edky, technologick\u00e9 postupy a v\u00fdrobn\u00ed zdroje. Pe\u010dliv\u011b zva\u017ete mapov\u00e1n\u00ed zdroj\u016f do SkyPlanner: pracovi\u0161t\u011b se \u010dty\u0159mi stroji se p\u0159evede na jednu skupinu pracovi\u0161\u0165 nebo \u010dty\u0159i pracovi\u0161t\u011b. Lidsk\u00e9 zdroje pro p\u0159edv\u00fdrobn\u00ed \u010dinnosti, nap\u0159\u00edklad technologov\u00e9 a konstrukt\u00e9\u0159i, kter\u00e9 se pl\u00e1nuj\u00ed pomoc\u00ed v\u00e1\u017een\u00e9ho pl\u00e1nov\u00e1n\u00ed, z\u016fst\u00e1vaj\u00ed mimo d\u00edlensk\u00fd rozvrh, pokud nerozhodnete jinak.<\/p>\n\n\n<p><strong>2. Synchronizace p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed a materi\u00e1lu a tak\u00e9 vydan\u00e9 objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed na n\u00e1kupn\u00ed objedn\u00e1vce a aktualizuje skladov\u00fd stav, jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune operaci, webhook SkyPlanner spust\u00ed import pl\u00e1novan\u00fdch term\u00edn\u016f zah\u00e1jen\u00ed a dokon\u010den\u00ed do syst\u00e9mu KARAT p\u0159es dohodnut\u00e9 rozhran\u00ed. C\u00edl importu v syst\u00e9mu KARAT, tedy rezervace zdroj\u016f nebo term\u00edny operac\u00ed na v\u00fdrobn\u00edm p\u0159\u00edkazu, se ur\u010d\u00ed p\u0159i vymezen\u00ed rozsahu zav\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed pl\u00e1n aktu\u00e1ln\u00ed. Sami si zvol\u00edte, zda se skute\u010dn\u00e9 \u010dasy budou zapisovat zp\u011bt do syst\u00e9mu KARAT. Pokud ano, importuj\u00ed se p\u0159es rozhran\u00ed termin\u00e1lov\u00e9ho odv\u00e1d\u011bn\u00ed jako ud\u00e1losti zah\u00e1jen\u00ed, zastaven\u00ed a vyk\u00e1z\u00e1n\u00ed mno\u017estv\u00ed pro jednotliv\u00e9 operace. Pokud ne, oper\u00e1to\u0159i d\u00e1l odv\u00e1d\u011bj\u00ed pr\u00e1ci na termin\u00e1lech KARAT a SkyPlanner tyto z\u00e1znamy na\u010d\u00edt\u00e1.<\/p>\n\n\n<p><strong>5. Pravidla pro spr\u00e1vu dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Karty polo\u017eek, kusovn\u00edky, technologick\u00e9 postupy, mno\u017estv\u00ed, stav zak\u00e1zky<\/td><td>KARAT<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed stroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice se\u0159izovac\u00edch \u010das\u016f, po\u017eadavky na n\u00e1stroje a oper\u00e1tory, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu projektu<\/td><\/tr><tr><td>Z\u00e1znamy o odv\u00e1d\u011bn\u00ed operac\u00ed, v\u00fddeje a p\u0159\u00edjmy materi\u00e1lu<\/td><td>KARAT; \u00fadaje se zad\u00e1vaj\u00ed p\u0159\u00edmo do n\u011bj nebo se p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jedin\u00fd syst\u00e9m, kter\u00fd bude zapisovat term\u00edny zak\u00e1zek. Pokud APS KARAT st\u00e1le ukl\u00e1d\u00e1 pl\u00e1ny zp\u011bt do v\u00fdrobn\u00edch dat, vypn\u011bte tuto funkci u zak\u00e1zek pl\u00e1novan\u00fdch ve SkyPlanner, aby si oba syst\u00e9my navz\u00e1jem nep\u0159episovaly data.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd pr\u016fb\u011bh projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si ov\u011b\u0159te pl\u00e1n v r\u00e1mci 30denn\u00edho bezplatn\u00e9ho vyzkou\u0161en\u00ed se stroji, technologick\u00fdmi postupy a otev\u0159en\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy exportovan\u00fdmi ze syst\u00e9mu KARAT do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Dohodn\u011bte mapovac\u00ed tabulku, pravidla pro spr\u00e1vu dat, frekvence synchronizace a to, zda se budou z\u00e1znamy o odv\u00e1d\u011bn\u00ed operac\u00ed zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>Rozhran\u00ed KARAT.<\/strong> Dohodn\u011bte s KARAT Software nebo se sv\u00fdm partnerem form\u00e1t exportu a importu i zp\u016fsob p\u0159enosu dat a nastavte integra\u010dn\u00edho u\u017eivatele. Nejprve v\u0161e otestujte na kopii datab\u00e1ze.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed.<\/strong> Karty polo\u017eek, kusovn\u00edky, technologick\u00e9 postupy, v\u00fdrobn\u00ed zdroje.<\/li>\n\n\n<li><strong>Synchronizace zak\u00e1zek a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 na\u010d\u00edt\u00e1n\u00ed s filtry a opakov\u00e1n\u00edm p\u0159i chyb\u011b.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f pro jednotliv\u00e9 operace a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Otestujte import pl\u00e1novan\u00fdch term\u00edn\u016f a p\u0159\u00edpadn\u011b i import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, pokud jste jej zvolili.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Pou\u017e\u00edvejte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-karat-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Rozhran\u00ed se dohodne pro ka\u017edou instalaci zvl\u00e1\u0161\u0165.<\/strong> Vyhra\u010fte si \u010das na vymezen\u00ed rozsahu s KARAT Software nebo sv\u00fdm partnerem a p\u0159i mapov\u00e1n\u00ed dat zdokumentujte form\u00e1t exportu i importu.<\/li>\n\n\n<li><strong>Odpov\u011bdnost za pl\u00e1n.<\/strong> APS KARAT p\u0159i ukon\u010den\u00ed ukl\u00e1d\u00e1 pl\u00e1ny do v\u00fdrobn\u00edch dat. Rozhodn\u011bte, kter\u00e9 zak\u00e1zky v n\u011bm budete nad\u00e1le pl\u00e1novat, pokud v\u016fbec n\u011bjak\u00e9.<\/li>\n\n\n<li><strong>Hlavn\u00ed pl\u00e1n nap\u0159\u00ed\u010d z\u00e1vody.<\/strong> Pro ka\u017ed\u00fd z\u00e1vod ur\u010dete, kter\u00e9 zak\u00e1zky bude SkyPlanner rozvrhovat.<\/li>\n\n\n<li><strong>St\u00e1vaj\u00edc\u00ed integrace termin\u00e1l\u016f.<\/strong> Pokud se hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f ji\u017e exportuj\u00ed do jin\u00e9ho syst\u00e9mu, vyu\u017eijte dohodnut\u00e9 rozhran\u00ed i pro \u010dasov\u00e9 z\u00e1znamy ze SkyPlanner m\u00edsto p\u0159id\u00e1v\u00e1n\u00ed dal\u0161\u00edho.<\/li>\n\n\n<li><strong>\u010casov\u00e9 jednotky.<\/strong> P\u0159i prvn\u00edm na\u010dten\u00ed zkontrolujte jednotky \u010das\u016f operac\u00ed v technologick\u00fdch postupech. Z\u00e1vis\u00ed na nich v\u0161echny doby trv\u00e1n\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-karat-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci s KARAT a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to pro dohodnut\u00e9 exporty, importy i hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 KARAT jinak a pr\u00e1v\u011b p\u0159i tomto nastaven\u00ed se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i KARAT Software nebo v\u00e1\u0161 partner pro KARAT.<\/strong> Znaj\u00ed va\u0161i instalaci a datov\u00e9 struktury a mohou spole\u010dn\u011b s t\u00fdmem SkyPlanner nastavit dohodnut\u00e9 rozhran\u00ed i u\u017eivatelsk\u00fd \u00fa\u010det pro integraci.<\/li>\n\n\n<li><strong>Va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API syst\u00e9mu SkyPlanner a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrac\u00ed SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner stoj\u00ed od 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku integrace dostanete p\u0159edem spolu s nab\u00eddkou p\u0159edplatn\u00e9ho podle sv\u00fdch proces\u016f a pot\u0159eb. Prohl\u00e9dn\u011bte si <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/karat\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro KARAT<\/a>, <a href=\"\/cs\/integrace\/erp\/karat\/\">str\u00e1nku KARAT<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>. Z\u00e1klady rozvrhov\u00e1n\u00ed najdete na str\u00e1nce <a href=\"\/cs\/zdroje\/co-je-planovani-vyroby\/\">rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit si uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu v\u00fdroby rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky syst\u00e9mu SkyPlanner jsme p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby p\u0159e\u0161li od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b zabere m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na z\u00e1vod spole\u010dnosti Piristeel na v\u00fdrobu st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f v Kauhav\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m pomohl odhalovat \u00fazk\u00e1 m\u00edsta a zp\u0159ehlednil \u0159\u00edzen\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky a okapov\u00e9 syst\u00e9my<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a rozvrhov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pr\u00e1ce denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>M\u00e9n\u011b<\/b><span>prostoj\u016f kv\u016fli nedostatku materi\u00e1lu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eP\u0159\u00ednos syst\u00e9mu SkyPlanner pro n\u00e1s spo\u010d\u00edv\u00e1 v tom, \u017ee je to n\u00e1stroj, kter\u00fd funguje v ka\u017edodenn\u00ed praxi, zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/b><br>Eskomatic \u00b7 Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Automatick\u00e9 pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed umo\u017e\u0148uje p\u0159esn\u011bji stanovovat term\u00edny dod\u00e1n\u00ed a v\u00fdrazn\u011b ubylo prostoj\u016f ve v\u00fdrob\u011b zp\u016fsoben\u00fdch nedostatkem materi\u00e1lu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se SkyPlanner propojuje s KARAT?<\/summary>\n<p class=\"sp-faq__a\">Pro zak\u00e1zky, kmenov\u00e1 data a pl\u00e1novan\u00e9 term\u00edny vyu\u017e\u00edv\u00e1 dohodnut\u00e9 datov\u00e9 rozhran\u00ed KARAT ve form\u00e1tu XML. Vyk\u00e1zanou pr\u00e1ci p\u0159en\u00e1\u0161\u00ed prost\u0159ednictv\u00edm hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f KARAT. T\u00fdm SkyPlanner propojen\u00ed nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed spole\u010dn\u011b s KARAT Software nebo va\u0161\u00edm partnerem pro KARAT.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak SkyPlanner p\u0159eb\u00edr\u00e1 zm\u011bny z KARAT?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner na\u010d\u00edt\u00e1 data z KARAT v intervalech nastaven\u00fdch pro ka\u017ed\u00fd z\u00e1vod. Na\u010d\u00edt\u00e1n\u00ed se omezuje na otev\u0159en\u00e9 v\u00fdrobn\u00ed zak\u00e1zky a posledn\u00ed zm\u011bny. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu ihned, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do KARAT?<\/summary>\n<p class=\"sp-faq__a\">Importem pl\u00e1novan\u00fdch term\u00edn\u016f zah\u00e1jen\u00ed a dokon\u010den\u00ed jednotliv\u00fdch operac\u00ed zak\u00e1zky p\u0159es dohodnut\u00e9 rozhran\u00ed. P\u0159i vymezen\u00ed rozsahu b\u011bhem zav\u00e1d\u011bn\u00ed t\u00fdm SkyPlanner ur\u010d\u00ed c\u00edl importu: rezervace v\u00fdrobn\u00edch zdroj\u016f, nebo term\u00edny operac\u00ed na v\u00fdrobn\u00ed zak\u00e1zce.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Lze \u010dasov\u00e9 z\u00e1znamy obsluhy zapisovat zp\u011bt do KARAT?<\/summary>\n<p class=\"sp-faq__a\">Ano, pokud tuto mo\u017enost zvol\u00edte. Hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f KARAT umo\u017e\u0148uje import dat p\u0159es dohodnut\u00e9 rozhran\u00ed. \u010casov\u00e9 z\u00e1znamy ze SkyPlanner se tak zapisuj\u00ed jako ud\u00e1losti zah\u00e1jen\u00ed, ukon\u010den\u00ed a hl\u00e1\u0161en\u00ed mno\u017estv\u00ed pro jednotliv\u00e9 operace.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner pro KARAT doporu\u010dit APS KARAT, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud se pl\u00e1n z\u00e1kazn\u00edka \u010dasto m\u011bn\u00ed a mus\u00ed vych\u00e1zet z aktu\u00e1ln\u00edch dat. APS KARAT pl\u00e1nuje nad daty exportovan\u00fdmi z v\u00fdroby. Pl\u00e1nova\u010di vytv\u00e1\u0159ej\u00ed varianty a pot\u00e9 jednu z nich ulo\u017e\u00ed zp\u011bt (<a href=\"https:\/\/www.karatsoftware.cz\/propojeni-pokrocileho-planovani-vyroby-aps-a-rizeni-dodavatelskeho-retezce-scm-v-is-karat\/\">KARAT<\/a>). SkyPlanner automaticky p\u0159epl\u00e1nov\u00e1v\u00e1, pl\u00e1nuje p\u0159estavby, n\u00e1stroje, pracovn\u00ed t\u00fdmy i materi\u00e1l a nab\u00edz\u00ed neomezen\u00fd po\u010det u\u017eivatel\u016f, a to od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner otestovat p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. Bezplatn\u00e1 30denn\u00ed zku\u0161ebn\u00ed verze podporuje a\u017e 20 pracovi\u0161\u0165 a importy z KARAT ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ KARAT Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby Tento pr\u016fvodce integrac\u00ed KARAT ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit IS KARAT se SkyPlanner APS. SkyPlanner se syst\u00e9mem KARAT komunikuje obousm\u011brn\u011b prost\u0159ednictv\u00edm jeho vlastn\u00edch rozhran\u00ed: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161\u00ed konfiguraci syst\u00e9mu KARAT a &#8230; <a title=\"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106637,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107857","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KARAT integrace s APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\" \/>\n<meta property=\"og:description\" content=\"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/pruvodce-integraci\\\/\",\"name\":\"KARAT integrace s APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro KARAT: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s omezenou kapacitou\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/karat\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KARAT integrace s APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","description":"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","og_description":"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/","name":"KARAT integrace s APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte KARAT se SkyPlanner APS: dohodnut\u00e9 XML rozhran\u00ed, import hl\u00e1\u0161en\u00ed z termin\u00e1l\u016f, mapov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, pravidla zp\u011btn\u00e9ho z\u00e1pisu a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro KARAT: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s omezenou kapacitou","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/karat\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ KARAT Pr\u016fvodce integrac\u00ed KARAT se SkyPlanner APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby Tento pr\u016fvodce integrac\u00ed KARAT ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit IS KARAT se SkyPlanner APS. SkyPlanner se syst\u00e9mem KARAT komunikuje obousm\u011brn\u011b prost\u0159ednictv\u00edm jeho vlastn\u00edch rozhran\u00ed: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161\u00ed konfiguraci syst\u00e9mu KARAT a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107857"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107857\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106637"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}