{"id":107741,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed SAP Business ByDesign <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed SAP Business ByDesign ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ByDesign se SkyPlanner APS. SkyPlanner se s ByDesign integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm ofici\u00e1ln\u011b vydan\u00fdch webov\u00fdch slu\u017eeb SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se na\u010d\u00edtaj\u00ed uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed, Production Models, Bills of Material a Bills of Operations, strojn\u00ed zdroje a pracovn\u00edci, materi\u00e1ly, z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Do ByDesign se vrac\u00ed pl\u00e1novan\u00fd za\u010d\u00e1tek ka\u017ed\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu a hlavn\u00ed v\u00fdrobn\u00ed zdroj ka\u017ed\u00e9 operace.<\/li>\n\n\n<li>Potvrzen\u00e1 mno\u017estv\u00ed, zmetky a dokon\u010den\u00e9 \u00fakoly lze zapisovat zp\u011bt do v\u00fdrobn\u00edch d\u00e1vek.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nakonfiguruje integraci s va\u0161\u00edm tenantem ByDesign p\u0159es REST API a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vyv\u00edjet \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed SAP ByDesign<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pro ka\u017edou verzi ByDesign je v <a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/IntegrationServices.html\">seznamu API webov\u00fdch slu\u017eeb<\/a> uveden p\u0159ehled ofici\u00e1ln\u011b vydan\u00fdch webov\u00fdch slu\u017eeb A2X SOAP. Integrace pro rozvrhov\u00e1n\u00ed v\u00fdroby vyu\u017e\u00edv\u00e1 tyto slu\u017eby:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manage Production Orders (ManageProductionOrderIn).<\/strong> READ_PROD_ORDER vrac\u00ed po\u017eadovan\u00fd, nejd\u0159\u00edv\u011bj\u0161\u00ed a nejpozd\u011bj\u0161\u00ed za\u010d\u00e1tek a konec, v\u00fdrobn\u00ed zdroje s pl\u00e1novanou a skute\u010dnou dobou trv\u00e1n\u00ed, prioritu, stav realizace a stav rozvr\u017een\u00ed. MAINTAIN_BUNDLE_V2 aktualizuje EarliestStartPeriod nebo LatestEndPeriod a MainResourceID operace (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_ORDER_IN.html\">n\u00e1pov\u011bda SAP<\/a>).<\/li>\n\n\n<li><strong>Manage Production Lots (ManageProductionLotsIn).<\/strong> MaintainBundle vytv\u00e1\u0159\u00ed nebo aktualizuje v\u00fdrobn\u00ed \u00fakoly. Pro ka\u017ed\u00fd vykazovac\u00ed bod zapisuje potvrzen\u00e9 mno\u017estv\u00ed, zmetky a p\u0159\u00edznak dokon\u010den\u00e9ho potvrzen\u00ed. Umo\u017e\u0148uje tak\u00e9 dokon\u010dit \u00fakol s uveden\u00edm zam\u011bstnance, kter\u00fd jej provedl, a doby realizace a zaznamenat vyu\u017eit\u00ed v\u00fdrobn\u00edch zdroj\u016f (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_LOT_IN.html\">n\u00e1pov\u011bda SAP<\/a>).<\/li>\n\n\n<li><strong>Dotazovac\u00ed slu\u017eby.<\/strong> Query Production Orders, Query Production Lots, Query Production Model, Query Production Bill of Materials, Query Production Bill of Operations (tak\u00e9 podle v\u00fdrobn\u00edho zdroje), Query Materials, Read Equipment Resources, Query Labour Resource, Query Purchase Orders, Query Identified Stocks a Determine Availability of Products.<\/li>\n\n\n<li><strong>OData.<\/strong> Vlastn\u00ed slu\u017eby OData pro podnikov\u00e9 objekty a tak\u00e9 OData pro datov\u00e9 zdroje a analytick\u00e9 sestavy. SAP uv\u00e1d\u00ed, \u017ee &#8222;companies are fully empowered to decide which business objects&#8220; (firmy mohou pln\u011b rozhodovat o tom, kter\u00e9 podnikov\u00e9 objekty) budou zp\u0159\u00edstupn\u011bny (<a href=\"https:\/\/help.sap.com\/doc\/7f6eeef4edc84312870d687b2ce0f3a1\/2608\/en-US\/IntegrationScenarios.html\">integra\u010dn\u00ed sc\u00e9n\u00e1\u0159e SAP<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Pro \u010dten\u00ed pou\u017e\u00edvejte dotazovac\u00ed slu\u017eby nebo OData, pro ve\u0161ker\u00fd z\u00e1pis pak ob\u011b slu\u017eby Manage.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a licence<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>V ByDesign vytvo\u0159te pro SkyPlanner komunika\u010dn\u00ed syst\u00e9m a pro pou\u017e\u00edvan\u00e9 slu\u017eby nastavte komunika\u010dn\u00ed ujedn\u00e1n\u00ed. Ka\u017ed\u00e9 ujedn\u00e1n\u00ed m\u00e1 vlastn\u00edho technick\u00e9ho u\u017eivatele. Bezpe\u010dnostn\u00ed p\u0159\u00edru\u010dka SAP uv\u00e1d\u00ed pro ov\u011b\u0159ov\u00e1n\u00ed aplika\u010dn\u00ed integrace &#8222;user ID plus password, and the X.509 client certificate&#8220; (ID u\u017eivatele s heslem a p\u0159\u00edslu\u0161n\u00fd klientsk\u00fd certifik\u00e1t) (<a href=\"https:\/\/help.sap.com\/doc\/e9674bba2e9f423da76f05c02c4a8554\/2608\/en-US\/Security_Guide_for_SAP_Business_ByDesign.pdf\">bezpe\u010dnostn\u00ed p\u0159\u00edru\u010dka<\/a>). Pro OData lze nakonfigurovat OAuth 2.0. WSDL jednotliv\u00fdch slu\u017eeb st\u00e1hnete z komunika\u010dn\u00edho ujedn\u00e1n\u00ed nebo ze Service Explorer.<\/p>\n\n\n<p>Na stran\u011b SkyPlanner obsahuje ka\u017ed\u00e9 vol\u00e1n\u00ed token API v hlavi\u010dce <code>Authorization-Token<\/code>. Token vytvo\u0159\u00edte v SkyPlanner v nab\u00eddce Settings &gt; API. K zah\u00e1jen\u00ed v\u00fdvoje sta\u010d\u00ed token API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b rozvrhu, tak\u017ee se zm\u011bny pl\u00e1nu pr\u016fb\u011b\u017en\u011b zapisuj\u00ed zp\u011bt do ByDesign.<\/p>\n\n\n<p>Zm\u011bny v ByDesign zji\u0161\u0165ujte pravideln\u00fdm dotazov\u00e1n\u00edm slu\u017eeb Query. Uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy a v\u00fdrobn\u00ed d\u00e1vky na\u010d\u00edtejte ka\u017ed\u00fdch n\u011bkolik minut, materi\u00e1ly, z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky v del\u0161\u00edch intervalech. V\u00fdsledky dotaz\u016f se str\u00e1nkuj\u00ed pomoc\u00ed QueryHitsMaximumNumberValue a LastReturnedObjectID. V\u00fdchoz\u00ed velikost str\u00e1nky SAP uv\u00e1d\u00ed na <a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/34de7a7c1a7e43178141074817068fb1\/37faab74f63049d7816184add8077065.html\">str\u00e1nce v\u011bnovan\u00e9 webov\u00fdm slu\u017eb\u00e1m<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt ByDesign (rozhran\u00ed)<\/th><th>Objekt ve SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1ly (Query Materials)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Production Bill of Material (Query Production Bill of Materials)<\/td><td>Struktura v\u00fdrobku, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Production Bill of Operations: operace a \u010dinnosti Setup, Produce a Tear down (Query Production Bill of Operations)<\/td><td>Kroky postupu s dobami trv\u00e1n\u00ed, p\u0159\u00edpravy a zakon\u010den\u00ed<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Production Model (Query Production Model)<\/td><td>Technologick\u00fd postup v\u00fdrobku pro jednotliv\u00e9 z\u00e1vody<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Strojn\u00ed zdroje a skupiny v\u00fdrobn\u00edch zdroj\u016f (Read Equipment Resources)<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, n\u00e1stroje<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Pracovn\u00edci, provozn\u00ed doby (Query Labour Resource)<\/td><td>Pracovn\u00edci a sm\u011bny<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo spr\u00e1va sm\u011bn ve SkyPlanner<\/td><\/tr><tr><td>Uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy a operace (Query Production Orders, READ_PROD_ORDER)<\/td><td>P\u0159\u00edkazy a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi pot\u0159ebami<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>V\u00fdrobn\u00ed d\u00e1vky a \u00fakoly (Query Production Lots)<\/td><td>Pr\u016fb\u011bh operac\u00ed<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Identifikovan\u00e9 z\u00e1soby, dostupnost v\u00fdrobk\u016f (Query Identified Stocks, Determine Availability of Products)<\/td><td>Stavy z\u00e1sob<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>N\u00e1kupn\u00ed objedn\u00e1vky (Query Purchase Orders)<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>EarliestStartPeriod, MainResourceID operace (Manage Production Orders, MAINTAIN_BUNDLE_V2)<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek, p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Potvrzen\u00e9 mno\u017estv\u00ed, zmetky, dokon\u010den\u00ed \u00fakolu (Manage Production Lots, MaintainBundle)<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed od obsluhy<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud je tato mo\u017enost zvolena<\/td><\/tr><tr><td>Nen\u00ed v ByDesign<\/td><td>Matice \u010das\u016f p\u0159\u00edpravy, po\u017eadavky na v\u00edce pracovn\u00edk\u016f obsluhy, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spravov\u00e1no v SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Postupy integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte materi\u00e1ly, Production Models, Bills of Material a Bills of Operations, strojn\u00ed zdroje a pracovn\u00edky. Mapov\u00e1n\u00ed v\u00fdrobn\u00edch zdroj\u016f si dob\u0159e promyslete: skupina se \u010dty\u0159mi stroji se p\u0159evede na jednu skupinu pracovi\u0161\u0165 nebo \u010dty\u0159i pracovi\u0161t\u011b. Strojn\u00ed zdroje, kter\u00e9 p\u0159edstavuj\u00ed n\u00e1stroje, se v SkyPlanner p\u0159evedou na n\u00e1stroje s omezenou kapacitou.<\/p>\n\n\n<p><strong>2. Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed a materi\u00e1lu a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, jakmile objedn\u00e1vka z\u00edsk\u00e1 stav Delivered. N\u00e1vrhy v\u00fdroby z\u016fst\u00e1vaj\u00ed v ByDesign Supply Planning, dokud se z nich nestanou v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed j\u00e1dro za\u0159ad\u00ed p\u0159\u00edkaz do rozvrhu nebo jej p\u0159esune, webhook SkyPlanner vyvol\u00e1 MAINTAIN_BUNDLE_V2 ve slu\u017eb\u011b Manage Production Orders. Nastav\u00ed EarliestStartPeriod a MainResourceID operace, kterou SkyPlanner vybral.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed z v\u00fdroby.<\/strong> Obsluha zaznamen\u00e1v\u00e1 pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer. D\u00edky \u010dasov\u00fdm z\u00e1znam\u016fm z\u016fst\u00e1v\u00e1 rozvrh aktu\u00e1ln\u00ed. Sami si zvol\u00edte, zda se skute\u010dn\u00e9 \u00fadaje budou zapisovat zp\u011bt. Pokud ano, MaintainBundle ve slu\u017eb\u011b Manage Production Lots zap\u00ed\u0161e potvrzen\u00e9 mno\u017estv\u00ed, zmetky a dokon\u010den\u00fd \u00fakol v\u010detn\u011b zam\u011bstnance, kter\u00fd jej provedl. Pokud ne, potvrzen\u00ed se nad\u00e1le zad\u00e1vaj\u00ed v ByDesign jako dosud.<\/p>\n\n\n<p><strong>5. Pravidla pro spr\u00e1vu dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Kde se spravuj\u00ed<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1ly, Production Models, mno\u017estv\u00ed, stav p\u0159\u00edkaz\u016f a d\u00e1vek<\/td><td>ByDesign<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed v\u00fdrobn\u00edch zdroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f p\u0159\u00edpravy a p\u0159echod\u016f mezi operacemi, po\u017eadavky na n\u00e1stroje a obsluhu, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Potvrzen\u00ed, pohyby z\u00e1sob, kalkulace n\u00e1klad\u016f<\/td><td>ByDesign, s p\u0159\u00edm\u00fdm zad\u00e1v\u00e1n\u00edm nebo z\u00e1pisem z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pro z\u00e1pis term\u00edn\u016f p\u0159\u00edkaz\u016f ur\u010dete jedin\u00fd syst\u00e9m. Na v\u00fdrobn\u00edch zdroj\u00edch, kter\u00e9 rozvrhuje SkyPlanner, nespou\u0161t\u011bjte Load Leveling. Ov\u011b\u0159te tak\u00e9, \u017ee pl\u00e1novac\u00ed b\u011bh neposouv\u00e1 uvoln\u011bn\u00e9 p\u0159\u00edkazy, kter\u00e9 spravuje SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00e9 kroky projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te rozvrh v r\u00e1mci 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed verze. Pou\u017eijte v\u00fdrobn\u00ed zdroje, Bills of Operations a otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy exportovan\u00e9 z ByDesign do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte kone\u010dnou podobu mapovac\u00ed tabulky, pravidla odpov\u011bdnosti za data, intervaly synchronizace a to, zda se potvrzen\u00ed budou zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup do ByDesign.<\/strong> Vytvo\u0159te komunika\u010dn\u00ed syst\u00e9m a komunika\u010dn\u00ed ujedn\u00e1n\u00ed a st\u00e1hn\u011bte soubory WSDL. Nejprve v\u0161e otestujte v testovac\u00edm tenantu ByDesign.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed.<\/strong> Materi\u00e1ly, Production Models, Bills of Material a Bills of Operations, v\u00fdrobn\u00ed zdroje a provozn\u00ed doby.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed se str\u00e1nkov\u00e1n\u00edm, filtry a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed a p\u0159echod\u016f mezi operacemi, n\u00e1stroje, po\u010dty obsluhuj\u00edc\u00edch pracovn\u00edk\u016f pro jednotliv\u00e9 operace a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Vol\u00e1n\u00ed MAINTAIN_BUNDLE_V2 spou\u0161t\u011bn\u00e1 webhooky ze SkyPlanner, p\u0159\u00edpadn\u011b i potvrzov\u00e1n\u00ed v\u00fdrobn\u00edch d\u00e1vek, pokud tuto mo\u017enost zvol\u00edte.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Pou\u017e\u00edvejte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovn\u00e1vejte term\u00edny a opravujte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-sap-bydesign-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci se SAP ByDesign<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jedno datum na vol\u00e1n\u00ed.<\/strong> &#8222;The EarliestStartPeriod and the LatestEndPeriod cannot be updated together.&#8220; (EarliestStartPeriod a LatestEndPeriod nelze aktualizovat sou\u010dasn\u011b.) P\u0159i zp\u011btn\u00e9m z\u00e1pisu pou\u017e\u00edvejte jako v\u00fdchoz\u00ed bod datum zah\u00e1jen\u00ed.<\/li>\n\n\n<li><strong>Bez zamyk\u00e1n\u00ed.<\/strong> Slu\u017eby A2X jsou bezstavov\u00e9, tak\u017ee podle SAP nelze vynutit transak\u010dn\u00ed ani logick\u00e9 zamyk\u00e1n\u00ed. P\u0159ed ka\u017ed\u00fdm z\u00e1pisem zak\u00e1zku znovu na\u010dt\u011bte a o\u0161et\u0159ete konflikty.<\/li>\n\n\n<li><strong>Dokon\u010den\u00ed je nevratn\u00e9.<\/strong> &#8222;Confirmation Finished Indicator cannot be unchecked once it is set.&#8220; (Jakmile je p\u0159\u00edznak Confirmation Finished Indicator nastaven, nelze jeho za\u0161krtnut\u00ed zru\u0161it.) Dokon\u010den\u00ed zapisujte a\u017e ve chv\u00edli, kdy oper\u00e1tor \u00fakol uzav\u0159e.<\/li>\n\n\n<li><strong>Hlavn\u00ed a dopl\u0148kov\u00e9 v\u00fdrobn\u00ed zdroje.<\/strong> ByDesign p\u0159i pl\u00e1nov\u00e1n\u00ed zohled\u0148uje hlavn\u00ed zdroje. Oper\u00e1tory a n\u00e1stroje veden\u00e9 jako dopl\u0148kov\u00e9 zdroje nastavte ve SkyPlanner jako zdroje s omezenou kapacitou, aby pl\u00e1n kontroloval i jejich dostupnost.<\/li>\n\n\n<li><strong>P\u0159\u00edprava a ukon\u010den\u00ed pr\u00e1ce.<\/strong> V Bills of Operations jsou p\u0159\u00edprava a ukon\u010den\u00ed pr\u00e1ce vedeny jako \u010dinnosti. \u010casy p\u0159etypov\u00e1n\u00ed z\u00e1visl\u00e9 na po\u0159ad\u00ed operac\u00ed p\u0159eneste do matice se\u0159izovac\u00edch \u010das\u016f.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-sap-bydesign-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci se SAP ByDesign a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed p\u0159i zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to v rozsahu dohodnut\u00fdch webov\u00fdch slu\u017eeb a dotaz\u016f OData. Ka\u017ed\u00e1 firma pou\u017e\u00edv\u00e1 ByDesign jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed integrace se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro SAP ByDesign.<\/strong> Zn\u00e1 v\u00e1\u0161 tenant, vymezen\u00ed rozsahu i roz\u0161\u00ed\u0159en\u00ed a m\u016f\u017ee spole\u010dn\u011b s t\u00fdmem SkyPlanner nastavit komunika\u010dn\u00ed ujedn\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Integraci mohou d\u00e1le rozv\u00edjet i va\u0161i v\u00fdvoj\u00e1\u0159i<\/strong> prost\u0159ednictv\u00edm REST API syst\u00e9mu SkyPlanner s API tokenem v hlavi\u010dce <code>Authorization-Token<\/code>. T\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku integrace dostanete p\u0159edem spole\u010dn\u011b s nab\u00eddkou tarifu, podle va\u0161ich proces\u016f a pot\u0159eb. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/sap-business-bydesign\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro SAP ByDesign<\/a>, <a href=\"\/cs\/integrace\/erp\/sap-business-bydesign\/\">str\u00e1nku SAP Business ByDesign<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>. Pro dal\u0161\u00ed syst\u00e9my SAP jsou k dispozici samostatn\u00e9 pr\u016fvodce: <a href=\"\/cs\/integrace\/erp\/sap-business-one\/\">SAP Business One<\/a> a <a href=\"\/cs\/integrace\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Objednat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale pro v\u00fdrobu rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme v pl\u00e1nov\u00e1n\u00ed v\u00fdroby p\u0159e\u0161li od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby u\u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>v\u010dasnost dod\u00e1vek od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u00e1ch a p\u0159in\u00e1\u0161\u00ed do pl\u00e1nov\u00e1n\u00ed p\u0159edv\u00eddatelnost.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Od roku 2021, kdy za\u010dali SkyPlanner pou\u017e\u00edvat, dosahuje v\u010dasnost dod\u00e1vek po celou dobu 100 %.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>M\u00e9n\u011b<\/b><span>prostoj\u016f kv\u016fli nedostatku materi\u00e1lu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eP\u0159\u00ednos SkyPlanner pro n\u00e1s spo\u010d\u00edv\u00e1 v tom, \u017ee je to n\u00e1stroj, kter\u00fd funguje v ka\u017edodenn\u00ed praxi, zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/b><br>Eskomatic \u00b7 Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Automatick\u00e9 pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed p\u0159in\u00e1\u0161\u00ed p\u0159esn\u011bj\u0161\u00ed term\u00edny dod\u00e1n\u00ed a v\u00fdrazn\u011b ubylo v\u00fdrobn\u00edch prostoj\u016f zp\u016fsoben\u00fdch nedostatkem materi\u00e1lu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kter\u00e1 API syst\u00e9mu SAP ByDesign SkyPlanner pou\u017e\u00edv\u00e1?<\/summary>\n<p class=\"sp-faq__a\">Pou\u017e\u00edv\u00e1 zve\u0159ejn\u011bn\u00e9 webov\u00e9 slu\u017eby A2X od SAP. Pro \u010dten\u00ed slou\u017e\u00ed slu\u017eby Query, nap\u0159\u00edklad Query Production Orders a Query Purchase Orders, nebo vlastn\u00ed OData. Pro z\u00e1pis se pou\u017e\u00edvaj\u00ed Manage Production Orders a Manage Production Lots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Co SkyPlanner zapisuje zp\u011bt do ByDesign?<\/summary>\n<p class=\"sp-faq__a\">U ka\u017ed\u00e9 v\u00fdrobn\u00ed zak\u00e1zky zapisuje EarliestStartPeriod a MainResourceID operace. Pokud tuto mo\u017enost zvol\u00edte, do v\u00fdrobn\u00ed d\u00e1vky se zapisuj\u00ed i potvrzen\u00e1 mno\u017estv\u00ed, zmetky a dokon\u010den\u00e9 \u00fakoly.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pos\u00edl\u00e1 ByDesign ud\u00e1losti do SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner se ka\u017ed\u00fdch n\u011bkolik minut dotazuje slu\u017eeb Query v ByDesign na zak\u00e1zky a v\u00fdrobn\u00ed d\u00e1vky. S\u00e1m SkyPlanner p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b pl\u00e1nu odes\u00edl\u00e1 webhooky, kter\u00e9 spou\u0161t\u011bj\u00ed zp\u011btn\u00fd z\u00e1pis.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se SkyPlanner autentizuje v\u016f\u010di ByDesign?<\/summary>\n<p class=\"sp-faq__a\">Prost\u0159ednictv\u00edm komunika\u010dn\u00edho syst\u00e9mu a komunika\u010dn\u00edho ujedn\u00e1n\u00ed s technick\u00fdm u\u017eivatelem, jak popisuje bezpe\u010dnostn\u00ed p\u0159\u00edru\u010dka SAP. Vlastn\u00ed API syst\u00e9mu SkyPlanner pou\u017e\u00edv\u00e1 API token v hlavi\u010dce <code>Authorization-Token<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>P\u0159en\u00e1\u0161ej\u00ed se do SkyPlanner n\u00e1vrhy v\u00fdroby?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner pl\u00e1nuje uvoln\u011bn\u00e9 v\u00fdrobn\u00ed zak\u00e1zky. N\u00e1vrhy z\u016fst\u00e1vaj\u00ed v ByDesign Supply Planning, dokud se z nich nestanou v\u00fdrobn\u00ed zak\u00e1zky.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdo integraci realizuje?<\/summary>\n<p class=\"sp-faq__a\">T\u00fdm SkyPlanner ji nastav\u00ed p\u0159i zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Na integraci m\u016f\u017ee pracovat tak\u00e9 v\u00e1\u0161 partner pro SAP ByDesign nebo va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i prost\u0159ednictv\u00edm REST API syst\u00e9mu SkyPlanner s API tokenem.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ SAP Business ByDesign Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed SAP Business ByDesign ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ByDesign se SkyPlanner APS. SkyPlanner se s ByDesign integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm ofici\u00e1ln\u011b vydan\u00fdch webov\u00fdch slu\u017eeb SAP: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106579,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107741","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP Business ByDesign: integrace APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/pruvodce-integraci\\\/\",\"name\":\"SAP Business ByDesign: integrace APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro SAP Business ByDesign: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s ohledem na skute\u010dn\u00e9 kapacity\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-business-bydesign\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP Business ByDesign: integrace APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","description":"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/","name":"SAP Business ByDesign: integrace APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte SAP Business ByDesign se SkyPlanner APS: webov\u00e9 slu\u017eby A2X, OData, mapov\u00e1n\u00ed dat a zp\u011btn\u00fd z\u00e1pis p\u0159es Manage Production Orders a Manage Production Lots.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro SAP Business ByDesign: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s ohledem na skute\u010dn\u00e9 kapacity","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-business-bydesign\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ SAP Business ByDesign Pr\u016fvodce integrac\u00ed SAP Business ByDesign pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed SAP Business ByDesign ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ByDesign se SkyPlanner APS. SkyPlanner se s ByDesign integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm ofici\u00e1ln\u011b vydan\u00fdch webov\u00fdch slu\u017eeb SAP: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107741"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107741\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106579"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}