{"id":107683,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed DELMIAWorks <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed DELMIAWorks ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit DELMIAWorks, d\u0159\u00edve IQMS, se SkyPlanner APS. SkyPlanner se s DELMIAWorks propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm DELMIAWorks WebAPI:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy, v\u00fdrobn\u00ed kusovn\u00edky s operacemi d\u00edl\u016f, pracovi\u0161t\u011b, n\u00e1stroje a formy, skladov\u00e9 polo\u017eky, stavy z\u00e1sob a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Do v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se zp\u011bt zapisuj\u00ed pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed a p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b.<\/li>\n\n\n<li>Dobr\u00e9 kusy lze vykazovat jako v\u00fdrobn\u00ed z\u00e1znamy a \u010dasy se\u0159\u00edzen\u00ed a v\u00fdroby jako pr\u00e1ci na \u00fakolech v Time &amp; Attendance.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci p\u0159es REST API podle va\u0161\u00ed konfigurace DELMIAWorks a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vyv\u00edjet \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Dokumentace DELMIAWorks uv\u00e1d\u00ed: &#8222;WebAPI includes both the API SDK for GRAPHQL APIs and WebAPI SDK for REST APIs&#8220; (WebAPI zahrnuje API SDK pro GRAPHQL API i WebAPI SDK pro REST API; <a href=\"https:\/\/www.3ds.com\/assets\/invest\/2022-03\/delmiaworks-webapi-graphql-rest-api-datasheet.pdf\">technick\u00fd list WebAPI<\/a>). Rozhran\u00ed REST je \u010dlen\u011bno do modul\u016f a kontroler\u016f. Pro integraci pl\u00e1nov\u00e1n\u00ed se pou\u017e\u00edvaj\u00ed tyto:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manufacturing WorkOrders:<\/strong> WorkOrder, WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders, CreateWorkOrder, UpdateWorkOrder, UpdateWorkOrderEx, WorkOrderReleases, InventoryItemsForWorkOrder, SalesOrdersForWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Schedule:<\/strong> RunAutoLoad, RemoveFromSchedule, NextSetup, GetSetupTemplateChecklists.<\/li>\n\n\n<li><strong>Manufacturing WorkCenters:<\/strong> WorkCenter, WorkCenters, WorkCenterDetails, RunningWorkOrder, PMEquipment.<\/li>\n\n\n<li><strong>Manufacturing BOM:<\/strong> BillOfMaterials, BomLabor, PartOperations, StandardOperations, BOMComponents.<\/li>\n\n\n<li><strong>Manufacturing Inventory:<\/strong> InventoryItems, AddProductionRecords, InventoryProductionReportsByWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Realtime:<\/strong> GetWorkCenterSchedule, ActualCavity, GetSetupTime, RealTimeData.<\/li>\n\n\n<li><strong>Manufacturing Downtime:<\/strong> AddDownTime, CloseDownTime.<\/li>\n\n\n<li><strong>PO Receiving:<\/strong> POs, POLineItems, POReleaseItems, POReceipts.<\/li>\n\n\n<li><strong>Time &amp; Attendance:<\/strong> TimeClock (LogInOut, TaskClockLogin), Tasks (ClockInTATask, ClockOutTATask, UpdateGoodParts), EmployeeCalendar.<\/li>\n\n<\/ul>\n\n\n<p>GraphQL SDK se hod\u00ed pro hromadn\u00e9 \u010dten\u00ed, nap\u0159\u00edklad p\u0159i po\u010d\u00e1te\u010dn\u00edm na\u010dten\u00ed polo\u017eek a kusovn\u00edk\u016f. Ve\u0161ker\u00fd z\u00e1pis prob\u00edh\u00e1 p\u0159es kontrolery REST.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a licence<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>V DELMIAWorks vytvo\u0159te vyhrazen\u00fd u\u017eivatelsk\u00fd \u00fa\u010det pro integraci a ov\u011b\u0159te, \u017ee m\u00e1te pro sv\u00e9 prost\u0159ed\u00ed licenci WebAPI a \u017ee je WebAPI nainstalov\u00e1no. Modul Realtime zp\u0159\u00edstup\u0148uje kontroler AuthToken. Relace WebAPI se otev\u00edr\u00e1 pomoc\u00ed p\u0159ihla\u0161ovac\u00edch \u00fadaj\u016f integra\u010dn\u00edho \u00fa\u010dtu. P\u0159esn\u00e9 nastaven\u00ed pro va\u0161i verzi v\u00e1m potvrd\u00ed partner DELMIAWorks.<\/p>\n\n\n<p>Na stran\u011b SkyPlanner obsahuje ka\u017ed\u00e9 vol\u00e1n\u00ed token API v hlavi\u010dce <code>Authorization-Token<\/code>. Token vytvo\u0159\u00edte ve SkyPlanner v nab\u00eddce Settings &gt; API. K zah\u00e1jen\u00ed v\u00fdvoje sta\u010d\u00ed token API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b pl\u00e1nu, tak\u017ee se zm\u011bny pr\u016fb\u011b\u017en\u011b zapisuj\u00ed zp\u011bt do DELMIAWorks.<\/p>\n\n\n<p>Zm\u011bny v DELMIAWorks zji\u0161\u0165ujte pravideln\u00fdmi dotazy na WebAPI. ScheduledWorkOrders a UnscheduledWorkOrders na\u010d\u00edtejte ka\u017ed\u00fdch n\u011bkolik minut, n\u00e1kupn\u00ed objedn\u00e1vky a skladov\u00e9 polo\u017eky v del\u0161\u00edch intervalech. IQAlert, n\u00e1stroj pro upozorn\u011bn\u00ed a akce v DELMIAWorks, m\u016f\u017ee v r\u00e1mci partnersk\u00e9ho projektu spou\u0161t\u011bt akce na z\u00e1klad\u011b ud\u00e1lost\u00ed.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt DELMIAWorks (rozhran\u00ed)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Skladov\u00e9 polo\u017eky (InventoryItems)<\/td><td>Produkty a materi\u00e1ly<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>V\u00fdrobn\u00ed kusovn\u00edk, komponenty kusovn\u00edku (BillOfMaterials, BOMComponents)<\/td><td>Struktura v\u00fdrobku, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Operace d\u00edl\u016f, standardn\u00ed operace, pracnost z kusovn\u00edku (PartOperations, BomLabor)<\/td><td>V\u00fdrobn\u00ed operace s dobou trv\u00e1n\u00ed, \u010dasy se\u0159\u00edzen\u00ed a po\u010dty oper\u00e1tor\u016f<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Pracovi\u0161t\u011b: lisy, extrud\u00e9ry, v\u00fdrobn\u00ed bu\u0148ky (WorkCenters, WorkCenterDetails)<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, efektivita<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>N\u00e1stroje a formy, sdru\u017een\u00e9 formy, dutiny (BOM, ActualCavity)<\/td><td>N\u00e1stroje jako kapacitn\u011b omezen\u00e9 zdroje, mno\u017estv\u00ed na cyklus<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Shop Calendar, kalend\u00e1\u0159 zam\u011bstnanc\u016f (EmployeeCalendar)<\/td><td>Sm\u011bny, pracovn\u00edci, nep\u0159\u00edtomnosti<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo spr\u00e1va sm\u011bn p\u0159\u00edmo ve SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy a d\u00edl\u010d\u00ed uvoln\u011bn\u00ed (WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders)<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a po\u017eadavky na materi\u00e1l<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Mno\u017estv\u00ed na sklad\u011b podle polo\u017eek (InventoryItems)<\/td><td>Stavy z\u00e1sob<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>N\u00e1kupn\u00ed objedn\u00e1vky a d\u00edl\u010d\u00ed odvol\u00e1vky (POs, POReleaseItems)<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu, pracovi\u0161t\u011b (kontroler Manufacturing WorkOrders)<\/td><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>P\u0159i zm\u011bn\u011b pl\u00e1nu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00ed z\u00e1znamy: dobr\u00e9 kusy na v\u00fdrobn\u00ed p\u0159\u00edkaz (AddProductionRecords)<\/td><td>Dokon\u010den\u00e1 mno\u017estv\u00ed z potvrzen\u00ed v\u00fdroby<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed, pokud je tato mo\u017enost zvolena<\/td><\/tr><tr><td>Pr\u00e1ce na \u00fakolech (ClockInTATask, ClockOutTATask)<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud je tato mo\u017enost zvolena<\/td><\/tr><tr><td>Nen\u00ed v DELMIAWorks<\/td><td>Matice \u010das\u016f se\u0159\u00edzen\u00ed, alternativn\u00ed lisy a pracovn\u00edci<\/td><td>Spravov\u00e1no ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Postupy integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte skladov\u00e9 polo\u017eky, kusovn\u00edky, operace d\u00edl\u016f, pracovi\u0161t\u011b a formy. Mapov\u00e1n\u00ed pracovi\u0161\u0165 pe\u010dliv\u011b promyslete: ka\u017ed\u00fd lis p\u0159edstavuje jedno pracovi\u0161t\u011b a lisy pro stejnou velikost formy tvo\u0159\u00ed skupinu pracovi\u0161\u0165 se vz\u00e1jemn\u011b zastupiteln\u00fdmi alternativami.<\/p>\n\n\n<p><strong>2. Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed a materi\u00e1lu a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd polymer a vlo\u017eky za dostupn\u00e9 k term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje stav z\u00e1sob, jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune v\u00fdrobn\u00ed p\u0159\u00edkaz, webhook SkyPlanner vyvol\u00e1 aktualizaci p\u0159\u00edkazu p\u0159es kontroler Manufacturing WorkOrders. P\u0159en\u00e1\u0161\u00ed pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed a pracovi\u0161t\u011b, kter\u00e9 SkyPlanner vybral. Konkr\u00e9tn\u00ed pole i zp\u016fsob, jak\u00fdm je bude zohled\u0148ovat tabule Finite Schedule, se stanov\u00ed p\u0159i vymezen\u00ed rozsahu b\u011bhem zav\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed v\u00fdroby v provozu.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed pl\u00e1n aktu\u00e1ln\u00ed. Sami ur\u010d\u00edte, zda se skute\u010dn\u00e9 \u00fadaje budou zapisovat zp\u011bt. Pokud ano, dobr\u00e9 kusy se zapisuj\u00ed p\u0159es AddProductionRecords a odveden\u00e1 pr\u00e1ce pomoc\u00ed vol\u00e1n\u00ed API pro \u00fakoly v Time &amp; Attendance. Pokud ne, RealTime a Shopworks d\u00e1l zaji\u0161\u0165uj\u00ed vykazov\u00e1n\u00ed jako dosud a SkyPlanner na\u010d\u00edt\u00e1 pr\u016fb\u011bh v\u00fdroby z DELMIAWorks.<\/p>\n\n\n<p><strong>5. Pravidla spr\u00e1vy dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, kusovn\u00edky, \u010dasy cykl\u016f, dutiny, mno\u017estv\u00ed a stav v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/td><td>DELMIAWorks<\/td><\/tr><tr><td>Po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed lis\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f se\u0159\u00edzen\u00ed, po\u017eadavky na formy a oper\u00e1tory, alternativn\u00ed lisy<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>V\u00fdroba, zmetky, pr\u00e1ce a v\u00fddeje materi\u00e1lu<\/td><td>DELMIAWorks, s vykazov\u00e1n\u00edm p\u0159\u00edmo v n\u011bm nebo z\u00e1pisem z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jedin\u00fd syst\u00e9m, kter\u00fd bude zapisovat term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f. Pro pracovi\u0161t\u011b pl\u00e1novan\u00e1 ve SkyPlanner vypn\u011bte Auto Load, v\u010detn\u011b v\u0161ech akc\u00ed IQAlert, kter\u00e9 spou\u0161t\u011bj\u00ed Update Schedule a Auto Load. Pro uzam\u010den\u00ed kr\u00e1tkodob\u00e9ho pl\u00e1nu na t\u011bchto pracovi\u0161t\u00edch pou\u017eijte Running Time Lock ve SkyPlanner m\u00edsto \u010dasov\u00e9 hranice v DELMIAWorks.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od za\u010d\u00e1tku zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te pl\u00e1n v r\u00e1mci 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed s pracovi\u0161ti, kusovn\u00edky a otev\u0159en\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy exportovan\u00fdmi z DELMIAWorks do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla vlastnictv\u00ed dat, \u010detnost synchronizace a to, zda se budou zp\u011btn\u011b zapisovat \u00fadaje o v\u00fdrob\u011b a pr\u00e1ci.<\/li>\n\n\n<li><strong>P\u0159\u00edstup k DELMIAWorks.<\/strong> Vytvo\u0159te u\u017eivatelsk\u00fd \u00fa\u010det pro integraci a ov\u011b\u0159te licenci WebAPI. Nejprve v\u0161e vyzkou\u0161ejte v testovac\u00ed datab\u00e1zi.<\/li>\n\n\n<li><strong>Prvotn\u00ed na\u010dten\u00ed.<\/strong> Polo\u017eky, kusovn\u00edky, operace d\u00edl\u016f, pracovi\u0161t\u011b, formy a kalend\u00e1\u0159e.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed s filtry a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch pokus\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v SkyPlanner.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed, formy jako n\u00e1stroje, po\u010dty obsluhuj\u00edc\u00edch pracovn\u00edk\u016f pro jednotliv\u00e9 operace, alternativn\u00ed lisy a pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Aktualizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f na z\u00e1klad\u011b webhook\u016f SkyPlanner a voliteln\u011b tak\u00e9 z\u00e1pis \u00fadaj\u016f o v\u00fdrob\u011b a pr\u00e1ci.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00e9 testov\u00e1n\u00ed.<\/strong> Provozujte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm Finite Schedule, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Na pl\u00e1novan\u00fdch pracovi\u0161t\u00edch vypn\u011bte Auto Load a zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-delmiaworks-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sdru\u017een\u00e9 formy.<\/strong> Jedna forma vyr\u00e1b\u00ed v jednom cyklu n\u011bkolik r\u016fzn\u00fdch polo\u017eek. V\u00fdrobu ve sdru\u017een\u00e9 form\u011b modelujte jako jednu operaci, kter\u00e1 vyr\u00e1b\u00ed v\u0161echny jej\u00ed polo\u017eky, aby se kapacita formy rezervovala jen jednou.<\/li>\n\n\n<li><strong>Dutiny formy.<\/strong> P\u0159i zaslepen\u00ed dutiny se skute\u010dn\u00fd po\u010det dutin m\u016f\u017ee li\u0161it od standardn\u00edho. Rozhodn\u011bte, zda se doby v\u00fdroby budou po\u010d\u00edtat podle standardn\u00edho po\u010dtu, nebo podle hodnoty ActualCavity z RealTime.<\/li>\n\n\n<li><strong>Kompatibilita forem a lis\u016f.<\/strong> Ne ka\u017edou formu lze pou\u017e\u00edt v ka\u017ed\u00e9m lisu. Pro ka\u017edou formu nastavte v SkyPlanner povolen\u00e9 lisy jako alternativy, aby se operace p\u0159esouvaly pouze na vhodn\u00e9 lisy.<\/li>\n\n\n<li><strong>Zm\u011bny barvy a materi\u00e1lu.<\/strong> Do matice \u010das\u016f se\u0159\u00edzen\u00ed zadejte skute\u010dn\u00e9 \u010dasy proplachu a v\u00fdm\u011bny formy pro oba sm\u011bry zm\u011bny. Nap\u0159\u00edklad p\u0159echod z modr\u00e9 na \u010dervenou m\u016f\u017ee trvat 30 minut a z \u010derven\u00e9 na modrou 60.<\/li>\n\n\n<li><strong>Auto Load a \u010dasov\u00e9 hranice pl\u00e1nov\u00e1n\u00ed.<\/strong> Dva pl\u00e1novac\u00ed syst\u00e9my, kter\u00e9 zapisuj\u00ed term\u00edny, si je budou navz\u00e1jem p\u0159episovat. P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu vypn\u011bte ob\u011b funkce pro pracovi\u0161t\u011b pl\u00e1novan\u00e1 v SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-delmiaworks-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje a podporuje integraci s DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to v rozsahu dohodnut\u00fdch kontroler\u016f WebAPI. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 DELMIAWorks jinak a pr\u00e1v\u011b p\u0159i tomto nastaven\u00ed se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro DELMIAWorks.<\/strong> Zn\u00e1 va\u0161i verzi, vlastn\u00ed pole i licence a ve spolupr\u00e1ci s t\u00fdmem SkyPlanner m\u016f\u017ee nastavit u\u017eivatelsk\u00fd \u00fa\u010det pro integraci a WebAPI.<\/li>\n\n\n<li><strong>Na integraci mohou d\u00e1le pracovat i va\u0161i v\u00fdvoj\u00e1\u0159i.<\/strong> Vyu\u017eij\u00ed REST API syst\u00e9mu SkyPlanner s API tokenem v hlavi\u010dce <code>Authorization-Token<\/code>. T\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrac\u00ed SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku na integraci dostanete p\u0159edem spole\u010dn\u011b s nab\u00eddkou tarifu, podle va\u0161ich proces\u016f a pot\u0159eb. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/delmiaworks\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro DELMIAWorks<\/a>, <a href=\"\/cs\/integrace\/erp\/delmiaworks\/\">str\u00e1nku DELMIAWorks<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobci hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, ve v\u00fdrob\u011b rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Sv\u00e1\u0159e\u010d KJH-Comp brous\u00ed sva\u0159enou ocelovou konstrukci v z\u00e1vod\u011b Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>v\u010dasnost dod\u00e1vek oproti p\u016fvodn\u00edm p\u0159ibli\u017en\u011b 50 %<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner hraje rozhoduj\u00edc\u00ed roli v tom, \u017ee dok\u00e1\u017eeme dod\u00e1vat v\u010das.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd \u0159editel<\/b><br>KJH-Comp \u00b7 Zpracov\u00e1n\u00ed plech\u016f a zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % a pl\u00e1nov\u00e1n\u00ed nyn\u00ed zvl\u00e1dne jeden vedouc\u00ed m\u00edsto dvou.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010d\u00edst hodnocen\u00ed KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchodn\u00edci volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner vytv\u00e1\u0159\u00ed spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu a na po\u017eadavky na zm\u011bnu pl\u00e1nu nyn\u00ed dost\u00e1vaj\u00ed odpov\u011b\u010f b\u011bhem sekund, zat\u00edmco d\u0159\u00edve jejich vy\u0159\u00edzen\u00ed trvalo hodinu i d\u00e9le.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kter\u00e9 API syst\u00e9mu DELMIAWorks SkyPlanner pou\u017e\u00edv\u00e1?<\/summary>\n<p class=\"sp-faq__a\">DELMIAWorks WebAPI. SkyPlanner \u010dte data p\u0159es kontrolery REST, pro hromadn\u00e9 \u010dten\u00ed p\u0159\u00edpadn\u011b p\u0159es GraphQL SDK. Zp\u011btn\u00fd z\u00e1pis prob\u00edh\u00e1 p\u0159es kontrolery REST: aktualizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f p\u0159es kontroler WorkOrders, d\u00e1le p\u0159es AddProductionRecords a vol\u00e1n\u00ed \u00faloh Time &amp; Attendance.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Co SkyPlanner zapisuje zp\u011bt do DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">Pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed a p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b pro ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz. Pokud si tuto mo\u017enost zvol\u00edte, zapisuj\u00ed se tak\u00e9 vyhovuj\u00edc\u00ed kusy jako v\u00fdrobn\u00ed z\u00e1znamy a \u010dasy se\u0159\u00edzen\u00ed a v\u00fdroby jako odpracovan\u00fd \u010das na \u00faloh\u00e1ch.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje integrace i s IQMS EnterpriseIQ?<\/summary>\n<p class=\"sp-faq__a\">DELMIAWorks je sou\u010dasn\u00fd n\u00e1zev syst\u00e9mu IQMS EnterpriseIQ. Integrace vyu\u017e\u00edv\u00e1 WebAPI, tak\u017ee rozhoduj\u00edc\u00ed je, zda je ve va\u0161\u00ed verzi WebAPI nainstalovan\u00e9 a licencovan\u00e9. V\u00e1\u0161 partner to ov\u011b\u0159\u00ed p\u0159i vymezen\u00ed rozsahu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pracuje s formami a sdru\u017een\u00fdmi formami?<\/summary>\n<p class=\"sp-faq__a\">Formy se v SkyPlanner nastav\u00ed jako n\u00e1stroje s omezenou kapacitou, tak\u017ee jedna forma nikdy nen\u00ed ve dvou lisech sou\u010dasn\u011b. V\u0161echny v\u00fdrobky ze sdru\u017een\u00e9 formy se vyr\u00e1b\u011bj\u00ed v r\u00e1mci jedn\u00e9 operace. Povolen\u00e9 lisy pro jednotliv\u00e9 formy se nastav\u00ed jako alternativy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Co se stane s funkc\u00ed Auto Load?<\/summary>\n<p class=\"sp-faq__a\">Pro pracovi\u0161t\u011b pl\u00e1novan\u00e1 v SkyPlanner ji vypn\u011bte, v\u010detn\u011b akc\u00ed IQAlert, kter\u00e9 ji spou\u0161t\u011bj\u00ed. SkyPlanner bude na t\u011bchto pracovi\u0161t\u00edch jedin\u00fdm syst\u00e9mem, kter\u00fd zapisuje term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdo integraci realizuje?<\/summary>\n<p class=\"sp-faq__a\">T\u00fdm SkyPlanner ji nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. V\u00e1\u0161 partner pro DELMIAWorks nebo va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou integraci tak\u00e9 rozv\u00edjet p\u0159es REST API syst\u00e9mu SkyPlanner s pou\u017eit\u00edm API tokenu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ DELMIAWorks Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed DELMIAWorks ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit DELMIAWorks, d\u0159\u00edve IQMS, se SkyPlanner APS. SkyPlanner se s DELMIAWorks propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm DELMIAWorks WebAPI: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci p\u0159es REST API podle va\u0161\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106550,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107683","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrace DELMIAWorks s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/pruvodce-integraci\\\/\",\"name\":\"Integrace DELMIAWorks s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro DELMIAWorks (IQMS): pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/delmiaworks\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrace DELMIAWorks s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","description":"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"13 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/","name":"Integrace DELMIAWorks s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte DELMIAWorks (IQMS) se SkyPlanner APS: WebAPI REST a GraphQL, zp\u011btn\u00fd z\u00e1pis WorkOrders, vykazov\u00e1n\u00ed v\u00fdroby a pr\u00e1ce, mapov\u00e1n\u00ed dat.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro DELMIAWorks (IQMS): pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/delmiaworks\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ DELMIAWorks Pr\u016fvodce integrac\u00ed DELMIAWorks pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed DELMIAWorks ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit DELMIAWorks, d\u0159\u00edve IQMS, se SkyPlanner APS. SkyPlanner se s DELMIAWorks propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm DELMIAWorks WebAPI: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci p\u0159es REST API podle va\u0161\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107683"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107683\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106550"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}