{"id":107567,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/senior-erp\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Senior ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Senior ERP <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Senior ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Senior ERP od Senior Sistemas (Gest\u00e3o Empresarial | ERP XT se Senior X) se SkyPlanner APS. SkyPlanner se se Senior ERP propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Senior:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se na\u010d\u00edtaj\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy (OP) v\u010detn\u011b f\u00e1z\u00ed, technologick\u00fdch postup\u016f (roteiros), v\u00fdrobn\u00edch zdroj\u016f a st\u0159edisek zdroj\u016f, d\u00e1le SKU, struktury v\u00fdrobk\u016f, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Zp\u011bt do OP se zapisuje pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9 f\u00e1ze i v\u00fdrobn\u00ed zdroj, kter\u00fd pro ni byl vybr\u00e1n.<\/li>\n\n\n<li>Pokud se tak rozhodnete, \u010dasov\u00e9 z\u00e1znamy oper\u00e1tor\u016f se zapisuj\u00ed zp\u011bt jako hl\u00e1\u0161en\u00ed v\u00fdroby (apontamentos de produ\u00e7\u00e3o).<\/li>\n\n\n<li>Senior X Events Hub informuje SkyPlanner o zm\u011bn\u011b stavu f\u00e1ze OP a webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu hned, jak nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace Senior ERP a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu pro ni zaji\u0161\u0165uje podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vytvo\u0159it \u0159e\u0161en\u00ed vyu\u017e\u00edvaj\u00edc\u00ed zdokumentovan\u00e9 REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"senior-erp-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed Senior ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ERP XT je hybridn\u00ed syst\u00e9m. Dokumentace spole\u010dnosti Senior uv\u00e1d\u00ed, \u017ee Gest\u00e3o Empresarial XT &#8222;becomes a hybrid system: an on-premises (local) system with integration of cloud solutions&#8220; (st\u00e1v\u00e1 se hybridn\u00edm syst\u00e9mem: lok\u00e1ln\u00edm syst\u00e9mem s integrac\u00ed cloudov\u00fdch \u0159e\u0161en\u00ed) (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/xtended.htm\">dokumentace Senior, v p\u0159ekladu<\/a>). Syst\u00e9m pro rozvrhov\u00e1n\u00ed vyu\u017e\u00edv\u00e1 t\u0159i rozhran\u00ed Senior:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Webov\u00e9 slu\u017eby G5 (SOAP).<\/strong> B\u011b\u017e\u00ed na va\u0161em serveru Senior a jsou pojmenovan\u00e9 podle modulu (com.senior.g5.co.&lt;module&gt;&#8230;). Ka\u017ed\u00e1 je dostupn\u00e1 ve t\u0159ech variant\u00e1ch WSDL: sapiens_Sync, sapiens_Async a sapiens_Scheduled. Mezi slu\u017eby pro v\u00fdrobu pat\u0159\u00ed <strong>com.senior.g5.co.mpr.pcp.ordemproducao<\/strong>, kter\u00e1 &#8222;calls the same production order generation routine&#8220; (vol\u00e1 stejnou rutinu pro generov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f) jako obrazovka ERP (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/webservices\/com_senior_g5_co_mpr_pcp_ordemproducao.htm\">dokumentace Senior, v p\u0159ekladu<\/a>), d\u00e1le slu\u017eby pro produkty (com.senior.g5.co.ger.cad.produto) a hl\u00e1\u0161en\u00ed v\u00fdroby.<\/li>\n\n\n<li><strong>REST API Senior X Platform<\/strong> na adrese api.senior.com.br zp\u0159\u00edstup\u0148uj\u00ed oblasti ERP, kter\u00e9 Senior nab\u00edz\u00ed v Senior X, nap\u0159\u00edklad produkty a prodejn\u00ed objedn\u00e1vky (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/mercado\/vendas\/integracao-pedido-venda-api.htm\">dokumentace Senior<\/a>).<\/li>\n\n\n<li><strong>Webhooky Events Hub.<\/strong> Vytv\u00e1\u0159ej\u00ed se v Senior X v nab\u00eddce Tecnologia &gt; Customiza\u00e7\u00e3o &gt; Events Hub &gt; Webhooks. P\u0159i zm\u011bn\u011b stavu f\u00e1ze OP publikuje modul Manufacturing ud\u00e1lost <strong>erp_man\/pcp_programacaocontrole\/orderProductionStageChangeStatus<\/strong> (<a href=\"https:\/\/documentacao.senior.com.br\/fabrica-ao-vivo-x\/manual-do-usuario\/fabrica-ao-vivo-x\/cadastros\/\">dokumentace Senior<\/a>).<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a p\u0159\u00edstup<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Senior X Platform.<\/strong> Integrace se p\u0159ihla\u0161uje po\u017eadavkem POST na platform.senior.com.br p\u0159es cestu \/t\/senior.com.br\/bridge\/1.0\/rest\/platform\/authentication\/actions\/Login s u\u017eivatelem ve form\u00e1tu user@tenant. Odpov\u011b\u010f obsahuje p\u0159\u00edstupov\u00fd token Bearer a obnovovac\u00ed token. Pro p\u0159ihl\u00e1\u0161en\u00ed pomoc\u00ed aplika\u010dn\u00edch kl\u00ed\u010d\u016f lze pou\u017e\u00edt loginWithKey (p\u0159\u00edstupov\u00fd kl\u00ed\u010d, tajn\u00fd kl\u00ed\u010d, tenant). Vol\u00e1n\u00ed REST obsahuj\u00ed hlavi\u010dku authorization a hlavi\u010dku client_id. Ta identifikuje p\u0159ipojuj\u00edc\u00ed se aplikaci, kter\u00e1 je registrovan\u00e1 na port\u00e1lu Senior API a propojen\u00e1 s rol\u00ed v ERP.<\/li>\n\n\n<li><strong>Webov\u00e9 slu\u017eby G5.<\/strong> Vol\u00e1n\u00ed obsahuj\u00ed parametry pro u\u017eivatele, heslo a \u0161ifrov\u00e1n\u00ed. P\u0159i pou\u017eit\u00ed tokenu Senior X nahrazuje token heslo (<a href=\"https:\/\/documentacao.senior.com.br\/tecnologia-senior-x\/manual-do-usuario\/integracoes\/web-services.htm\">dokumentace Senior<\/a>).<\/li>\n\n\n<li><strong>Opr\u00e1vn\u011bn\u00ed.<\/strong> Vytvo\u0159te v Senior samostatn\u00e9ho u\u017eivatele pro integraci s p\u0159\u00edstupem k dat\u016fm PCP, technick\u00e9 p\u0159\u00edpravy v\u00fdroby, skladu a n\u00e1kupu, kter\u00e1 integrace \u010dte a zapisuje.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner se REST API ov\u011b\u0159uje pomoc\u00ed tokenu API v hlavi\u010dce Authorization-Token (SkyPlanner Settings &gt; API). Dokumentace je ve form\u00e1tu Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Events Hub zaji\u0161\u0165uje ud\u00e1losti z v\u00fdroby: p\u0159i zm\u011bn\u011b stavu f\u00e1ze OP doraz\u00ed do SkyPlanner webhook a rozvrh se aktualizuje. Ostatn\u00ed data se na\u010d\u00edtaj\u00ed pravideln\u00fdmi dotazy. Nov\u00e9 v\u00fdrobn\u00ed \u00fakoly se zji\u0161\u0165uj\u00ed dotazy filtrovan\u00fdmi podle stav\u016f OP Firme a Liberada a podle posledn\u00edch zm\u011bn. \u010cetnost se nastavuje pro ka\u017ed\u00fd z\u00e1vod zvl\u00e1\u0161\u0165, od n\u011bkolika minut u OP po hodinov\u00fd interval u z\u00e1sob.<\/p>\n\n\n<p>SkyPlanner p\u0159i zm\u011bn\u011b stavu nebo pl\u00e1nu odes\u00edl\u00e1 webhooky, tak\u017ee zp\u011btn\u00fd z\u00e1pis se \u0159\u00edd\u00ed ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Senior ERP (rozhran\u00ed)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>Frekvence<\/th><\/tr><\/thead><tbody><tr><td>SKU: produto a deriva\u00e7\u00e3o, m\u011brn\u00e9 jednotky (webov\u00e9 slu\u017eby G5 nebo entity Senior X)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Struktura v\u00fdrobku (engenharia do SKU)<\/td><td>Struktura v\u00fdrobku, d\u00edl\u010d\u00ed v\u00fdrobky, materi\u00e1ly pro ka\u017ed\u00fd v\u00fdrobek<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Roteiro s f\u00e1zemi (est\u00e1gios): po\u0159ad\u00ed, z\u00e1vislost na p\u0159edchoz\u00ed f\u00e1zi<\/td><td>Operace v dan\u00e9m po\u0159ad\u00ed<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Recurso: Tempo processo, Tempo setup, Tempo carga e descarga, Tempo transfer\u00eancia, Fator de carga<\/td><td>Pracovi\u0161t\u011b, doby trv\u00e1n\u00ed, \u010dasy p\u0159\u00edpravy a \u00faklidu po operaci, efektivita<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Centro de recurso<\/td><td>Skupiny pracovi\u0161\u0165<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen v\u00fdjime\u010dn\u011b<\/td><\/tr><tr><td>Calend\u00e1rio: Feriados, v\u00fdrobn\u00ed kalend\u00e1\u0159 pro jednotliv\u00e9 sm\u011bny<\/td><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo vlastn\u00ed sm\u011bny ve SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Firme, Liberada) v\u010detn\u011b f\u00e1z\u00ed a materi\u00e1l\u016f<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a po\u017eadavky na materi\u00e1l<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Stav f\u00e1ze OP (Events Hub orderProductionStageChangeStatus)<\/td><td>Pr\u016fb\u011bh operace<\/td><td>Senior \u2192 SkyPlanner<\/td><td>V re\u00e1ln\u00e9m \u010dase p\u0159es webhook<\/td><\/tr><tr><td>Estoque pro jednotliv\u00e9 SKU<\/td><td>Stavy z\u00e1sob<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Ordens de compra s term\u00edny dod\u00e1n\u00ed<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Na\u010d\u00edt\u00e1n\u00ed dotazy ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>F\u00e1ze OP: pl\u00e1novan\u00fd za\u010d\u00e1tek a konec, v\u00fdrobn\u00ed zdroj<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9 operace, p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b<\/td><td>SkyPlanner \u2192 Senior<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td>Apontamento de produ\u00e7\u00e3o: numOrp, codEtg, seqRot, qtdRel, qtdRfg, datum a \u010das za\u010d\u00e1tku a konce<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 Senior<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Nen\u00ed v Senior ERP<\/td><td>Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje jako zdroje s omezenou kapacitou, operace s v\u00edce oper\u00e1tory, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed sc\u00e9n\u00e1\u0159e<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte SKU, struktury, technologick\u00e9 postupy (roteiros), v\u00fdrobn\u00ed zdroje (recursos), st\u0159ediska zdroj\u016f (centros de recurso) a v\u00fdrobn\u00ed kalend\u00e1\u0159. Promyslete mapov\u00e1n\u00ed st\u0159edisek zdroj\u016f: centro de recurso se \u010dty\u0159mi stroji se p\u0159evede na jednu skupinu pracovi\u0161\u0165 nebo na \u010dty\u0159i pracovi\u0161t\u011b. Fator de carga p\u0159eve\u010fte bu\u010f na efektivitu pracovi\u0161t\u011b ve SkyPlanner, nebo na sm\u011bny, nikoli na oboj\u00ed.<\/p>\n\n\n<p><strong>2. Synchronizace OP.<\/strong> Na\u010dt\u011bte OP ve stavech Firme a Liberada v\u010detn\u011b f\u00e1z\u00ed a materi\u00e1l\u016f a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. OP ve stavu Planejada m\u016f\u017ee MRP st\u00e1le m\u011bnit nebo mazat, proto je rozvrhujte jen tehdy, pokud chcete v\u00fdhled do budoucna. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd v term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a po jej\u00edm ozna\u010den\u00ed stavem Delivered aktualizuje z\u00e1soby.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed j\u00e1dro um\u00edst\u00ed nebo p\u0159esune f\u00e1zi, webhook SkyPlanner spust\u00ed zp\u011btn\u00fd z\u00e1pis. Zap\u00ed\u0161e pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9 f\u00e1ze OP a vybran\u00fd v\u00fdrobn\u00ed zdroj, tedy stejn\u00e1 pole, kter\u00e1 pl\u00e1nova\u010d upravuje v Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Konkr\u00e9tn\u00ed webovou slu\u017ebu s v\u00e1mi a va\u0161\u00edm partnerem Senior dohodne t\u00fdm SkyPlanner p\u0159i vymezen\u00ed rozsahu.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed pr\u00e1ce ve v\u00fdrob\u011b.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a jejich \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed rozvrh aktu\u00e1ln\u00ed. Sami rozhodnete, zda se skute\u010dn\u00e9 \u010dasy budou zapisovat zp\u011bt do Senior. Pokud ano, ka\u017ed\u00e9 potvrzen\u00ed se zap\u00ed\u0161e jako apontamento de produ\u00e7\u00e3o k f\u00e1zi OP, v\u010detn\u011b vyroben\u00e9ho mno\u017estv\u00ed, zmetk\u016f a \u010dasu za\u010d\u00e1tku a konce. Senior p\u0159ij\u00edm\u00e1 hl\u00e1\u0161en\u00ed v\u00fdroby pouze pro OP ve stavu Liberada nebo Andamento. Pokud v\u00fdrobu hl\u00e1s\u00edte p\u0159es F\u00e1brica ao Vivo, SkyPlanner m\u00edsto toho na\u010d\u00edt\u00e1 pr\u016fb\u011bh p\u0159es Events Hub.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>SKU, struktury, technologick\u00e9 postupy (roteiros), mno\u017estv\u00ed a stav OP<\/td><td>Senior ERP<\/td><\/tr><tr><td>Po\u0159ad\u00ed f\u00e1z\u00ed, \u010dasy za\u010d\u00e1tku a konce, p\u0159i\u0159azen\u00ed v\u00fdrobn\u00edch zdroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice se\u0159izovac\u00edch \u010das\u016f, po\u017eadavky na n\u00e1stroje a oper\u00e1tory, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00ed kalend\u00e1\u0159 a sm\u011bny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Hl\u00e1\u0161en\u00ed v\u00fdroby (apontamentos), skladov\u00e9 pohyby, kalkulace n\u00e1klad\u016f<\/td><td>Senior ERP; data se zad\u00e1vaj\u00ed p\u0159\u00edmo v n\u011bm nebo se do n\u011bj zapisuj\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jedin\u00fd syst\u00e9m, kter\u00fd bude zapisovat term\u00edny f\u00e1z\u00ed. Pokud pl\u00e1nova\u010di nad\u00e1le \u0159ad\u00ed stejn\u00e9 OP v Programa\u00e7\u00e3o de produ\u00e7\u00e3o nebo v Ganttov\u011b diagramu, dohodn\u011bte se, kter\u00e9 OP bude spravovat SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te rozvrh v r\u00e1mci 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed s v\u00fdrobn\u00edmi zdroji, technologick\u00fdmi postupy (roteiros) a otev\u0159en\u00fdmi OP exportovan\u00fdmi ze Senior do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla spr\u00e1vy dat, \u010detnost synchronizace a to, zda se budou hl\u00e1\u0161en\u00ed v\u00fdroby (apontamentos) zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup do Senior.<\/strong> Vytvo\u0159te u\u017eivatele pro integraci, zaregistrujte aplikaci na port\u00e1lu Senior API a povolte webov\u00e9 slu\u017eby G5 a webhook Events Hub. Nejprve v\u0161e otestujte v testovac\u00ed datab\u00e1zi.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed.<\/strong> SKU, struktury, technologick\u00e9 postupy (roteiros), v\u00fdrobn\u00ed zdroje (recursos), st\u0159ediska zdroj\u016f (centros de recurso), kalend\u00e1\u0159.<\/li>\n\n\n<li><strong>Synchronizace OP a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazy s filtry a opakov\u00e1n\u00edm p\u0159i chyb\u011b, dopln\u011bn\u00e9 webhookem pro stav f\u00e1ze.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty pracovn\u00edk\u016f obsluhy na operaci a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Term\u00edny f\u00e1z\u00ed a v\u00fdrobn\u00ed zdroje z webhook\u016f SkyPlanner, p\u0159\u00edpadn\u011b i hl\u00e1\u0161en\u00ed v\u00fdroby (apontamentos), pokud tuto mo\u017enost zvol\u00edte.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00e9 testov\u00e1n\u00ed.<\/strong> Pou\u017e\u00edvejte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovn\u00e1vejte term\u00edny a opravujte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile data souhlas\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-senior-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci Senior ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u010cty\u0159i druhy \u010das\u016f v\u00fdrobn\u00edho zdroje.<\/strong> Recurso obsahuje \u010das zpracov\u00e1n\u00ed, se\u0159\u00edzen\u00ed, nakl\u00e1dky a vykl\u00e1dky a p\u0159esunu. \u010cas nakl\u00e1dky a p\u0159esunu m\u016f\u017ee p\u0159edstavovat manipulaci, nikoli strojn\u00ed \u010das. Pro ka\u017ed\u00fd v\u00fdrobn\u00ed zdroj ur\u010dete, jak se jednotliv\u00e9 \u010dasy mapuj\u00ed, jinak budou v\u0161echny doby trv\u00e1n\u00ed chybn\u00e9.<\/li>\n\n\n<li><strong>Jeden se\u0159izovac\u00ed \u010das na v\u00fdrobn\u00ed zdroj.<\/strong> Tempo setup v Senior je jedin\u00e1 hodnota. B\u011bhem zav\u00e1d\u011bn\u00ed vytvo\u0159te ve SkyPlanner matici se\u0159izovac\u00edch \u010das\u016f podle skute\u010dn\u00fdch p\u0159estaveb ve va\u0161\u00ed v\u00fdrob\u011b.<\/li>\n\n\n<li><strong>Varianty v\u00fdrobk\u016f.<\/strong> SKU v Senior tvo\u0159\u00ed produkt a jeho varianta (deriva\u00e7\u00e3o). Technologick\u00e9 postupy (roteiros) se mohou pro jednotliv\u00e9 varianty li\u0161it. K\u00f3d varianty p\u0159eneste do kl\u00ed\u010d\u016f produkt\u016f ve SkyPlanner.<\/li>\n\n\n<li><strong>Stavy OP.<\/strong> Hl\u00e1\u0161en\u00ed v\u00fdroby lze zapisovat pouze k OP ve stavech Liberada a Andamento. Stavy m\u011b\u0148te v Senior a nechte SkyPlanner tyto zm\u011bny p\u0159eb\u00edrat p\u0159es Events Hub.<\/li>\n\n\n<li><strong>Hybridn\u00ed nasazen\u00ed.<\/strong> Webov\u00e9 slu\u017eby G5 b\u011b\u017e\u00ed na va\u0161em serveru Senior a Events Hub b\u011b\u017e\u00ed v Senior X. Napl\u00e1nujte s\u00ed\u0165ov\u00fd p\u0159\u00edstup k ob\u011bma.<\/li>\n\n\n<li><strong>Form\u00e1t \u010d\u00edsel.<\/strong> Webov\u00e9 slu\u017eby Senior odm\u00edtaj\u00ed \u010d\u00edsla s odd\u011blova\u010di tis\u00edc\u016f a vy\u017eaduj\u00ed desetinnou \u010d\u00e1rku. Odes\u00edlejte \u010d\u00edsla v tomto form\u00e1tu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-senior-erp-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci se Senior ERP a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu.<\/strong> To zahrnuje dohodnut\u00e9 webov\u00e9 slu\u017eby, API Senior X a webhooky Events Hub. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Senior ERP jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed integrace se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro Senior.<\/strong> Zn\u00e1 va\u0161i konfiguraci, \u00fapravy na m\u00edru i licence a m\u016f\u017ee spole\u010dn\u011b s t\u00fdmem SkyPlanner nastavit integra\u010dn\u00edho u\u017eivatele, registraci v port\u00e1lu API a webov\u00e9 slu\u017eby.<\/li>\n\n\n<li><strong>Va\u0161i v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API SkyPlanner s API tokenem. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Dokumentaci najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku integrace dostanete p\u0159edem spolu s nab\u00eddkou tarifu podle va\u0161ich proces\u016f a pot\u0159eb. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/senior-erp\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed se Senior ERP<\/a>, <a href=\"\/cs\/integrace\/erp\/senior-erp\/\">str\u00e1nku Senior ERP<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista na dodavatelsk\u00fd \u0159et\u011bzec ve spole\u010dnosti UTU, v hale na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky syst\u00e9mu SkyPlanner jsme od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v tabulk\u00e1ch Excelu p\u0159e\u0161li k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista na dodavatelsk\u00fd \u0159et\u011bzec<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby se ka\u017ed\u00fd t\u00fdden u\u0161et\u0159\u00ed 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Pracovn\u00edci v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale spole\u010dnosti ve m\u011bst\u011b Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000+<\/b><span>automaticky napl\u00e1novan\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se pl\u00e1nuj\u00ed automaticky a cel\u00e1 organizace m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>M\u00e9n\u011b<\/b><span>prostoj\u016f kv\u016fli nedostatku materi\u00e1lu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eP\u0159\u00ednos syst\u00e9mu SkyPlanner pro n\u00e1s spo\u010d\u00edv\u00e1 v tom, \u017ee funguje v ka\u017edodenn\u00ed praxi, zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/b><br>Eskomatic \u00b7 Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Automatick\u00e9 pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed umo\u017e\u0148uje p\u0159esn\u011bji stanovit term\u00edny dod\u00e1n\u00ed a v\u00fdrazn\u011b ubylo prostoj\u016f ve v\u00fdrob\u011b zp\u016fsoben\u00fdch nedostatkem materi\u00e1lu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Senior ERP API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. Webov\u00e1 slu\u017eba G5 com.senior.g5.co.mpr.pcp.ordemproducao vytv\u00e1\u0159\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy OP pomoc\u00ed stejn\u00e9 rutiny, kter\u00e1 se pou\u017e\u00edv\u00e1 p\u0159i jejich vytv\u00e1\u0159en\u00ed na obrazovce ERP. Dal\u0161\u00ed slu\u017eby G5 pokr\u00fdvaj\u00ed produkty a vykazov\u00e1n\u00ed v\u00fdroby. Senior X Platform nav\u00edc poskytuje REST API s p\u0159ihl\u00e1\u0161en\u00edm pomoc\u00ed tokenu Bearer a webhooky Events Hub.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje Senior ERP webhooky?<\/summary>\n<p class=\"sp-faq__a\">Ano. Senior X Events Hub odes\u00edl\u00e1 webhooky, v\u010detn\u011b orderProductionStageChangeStatus p\u0159i zm\u011bn\u011b stavu f\u00e1ze v\u00fdrobn\u00edho p\u0159\u00edkazu OP. SkyPlanner tak sleduje pr\u016fb\u011bh v\u00fdroby v re\u00e1ln\u00e9m \u010dase a vlastn\u00edmi webhooky p\u0159ed\u00e1v\u00e1 zm\u011bny pl\u00e1nu zp\u011bt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do Senior ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nastavuje pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9 f\u00e1ze v\u00fdrobn\u00edho p\u0159\u00edkazu OP a v\u00fdrobn\u00ed zdroj, kter\u00fd je pro ni vybr\u00e1n. Jde o stejn\u00e1 pole, kter\u00e1 pl\u00e1nova\u010d upravuje v Programa\u00e7\u00e3o de produ\u00e7\u00e3o. P\u0159i ka\u017ed\u00e9 zm\u011bn\u011b pl\u00e1nu spust\u00ed webhook SkyPlanner zp\u011btn\u00fd z\u00e1pis cestou, kterou t\u00fdm SkyPlanner ur\u010d\u00ed pro va\u0161i instalaci Senior p\u0159i vymezen\u00ed rozsahu b\u011bhem zav\u00e1d\u011bn\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje integrace se Senior X a ERP XT?<\/summary>\n<p class=\"sp-faq__a\">Ano. ERP XT b\u011b\u017e\u00ed na va\u0161em serveru a cloudov\u00e9 slu\u017eby vyu\u017e\u00edv\u00e1 na Senior X. Integrace pou\u017e\u00edv\u00e1 webov\u00e9 slu\u017eby G5 na serveru a API Senior X a Events Hub v cloudu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme si SkyPlanner vyzkou\u0161et p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed verze m\u016f\u017eete vyu\u017e\u00edt a\u017e 20 pracovi\u0161\u0165 a importovat data ze Senior ve form\u00e1tu CSV nebo Excel. Platebn\u00ed karta nen\u00ed pot\u0159eba. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte s n\u00edm rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Senior ERP Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Senior ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Senior ERP od Senior Sistemas (Gest\u00e3o Empresarial | ERP XT se Senior X) se SkyPlanner APS. SkyPlanner se se Senior ERP propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Senior: &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106492,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107567","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrace Senior ERP s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/pruvodce-integraci\\\/\",\"name\":\"Integrace Senior ERP s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Senior ERP: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/senior-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrace Senior ERP s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","description":"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/","name":"Integrace Senior ERP s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte Senior ERP a SkyPlanner APS: API Senior X Platform, webov\u00e9 slu\u017eby G5, webhooky Events Hub, zp\u011btn\u00fd z\u00e1pis f\u00e1z\u00ed OP, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Senior ERP: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/senior-erp\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Senior ERP Pr\u016fvodce integrac\u00ed Senior ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Senior ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Senior ERP od Senior Sistemas (Gest\u00e3o Empresarial | ERP XT se Senior X) se SkyPlanner APS. SkyPlanner se se Senior ERP propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Senior:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107567"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107567\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106492"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}