{"id":107507,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Comarch ERP XL <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Comarch ERP XL ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Comarch ERP XL se SkyPlanner APS. SkyPlanner se s Comarch ERP XL propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Comarch:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy (zlecenia produkcyjne) s procesy a operacemi, technologick\u00e9 postupy, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje, polo\u017eky, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed se p\u0159es XL API zapisuj\u00ed zp\u011bt ke ka\u017ed\u00e9 operaci v\u00fdrobn\u00edho p\u0159\u00edkazu.<\/li>\n\n\n<li>Pokud tuto mo\u017enost zvol\u00edte, \u010dasov\u00e9 z\u00e1znamy oper\u00e1tor\u016f se zapisuj\u00ed zp\u011bt jako v\u00fdkazy proveden\u00fdch operac\u00ed.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nakonfiguruje integraci podle va\u0161eho nastaven\u00ed Comarch ERP XL a poskytuje podporu i po spu\u0161t\u011bn\u00ed do ostr\u00e9ho provozu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed do integrace zapojit nebo sami vyv\u00edjet \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Comarch uv\u00e1d\u00ed t\u0159i zp\u016fsoby komunikace s ERP XL: &#8222;DCOM, direct database connection (SQL Client), REST API&#8220; (DCOM, p\u0159\u00edm\u00e9 p\u0159ipojen\u00ed k datab\u00e1zi p\u0159es SQL Client, REST API) (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch, v p\u0159ekladu<\/a>). Pro rozvrhov\u00e1n\u00ed v\u00fdroby se vyu\u017e\u00edvaj\u00ed p\u0159edev\u0161\u00edm dva z nich:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>XL API (CDN_API.DLL).<\/strong> &#8222;These functions are collected in the CDN_API.DLL library, installed together with the whole Comarch ERP XL system.&#8220; (Tyto funkce jsou sou\u010d\u00e1st\u00ed knihovny CDN_API.DLL, kter\u00e1 se instaluje spolu s cel\u00fdm syst\u00e9mem Comarch ERP XL.) (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl017-wykorzystanie-api-erp-xl\/\">N\u00e1pov\u011bda Comarch, v p\u0159ekladu<\/a>) Extern\u00ed program se p\u0159ihl\u00e1s\u00ed pomoc\u00ed XLLogin, vol\u00e1 funkce sd\u00edlej\u00edc\u00ed stejnou relaci a odhl\u00e1s\u00ed se pomoc\u00ed XLLogout. Ka\u017ed\u00e1 struktura obsahuje pole <strong>Wersja<\/strong>, kter\u00e9 ur\u010duje verzi sady parametr\u016f pro va\u0161e vyd\u00e1n\u00ed ERP XL.<\/li>\n\n\n<li><strong>ERP XL Web REST API.<\/strong> Comarch ERP XL Web 2026.0 zp\u0159\u00edstup\u0148uje mikroslu\u017eby REST: &#8222;Each RestAPI microservice exposes its own interactive documentation at the \/swagger endpoint.&#8220; (Ka\u017ed\u00e1 mikroslu\u017eba RestAPI zp\u0159\u00edstup\u0148uje vlastn\u00ed interaktivn\u00ed dokumentaci na koncov\u00e9m bodu \/swagger.) (<a href=\"https:\/\/pomoc.comarch.pl\/xlweb\/index.php\/dokumentacja\/modyfikacja-systemu\/\">N\u00e1pov\u011bda Comarch, v p\u0159ekladu<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>P\u0159\u00edm\u00e9 p\u0159ipojen\u00ed p\u0159es <strong>SQL Client<\/strong> umo\u017e\u0148uje \u010d\u00edst kmenov\u00e1 data a p\u0159\u00edkazy z datab\u00e1ze ERP XL v rozsahu dohodnut\u00e9m s va\u0161\u00edm IT t\u00fdmem a partnerem Comarch.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Funkce XL API pro v\u00fdrobu<\/h3>\n\n\n<p>Comarch dokumentuje tyto v\u00fdrobn\u00ed funkce (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">XL128<\/a>):<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Oblast<\/th><th>Funkce<\/th><th>Co d\u011bl\u00e1<\/th><\/tr><\/thead><tbody><tr><td>Technologick\u00e9 postupy<\/td><td>XLNowaTechnologia, XLNowaCzynnoscTechnologia, XLNowaFunkcjaCzynnoscTechnologia, XLNowyZasobCzynnoscTechnologia<\/td><td>Vytvo\u0159\u00ed technologick\u00fd postup \u010di operaci nebo k operaci p\u0159id\u00e1 pracovi\u0161t\u011b, materi\u00e1l \u010di v\u00fdrobek<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy<\/td><td>XLNoweZlecenieProd<\/td><td>Vytvo\u0159\u00ed v\u00fdrobn\u00ed p\u0159\u00edkaz<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy<\/td><td>XLZamknijZlecenieProd<\/td><td>Podle k\u00f3du akce napl\u00e1nuje, p\u0159epl\u00e1nuje, vypo\u0159\u00e1d\u00e1 nebo uzav\u0159e v\u00fdrobn\u00ed p\u0159\u00edkaz<\/td><\/tr><tr><td>Operace<\/td><td>XLDodajCzynnoscDoProcesuProd, XLDodajZasobDoProcesuProd<\/td><td>P\u0159id\u00e1 operaci nebo v\u00fdrobn\u00ed zdroj do v\u00fdrobn\u00edho procesu<\/td><\/tr><tr><td>Rozvrh v\u00fdroby<\/td><td>XLDodajTerminDoProcesuProd<\/td><td>P\u0159id\u00e1 k operaci \u010dasov\u00fd interval: IdCzynnosci, TerminOd, TerminDo<\/td><\/tr><tr><td>Vykazov\u00e1n\u00ed v\u00fdroby<\/td><td>XLDodajRealizacjeOperacjiProd, XLProdZmienIloscRealizacji<\/td><td>P\u0159id\u00e1 k p\u0159\u00edkazu v\u00fdkaz proveden\u00e9 operace, zm\u011bn\u00ed vyk\u00e1zan\u00e9 mno\u017estv\u00ed<\/td><\/tr><tr><td>Doklady<\/td><td>XLProdObiektyDoDokumentow, XLProdGenerujDokumentyDlaObiektow<\/td><td>Vytvo\u0159\u00ed doklady RW a PW pro v\u00fdrobn\u00ed objekty<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentizace a p\u0159\u00edstup<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>XL API.<\/strong> Integrace se pomoc\u00ed XLLogin p\u0159ihl\u00e1s\u00ed do datab\u00e1ze pod \u00fa\u010dtem oper\u00e1tora ERP XL a z\u00edsk\u00e1 relaci pro dal\u0161\u00ed vol\u00e1n\u00ed. Knihovna DLL b\u011b\u017e\u00ed na po\u010d\u00edta\u010di s Windows a nainstalovan\u00fdm ERP XL, tak\u017ee slu\u017eba pro zp\u011btn\u00fd z\u00e1pis b\u011b\u017e\u00ed ve va\u0161\u00ed s\u00edti vedle ERP XL.<\/li>\n\n\n<li><strong>REST API.<\/strong> P\u0159\u00edstup se nastavuje pro ka\u017edou instalaci ERP XL Web zvl\u00e1\u0161\u0165. Vol\u00e1n\u00ed ka\u017ed\u00e9 mikroslu\u017eby jsou pops\u00e1na na jej\u00ed str\u00e1nce Swagger.<\/li>\n\n\n<li><strong>\u010cten\u00ed p\u0159es SQL.<\/strong> Datab\u00e1zov\u00fd \u00fa\u010det pouze pro \u010dten\u00ed, schv\u00e1len\u00fd va\u0161\u00edm IT t\u00fdmem.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner pou\u017e\u00edv\u00e1 REST API k autentizaci API token v hlavi\u010dce Authorization-Token (SkyPlanner Settings &gt; API). Dokumentace je k dispozici ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>V prov\u011b\u0159en\u00e9 dokumentaci Comarch ERP XL nejsou uvedeny \u017e\u00e1dn\u00e9 odchoz\u00ed webhooky. Vlastn\u00ed APS spole\u010dnosti Comarch na\u010d\u00edt\u00e1 data, kdy\u017e pl\u00e1nova\u010d stiskne \u201eAktualizuj dane z ERP\u201c (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">N\u00e1pov\u011bda Comarch APS<\/a>).<\/p>\n\n\n<p>Data z ERP XL se proto na\u010d\u00edtaj\u00ed pravideln\u00fdm dotazov\u00e1n\u00edm. Nov\u00e9 v\u00fdrobn\u00ed \u00fakoly se zachyt\u00ed \u010dten\u00edm omezen\u00fdm na otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy a posledn\u00ed zm\u011bny. \u010cetnost se nastavuje pro ka\u017ed\u00fd z\u00e1vod zvl\u00e1\u0161\u0165: od n\u011bkolika minut u v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f po hodinu u skladov\u00fdch z\u00e1sob.<\/p>\n\n\n<p>SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i zm\u011bn\u011b stavu nebo rozvrhu v\u00fdroby, tak\u017ee zp\u011btn\u00fd z\u00e1pis se \u0159\u00edd\u00ed ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Comarch ERP XL (rozhran\u00ed)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Karty towar\u00f3w, m\u011brn\u00e9 jednotky (REST nebo \u010dten\u00ed p\u0159es SQL)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Technologia: operace, materi\u00e1ly, polotovary a v\u00fdrobky pro jednotliv\u00e9 operace<\/td><td>Struktura v\u00fdrobku, d\u00edl\u010d\u00ed v\u00fdrobky, materi\u00e1ly pro jednotliv\u00e9 kroky procesu<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Operace v Technologia: pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje, \u010dasy<\/td><td>Kroky procesu s dobou trv\u00e1n\u00ed, \u010dasy se\u0159\u00edzen\u00ed a \u010dasy na ukon\u010den\u00ed operace<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Gniazda robocze a zasoby (stroje, n\u00e1stroje, zam\u011bstnanci)<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, n\u00e1stroje, pracovn\u00edci<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen v\u00fdjime\u010dn\u011b<\/td><\/tr><tr><td>Kalendarze i okresy, przestoje i awarie<\/td><td>Sm\u011bny, nepracovn\u00ed doba a prostoje<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo vlastn\u00ed sm\u011bny ve SkyPlanner<\/td><\/tr><tr><td>Zlecenia produkcyjne (ZP) s procesy, operacemi, materi\u00e1ly, term\u00ednem dokon\u010den\u00ed a prioritou<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi po\u017eadavky<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Z\u00e1soby v jednotliv\u00fdch skladech<\/td><td>Skladov\u00e9 z\u016fstatky<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>Zam\u00f3wienia zakupu (ZZ) s term\u00edny dod\u00e1n\u00ed<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd p\u0159\u00edjem materi\u00e1lu podle term\u00ednu dod\u00e1n\u00ed<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>Term\u00edny operac\u00ed: TerminOd, TerminDo (XLDodajTerminDoProcesuProd)<\/td><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed ka\u017ed\u00e9 operace<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Realizacja operacji (XLDodajRealizacjeOperacjiProd)<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Nen\u00ed v ERP XL<\/td><td>Matice p\u0159\u00edpravn\u00fdch a p\u0159echodov\u00fdch \u010das\u016f, n\u00e1stroje s omezenou dostupnost\u00ed, operace s v\u00edce oper\u00e1tory, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte polo\u017eky, technologick\u00e9 postupy, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje a kalend\u00e1\u0159e. Mapov\u00e1n\u00ed pracovi\u0161\u0165 do SkyPlanner dob\u0159e zva\u017ete: pracovi\u0161t\u011b se \u010dty\u0159mi stroji p\u0159evedete na jednu skupinu pracovi\u0161\u0165 nebo \u010dty\u0159i pracovi\u0161t\u011b. N\u00e1stroje evidovan\u00e9 mezi v\u00fdrobn\u00edmi zdroji ERP XL se ve SkyPlanner p\u0159evedou na n\u00e1stroje s omezenou dostupnost\u00ed a zam\u011bstnanci na pracovn\u00edky s p\u0159i\u0159azen\u00fdmi sm\u011bnami.<\/p>\n\n\n<p><strong>2. Synchronizace p\u0159\u00edkaz\u016f a objedn\u00e1vek.<\/strong> Na\u010dt\u011bte v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed a materi\u00e1l\u016f a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, jakmile je objedn\u00e1vka ozna\u010dena jako dodan\u00e1.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed j\u00e1dro za\u0159ad\u00ed nebo p\u0159esune operaci, webhook SkyPlanner spust\u00ed slu\u017ebu pro zp\u011btn\u00fd z\u00e1pis. Ta zavol\u00e1 XLDodajTerminDoProcesuProd s hodnotami TerminOd a TerminDo dan\u00e9 operace. Ka\u017ed\u00e1 operace ZP tak obsahuje za\u010d\u00e1tek a konec napl\u00e1novan\u00fd ve SkyPlanner.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed pl\u00e1n aktu\u00e1ln\u00ed. Sami ur\u010d\u00edte, zda se maj\u00ed skute\u010dn\u00e9 \u010dasy zapisovat zp\u011bt. Pokud ano, slu\u017eba p\u0159id\u00e1v\u00e1 z\u00e1znamy o proveden\u00ed pomoc\u00ed XLDodajRealizacjeOperacjiProd a doklady RW a PW se \u0159\u00edd\u00ed va\u0161imi pravidly v ERP XL. Pokud na n\u011bkter\u00fdch pracovi\u0161t\u00edch pou\u017e\u00edv\u00e1te Comarch MES, ponechte pro ka\u017edou operaci jen jeden zdroj odv\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p><strong>5. Pravidla pro spr\u00e1vu dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, technologick\u00e9 postupy, mno\u017estv\u00ed, stav ZP, kalkulace n\u00e1klad\u016f<\/td><td>Comarch ERP XL<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a ukon\u010den\u00ed, p\u0159i\u0159azen\u00ed v\u00fdrobn\u00edch zdroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice p\u0159\u00edpravn\u00fdch a p\u0159echodov\u00fdch \u010das\u016f, po\u017eadavky na n\u00e1stroje a obsluhu, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny, kalend\u00e1\u0159e a odst\u00e1vky<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Z\u00e1znamy o proveden\u00ed, doklady RW a PW<\/td><td>Comarch ERP XL; zad\u00e1vaj\u00ed se p\u0159\u00edmo v n\u011bm nebo se p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jedin\u00fd syst\u00e9m, kter\u00fd bude zapisovat term\u00edny operac\u00ed. Pokud automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed v ERP XL nebo Comarch APS st\u00e1le zapisuje term\u00edny do stejn\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, vypn\u011bte tuto funkci u p\u0159\u00edkaz\u016f pl\u00e1novan\u00fdch ve SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed \u00favodn\u00edho nastaven\u00ed. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te pl\u00e1n v r\u00e1mci 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed verze s pracovi\u0161ti, technologick\u00fdmi postupy a otev\u0159en\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy exportovan\u00fdmi z ERP XL do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla pro spr\u00e1vu dat, intervaly synchronizace a to, zda se budou z\u00e1znamy o proveden\u00ed zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup k ERP XL.<\/strong> Vytvo\u0159te \u00fa\u010det oper\u00e1tora pro integraci, nastavte p\u0159ipojen\u00ed pro \u010dten\u00ed a nasa\u010fte slu\u017ebu pro zp\u011btn\u00fd z\u00e1pis na hostitele s nainstalovan\u00fdm ERP XL. Nejprve v\u0161e otestujte na kopii datab\u00e1ze.<\/li>\n\n\n<li><strong>Prvotn\u00ed na\u010dten\u00ed.<\/strong> Polo\u017eky, technologick\u00e9 postupy, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje, kalend\u00e1\u0159e.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed s filtry a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch pokus\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice p\u0159\u00edpravn\u00fdch a p\u0159echodov\u00fdch \u010das\u016f, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f na operaci a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Vol\u00e1n\u00ed XLDodajTerminDoProcesuProd spou\u0161t\u011bn\u00e1 webhooky SkyPlanner a p\u0159\u00edpadn\u011b tak\u00e9 z\u00e1pis z\u00e1znam\u016f o proveden\u00ed, pokud jej zvol\u00edte.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Pou\u017e\u00edvejte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovn\u00e1vejte term\u00edny a opravujte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Ostr\u00fd provoz.<\/strong> Jakmile data souhlas\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-comarch-erp-xl-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ru\u010dn\u011b zadan\u00e1 kapacita.<\/strong> Kapacita pracovi\u0161t\u011b v ERP XL je \u010d\u00edslo zadan\u00e9 u\u017eivatelem s povolen\u00fdm zat\u00ed\u017een\u00edm v %. SkyPlanner m\u00edsto toho odvozuje kapacitu ze skute\u010dn\u00fdch sm\u011bn a v\u00fdrobn\u00edch zdroj\u016f. Sm\u011bny proto nastavte pe\u010dliv\u011b a procentu\u00e1ln\u00ed zat\u00ed\u017een\u00ed ponechte stranou.<\/li>\n\n\n<li><strong>Neomezen\u00e9 v\u00fdrobn\u00ed zdroje.<\/strong> U zdroj\u016f ozna\u010den\u00fdch jako kapacitn\u011b neomezen\u00e9 ERP XL nekontroluje obsazenost. U ka\u017ed\u00e9ho rozhodn\u011bte, zda se m\u00e1 ve SkyPlanner st\u00e1t pracovi\u0161t\u011bm s omezenou kapacitou.<\/li>\n\n\n<li><strong>Uvoln\u011bn\u00e9 p\u0159\u00edkazy.<\/strong> ERP XL nezahrnuje operace uvoln\u011bn\u00e9 do v\u00fdroby do p\u0159epl\u00e1nov\u00e1n\u00ed, pokud nen\u00ed za\u0161krtnuta volba &#8222;Przesu\u0144 na zwolnionych&#8220;. Dohodn\u011bte se, jak se maj\u00ed term\u00edny ze SkyPlanner uplatnit u uvoln\u011bn\u00fdch p\u0159\u00edkaz\u016f, a pomoc\u00ed Running Time Lock zafixujte pr\u00e1ci na nejbli\u017e\u0161\u00ed hodiny.<\/li>\n\n\n<li><strong>Verze struktur.<\/strong> Struktury XL API obsahuj\u00ed pole Wersja. Nastavte je podle pou\u017e\u00edvan\u00e9 verze ERP XL a po ka\u017ed\u00e9m ro\u010dn\u00edm upgradu znovu prove\u010fte testy.<\/li>\n\n\n<li><strong>Polsk\u00e9 jednotky a \u010dasy.<\/strong> \u010casy operac\u00ed a jednotky kalend\u00e1\u0159\u016f se mus\u00ed p\u0159i importu p\u0159ev\u00e9st p\u0159esn\u011b, jinak budou v\u0161echny doby trv\u00e1n\u00ed chybn\u00e9.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-comarch-erp-xl-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci Comarch ERP XL a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem \u00favodn\u00edho zaveden\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to v rozsahu dohodnut\u00e9ho \u010dten\u00ed dat a vol\u00e1n\u00ed XL API. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Comarch ERP XL jinak a pr\u00e1v\u011b p\u0159i tomto nastaven\u00ed se uplatn\u00ed znalost jeho konkr\u00e9tn\u00edho provozu.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner Comarch.<\/strong> Zn\u00e1 va\u0161e nastaven\u00ed, licence i XL API a spole\u010dn\u011b s t\u00fdmem SkyPlanner m\u016f\u017ee nastavit \u00fa\u010det oper\u00e1tora, p\u0159ipojen\u00ed pro \u010dten\u00ed a hostitele pro zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n\n<li><strong>Va\u0161i v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API SkyPlanner s API tokenem. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrac\u00ed SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner stoj\u00ed od 199 \u20ac m\u011bs\u00ed\u010dn\u011b v\u010detn\u011b 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/comarch-erp-xl\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro Comarch ERP XL<\/a>, <a href=\"\/cs\/integrace\/erp\/comarch-erp-xl\/\">str\u00e1nku Comarch ERP XL<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1s p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby posunul od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve spole\u010dnosti Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchodn\u00edci volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner poskytuje spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry vhodn\u00e9 pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu a na po\u017eadavky na zm\u011bnu pl\u00e1nu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, dostanou odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100 %<\/b><span>v\u010dasnost dod\u00e1vek od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u011b a d\u00edky n\u011bmu je pl\u00e1nov\u00e1n\u00ed p\u0159edv\u00eddateln\u00e9.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek dosahuje 100 % po celou dobu pou\u017e\u00edv\u00e1n\u00ed SkyPlanner, tedy od roku 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Comarch ERP XL API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. XL API (CDN_API.DLL) vytv\u00e1\u0159\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy, pl\u00e1nuje a p\u0159epl\u00e1nov\u00e1v\u00e1 je pomoc\u00ed XLZamknijZlecenieProd, p\u0159id\u00e1v\u00e1 term\u00edny operac\u00ed pomoc\u00ed XLDodajTerminDoProcesuProd a zapisuje z\u00e1znamy o proveden\u00ed pomoc\u00ed XLDodajRealizacjeOperacjiProd. Comarch ERP XL Web nav\u00edc nab\u00edz\u00ed REST mikroslu\u017eby dokumentovan\u00e9 v n\u00e1stroji Swagger.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">Pomoc\u00ed funkce XLDodajTerminDoProcesuProd, kter\u00e1 ke ka\u017ed\u00e9 operaci v\u00fdrobn\u00edho p\u0159\u00edkazu p\u0159id\u00e1 \u010dasov\u00fd interval (TerminOd, TerminDo). Webhook SkyPlanner spust\u00ed vol\u00e1n\u00ed p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b pl\u00e1nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje Comarch ERP XL webhooky?<\/summary>\n<p class=\"sp-faq__a\">Odchoz\u00ed webhooky nejsou zdokumentovan\u00e9, proto se integrace dotazuje ERP XL v intervalech nastaven\u00fdch pro dan\u00fd z\u00e1vod. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu ihned, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner Comarch doporu\u010dit Comarch APS, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud chce z\u00e1kazn\u00edk b\u011bhem n\u011bkolika t\u00fddn\u016f z\u00edskat pl\u00e1n v\u00fdroby, kter\u00fd respektuje skute\u010dnou kapacitu a s\u00e1m se pr\u016fb\u011b\u017en\u011b aktualizuje. Comarch APS je samostatn\u00e1 aplikace s vlastn\u00ed datab\u00e1z\u00ed PostgreSQL, integr\u00e1torem a licen\u010dn\u00edm kl\u00ed\u010dem. Synchronizuje se po kliknut\u00ed pl\u00e1nova\u010de a \u010das se\u0159\u00edzen\u00ed je v n\u00ed jedna pevn\u00e1 hodnota pro ka\u017edou operaci (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">n\u00e1pov\u011bda Comarch APS<\/a>). SkyPlanner je cloudov\u00fd software, kter\u00fd automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 a pl\u00e1nuje p\u0159ese\u0159\u00edzen\u00ed, n\u00e1stroje, pracovn\u00ed t\u00fdmy i materi\u00e1l, a to od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. Bezplatn\u00e1 30denn\u00ed zku\u0161ebn\u00ed verze podporuje a\u017e 20 pracovi\u0161\u0165 s importem dat z ERP XL ve form\u00e1tu CSV nebo Excel, bez nutnosti zad\u00e1vat platebn\u00ed kartu. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte ji<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte s n\u00edm rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Comarch ERP XL Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Comarch ERP XL ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Comarch ERP XL se SkyPlanner APS. SkyPlanner se s Comarch ERP XL propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Comarch: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106463,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107507","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch ERP XL: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/pruvodce-integraci\\\/\",\"name\":\"Comarch ERP XL: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Comarch ERP XL: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/comarch-erp-xl\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch ERP XL: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","description":"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/","name":"Comarch ERP XL: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte Comarch ERP XL se SkyPlanner APS: v\u00fdrobn\u00ed funkce XL API, ERP XL Web REST API, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Comarch ERP XL: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/comarch-erp-xl\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Comarch ERP XL Pr\u016fvodce integrac\u00ed Comarch ERP XL pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Comarch ERP XL ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Comarch ERP XL se SkyPlanner APS. SkyPlanner se s Comarch ERP XL propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed spole\u010dnosti Comarch: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107507","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107507"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107507\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106463"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107507"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}