{"id":107333,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/cegid\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Cegid <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Cegid ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit v\u00fdrobn\u00ed ERP syst\u00e9my Cegid se SkyPlanner APS. Nejprve se v\u011bnuje Cegid PMI, pot\u00e9 Cegid Primavera a Cegid Ekon. SkyPlanner se s Cegid propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed Cegid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n) v\u010detn\u011b operac\u00ed, technologick\u00fdch postup\u016f, kusovn\u00edk\u016f, kapacitn\u00edch pracovi\u0161\u0165 a stroj\u016f, d\u00e1le polo\u017eky, z\u00e1soby a objedn\u00e1vky u dodavatel\u016f.<\/li>\n\n\n<li>Ke ka\u017ed\u00e9 operaci OF se zp\u011bt zapisuj\u00ed pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed.<\/li>\n\n\n<li>Pokud si to zvol\u00edte, lze zp\u011btn\u011b zapisovat i pracovn\u00ed \u010das oper\u00e1tor\u016f jako pointages (PMI), Di\u00e1rios de Trabalho (Primavera) nebo imputaciones (Ekon).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> Cegid poskytuje pro PMI rozhran\u00ed Web API: &#8222;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8220; (Usnadn\u011bte bezpe\u010dnou v\u00fdm\u011bnu dat s extern\u00edmi aplikacemi d\u00edky Web API dostupn\u00e9mu v syst\u00e9mu \u0159\u00edzen\u00ed v\u00fdroby Cegid.) Web API zachov\u00e1v\u00e1 v extern\u00edch aplikac\u00edch aplika\u010dn\u00ed pravidla Manufacturing PMI (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). PMI nab\u00edz\u00ed tak\u00e9 EDI, standardizovan\u00e9 soubory XML pro technick\u00e1 data z CAD a gener\u00e1tor sestav s exportem do aplikace Excel. Export do aplikace Excel je nejrychlej\u0161\u00ed cesta, jak z\u00edskat data pro vyzkou\u0161en\u00ed.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> PRIMAVERA ERP V10 API &#8222;allows third party applications to perform both data query and writing operations&#8220; (umo\u017e\u0148uje aplikac\u00edm t\u0159et\u00edch stran data \u010d\u00edst i zapisovat) a pokr\u00fdv\u00e1 v\u0161echny moduly produktu (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">dokumentace V10 API<\/a>). Web API je zdokumentov\u00e1no v n\u00e1stroji Swagger, odkud jej lze tak\u00e9 volat; rozhran\u00ed je rozd\u011bleno podle modul\u016f (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger pro Web API<\/a>). Modul Produ\u00e7\u00e3o (GPR) pokr\u00fdv\u00e1 technick\u00e9 listy, \u010distou pot\u0159ebu, uvol\u0148ov\u00e1n\u00ed OF, Planeamento, v\u00fdrobn\u00ed z\u00e1znamy a Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">referen\u010dn\u00ed dokumentace Produ\u00e7\u00e3o<\/a>). Kl\u00ed\u010dov\u00e9 slu\u017eby pro rozvrhov\u00e1n\u00ed v\u00fdroby:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> na\u010d\u00edt\u00e1 v\u00fdrobn\u00ed p\u0159\u00edkazy a jejich operace (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> na\u010d\u00edt\u00e1 OF k pl\u00e1nov\u00e1n\u00ed a pomoc\u00ed <strong>ActualizaPlaneamentoOperacao<\/strong> aktualizuje napl\u00e1novan\u00e9 operace.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> a <strong>IGprBSRoteiros<\/strong> na\u010d\u00edtaj\u00ed pracovn\u00ed st\u0159ediska, pracovi\u0161t\u011b, oper\u00e1tory a technologick\u00e9 postupy.<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> zaznamen\u00e1v\u00e1 pr\u00e1ci pomoc\u00ed <strong>IniciaPicagem<\/strong> a <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> Cegid uv\u00e1d\u00ed, \u017ee se Ekon propojuje s dal\u0161\u00edmi podnikov\u00fdmi syst\u00e9my \u0159\u00edzen\u00ed (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). T\u00fdm SkyPlanner ur\u010d\u00ed rozhran\u00ed pro va\u0161i instalaci Ekon p\u0159i vymezen\u00ed rozsahu projektu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a licence<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> P\u0159\u00edstup k Web API pro integraci se ve va\u0161\u00ed instalaci PMI aktivuje p\u0159i vymezen\u00ed rozsahu projektu ve spolupr\u00e1ci s va\u0161\u00edm partnerem Cegid.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Ka\u017ed\u00e1 entita Web API nab\u00edz\u00ed metodu Login, kter\u00e1 vrac\u00ed token Bearer s kl\u00ed\u010dem relace. Token se obnovuje prost\u0159ednictv\u00edm endpointu pro tokeny (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger pro Web API<\/a>). U\u017eivatelsk\u00fd \u00fa\u010det integrace pot\u0159ebuje licence Produ\u00e7\u00e3o pro oblasti, kter\u00e9 vol\u00e1.<\/li>\n\n\n<li><strong>Na stran\u011b SkyPlanner.<\/strong> REST API pou\u017e\u00edv\u00e1 k ov\u011b\u0159ov\u00e1n\u00ed API token v hlavi\u010dce Authorization-Token (SkyPlanner Settings &gt; API) a je zdokumentov\u00e1no ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a polling<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Data z Cegid se na\u010d\u00edtaj\u00ed pravideln\u00fdm dotazov\u00e1n\u00edm (pollingem). Nov\u00e9 v\u00fdrobn\u00ed \u00fakoly se zji\u0161\u0165uj\u00ed pomoc\u00ed dotaz\u016f omezen\u00fdch na otev\u0159en\u00e9 OF a posledn\u00ed zm\u011bny. Interval se nastavuje pro ka\u017ed\u00fd z\u00e1vod zvl\u00e1\u0161\u0165: od n\u011bkolika minut u OF po hodinu u z\u00e1sob.<\/p>\n\n\n<p>SkyPlanner p\u0159i zm\u011bn\u011b stavu nebo pl\u00e1nu odes\u00edl\u00e1 webhooky, tak\u017ee zp\u011btn\u00fd z\u00e1pis se \u0159\u00edd\u00ed ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt v Cegid (PMI \/ Primavera)<\/th><th>Objekt ve SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Articles \/ artigos<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 polling<\/td><\/tr><tr><td>Nomenclatures \/ fichas t\u00e9cnicas, componentes<\/td><td>Struktura v\u00fdrobku, podsestavy, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Gammes a operace \/ roteiros, opera\u00e7\u00f5es<\/td><td>Kroky postupu s dobou trv\u00e1n\u00ed, \u010dasem p\u0159\u00edpravy a \u010dasem ukon\u010dovac\u00edch prac\u00ed<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Postes de charge a stroje \/ centros de trabalho, postos de trabalho<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, efektivita<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Salari\u00e9s \/ operadores<\/td><td>Pracovn\u00edci<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Kalend\u00e1\u0159e \/ exce\u00e7\u00f5es de capacidade<\/td><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo vlastn\u00ed sm\u011bny ve SkyPlanner<\/td><\/tr><tr><td>Ferramentas e moldes (Primavera)<\/td><td>N\u00e1stroje jako zdroje s omezenou kapacitou<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Z\u00e1vazn\u00e9 a p\u0159edb\u011b\u017en\u00e9 OF \/ ordens de fabrico s operacemi<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi po\u017eadavky<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Polling ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Z\u00e1soby podle polo\u017eky a skladu<\/td><td>Skladov\u00e9 z\u016fstatky<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Polling, ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Objedn\u00e1vky u dodavatel\u016f s term\u00edny dod\u00e1n\u00ed<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Polling, ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed operace OF \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista prost\u0159ednictv\u00edm ActualizaPlaneamentoOperacao<\/td><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed ka\u017ed\u00e9ho kroku, p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>P\u0159i zm\u011bn\u011b pl\u00e1nu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>V Cegid nen\u00ed<\/td><td>Matice \u010das\u016f p\u0159\u00edpravy, n\u00e1stroje jako zdroje s omezenou kapacitou (PMI), alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte polo\u017eky, kusovn\u00edky, technologick\u00e9 postupy, kapacitn\u00ed pracovi\u0161t\u011b, stroje, oper\u00e1tory a kalend\u00e1\u0159e. Mapov\u00e1n\u00ed pracovi\u0161\u0165 pe\u010dliv\u011b promyslete: z jednoho poste de charge se \u010dty\u0159mi stroji vznikne jedna skupina pracovi\u0161\u0165 se \u010dty\u0159mi pracovi\u0161ti.<\/p>\n\n\n<p><strong>2. Synchronizace OF.<\/strong> Na\u010dt\u011bte z\u00e1vazn\u00e9 OF v\u010detn\u011b operac\u00ed a komponent i otev\u0159en\u00e9 objedn\u00e1vky u dodavatel\u016f. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, kdy\u017e je objedn\u00e1vka ozna\u010dena stavem Delivered. P\u0159i vymezen\u00ed rozsahu projektu rozhodn\u011bte, zda se budou rozvrhovat i p\u0159edb\u011b\u017en\u00e9 OF (OF pr\u00e9visionnels), nebo pouze z\u00e1vazn\u00e9 OF.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune operaci, webhook SkyPlanner spust\u00ed z\u00e1pis do Cegid. V PMI se pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed zapisuj\u00ed k operac\u00edm OF prost\u0159ednictv\u00edm Web API v souladu s aplika\u010dn\u00edmi pravidly PMI. V Primavera integrace vol\u00e1 IGprBSPlaneamento.ActualizaPlaneamentoOperacao a p\u0159ed\u00e1v\u00e1 operaci, pracovn\u00ed st\u0159edisko a pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed. T\u00edm se u operace v\u00fdrobn\u00edho p\u0159\u00edkazu aktualizuj\u00ed pole DataIniPrevista a DataFimPrevista.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed pr\u00e1ce ve v\u00fdrob\u011b.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed pl\u00e1n aktu\u00e1ln\u00ed. Sami rozhodnete, zda se m\u00e1 \u010das zapisovat zp\u011bt do Cegid. Pokud ano, zapisuje se jako pointages v PMI nebo prost\u0159ednictv\u00edm IniciaPicagem a TerminaPicagem do Di\u00e1rios de Trabalho v Primavera. Pokud ne, \u010das se nad\u00e1le zaznamen\u00e1v\u00e1 v Cegid pomoc\u00ed \u010d\u00e1rov\u00fdch k\u00f3d\u016f.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu je p\u00edsemn\u011b stanovte:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, kusovn\u00edky, technologick\u00e9 postupy, mno\u017estv\u00ed a stav OF<\/td><td>Cegid<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed stroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f p\u0159\u00edpravy, po\u017eadavky na n\u00e1stroje a oper\u00e1tory, alternativn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu projektu<\/td><\/tr><tr><td>\u010cas, spot\u0159eba a dokon\u010den\u00ed<\/td><td>Cegid; \u00fadaje se zad\u00e1vaj\u00ed p\u0159\u00edmo v n\u011bm nebo p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jedin\u00fd syst\u00e9m, kter\u00fd bude zapisovat term\u00edny OF. P\u0159i z\u00e1pisu pl\u00e1novan\u00fdch term\u00edn\u016f SkyPlanner nahrazuje pl\u00e1novac\u00ed v\u00fdpo\u010dty PMI a pl\u00e1novac\u00ed algoritmus Primavera. Pro OF, kter\u00e9 rozvrhuje SkyPlanner, tyto v\u00fdpo\u010dty p\u0159esta\u0148te spou\u0161t\u011bt, aby si syst\u00e9my term\u00edny navz\u00e1jem nep\u0159episovaly.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace obvykle trv\u00e1 n\u011bkolik t\u00fddn\u016f od zah\u00e1jen\u00ed \u00favodn\u00edho nastaven\u00ed. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te pl\u00e1n b\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed s \u00fadaji o pracovi\u0161t\u00edch, technologick\u00fdch postupech a otev\u0159en\u00fdch OF exportovan\u00fdmi z Cegid ve form\u00e1tu CSV nebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla pro spr\u00e1vu dat, intervaly synchronizace a to, zda se budou zp\u011btn\u011b zapisovat i \u010dasy.<\/li>\n\n\n<li><strong>P\u0159\u00edstup k Cegid.<\/strong> Vytvo\u0159te integra\u010dn\u00edho u\u017eivatele a ov\u011b\u0159te opr\u00e1vn\u011bn\u00ed a licence pro v\u00fdrobn\u00ed objekty. Nejprve v\u0161e otestujte v testovac\u00ed firm\u011b.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed dat.<\/strong> Articles, nomenclatures, gammes, postes de charge, stroje, oper\u00e1to\u0159i a kalend\u00e1\u0159e.<\/li>\n\n\n<li><strong>Synchronizace OF a dodavatelsk\u00fdch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed s filtry, str\u00e1nkov\u00e1n\u00edm a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v SkyPlanner.<\/strong> Matice \u010das\u016f p\u0159\u00edpravy, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f na operaci a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Pl\u00e1novan\u00e9 term\u00edny operac\u00ed z webhook\u016f SkyPlanner a p\u0159\u00edpadn\u011b tak\u00e9 z\u00e1pis \u010das\u016f, pokud jej zvol\u00edte.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Spus\u0165te SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Ostr\u00fd provoz.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Potvrzen\u00e9 a pl\u00e1novan\u00e9 OF.<\/strong> PMI vytv\u00e1\u0159\u00ed oba typy z CBN. Za\u0159azen\u00ed pl\u00e1novan\u00fdch OF do pl\u00e1nu uk\u00e1\u017ee budouc\u00ed vyt\u00ed\u017een\u00ed, term\u00edny ale zapisujte zp\u011bt pouze do potvrzen\u00fdch OF.<\/li>\n\n\n<li><strong>Operace vy\u0159azen\u00e9 z pl\u00e1nov\u00e1n\u00ed.<\/strong> V Primavera lze operaci ozna\u010dit jako nepodl\u00e9haj\u00edc\u00ed pl\u00e1nov\u00e1n\u00ed (NaoSujeitaPlaneamento). P\u0159i zp\u011btn\u00e9m z\u00e1pisu tyto operace vynechte.<\/li>\n\n\n<li><strong>Strojn\u00ed \u010das a \u010das obsluhy.<\/strong> Primavera u ka\u017ed\u00e9 operace eviduje strojn\u00ed \u010das a \u010das obsluhy samostatn\u011b. Namapujte oba \u00fadaje, aby operace vy\u017eaduj\u00edc\u00ed v\u00edce oper\u00e1tor\u016f m\u011bly spr\u00e1vn\u00e9 obsazen\u00ed.<\/li>\n\n\n<li><strong>P\u0159ekr\u00fdv\u00e1n\u00ed operac\u00ed.<\/strong> Operace v Primavera maj\u00ed koeficient p\u0159ekryt\u00ed. Namapujte jej na \u010dasov\u00e1n\u00ed krok\u016f v SkyPlanner, jinak bude pl\u00e1n po\u010d\u00edtat s del\u0161\u00edm \u010dek\u00e1n\u00edm, ne\u017e jak\u00e9 ve v\u00fdrob\u011b skute\u010dn\u011b pot\u0159ebujete.<\/li>\n\n\n<li><strong>Konkr\u00e9tn\u00ed ERP od Cegid.<\/strong> PMI, Primavera a Ekon pou\u017e\u00edvaj\u00ed r\u016fzn\u00e1 rozhran\u00ed. Nejprve ov\u011b\u0159te produkt a verzi. Pro Cegid XRP Flex pou\u017eijte <a href=\"\/cs\/integrace\/erp\/acumatica\/pruvodce-integraci\/\">pr\u016fvodce integrac\u00ed s Acumatica<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo integraci s Cegid nastavuje a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje podporu,<\/strong> a to v rozsahu dohodnut\u00fdch vol\u00e1n\u00ed Cegid API. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Cegid jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro Cegid.<\/strong> Zn\u00e1 va\u0161e nastaven\u00ed, \u00fapravy i licence a m\u016f\u017ee spole\u010dn\u011b s t\u00fdmem SkyPlanner nastavit integra\u010dn\u00edho u\u017eivatele a p\u0159\u00edstup k API.<\/li>\n\n\n<li><strong>Na integraci mohou nav\u00e1zat i va\u0161i v\u00fdvoj\u00e1\u0159i<\/strong> pomoc\u00ed REST API SkyPlanner a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner stoj\u00ed od 199 \u20ac m\u011bs\u00ed\u010dn\u011b za 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/cegid\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro Cegid<\/a>, <a href=\"\/cs\/integrace\/erp\/cegid\/\">str\u00e1nku Cegid<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Objednat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1s posunul od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v tabulk\u00e1ch Excelu k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivity v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve spole\u010dnosti Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchod volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner d\u00e1v\u00e1 ve\u0161ker\u00e9mu pl\u00e1nov\u00e1n\u00ed v\u00fdroby pevn\u00fd a spolehliv\u00fd z\u00e1klad.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Obalov\u00e9 pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00ed odd\u011blen\u00ed vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu pl\u00e1nu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, se nyn\u00ed odpov\u00edd\u00e1 b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100 %<\/b><span>dod\u00e1vek v\u010das od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u00e1ch a d\u00edky n\u011bmu je pl\u00e1nov\u00e1n\u00ed p\u0159edv\u00eddateln\u00e9.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Po celou dobu pou\u017e\u00edv\u00e1n\u00ed SkyPlanner, tedy od roku 2021, dosahuje v\u010dasnost dod\u00e1vek 100 %.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Cegid PMI rozhran\u00ed API?<\/summary>\n<p class=\"sp-faq__a\">Ano. Cegid poskytuje pro PMI rozhran\u00ed Web API pro bezpe\u010dnou v\u00fdm\u011bnu dat s extern\u00edmi aplikacemi p\u0159i zachov\u00e1n\u00ed obchodn\u00edch pravidel Manufacturing PMI. SkyPlanner jej pou\u017e\u00edv\u00e1 ke \u010dten\u00ed OF a z\u00e1pisu pl\u00e1novan\u00fdch term\u00edn\u016f a pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Cegid Primavera API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. PRIMAVERA V10 API podporuje \u010dten\u00ed a z\u00e1pis ve v\u0161ech modulech. Modul Produ\u00e7\u00e3o zp\u0159\u00edstup\u0148uje ordens de fabrico, Planeamento s ActualizaPlaneamentoOperacao a Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do Cegid?<\/summary>\n<p class=\"sp-faq__a\">V PMI se term\u00edny zapisuj\u00ed p\u0159es Web API k jednotliv\u00fdm operac\u00edm OF. V syst\u00e9mu Primavera se zapisuj\u00ed prost\u0159ednictv\u00edm IGprBSPlaneamento.ActualizaPlaneamentoOperacao, \u010d\u00edm\u017e se nastavuje pl\u00e1novan\u00fd za\u010d\u00e1tek a konec operace ordem de fabrico.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje Cegid webhooky?<\/summary>\n<p class=\"sp-faq__a\">Integrace se dotazuje Cegid v intervalech nastaven\u00fdch pro konkr\u00e9tn\u00ed z\u00e1vod. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu hned, jak nastanou, tak\u017ee se term\u00edny dostanou do Cegid ihned po ka\u017ed\u00e9m p\u0159epl\u00e1nov\u00e1n\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner pro Cegid nab\u00eddnout vestav\u011bn\u00e9 pl\u00e1nov\u00e1n\u00ed Cegid, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud z\u00e1kazn\u00edk pot\u0159ebuje zohlednit i jin\u00e1 omezen\u00ed ne\u017e stroje a z\u00e1soby. Samotn\u00fd Cegid doporu\u010duje p\u0159ipojit n\u00e1stroje pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed, kter\u00e9 zohledn\u00ed dal\u0161\u00ed omezen\u00ed (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner pl\u00e1nuje oper\u00e1tory, n\u00e1stroje, se\u0159izov\u00e1n\u00ed i materi\u00e1l, automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 a umo\u017e\u0148uje neomezen\u00fd po\u010det u\u017eivatel\u016f, a to od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed m\u016f\u017eete pou\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165 a importovat data z Cegid ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a domluvte se na vymezen\u00ed rozsahu integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Cegid Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Cegid ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit v\u00fdrobn\u00ed ERP syst\u00e9my Cegid se SkyPlanner APS. Nejprve se v\u011bnuje Cegid PMI, pot\u00e9 Cegid Primavera a Cegid Ekon. SkyPlanner se s Cegid propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed Cegid: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106376,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107333","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrace Cegid s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/pruvodce-integraci\\\/\",\"name\":\"Integrace Cegid s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Cegid: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s ohledem na kapacity\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrace Cegid s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","description":"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"13 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/","name":"Integrace Cegid s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Cegid PMI a Cegid Primavera se SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, z\u00e1pis do Planeamento, mapov\u00e1n\u00ed dat, polling a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Cegid: pl\u00e1nov\u00e1n\u00ed v\u00fdroby s ohledem na kapacity","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Cegid Pr\u016fvodce integrac\u00ed Cegid pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Cegid ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit v\u00fdrobn\u00ed ERP syst\u00e9my Cegid se SkyPlanner APS. Nejprve se v\u011bnuje Cegid PMI, pot\u00e9 Cegid Primavera a Cegid Ekon. SkyPlanner se s Cegid propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm rozhran\u00ed Cegid: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107333"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107333\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106376"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}