{"id":107275,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Global Shop Solutions<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Global Shop Solutions <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Global Shop Solutions ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ERP Global Shop Solutions se SkyPlanner APS. Integrace SkyPlanner s Global Shop funguje obousm\u011brn\u011b:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed Parts, kusovn\u00edky, Routers s jednotliv\u00fdmi operacemi, Workcenters a pracovn\u00ed skupiny, kapacitn\u00ed kalend\u00e1\u0159e, zam\u011bstnanci, otev\u0159en\u00e9 Work Orders, materi\u00e1lov\u00e9 po\u017eadavky a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Ke ka\u017ed\u00e9 operaci v\u00fdrobn\u00edho p\u0159\u00edkazu se zp\u011bt zapisuje pl\u00e1novan\u00fd za\u010d\u00e1tek a konec spolu s Workcenter, kter\u00e9 SkyPlanner p\u0159i\u0159adil.<\/li>\n\n\n<li>Pokud tuto mo\u017enost zvol\u00edte, lze odpracovan\u00fd \u010das oper\u00e1tor\u016f a mno\u017estv\u00ed zapisovat zp\u011bt jako v\u00fdkazy pr\u00e1ce k v\u00fdrobn\u00edmu p\u0159\u00edkazu.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161emu nastaven\u00ed Global Shop a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm, v\u00fdvoj\u00e1\u0159\u016fm Global Shop a IT t\u00fdm\u016fm, kter\u00e9 se cht\u011bj\u00ed do integrace zapojit nebo samostatn\u011b vyu\u017e\u00edt zdokumentovan\u00e9 REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"global-shop-s-integration-tools\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed n\u00e1stroje Global Shop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Global Shop pro roz\u0161i\u0159ov\u00e1n\u00ed a propojov\u00e1n\u00ed sv\u00e9ho ERP pou\u017e\u00edv\u00e1 vlastn\u00ed sadu n\u00e1stroj\u016f, nikoli ve\u0159ejn\u00e9 REST API:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Global Application Builder (GAB) SDK.<\/strong> &#8222;The Global Application Builder (GAB) SDK allows you to tailor screens and create applications specific to your manufacturing processes&#8220; (Global Application Builder (GAB) SDK umo\u017e\u0148uje p\u0159izp\u016fsobovat obrazovky a vytv\u00e1\u0159et aplikace pro va\u0161e konkr\u00e9tn\u00ed v\u00fdrobn\u00ed procesy) (<a href=\"https:\/\/www.globalshopsolutions.com\/tailored-erp-software-for-manufacturing\">Global Shop<\/a>). Produktov\u00fd list uv\u00e1d\u00ed &#8222;Integrate with third-party APIs and office software suites&#8220; (propojen\u00ed s API t\u0159et\u00edch stran a kancel\u00e1\u0159sk\u00fdmi bal\u00edky), &#8222;Manage data flow&#8220; (spr\u00e1va datov\u00fdch tok\u016f), &#8222;Automate processes&#8220; (automatizace proces\u016f), &#8222;Schedule reporting&#8220; (pl\u00e1nov\u00e1n\u00ed sestav) a &#8222;Create custom ERP subsystems that integrate with the base package&#8220; (tvorba vlastn\u00edch subsyst\u00e9m\u016f ERP propojen\u00fdch se z\u00e1kladn\u00edm bal\u00edkem) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/pdfs\/product-sheets\/tailored-erp.pdf\">produktov\u00fd list GAB<\/a>). Global Shop dod\u00e1v\u00e1, \u017ee &#8222;GAB&#8217;s innovative use of business data objects removes the risk normally associated with extending your ERP system&#8220; (inovativn\u00ed vyu\u017eit\u00ed podnikov\u00fdch datov\u00fdch objekt\u016f v GAB odstra\u0148uje riziko obvykle spojen\u00e9 s roz\u0161i\u0159ov\u00e1n\u00edm syst\u00e9mu ERP) (<a href=\"https:\/\/www.globalshopsolutions.com\/blog\/global-shop-solutions-erp-software-sdk-allows-you-to-customize-and-accessorize\">blog Global Shop<\/a>). Pr\u00e1v\u011b touto cestou se integruje SkyPlanner.<\/li>\n\n\n<li><strong>Slu\u017eby Global Shop.<\/strong> Global Shop nab\u00edz\u00ed &#8222;Development as a Service (DaaS)&#8220; (v\u00fdvoj jako slu\u017ebu) a pomoc s &#8222;Add Third-Party Integrations, Applications, Automations &amp; Software&#8220; (p\u0159id\u00e1v\u00e1n\u00edm integrac\u00ed, aplikac\u00ed, automatizac\u00ed a softwaru t\u0159et\u00edch stran) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/website-pdfs\/whitepapers\/global-shop-solutions-info-pack.pdf\">informa\u010dn\u00ed materi\u00e1ly<\/a>). Ve sv\u00e9m katalogu integrac\u00ed vyb\u00edz\u00ed z\u00e1jemce ke konzultaci &#8222;your specific integration needs&#8220; (va\u0161ich konkr\u00e9tn\u00edch pot\u0159eb v oblasti integrace) (<a href=\"https:\/\/www.globalshopsolutions.com\/software-application-integrations\">integrace<\/a>).<\/li>\n\n\n<li><strong>Excel a exporty do soubor\u016f.<\/strong> V katalogu integrac\u00ed Global Shop najdete Microsoft Excel a Access. GAB tak\u00e9 umo\u017e\u0148uje napl\u00e1novat spou\u0161t\u011bn\u00ed sestav. Exportovan\u00e9 soubory s d\u00edly, Routers, Workcenters a otev\u0159en\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy slou\u017e\u00ed k vyzkou\u0161en\u00ed SkyPlanner.<\/li>\n\n<\/ol>\n\n\n<p>Na stran\u011b SkyPlanner slou\u017e\u00ed REST API ke \u010dten\u00ed a z\u00e1pisu zak\u00e1zek, produkt\u016f, materi\u00e1l\u016f, krok\u016f postupu, \u010dasov\u00fdch z\u00e1znam\u016f a n\u00e1kupn\u00edch objedn\u00e1vek. Ov\u011b\u0159ov\u00e1n\u00ed prob\u00edh\u00e1 pomoc\u00ed API tokenu v hlavi\u010dce <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). Dokumentace je k dispozici ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-the-pieces-connect\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak propojen\u00ed funguje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Odchoz\u00ed data z Global Shop.<\/strong> Napl\u00e1novan\u00fd proces GAB na\u010dte Work Orders, operace z Router a n\u00e1kupn\u00ed objedn\u00e1vky, kter\u00e9 se od posledn\u00edho spu\u0161t\u011bn\u00ed zm\u011bnily, a ode\u0161le je do REST API SkyPlanner. GAB umo\u017e\u0148uje &#8222;Schedule processes and reports to run at regular intervals,&#8220; (pl\u00e1novat pravideln\u00e9 spou\u0161t\u011bn\u00ed proces\u016f a sestav), tak\u017ee operace se synchronizuj\u00ed ka\u017ed\u00fdch n\u011bkolik minut a kmenov\u00e1 data ka\u017edou hodinu nebo ka\u017edou noc.<\/li>\n\n\n<li><strong>P\u0159\u00edchoz\u00ed data do Global Shop.<\/strong> P\u0159i zm\u011bn\u011b pl\u00e1nu ode\u0161le SkyPlanner webhook a pl\u00e1novan\u00e9 term\u00edny se na\u010dtou z REST API SkyPlanner. Proces GAB zap\u00ed\u0161e \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed k odpov\u00eddaj\u00edc\u00edm operac\u00edm v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f. P\u0159i vymezen\u00ed rozsahu v r\u00e1mci zav\u00e1d\u011bn\u00ed se ur\u010d\u00ed, zda GAB p\u0159ijme webhook p\u0159\u00edmo, nebo bude zm\u011bny na\u010d\u00edtat v kr\u00e1tk\u00fdch intervalech.<\/li>\n\n\n<li><strong>V\u00fdrobn\u00ed provoz.<\/strong> \u010casov\u00e9 z\u00e1znamy SkyPlanner jsou dostupn\u00e9 p\u0159es REST API nebo webhook. Pokud tuto mo\u017enost zvol\u00edte, GAB je zap\u00ed\u0161e jako v\u00fdkazy pr\u00e1ce k v\u00fdrobn\u00edmu p\u0159\u00edkazu.<\/li>\n\n<\/ul>\n\n\n<p>Global Shop b\u011b\u017e\u00ed ve vlastn\u00ed infrastruktu\u0159e, v Global Shop Cloud (zaji\u0161\u0165ovan\u00e9m Amazon Web Services) nebo jako SaaS. P\u0159i vymezen\u00ed rozsahu se s va\u0161\u00edm IT t\u00fdmem nebo Global Shop dohodne, kde bude proces GAB b\u011b\u017eet a jak bude s\u00ed\u0165ov\u011b propojen se SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt v Global Shop<\/th><th>Objekt ve SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Parts (kmenov\u00e1 data d\u00edl\u016f), kusovn\u00edky, v\u00edce\u00farov\u0148ov\u00e9 kusovn\u00edky<\/td><td>Produkty, materi\u00e1ly, struktura produktu<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Routers: operace pro pr\u00e1ci, materi\u00e1l a extern\u00ed slu\u017eby s p\u0159i\u0159azen\u00fdm Workcenter a uveden\u00fdmi \u010dasy<\/td><td>Kroky postupu s dobou trv\u00e1n\u00ed a \u010dasy p\u0159\u00edpravy<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Workcenters a pracovn\u00ed skupiny<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, alternativn\u00ed pracovi\u0161t\u011b<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Kapacitn\u00ed kalend\u00e1\u0159e, zam\u011bstnanci, sm\u011bny<\/td><td>Sm\u011bny, kalend\u00e1\u0159e, pracovn\u00edci<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo vlastn\u00ed spr\u00e1va sm\u011bn ve SkyPlanner<\/td><\/tr><tr><td>Work Orders: d\u00edl, mno\u017estv\u00ed, po\u017eadovan\u00fd term\u00edn, priorita, nav\u00e1zan\u00e1 prodejn\u00ed objedn\u00e1vka<\/td><td>Zak\u00e1zky s po\u017eadovan\u00fdmi term\u00edny a prioritami<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Proces GAB ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Operace v\u00fdrobn\u00edho p\u0159\u00edkazu: stav, dokon\u010den\u00e9 mno\u017estv\u00ed, zb\u00fdvaj\u00edc\u00ed hodiny<\/td><td>Operace pro jednotliv\u00e9 kroky postupu<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Proces GAB ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Materi\u00e1lov\u00e9 po\u017eadavky, n\u00e1kupn\u00ed objedn\u00e1vky, objedn\u00e1vky kooperac\u00ed<\/td><td>Pot\u0159eba materi\u00e1lu, n\u00e1kupn\u00ed objedn\u00e1vky podle term\u00ednu dod\u00e1n\u00ed<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec operace v\u00fdrobn\u00edho p\u0159\u00edkazu, Workcenter<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec, stroj a oper\u00e1tor pro ka\u017ed\u00fd krok<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>P\u0159i zm\u011bn\u011b pl\u00e1nu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td>V\u00fdkazy pr\u00e1ce: \u010das a mno\u017estv\u00ed pro ka\u017edou operaci v\u00fdrobn\u00edho p\u0159\u00edkazu<\/td><td>\u010casov\u00e9 z\u00e1znamy a odv\u00e1d\u011bn\u00ed v\u00fdroby oper\u00e1tory<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>P\u0159i ka\u017ed\u00e9m odveden\u00ed v\u00fdroby nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Pravidla pl\u00e1nov\u00e1n\u00ed ve SkyPlanner<\/td><td>Matice p\u0159\u00edpravn\u00fdch \u010das\u016f, n\u00e1stroje jako zdroje s omezenou kapacitou, operace s v\u00edce oper\u00e1tory<\/td><td>Spravov\u00e1no ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Postupy integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte Parts, kusovn\u00edky, Routers, Workcenters, pracovn\u00ed skupiny, kapacitn\u00ed kalend\u00e1\u0159e a zam\u011bstnance. Mapov\u00e1n\u00ed Workcenters pe\u010dliv\u011b promyslete: z Workcenter se \u010dty\u0159mi stejn\u00fdmi stroji vznikne skupina se \u010dty\u0159mi pracovi\u0161ti, aby SkyPlanner pl\u00e1noval po\u0159ad\u00ed operac\u00ed pro ka\u017ed\u00fd stroj zvl\u00e1\u0161\u0165. Pracovn\u00ed skupiny se mapuj\u00ed na alternativn\u00ed pracovi\u0161t\u011b.<\/p>\n\n\n<p><strong>2. Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte otev\u0159en\u00e9 Work Orders v\u010detn\u011b jejich operac\u00ed, materi\u00e1lov\u00fdch po\u017eadavk\u016f a otev\u0159en\u00fdch n\u00e1kupn\u00edch objedn\u00e1vek. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a po jej\u00edm ozna\u010den\u00ed stavem Delivered aktualizuje z\u00e1soby. Operace extern\u00edch slu\u017eeb se p\u0159en\u00e1\u0161ej\u00ed jako kroky s pouhou dobou trv\u00e1n\u00ed odpov\u00eddaj\u00edc\u00ed jejich pr\u016fb\u011b\u017en\u00e9 dob\u011b.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed j\u00e1dro za\u0159ad\u00ed nebo p\u0159esune operaci, webhook SkyPlanner spust\u00ed GAB. GAB zap\u00ed\u0161e k dan\u00e9 operaci v\u00fdrobn\u00edho p\u0159\u00edkazu pl\u00e1novan\u00fd za\u010d\u00e1tek a konec. Pokud SkyPlanner p\u0159esunul pr\u00e1ci na jin\u00fd stroj, zap\u00ed\u0161e tak\u00e9 Workcenter. Seznamy pr\u00e1ce a zobrazen\u00ed APS pak ukazuj\u00ed po\u0159ad\u00ed operac\u00ed ze SkyPlanner.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby v provozu.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer. D\u00edky \u010dasov\u00fdm z\u00e1znam\u016fm z\u016fst\u00e1v\u00e1 pl\u00e1n aktu\u00e1ln\u00ed. Vy rozhodnete, zda se skute\u010dn\u011b odpracovan\u00fd \u010das bude zapisovat zp\u011bt do Global Shop. Pokud ano, ka\u017ed\u00e9 odveden\u00ed v\u00fdroby se zap\u00ed\u0161e jako v\u00fdkaz pr\u00e1ce k operaci v\u00fdrobn\u00edho p\u0159\u00edkazu. Pokud ne, Shop Floor Data Collection z\u016fstane beze zm\u011bny a SkyPlanner bude na\u010d\u00edtat pr\u016fb\u011bh v\u00fdroby z operac\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Parts, kusovn\u00edky, Routers, mno\u017estv\u00ed, po\u017eadovan\u00e9 term\u00edny, stav v\u00fdrobn\u00edho p\u0159\u00edkazu<\/td><td>Global Shop<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, stroj a oper\u00e1tor pro ka\u017edou operaci<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice p\u0159\u00edpravn\u00fdch \u010das\u016f, po\u017eadavky na n\u00e1stroje a oper\u00e1tory, alternativn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Kapacitn\u00ed kalend\u00e1\u0159e a sm\u011bny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>V\u00fdkazy pr\u00e1ce, v\u00fddeje materi\u00e1lu, p\u0159\u00edjmy, kalkulace n\u00e1klad\u016f<\/td><td>Global Shop; data se zad\u00e1vaj\u00ed p\u0159\u00edmo v n\u011bm nebo p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pro z\u00e1pis term\u00edn\u016f operac\u00ed ur\u010dete jedin\u00fd syst\u00e9m. Pl\u00e1nova\u010di p\u0159esouvaj\u00ed pr\u00e1ci ve SkyPlanner a term\u00edny se p\u0159en\u00e1\u0161ej\u00ed do Global Shop. U v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f pl\u00e1novan\u00fdch ve SkyPlanner je nutn\u00e9 p\u0159estat pou\u017e\u00edvat glob\u00e1ln\u00ed p\u0159epl\u00e1nov\u00e1n\u00ed a p\u0159esouv\u00e1n\u00ed p\u0159eta\u017een\u00edm v Global Shop APS. Jinak se oba pl\u00e1ny za\u010dnou rozch\u00e1zet.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si pl\u00e1n ov\u011b\u0159te v 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed verzi s daty Workcenters, Routers a otev\u0159en\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f exportovan\u00fdmi z Global Shop ve form\u00e1tu Excel nebo CSV.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vymezen\u00ed rozsahu.<\/strong> Stanovte mapovac\u00ed tabulku, odpov\u011bdnost za data, intervaly synchronizace a to, zda se budou v\u00fdkazy pr\u00e1ce zapisovat zp\u011bt. Potvr\u010fte zp\u016fsob nasazen\u00ed (vlastn\u00ed infrastruktura, Cloud nebo SaaS) a kdo zajist\u00ed v\u00fdvoj na stran\u011b GAB.<\/li>\n\n\n<li><strong>P\u0159\u00edstup.<\/strong> Vytvo\u0159te API token SkyPlanner a dohodn\u011bte odchoz\u00ed s\u00ed\u0165ov\u00e9 p\u0159ipojen\u00ed pro GAB.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed.<\/strong> Parts, kusovn\u00edky, Routers, Workcenters, pracovn\u00ed skupiny, kalend\u00e1\u0159e a zam\u011bstnanci.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u011b spou\u0161t\u011bn\u00fd proces GAB s detekc\u00ed zm\u011bn, opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch pokus\u016f a protokolov\u00e1n\u00edm.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice \u010das\u016f p\u0159\u00edpravy, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f na operaci a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Webhooky spou\u0161t\u011bj\u00ed z\u00e1pis k operac\u00edm v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, p\u0159\u00edpadn\u011b i z\u00e1pis v\u00fdkaz\u016f pr\u00e1ce, pokud tuto mo\u017enost zvol\u00edte.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Spus\u0165te SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem APS, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis a p\u0159esta\u0148te ru\u010dn\u011b p\u0159epl\u00e1nov\u00e1vat pr\u00e1ci, kterou pl\u00e1nuje SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-global-shop-solutions-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s Global Shop Solutions<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Workcenters a jednotliv\u00e9 stroje.<\/strong> Global Shop pl\u00e1nuje podle Workcenter a pracovn\u00edch skupin. Ur\u010dete, kter\u00e9 Workcenters zahrnuj\u00ed v\u00edce stroj\u016f, a rozd\u011blte je na jednotliv\u00e1 pracovi\u0161t\u011b ve SkyPlanner.<\/li>\n\n\n<li><strong>T\u0159i typy sekvenc\u00ed.<\/strong> Routers obsahuj\u00ed sekvence pro materi\u00e1l, pr\u00e1ci a extern\u00ed slu\u017eby. Kapacitu \u010derpaj\u00ed pouze pracovn\u00ed sekvence. Materi\u00e1lov\u00e9 sekvence se p\u0159ev\u00e1d\u011bj\u00ed na po\u017eadavky na materi\u00e1l a extern\u00ed slu\u017eby na kroky, u nich\u017e se zohled\u0148uje pouze doba trv\u00e1n\u00ed.<\/li>\n\n\n<li><strong>\u010cas p\u0159\u00edpravy a \u010das zpracov\u00e1n\u00ed.<\/strong> P\u0159en\u00e1\u0161ejte je odd\u011blen\u011b, aby tam, kde z\u00e1le\u017e\u00ed na po\u0159ad\u00ed operac\u00ed, mohla matice \u010das\u016f p\u0159\u00edpravy nahradit pevn\u011b stanoven\u00fd \u010das p\u0159\u00edpravy.<\/li>\n\n\n<li><strong>Kalend\u00e1\u0159e.<\/strong> Global Shop vede kapacitn\u00ed kalend\u00e1\u0159e se zm\u011bnami pro konkr\u00e9tn\u00ed data. Ur\u010dete jeden syst\u00e9m, ve kter\u00e9m se budou spravovat sm\u011bny a sv\u00e1tky. Jinak se budou oba pl\u00e1ny rozch\u00e1zet.<\/li>\n\n\n<li><strong>Pracovn\u00edci na pracovi\u0161t\u00edch.<\/strong> Global Shop pl\u00e1nuje zam\u011bstnance podle jejich dovednost\u00ed. P\u0159i vymezen\u00ed rozsahu se dohodn\u011bte, jak se budou pracovn\u00edci p\u0159i\u0159azovat k pracovi\u0161t\u00edm ve SkyPlanner.<\/li>\n\n\n<li><strong>Ozna\u010den\u00ed urgentn\u00ed pr\u00e1ce a priority.<\/strong> Namapujte priority z Global Shop na prioritu a Fast Track ve SkyPlanner, aby si urgentn\u00ed pr\u00e1ce udr\u017eela sv\u00e9 m\u00edsto v pl\u00e1nu.<\/li>\n\n\n<li><strong>Aktualizace.<\/strong> Global Shop Cloud zahrnuje &#8222;Semi-annual upgrades.&#8220; (aktualizace dvakr\u00e1t ro\u010dn\u011b). Po ka\u017ed\u00e9 aktualizaci znovu otestujte proces GAB.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-global-shop-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci s Global Shop a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to v rozsahu dohodnut\u00fdch objekt\u016f a pravidel synchronizace. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Global Shop jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed integrace se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i t\u00fdm slu\u017eeb Global Shop.<\/strong> Jeho v\u00fdvoj\u00e1\u0159i DaaS znaj\u00ed GAB i va\u0161e nastaven\u00ed a mohou spole\u010dn\u011b s t\u00fdmem SkyPlanner vytvo\u0159it \u010d\u00e1st integrace na stran\u011b Global Shop.<\/li>\n\n\n<li><strong>Integraci mohou d\u00e1le rozv\u00edjet i va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i GAB<\/strong> pomoc\u00ed REST API SkyPlanner a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v\u00e1m v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrac\u00ed SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku integrace dostanete p\u0159edem spolu s nab\u00eddkou tarifu podle va\u0161ich proces\u016f a pot\u0159eb. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/global-shop-solutions\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro Global Shop Solutions<\/a>, <a href=\"\/cs\/integrace\/erp\/global-shop-solutions\/\">str\u00e1nku Global Shop Solutions<\/a>, <a href=\"\/cs\/funkce\/\">funkce SkyPlanner<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">V\u00fdrobn\u00ed firmy, kter\u00e9 pou\u017e\u00edvaj\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu na v\u00fdrobu rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme p\u0159e\u0161li od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v excelov\u00fdch tabulk\u00e1ch k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pracovn\u00ed doby a nov\u00e1 fronta \u00faloh se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>M\u00e9n\u011b<\/b><span>prostoj\u016f kv\u016fli nedostatku materi\u00e1lu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eP\u0159\u00ednos SkyPlanner pro n\u00e1s spo\u010d\u00edv\u00e1 v tom, \u017ee je to n\u00e1stroj, kter\u00fd funguje v ka\u017edodenn\u00ed praxi, zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/b><br>Eskomatic \u00b7 Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Automatick\u00e9 pl\u00e1nov\u00e1n\u00ed vyt\u00ed\u017een\u00ed umo\u017e\u0148uje p\u0159esn\u011bji stanovit term\u00edny dod\u00e1n\u00ed a prostoje ve v\u00fdrob\u011b zp\u016fsoben\u00e9 nedostatkem materi\u00e1lu v\u00fdrazn\u011b klesly.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale firmy v Lohje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a v\u00edce<\/b><span>automaticky napl\u00e1novan\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se pl\u00e1nuj\u00ed automaticky a cel\u00e1 firma m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Global Shop Solutions API?<\/summary>\n<p class=\"sp-faq__a\">Global Shop se propojuje s dal\u0161\u00edmi syst\u00e9my prost\u0159ednictv\u00edm SDK Global Application Builder (GAB), kter\u00e9 umo\u017e\u0148uje &#8222;integrate with third-party APIs,&#8220; (integraci s API t\u0159et\u00edch stran), a pomoc\u00ed vlastn\u00edch integra\u010dn\u00edch slu\u017eeb. Integrace se SkyPlanner vyu\u017e\u00edv\u00e1 na stran\u011b Global Shop GAB a na stran\u011b SkyPlanner REST API a webhooky.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Co je GAB v Global Shop Solutions?<\/summary>\n<p class=\"sp-faq__a\">Global Application Builder je SDK syst\u00e9mu Global Shop pro tvorbu vlastn\u00edch obrazovek, aplikac\u00ed a integrac\u00ed. Pracuje s objekty podnikov\u00fdch dat, umo\u017e\u0148uje \u0159\u00eddit datov\u00e9 toky a spou\u0161t\u011bt procesy podle \u010dasov\u00e9ho pl\u00e1nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do Global Shop?<\/summary>\n<p class=\"sp-faq__a\">Pro ka\u017edou sekvenci v\u00fdrobn\u00edho p\u0159\u00edkazu zvl\u00e1\u0161\u0165. Webhook ze SkyPlanner spust\u00ed GAB, kter\u00fd do sekvence zap\u00ed\u0161e pl\u00e1novan\u00fd za\u010d\u00e1tek a konec. Pokud SkyPlanner p\u0159esunul pr\u00e1ci na jin\u00fd stroj, zap\u00ed\u0161e tak\u00e9 Workcenter.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje integrace s Global Shop Cloud a SaaS?<\/summary>\n<p class=\"sp-faq__a\">Ano. SkyPlanner je cloudov\u00e1 slu\u017eba SaaS a propoj\u00ed se s Global Shop provozovan\u00fdm lok\u00e1ln\u011b, v Global Shop Cloud i formou SaaS. P\u0159i vymezen\u00ed rozsahu b\u011bhem zav\u00e1d\u011bn\u00ed se s v\u00e1mi a t\u00fdmem Global Shop dohodneme, kde pob\u011b\u017e\u00ed \u010d\u00e1st GAB a jak bude s\u00ed\u0165ov\u011b propojena se SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdo vytvo\u0159\u00ed \u010d\u00e1st integrace na stran\u011b Global Shop?<\/summary>\n<p class=\"sp-faq__a\">T\u00fdm SkyPlanner integraci nastavuje a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. T\u00fdm DaaS spole\u010dnosti Global Shop nebo va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i GAB mohou vytvo\u0159it \u010di roz\u0161\u00ed\u0159it \u010d\u00e1st GAB s vyu\u017eit\u00edm zdokumentovan\u00e9ho API SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed doby m\u016f\u017eete vyu\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165 a importovat data z Global Shop ve form\u00e1tu Excel nebo CSV. Platebn\u00ed karta nen\u00ed pot\u0159eba. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte spole\u010dn\u011b rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Global Shop Solutions Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Global Shop Solutions ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ERP Global Shop Solutions se SkyPlanner APS. Integrace SkyPlanner s Global Shop funguje obousm\u011brn\u011b: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106347,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107275","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Global Shop: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/pruvodce-integraci\\\/\",\"name\":\"Global Shop: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Global Shop Solutions: kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/global-shop-solutions\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Global Shop: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","description":"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/","name":"Global Shop: pr\u016fvodce integrac\u00ed APS pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte Global Shop Solutions se SkyPlanner APS: GAB SDK, REST API, webhooky, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Global Shop Solutions: kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/global-shop-solutions\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Global Shop Solutions Pr\u016fvodce integrac\u00ed Global Shop Solutions pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Global Shop Solutions ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit ERP Global Shop Solutions se SkyPlanner APS. Integrace SkyPlanner s Global Shop funguje obousm\u011brn\u011b: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=107275"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/107275\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106347"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=107275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}