{"id":106927,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed QAD Adaptive ERP <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed QAD Adaptive ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit QAD Adaptive ERP se SkyPlanner APS, a to i ve star\u0161\u00edch instalac\u00edch QAD Enterprise Edition a MFG\/PRO. SkyPlanner se s QAD Adaptive ERP integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm vlastn\u00edch rozhran\u00ed QAD:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner p\u0159ich\u00e1zej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy a jejich operace, polo\u017eky, struktury v\u00fdrobk\u016f, technologick\u00e9 postupy, pracovi\u0161t\u011b, v\u00fdrobn\u00ed kalend\u00e1\u0159e, z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Napl\u00e1novan\u00e9 term\u00edny uvoln\u011bn\u00ed a dokon\u010den\u00ed se zapisuj\u00ed zp\u011bt do Work Order Maintenance (16.1).<\/li>\n\n\n<li>\u010casov\u00e9 z\u00e1znamy obsluhy se zapisuj\u00ed zp\u011bt p\u0159es Labor Feedback by Work Order (16.20.1) a dokon\u010den\u00e1 mno\u017estv\u00ed p\u0159es Work Order Receipt (16.11).<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nakonfiguruje integraci podle va\u0161eho nastaven\u00ed QAD a zaji\u0161\u0165uje jej\u00ed podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vytv\u00e1\u0159et \u0159e\u0161en\u00ed s vyu\u017eit\u00edm zdokumentovan\u00e9ho REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed QAD<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD nab\u00edz\u00ed extern\u00edmu pl\u00e1novac\u00edmu syst\u00e9mu t\u0159i mo\u017enosti propojen\u00ed:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD jej popisuje jako &#8222;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8220; (XML framework zalo\u017een\u00fd na webov\u00fdch slu\u017eb\u00e1ch a kompatibiln\u00ed se SOAP, kter\u00fd poskytuje \u00fapln\u00fd, platformov\u011b nez\u00e1visl\u00fd p\u0159\u00edstup k podnikov\u00fdm funkc\u00edm QAD Enterprise Applications.) Ka\u017ed\u00fd po\u017eadavek m\u00e1 podobu <strong>QDoc<\/strong>, kter\u00fd spust\u00ed program QAD se stejn\u00fdmi validacemi jako p\u0159i pr\u00e1ci v jeho obrazovce. V\u00fdsledkem ka\u017ed\u00e9ho po\u017eadavku je odpov\u011b\u010f ve form\u00e1tu QDoc. Mezi vydan\u00e9 QDocs pat\u0159\u00ed <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> a <code>maintainPurchaseOrder<\/code>. Pro programy bez vydan\u00e9ho QDoc slou\u017e\u00ed n\u00e1stroj <strong>QGen<\/strong> od QAD, kter\u00fd mapuje program z nab\u00eddky: &#8222;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8220; (QGen slou\u017e\u00ed k mapov\u00e1n\u00ed vlastn\u00edch program\u016f nebo program\u016f QAD Enterprise Applications, pro kter\u00e9 nejsou vyd\u00e1na sch\u00e9mata QDoc a soubory ud\u00e1lost\u00ed.) Tuto cestu vyu\u017e\u00edv\u00e1 i samotn\u00fd QAD: &#8222;QAD Production Scheduler uses QAD QXtend to update work orders.&#8220; (QAD Production Scheduler pou\u017e\u00edv\u00e1 QAD QXtend k aktualizaci v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">Pr\u016fvodce QXtend<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8222;exports user-configurable business objects as XML QDocs out of QAD products.&#8220; (exportuje u\u017eivatelsky konfigurovateln\u00e9 podnikov\u00e9 objekty z produkt\u016f QAD ve form\u00e1tu XML QDocs.) Mezi standardn\u00ed podnikov\u00e9 objekty pat\u0159\u00ed Item, Product Structure, Routing, Work Center, Department, Inventory Transaction a Inventory Status.<\/li>\n\n\n<li><strong>REST API pro podnikov\u00e9 dokumenty.<\/strong> Od verze Adaptive ERP 2022.1 plat\u00ed: &#8222;Query REST APIs are now available for business documents,&#8220; (pro podnikov\u00e9 dokumenty jsou nyn\u00ed k dispozici dotazovac\u00ed REST API). Podporuj\u00ed filtrov\u00e1n\u00ed, \u0159azen\u00ed, str\u00e1nkov\u00e1n\u00ed a na\u010d\u00edt\u00e1n\u00ed \u010d\u00e1sti dat. Dokumentaci najdete ve sv\u00e9 instanci v rozhran\u00ed Swagger (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">pozn\u00e1mky k vyd\u00e1n\u00ed<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Z\u00e1pis zaji\u0161\u0165uje QXtend. \u010cten\u00ed zaji\u0161\u0165uj\u00ed QXO a dotazovac\u00ed REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a licence<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Pokud je na p\u0159ij\u00edma\u010di zapnut\u00e1 volba Require Authentication, ka\u017ed\u00fd QDoc obsahuje Session ID nebo u\u017eivatelsk\u00e9 jm\u00e9no a heslo do QAD. QXI p\u0159ed spu\u0161t\u011bn\u00edm programu ov\u011b\u0159\u00ed p\u0159\u00edstupov\u00e1 pr\u00e1va u\u017eivatele k dan\u00e9 polo\u017ece nab\u00eddky.<\/li>\n\n\n<li><strong>Integra\u010dn\u00ed u\u017eivatel.<\/strong> Vytvo\u0159te v QAD samostatn\u00e9ho u\u017eivatele s p\u0159\u00edstupem pr\u00e1v\u011b k t\u011bm program\u016fm v nab\u00eddce, kter\u00e9 integrace vol\u00e1: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt a program\u016fm pro spr\u00e1vu kmenov\u00fdch dat.<\/li>\n\n\n<li><strong>Licence QXtend.<\/strong> Licencov\u00e1n\u00ed QXtend se \u0159\u00edd\u00ed po\u010dtem agent\u016f a p\u0159ij\u00edma\u010d\u016f. Pr\u016fvodce QAD uv\u00e1d\u00ed, \u017ee komunikace webov\u00fdch slu\u017eeb s extern\u00ed aplikac\u00ed v obou sm\u011brech nen\u00ed bezplatn\u00e1. P\u0159ed zah\u00e1jen\u00edm projektu si proto ov\u011b\u0159te licenci QXtend.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner pou\u017e\u00edv\u00e1 REST API k autentizaci API token v hlavi\u010dce <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). Dokumentace je k dispozici ve Swagger\/OpenAPI. <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">Integra\u010dn\u00ed tutori\u00e1l<\/a> v\u00e1s provede prvn\u00edmi vol\u00e1n\u00edmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a zm\u011bny dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound slou\u017e\u00ed v QAD k p\u0159enosu zm\u011bn dat. &#8222;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8220; (P\u0159i zm\u011bn\u011b sledovan\u00fdch dat v QAD Enterprise Applications se ozn\u00e1men\u00ed o zm\u011bn\u011b zap\u00ed\u0161\u00ed do datab\u00e1ze qxevents.) QXO pot\u00e9 sestav\u00ed QDocs a doru\u010d\u00ed je &#8222;to a directory location where the subscriber polls for and picks up new QDocs,&#8220; (do adres\u00e1\u0159e, v n\u011bm\u017e odb\u011bratel pravideln\u011b vyhled\u00e1v\u00e1 a p\u0159eb\u00edr\u00e1 nov\u00e9 QDocs), nebo webov\u00e9 slu\u017eb\u011b naslouchaj\u00edc\u00ed na dan\u00e9 URL.<\/p>\n\n\n<p>SkyPlanner odeb\u00edr\u00e1 data publikovan\u00e1 QXO jako webov\u00e1 slu\u017eba. Data, kter\u00e1 QXO nepokr\u00fdv\u00e1, pravideln\u011b na\u010d\u00edt\u00e1 p\u0159es dotazovac\u00ed REST API. Work Order nepat\u0159\u00ed mezi standardn\u00ed podnikov\u00e9 objekty QXO. Integrace proto bu\u010f p\u0159id\u00e1 podnikov\u00fd objekt QXO nad tabulkami v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (<code>wo_mstr<\/code>, <code>wr_route<\/code>), nebo v\u00fdrobn\u00ed p\u0159\u00edkazy na\u010d\u00edt\u00e1 p\u0159es dotazovac\u00ed REST API ka\u017ed\u00fdch n\u011bkolik minut.<\/p>\n\n\n<p>SkyPlanner p\u0159i zm\u011bn\u011b stavu nebo pl\u00e1nu odes\u00edl\u00e1 webhooky, tak\u017ee zp\u011btn\u00fd z\u00e1pis je \u0159\u00edzen ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt QAD (program, rozhran\u00ed)<\/th><th>Objekt ve SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Produkty a materi\u00e1ly<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b p\u0159es QXO<\/td><\/tr><tr><td>Struktury v\u00fdrobk\u016f (13.5; QXO Product Structure)<\/td><td>Struktura produktu, d\u00edl\u010d\u00ed produkty, materi\u00e1ly pro jednotliv\u00e9 produkty<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b p\u0159es QXO<\/td><\/tr><tr><td>Technologick\u00e9 postupy (14.13.1; QXO Routing): fronta, se\u0159\u00edzen\u00ed, zpracov\u00e1n\u00ed, \u010dek\u00e1n\u00ed, p\u0159esun<\/td><td>V\u00fdrobn\u00ed operace s dobou trv\u00e1n\u00ed a \u010dasy p\u0159\u00edpravn\u00fdch a dokon\u010dovac\u00edch prac\u00ed<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b p\u0159es QXO<\/td><\/tr><tr><td>Pracovi\u0161t\u011b (14.5) a odd\u011blen\u00ed (14.1; QXO Work Center, Department)<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, \u00fa\u010dinnosti<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Kalend\u00e1\u0159e v\u00fdroby a pracovi\u0161\u0165<\/td><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo spr\u00e1va sm\u011bn p\u0159\u00edmo ve SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy (16.1) s technologick\u00fdmi postupy p\u0159\u00edkaz\u016f (16.13.13) a komponentami<\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi pot\u0159ebami<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Vlastn\u00ed objekt QXO nebo pravideln\u00e9 dotazov\u00e1n\u00ed p\u0159es REST ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Z\u00e1soby (QXO Inventory Status, Inventory Transaction)<\/td><td>Stavy z\u00e1sob<\/td><td>QAD \u2192 SkyPlanner<\/td><td>P\u0159i zm\u011bn\u011b nebo ka\u017edou hodinu<\/td><\/tr><tr><td>N\u00e1kupn\u00ed objedn\u00e1vky s term\u00edny dod\u00e1n\u00ed<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle data dod\u00e1n\u00ed<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>Term\u00edny uvoln\u011bn\u00ed a dokon\u010den\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9ho p\u0159\u00edkazu<\/td><td>SkyPlanner \u2192 QAD<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): \u010das se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed pro ka\u017edou operaci<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed obsluhy<\/td><td>SkyPlanner \u2192 QAD<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Dokon\u010den\u00e1 mno\u017estv\u00ed<\/td><td>SkyPlanner \u2192 QAD<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>Nen\u00ed v QAD<\/td><td>Matice p\u0159\u00edpravn\u00fdch \u010das\u016f, n\u00e1stroje jako kapacitn\u011b omezen\u00e9 zdroje, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spr\u00e1va ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Zp\u016fsoby integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte polo\u017eky, struktury v\u00fdrobk\u016f, technologick\u00e9 postupy, pracovi\u0161t\u011b a kalend\u00e1\u0159e p\u0159es QXO nebo dotazovac\u00ed REST API. Promyslete mapov\u00e1n\u00ed pracovi\u0161\u0165: pracovi\u0161t\u011b se \u010dty\u0159mi stroji se p\u0159evede na jednu skupinu pracovi\u0161\u0165 nebo na \u010dty\u0159i pracovi\u0161t\u011b. Na pracovi\u0161t\u011b lze p\u0159ev\u00e9st i linky pro opakovanou v\u00fdrobu z Production Line Maintenance.<\/p>\n\n\n<p><strong>2. Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte pevn\u011b pl\u00e1novan\u00e9 a uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b jejich technologick\u00fdch postup\u016f a komponent a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, kdy\u017e objedn\u00e1vka p\u0159ejde do stavu Delivered.<\/p>\n\n\n<p>Do pl\u00e1nu za\u0159azujte v\u00fdrobn\u00ed p\u0159\u00edkazy, nikoli pl\u00e1novan\u00e9 objedn\u00e1vky z MRP. Ty se mus\u00ed nejprve v QAD p\u0159ev\u00e9st na pevn\u011b pl\u00e1novan\u00e9 nebo uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune p\u0159\u00edkaz, webhook SkyPlanner vyvol\u00e1 QXtend Inbound QDoc pro Work Order Maintenance (16.1). Datum uvoln\u011bn\u00ed nastav\u00ed podle prvn\u00ed napl\u00e1novan\u00e9 operace a term\u00edn dokon\u010den\u00ed podle posledn\u00ed. QXtend spust\u00ed program s vlastn\u00edmi validacemi QAD a vr\u00e1t\u00ed odpov\u011b\u010f ve form\u00e1tu QDoc, kterou integrace zkontroluje.<\/p>\n\n\n<p>Po\u0159ad\u00ed operac\u00ed na jednotliv\u00fdch stroj\u00edch z\u016fst\u00e1v\u00e1 ve SkyPlanner a obsluha jej dost\u00e1v\u00e1 prost\u0159ednictv\u00edm Mobile Confirmations. Integrace tak nenar\u00e1\u017e\u00ed na zablokovan\u00e9 zm\u011bny technologick\u00fdch postup\u016f u uvoln\u011bn\u00fdch p\u0159\u00edkaz\u016f v QAD.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Obsluha zaznamen\u00e1v\u00e1 pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer. D\u00edky \u010dasov\u00fdm z\u00e1znam\u016fm z\u016fst\u00e1v\u00e1 pl\u00e1n aktu\u00e1ln\u00ed. Sami zvol\u00edte, zda se skute\u010dn\u00e9 \u010dasy budou zapisovat zp\u011bt do QAD. Pokud ano, \u010dasy se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed se ode\u0161lou za ka\u017edou operaci do Labor Feedback by Work Order a dokon\u010den\u00e1 mno\u017estv\u00ed do Work Order Receipt. Pokud ne, pr\u00e1ce se bude zad\u00e1vat v QAD jako dosud.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, struktury v\u00fdrobk\u016f, technologick\u00e9 postupy, mno\u017estv\u00ed, stav v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/td><td>QAD<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed stroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Term\u00edny uvoln\u011bn\u00ed a dokon\u010den\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/td><td>SkyPlanner zapisuje, QAD ukl\u00e1d\u00e1<\/td><\/tr><tr><td>Matice se\u0159izovac\u00edch \u010das\u016f, po\u017eadavky na n\u00e1stroje a obsluhu, alternativn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Odveden\u00e1 pr\u00e1ce, v\u00fddeje komponent a p\u0159\u00edjmy<\/td><td>QAD, se zad\u00e1v\u00e1n\u00edm p\u0159\u00edmo v n\u011bm nebo p\u0159enosem z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pro z\u00e1pis term\u00edn\u016f v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f ur\u010dete jedin\u00fd syst\u00e9m. SkyPlanner nepot\u0159ebuje \u017e\u00e1dn\u00fd pl\u00e1novac\u00ed modul QAD. U p\u0159\u00edkaz\u016f, kter\u00e9 pl\u00e1nuje, proto p\u0159eb\u00edr\u00e1 z\u00e1pis term\u00edn\u016f m\u00edsto pl\u00e1novac\u00edch n\u00e1stroj\u016f QAD nebo jin\u00fdch pl\u00e1novac\u00edch syst\u00e9m\u016f.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd pr\u016fb\u011bh projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace je obvykle hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si ov\u011b\u0159te pl\u00e1n v r\u00e1mci 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed. Pou\u017eijte pracovi\u0161t\u011b, technologick\u00e9 postupy a otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy vyexportovan\u00e9 z QAD ve form\u00e1tu CSV nebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, odpov\u011bdnost za data, zahrnut\u00e9 z\u00e1vody a dom\u00e9ny, \u010detnost synchronizace a to, zda se odveden\u00e1 pr\u00e1ce bude zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup do QAD.<\/strong> Vytvo\u0159te integra\u010dn\u00edho u\u017eivatele, ov\u011b\u0159te licencov\u00e1n\u00ed QXtend a nastavte p\u0159ij\u00edma\u010d QXtend a odb\u011bratele QXO. Nejprve v\u0161e otestujte v testovac\u00ed dom\u00e9n\u011b.<\/li>\n\n\n<li><strong>Nastaven\u00ed QDoc.<\/strong> Kde jsou k dispozici vydan\u00e9 QDocs, pou\u017eijte je. Podle pot\u0159eby vygenerujte pomoc\u00ed QGen QDocs pro Work Order Maintenance, Labor Feedback by Work Order a Work Order Receipt.<\/li>\n\n\n<li><strong>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed.<\/strong> Polo\u017eky, struktury v\u00fdrobk\u016f, technologick\u00e9 postupy, pracovi\u0161t\u011b, kalend\u00e1\u0159e.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Ud\u00e1losti QXO nebo pravideln\u00e9 dotazov\u00e1n\u00ed p\u0159es REST s filtrov\u00e1n\u00edm, str\u00e1nkov\u00e1n\u00edm a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty pracovn\u00edk\u016f obsluhy pro jednotliv\u00e9 operace a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu a soub\u011b\u017en\u00e9 testov\u00e1n\u00ed.<\/strong> Zapisujte term\u00edny z webhook\u016f SkyPlanner, testujte soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovn\u00e1vejte term\u00edny a opravujte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Zp\u011btn\u00fd z\u00e1pis zapn\u011bte, a\u017e budou data souhlasit.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Opakovan\u00e9 spu\u0161t\u011bn\u00ed CRP.<\/strong> CRP p\u0159epl\u00e1nuje v\u0161echny otev\u0159en\u00e9 operace vybran\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f. QAD zachov\u00e1 ru\u010dn\u011b zadan\u00e9 term\u00edny pouze za podm\u00ednky \u201eyou also adjusted the work order release and due date to match,\u201c (sou\u010dasn\u011b jste odpov\u00eddaj\u00edc\u00edm zp\u016fsobem upravili datum uvoln\u011bn\u00ed a term\u00edn dokon\u010den\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu), co\u017e jsou pr\u00e1v\u011b \u00fadaje, kter\u00e9 SkyPlanner zapisuje. CRP spou\u0161t\u011bjte a\u017e po zp\u011btn\u00e9m z\u00e1pisu, nebo z n\u011bj vylu\u010dte p\u0159\u00edkazy, kter\u00e9 pl\u00e1nuje SkyPlanner.<\/li>\n\n\n<li><strong>Uvoln\u011bn\u00e9 technologick\u00e9 postupy u\u017e nelze m\u011bnit.<\/strong> \u201eOnce the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.\u201c (Jakmile je v\u00fdrobn\u00ed p\u0159\u00edkaz ve stavu Exploded, Allocated nebo Released, technologick\u00fd postup ji\u017e nelze m\u011bnit.) Technologick\u00fd postup na\u010d\u00edtejte p\u0159i uvoln\u011bn\u00ed a m\u011b\u0148te jej pouze u pl\u00e1novan\u00fdch nebo pevn\u011b pl\u00e1novan\u00fdch p\u0159\u00edkaz\u016f.<\/li>\n\n\n<li><strong>\u010casov\u00e9 jednotky v technologick\u00fdch postupech.<\/strong> Se\u0159izovac\u00ed a v\u00fdrobn\u00ed \u010das se zapo\u010d\u00edt\u00e1vaj\u00ed do zat\u00ed\u017een\u00ed, zat\u00edmco \u201equeue, wait, and move times are excluded from load calculations.\u201c (\u010dasy ve front\u011b, \u010dek\u00e1n\u00ed a p\u0159esunu se do v\u00fdpo\u010dtu zat\u00ed\u017een\u00ed nezahrnuj\u00ed.) Tyto \u010dasy modelujte ve SkyPlanner jako kroky, kter\u00e9 pouze zab\u00edraj\u00ed \u010das, a ov\u011b\u0159te, zda je v\u00fdrobn\u00ed \u010das uveden na kus, nebo na cel\u00fd p\u0159\u00edkaz.<\/li>\n\n\n<li><strong>Propustnost QXtend.<\/strong> QAD upozor\u0148uje: \u201eUI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.\u201c (P\u0159i zpracov\u00e1n\u00ed velk\u00fdch objem\u016f dat nebo transakc\u00ed v re\u00e1ln\u00e9m \u010dase m\u016f\u017ee b\u00fdt v\u00fdkon adapt\u00e9ru UI API nevyhovuj\u00edc\u00ed.) Odes\u00edlejte v d\u00e1vk\u00e1ch pouze zm\u011bn\u011bn\u00e9 p\u0159\u00edkazy a tam, kde jsou k dispozici nativn\u00ed QDocs, je pou\u017e\u00edvejte.<\/li>\n\n\n<li><strong>Dom\u00e9ny a z\u00e1vody.<\/strong> Instalace QAD s v\u00edce dom\u00e9nami vedou pracovi\u0161t\u011b a v\u00fdrobn\u00ed p\u0159\u00edkazy odd\u011blen\u011b podle dom\u00e9ny a z\u00e1vodu. Ka\u017ed\u00e9mu z\u00e1vodu zahrnut\u00e9mu do integrace p\u0159i\u0159a\u010fte vlastn\u00ed skupinu pracovi\u0161\u0165.<\/li>\n\n\n<li><strong>Kombinace opakovan\u00e9 a diskr\u00e9tn\u00ed v\u00fdroby.<\/strong> Linky v Advanced Repetitive pou\u017e\u00edvaj\u00ed pl\u00e1ny opakovan\u00e9 v\u00fdroby, nikoli v\u00fdrobn\u00ed p\u0159\u00edkazy. P\u0159i vymezen\u00ed rozsahu rozhodn\u011bte, kter\u00e9 linky bude SkyPlanner pl\u00e1novat.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo integraci QAD nastavuje a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed p\u0159i zav\u00e1d\u011bn\u00ed a zajist\u00ed podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu,<\/strong> a to v rozsahu dohodnut\u00fdch QDocs, odb\u011br\u016f QXO a dotaz\u016f REST. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 QAD jinak a pr\u00e1v\u011b p\u0159i integraci se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro QAD.<\/strong> Zn\u00e1 va\u0161e dom\u00e9ny, \u00fapravy na m\u00edru i licen\u010dn\u00ed podm\u00ednky a m\u016f\u017ee spole\u010dn\u011b s t\u00fdmem SkyPlanner nastavit QXtend, QGen QDocs a u\u017eivatelsk\u00fd \u00fa\u010det pro integraci.<\/li>\n\n\n<li><strong>Va\u0161i v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API SkyPlanner a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Podrobnosti najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Fakturace prob\u00edh\u00e1 m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku integrace p\u0159iprav\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb, spole\u010dn\u011b s nab\u00eddkou tarifu. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/qad-adaptive-erp\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro QAD Adaptive ERP<\/a>, <a href=\"\/cs\/integrace\/erp\/qad-adaptive-erp\/\">str\u00e1nku QAD Adaptive ERP<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve firemn\u00ed v\u00fdrobn\u00ed hale ve m\u011bst\u011b Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a v\u00edce<\/b><span>automaticky napl\u00e1novan\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se pl\u00e1nuj\u00ed automaticky a cel\u00e1 firma m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na tov\u00e1rnu spole\u010dnosti Piristeel na bezpe\u010dnostn\u00ed st\u0159e\u0161n\u00ed prvky ve m\u011bst\u011b Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2 %<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m pomohl odhalovat \u00fazk\u00e1 m\u00edsta a zp\u0159ehlednil \u0159\u00edzen\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 Bezpe\u010dnostn\u00ed st\u0159e\u0161n\u00ed prvky a syst\u00e9my odvodu de\u0161\u0165ov\u00e9 vody<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a pl\u00e1nov\u00e1n\u00ed \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pr\u00e1ce denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 QAD Adaptive ERP API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. QXtend Inbound spou\u0161t\u00ed Work Order Maintenance a programy pro d\u00edlensk\u00e9 \u0159\u00edzen\u00ed prost\u0159ednictv\u00edm SOAP a XML QDocs. Pokud nen\u00ed k dispozici vydan\u00fd QDoc, vygeneruje se pomoc\u00ed QGen. REST API pro obchodn\u00ed dokumenty nav\u00edc umo\u017e\u0148uj\u00ed dotazov\u00e1n\u00ed s filtrov\u00e1n\u00edm a str\u00e1nkov\u00e1n\u00edm.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje QAD webhooky?<\/summary>\n<p class=\"sp-faq__a\">QAD pou\u017e\u00edv\u00e1 pro p\u0159enos zm\u011bn dat QXtend Outbound: triggery nad tabulkami zaznamen\u00e1vaj\u00ed zm\u011bny a QXO doru\u010duje QDocs na URL webov\u00e9 slu\u017eby nebo do pravideln\u011b kontrolovan\u00e9ho adres\u00e1\u0159e. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu ihned, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se napl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do QAD?<\/summary>\n<p class=\"sp-faq__a\">Prost\u0159ednictv\u00edm QDoc v QXtend Inbound pro Work Order Maintenance (16.1), kter\u00fd nastav\u00ed datum uvoln\u011bn\u00ed a term\u00edn dokon\u010den\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu podle pl\u00e1nu SkyPlanner. QAD ov\u011b\u0159\u00ed QDoc podle stejn\u00fdch pravidel jako p\u0159i zad\u00e1v\u00e1n\u00ed na obrazovce a vr\u00e1t\u00ed odpov\u011b\u010f ve form\u011b QDoc.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se hl\u00e1\u0161en\u00ed obsluhy dost\u00e1vaj\u00ed do QAD?<\/summary>\n<p class=\"sp-faq__a\">Se\u0159izovac\u00ed a v\u00fdrobn\u00ed \u010das se zapisuj\u00ed prost\u0159ednictv\u00edm Labor Feedback by Work Order (16.20.1) a dokon\u010den\u00e9 mno\u017estv\u00ed prost\u0159ednictv\u00edm Work Order Receipt (16.11), v obou p\u0159\u00edpadech jako QDocs v QXtend Inbound. O tom, zda se budou \u00fadaje zapisovat zp\u011bt, se rozhoduje p\u0159i vymezen\u00ed rozsahu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner QAD doporu\u010dit QAD Advanced Scheduling, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud z\u00e1kazn\u00edk pou\u017e\u00edv\u00e1 v\u00fdrobn\u00ed p\u0159\u00edkazy pro diskr\u00e9tn\u00ed v\u00fdrobu a chce b\u011bhem n\u011bkolika t\u00fddn\u016f z\u00edskat funk\u010dn\u00ed pl\u00e1n v\u00fdroby, kter\u00fd respektuje skute\u010dn\u00e9 kapacity. QAD popisuje Advanced Scheduling jako pl\u00e1nov\u00e1n\u00ed jednotliv\u00fdch linek v ka\u017ed\u00e9m z\u00e1vod\u011b a p\u0159edstavuje jej spole\u010dn\u011b s DSCP Production Planning a Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner se p\u0159ipojuje p\u0159es QXtend, pl\u00e1nuje ka\u017ed\u00fd stroj, pracovn\u00edka, n\u00e1stroj i materi\u00e1l, automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 a umo\u017e\u0148uje neomezen\u00fd po\u010det u\u017eivatel\u016f, a to od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner otestovat je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed podporuje a\u017e 20 pracovi\u0161\u0165 a importy z QAD ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte ji zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ QAD Adaptive ERP Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed QAD Adaptive ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit QAD Adaptive ERP se SkyPlanner APS, a to i ve star\u0161\u00edch instalac\u00edch QAD Enterprise Edition a MFG\/PRO. SkyPlanner se s QAD Adaptive ERP integruje &#8230; <a title=\"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106173,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106927","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrace QAD APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/pruvodce-integraci\\\/\",\"name\":\"Integrace QAD APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro QAD Adaptive ERP: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrace QAD APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","description":"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"17 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/","name":"Integrace QAD APS: pr\u016fvodce pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Spojte QAD Adaptive ERP se SkyPlanner APS: QXtend Inbound QDocs pro Work Order Maintenance, ud\u00e1losti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapov\u00e1n\u00ed a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro QAD Adaptive ERP: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ QAD Adaptive ERP Pr\u016fvodce integrac\u00ed QAD Adaptive ERP pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed QAD Adaptive ERP ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit QAD Adaptive ERP se SkyPlanner APS, a to i ve star\u0161\u00edch instalac\u00edch QAD Enterprise Edition a MFG\/PRO. SkyPlanner se s QAD Adaptive ERP integruje&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=106927"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106927\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106173"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=106927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}