{"id":106869,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud <span class=\"hl\">pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Oracle Fusion Cloud ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Oracle Fusion Cloud Manufacturing se SkyPlanner APS. SkyPlanner se s Oracle Fusion Cloud integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm REST zdroj\u016f p\u0159\u00edmo od Oracle:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se na\u010d\u00edtaj\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy a jejich operace, definice v\u00fdroby, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje, kalend\u00e1\u0159e, polo\u017eky, struktury polo\u017eek, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed zp\u011bt ke ka\u017ed\u00e9 operaci v\u00fdrobn\u00edho p\u0159\u00edkazu.<\/li>\n\n\n<li>Potvrzen\u00ed od obsluhy se zapisuj\u00ed zp\u011bt jako transakce operac\u00ed a transakce zdroj\u016f.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Objednat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace Oracle Fusion Cloud a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu pro ni poskytuje podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed do integrace zapojit nebo sami vytv\u00e1\u0159et \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud nab\u00edz\u00ed extern\u00edmu pl\u00e1novac\u00edmu syst\u00e9mu t\u0159i cesty pro p\u0159enos dat:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API pro Oracle Fusion Cloud SCM.<\/strong> Z\u00e1kladn\u00ed cesta je <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. Pl\u00e1novac\u00ed syst\u00e9m vyu\u017e\u00edv\u00e1 zdroje <code>workOrders<\/code> (s pod\u0159\u00edzen\u00fdmi objekty <code>WorkOrderOperation<\/code>, <code>WorkOrderOperationResource<\/code> a <code>WorkOrderOperationMaterial<\/code>), <code>processWorkOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>calendars<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> a <code>inventoryOnhandBalances<\/code>. Pr\u016fb\u011bh v\u00fdroby se zapisuje do <code>operationTransactions<\/code>, <code>resourceTransactions<\/code> a <code>materialTransactions<\/code>. N\u00e1kupn\u00ed objedn\u00e1vky se na\u010d\u00edtaj\u00ed ze zdroje <code>purchaseOrders<\/code> v Procurement REST API. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">Koncov\u00e9 body REST<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> Proces Import Work Orders vytv\u00e1\u0159\u00ed nebo aktualizuje v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b jejich operac\u00ed a zdroj\u016f operac\u00ed podle \u0161ablony. Proces Import Work Order Resource Transactions na\u010d\u00edt\u00e1 z\u00e1znamy o vyu\u017eit\u00ed zdroj\u016f. Oracle v\u00fdslovn\u011b upozor\u0148uje na omezen\u00ed importu v re\u00e1ln\u00e9m \u010dase: &#8222;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8220; (Tato mo\u017enost nen\u00ed vhodn\u00e1 pro import v\u00fdrobn\u00edch dat v re\u00e1ln\u00e9m \u010dase.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> Integra\u010dn\u00ed platforma Oracle zaji\u0161\u0165uje datov\u00e9 toky mezi Fusion a dal\u0161\u00edmi syst\u00e9my. Integra\u010dn\u00ed sc\u00e9n\u00e1\u0159 v Oracle Integration naslouch\u00e1 ud\u00e1losti Work Order Status Change v Oracle Fusion Cloud Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">zdroj<\/a>). Tuto cestu vyu\u017eijte, pokud va\u0161e spole\u010dnost ji\u017e provozuje OIC.<\/li>\n\n<\/ol>\n\n\n<p>Pro pr\u016fb\u011b\u017en\u00e9 rozvrhov\u00e1n\u00ed je hlavn\u00ed cestou REST. FBDI se hod\u00ed pro prvotn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentizace a p\u0159\u00edstup<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Zabezpe\u010den\u00ed Oracle REST.<\/strong> &#8222;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8220; (REST API Fusion Applications pou\u017e\u00edvaj\u00ed glob\u00e1ln\u00ed bezpe\u010dnostn\u00ed z\u00e1sadu Oracle Web Services Manager (OWSM) s n\u00e1zvem Multi Token Over SSL RESTful Service Policy.) Podporuje autentizaci Basic p\u0159es SSL a autentizaci pomoc\u00ed token\u016f, nap\u0159\u00edklad bearer tokenu SAML 2.0. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">Rychl\u00fd start<\/a>)<\/li>\n\n\n<li><strong>Integra\u010dn\u00ed u\u017eivatel.<\/strong> V Oracle vytvo\u0159te samostatn\u00e9ho u\u017eivatele pro integraci. P\u0159i\u0159a\u010fte mu pracovn\u00ed role s pot\u0159ebn\u00fdmi opr\u00e1vn\u011bn\u00edmi pro v\u00fdrobn\u00ed p\u0159\u00edkazy, definice v\u00fdroby, z\u00e1soby a transakce. P\u0159\u00edstup omezte na v\u00fdrobn\u00ed organizace zahrnut\u00e9 do rozsahu integrace.<\/li>\n\n\n<li><strong>Str\u00e1nkov\u00e1n\u00ed.<\/strong> Oracle omezuje po\u010det z\u00e1znam\u016f vr\u00e1cen\u00fdch jedn\u00edm vol\u00e1n\u00edm SCM REST. P\u0159i na\u010d\u00edt\u00e1n\u00ed proto pou\u017e\u00edvejte <code>limit<\/code> a <code>offset<\/code> a filtrujte podle organizace a stavu (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">zdroj<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner se REST API autentizuje tokenem API v hlavi\u010dce <code>Authorization-Token<\/code> (v SkyPlanner v \u010d\u00e1sti Settings &gt; API). Dokumentace je k dispozici ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Data z Oracle se z\u00edsk\u00e1vaj\u00ed pravideln\u00fdm dotazov\u00e1n\u00edm. Filtrovan\u00e9 dotazy REST na\u010d\u00edtaj\u00ed nov\u00e9 a zm\u011bn\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy, zm\u011bny stavu na uvoln\u011bno, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky. Interval se nastavuje pro ka\u017ed\u00fd z\u00e1vod zvl\u00e1\u0161\u0165: od n\u011bkolika minut u v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f po hodinu u z\u00e1sob. Pokud provozujete Oracle Integration, m\u016f\u017ee ud\u00e1lost Work Order Status Change vyvolat okam\u017eit\u00e9 na\u010dten\u00ed.<\/p>\n\n\n<p>SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i zm\u011bn\u011b stavu nebo rozvrhu, tak\u017ee zp\u011btn\u00fd z\u00e1pis se \u0159\u00edd\u00ed ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Oracle Fusion Cloud (zdroj REST)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky (<code>itemsV2<\/code>), m\u011brn\u00e9 jednotky<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Struktury polo\u017eek (<code>itemStructures<\/code>)<\/td><td>Struktura v\u00fdrobku, d\u00edl\u010d\u00ed v\u00fdrobky, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Definice v\u00fdroby (<code>workDefinitions<\/code>): operace, zdroje operac\u00ed, spot\u0159eba, Basis Type<\/td><td>V\u00fdrobn\u00ed kroky s dobou trv\u00e1n\u00ed, \u010dasy p\u0159\u00edpravy a \u00faklidu<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Pracovi\u0161t\u011b (<code>workCenters<\/code>), v\u00fdrobn\u00ed zdroje (<code>productionResources<\/code>) pro za\u0159\u00edzen\u00ed a pracovn\u00ed s\u00edlu<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, pracovn\u00edci, efektivita<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Kalend\u00e1\u0159e a sm\u011bny (<code>calendars<\/code>, v\u00fdjimky ze sm\u011bn)<\/td><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Denn\u011b, p\u0159\u00edpadn\u011b vlastn\u00ed spr\u00e1va sm\u011bn ve SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00ed organizace<\/td><td>Skupiny pracovi\u0161\u0165 podle z\u00e1vod\u016f<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkazy (<code>workOrders<\/code>, <code>processWorkOrders<\/code>) s <code>WorkOrderOperation<\/code> a <code>WorkOrderOperationMaterial<\/code><\/td><td>Zak\u00e1zky a operace s term\u00edny dokon\u010den\u00ed a materi\u00e1lov\u00fdmi pot\u0159ebami<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Skladov\u00e9 z\u00e1soby (<code>inventoryOnhandBalances<\/code>)<\/td><td>Stavy z\u00e1sob<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>N\u00e1kupn\u00ed objedn\u00e1vky (<code>purchaseOrders<\/code>) s p\u0159isl\u00edben\u00fdmi term\u00edny<\/td><td>N\u00e1kupn\u00ed objedn\u00e1vky, o\u010dek\u00e1van\u00fd materi\u00e1l podle term\u00ednu dod\u00e1n\u00ed<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>, <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec ka\u017ed\u00e9 operace<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Term\u00edny <code>WorkOrderOperationResource<\/code> (PATCH)<\/td><td>P\u0159i\u0159azen\u00ed zdroje ke ka\u017ed\u00e9 operaci<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu, pokud je tato mo\u017enost zvolena<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>Dokon\u010den\u00e1 mno\u017estv\u00ed pro jednotliv\u00e9 operace<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>\u010casov\u00e9 z\u00e1znamy: pracovn\u00ed a strojn\u00ed \u010das<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud je tato mo\u017enost zvolena<\/td><\/tr><tr><td>Nen\u00ed v Oracle Fusion Cloud<\/td><td>Matice p\u0159\u00edpravn\u00fdch \u010das\u016f, n\u00e1stroje jako zdroje s omezenou kapacitou, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spr\u00e1va ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Prvotn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte polo\u017eky, struktury polo\u017eek, definice v\u00fdroby, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje a kalend\u00e1\u0159e p\u0159es REST nebo je jednor\u00e1zov\u011b na\u010dt\u011bte z export\u016f FBDI. Mapov\u00e1n\u00ed pracovi\u0161\u0165 si dob\u0159e rozmyslete: pracovi\u0161t\u011b se \u010dty\u0159mi stroji p\u0159i\u0159azen\u00fdmi ke stejn\u00e9mu v\u00fdrobn\u00edmu zdroji se p\u0159evede na jednu skupinu pracovi\u0161\u0165 nebo \u010dty\u0159i pracovi\u0161t\u011b. Ka\u017ed\u00e1 v\u00fdrobn\u00ed organizace se p\u0159evede na skupinu pracovi\u0161\u0165, tak\u017ee v\u0161echny z\u00e1vody budou v jednom pl\u00e1nu.<\/p>\n\n\n<p><strong>2. Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Na\u010d\u00edtejte uvoln\u011bn\u00e9 i neuvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b operac\u00ed a materi\u00e1l\u016f a tak\u00e9 otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered.<\/p>\n\n\n<p>Pl\u00e1nujte v\u00fdrobn\u00ed p\u0159\u00edkazy, nikoli pl\u00e1novan\u00e9 objedn\u00e1vky z modulu Supply Planning. Ty se mus\u00ed nejprve v Oracle p\u0159ev\u00e9st na v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune operaci, webhook ze SkyPlanner vyvol\u00e1 po\u017eadavek PATCH na <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code> s poli <code>PlannedStartDate<\/code> a <code>PlannedCompletionDate<\/code>. Plat\u00ed pravidlo Oracle: &#8222;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8220; (Pl\u00e1novan\u00e9 datum zah\u00e1jen\u00ed nesm\u00ed b\u00fdt p\u0159ed datem zah\u00e1jen\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu ani po datu jeho dokon\u010den\u00ed.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">zdroj<\/a>) Pokud tedy nov\u00fd pl\u00e1n p\u0159ekro\u010d\u00ed term\u00edny v hlavi\u010dce v\u00fdrobn\u00edho p\u0159\u00edkazu, integrace nejprve aktualizuje tyto term\u00edny a pot\u00e9 operace.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Obsluha zaznamen\u00e1v\u00e1 pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed pl\u00e1n aktu\u00e1ln\u00ed. Dokon\u010den\u00e1 mno\u017estv\u00ed se zapisuj\u00ed do <code>operationTransactions<\/code>, pracovn\u00ed \u010das obsluhy a strojn\u00ed \u010das do <code>resourceTransactions<\/code>. Pokud v\u00e1\u0161 z\u00e1vod ji\u017e odv\u00e1d\u00ed v\u00fdrobu v Oracle, SkyPlanner m\u00edsto toho na\u010d\u00edt\u00e1 pr\u016fb\u011bh v\u00fdroby odtud.<\/p>\n\n\n<p><strong>5. Pravidla spr\u00e1vy dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Spravuj\u00edc\u00ed syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, struktury polo\u017eek, definice v\u00fdrobn\u00edch postup\u016f, mno\u017estv\u00ed, stav v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed v\u00fdrobn\u00edch zdroj\u016f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f p\u0159\u00edpravy, po\u017eadavky na n\u00e1stroje a obsluhu, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Transakce v\u00fdrobn\u00edch zdroj\u016f, operac\u00ed a materi\u00e1l\u016f<\/td><td>Oracle; zad\u00e1vaj\u00ed se p\u0159\u00edmo v n\u011bm nebo se p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dete jeden syst\u00e9m, kter\u00fd bude zapisovat term\u00edny operac\u00ed. SkyPlanner nepot\u0159ebuje pl\u00e1novac\u00ed pracovn\u00ed oblast Oracle, a proto p\u0159i z\u00e1pisu pl\u00e1novan\u00fdch term\u00edn\u016f nahrazuje Production Scheduling. Pokud Production Scheduling nad\u00e1le uvol\u0148uje pl\u00e1ny, odd\u011blte jeho organizace od t\u011bch, kter\u00e9 pl\u00e1nuje SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed, a to i ve velk\u00fdch firm\u00e1ch. Je\u0161t\u011b p\u0159edt\u00edm ov\u011b\u0159te pl\u00e1n v r\u00e1mci 30denn\u00ed bezplatn\u00e9 zku\u0161ebn\u00ed verze s pracovi\u0161ti, definicemi v\u00fdrobn\u00edch postup\u016f a otev\u0159en\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy exportovan\u00fdmi z Oracle ve form\u00e1tu CSV nebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla spr\u00e1vy dat, zahrnut\u00e9 organizace, frekvenci synchronizace a to, zda se budou transakce zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup do Oracle.<\/strong> Vytvo\u0159te integra\u010dn\u00edho u\u017eivatele a role. Nejprve v\u0161e otestujte v neproduk\u010dn\u00edm prost\u0159ed\u00ed Oracle.<\/li>\n\n\n<li><strong>\u00davodn\u00ed na\u010dten\u00ed.<\/strong> Polo\u017eky, struktury polo\u017eek, definice v\u00fdrobn\u00edch postup\u016f, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zdroje a kalend\u00e1\u0159e.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed s filtry, str\u00e1nkov\u00e1n\u00edm a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v SkyPlanner.<\/strong> Matice \u010das\u016f p\u0159\u00edpravy, n\u00e1stroje, po\u010dty pracovn\u00edk\u016f obsluhy pro jednotliv\u00e9 operace a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis pl\u00e1nu.<\/strong> Po\u017eadavky PATCH vyvolan\u00e9 webhooky SkyPlanner a p\u0159\u00edpadn\u011b tak\u00e9 z\u00e1pis transakc\u00ed, pokud byl zvolen.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Provozujte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile data souhlas\u00ed, zap\u00ednejte zp\u011btn\u00fd z\u00e1pis postupn\u011b po jednotliv\u00fdch z\u00e1vodech.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00fdchoz\u00ed chov\u00e1n\u00ed pl\u00e1nova\u010de.<\/strong> Pl\u00e1novac\u00ed algoritmus Oracle bez kapacitn\u00edch omezen\u00ed se spou\u0161t\u00ed p\u0159i vytvo\u0159en\u00ed a p\u0159i \u201ecertain update actions\u201c (ur\u010dit\u00fdch aktualiza\u010dn\u00edch akc\u00edch). Otestujte ve sv\u00e9m prost\u0159ed\u00ed, kter\u00e9 aktualizace p\u0159epo\u010d\u00edt\u00e1vaj\u00ed term\u00edny, a zajist\u011bte, aby term\u00edny operac\u00ed jako posledn\u00ed zapisoval SkyPlanner.<\/li>\n\n\n<li><strong>\u010casov\u00e1 okna v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/strong> Term\u00edny operac\u00ed mus\u00ed spadat mezi zah\u00e1jen\u00ed a dokon\u010den\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu. Nejprve aktualizujte hlavi\u010dku.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> Spot\u0159eba v\u00fdrobn\u00edho zdroje je vzta\u017eena na jednotku pouze tehdy, kdy\u017e m\u00e1 Basis Type hodnotu Variable. Hodnota Fixed znamen\u00e1 pevn\u00fd \u010das na operaci. P\u0159i importu prove\u010fte p\u0159epo\u010det, jinak budou v\u0161echny doby trv\u00e1n\u00ed chybn\u00e9.<\/li>\n\n\n<li><strong>Diskr\u00e9tn\u00ed a procesn\u00ed v\u00fdroba.<\/strong> Z\u00e1vody s diskr\u00e9tn\u00ed v\u00fdrobou pou\u017e\u00edvaj\u00ed <code>workOrders<\/code>, z\u00e1vody s procesn\u00ed v\u00fdrobou <code>processWorkOrders<\/code>. Pokud provozujete oba typy, namapujte oba.<\/li>\n\n\n<li><strong>Str\u00e1nkov\u00e1n\u00ed.<\/strong> Oracle omezuje po\u010det z\u00e1znam\u016f na jedno vol\u00e1n\u00ed REST. U ka\u017ed\u00e9ho dotazu pou\u017eijte str\u00e1nkov\u00e1n\u00ed a filtrujte podle organizace a stavu.<\/li>\n\n\n<li><strong>\u010ctvrtletn\u00ed aktualizace.<\/strong> Oracle aktualizuje Fusion ka\u017ed\u00e9 \u010dtvrtlet\u00ed. V cest\u011b pevn\u011b ur\u010dete verzi REST a po ka\u017ed\u00e9 aktualizaci integraci znovu otestujte.<\/li>\n\n\n<li><strong>Pravidla podle stavu.<\/strong> V\u00fdrobn\u00ed p\u0159\u00edkazy ve stavu Pending Approval ani uzav\u0159en\u00e9 p\u0159\u00edkazy by nem\u011bly dost\u00e1vat nov\u00e9 term\u00edny. Vy\u0159a\u010fte je filtrem u\u017e p\u0159i na\u010d\u00edt\u00e1n\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci Oracle Fusion Cloud a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to pro dohodnut\u00e9 zdroje REST a organizace. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Oracle Fusion Cloud jinak a pr\u00e1v\u011b p\u0159i tomto nastaven\u00ed se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro Oracle.<\/strong> Zn\u00e1 va\u0161e organizace, role i roz\u0161\u00ed\u0159en\u00ed a ve spolupr\u00e1ci s t\u00fdmem SkyPlanner m\u016f\u017ee nastavit integra\u010dn\u00edho u\u017eivatele, role a p\u0159\u00edpadn\u00e9 toky v Oracle Integration.<\/li>\n\n\n<li><strong>Va\u0161i v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API SkyPlanner s API tokenem. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Dokumentaci najdete na str\u00e1nce <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">Dokumentace integrace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed a zahrnuje 5 pracovi\u0161\u0165. Cenovou nab\u00eddku integrace pro va\u0161e procesy a pot\u0159eby dostanete p\u0159edem spole\u010dn\u011b s nab\u00eddkou tarifu. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/oracle-fusion-cloud\/planovani-vyroby\/\">kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed pro Oracle Fusion Cloud<\/a>, <a href=\"\/cs\/integrace\/erp\/oracle-fusion-cloud\/\">str\u00e1nku Oracle Fusion Cloud<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed ERP<\/a>. Pou\u017e\u00edv\u00e1te NetSuite? P\u0159e\u010dt\u011bte si <a href=\"\/cs\/integrace\/erp\/netsuite\/pruvodce-integraci\/\">pr\u016fvodce integrac\u00ed NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale pro v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od tabulek v Excelu k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na z\u00e1vod Piristeel vyr\u00e1b\u011bj\u00edc\u00ed st\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky v Kauhav\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m umo\u017enil l\u00e9pe odhalovat \u00fazk\u00e1 m\u00edsta a zp\u0159ehlednil \u0159\u00edzen\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky a okapov\u00e9 syst\u00e9my<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a rozvrhov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pr\u00e1ce denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve firemn\u00ed v\u00fdrobn\u00ed hale v Lohje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a v\u00edce<\/b><span>automaticky napl\u00e1novan\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se pl\u00e1nuj\u00ed automaticky a cel\u00e1 organizace m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Oracle Fusion Cloud API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. REST API pro Oracle Fusion Cloud SCM obsahuje <code>workOrders<\/code> s pod\u0159\u00edzen\u00fdmi objekty operac\u00ed, v\u00fdrobn\u00edch zdroj\u016f a materi\u00e1l\u016f a tak\u00e9 <code>processWorkOrders<\/code> pro procesn\u00ed v\u00fdrobu. Podporuje metody GET, POST a PATCH.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Po\u017eadavkem PATCH na pod\u0159\u00edzen\u00fd objekt <code>WorkOrderOperation<\/code> v\u00fdrobn\u00edho p\u0159\u00edkazu, kter\u00fd nastav\u00ed <code>PlannedStartDate<\/code> a <code>PlannedCompletionDate<\/code>. Term\u00edny operac\u00ed mus\u00ed z\u016fstat v \u010dasov\u00e9m rozmez\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu, proto se v p\u0159\u00edpad\u011b pot\u0159eby nejprve aktualizuje hlavi\u010dka.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se hl\u00e1\u0161en\u00ed obsluhy dost\u00e1vaj\u00ed do Oracle?<\/summary>\n<p class=\"sp-faq__a\">Dokon\u010den\u00e1 mno\u017estv\u00ed se zapisuj\u00ed do <code>operationTransactions<\/code>, pracovn\u00ed \u010das obsluhy a strojn\u00ed \u010das do <code>resourceTransactions<\/code>. Oba zdroje ve Fusion Manufacturing podporuj\u00ed metodu REST POST.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje Oracle Fusion Cloud webhooky?<\/summary>\n<p class=\"sp-faq__a\">Fusion publikuje obchodn\u00ed ud\u00e1losti, nap\u0159\u00edklad Work Order Status Change, k jejich\u017e odb\u011bru se m\u016f\u017ee p\u0159ihl\u00e1sit Oracle Integration. Bez Oracle Integration se integrace pravideln\u011b dotazuje REST API v intervalech nastaven\u00fdch pro jednotliv\u00e9 z\u00e1vody. Vlastn\u00ed webhooky syst\u00e9mu SkyPlanner odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner Oracle doporu\u010dit Oracle Production Scheduling, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud z\u00e1kazn\u00edk chce jeden pl\u00e1n pro v\u0161echny z\u00e1vody, kter\u00fd respektuje skute\u010dn\u00e9 kapacity a s\u00e1m se pr\u016fb\u011b\u017en\u011b aktualizuje. Production Scheduling se aktivuje v r\u00e1mci nab\u00eddky Supply Chain Planning, vytv\u00e1\u0159\u00ed pl\u00e1n pro ka\u017edou pl\u00e1novac\u00ed organizaci zvl\u00e1\u0161\u0165 a pravidla p\u0159etypov\u00e1n\u00ed uplat\u0148uje pouze na za\u0159\u00edzen\u00ed s jedinou jednotkou (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">dokumentace Oracle<\/a>). SkyPlanner se p\u0159ipojuje p\u0159es SCM REST API, automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 v\u00fdrobu a pl\u00e1nuje p\u0159etypov\u00e1n\u00ed, n\u00e1stroje, pracovn\u00ed t\u00fdmy i materi\u00e1l. Po\u010det u\u017eivatel\u016f nen\u00ed omezen a cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme si SkyPlanner vyzkou\u0161et je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed m\u016f\u017eete pracovat a\u017e s 20 pracovi\u0161ti a importovat data z Oracle ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte s n\u00edm rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Oracle Fusion Cloud Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Oracle Fusion Cloud ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Oracle Fusion Cloud Manufacturing se SkyPlanner APS. SkyPlanner se s Oracle Fusion Cloud integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm REST zdroj\u016f p\u0159\u00edmo od Oracle: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106144,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106869","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrace Oracle Cloud s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/pruvodce-integraci\\\/\",\"name\":\"Integrace Oracle Cloud s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Oracle Fusion Cloud: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrace Oracle Cloud s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","description":"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/","name":"Integrace Oracle Cloud s APS: pr\u016fvodce pl\u00e1nov\u00e1n\u00edm v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Propojte Oracle Fusion Cloud se SkyPlanner APS: SCM REST API, workOrders PATCH pro term\u00edny operac\u00ed, transakce operac\u00ed a zdroj\u016f, mapov\u00e1n\u00ed a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Oracle Fusion Cloud: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Oracle Fusion Cloud Pr\u016fvodce integrac\u00ed Oracle Fusion Cloud pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed Oracle Fusion Cloud ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Oracle Fusion Cloud Manufacturing se SkyPlanner APS. SkyPlanner se s Oracle Fusion Cloud integruje obousm\u011brn\u011b prost\u0159ednictv\u00edm REST zdroj\u016f p\u0159\u00edmo od Oracle: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=106869"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106869\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106144"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=106869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}