{"id":106086,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/xero\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"xero","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/","title":{"rendered":"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pro Xero: <span class=\"hl\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS je dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro Xero. Z p\u0159ijat\u00fdch nab\u00eddek sestav\u00ed pl\u00e1n pro ka\u017ed\u00fd stroj, pracovn\u00edka obsluhy, n\u00e1stroj i materi\u00e1l s ohledem na skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed. Kontakty, polo\u017eky, faktury a \u00fa\u010detnictv\u00ed z\u016fst\u00e1vaj\u00ed v Xero. SkyPlanner p\u0159id\u00e1v\u00e1 v\u00fdrobn\u00ed pl\u00e1n, kter\u00fd \u00fa\u010detn\u00ed software nem\u00e1, a Autopilot ho p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner a Xero si p\u0159ed\u00e1vaj\u00ed data ob\u011bma sm\u011bry. Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed kontakty, polo\u017eky se sledov\u00e1n\u00edm z\u00e1sob, p\u0159ijat\u00e9 nab\u00eddky a n\u00e1kupn\u00ed objedn\u00e1vky s term\u00edny dod\u00e1n\u00ed. Zp\u011bt se vrac\u00ed pl\u00e1novan\u00fd term\u00edn dokon\u010den\u00ed, koncepty faktur za dokon\u010den\u00e9 zak\u00e1zky a \u010das vyk\u00e1zan\u00fd na projektech. T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci pro va\u0161i organizaci v Xero.<\/p>\n\n\n<p>Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Ka\u017ed\u00e9 dal\u0161\u00ed pracovi\u0161t\u011b stoj\u00ed 20 \u20ac m\u011bs\u00ed\u010dn\u011b. Bezplatn\u00e1 zku\u0161ebn\u00ed verze je na 30 dn\u00ed, umo\u017e\u0148uje vyu\u017e\u00edt a\u017e 20 pracovi\u0161\u0165 a nevy\u017eaduje platebn\u00ed kartu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Co se ve va\u0161\u00ed v\u00fdrob\u011b zm\u011bn\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u00e1n pro ka\u017ed\u00fd stroj, ne seznam p\u0159ijat\u00fdch nab\u00eddek.<\/p>\n\n\n<p class=\"fx-pain__b\">V Xero p\u0159ijat\u00e1 nab\u00eddka \u010dek\u00e1 na fakturaci. Pl\u00e1novac\u00ed j\u00e1dro Arcturus v SkyPlanner z ka\u017ed\u00e9 nab\u00eddky vytvo\u0159\u00ed operace a na interaktivn\u00edm Ganttov\u011b diagramu je napl\u00e1nuje na konkr\u00e9tn\u00ed \u010dasy na pracovi\u0161t\u00edch, kde se budou prov\u00e1d\u011bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Term\u00edny dod\u00e1n\u00ed, kter\u00e9 dok\u00e1\u017eete dodr\u017eet.<\/p>\n\n\n<p class=\"fx-pain__b\">Term\u00edn dokon\u010den\u00ed ka\u017ed\u00e9 zak\u00e1zky vych\u00e1z\u00ed z vyt\u00ed\u017een\u00ed v\u0161ech stroj\u016f a pracovn\u00edk\u016f. Je\u0161t\u011b p\u0159ed odesl\u00e1n\u00edm nab\u00eddky vid\u00edte, \u017ee CNC je obsazen\u00e9 na dva t\u00fddny, zat\u00edmco mont\u00e1\u017e m\u00e1 volnou kapacitu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sm\u011bny podle va\u0161eho provozu.<\/p>\n\n\n<p class=\"fx-pain__b\">Ka\u017ed\u00e9 pracovi\u0161t\u011b i ka\u017ed\u00fd pracovn\u00edk m\u00e1 vlastn\u00ed rozvrh sm\u011bn, volna, nep\u0159\u00edtomnost\u00ed a p\u0159es\u010dasov\u00fdch sm\u011bn. P\u0159idejte ve\u010dern\u00ed sm\u011bnu na \u00fazk\u00e9m m\u00edst\u011b a term\u00edny se ihned posunou.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">M\u00e9n\u011b p\u0159etypov\u00e1n\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner eviduje \u010das se\u0159\u00edzen\u00ed mezi ka\u017edou dvojic\u00ed v\u00fdrobk\u016f v obou sm\u011brech. P\u0159echod z modr\u00e9 na \u010dervenou m\u016f\u017ee trvat 30 minut a z \u010derven\u00e9 na modrou 60. Pl\u00e1novac\u00ed j\u00e1dro \u0159ad\u00ed operace tak, aby se ztratilo co nejm\u00e9n\u011b \u010dasu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u00e1n po\u010d\u00edt\u00e1 se sd\u00edlen\u00fdmi n\u00e1stroji i t\u00fdmy.<\/p>\n\n\n<p class=\"fx-pain__b\">Forma pou\u017e\u00edvan\u00e1 na jednom stroji se nikdy nenapl\u00e1nuje sou\u010dasn\u011b na jin\u00fd. Operaci, kter\u00e1 vy\u017eaduje t\u0159i pracovn\u00edky obsluhy, syst\u00e9m p\u0159id\u011bl\u00ed t\u0159i lidi s volnou kapacitou ve sm\u011bn\u011b.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed p\u0159i urgentn\u00edch zak\u00e1zk\u00e1ch a poruch\u00e1ch.<\/p>\n\n\n<p class=\"fx-pain__b\">Nastavte zak\u00e1zce Fast Track nebo vy\u0161\u0161\u00ed prioritu a pl\u00e1novac\u00ed j\u00e1dro pro ni uvoln\u00ed m\u00edsto. Kdy\u017e se stroj zastav\u00ed, Autopilot rozvrh p\u0159epl\u00e1nuje a Running Time Lock ponech\u00e1 zah\u00e1jen\u00e9 operace na m\u00edst\u011b.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kontrola materi\u00e1lu p\u0159ed zah\u00e1jen\u00edm pr\u00e1ce.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner na\u010d\u00edt\u00e1 stav z\u00e1sob u polo\u017eek se sledov\u00e1n\u00edm z\u00e1sob a o\u010dek\u00e1van\u00fd term\u00edn dod\u00e1n\u00ed u ka\u017ed\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky v Xero. Operaci, kter\u00e1 \u010dek\u00e1 na dod\u00e1vku od dodavatele, napl\u00e1nuje a\u017e po p\u0159\u00edchodu zbo\u017e\u00ed.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Hotov\u00e1 pr\u00e1ce p\u0159ipraven\u00e1 k fakturaci.<\/p>\n\n\n<p class=\"fx-pain__b\">Obsluha vykazuje pr\u00e1ci na telefonu nebo tabletu pomoc\u00ed Mobile Confirmations nebo Production Timer. Po dokon\u010den\u00ed zak\u00e1zky \u010dek\u00e1 v Xero na schv\u00e1len\u00ed koncept faktury s polo\u017ekami z nab\u00eddky.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme v pl\u00e1nov\u00e1n\u00ed v\u00fdroby p\u0159e\u0161li od tabulek v Excelu k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby se ka\u017ed\u00fd t\u00fdden u\u0161et\u0159\u00ed 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b zabere m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>v\u010dasnost dod\u00e1vek od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u00e1ch a vn\u00e1\u0161\u00ed do pl\u00e1nov\u00e1n\u00ed p\u0159edv\u00eddatelnost.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Po celou dobu pou\u017e\u00edv\u00e1n\u00ed SkyPlanner, tedy od roku 2021, dosahuje v\u010dasnost dod\u00e1vek 100 %.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na z\u00e1vod Piristeel na v\u00fdrobu st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f v Kauhav\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner m\u00e1me p\u0159ehled o \u00fazk\u00fdch m\u00edstech a \u0159\u00edzen\u00ed v\u00fdroby je p\u0159ehledn\u011bj\u0161\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky a okapov\u00e9 syst\u00e9my<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a rozvrhov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pracovn\u00ed doby denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010d\u00edst zku\u0161enosti Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-xero-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak funguje integrace s Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Xero p\u0159ed\u00e1v\u00e1 podklady pro v\u00fdrobu.<\/strong> Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed kontakty, polo\u017eky se sledov\u00e1n\u00edm z\u00e1sob v\u010detn\u011b mno\u017estv\u00ed na sklad\u011b, p\u0159ijat\u00e9 nab\u00eddky a n\u00e1kupn\u00ed objedn\u00e1vky s o\u010dek\u00e1van\u00fdmi term\u00edny dod\u00e1n\u00ed. Z ka\u017ed\u00e9 p\u0159ijat\u00e9 nab\u00eddky vznikne v\u00fdrobn\u00ed zak\u00e1zka.<\/li>\n\n\n<li><strong>SkyPlanner sestav\u00ed pl\u00e1n a udr\u017euje ho aktu\u00e1ln\u00ed.<\/strong> Pro ka\u017ed\u00fd v\u00fdrobek jednou zad\u00e1te do SkyPlanner technologick\u00fd postup, pracovi\u0161t\u011b a \u010dasy se\u0159\u00edzen\u00ed. Pl\u00e1novac\u00ed j\u00e1dro Arcturus pak b\u011bhem n\u011bkolika sekund napl\u00e1nuje v\u0161echny operace na v\u0161ech stroj\u00edch a p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b pl\u00e1n p\u0159epo\u010d\u00edt\u00e1.<\/li>\n\n\n<li><strong>\u00dadaje o dokon\u010den\u00e9 pr\u00e1ci se vracej\u00ed do Xero.<\/strong> SkyPlanner zap\u00ed\u0161e pl\u00e1novan\u00fd term\u00edn dokon\u010den\u00ed do historie nab\u00eddky. Po dokon\u010den\u00ed zak\u00e1zky vytvo\u0159\u00ed koncept vydan\u00e9 faktury s polo\u017ekami a referenc\u00ed z nab\u00eddky a zm\u011bn\u00ed stav nab\u00eddky na Invoiced. U projektov\u00e9 pr\u00e1ce se vyk\u00e1zan\u00e9 hodiny p\u0159en\u00e1\u0161ej\u00ed do Xero Projects jako \u010dasov\u00e9 z\u00e1znamy.<\/li>\n\n<\/ol>\n\n\n<p>Integrace vyu\u017e\u00edv\u00e1 Xero Accounting API a Projects API s OAuth 2.0, tak\u017ee se do Xero nic neinstaluje. Webhooky Xero hl\u00e1s\u00ed nov\u00e9 a zm\u011bn\u011bn\u00e9 kontakty a faktury. SkyPlanner na\u010d\u00edt\u00e1 nab\u00eddky, polo\u017eky a n\u00e1kupn\u00ed objedn\u00e1vky zm\u011bn\u011bn\u00e9 od posledn\u00ed synchronizace a jeho webhooky odes\u00edlaj\u00ed zm\u011bny pl\u00e1nu ihned, jak nastanou. Ka\u017ed\u00fd v\u00fdrobn\u00ed provoz m\u00e1 v Xero jinak nastaven\u00e9 polo\u017eky, nab\u00eddky a z\u00e1soby. T\u00fdm SkyPlanner proto p\u0159i zav\u00e1d\u011bn\u00ed namapuje va\u0161e data a po spu\u0161t\u011bn\u00ed poskytuje podporu integrace.<\/p>\n\n\n<p>Cenovou nab\u00eddku na integraci dostanete p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb. V\u00e1\u0161 poradce pro Xero, integra\u010dn\u00ed partner nebo vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vyu\u017e\u00edt zdokumentovan\u00e9 API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>). Koncov\u00e9 body, mapov\u00e1n\u00ed pol\u00ed a pravidla zp\u011btn\u00e9ho z\u00e1pisu najdete v <a href=\"\/cs\/integrace\/erp\/xero\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed Xero pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-xero-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Co pl\u00e1nuje Xero a co p\u0159id\u00e1v\u00e1 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero je \u00fa\u010detn\u00ed software. Spravuje nab\u00eddky, vydan\u00e9 faktury, n\u00e1kupn\u00ed objedn\u00e1vky, p\u0159ijat\u00e9 faktury a p\u00e1rov\u00e1n\u00ed bankovn\u00edch transakc\u00ed. U polo\u017eek se sledov\u00e1n\u00edm z\u00e1sob eviduje stav skladu. Xero to popisuje takto: &#8222;If an item is tracked it means Xero tracks the available quantity and value of the item.&#8220; (Pokud je u polo\u017eky zapnut\u00e9 sledov\u00e1n\u00ed z\u00e1sob, Xero sleduje jej\u00ed dostupn\u00e9 mno\u017estv\u00ed a hodnotu.) (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/items\">zdroj<\/a>)<\/p>\n\n\n<p>Xero neeviduje kusovn\u00edky, technologick\u00e9 postupy, stroje ani v\u00fdrobn\u00ed zak\u00e1zky. V\u00fdrobu hotov\u00fdch v\u00fdrobk\u016f z komponent dnes nepodporuje. Na f\u00f3ru s n\u00e1vrhy na vylep\u0161en\u00ed t\u00fdm Xero v roce 2026 o evidenci montovan\u00fdch v\u00fdrobk\u016f napsal, \u017ee &#8222;hasn&#8217;t been roadmapped at this stage.&#8220; (V t\u00e9to f\u00e1zi nebyla za\u0159azena do pl\u00e1nu v\u00fdvoje.) (<a href=\"https:\/\/productideas.xero.com\/forums\/967139-purchase-orders-bills-inventory\/suggestions\/45048400-advanced-inventory-assembly-inventory\">zdroj<\/a>)<\/p>\n\n\n<p>Na sv\u00e9 str\u00e1nce o spr\u00e1v\u011b z\u00e1sob Xero odkazuje firmy s vy\u0161\u0161\u00edmi n\u00e1roky na aplikace: &#8222;Apps include Cin7 Core, Unleashed, and ZapInventory&#8220; (Mezi aplikace pat\u0159\u00ed Cin7 Core, Unleashed a ZapInventory). (<a href=\"https:\/\/www.xero.com\/us\/accounting-software\/manage-inventory\/\">zdroj<\/a>) Tyto aplikace \u0159e\u0161\u00ed z\u00e1soby a zak\u00e1zky. SkyPlanner p\u0159id\u00e1v\u00e1 pl\u00e1n pro stroje a lidi. Jednotliv\u00e9 kroky vysv\u011btluje \u010dl\u00e1nek <a href=\"\/cs\/integrace\/erp\/xero\/planovani-vyroby\/\">Um\u00ed Xero pl\u00e1novat v\u00fdrobu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero dnes a se SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Xero<\/th><th>Xero se SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>P\u0159ehled zak\u00e1zek<\/td><td>P\u0159ijat\u00e9 nab\u00eddky a vydan\u00e9 faktury<\/td><td>Ka\u017ed\u00e1 zak\u00e1zka rozd\u011blen\u00e1 na operace na \u010dasov\u00e9 ose pracovi\u0161\u0165<\/td><\/tr><tr><td>Kapacita<\/td><td>Bez modelov\u00e1n\u00ed<\/td><td>Ka\u017ed\u00fd stroj, pracovn\u00edk a n\u00e1stroj s vlastn\u00edm rozvrhem sm\u011bn<\/td><\/tr><tr><td>Technologick\u00e9 postupy<\/td><td>Bez evidence<\/td><td>Technologick\u00fd postup, pracovi\u0161t\u011b a \u010dasy se\u0159\u00edzen\u00ed pro ka\u017ed\u00fd v\u00fdrobek<\/td><\/tr><tr><td>\u0158azen\u00ed operac\u00ed<\/td><td>Pl\u00e1nova\u010d ur\u010duje po\u0159ad\u00ed na tabuli nebo v tabulkov\u00e9m procesoru<\/td><td>Pl\u00e1novac\u00ed j\u00e1dro \u0159ad\u00ed v\u0161echny otev\u0159en\u00e9 zak\u00e1zky podle priority a term\u00ednu dod\u00e1n\u00ed<\/td><\/tr><tr><td>P\u0159ese\u0159\u00edzen\u00ed<\/td><td>Bez modelov\u00e1n\u00ed<\/td><td>Matice \u010das\u016f p\u0159ese\u0159\u00edzen\u00ed, nejkrat\u0161\u00ed celkov\u00fd \u010das se\u0159\u00edzen\u00ed<\/td><\/tr><tr><td>Zm\u011bny<\/td><td>Telefon\u00e1ty a ru\u010dn\u00ed p\u0159epl\u00e1nov\u00e1n\u00ed<\/td><td>Autopilot p\u0159epl\u00e1nuje cel\u00fd v\u00fdrobn\u00ed provoz<\/td><\/tr><tr><td>Materi\u00e1l<\/td><td>Mno\u017estv\u00ed na sklad\u011b u ka\u017ed\u00e9 polo\u017eky se sledov\u00e1n\u00edm z\u00e1sob<\/td><td>Kontrola z\u00e1sob a term\u00edn\u016f dod\u00e1n\u00ed n\u00e1kupn\u00edch objedn\u00e1vek p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b<\/td><\/tr><tr><td>V\u00fdrobn\u00ed provoz<\/td><td>Pap\u00edrov\u00e9 pr\u016fvodky<\/td><td>Fronta operac\u00ed s napl\u00e1novan\u00fdmi \u010dasy, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>Fakturace<\/td><td>Ru\u010dn\u00ed vystaven\u00ed faktury po dokon\u010den\u00ed zak\u00e1zky<\/td><td>Koncept faktury vytvo\u0159en\u00fd z dokon\u010den\u00e9 pr\u00e1ce<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-xero-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak\u00e1 data se p\u0159en\u00e1\u0161ej\u00ed mezi Xero a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero<\/th><th>SkyPlanner<\/th><th>Sm\u011br<\/th><\/tr><\/thead><tbody><tr><td>Contact (z\u00e1kazn\u00edk)<\/td><td>Z\u00e1kazn\u00edk, priorita dod\u00e1n\u00ed<\/td><td>Do SkyPlanner<\/td><\/tr><tr><td>Item (se sledov\u00e1n\u00edm z\u00e1sob i bez n\u011bj) s QuantityOnHand<\/td><td>V\u00fdrobky a materi\u00e1ly, z\u00e1soby<\/td><td>Do SkyPlanner<\/td><\/tr><tr><td>Quote (Accepted) s polo\u017ekami<\/td><td>Zak\u00e1zka s term\u00ednem dod\u00e1n\u00ed, operace pro ka\u017edou polo\u017eku<\/td><td>Do SkyPlanner<\/td><\/tr><tr><td>PurchaseOrder s ExpectedArrivalDate a DeliveryDate<\/td><td>O\u010dek\u00e1van\u00fd materi\u00e1l s term\u00ednem dod\u00e1n\u00ed<\/td><td>Do SkyPlanner<\/td><\/tr><tr><td>Pozn\u00e1mka v historii Quote<\/td><td>Pl\u00e1novan\u00fd term\u00edn dokon\u010den\u00ed<\/td><td>Zp\u011bt do Xero<\/td><\/tr><tr><td>Invoice (ACCREC, Draft) s polo\u017ekami a referenc\u00ed z nab\u00eddky<\/td><td>Dokon\u010den\u00e1 zak\u00e1zka<\/td><td>Zp\u011bt do Xero<\/td><\/tr><tr><td>Stav Quote nastaven\u00fd na Invoiced<\/td><td>Dokon\u010den\u00e1 zak\u00e1zka<\/td><td>Zp\u011bt do Xero<\/td><\/tr><tr><td>\u010casov\u00fd z\u00e1znam v Projects<\/td><td>Mobile Confirmations, v\u00fdkazy \u010dasu<\/td><td>Zp\u011bt do Xero<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Srovn\u00e1n\u00ed softwaru a dopl\u0148k\u016f pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby s Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Mo\u017enost<\/th><th>Co nab\u00edz\u00ed<\/th><th>Kdy se hod\u00ed<\/th><\/tr><\/thead><tbody><tr><td>Samotn\u00e9 Xero<\/td><td>Nab\u00eddky, faktury, n\u00e1kupn\u00ed objedn\u00e1vky a sledov\u00e1n\u00ed z\u00e1sob v Xero, pl\u00e1n na tabuli<\/td><td>M\u00e1te jeden nebo dva stroje a jeden \u010dlov\u011bk zn\u00e1 po\u0159ad\u00ed pr\u00e1ce<\/td><\/tr><tr><td>Aplikace pro spr\u00e1vu z\u00e1sob a MRP se synchronizac\u00ed s Xero (nap\u0159\u00edklad Katana, MRPeasy, Fishbowl Manufacturing, Cin7 Core, Unleashed)<\/td><td>Dal\u0161\u00ed syst\u00e9m pro z\u00e1soby, kusovn\u00edky a zak\u00e1zky, kter\u00fd do Xero p\u0159en\u00e1\u0161\u00ed vydan\u00e9 a p\u0159ijat\u00e9 faktury a n\u00e1klady<\/td><td>Chcete p\u0159esunout spr\u00e1vu z\u00e1sob a objedn\u00e1vek mimo Xero<\/td><\/tr><tr><td>Cloudov\u00fd APS propojen\u00fd p\u0159es API (SkyPlanner APS)<\/td><td>N\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit, kter\u00fd na\u010d\u00edt\u00e1 nab\u00eddky z Xero a zapisuje do n\u011bj zp\u011bt \u00fadaje o dokon\u010den\u00e9 pr\u00e1ci<\/td><td>Xero z\u016fst\u00e1v\u00e1 va\u0161\u00edm syst\u00e9mem, ale pro stroje a lidi pot\u0159ebujete skute\u010dn\u00fd pl\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pokud vedle Xero u\u017e pou\u017e\u00edv\u00e1te MRP, SkyPlanner pl\u00e1nuje v\u00fdrobu podle jeho dat. Pod\u00edvejte se na str\u00e1nky <a href=\"\/cs\/integrace\/erp\/katana\/\">Katana<\/a> a <a href=\"\/cs\/integrace\/erp\/mrpeasy\/\">MRPeasy<\/a>.<\/p>\n\n\n<p><strong>SkyPlanner pro Xero zvolte, pokud:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Chcete Xero ponechat beze zm\u011bn.<\/strong> SkyPlanner dopln\u00ed pl\u00e1n v\u00fdroby. \u00da\u010detnictv\u00ed, polo\u017eky i fakturace z\u016fstanou tam, kde jsou.<\/li>\n\n\n<li><strong>Stejn\u00e9 zak\u00e1zky lze p\u0159id\u011blit n\u011bkolika stroj\u016fm,<\/strong> ale jejich po\u0159ad\u00ed m\u00e1 n\u011bkdo jen v hlav\u011b.<\/li>\n\n\n<li><strong>O objemu v\u00fdroby rozhoduje p\u0159ese\u0159izov\u00e1n\u00ed.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed uchov\u00e1v\u00e1 \u010das p\u0159echodu mezi ka\u017edou dvojic\u00ed v\u00fdrobk\u016f v obou sm\u011brech a vol\u00ed po\u0159ad\u00ed s nejkrat\u0161\u00edm celkov\u00fdm \u010dasem se\u0159\u00edzen\u00ed.<\/li>\n\n\n<li><strong>Obsluha, p\u0159\u00edpravky a materi\u00e1l omezuj\u00ed pl\u00e1n stejn\u011b jako stroje.<\/strong> Pl\u00e1n zohled\u0148uje omezen\u00ed v\u0161ech v\u00fdrobn\u00edch zdroj\u016f sou\u010dasn\u011b a operac\u00edm, kter\u00e9 vy\u017eaduj\u00ed v\u00edce pracovn\u00edk\u016f, p\u0159id\u011bluje pot\u0159ebn\u00fd po\u010det lid\u00ed.<\/li>\n\n\n<li><strong>Chcete fakturovat dokon\u010denou pr\u00e1ci bez p\u0159episov\u00e1n\u00ed \u00fadaj\u016f.<\/strong> N\u00e1vrh faktury se p\u0159enese do Xero, jakmile je potvrzeno dokon\u010den\u00ed zak\u00e1zky.<\/li>\n\n\n<li><strong>Chcete jednu jasnou cenu.<\/strong> Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b. Cenu obousm\u011brn\u00e9 integrace zn\u00e1te p\u0159edem a jej\u00ed podporu zaji\u0161\u0165uje t\u00fdm SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak za\u010d\u00edt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vyzkou\u0161ejte zdarma.<\/strong> 30 dn\u00ed, a\u017e 20 pracovi\u0161\u0165, v\u0161echny funkce tarifu Basic, bez platebn\u00ed karty.<\/li>\n\n\n<li><strong>Nastavte model sv\u00e9 v\u00fdroby.<\/strong> Vytvo\u0159te ve SkyPlanner pracovi\u0161t\u011b, pracovn\u00edky, sm\u011bny a v\u00fdrobn\u00ed operace nebo je importujte. Se zaveden\u00edm v\u00e1m m\u016f\u017eeme pomoci.<\/li>\n\n\n<li><strong>Na\u010dt\u011bte zak\u00e1zky.<\/strong> Exportujte z Xero kontakty, produkty a slu\u017eby i otev\u0159en\u00e9 nab\u00eddky do CSV. Importujte je do SkyPlanner a porovnejte vytvo\u0159en\u00fd pl\u00e1n se sv\u00fdm sou\u010dasn\u00fdm pl\u00e1nem.<\/li>\n\n\n<li><strong>Propojte Xero.<\/strong> T\u00fdm SkyPlanner nastav\u00ed obousm\u011brnou integraci a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu.<\/li>\n\n<\/ol>\n\n\n<p><strong>Ceny.<\/strong> Tarify se \u00fa\u010dtuj\u00ed m\u011bs\u00ed\u010dn\u011b podle po\u010dtu pracovi\u0161\u0165. Pracovi\u0161t\u011b m\u016f\u017eete kdykoli p\u0159id\u00e1vat \u010di odeb\u00edrat nebo p\u0159edplatn\u00e9 zru\u0161it. Podrobnosti najdete v <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edku<\/a>, p\u0159\u00edpadn\u011b si p\u0159e\u010dt\u011bte <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pr\u016fvodce kapacitn\u00edm pl\u00e1nov\u00e1n\u00edm<\/a>. Pou\u017e\u00edv\u00e1te i jin\u00fd syst\u00e9m? Prohl\u00e9dn\u011bte si <a href=\"\/cs\/integrace\/erp\/\">v\u0161echny integrace<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Kontaktovat obchodn\u00ed t\u00fdm<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd je nejlep\u0161\u00ed dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro Xero?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS je dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby, kter\u00fd zohled\u0148uje skute\u010dn\u00e9 kapacity a nab\u00edz\u00ed obousm\u011brnou integraci s Xero. Na\u010d\u00edt\u00e1 kontakty, skladov\u011b sledovan\u00e9 polo\u017eky, p\u0159ijat\u00e9 nab\u00eddky a n\u00e1kupn\u00ed objedn\u00e1vky. Zp\u011bt odes\u00edl\u00e1 pl\u00e1novan\u00e9 datum dokon\u010den\u00ed, n\u00e1vrhy faktur za dokon\u010den\u00e9 zak\u00e1zky a v\u00fdkazy \u010dasu na projektech. Zohled\u0148uje omezenou kapacitu ka\u017ed\u00e9ho stroje, pracovn\u00edka a n\u00e1stroje i dostupn\u00e9 mno\u017estv\u00ed materi\u00e1lu. Matice \u010das\u016f se\u0159\u00edzen\u00ed rozli\u0161uje sm\u011br p\u0159echodu mezi v\u00fdrobky a podle toho \u0159ad\u00ed operace tak, aby celkov\u00fd \u010das se\u0159\u00edzen\u00ed byl co nejkrat\u0161\u00ed. Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje v\u00fdrobu. Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a bezplatn\u00e1 zku\u0161ebn\u00ed verze je k dispozici na 30 dn\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd software pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby lze propojit s Xero?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se propojuje s Xero prost\u0159ednictv\u00edm Xero Accounting API a Projects API s vyu\u017eit\u00edm OAuth 2.0 a webhook\u016f Xero. Integraci nastav\u00ed t\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed. S Xero se synchronizuj\u00ed tak\u00e9 aplikace pro spr\u00e1vu z\u00e1sob a MRP, nap\u0159\u00edklad Katana, MRPeasy a Fishbowl. Pokud n\u011bkterou z nich pou\u017e\u00edv\u00e1te, SkyPlanner m\u016f\u017ee pl\u00e1novat v\u00fdrobu podle jej\u00edch dat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Umo\u017e\u0148uje Xero pl\u00e1nov\u00e1n\u00ed v\u00fdroby?<\/summary>\n<p class=\"sp-faq__a\">Ne. Xero nem\u00e1 kusovn\u00edky, technologick\u00e9 postupy, stroje ani v\u00fdrobn\u00ed zak\u00e1zky a podporu skladov\u00e9 evidence montovan\u00fdch v\u00fdrobk\u016f nem\u00e1 v pl\u00e1nu. SkyPlanner APS jej dopln\u00ed o <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mus\u00edme kv\u016fli pl\u00e1nov\u00e1n\u00ed v\u00fdroby nahradit Xero syst\u00e9mem ERP?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner funguje soub\u011b\u017en\u011b s Xero. Kontakty, polo\u017eky, nab\u00eddky, faktury, n\u00e1kup i \u00fa\u010detnictv\u00ed z\u016fst\u00e1vaj\u00ed v Xero. SkyPlanner pl\u00e1nuje pr\u00e1ci podle skute\u010dn\u00fdch kapacit a odes\u00edl\u00e1 \u00fadaje o dokon\u010den\u00e9 pr\u00e1ci zp\u011bt do Xero k fakturaci.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kolik stoj\u00ed SkyPlanner p\u0159i pou\u017e\u00edv\u00e1n\u00ed s Xero?<\/summary>\n<p class=\"sp-faq__a\">Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b za 5 pracovi\u0161\u0165, ka\u017ed\u00e9 dal\u0161\u00ed pracovi\u0161t\u011b stoj\u00ed 20 \u20ac m\u011bs\u00ed\u010dn\u011b. D\u00edlna s 10 pracovi\u0161ti zaplat\u00ed 299 \u20ac m\u011bs\u00ed\u010dn\u011b. Cenu integrace v\u00e1m vy\u010d\u00edsl\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mus\u00edme do Xero n\u011bco instalovat?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner b\u011b\u017e\u00ed v cloudu soub\u011b\u017en\u011b s Xero. Spr\u00e1vce Xero se jednou p\u0159ihl\u00e1s\u00ed a povol\u00ed p\u0159\u00edstup na autoriza\u010dn\u00ed obrazovce OAuth 2.0 v Xero.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak dlouho trv\u00e1 implementace?<\/summary>\n<p class=\"sp-faq__a\">Implementace je obvykle hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. T\u00fdm nastav\u00ed va\u0161e pracovi\u0161t\u011b a v\u00fdrobn\u00ed operace, propoj\u00ed nab\u00eddky a n\u00e1kupn\u00ed objedn\u00e1vky a zapne zp\u011btn\u00fd z\u00e1pis faktur. P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu v\u0161e otestuje porovn\u00e1n\u00edm s va\u0161\u00edm sou\u010dasn\u00fdm pl\u00e1nem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme si SkyPlanner nejprve vyzkou\u0161et s vlastn\u00edmi daty z Xero?<\/summary>\n<p class=\"sp-faq__a\">Ano. Ve zku\u0161ebn\u00ed verzi importujte produkty a otev\u0159en\u00e9 nab\u00eddky z CSV exportu z Xero. Je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm prac\u00ed na integraci uvid\u00edte pl\u00e1n vlastn\u00ed v\u00fdroby, kter\u00fd respektuje skute\u010dn\u00e9 kapacity.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Xero SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy SkyPlanner APS je dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro Xero. Z p\u0159ijat\u00fdch nab\u00eddek sestav\u00ed pl\u00e1n pro ka\u017ed\u00fd stroj, pracovn\u00edka obsluhy, n\u00e1stroj i materi\u00e1l s ohledem na skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed. Kontakty, polo\u017eky, faktury a \u00fa\u010detnictv\u00ed z\u016fst\u00e1vaj\u00ed v Xero. SkyPlanner p\u0159id\u00e1v\u00e1 v\u00fdrobn\u00ed &#8230; <a title=\"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/\" aria-label=\"Read more about SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100671,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106086","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Xero: integrace pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u2013 dopln\u011bk APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/xero\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/xero\\\/\",\"name\":\"Xero: integrace pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u2013 dopln\u011bk APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/xero\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/xero\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/xero\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Xero: integrace pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u2013 dopln\u011bk APS","description":"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/","og_locale":"cs_CZ","og_type":"article","og_title":"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy","og_description":"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/","name":"Xero: integrace pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u2013 dopln\u011bk APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Xero s obousm\u011brnou integrac\u00ed. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj i materi\u00e1l. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/xero\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Xero SkyPlanner APS pro Xero: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro v\u00fdrobn\u00ed firmy SkyPlanner APS je dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro Xero. Z p\u0159ijat\u00fdch nab\u00eddek sestav\u00ed pl\u00e1n pro ka\u017ed\u00fd stroj, pracovn\u00edka obsluhy, n\u00e1stroj i materi\u00e1l s ohledem na skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed. Kontakty, polo\u017eky, faktury a \u00fa\u010detnictv\u00ed z\u016fst\u00e1vaj\u00ed v Xero. SkyPlanner p\u0159id\u00e1v\u00e1 v\u00fdrobn\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=106086"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/106086\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100671"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=106086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}