{"id":104410,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/visma-net\/pruvodce-integraci\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Visma Net ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Visma Net <span class=\"hl\">pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Visma Net (Visma.net ERP) se SkyPlanner APS. SkyPlanner si s Visma Net vym\u011b\u0148uje data obousm\u011brn\u011b p\u0159es Visma Net API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed skladov\u00e9 polo\u017eky, Kit specifications, prodejn\u00ed objedn\u00e1vky, stavy z\u00e1sob a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Z rozvr\u017een\u00fdch operac\u00ed vznikaj\u00ed Kit assemblies, kter\u00e9 se po dokon\u010den\u00ed pr\u00e1ce uvoln\u00ed.<\/li>\n\n\n<li>Odpracovan\u00e9 hodiny obsluhy se zapisuj\u00ed zp\u011bt jako Employee time cards.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace Visma Net a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed na integraci pod\u00edlet nebo sami vyu\u017e\u00edt zdokumentovan\u00e9 REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-net-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed Visma Net<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visma Net ERP API.<\/strong> Rozhran\u00ed REST se specifikac\u00ed OpenAPI, kter\u00e1 st\u00e1le nese n\u00e1zev \u201eVisma.net ERP API v1\u201c, obsahuje cesty v1 i v2. Z\u00e1kladn\u00ed URL je <code>https:\/\/api.finance.visma.net<\/code>. Provoz na p\u016fvodn\u00ed dom\u00e9n\u011b <code>integration.visma.net<\/code> je od 1. \u00fanora 2026 omezov\u00e1n a dom\u00e9na se postupn\u011b vyp\u00edn\u00e1 (<a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/end-of-life-notices\/change-base-url\/\">ozn\u00e1men\u00ed<\/a>).<\/li>\n\n\n<li><strong>SalesOrder service v3<\/strong> na adrese <code>https:\/\/salesorder.visma.net<\/code>. Endpointy v1 a v2 pro prodejn\u00ed objedn\u00e1vky ji\u017e dos\u00e1hly konce \u017eivotn\u00edho cyklu.<\/li>\n\n\n<li><strong>Webhooky<\/strong> p\u0159es Visma Developer Portal.<\/li>\n\n\n<li><strong>Background API.<\/strong> Hlavi\u010dka <code>erp-api-background<\/code> za\u0159ad\u00ed dlouho trvaj\u00edc\u00ed vol\u00e1n\u00ed do fronty. API vr\u00e1t\u00ed stav 202 s ID \u00falohy a upozorn\u00ed v\u00e1s, a\u017e bude v\u00fdsledek p\u0159ipraven.<\/li>\n\n\n<li><strong>Sc\u00e9n\u00e1\u0159e importu a exportu<\/strong> ve Visma Net s datov\u00fdmi zdroji CSV, Excel nebo SQL slou\u017e\u00ed k jednor\u00e1zov\u00e9mu na\u010dten\u00ed kmenov\u00fdch dat.<\/li>\n\n<\/ul>\n\n\n<p>API nem\u00e1 endpointy pro v\u00fdrobn\u00ed p\u0159\u00edkazy, technologick\u00e9 postupy ani pracovi\u0161t\u011b, proto\u017ee Visma Net takov\u00e9 objekty neobsahuje. Data pro rozvrhov\u00e1n\u00ed se z\u00edsk\u00e1vaj\u00ed z polo\u017eek, sad, objedn\u00e1vek a z\u00e1sob:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>GET \/v1\/inventory<\/code>: skladov\u00e9 a neskladov\u00e9 polo\u017eky v\u010detn\u011b p\u0159\u00edznaku sady a t\u0159\u00eddy polo\u017eky<\/li>\n\n\n<li><code>GET \/v1\/KitSpecifications\/{kitInventoryID}\/{revisionID}<\/code>: \u0159\u00e1dky komponent pro jednotliv\u00e9 revize<\/li>\n\n\n<li><code>GET \/v1\/kitassembly<\/code>: existuj\u00edc\u00ed sestavy s mo\u017enost\u00ed filtrov\u00e1n\u00ed podle typu a stavu<\/li>\n\n\n<li>SalesOrder service v3: popt\u00e1vka s po\u017eadovan\u00fdmi term\u00edny a \u0159\u00e1dky objedn\u00e1vek<\/li>\n\n\n<li><code>GET \/v1\/inventorysummary\/{inventoryNumber}<\/code>: fyzick\u00e9 a disponibiln\u00ed z\u00e1soby podle sklad\u016f<\/li>\n\n\n<li><code>GET \/v1\/purchaseorder<\/code> a <code>GET \/v2\/PurchaseReceipt<\/code>: o\u010dek\u00e1van\u00fd materi\u00e1l a p\u0159\u00edjemky<\/li>\n\n<\/ul>\n\n\n<p>V\u0161echny endpointy pro seznamy p\u0159ij\u00edmaj\u00ed <code>lastModifiedDateTime<\/code> s parametrem <code>lastModifiedDateTimeCondition<\/code> a tak\u00e9 <code>pageNumber<\/code> a <code>pageSize<\/code>. Ka\u017ed\u00e1 synchronizace tak m\u016f\u017ee p\u0159en\u00e1\u0161et pouze zm\u011bny.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed a limity<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Visma Net pou\u017e\u00edv\u00e1 <strong>Visma Connect<\/strong> (OpenID Connect a OAuth 2.0):<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Zaregistrujte <strong>Service Integration<\/strong> na Visma Developer Portal.<\/li>\n\n\n<li>Integraci <strong>schv\u00e1l\u00ed spr\u00e1vce tenantu<\/strong> Visma Net na stran\u011b z\u00e1kazn\u00edka.<\/li>\n\n\n<li>Tokeny z\u00edsk\u00e1te pomoc\u00ed toku client credentials na adrese <code>https:\/\/connect.visma.com\/connect\/token<\/code>. P\u0159edejte <code>tenant_id<\/code> a rozsahy opr\u00e1vn\u011bn\u00ed API, nap\u0159\u00edklad <code>visma_api:read<\/code>. Tokeny plat\u00ed 3 600 sekund.<\/li>\n\n<\/ul>\n\n\n<p>Limity vol\u00e1n\u00ed se po\u010d\u00edtaj\u00ed v pevn\u00fdch hodinov\u00fdch oknech pro ka\u017edou spole\u010dnost a klienta. Odpov\u011bdi obsahuj\u00ed hlavi\u010dky <code>X-RateLimit-Limit<\/code>, <code>X-RateLimit-Remaining<\/code> a <code>X-RateLimit-Reset<\/code>. P\u0159i p\u0159ekro\u010den\u00ed limitu API vr\u00e1t\u00ed stav 429 s hlavi\u010dkou <code>Retry-After<\/code> (<a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/api-reference\/rate-limits\/\">limity vol\u00e1n\u00ed<\/a>). Hlavi\u010dky ETag a <code>If-Match<\/code> chr\u00e1n\u00ed aktualizace.<\/p>\n\n\n<p>Partne\u0159i testuj\u00ed na demonstra\u010dn\u00ed spole\u010dnosti v r\u00e1mci bezplatn\u00e9ho programu Integrator Programme spole\u010dnosti Visma. P\u0159\u00edstup k REST API SkyPlanner se ov\u011b\u0159uje tokenem API (SkyPlanner Settings &gt; API); API je zdokumentov\u00e1no ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-webhooks-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti, webhooky a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/webhooks\/event-and-entities\/\">Webhooky<\/a> na Visma Developer Portal pokr\u00fdvaj\u00ed ud\u00e1losti d\u016fle\u017eit\u00e9 pro rozvrhov\u00e1n\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Inventory Item Created, Updated a Changed<\/li>\n\n\n<li>Purchase Order Changed a Status Changed<\/li>\n\n\n<li>Sales Order Changed a Status Changed, kter\u00e9 p\u0159ech\u00e1zej\u00ed pod vydavatele SalesOrderService<\/li>\n\n<\/ul>\n\n\n<p>Pro Kit assembly ani Kit specifications nejsou k dispozici \u017e\u00e1dn\u00e9 ud\u00e1losti. SkyPlanner je pravideln\u011b na\u010d\u00edt\u00e1 pomoc\u00ed filtr\u016f <code>lastModifiedDateTime<\/code>. Stavy z\u00e1sob se na\u010d\u00edtaj\u00ed p\u0159i ka\u017ed\u00e9m spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed. V opa\u010dn\u00e9m sm\u011bru SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i zm\u011bn\u011b stavu nebo rozvrhu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Visma Net (endpoint)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Stock items, Non-stock items (<code>\/v1\/inventory<\/code>)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 webhook<\/td><\/tr><tr><td>Kit specifications (<code>\/v1\/KitSpecifications<\/code>)<\/td><td>Struktura v\u00fdrobku, materi\u00e1ly pro jednotliv\u00e9 v\u00fdrobky<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>\u00davodn\u00ed na\u010dten\u00ed, pot\u00e9 pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Prodejn\u00ed objedn\u00e1vky (SalesOrder service v3)<\/td><td>Objedn\u00e1vky s term\u00edny dokon\u010den\u00ed a prioritou z\u00e1kazn\u00edka<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Webhook<\/td><\/tr><tr><td>Kit assembly ve stavu On hold (<code>\/v1\/kitassembly<\/code>), pokud sestavy vznikaj\u00ed ve Visma Net<\/td><td>Operace<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Inventory summary (<code>\/v1\/inventorysummary<\/code>)<\/td><td>Stavy z\u00e1sob podle sklad\u016f<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Na\u010dten\u00ed p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>N\u00e1kupn\u00ed objedn\u00e1vky a p\u0159\u00edjemky (<code>\/v1\/purchaseorder<\/code>, <code>\/v2\/PurchaseReceipt<\/code>)<\/td><td>O\u010dek\u00e1van\u00fd materi\u00e1l s term\u00ednem dod\u00e1n\u00ed; aktualizace z\u00e1sob p\u0159i dod\u00e1n\u00ed materi\u00e1lu z n\u00e1kupn\u00ed objedn\u00e1vky<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Webhook, pot\u00e9 na\u010dten\u00ed dat<\/td><\/tr><tr><td>Ve Visma Net nejsou<\/td><td>Kroky postupu, pracovi\u0161t\u011b, sm\u011bny, matice \u010das\u016f p\u0159estaven\u00ed, n\u00e1stroje, alternativn\u00ed zdroje<\/td><td>Spr\u00e1va ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><tr><td>Vytvo\u0159en\u00ed a aktualizace Kit assembly (<code>POST<\/code>\/<code>PUT \/v1\/kitassembly<\/code>)<\/td><td>Rozvr\u017een\u00e1 operace: polo\u017eka sady, mno\u017estv\u00ed, pl\u00e1novan\u00fd term\u00edn dokon\u010den\u00ed<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td>Uvoln\u011bn\u00ed Kit assembly (<code>\/v1\/kitassembly\/{type}\/{refNo}\/action\/release<\/code>)<\/td><td>Dokon\u010den\u00e1 operace: vyroben\u00e9 mno\u017estv\u00ed a spot\u0159eba komponent<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>P\u0159i dokon\u010den\u00ed<\/td><\/tr><tr><td>Inventory receipt, Inventory issue (<code>\/v1\/inventoryReceipt<\/code>, <code>\/v1\/inventoryissue<\/code>, uvoln\u011bn\u00ed)<\/td><td>Vyroben\u00e9 mno\u017estv\u00ed a spot\u0159eba materi\u00e1lu tam, kde se nepou\u017e\u00edvaj\u00ed sady<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>P\u0159i dokon\u010den\u00ed<\/td><\/tr><tr><td>Employee time card (<code>\/v1\/timeCard<\/code>)<\/td><td>Vyk\u00e1zan\u00e9 hodiny jednotliv\u00fdch pracovn\u00edk\u016f obsluhy<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>T\u00fddn\u011b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Postupy integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte skladov\u00e9 polo\u017eky, t\u0159\u00eddy polo\u017eek a nejnov\u011bj\u0161\u00ed revizi Kit specification pro ka\u017edou sadu. Ka\u017ed\u00fd \u0159\u00e1dek komponenty namapujte na materi\u00e1l ve SkyPlanner. Pot\u00e9 vytvo\u0159te to, co Visma Net neobsahuje: pracovi\u0161t\u011b, sm\u011bny, kroky postupu s \u010dasy p\u0159\u00edpravy a zpracov\u00e1n\u00ed, matici \u010das\u016f p\u0159estaven\u00ed a po\u017eadavky na n\u00e1stroje. Importujte je ze soubor\u016f CSV nebo Excel. Jde o nejv\u011bt\u0161\u00ed \u010d\u00e1st projektu.<\/p>\n\n\n<p><strong>2. Synchronizace objedn\u00e1vek.<\/strong> Zvolte jeden model popt\u00e1vky:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Podle prodejn\u00edch objedn\u00e1vek.<\/strong> Z otev\u0159en\u00fdch \u0159\u00e1dk\u016f prodejn\u00edch objedn\u00e1vek na polo\u017eky sad vznikaj\u00ed objedn\u00e1vky ve SkyPlanner. Po\u017eadovan\u00fd term\u00edn se pou\u017eije jako term\u00edn dokon\u010den\u00ed.<\/li>\n\n\n<li><strong>Podle sestav.<\/strong> Z Kit assemblies vytvo\u0159en\u00fdch ve Visma Net ve stavu On hold vznikaj\u00ed operace ve SkyPlanner.<\/li>\n\n<\/ul>\n\n\n<p>Otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky se p\u0159en\u00e1\u0161ej\u00ed v\u010detn\u011b term\u00edn\u016f. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered. P\u0159i rozvrhov\u00e1n\u00ed tak na z\u00e1klad\u011b t\u011bchto dat a p\u0159ehledu z\u00e1sob kontroluje jak skladov\u00e9 z\u00e1soby, tak o\u010dek\u00e1van\u00e9 n\u00e1kupy.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> P\u0159i \u0159\u00edzen\u00ed podle prodejn\u00edch objedn\u00e1vek SkyPlanner vytvo\u0159\u00ed pro ka\u017edou rozvr\u017eenou operaci Kit assembly typu Production. Nastav\u00ed polo\u017eku sady, revizi, sklad, mno\u017estv\u00ed a komponenty a propoj\u00ed sestavu s \u0159\u00e1dkem prodejn\u00ed objedn\u00e1vky. Datum sestavy odpov\u00edd\u00e1 pl\u00e1novan\u00e9mu dokon\u010den\u00ed. Kdy\u017e Autopilot operaci p\u0159esune, vol\u00e1n\u00ed <code>PUT<\/code> aktualizuje datum p\u0159ed uvoln\u011bn\u00edm.<\/p>\n\n\n<p>Kit assembly m\u00e1 jedin\u00e9 pole Date. \u010casy jednotliv\u00fdch operac\u00ed proto z\u016fst\u00e1vaj\u00ed ve SkyPlanner a do Visma Net se p\u0159en\u00e1\u0161\u00ed datum d\u016fle\u017eit\u00e9 pro prodej a z\u00e1soby.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Obsluha zaznamen\u00e1v\u00e1 pr\u00e1ci pomoc\u00ed Mobile Confirmations nebo Production Timer a z\u00e1znamy \u010dasu udr\u017euj\u00ed rozvrh aktu\u00e1ln\u00ed. Po dokon\u010den\u00ed posledn\u00edho kroku SkyPlanner vyvol\u00e1 akci uvoln\u011bn\u00ed Kit assembly. Uvoln\u011bn\u00edm se za\u00fa\u010dtuje vyroben\u00e9 mno\u017estv\u00ed a spot\u0159eba komponent a n\u00e1sledn\u011b vznikne d\u00e1vka v hlavn\u00ed knize. Hodiny se souhrnn\u011b p\u0159en\u00e1\u0161ej\u00ed do t\u00fddenn\u00edch Employee time cards, u projektov\u011b \u0159\u00edzen\u00e9 pr\u00e1ce do projektov\u00fdch transakc\u00ed.<\/p>\n\n\n<p><strong>5. Pravidla vlastnictv\u00ed dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Vlastn\u00edk<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, Kit specifications, prodejn\u00ed objedn\u00e1vky, n\u00e1kupn\u00ed objedn\u00e1vky, skladov\u00e9 z\u00e1soby, n\u00e1klady<\/td><td>Visma Net<\/td><\/tr><tr><td>V\u00fdrobn\u00ed operace, pracovi\u0161t\u011b, sm\u011bny, se\u0159\u00edzen\u00ed, n\u00e1stroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed k pracovi\u0161t\u00edm<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Datum dokladu Kit assembly p\u0159ed uvoln\u011bn\u00edm<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Uvoln\u011bn\u00e9 doklady Kit assemblies a pracovn\u00ed v\u00fdkazy<\/td><td>Visma Net, z\u00e1pis ze SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Zm\u011bnou Kit specification vznik\u00e1 nov\u00e1 revize. Na\u010dt\u011bte nejnov\u011bj\u0161\u00ed revizi a znovu ji namapujte, proto\u017ee k v\u00fdrob\u011b lze pou\u017e\u00edt pouze posledn\u00ed revizi. Ru\u010dn\u00ed zm\u011bny komponent v mont\u00e1\u017en\u00edm dokladu z\u016fst\u00e1vaj\u00ed ve Visma Net platn\u00e9, proto SkyPlanner p\u0159ed uvoln\u011bn\u00edm doklad znovu na\u010dte.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace je obvykle hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm m\u016f\u017eete b\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed pracovat s vlastn\u00edmi daty z exportn\u00edho sc\u00e9n\u00e1\u0159e Visma Net, importovan\u00fdmi ve form\u00e1tu CSV nebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vymezen\u00ed rozsahu.<\/strong> Stanovte model popt\u00e1vky, mapovac\u00ed tabulku, pravidla vlastnictv\u00ed dat a c\u00edl zp\u011btn\u00e9ho z\u00e1pisu (Kit assembly nebo skladov\u00e9 p\u0159\u00edjemky).<\/li>\n\n\n<li><strong>Nastaven\u00ed Visma Connect.<\/strong> Zaregistrujte Service Integration a zajist\u011bte schv\u00e1len\u00ed spr\u00e1vcem tenantu. Nejprve v\u0161e otestujte v uk\u00e1zkov\u00e9 firm\u011b.<\/li>\n\n\n<li><strong>V\u00fdrobn\u00ed model.<\/strong> Pracovi\u0161t\u011b, sm\u011bny, v\u00fdrobn\u00ed operace, se\u0159\u00edzen\u00ed a n\u00e1stroje ve SkyPlanner.<\/li>\n\n\n<li><strong>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed.<\/strong> Skladov\u00e9 polo\u017eky, t\u0159\u00eddy polo\u017eek, Kit specifications, sklady a skladov\u00e9 z\u00e1soby.<\/li>\n\n\n<li><strong>Synchronizace prodejn\u00edch a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pro prodejn\u00ed objedn\u00e1vky, n\u00e1kupn\u00ed objedn\u00e1vky a polo\u017eky pou\u017eijte webhooky, pro sady a skladov\u00e9 z\u00e1soby pravideln\u00e9 dotazov\u00e1n\u00ed. Do t\u00e9to \u010d\u00e1sti pat\u0159\u00ed tak\u00e9 obnova token\u016f a o\u0161et\u0159en\u00ed odpov\u011bd\u00ed 429.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis.<\/strong> Vytv\u00e1\u0159en\u00ed, aktualizace a uvol\u0148ov\u00e1n\u00ed doklad\u016f Kit assembly a z\u00e1pis pracovn\u00edch v\u00fdkaz\u016f.<\/li>\n\n\n<li><strong>Paraleln\u00ed testov\u00e1n\u00ed.<\/strong> Provozujte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem a porovn\u00e1vejte term\u00edny.<\/li>\n\n\n<li><strong>Ostr\u00fd provoz.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-visma-net-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s Visma Net<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Technologick\u00e9 postupy nen\u00ed odkud importovat.<\/strong> V\u0161echny v\u00fdrobn\u00ed operace i \u010dasy se\u0159\u00edzen\u00ed a v\u00fdroby se zakl\u00e1daj\u00ed ve SkyPlanner. Vyhra\u010fte na to \u010das a ur\u010dete odpov\u011bdnou osobu.<\/li>\n\n\n<li><strong>Advanced logistics.<\/strong> Kit assembly vy\u017eaduje skupinu Advanced logistics. Se Standard logistics za\u00fa\u010dtujte hotovou v\u00fdrobu pomoc\u00ed Inventory receipt a Inventory issue.<\/li>\n\n\n<li><strong>Uzam\u010den\u00e9 revize.<\/strong> Pou\u017eitou revizi Kit specification nelze upravit a vyr\u00e1b\u011bt lze pouze podle nejnov\u011bj\u0161\u00ed revize.<\/li>\n\n\n<li><strong>M\u011brn\u00e9 jednotky.<\/strong> Kit assembly m\u00e1 vlastn\u00ed m\u011brnou jednotku. P\u0159i importu ji sla\u010fte s mno\u017estv\u00edmi ve SkyPlanner.<\/li>\n\n\n<li><strong>Pravideln\u00e9 dotazov\u00e1n\u00ed bez ud\u00e1lost\u00ed.<\/strong> Sady nemaj\u00ed webhooky. Na\u010d\u00edtejte pouze zm\u011bny podle <code>lastModifiedDateTime<\/code>, nikoli v\u0161echna data znovu, abyste nep\u0159ekro\u010dili hodinov\u00fd limit po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Aktu\u00e1ln\u00ed endpointy.<\/strong> Integraci stavte pouze na <code>api.finance.visma.net<\/code> a SalesOrder service v3.<\/li>\n\n\n<li><strong>Schv\u00e1len\u00ed v tenantu.<\/strong> Ov\u011b\u0159ov\u00e1n\u00ed pomoc\u00ed client credentials nebude fungovat, dokud spr\u00e1vce tenantu aplikaci neschv\u00e1l\u00ed. Domluvte tento krok v\u010das.<\/li>\n\n\n<li><strong>T\u00fddenn\u00ed pracovn\u00ed v\u00fdkazy.<\/strong> Pracovn\u00ed v\u00fdkazy vy\u017eaduj\u00ed Advanced financials a vedou se po t\u00fddnech. S\u010d\u00edtejte hodiny obsluhy za jednotliv\u00e9 t\u00fddny, nebo je zapisujte do projektov\u00fdch transakc\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-visma-net-integr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci s Visma Net a zaji\u0161\u0165uje podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje podporu.<\/strong> To zahrnuje nastaven\u00ed na stran\u011b SkyPlanner, v\u00fdrobn\u00ed model, kter\u00fd ve Visma Net chyb\u00ed, a dohodnut\u00e1 vol\u00e1n\u00ed API Visma Net. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Visma Net jinak a pr\u00e1v\u011b p\u0159i tomto nastaven\u00ed se znalost jeho provozu uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro Visma Net.<\/strong> Visma dod\u00e1v\u00e1 Visma Net prost\u0159ednictv\u00edm partner\u016f certifikovan\u00fdch spole\u010dnost\u00ed Visma. Ti znaj\u00ed va\u0161e nastaven\u00ed a mohou zkontrolovat mapov\u00e1n\u00ed i aplikaci ve Visma Connect. SkyPlanner poskytuje REST API, dokumentaci Swagger\/OpenAPI a webhooky.<\/li>\n\n\n<li><strong>Integraci mohou vytvo\u0159it i va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i<\/strong> pomoc\u00ed stejn\u00e9ho zdokumentovan\u00e9ho REST API a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Ve\u0159ejn\u011b dostupn\u00e1 je <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Po propojen\u00ed Arcturus rozvrhuje v\u00fdrobu podle aktu\u00e1ln\u00edch objedn\u00e1vek z Visma Net a dokon\u010den\u00e1 pr\u00e1ce se vrac\u00ed do Visma Net jako uvoln\u011bn\u00e9 doklady Kit assemblies. Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b, zahrnuje 5 pracovi\u0161\u0165 a \u00fa\u010dtuje se m\u011bs\u00ed\u010dn\u011b. Cenovou nab\u00eddku na integraci p\u0159iprav\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s nab\u00eddkou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm.<\/p>\n\n\n<p>Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>. Pro\u010d Visma Net pot\u0159ebuje n\u00e1stroj pro rozvrhov\u00e1n\u00ed, vysv\u011btluje str\u00e1nka <a href=\"\/cs\/integrace\/erp\/visma-net\/planovani-vyroby\/\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby ve Visma Net s ohledem na skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed<\/a>. P\u0159ehled najdete na <a href=\"\/cs\/integrace\/erp\/visma-net\/\">str\u00e1nce Visma Net<\/a> a dal\u0161\u00ed syst\u00e9my ERP v <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehledu integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit si uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce v UTU, ve v\u00fdrobn\u00ed hale rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme p\u0159e\u0161li od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v excelov\u00fdch tabulk\u00e1ch k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Sv\u00e1\u0159e\u010d KJH-Comp brous\u00ed sva\u0159enou ocelovou konstrukci v z\u00e1vod\u011b Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>v\u010dasnost dod\u00e1vek, n\u00e1r\u016fst z p\u0159ibli\u017en\u011b 50 %<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner hraje rozhoduj\u00edc\u00ed roli v tom, abychom dod\u00e1vali v\u010das.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd \u0159editel<\/b><br>KJH-Comp \u00b7 Zpracov\u00e1n\u00ed plech\u016f a zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % a rozvrhov\u00e1n\u00ed nyn\u00ed zaji\u0161\u0165uje jeden mistr m\u00edsto dvou.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010d\u00edst hodnocen\u00ed KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchodn\u00edci volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner poskytuje spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu a na po\u017eadavky na zm\u011bnu rozvrhu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, dost\u00e1vaj\u00ed odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Obsahuje API Visma Net v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ne. Visma Net nem\u00e1 objekty pro v\u00fdrobn\u00ed p\u0159\u00edkazy, technologick\u00e9 postupy ani pracovi\u0161t\u011b, a proto je nem\u00e1 ani jeho API. V\u00fdrobn\u00edm dokladem je Kit assembly na <code>\/v1\/kitassembly<\/code>, zat\u00edmco technologick\u00e9 postupy a pracovi\u0161t\u011b jsou vedeny ve SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00e9 ov\u011b\u0159ov\u00e1n\u00ed integrace pou\u017e\u00edv\u00e1?<\/summary>\n<p class=\"sp-faq__a\">Integrace pou\u017e\u00edv\u00e1 Visma Connect s tokem OAuth 2.0 client credentials a je registrov\u00e1na jako Service Integration ve Visma Developer Portal. Integraci schvaluje spr\u00e1vce tenantu a tokeny plat\u00ed jednu hodinu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017ee Visma Net odes\u00edlat zm\u011bny v re\u00e1ln\u00e9m \u010dase?<\/summary>\n<p class=\"sp-faq__a\">U polo\u017eek, prodejn\u00edch objedn\u00e1vek a n\u00e1kupn\u00edch objedn\u00e1vek ano, prost\u0159ednictv\u00edm webhook\u016f ve Visma Developer Portal. Kit assemblies a Kit specifications nemaj\u00ed ud\u00e1losti, proto se jejich zm\u011bny na\u010d\u00edtaj\u00ed p\u0159\u00edr\u016fstkov\u00fdm dotazov\u00e1n\u00edm. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se dokon\u010den\u00e1 v\u00fdroba zapisuje zp\u011bt do Visma Net?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner vytvo\u0159\u00ed pro ka\u017edou napl\u00e1novanou operaci doklad Kit assembly, pr\u016fb\u011b\u017en\u011b aktualizuje jeho datum a po dokon\u010den\u00ed operace zavol\u00e1 akci release. Uvoln\u011bn\u00edm se za\u00fa\u010dtuje hotov\u00e1 v\u00fdroba a spot\u0159eba komponent. Bez sad tot\u00e9\u017e zaji\u0161\u0165uj\u00ed Inventory receipt a Inventory issue.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner otestovat je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed m\u016f\u017eete pou\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165 a importovat data z Visma Net ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a>, nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte spole\u010dn\u011b rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Visma Net ERP Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Visma Net (Visma.net ERP) se SkyPlanner APS. SkyPlanner si s Visma Net vym\u011b\u0148uje data obousm\u011brn\u011b p\u0159es Visma Net API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103286,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104410","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma Net a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/pruvodce-integraci\\\/\",\"name\":\"Visma Net a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Visma Net: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/visma-net\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma Net a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby","description":"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/","name":"Visma Net a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Propojte Visma Net se SkyPlanner APS: Visma Net API, ov\u011b\u0159ov\u00e1n\u00ed Visma Connect, webhooky, mapov\u00e1n\u00ed dat, zp\u011btn\u00fd z\u00e1pis Kit assembly a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Visma Net: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/visma-net\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Visma Net ERP Pr\u016fvodce integrac\u00ed Visma Net pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Visma Net (Visma.net ERP) se SkyPlanner APS. SkyPlanner si s Visma Net vym\u011b\u0148uje data obousm\u011brn\u011b p\u0159es Visma Net API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/104410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=104410"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/104410\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103286"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=104410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}