{"id":104004,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Monitor ERP <span class=\"hl\">pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Monitor ERP (Monitor G5) se SkyPlanner APS. SkyPlanner se s Monitor ERP propojuje obousm\u011brn\u011b p\u0159es Monitor ERP API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se na\u010d\u00edtaj\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy, operace, pracovi\u0161t\u011b, technologick\u00e9 postupy a materi\u00e1ly.<\/li>\n\n\n<li>Pl\u00e1novan\u00fd za\u010d\u00e1tek, pl\u00e1novan\u00e9 dokon\u010den\u00ed a pracovi\u0161t\u011b se pro ka\u017edou operaci zapisuj\u00ed zp\u011bt do syst\u00e9mu Monitor.<\/li>\n\n\n<li>Vyk\u00e1zan\u00e9 \u010dasy a mno\u017estv\u00ed udr\u017euj\u00ed oba syst\u00e9my v souladu.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace Monitor G5 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vyv\u00edjet \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-monitor-erp-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Zdokumentovan\u00fdm integra\u010dn\u00edm rozhran\u00edm Monitor G5 je <strong>Monitor ERP API v1<\/strong>. Kombinuje CQRS a REST a p\u0159en\u00e1\u0161\u00ed JSON p\u0159es HTTPS. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/index.html\">Monitor ERP API<\/a>)<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dotazy<\/strong> \u010dtou data metodou GET. Podporuj\u00ed parametry ve stylu OData: <code>$filter<\/code>, <code>$select<\/code>, <code>$expand<\/code>, <code>$orderby<\/code>, <code>$top<\/code> a <code>$skip<\/code>.<\/li>\n\n\n<li><strong>P\u0159\u00edkazy<\/strong> zapisuj\u00ed data metodou POST, nap\u0159\u00edklad <code>Manufacturing\/ManufacturingOrderOperations\/Update<\/code>.<\/li>\n\n\n<li><strong>Batch<\/strong> provede n\u011bkolik p\u0159\u00edkaz\u016f v jedin\u00e9 transakci typu v\u0161e, nebo nic p\u0159es <code>POST \/api\/v1\/Batch<\/code>. P\u0159ipojen\u00edm <code>\/Simulate<\/code> nebo <code>\/Validate<\/code> d\u00e1vku otestujete a jej\u00ed zm\u011bny vr\u00e1t\u00edte zp\u011bt. Takto lze bezpe\u010dn\u011b zapsat cel\u00fd rozvrh. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/commands\/batch.html\">Batch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Z\u00e1kladn\u00ed URL je <code>https:\/\/{host}:8001\/{languageCode}\/{companyNumber}\/api\/v1\/<\/code>. \u010c\u00edslo spole\u010dnosti se skl\u00e1d\u00e1 z \u010d\u00edsla datab\u00e1ze a ID spole\u010dnosti, nap\u0159\u00edklad <code>004.1<\/code>.<\/p>\n\n\n<p>K licencov\u00e1n\u00ed Monitor uv\u00e1d\u00ed: &#8222;It is free to query and extract information from the API for all our customers. However, in order to use commands and write data to the ERP system, you need to purchase Monitor ERP API.&#8220; (V\u0161ichni na\u0161i z\u00e1kazn\u00edci mohou p\u0159es API zdarma zad\u00e1vat dotazy a z\u00edsk\u00e1vat informace. Pro pou\u017e\u00edv\u00e1n\u00ed p\u0159\u00edkaz\u016f a z\u00e1pis dat do ERP je v\u0161ak nutn\u00e9 zakoupit Monitor ERP API.) S licenc\u00ed pro z\u00e1pis po\u010d\u00edtejte v projektu od sam\u00e9ho za\u010d\u00e1tku. (<a href=\"https:\/\/api.monitor.se\/\">api.monitor.se<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0159ihl\u00e1\u0161en\u00ed k relaci.<\/strong> Vol\u00e1n\u00ed <code>POST \/{languageCode}\/{companyNumber}\/login<\/code> s u\u017eivatelsk\u00fdm jm\u00e9nem a heslem u\u017eivatele syst\u00e9mu Monitor vr\u00e1t\u00ed hlavi\u010dku <code>X-Monitor-SessionId<\/code> pro dal\u0161\u00ed vol\u00e1n\u00ed. K dispozici je tak\u00e9 postup ov\u011b\u0159en\u00ed s tokenem MFA.<\/li>\n\n\n<li><strong>OIDC.<\/strong> Od verze Monitor 25.8 se lze p\u0159ihl\u00e1sit tak\u00e9 p\u0159es Microsoft Entra ID pomoc\u00ed Authorization Code a PKCE. (<a href=\"https:\/\/api.monitor.se\/articles\/authentication\/index.html\">Ov\u011b\u0159ov\u00e1n\u00ed<\/a>)<\/li>\n\n\n<li><strong>Samostatn\u00fd u\u017eivatel pro API.<\/strong> Pro integraci vytvo\u0159te jednoho u\u017eivatele. Vztahuj\u00ed se na n\u011bj opr\u00e1vn\u011bn\u00ed syst\u00e9mu Monitor, nap\u0159\u00edklad Show manufacturing orders a Replan existing manufacturing order.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner pou\u017e\u00edv\u00e1 REST API k ov\u011b\u0159ov\u00e1n\u00ed API token (SkyPlanner Settings &gt; API) a jeho dokumentace je dostupn\u00e1 ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Zji\u0161\u0165ov\u00e1n\u00ed zm\u011bn a polling<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Referen\u010dn\u00ed dokumentace Monitor ERP API nepopisuje \u017e\u00e1dn\u00e9 webhooky ani odb\u011br ud\u00e1lost\u00ed. Zm\u011bny se zji\u0161\u0165uj\u00ed pravideln\u00fdm dotazov\u00e1n\u00edm (pollingem):<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>Common\/EntityChangeLogs<\/code> (od verze 2.33) vrac\u00ed <code>ChangeType<\/code> (Update, Create, Delete), <code>EntityTypeId<\/code>, <code>EntityId<\/code> a <code>ModifiedTimestamp<\/code>. Dotazujte se ka\u017ed\u00fdch n\u011bkolik minut a na\u010d\u00edtejte pouze zm\u011bn\u011bn\u00e9 z\u00e1znamy. (<a href=\"https:\/\/api.monitor.se\/api\/Monitor.API.Common.EntityChangeLog.html\">EntityChangeLog<\/a>)<\/li>\n\n\n<li>Dotazy na v\u00fdrobn\u00ed p\u0159\u00edkazy omezte na otev\u0159en\u00e9 p\u0159\u00edkazy a v\u00fdsledky str\u00e1nkujte pomoc\u00ed <code>$top<\/code> a <code>$skip<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner p\u0159i zm\u011bn\u011b stavu nebo rozvrhu odes\u00edl\u00e1 webhooky, tak\u017ee zp\u011btn\u00fd z\u00e1pis je \u0159\u00edzen ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Monitor ERP (API)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Part (<code>Inventory\/Parts<\/code>)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 podle protokolu zm\u011bn<\/td><\/tr><tr><td>Kusovn\u00edk a technologick\u00fd postup: <code>Manufacturing\/MaterialRows<\/code>, <code>Manufacturing\/OperationRows<\/code><\/td><td>Struktura v\u00fdrobku; operace s \u010dasy se\u0159\u00edzen\u00ed a jednotkov\u00fdmi \u010dasy<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td><code>Manufacturing\/AlternativeOperationRows<\/code><\/td><td>Alternativn\u00ed pracovi\u0161t\u011b pro jednotliv\u00e9 operace<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Pracovi\u0161t\u011b (<code>Manufacturing\/WorkCenters<\/code>): Type, TimePrecision, BasicTime, NumberOfPlanningUnits, AvailabilityFactor<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, efektivita<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td><code>Manufacturing\/ProductionCalendarExceptions<\/code>, <code>TimeRecording\/Schedules<\/code><\/td><td>Sm\u011bny a nep\u0159\u00edtomnosti<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo vlastn\u00ed sm\u011bny ve SkyPlanner<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code><\/td><td>Zak\u00e1zky s term\u00edny dokon\u010den\u00ed a stavem<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed na protokol zm\u011bn ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderOperations<\/code>: Priority, WorkCenterId, PlannedQuantity, RestQuantity, PlannedSetupTime, PlannedUnitTime<\/td><td>\u00dalohy s dobou trv\u00e1n\u00ed a zb\u00fdvaj\u00edc\u00edm mno\u017estv\u00edm<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed na protokol zm\u011bn ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderMaterials<\/code><\/td><td>Pot\u0159eba materi\u00e1lu pro jednotliv\u00e9 zak\u00e1zky<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed na protokol zm\u011bn<\/td><\/tr><tr><td><code>Inventory\/PartLocations<\/code> (Balance), <code>Purchase\/PurchaseOrderRows<\/code> (DeliveryDate, RestQuantity)<\/td><td>Z\u00e1soby; o\u010dek\u00e1van\u00fd materi\u00e1l k datu dod\u00e1n\u00ed<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/Update<\/code>: PlannedStartDate, PlannedFinishDate (24.5+)<\/td><td>Pl\u00e1novan\u00fd za\u010d\u00e1tek a konec jednotliv\u00fdch operac\u00ed<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/SetWorkCenter<\/code><\/td><td>Pracovi\u0161t\u011b vybran\u00e9 pl\u00e1novac\u00edm j\u00e1drem<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu<\/td><\/tr><tr><td><code>ReportManufacturingOrderOperation<\/code> \/ <code>ManufacturingOrderOperationReportings<\/code><\/td><td>\u010casov\u00e9 z\u00e1znamy a mno\u017estv\u00ed<\/td><td>Jeden kan\u00e1l zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu<\/td><\/tr><tr><td>V syst\u00e9mu Monitor nen\u00ed<\/td><td>Matice \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje jako kapacitn\u011b omezen\u00e9 zdroje, \u00falohy pro v\u00edce oper\u00e1tor\u016f<\/td><td>Spravov\u00e1no ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte pracovi\u0161t\u011b, \u0159\u00e1dky operac\u00ed, \u0159\u00e1dky alternativn\u00edch operac\u00ed, materi\u00e1lov\u00e9 \u0159\u00e1dky, polo\u017eky a rozvrhy sm\u011bn. Pe\u010dliv\u011b ur\u010dete, kter\u00e9mu pracovi\u0161ti ve SkyPlanner bude ka\u017ed\u00e9 pracovi\u0161t\u011b odpov\u00eddat. Z pracovi\u0161t\u011b typu Pool vznikne skupina pracovi\u0161\u0165 a z pracovi\u0161\u0165, kter\u00e1 sdru\u017euje, vzniknou jednotliv\u00e1 pracovi\u0161t\u011b, mezi nimi\u017e bude pl\u00e1novac\u00ed j\u00e1dro vyb\u00edrat.<\/p>\n\n\n<p><strong>2. Synchronizace zak\u00e1zek.<\/strong> Na\u010dt\u011bte otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy v\u010detn\u011b jejich uzl\u016f, operac\u00ed a materi\u00e1l\u016f, d\u00e1le z\u00e1soby a otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a aktualizuje z\u00e1soby, jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered. Po prvn\u00edm na\u010dten\u00ed se p\u0159\u00edr\u016fstkov\u00e9 aktualizace \u0159\u00edd\u00ed podle <code>Common\/EntityChangeLogs<\/code>.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Pro ka\u017edou operaci, kterou pl\u00e1novac\u00ed j\u00e1dro za\u0159adilo nebo p\u0159esunulo, ode\u0161le SkyPlanner <code>ManufacturingOrderOperations\/Update<\/code> s PlannedStartDate a PlannedFinishDate. Pokud j\u00e1dro p\u0159esunulo operaci na jin\u00fd stroj ve skupin\u011b, nejprve se provede <code>SetWorkCenter<\/code>. P\u0159\u00edkazy pro jednu zak\u00e1zku se ode\u0161lou v jedn\u00e9 d\u00e1vce <code>Batch<\/code>, tak\u017ee je Monitor p\u0159ijme bu\u010f v\u0161echny, nebo \u017e\u00e1dn\u00fd. P\u0159i testov\u00e1n\u00ed spus\u0165te d\u00e1vku p\u0159es <code>\/Validate<\/code>.<\/p>\n\n\n<p>Ve verz\u00edch Monitor p\u0159ed 24.5 nelze pl\u00e1novan\u00e9 term\u00edny zapisovat p\u0159es Update. M\u00edsto toho pou\u017eijte <code>ManufacturingOrders\/ReplanOperation<\/code> (od verze 2.40) se StartDate a FinishDate a nastavte RestrictToOrderBounds podle sv\u00fdch pravidel.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/strong> Pou\u017e\u00edvejte pouze jeden kan\u00e1l pro vykazov\u00e1n\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vykazov\u00e1n\u00ed z\u016fst\u00e1v\u00e1 v syst\u00e9mu Monitor.<\/strong> Oper\u00e1to\u0159i vykazuj\u00ed pr\u00e1ci p\u0159es Recording terminal nebo prost\u0159ednictv\u00edm integrace stroj\u016f stejn\u011b jako dosud. SkyPlanner na\u010d\u00edt\u00e1 pr\u016fb\u011bh v\u00fdroby z <code>ManufacturingOrderOperationReportings<\/code> a podle n\u011bj p\u0159epl\u00e1nov\u00e1v\u00e1.<\/li>\n\n\n<li><strong>Vykazov\u00e1n\u00ed p\u0159eb\u00edr\u00e1 SkyPlanner.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed Mobile Confirmations nebo Production Timer a SkyPlanner odes\u00edl\u00e1 do syst\u00e9mu Monitor <code>ReportManufacturingOrderOperation<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>P\u0159i vykazov\u00e1n\u00ed v obou syst\u00e9mech se \u010dasy a mno\u017estv\u00ed zapo\u010d\u00edtaj\u00ed dvakr\u00e1t.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu je p\u00edsemn\u011b stanovte:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, kusovn\u00edk a technologick\u00fd postup, mno\u017estv\u00ed, stav zak\u00e1zky<\/td><td>Monitor<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, pl\u00e1novan\u00fd za\u010d\u00e1tek a dokon\u010den\u00ed, pracovi\u0161t\u011b v r\u00e1mci skupiny<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f, alternativn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a absence<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Odv\u00e1d\u011bn\u00ed operac\u00ed<\/td><td>Jeden kan\u00e1l zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Hlavn\u00edm zdrojem konflikt\u016f jsou dal\u0161\u00ed \u00fapravy prioritn\u00edho pl\u00e1nu ze strany pl\u00e1nova\u010d\u016f. <strong>Rescheduling according to New finish<\/strong> a p\u0159etahov\u00e1n\u00ed \u0159\u00e1dk\u016f v Priority planning p\u0159episuj\u00ed term\u00edny zapsan\u00e9 syst\u00e9mem SkyPlanner. Jakmile po\u0159ad\u00ed operac\u00ed \u0159\u00edd\u00ed SkyPlanner, slou\u017e\u00ed Priority planning u\u017e jen k prohl\u00ed\u017een\u00ed. S funkc\u00ed Autopilot SkyPlanner p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje rozvrh.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si m\u016f\u017eete syst\u00e9m na 30 dn\u00ed zdarma vyzkou\u0161et na vlastn\u00edch datech. Exportujte ze syst\u00e9mu Monitor do Excelu operace otev\u0159en\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a pracovi\u0161t\u011b, importujte je a ov\u011b\u0159te rozvrh je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm integra\u010dn\u00edch prac\u00ed.<\/p>\n\n\n<p>Samotn\u00fd projekt zahrnuje:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vymezen\u00ed rozsahu.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla odpov\u011bdnosti za data, intervaly dotazov\u00e1n\u00ed, kan\u00e1l pro odv\u00e1d\u011bn\u00ed operac\u00ed a verzi syst\u00e9mu Monitor.<\/li>\n\n\n<li><strong>P\u0159\u00edstup.<\/strong> Vytvo\u0159te u\u017eivatele API, zakupte licenci Monitor ERP API pro z\u00e1pis a povolte s\u00ed\u0165ov\u00fd p\u0159\u00edstup na port 8001.<\/li>\n\n\n<li><strong>Prvotn\u00ed na\u010dten\u00ed dat.<\/strong> Polo\u017eky, pracovi\u0161t\u011b, \u0159\u00e1dky operac\u00ed, alternativy, materi\u00e1ly a rozvrhy.<\/li>\n\n\n<li><strong>Synchronizace zak\u00e1zek a n\u00e1kupn\u00edch objedn\u00e1vek<\/strong> na z\u00e1klad\u011b protokolu zm\u011bn.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v syst\u00e9mu SkyPlanner.<\/strong> Matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis rozvrhu<\/strong> po d\u00e1vk\u00e1ch, s ov\u011b\u0159en\u00edm pomoc\u00ed <code>\/Validate<\/code>.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00e9 testov\u00e1n\u00ed.<\/strong> Provozujte SkyPlanner soub\u011b\u017en\u011b s prioritn\u00edm pl\u00e1nem, porovnejte term\u00edny a opravte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-monitor-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Koeficient dostupnosti.<\/strong> Monitor p\u0159epo\u010d\u00edt\u00e1v\u00e1 hrubou kapacitu na \u010distou pomoc\u00ed koeficientu dostupnosti. U nov\u00e9ho pracovi\u0161t\u011b je v\u00fdchoz\u00ed hodnota 80 %. Zohledn\u011bte jej pouze jednou: bu\u010f jako efektivitu v syst\u00e9mu SkyPlanner, nebo zkr\u00e1cen\u00edm sm\u011bn, nikdy oboj\u00edm.<\/li>\n\n\n<li><strong>\u010casov\u00e1 p\u0159esnost.<\/strong> Pracovi\u0161t\u011b v Day planning maj\u00ed kapacitu vyj\u00e1d\u0159enou jako z\u00e1kladn\u00ed \u010das na den, bez \u010das\u016f sm\u011bn. Namapujte do syst\u00e9mu SkyPlanner skute\u010dn\u00e9 sm\u011bny z v\u00fdrobn\u00edch kalend\u00e1\u0159\u016f, aby se pr\u00e1ce rozvrhovala do pracovn\u00ed doby.<\/li>\n\n\n<li><strong>\u010cekac\u00ed doba a p\u0159ekryt\u00ed.<\/strong> \u0158\u00e1dky operac\u00ed obsahuj\u00ed \u010dekac\u00ed dobu a p\u0159ekryt\u00ed v %. P\u0159i vymezen\u00ed rozsahu rozhodn\u011bte, jak se ob\u011b hodnoty p\u0159evedou do syst\u00e9mu SkyPlanner. Jinak se po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zm\u011bn\u00ed pr\u016fb\u011b\u017en\u00e9 doby.<\/li>\n\n\n<li><strong>Skupiny pracovi\u0161\u0165.<\/strong> Skupinov\u00e1 pracovi\u0161t\u011b se pl\u00e1nuj\u00ed v Pool planning, nikoli v Priority planning. Na\u010d\u00edtejte i za\u0159azen\u00e1 pracovi\u0161t\u011b, ne pouze \u0159\u00e1dek skupiny.<\/li>\n\n\n<li><strong>Po\u017eadavky na verzi.<\/strong> Z\u00e1pis pl\u00e1novan\u00fdch term\u00edn\u016f pomoc\u00ed Update vy\u017eaduje verzi 24.5. Pole kapacity pracovi\u0161\u0165 v API vy\u017eaduj\u00ed verzi 24.3 a OIDC verzi 25.8. P\u0159ed vymezen\u00edm rozsahu zkontrolujte sestaven\u00ed syst\u00e9mu.<\/li>\n\n\n<li><strong>S\u00ed\u0165 a certifik\u00e1t.<\/strong> Lok\u00e1ln\u011b provozovan\u00fd Monitor poskytuje API na portu 8001 s certifik\u00e1tem podepsan\u00fdm sv\u00fdm dr\u017eitelem. SkyPlanner b\u011b\u017e\u00ed v cloudu, proto napl\u00e1nujte pravidlo firewallu nebo p\u0159enos p\u0159es prost\u0159edn\u00edka a certifik\u00e1t v\u00fdslovn\u011b nastavte jako d\u016fv\u011bryhodn\u00fd.<\/li>\n\n\n<li><strong>Licence.<\/strong> Ka\u017ed\u00e1 aplikace t\u0159et\u00ed strany, kter\u00e1 zapisuje data, pot\u0159ebuje vlastn\u00ed licencovan\u00e9 u\u017eivatele API. Sou\u010d\u00e1st\u00ed ka\u017ed\u00e9ho syst\u00e9mu je jeden u\u017eivatel API s p\u0159\u00edstupem pouze pro \u010dten\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-monitor-erp-integration-who-configures-and-s\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrace s Monitor ERP: kdo ji nastavuje a zaji\u0161\u0165uje podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pr\u00e1ce zahrnuj\u00ed mapov\u00e1n\u00ed va\u0161ich pracovi\u0161\u0165, \u0159\u00e1dk\u016f operac\u00ed a toku zak\u00e1zek. Zahrnuj\u00ed tak\u00e9 nastaven\u00ed omezen\u00ed, kter\u00e1 Monitor neeviduje: matici se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty pracovn\u00edk\u016f obsluhy a alternativn\u00ed zdroje.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje podporu.<\/strong> Ta pokr\u00fdv\u00e1 stranu syst\u00e9mu SkyPlanner a dohodnut\u00e1 vol\u00e1n\u00ed Monitor ERP API. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Monitor G5 jinak a pr\u00e1v\u011b zde se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro Monitor.<\/strong> Zn\u00e1 va\u0161e nastaven\u00ed, verzi a opr\u00e1vn\u011bn\u00ed a m\u016f\u017ee p\u0159ipravit u\u017eivatele API, licenci i s\u00ed\u0165ov\u00fd p\u0159\u00edstup. SkyPlanner poskytuje REST API, dokumentaci Swagger\/OpenAPI a webhooky.<\/li>\n\n\n<li><strong>Na integraci mohou nav\u00e1zat i va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i<\/strong> prost\u0159ednictv\u00edm stejn\u00e9ho zdokumentovan\u00e9ho REST API s tokenem API. Pro zah\u00e1jen\u00ed pr\u00e1ce sta\u010d\u00ed token API a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Ve\u0159ejn\u00e1 dokumentace je dostupn\u00e1 na str\u00e1nce <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">Dokumentace SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Po propojen\u00ed vytv\u00e1\u0159\u00ed pl\u00e1novac\u00ed j\u00e1dro Arcturus rozvrh z aktu\u00e1ln\u00edch zak\u00e1zek v syst\u00e9mu Monitor a pl\u00e1novan\u00e9 term\u00edny se zapisuj\u00ed do operac\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f. Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenovou nab\u00eddku integrace p\u0159iprav\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s nab\u00eddkou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, porovn\u00e1n\u00ed s vlastn\u00edm pl\u00e1nov\u00e1n\u00edm syst\u00e9mu Monitor v \u010dl\u00e1nku <a href=\"\/cs\/integrace\/erp\/monitor-erp\/planovani-vyroby\/\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Monitor ERP s ohledem na skute\u010dnou kapacitu stroj\u016f a pracovn\u00edk\u016f<\/a>, p\u0159ehled na <a href=\"\/cs\/integrace\/erp\/monitor-erp\/\">str\u00e1nce Monitor ERP<\/a> a dal\u0161\u00ed syst\u00e9my ERP v <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehledu integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Objednat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce spole\u010dnosti UTU, ve v\u00fdrobn\u00ed hale rozvad\u011b\u010d\u016f ve m\u011bst\u011b Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky syst\u00e9mu SkyPlanner jsme p\u0159e\u0161li od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v excelov\u00fdch tabulk\u00e1ch k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby u\u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta \u00fakol\u016f se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivity v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve firemn\u00ed v\u00fdrobn\u00ed hale ve m\u011bst\u011b Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a v\u00edce<\/b><span>automaticky rozvr\u017een\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u011b je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se rozvrhuj\u00ed automaticky a cel\u00e1 firma m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby spole\u010dnosti Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b ve m\u011bst\u011b Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchodn\u00edci volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner poskytuje spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Obalov\u00e9 pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu rozvrhu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, te\u010f dost\u00e1vaj\u00ed odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Monitor ERP API pro v\u00fdrobn\u00ed p\u0159\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">Ano. Monitor ERP API zp\u0159\u00edstup\u0148uje dotazy <code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code>, <code>ManufacturingOrderOperations<\/code> a <code>ManufacturingOrderMaterials<\/code>. P\u0159\u00edkazy jako <code>ManufacturingOrderOperations\/Update<\/code> a <code>ReplanOperation<\/code> zapisuj\u00ed pl\u00e1novan\u00e9 term\u00edny zp\u011bt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vy\u017eaduje z\u00e1pis do syst\u00e9mu Monitor p\u0159es API dal\u0161\u00ed licenci?<\/summary>\n<p class=\"sp-faq__a\">Ano. \u010cten\u00ed p\u0159es API je pro v\u0161echny z\u00e1kazn\u00edky syst\u00e9mu Monitor zdarma. P\u0159\u00edkazy pro z\u00e1pis dat vy\u017eaduj\u00ed licenci Monitor ERP API, kterou prod\u00e1v\u00e1 Monitor. Cenovou nab\u00eddku v\u00e1m p\u0159iprav\u00ed v\u00e1\u0161 partner pro Monitor nebo obchodn\u00ed t\u00fdm spole\u010dnosti Monitor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje Monitor ERP API webhooky?<\/summary>\n<p class=\"sp-faq__a\">V dokumentaci nejsou uvedeny \u017e\u00e1dn\u00e9 webhooky. Integrace se ka\u017ed\u00fdch n\u011bkolik minut dotazuje na <code>Common\/EntityChangeLogs<\/code> a na\u010d\u00edt\u00e1 pouze zm\u011bn\u011bn\u00e9 z\u00e1znamy. V opa\u010dn\u00e9m sm\u011bru vlastn\u00ed webhooky syst\u00e9mu SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jakou verzi syst\u00e9mu Monitor pot\u0159ebujeme?<\/summary>\n<p class=\"sp-faq__a\">Z\u00e1pis pl\u00e1novan\u00e9ho za\u010d\u00e1tku a konce prost\u0159ednictv\u00edm <code>ManufacturingOrderOperations\/Update<\/code> vy\u017eaduje Monitor 24.5 nebo nov\u011bj\u0161\u00ed. Star\u0161\u00ed sestaven\u00ed G5 od verze 2.40 pou\u017e\u00edvaj\u00ed <code>ReplanOperation<\/code>. Vhodn\u00fd postup pro va\u0161e sestaven\u00ed potvrd\u00edme p\u0159i vymezen\u00ed rozsahu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdo realizuje integraci s Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed obousm\u011brnou integraci podle va\u0161\u00ed konfigurace Monitor G5 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje podporu. V\u00e1\u0161 partner pro Monitor nebo va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vyu\u017e\u00edt zdokumentovan\u00e9 REST API syst\u00e9mu SkyPlanner. Pro zah\u00e1jen\u00ed pr\u00e1ce sta\u010d\u00ed token API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et je\u0161t\u011b p\u0159ed realizac\u00ed integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed m\u016f\u017eete vyu\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165 s importem dat ze syst\u00e9mu Monitor p\u0159es Excel nebo CSV. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte syst\u00e9m zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Monitor ERP Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Monitor ERP (Monitor G5) se SkyPlanner APS. SkyPlanner se s Monitor ERP propojuje obousm\u011brn\u011b p\u0159es Monitor ERP API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103077,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104004","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/pruvodce-integraci\\\/\",\"name\":\"Monitor ERP a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Monitor ERP: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby","description":"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/","name":"Monitor ERP a APS: pr\u016fvodce integrac\u00ed pro rozvrhov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor G5 a SkyPlanner APS: dotazy a p\u0159\u00edkazy Monitor ERP API, Batch, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f operac\u00ed, polling, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Monitor ERP: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Monitor ERP Pr\u016fvodce integrac\u00ed Monitor ERP pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Monitor ERP (Monitor G5) se SkyPlanner APS. SkyPlanner se s Monitor ERP propojuje obousm\u011brn\u011b p\u0159es Monitor ERP API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/104004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=104004"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/104004\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103077"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=104004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}