{"id":103828,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/katana\/pruvodce-integraci\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Katana <span class=\"hl\">se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed Katana ukazuje konzultant\u016fm a IT t\u00fdm\u016fm, jak propojit Katana Cloud Inventory (Katana MRP) se SkyPlanner APS. SkyPlanner se s Katana propojuje obousm\u011brn\u011b p\u0159es ve\u0159ejn\u00e9 Katana API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy, \u0159\u00e1dky operac\u00ed, receptury v\u00fdrobk\u016f, v\u00fdrobn\u00ed operace, v\u00fdrobn\u00ed zdroje, z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Napl\u00e1novan\u00e9 po\u0159ad\u00ed se zapisuje zp\u011bt na kartu Schedule v Katana spolu s term\u00ednem dokon\u010den\u00ed v\u00fdroby u ka\u017ed\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu.<\/li>\n\n\n<li>Stav operace a skute\u010dn\u00fd \u010das se zapisuj\u00ed zp\u011bt do \u0159\u00e1dk\u016f operac\u00ed.<\/li>\n\n\n<li>Webhooky Katana hl\u00e1s\u00ed zm\u011bny do SkyPlanner a webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace Katana a zaji\u0161\u0165uje jej\u00ed podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. Tento pr\u016fvodce je ur\u010den konzultant\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vyv\u00edjet \u0159e\u0161en\u00ed s vyu\u017eit\u00edm zdokumentovan\u00e9ho REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-katana-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana je jednotn\u00fd cloudov\u00fd produkt s architekturou pro v\u00edce tenant\u016f, tak\u017ee v\u0161ichni z\u00e1kazn\u00edci pou\u017e\u00edvaj\u00ed stejn\u00e9 API. Jde o REST API ve verzi v1 na adrese <code>https:\/\/api.katanamrp.com\/v1<\/code>. Specifikace OpenAPI 3.0 je dostupn\u00e1 na <code>https:\/\/api.katanamrp.com\/v1\/openapi.json<\/code>. Dokumentaci najdete v <a href=\"https:\/\/developer.katanamrp.com\/reference\/api-introduction\">Katana Developer Hub<\/a>.<\/p>\n\n\n<p>Endpointy pot\u0159ebn\u00e9 pro rozvrhov\u00e1n\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kmenov\u00e1 data:<\/strong> <code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>, <code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>, <code>\/product_operation_rows<\/code>.<\/li>\n\n\n<li><strong>P\u0159\u00edkazy:<\/strong> <code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>, <code>\/manufacturing_order_recipe_rows<\/code>, <code>\/manufacturing_order_productions<\/code>.<\/li>\n\n\n<li><strong>Po\u0159ad\u00ed:<\/strong> <code>\/manufacturing_order_rerank<\/code>.<\/li>\n\n\n<li><strong>Z\u00e1sobov\u00e1n\u00ed a popt\u00e1vka:<\/strong> <code>\/inventory<\/code>, <code>\/purchase_orders<\/code>, <code>\/purchase_order_rows<\/code>, <code>\/sales_orders<\/code>, <code>\/sales_order_rows<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Endpoint <code>\/resources<\/code> neexistuje. V\u00fdrobn\u00ed zdroje jsou uvedeny v pol\u00edch <code>resource_id<\/code> a <code>resource_name<\/code> na \u0159\u00e1dc\u00edch operac\u00ed v\u00fdrobk\u016f a v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (MO).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentizace a limity<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>K autentizaci slou\u017e\u00ed API kl\u00ed\u010d pou\u017eit\u00fd jako bearer token: <code>Authorization: Bearer &lt;api key&gt;<\/code>. Kl\u00ed\u010d vytvo\u0159\u00edte v nab\u00eddce <strong>Settings &gt; API &gt; Add new API key<\/strong>. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-authentication\">zdroj<\/a>)<\/p>\n\n\n<p>P\u0159i n\u00e1vrhu synchronizace je nutn\u00e9 zohlednit tyto limity:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ve v\u00fdchoz\u00edm nastaven\u00ed povoluje Katana API 60 po\u017eadavk\u016f za 60 sekund (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-rate-limiting\">zdroj<\/a>)<\/li>\n\n\n<li>P\u0159i p\u0159ekro\u010den\u00ed limitu vr\u00e1t\u00ed API k\u00f3d 429 s hlavi\u010dkou <code>Retry-After<\/code>. Hlavi\u010dka <code>X-Ratelimit-Remaining<\/code> ud\u00e1v\u00e1 zb\u00fdvaj\u00edc\u00ed po\u010det povolen\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li>Endpointy pro v\u00fdpisy str\u00e1nkuj\u00ed v\u00fdsledky a podporuj\u00ed filtry podle data aktualizace, tak\u017ee objem p\u0159en\u00e1\u0161en\u00fdch zm\u011bn z\u016fst\u00e1v\u00e1 mal\u00fd.<\/li>\n\n<\/ul>\n\n\n<p>REST API SkyPlanner pou\u017e\u00edv\u00e1 k autentizaci API token (SkyPlanner Settings &gt; API) a jeho dokumentace je ve form\u00e1tu Swagger\/OpenAPI. <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">Integra\u010dn\u00ed n\u00e1vod<\/a> v\u00e1s provede prvn\u00edmi vol\u00e1n\u00edmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Webhooky<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Webhook zaregistrujete vol\u00e1n\u00edm POST <code>\/webhooks<\/code>, ve kter\u00e9m zad\u00e1te HTTPS URL a po\u017eadovan\u00e9 ud\u00e1losti. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/webhooks\">zdroj<\/a>) Pro rozvrhov\u00e1n\u00ed jsou u\u017eite\u010dn\u00e9 tyto ud\u00e1losti:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>manufacturing_order.created<\/code>, <code>.updated<\/code>, <code>.deleted<\/code>, <code>.in_progress<\/code>, <code>.blocked<\/code>, <code>.done<\/code><\/li>\n\n\n<li><code>manufacturing_order_operation_row.created<\/code>, <code>.updated<\/code>, <code>.in_progress<\/code>, <code>.paused<\/code>, <code>.completed<\/code><\/li>\n\n\n<li><code>current_inventory.material_updated<\/code>, <code>.material_out_of_stock<\/code><\/li>\n\n\n<li><code>purchase_order.*<\/code> a <code>purchase_order_row.*<\/code>, v\u010detn\u011b ud\u00e1lost\u00ed received (p\u0159\u00edjem)<\/li>\n\n\n<li><code>product.*<\/code>, <code>product_recipe_row.*<\/code> a <code>sales_order.*<\/code><\/li>\n\n<\/ul>\n\n\n<p>Datov\u00fd obsah je stru\u010dn\u00fd: typ zdroje, akce a <code>href<\/code>. P\u0159\u00edjemce na\u010dte cel\u00fd objekt z adresy href. Ka\u017ed\u00e9 doru\u010den\u00ed obsahuje hlavi\u010dku <code>x-sha2-signature<\/code> (HMAC SHA-256) pro ov\u011b\u0159en\u00ed. V\u00e1\u0161 endpoint mus\u00ed do 10 sekund odpov\u011bd\u011bt k\u00f3dem 20X. Katana opakuje doru\u010den\u00ed t\u0159ikr\u00e1t: po 30 sekund\u00e1ch, 2 minut\u00e1ch a 15 minut\u00e1ch.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Katana (endpoint)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>V\u00fdrobky, materi\u00e1ly, varianty (<code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i p\u0159ijet\u00ed webhooku<\/td><\/tr><tr><td>Receptura v\u00fdrobku \/ BOM (<code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>)<\/td><td>Struktura v\u00fdrobku, d\u00edl\u010d\u00ed v\u00fdrobky<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i p\u0159ijet\u00ed webhooku<\/td><\/tr><tr><td>V\u00fdrobn\u00ed operace (<code>\/product_operation_rows<\/code>): typ, v\u00fdrobn\u00ed zdroj, \u010das<\/td><td>Kroky postupu s dobou trv\u00e1n\u00ed a \u010dasy se\u0159\u00edzen\u00ed<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>V\u00fdrobn\u00ed zdroje (<code>resource_id<\/code>, <code>resource_name<\/code> na \u0159\u00e1dc\u00edch operac\u00ed)<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, p\u0159i p\u0159id\u00e1n\u00ed nov\u00e9ho v\u00fdrobn\u00edho zdroje<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkaz s \u0159\u00e1dky operac\u00ed (<code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>)<\/td><td>Zak\u00e1zky a operace<\/td><td>Katana \u2192 SkyPlanner<\/td><td>V re\u00e1ln\u00e9m \u010dase p\u0159es webhook<\/td><\/tr><tr><td>Materi\u00e1lov\u00e9 polo\u017eky v\u00fdrobn\u00edho p\u0159\u00edkazu (<code>\/manufacturing_order_recipe_rows<\/code>)<\/td><td>Materi\u00e1ly pro jednotliv\u00e9 operace<\/td><td>Katana \u2192 SkyPlanner<\/td><td>V re\u00e1ln\u00e9m \u010dase p\u0159es webhook<\/td><\/tr><tr><td>Z\u00e1soby, n\u00e1kupn\u00ed objedn\u00e1vky s term\u00edny dod\u00e1n\u00ed (<code>\/inventory<\/code>, <code>\/purchase_order_rows<\/code>)<\/td><td>Skladov\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky materi\u00e1lu<\/td><td>Katana \u2192 SkyPlanner<\/td><td>V re\u00e1ln\u00e9m \u010dase p\u0159es webhook<\/td><\/tr><tr><td>Pole <code>delivery_date<\/code> prodejn\u00ed objedn\u00e1vky (<code>\/sales_orders<\/code>)<\/td><td>Term\u00edn zak\u00e1zky, priorita z\u00e1kazn\u00edka<\/td><td>Katana \u2192 SkyPlanner<\/td><td>V re\u00e1ln\u00e9m \u010dase p\u0159es webhook<\/td><\/tr><tr><td>Po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (POST <code>\/manufacturing_order_rerank<\/code>)<\/td><td>Po\u0159ad\u00ed otev\u0159en\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f v rozvrhu<\/td><td>SkyPlanner \u2192 Katana<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu<\/td><\/tr><tr><td>Pole <code>production_deadline_date<\/code> v\u00fdrobn\u00edho p\u0159\u00edkazu (PATCH <code>\/manufacturing_orders\/{id}<\/code>)<\/td><td>Pl\u00e1novan\u00e9 dokon\u010den\u00ed<\/td><td>SkyPlanner \u2192 Katana<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu<\/td><\/tr><tr><td>Pole <code>status<\/code>, <code>total_actual_time<\/code> \u0159\u00e1dku operace (PATCH <code>\/manufacturing_order_operation_rows\/{id}<\/code>)<\/td><td>Mobile Confirmations, \u010dasov\u00e9 z\u00e1znamy<\/td><td>SkyPlanner \u2192 Katana<\/td><td>P\u0159i vykazov\u00e1n\u00ed pr\u00e1ce<\/td><\/tr><tr><td>V Katana nejsou k dispozici<\/td><td>Sm\u011bny, nep\u0159\u00edtomnosti, matice \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f, alternativn\u00ed pracovi\u0161t\u011b<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed p\u0159i zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Postupn\u011b na\u010dt\u011bte v\u0161echny str\u00e1nky v\u00fdrobk\u016f, materi\u00e1l\u016f, variant, \u0159\u00e1dk\u016f receptur a \u0159\u00e1dk\u016f operac\u00ed v\u00fdrobk\u016f. Rychlost vol\u00e1n\u00ed omezte tak, abyste nep\u0159ekro\u010dili limit po\u017eadavk\u016f. Pro ka\u017ed\u00fd jedine\u010dn\u00fd v\u00fdrobn\u00ed zdroj uveden\u00fd na \u0159\u00e1dc\u00edch operac\u00ed vytvo\u0159te pracovi\u0161t\u011b ve SkyPlanner a zachovejte p\u0159i\u0159azen\u00ed kl\u00ed\u010d\u016f 1:1. Pro ka\u017ed\u00e9 pracovi\u0161t\u011b nastavte ve SkyPlanner sm\u011bny, dovolen\u00e9 a p\u0159es\u010dasy, proto\u017ee Katana nem\u00e1 kalend\u00e1\u0159 v\u00fdrobn\u00edch zdroj\u016f.<\/p>\n\n\n<p><strong>2. Synchronizace p\u0159\u00edkaz\u016f.<\/strong> P\u0159ihlaste se k odb\u011bru ud\u00e1lost\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, \u0159\u00e1dk\u016f operac\u00ed, z\u00e1sob a n\u00e1kupn\u00edch objedn\u00e1vek. P\u0159i ka\u017ed\u00e9 ud\u00e1losti na\u010dt\u011bte objekt z jeho adresy href a aktualizujte operaci. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a po jej\u00edm p\u0159\u00edjmu aktualizuje z\u00e1soby. No\u010dn\u00ed kontrola shody s filtry podle data aktualizace zachyt\u00ed v\u0161echny zme\u0161kan\u00e9 ud\u00e1losti.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Pl\u00e1n se do Katana zap\u00ed\u0161e dv\u011bma vol\u00e1n\u00edmi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>POST <code>\/manufacturing_order_rerank<\/code> &#8222;moves one or more manufacturing orders to an exact place in the production schedule&#8220; (p\u0159esune jeden nebo v\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f na p\u0159esn\u011b ur\u010den\u00e9 m\u00edsto v rozvrhu v\u00fdroby). Jeden po\u017eadavek pojme a\u017e 250 otev\u0159en\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, kter\u00e9 lze um\u00edstit na za\u010d\u00e1tek, na konec nebo p\u0159ed \u010di za dan\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/rerankmanufacturingorder\">zdroj<\/a>)<\/li>\n\n\n<li>PATCH <code>\/manufacturing_orders\/{id}<\/code> nastavuje pole <code>production_deadline_date<\/code>. Katana tuto hodnotu p\u0159ijme pouze tehdy, je-li pro danou v\u00fdrobn\u00ed lokalitu vypnut\u00fd automatick\u00fd v\u00fdpo\u010det term\u00ednu dokon\u010den\u00ed. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/updatemanufacturingorder\">zdroj<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Zm\u011bna po\u0159ad\u00ed nem\u00e1 vliv jen na seznam. V Katana plat\u00ed, \u017ee &#8222;higher-priority MOs reserve required materials and subassemblies first&#8220; (v\u00fdrobn\u00ed p\u0159\u00edkazy s vy\u0161\u0161\u00ed prioritou rezervuj\u00ed pot\u0159ebn\u00e9 materi\u00e1ly a podsestavy jako prvn\u00ed). Po\u0159ad\u00ed ze SkyPlanner tedy tak\u00e9 ur\u010duje, kter\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz z\u00edsk\u00e1 z\u00e1soby v Katana.<\/p>\n\n\n<p><strong>4. Odv\u00e1d\u011bn\u00ed v\u00fdroby ve v\u00fdrobn\u00edm provozu.<\/strong> Obsluha vykazuje pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations, Production Timer nebo Quick Log Mode. SkyPlanner zapisuje stav a skute\u010dn\u00fd \u010das do \u0159\u00e1dku operace v\u00fdrobn\u00edho p\u0159\u00edkazu. Pokud z\u00e1vod m\u00edsto toho nad\u00e1le pou\u017e\u00edv\u00e1 Katana Shop Floor App, SkyPlanner na\u010d\u00edt\u00e1 ud\u00e1losti \u0159\u00e1dk\u016f operac\u00ed. Pro ka\u017ed\u00fd z\u00e1vod zvolte jeden zp\u016fsob vykazov\u00e1n\u00ed.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>V\u00fdrobky, receptury, v\u00fdrobn\u00ed operace, z\u00e1soby, n\u00e1kup, prodejn\u00ed objedn\u00e1vky<\/td><td>Katana<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, pracovi\u0161t\u011b pro ka\u017edou operaci<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f na kart\u011b Schedule a term\u00edn dokon\u010den\u00ed v\u00fdroby<\/td><td>SkyPlanner, se z\u00e1pisem do Katana<\/td><\/tr><tr><td>Sm\u011bny, nep\u0159\u00edtomnosti, matice \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Stav operace a vyk\u00e1zan\u00fd \u010das<\/td><td>Jeden kan\u00e1l zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si m\u016f\u017eete SkyPlanner na 30 dn\u00ed zdarma vyzkou\u0161et s vlastn\u00edmi daty z CSV exportu ze syst\u00e9mu Katana, nap\u0159\u00edklad ze seznamu Tasks na obrazovce Make.<\/p>\n\n\n<p>Samotn\u00fd projekt zahrnuje:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tarif a kl\u00ed\u010d.<\/strong> Ov\u011b\u0159te, \u017ee v\u00e1\u0161 tarif Katana zahrnuje API a Manufacturing Management, a vytvo\u0159te kl\u00ed\u010d API.<\/li>\n\n\n<li><strong>Re\u017eim term\u00edn\u016f.<\/strong> Dohodn\u011bte se na vypnut\u00ed automatick\u00fdch term\u00edn\u016f pro dan\u00fd v\u00fdrobn\u00ed z\u00e1vod, aby v\u00fdrobn\u00ed term\u00edny spravoval SkyPlanner.<\/li>\n\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, kl\u00ed\u010de v\u00fdrobn\u00edch zdroj\u016f, pravidla pro spr\u00e1vu dat a kan\u00e1l pro vykazov\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Prvotn\u00ed na\u010dten\u00ed.<\/strong> Produkty, varianty, receptury, v\u00fdrobn\u00ed operace a v\u00fdrobn\u00ed zdroje.<\/li>\n\n\n<li><strong>Synchronizace ud\u00e1lost\u00ed.<\/strong> Webhooky pro zak\u00e1zky, operace, skladov\u00e9 z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky a k tomu no\u010dn\u00ed kontrola a slad\u011bn\u00ed dat.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v syst\u00e9mu SkyPlanner.<\/strong> Sm\u011bny, matice se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f a alternativn\u00ed pracovi\u0161t\u011b.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis.<\/strong> Zm\u011bna po\u0159ad\u00ed a term\u00edny, pot\u00e9 stav operac\u00ed a vyk\u00e1zan\u00fd \u010das.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00e9 testov\u00e1n\u00ed a spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Porovnejte term\u00edny ze syst\u00e9mu SkyPlanner s aktu\u00e1ln\u00edmi \u00fadaji na kart\u011b Schedule, opravte kmenov\u00e1 data a pot\u00e9 zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-katana-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci se syst\u00e9mem Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Re\u017eim term\u00edn\u016f p\u0159episuje data.<\/strong> &#8222;Once automatic mode is enabled, all manual deadlines will be overwritten and cannot be restored.&#8220; (Po zapnut\u00ed automatick\u00e9ho re\u017eimu se v\u0161echny ru\u010dn\u011b nastaven\u00e9 term\u00edny p\u0159ep\u00ed\u0161\u00ed a nelze je obnovit.) Re\u017eim zvolte jednou, hned p\u0159i zah\u00e1jen\u00ed projektu.<\/li>\n\n\n<li><strong>Chyb\u00ed kalend\u00e1\u0159 v\u00fdrobn\u00edch zdroj\u016f.<\/strong> Sm\u011bny neodvozujte z jedin\u00e9 hodnoty Weekly throughput. Nastavte je v syst\u00e9mu SkyPlanner pro ka\u017ed\u00e9 pracovi\u0161t\u011b zvl\u00e1\u0161\u0165.<\/li>\n\n\n<li><strong>V\u00fdrobn\u00ed zdroje jsou pouze na \u0159\u00e1dc\u00edch operac\u00ed.<\/strong> N\u00e1zvy v\u00fdrobn\u00edch zdroj\u016f v syst\u00e9mu Katana nem\u011b\u0148te, proto\u017ee slou\u017e\u00ed jako kl\u00ed\u010d k pracovi\u0161t\u00edm v syst\u00e9mu SkyPlanner.<\/li>\n\n\n<li><strong>\u010casov\u00e9 jednotky.<\/strong> <code>planned_time_parameter<\/code> je uveden v sekund\u00e1ch: u operac\u00ed typu per-unit na jednotku, u typ\u016f process, setup a fixed jako celkov\u00fd \u010das. Typ namapujte spr\u00e1vn\u011b, jinak budou doby trv\u00e1n\u00ed chybn\u00e9 o n\u00e1sobek odpov\u00eddaj\u00edc\u00ed mno\u017estv\u00ed.<\/li>\n\n\n<li><strong>Skupiny pro v\u00fdrobu na zak\u00e1zku.<\/strong> P\u0159i zm\u011bn\u011b po\u0159ad\u00ed z\u016fst\u00e1vaj\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy (MO) nav\u00e1zan\u00e9 na stejnou prodejn\u00ed objedn\u00e1vku pohromad\u011b. \u0158a\u010fte je proto jako skupinu.<\/li>\n\n\n<li><strong>Zm\u011bna chov\u00e1n\u00ed p\u0159i \u0159azen\u00ed.<\/strong> Od 7. \u0159\u00edjna 2026 umis\u0165uj\u00ed endpointy pro zm\u011bnu po\u0159ad\u00ed zak\u00e1zky p\u0159esn\u011b na po\u017eadovanou pozici. Integrace vytvo\u0159en\u00e9 pro p\u016fvodn\u00ed chov\u00e1n\u00ed je nutn\u00e9 znovu otestovat. (<a href=\"https:\/\/developer.katanamrp.com\/changelog\/breaking-change-order-rerank-endpoints-place-orders-exactly-where-asked\">zdroj<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-katana-integration-who-configures-and-suppor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrace se syst\u00e9mem Katana: kdo ji nastavuje a zaji\u0161\u0165uje podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Nastaven\u00ed zahrnuje va\u0161e v\u00fdrobn\u00ed zdroje, v\u00fdrobn\u00ed operace, tok zak\u00e1zek a re\u017eim term\u00edn\u016f. Dopl\u0148uje to, co Katana neeviduje: sm\u011bny, matici se\u0159izovac\u00edch \u010das\u016f, n\u00e1stroje, po\u010dty oper\u00e1tor\u016f a alternativn\u00ed v\u00fdrobn\u00ed zdroje.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu.<\/strong> Ka\u017ed\u00fd z\u00e1vod nastavuje v\u00fdrobn\u00ed zdroje a operace v syst\u00e9mu Katana jinak. Pr\u00e1v\u011b p\u0159i nastaven\u00ed integrace se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Integraci m\u016f\u017ee vytvo\u0159it v\u00e1\u0161 konzultant pro syst\u00e9m Katana nebo integra\u010dn\u00ed partner.<\/strong> SkyPlanner poskytuje REST API, dokumentaci Swagger\/OpenAPI a webhooky.<\/li>\n\n\n<li><strong>Na integraci mohou nav\u00e1zat i va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i<\/strong> s tokenem API. Pro za\u010d\u00e1tek sta\u010d\u00ed token API a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Produktovou dokumentaci v\u010detn\u011b n\u00e1kupn\u00edch objedn\u00e1vek a API pro produkty a materi\u00e1ly najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b za 5 pracovi\u0161\u0165 s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenovou nab\u00eddku na integraci p\u0159iprav\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s nab\u00eddkou tarifu, abyste znali celkov\u00e9 n\u00e1klady je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/funkce\/\">funkce<\/a> a srovn\u00e1n\u00ed s vlastn\u00edm rozvrhov\u00e1n\u00edm syst\u00e9mu Katana v \u010dl\u00e1nku <a href=\"\/cs\/integrace\/erp\/katana\/planovani-vyroby\/\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby v syst\u00e9mu Katana s ohledem na skute\u010dn\u00e9 kapacity stroj\u016f a pracovn\u00edk\u016f<\/a>. P\u0159ehled najdete na <a href=\"\/cs\/integrace\/erp\/katana\/\">str\u00e1nce syst\u00e9mu Katana<\/a> a dal\u0161\u00ed syst\u00e9my ERP v <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehledu integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Objednat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na v\u00fdrobn\u00ed linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho t\u0159\u00edm\u011bs\u00ed\u010dn\u00edho pl\u00e1nu pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>M\u00e9n\u011b<\/b><span>prostoj\u016f kv\u016fli nedostatku materi\u00e1lu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eP\u0159\u00ednos SkyPlanner pro n\u00e1s spo\u010d\u00edv\u00e1 v tom, \u017ee jde o n\u00e1stroj, kter\u00fd funguje p\u0159i ka\u017edodenn\u00edm pou\u017e\u00edv\u00e1n\u00ed, zejm\u00e9na p\u0159i stanovov\u00e1n\u00ed term\u00edn\u016f dod\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, vedouc\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/b><br>Eskomatic \u00b7 Zak\u00e1zkov\u00e9 obr\u00e1b\u011bn\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Automatick\u00e9 rozvrhov\u00e1n\u00ed zat\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f zp\u0159es\u0148uje term\u00edny dod\u00e1n\u00ed a prostoje ve v\u00fdrob\u011b zp\u016fsoben\u00e9 nedostatkem materi\u00e1lu v\u00fdrazn\u011b poklesly.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/eskomatic\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale firmy v Lohje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000+<\/b><span>automaticky rozvr\u017een\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se rozvrhuj\u00ed automaticky a cel\u00e1 organizace m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 Katana API a jak\u00fd tarif pot\u0159ebuji?<\/summary>\n<p class=\"sp-faq__a\">Ano. Katana nab\u00edz\u00ed ve\u0159ejn\u00e9 REST API v1 se specifikac\u00ed OpenAPI 3.0. Na str\u00e1nce s cenami uv\u00e1d\u00ed p\u0159\u00edstup k API u tarif\u016f Free a Advantage. K autentizaci slou\u017e\u00ed API kl\u00ed\u010d ze Settings &gt; API, kter\u00fd se pou\u017e\u00edv\u00e1 jako bearer token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017ee SkyPlanner zapsat rozvrh zp\u011bt do syst\u00e9mu Katana?<\/summary>\n<p class=\"sp-faq__a\">Ano. SkyPlanner prost\u0159ednictv\u00edm <code>\/manufacturing_order_rerank<\/code> se\u0159ad\u00ed otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy na kart\u011b Schedule v syst\u00e9mu Katana podle sv\u00e9ho po\u0159ad\u00ed a u ka\u017ed\u00e9ho MO zap\u00ed\u0161e <code>production_deadline_date<\/code>. Stav operace a skute\u010dn\u00fd \u010das se zapisuj\u00ed do \u0159\u00e1dk\u016f operac\u00ed dan\u00e9ho MO. \u010casov\u00fd rozvrh pro jednotliv\u00e1 pracovi\u0161t\u011b z\u016fst\u00e1v\u00e1 v syst\u00e9mu SkyPlanner, kde oper\u00e1to\u0159i pracuj\u00ed podle sv\u00e9 fronty operac\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odes\u00edl\u00e1 Katana zm\u011bny v re\u00e1ln\u00e9m \u010dase?<\/summary>\n<p class=\"sp-faq__a\">Ano. Webhooky syst\u00e9mu Katana pokr\u00fdvaj\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy, \u0159\u00e1dky operac\u00ed, skladov\u00e9 z\u00e1soby, n\u00e1kupn\u00ed objedn\u00e1vky a prodejn\u00ed objedn\u00e1vky. SkyPlanner na\u010d\u00edt\u00e1 ka\u017ed\u00fd zm\u011bn\u011bn\u00fd objekt a ka\u017edou noc data kontroluje a sla\u010fuje, tak\u017ee ani zme\u0161kan\u00e1 ud\u00e1lost nezanech\u00e1 operaci neaktu\u00e1ln\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se z v\u00fdrobn\u00edch zdroj\u016f v syst\u00e9mu Katana stanou pracovi\u0161t\u011b v syst\u00e9mu SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Ka\u017ed\u00e9mu odli\u0161n\u00e9mu v\u00fdrobn\u00edmu zdroji na \u0159\u00e1dc\u00edch operac\u00ed v syst\u00e9mu Katana odpov\u00edd\u00e1 pracovi\u0161t\u011b v syst\u00e9mu SkyPlanner s vazbou p\u0159es kl\u00ed\u010d 1:1. Sm\u011bny, absence a alternativn\u00ed pracovi\u0161t\u011b se pak nastavuj\u00ed v syst\u00e9mu SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner otestovat je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00ed zku\u0161ebn\u00ed verze zdarma m\u016f\u017eete vyu\u017e\u00edt a\u017e 20 pracovi\u0161\u0165 s importem CSV ze syst\u00e9mu Katana, bez platebn\u00ed karty. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte s n\u00edm rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Katana Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby Tento pr\u016fvodce integrac\u00ed Katana ukazuje konzultant\u016fm a IT t\u00fdm\u016fm, jak propojit Katana Cloud Inventory (Katana MRP) se SkyPlanner APS. SkyPlanner se s Katana propojuje obousm\u011brn\u011b p\u0159es ve\u0159ejn\u00e9 Katana API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102990,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103828","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP: pr\u016fvodce integrac\u00ed APS pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\" \/>\n<meta property=\"og:description\" content=\"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/pruvodce-integraci\\\/\",\"name\":\"Katana MRP: pr\u016fvodce integrac\u00ed APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Katana: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/katana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP: pr\u016fvodce integrac\u00ed APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","description":"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","og_description":"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/","name":"Katana MRP: pr\u016fvodce integrac\u00ed APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Propojen\u00ed Katana se SkyPlanner APS: Katana API v1, API kl\u00ed\u010de, webhooky, limity vol\u00e1n\u00ed, zm\u011bna po\u0159ad\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Katana: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00e9 kapacity stroj\u016f a lid\u00ed","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/katana\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Katana Pr\u016fvodce integrac\u00ed Katana se SkyPlanner APS pro rozvrhov\u00e1n\u00ed v\u00fdroby Tento pr\u016fvodce integrac\u00ed Katana ukazuje konzultant\u016fm a IT t\u00fdm\u016fm, jak propojit Katana Cloud Inventory (Katana MRP) se SkyPlanner APS. SkyPlanner se s Katana propojuje obousm\u011brn\u011b p\u0159es ve\u0159ejn\u00e9 Katana API: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=103828"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103828\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/102990"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=103828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}