{"id":103768,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/jobboss\/pruvodce-integraci\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ JobBOSS\u00b2<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 <span class=\"hl\">pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce integrac\u00ed JobBOSS\u00b2 ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit JobBOSS\u00b2 od ECI se SkyPlanner APS. SkyPlanner se s JobBOSS\u00b2 propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm vlastn\u00edch API spole\u010dnosti ECI:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se na\u010d\u00edtaj\u00ed Orders a Order Line Items, Order Routings, Estimates, Routings a materi\u00e1ly, Work Centers, Employees, Company Calendar, Job Requirements a \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed zp\u011bt do ka\u017ed\u00e9ho kroku Order Routing.<\/li>\n\n\n<li>Pokud se tak rozhodnete, mohou se \u010dasov\u00e9 z\u00e1znamy oper\u00e1tor\u016f zapisovat zp\u011bt jako Time Ticket Details.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace JobBOSS\u00b2 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se cht\u011bj\u00ed zapojit nebo sami vytvo\u0159it \u0159e\u0161en\u00ed s vyu\u017eit\u00edm zdokumentovan\u00e9ho REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>). P\u0159esn\u011b to u\u017e ud\u011blala jedna americk\u00e1 firma se zak\u00e1zkovou v\u00fdrobou:<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"jobboss-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed rozhran\u00ed JobBOSS\u00b2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ECI zve\u0159ej\u0148uje sv\u00e1 API pro v\u00fdrobu v\u010detn\u011b specifikac\u00ed OpenAPI na webu <a href=\"https:\/\/integrations.ecimanufacturing.com\/\">Dokumentace v\u00fdrobn\u00edch API ECI<\/a>. Pro rozvrhov\u00e1n\u00ed v\u00fdroby jsou d\u016fle\u017eit\u00e1 dv\u011b:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>JobBOSS\u00b2 API (v1).<\/strong> Vyu\u017e\u00edv\u00e1 REST a JSON a je ur\u010deno p\u0159\u00edmo pro JobBOSS\u00b2. Umo\u017e\u0148uje \u010d\u00edst a zapisovat zak\u00e1zky, Order Line Items, Order Routings, Estimates, Routings, materi\u00e1ly, Job Requirements, Work Centers, Company Calendar, Employees, n\u00e1kupn\u00ed objedn\u00e1vky, Time Tickets a Time Ticket Details. ECI uv\u00e1d\u00ed, \u017ee \u201eis currently only supported for JobBOSS\u00b2 hosted (Cloud) customers.\u201c (v sou\u010dasnosti je podporov\u00e1no pouze pro z\u00e1kazn\u00edky s hostovan\u00fdm JobBOSS\u00b2 v cloudu).<\/li>\n\n\n<li><strong>ECI ERP API (v2.1).<\/strong> REST API nez\u00e1visl\u00e9 na konkr\u00e9tn\u00edm produktu, ur\u010den\u00e9 pro Deacom, M1 a JobBOSS\u00b2. U JobBOSS\u00b2 pokr\u00fdv\u00e1 zak\u00e1zky, operace zak\u00e1zek, materi\u00e1ly zak\u00e1zek, d\u00edly, operace d\u00edl\u016f, pracovi\u0161t\u011b, \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek a \u0159\u00e1dky \u010dasov\u00fdch v\u00fdkaz\u016f. ECI uv\u00e1d\u00ed, \u017ee \u201ethe actual ERP database could be a cloud hosted ERP or on premises install,\u201c (samotn\u00e1 datab\u00e1ze ERP m\u016f\u017ee b\u00fdt hostov\u00e1na v cloudu nebo provozov\u00e1na lok\u00e1ln\u011b), tak\u017ee toto rozhran\u00ed je cestou k integraci lok\u00e1ln\u011b provozovan\u00e9ho JobBOSS\u00b2.<\/li>\n\n<\/ol>\n\n\n<p>Ob\u011b API pou\u017e\u00edvaj\u00ed stejn\u00e9 konvence: filtrovac\u00ed v\u00fdrazy, nap\u0159\u00edklad <code>lastModDate[gte]=<\/code>, parametr <code>fields=<\/code>, <code>sort=<\/code> a str\u00e1nkov\u00e1n\u00ed pomoc\u00ed <code>take<\/code> a <code>skip<\/code>, p\u0159i\u010dem\u017e v\u00fdchoz\u00ed hodnota <code>take<\/code> je 200. \u201eAll dates submitted to the API are assumed to be in UTC.\u201c (V\u0161echna data a \u010dasy odeslan\u00e9 do API se pova\u017euj\u00ed za \u00fadaje v UTC.)<\/p>\n\n\n<p>Pro ob\u011b rozhran\u00ed plat\u00ed pravidlo ECI: \u201eAll APIs must be activated by ECI before use.\u201c (V\u0161echna API mus\u00ed p\u0159ed pou\u017eit\u00edm aktivovat ECI.) Obra\u0165te se proto v\u010das na sv\u00e9ho obchodn\u00edho z\u00e1stupce ECI.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentizace a p\u0159\u00edstup<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>U\u017eivatel\u00e9 API.<\/strong> Integrace pou\u017e\u00edv\u00e1 u\u017eivatelsk\u00fd \u00fa\u010det API vytvo\u0159en\u00fd v konzoli Integration Engine Management Console spole\u010dnosti ECI. Tento \u00fa\u010det ur\u010duje, ke kter\u00e9mu produktu, z\u00e1kazn\u00edkovi a datab\u00e1zi budou vol\u00e1n\u00ed sm\u011b\u0159ovat.<\/li>\n\n\n<li><strong>OAuth 2.0 client credentials.<\/strong> Pomoc\u00ed ID klienta a tajn\u00e9ho kl\u00ed\u010de z\u00edsk\u00e1te token na tokenov\u00e9m endpointu Authentication API. Ka\u017ed\u00e9 vol\u00e1n\u00ed pak odes\u00edl\u00e1 <code>Authorization: Bearer [token]<\/code>.<\/li>\n\n\n<li><strong>Rozsah opr\u00e1vn\u011bn\u00ed.<\/strong> U\u017eivateli API ud\u011blte p\u0159\u00edstup pouze k prost\u0159edk\u016fm pot\u0159ebn\u00fdm podle n\u00ed\u017ee uveden\u00e9 mapovac\u00ed tabulky a k \u017e\u00e1dn\u00fdm dal\u0161\u00edm.<\/li>\n\n<\/ul>\n\n\n<p>Na stran\u011b SkyPlanner se REST API autentizuje pomoc\u00ed API tokenu (SkyPlanner Settings &gt; API) a je zdokumentov\u00e1no ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ud\u00e1losti a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ani jedno API spole\u010dnosti ECI nem\u00e1 zdokumentovan\u00e9 webhooky. Data z JobBOSS\u00b2 se z\u00edsk\u00e1vaj\u00ed pravideln\u00fdm dotazov\u00e1n\u00edm: Order Line Items, Order Routings a \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek filtrujte podle <code>lastModDate<\/code> od posledn\u00edho spu\u0161t\u011bn\u00ed a str\u00e1nkujte pomoc\u00ed <code>take<\/code> a <code>skip<\/code>. Interval se nastavuje pro ka\u017ed\u00fd provoz zvl\u00e1\u0161\u0165, od n\u011bkolika minut u zak\u00e1zek po hodinu u skladov\u00fdch z\u00e1sob.<\/p>\n\n\n<p>SkyPlanner odes\u00edl\u00e1 webhooky p\u0159i zm\u011bn\u011b stavu nebo rozvrhu, tak\u017ee zp\u011btn\u00fd z\u00e1pis se \u0159\u00edd\u00ed ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt JobBOSS\u00b2 (prost\u0159edek JobBOSS\u00b2 API)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Estimates (<code>\/estimates<\/code>), materi\u00e1ly (<code>\/materials<\/code>)<\/td><td>Produkty, materi\u00e1ly, struktura produktu<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Routings (<code>\/routings<\/code>): pracovi\u0161t\u011b, \u010das se\u0159\u00edzen\u00ed, \u010das cyklu, velikost t\u00fdmu, stroje pro zak\u00e1zku<\/td><td>Kroky technologick\u00e9ho postupu s dobou trv\u00e1n\u00ed a \u010dasy se\u0159\u00edzen\u00ed<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Work Centers (<code>\/work-centers<\/code>): po\u010det hodin na sm\u011bnu, provoz ve sm\u011bn\u00e1ch 1 a\u017e 3, pracovn\u00ed dny<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, efektivita<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Prvotn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>Company Calendar (<code>\/company-calendars<\/code>), Employees (<code>\/employees<\/code>)<\/td><td>Sm\u011bny, nepracovn\u00ed dny, pracovn\u00edci<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Denn\u011b, nebo spr\u00e1va sm\u011bn ve SkyPlanner<\/td><\/tr><tr><td>Orders a Order Line Items (<code>\/order-line-items<\/code>): \u010d\u00edslo zak\u00e1zky, term\u00edn dod\u00e1n\u00ed, priorita, mno\u017estv\u00ed k v\u00fdrob\u011b<\/td><td>Zak\u00e1zky s term\u00edny dod\u00e1n\u00ed a prioritami<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Order Routings (<code>\/order-routings<\/code>): kroky zak\u00e1zky, stav, zb\u00fdvaj\u00edc\u00ed hodiny<\/td><td>Operace pro jednotliv\u00e9 kroky technologick\u00e9ho postupu<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017ed\u00fdch n\u011bkolik minut<\/td><\/tr><tr><td>Job Requirements (<code>\/job-requirements<\/code>), \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek (<code>\/purchase-order-line-items<\/code>)<\/td><td>Materi\u00e1lov\u00e9 pot\u0159eby, n\u00e1kupn\u00ed objedn\u00e1vky podle term\u00ednu dod\u00e1n\u00ed<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>Order Routing: <code>estimatedStartDate<\/code>, <code>estimatedEndDate<\/code>, <code>workCenter<\/code>, <code>employeeCode<\/code> (PATCH)<\/td><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed, stroj a oper\u00e1tor pro ka\u017ed\u00fd krok<\/td><td>SkyPlanner \u2192 JobBOSS\u00b2<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu prost\u0159ednictv\u00edm webhooku SkyPlanner<\/td><\/tr><tr><td>Time Ticket Details (POST): zak\u00e1zka, krok, pracovi\u0161t\u011b, zam\u011bstnanec, \u010das se\u0159\u00edzen\u00ed, \u010das cyklu, po\u010det dokon\u010den\u00fdch a zmetkov\u00fdch kus\u016f, \u010das zah\u00e1jen\u00ed a dokon\u010den\u00ed<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrzen\u00ed oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 JobBOSS\u00b2<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu, pokud tuto mo\u017enost zvol\u00edte<\/td><\/tr><tr><td>V JobBOSS\u00b2 nen\u00ed<\/td><td>Matice \u010das\u016f se\u0159\u00edzen\u00ed a p\u0159echod\u016f, n\u00e1stroje jako v\u00fdrobn\u00ed zdroje s omezenou kapacitou, alternativn\u00ed stroje a pracovn\u00edci<\/td><td>Spravuje se ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>U lok\u00e1ln\u011b provozovan\u00e9ho JobBOSS\u00b2 se stejn\u00e9 objekty na\u010d\u00edtaj\u00ed prost\u0159ednictv\u00edm prost\u0159edk\u016f ERP API <code>\/jobs<\/code>, <code>\/job-operations<\/code>, <code>\/job-materials<\/code>, <code>\/parts<\/code>, <code>\/part-operations<\/code>, <code>\/work-centers<\/code> a <code>\/purchase-order-lines<\/code>. \u010casov\u00e9 z\u00e1znamy se odes\u00edlaj\u00ed do <code>\/timecard-lines<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Zp\u016fsoby integrace<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Prvotn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> Na\u010dt\u011bte Estimates, Routings, materi\u00e1ly, Work Centers, Company Calendar a Employees. Pe\u010dliv\u011b zvolte mapov\u00e1n\u00ed pracovi\u0161\u0165: z pracovi\u0161t\u011b se \u010dty\u0159mi soustruhy vznikne jedna skupina pracovi\u0161\u0165 nebo \u010dty\u0159i pracovi\u0161t\u011b, aby SkyPlanner rozvrhoval pr\u00e1ci pro ka\u017ed\u00fd stroj.<\/p>\n\n\n<p><strong>2. Synchronizace zak\u00e1zek.<\/strong> Na\u010dt\u011bte otev\u0159en\u00e9 Order Line Items spolu s jejich Order Routings, Job Requirements a otev\u0159en\u00fdmi \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd v term\u00ednu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a po jej\u00edm ozna\u010den\u00ed stavem Delivered aktualizuje skladov\u00e9 z\u00e1soby. Pozastaven\u00e9 a uzav\u0159en\u00e9 zak\u00e1zky vynechte.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Kdy\u017e pl\u00e1novac\u00ed algoritmus za\u0159ad\u00ed nebo p\u0159esune krok, webhook SkyPlanner spust\u00ed po\u017eadavek PATCH na <code>\/api\/v1\/orders\/{orderNumber}\/order-line-items\/{itemNumber}\/order-routings\/{stepNumber}<\/code>. Ten nastav\u00ed <code>estimatedStartDate<\/code> a <code>estimatedEndDate<\/code> v UTC. Pokud SkyPlanner p\u0159esunul krok na jin\u00fd stroj nebo jej p\u0159i\u0159adil jin\u00e9mu pracovn\u00edkovi, nastav\u00ed tak\u00e9 <code>workCenter<\/code> a <code>employeeCode<\/code>. Term\u00edny se zap\u00ed\u0161\u00ed do krok\u016f zak\u00e1zky, kter\u00e9 u\u017e zobrazuj\u00ed Whiteboard, Planning Board a Scheduling Advisor.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed pr\u00e1ce ve v\u00fdrob\u011b.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer a \u010dasov\u00e9 z\u00e1znamy udr\u017euj\u00ed rozvrh aktu\u00e1ln\u00ed. Sami si zvol\u00edte, zda se skute\u010dn\u00e9 \u010dasy budou zapisovat zp\u011bt do JobBOSS\u00b2. Pokud ano, z ka\u017ed\u00e9ho potvrzen\u00ed vznikne Time Ticket Detail s \u010dasem se\u0159\u00edzen\u00ed, \u010dasem cyklu a po\u010dtem kus\u016f. Pokud ne, sb\u011br dat z\u016fst\u00e1v\u00e1 v JobBOSS\u00b2 a SkyPlanner na\u010d\u00edt\u00e1 postup pr\u00e1ce z Order Routings.<\/p>\n\n\n<p><strong>5. Odpov\u011bdnost za data a pravidla \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu je p\u00edsemn\u011b stanovte:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Estimates, Routings, mno\u017estv\u00ed, term\u00edny dod\u00e1n\u00ed, stav zak\u00e1zky<\/td><td>JobBOSS\u00b2<\/td><\/tr><tr><td>Po\u0159ad\u00ed krok\u016f, \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed, stroj a oper\u00e1tor pro ka\u017ed\u00fd krok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f se\u0159\u00edzen\u00ed a p\u0159echod\u016f, po\u017eadavky na n\u00e1stroje a oper\u00e1tory, alternativn\u00ed v\u00fdrobn\u00ed zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a nepracovn\u00ed dny<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>\u010casov\u00e9 v\u00fdkazy, v\u00fddeje materi\u00e1lu, p\u0159\u00edjmy, kalkulace n\u00e1klad\u016f<\/td><td>JobBOSS\u00b2; \u00fadaje se zad\u00e1vaj\u00ed p\u0159\u00edmo v n\u011bm nebo se p\u0159en\u00e1\u0161ej\u00ed z \u010dasov\u00fdch z\u00e1znam\u016f SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pro z\u00e1pis term\u00edn\u016f krok\u016f zak\u00e1zky ur\u010dete jedin\u00fd syst\u00e9m. U zak\u00e1zek rozvrhovan\u00fdch ve SkyPlanner prov\u00e1d\u011bjte zm\u011bny rozvrhu v tomto syst\u00e9mu m\u00edsto ve Whiteboard. Pl\u00e1nova\u010di tedy p\u0159esouvaj\u00ed pr\u00e1ci ve SkyPlanner a term\u00edny se p\u0159en\u00e1\u0161ej\u00ed do JobBOSS\u00b2.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Obvykl\u00fd postup projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si rozvrh ov\u011b\u0159te v r\u00e1mci 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed s daty Work Centers, technologick\u00fdmi postupy a otev\u0159en\u00fdmi zak\u00e1zkami exportovan\u00fdmi z JobBOSS\u00b2 do CSV nebo Excelu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte kone\u010dnou podobu mapovac\u00ed tabulky, odpov\u011bdnost za data, intervaly synchronizace a to, zda se budou \u010dasov\u00e9 v\u00fdkazy zapisovat zp\u011bt.<\/li>\n\n\n<li><strong>P\u0159\u00edstup od ECI.<\/strong> Po\u017e\u00e1dejte ECI o aktivaci JobBOSS\u00b2 API nebo ERP API a vytvo\u0159en\u00ed u\u017eivatele API. Pokud m\u00e1te k dispozici testovac\u00ed firmu, testujte na n\u00ed.<\/li>\n\n\n<li><strong>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed.<\/strong> Estimates, Routings, Work Centers, kalend\u00e1\u0159 a zam\u011bstnanci.<\/li>\n\n\n<li><strong>Synchronizace v\u00fdrobn\u00edch a n\u00e1kupn\u00edch objedn\u00e1vek.<\/strong> Pravideln\u00e9 dotazov\u00e1n\u00ed s filtry <code>lastModDate<\/code>, str\u00e1nkov\u00e1n\u00edm a opakov\u00e1n\u00edm ne\u00fasp\u011b\u0161n\u00fdch po\u017eadavk\u016f.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed v SkyPlanner.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje, po\u010dty pracovn\u00edk\u016f pro jednotliv\u00e9 operace a alternativn\u00ed stroje nebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> Vol\u00e1n\u00ed PATCH pro Order Routing spou\u0161t\u011bn\u00e1 webhooky SkyPlanner a p\u0159\u00edpadn\u011b tak\u00e9 z\u00e1pis do Time Ticket Details, pokud jej zvol\u00edte.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00e9 testov\u00e1n\u00ed.<\/strong> Pou\u017e\u00edvejte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00ed pl\u00e1novac\u00ed tabul\u00ed, porovn\u00e1vejte term\u00edny a opravujte kmenov\u00e1 data.<\/li>\n\n\n<li><strong>Spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu.<\/strong> Jakmile se data shoduj\u00ed, zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-jobboss-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci JobBOSS\u00b2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Hostovan\u00e9 nebo m\u00edstn\u00ed nasazen\u00ed.<\/strong> JobBOSS\u00b2 API slou\u017e\u00ed z\u00e1kazn\u00edk\u016fm s hostovan\u00fdm \u0159e\u0161en\u00edm. M\u00edstn\u00ed instalace pou\u017e\u00edvaj\u00ed ERP API, kter\u00e9 nab\u00edz\u00ed jin\u00fd seznam prost\u0159edk\u016f. Zp\u016fsob p\u0159ipojen\u00ed si ujasn\u011bte v kroku 1.<\/li>\n\n\n<li><strong>V\u0161ude UTC.<\/strong> API \u010dte i zapisuje \u010das v UTC. P\u0159ev\u00e1d\u011bjte jej na m\u00edstn\u00ed \u010das z\u00e1vodu, jinak se za\u010d\u00e1tek v 7:00 napl\u00e1nuje na nespr\u00e1vnou hodinu.<\/li>\n\n\n<li><strong>Co se skr\u00fdv\u00e1 pod pracovi\u0161t\u011bm.<\/strong> Pracovi\u0161t\u011b m\u016f\u017ee p\u0159edstavovat stroj, skupinu stroj\u016f, v\u00fdrobn\u00ed bu\u0148ku nebo pracovn\u00edky. Podle po\u010dtu stroj\u016f a velikosti t\u00fdmu u ka\u017ed\u00e9 operace technologick\u00e9ho postupu SkyPlanner ur\u010d\u00ed, kolik v\u00fdrobn\u00edch zdroj\u016f operace pot\u0159ebuje.<\/li>\n\n\n<li><strong>Kooperace.<\/strong> Operace, kter\u00e9 maj\u00ed m\u00edsto pracovi\u0161t\u011b dodavatele, se zapo\u010d\u00edt\u00e1vaj\u00ed do pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby, ale nezat\u011b\u017euj\u00ed va\u0161i kapacitu. Modelujte je jako operace, kter\u00e9 maj\u00ed pouze dobu trv\u00e1n\u00ed.<\/li>\n\n\n<li><strong>P\u0159ekr\u00fdv\u00e1n\u00ed operac\u00ed a provoz bez obsluhy.<\/strong> Operace technologick\u00e9ho postupu mohou m\u00edt p\u0159\u00edznak, kter\u00fd povoluje jejich p\u0159ekr\u00fdv\u00e1n\u00ed nebo provoz bez obsluhy. P\u0159en\u00e1\u0161ejte oba p\u0159\u00edznaky, aby se pr\u00e1ce bez obsluhy pl\u00e1novala spr\u00e1vn\u011b.<\/li>\n\n\n<li><strong>\u010casov\u00e9 jednotky.<\/strong> \u010casy se\u0159\u00edzen\u00ed a \u010dasy cyklu maj\u00ed vlastn\u00ed jednotky. \u010cas ve front\u011b znamen\u00e1 \u010dek\u00e1n\u00ed, nikoli strojn\u00ed \u010das. P\u0159i importu jednotky p\u0159eve\u010fte, jinak budou v\u0161echny doby trv\u00e1n\u00ed chybn\u00e9.<\/li>\n\n\n<li><strong>Str\u00e1nkov\u00e1n\u00ed.<\/strong> V\u00fdchoz\u00ed str\u00e1nka obsahuje 200 z\u00e1znam\u016f. Str\u00e1nkov\u00e1n\u00ed pou\u017e\u00edvejte p\u0159i ka\u017ed\u00e9m \u010dten\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-jobboss-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci JobBOSS\u00b2 a zaji\u0161\u0165uje jej\u00ed podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner integraci nastav\u00ed p\u0159i zav\u00e1d\u011bn\u00ed a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu,<\/strong> a to pro dohodnut\u00e9 prost\u0159edky API a podle dohodnut\u00fdch pravidel pravideln\u00e9ho dotazov\u00e1n\u00ed. Ka\u017ed\u00fd v\u00fdrobn\u00ed podnik pou\u017e\u00edv\u00e1 JobBOSS\u00b2 jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed se tyto znalosti uplatn\u00ed.<\/li>\n\n\n<li><strong>Zapojit se m\u016f\u017ee i v\u00e1\u0161 partner pro JobBOSS\u00b2.<\/strong> Zn\u00e1 va\u0161e nastaven\u00ed a spole\u010dn\u011b s t\u00fdmem SkyPlanner m\u016f\u017ee u ECI zajistit aktivaci API a vytvo\u0159en\u00ed u\u017eivatele API.<\/li>\n\n\n<li><strong>Va\u0161i v\u00fdvoj\u00e1\u0159i mohou integraci d\u00e1le rozv\u00edjet<\/strong> pomoc\u00ed REST API syst\u00e9mu SkyPlanner a API tokenu. Pro za\u010d\u00e1tek sta\u010d\u00ed API token a t\u00fdm SkyPlanner v p\u0159\u00edpad\u011b pot\u0159eby pom\u016f\u017ee. Dokumentaci najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci integrac\u00ed SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b za 5 pracovi\u0161\u0165 s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb, spole\u010dn\u011b s cenou tarifu. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, <a href=\"\/cs\/integrace\/erp\/jobboss\/planovani-vyroby\/\">pl\u00e1nov\u00e1n\u00ed v\u00fdroby pro JobBOSS\u00b2 s ohledem na skute\u010dnou kapacitu stroj\u016f a pracovn\u00edk\u016f<\/a>, <a href=\"\/cs\/integrace\/erp\/jobboss\/\">str\u00e1nku JobBOSS\u00b2<\/a>, <a href=\"\/cs\/funkce\/\">funkce SkyPlanner<\/a> a <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehled integrac\u00ed ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">V\u00fdrobn\u00ed firmy, kter\u00e9 pou\u017e\u00edvaj\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v hale na v\u00fdrobu rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSe SkyPlanner jsme p\u0159e\u0161li od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v excelov\u00fdch tabulk\u00e1ch k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Pracovn\u00edci v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale firmy ve m\u011bst\u011b Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a v\u00edce<\/b><span>automaticky rozvr\u017een\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod mnohem lep\u0161\u00ed kontrolou a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se rozvrhuj\u00ed automaticky a cel\u00e1 firma m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Sv\u00e1\u0159e\u010d spole\u010dnosti KJH-Comp brous\u00ed sva\u0159enou ocelovou konstrukci v z\u00e1vod\u011b v Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98 %<\/b><span>v\u010dasnost dod\u00e1vek, n\u00e1r\u016fst z p\u0159ibli\u017en\u011b 50 %<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner hraje rozhoduj\u00edc\u00ed roli v tom, \u017ee dok\u00e1\u017eeme udr\u017eet v\u010dasnost dod\u00e1vek.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd \u0159editel<\/b><br>KJH-Comp \u00b7 Zpracov\u00e1n\u00ed plechu a zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % a rozvrhov\u00e1n\u00ed nyn\u00ed zvl\u00e1d\u00e1 jeden mistr m\u00edsto dvou.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010d\u00edst hodnocen\u00ed KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 JobBOSS\u00b2 API?<\/summary>\n<p class=\"sp-faq__a\">Ano. ECI poskytuje JobBOSS\u00b2 API a ERP API, kter\u00e9 nen\u00ed v\u00e1zan\u00e9 na konkr\u00e9tn\u00ed produkt. Ob\u011b rozhran\u00ed jsou typu REST a maj\u00ed specifikace OpenAPI. JobBOSS\u00b2 API umo\u017e\u0148uje z\u00e1kazn\u00edk\u016fm s hostovan\u00fdm \u0159e\u0161en\u00edm \u010d\u00edst a zapisovat objedn\u00e1vky, Order Routings, Estimates, Work Centers, n\u00e1kupn\u00ed objedn\u00e1vky a Time Tickets.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se integrace autentizuje v\u016f\u010di JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">Pomoc\u00ed p\u0159ihla\u0161ovac\u00edch \u00fadaj\u016f klienta v OAuth 2.0. ECI aktivuje API, v Integration Engine Management Console se vytvo\u0159\u00ed u\u017eivatel API a ka\u017ed\u00e9 vol\u00e1n\u00ed obsahuje Bearer token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje JobBOSS\u00b2 webhooky?<\/summary>\n<p class=\"sp-faq__a\">Dokumentace API od ECI \u017e\u00e1dn\u00e9 webhooky neuv\u00e1d\u00ed. Integrace se proto pravideln\u011b dotazuje JobBOSS\u00b2 s filtry <code>lastModDate<\/code> v intervalech nastaven\u00fdch pro konkr\u00e9tn\u00ed v\u00fdrobn\u00ed podnik. Vlastn\u00ed webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se pl\u00e1novan\u00e9 term\u00edny zapisuj\u00ed zp\u011bt do JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">Pro ka\u017edou operaci zvl\u00e1\u0161\u0165. SkyPlanner aktualizuje ka\u017ed\u00fd Order Routing vol\u00e1n\u00edm PATCH s hodnotami <code>estimatedStartDate<\/code> a <code>estimatedEndDate<\/code>. Pokud se operace p\u0159esunula na jin\u00fd stroj nebo k jin\u00e9mu pracovn\u00edkovi, p\u0159id\u00e1 tak\u00e9 <code>workCenter<\/code> a <code>employeeCode<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner pro JobBOSS\u00b2 nab\u00eddnout ECI APS, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud chce z\u00e1kazn\u00edk b\u011bhem n\u011bkolika t\u00fddn\u016f zprovoznit pl\u00e1nov\u00e1n\u00ed v\u00fdroby, kter\u00e9 zohled\u0148uje skute\u010dnou kapacitu v\u00edce v\u00fdrobn\u00edch zdroj\u016f sou\u010dasn\u011b. ECI APS je samostatn\u00fd dopln\u011bk zalo\u017een\u00fd na LYNQ. SkyPlanner se p\u0159ipojuje p\u0159es vlastn\u00ed JobBOSS\u00b2 API od ECI, pl\u00e1nuje p\u0159estavby, pracovn\u00ed t\u00fdmy, p\u0159\u00edpravky i materi\u00e1l a automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 v\u00fdrobu. Jeho cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed podporuje a\u017e 20 pracovi\u0161\u0165 a importy z JobBOSS\u00b2 ve form\u00e1tu CSV nebo Excel. Platebn\u00ed kartu nepot\u0159ebujete. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a domluvte se na vymezen\u00ed rozsahu integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ JobBOSS\u00b2 Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed JobBOSS\u00b2 ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit JobBOSS\u00b2 od ECI se SkyPlanner APS. SkyPlanner se s JobBOSS\u00b2 propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm vlastn\u00edch API spole\u010dnosti ECI: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace &#8230; <a title=\"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102961,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103768","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/pruvodce-integraci\\\/\",\"name\":\"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro JobBOSS\u00b2: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/jobboss\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","description":"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/","name":"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Propojte JobBOSS\u00b2 se SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, zp\u011btn\u00fd z\u00e1pis term\u00edn\u016f Order Routing, Time Tickets, mapov\u00e1n\u00ed dat a tipy pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro JobBOSS\u00b2: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/jobboss\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ JobBOSS\u00b2 Pr\u016fvodce integrac\u00ed JobBOSS\u00b2 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce integrac\u00ed JobBOSS\u00b2 ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit JobBOSS\u00b2 od ECI se SkyPlanner APS. SkyPlanner se s JobBOSS\u00b2 propojuje obousm\u011brn\u011b prost\u0159ednictv\u00edm vlastn\u00edch API spole\u010dnosti ECI: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103768","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=103768"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103768\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/102961"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=103768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}