{"id":103707,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/infor-m3\/pruvodce-integraci\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"pruvodce-integraci","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/","title":{"rendered":"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Pr\u016fvodce integrac\u00ed Infor M3 <span class=\"hl\">pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Infor M3 se SkyPlanner APS. Integrace SkyPlanner s Infor M3 je obousm\u011brn\u00e1:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed polo\u017eky, struktury v\u00fdrobk\u016f, pracovi\u0161t\u011b, v\u00fdrobn\u00ed p\u0159\u00edkazy a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 \u010dasy zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed zp\u011bt do operac\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/li>\n\n\n<li>Hl\u00e1\u0161en\u00ed oper\u00e1tor\u016f se vracej\u00ed p\u0159es PMS070MI Report operation.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161emu nastaven\u00ed M3 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Tento pr\u016fvodce je ur\u010den partner\u016fm a v\u00fdvoj\u00e1\u0159\u016fm, kte\u0159\u00ed se na integraci pod\u00edlej\u00ed nebo sami vytv\u00e1\u0159ej\u00ed \u0159e\u0161en\u00ed nad zdokumentovan\u00fdm REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-m3-interfaces-skyplanner-uses\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Rozhran\u00ed M3, kter\u00e1 SkyPlanner vyu\u017e\u00edv\u00e1<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Infor M3 nab\u00edz\u00ed \u010dty\u0159i integra\u010dn\u00ed vrstvy. Ka\u017ed\u00e1 z nich zde m\u00e1 svou \u00falohu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>M3 API (programy MI) p\u0159es ION API Gateway.<\/strong> Ka\u017ed\u00fd program MI se vol\u00e1 p\u0159es REST: <code>https:\/\/{ionapi-host}\/{tenant}\/M3\/m3api-rest\/v2\/execute\/{program}\/{transaction}<\/code>. Pou\u017e\u00edvejte v2. P\u0159id\u00e1v\u00e1 parametry pro spole\u010dnost, divizi a form\u00e1t data a vrac\u00ed jinou strukturu dat ne\u017e v1. PMS100MI slou\u017e\u00ed pro v\u00fdrobn\u00ed p\u0159\u00edkazy a PMS070MI pro hl\u00e1\u0161en\u00ed operac\u00ed. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/industry_content_fashion\/vmw1731577228531.html\">Dokumentace Infor<\/a>)<\/li>\n\n\n<li><strong>Compass query API v Infor Data Fabric.<\/strong> Umo\u017e\u0148uje \u010dten\u00ed pomoc\u00ed SQL z replikovan\u00fdch tabulek M3, jako jsou MITMAS, MWOHED a MWOOPE. Compass pracuje asynchronn\u011b: ode\u0161lete \u00falohu, opakovan\u011b zji\u0161\u0165ujte jej\u00ed stav a na\u010dt\u011bte str\u00e1nky v\u00fdsledk\u016f o velikosti a\u017e 100 000 \u0159\u00e1dk\u016f nebo 10 MB. Hod\u00ed se pro po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat, nikoli pro synchronizaci v re\u00e1ln\u00e9m \u010dase. (<a href=\"https:\/\/docs.infor.com\/inforos\/2026.x\/en-us\/useradminlib_cloud\/datafabrug\/uan1631199548644.html\">Dokumentace Infor<\/a>)<\/li>\n\n\n<li><strong>ION BODs.<\/strong> M3 BOD Processor publikuje povolen\u00e9 zpr\u00e1vy BOD pro jednotliv\u00e9 \u00fa\u010detn\u00ed jednotky. Mezi p\u0159\u00edchoz\u00ed zpr\u00e1vy BOD pat\u0159\u00ed Process ProductionOrder, Sync a Process BillOfMaterials, Process ItemMaster a Sync InventoryCount. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/cnw1511966505258.html\">Dokumentace Infor<\/a>)<\/li>\n\n\n<li><strong>M3 Event Hub.<\/strong> Syst\u00e9m pro publikov\u00e1n\u00ed a odb\u011br ud\u00e1lost\u00ed na \u00farovni tabulek, nap\u0159\u00edklad zm\u011bn hlavi\u010dek v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a operac\u00ed. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/szt1602149359647.html\">Dokumentace Infor<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>Specifikace MI API najdete v katalogu ION API ka\u017ed\u00e9ho tenantu v \u010d\u00e1sti Available APIs. Pro ka\u017ed\u00fd program je k dispozici Swagger. Pokud ve standardn\u00edm katalogu chyb\u00ed pot\u0159ebn\u00e1 transakce, lze pomoc\u00ed XtendM3 p\u0159idat vlastn\u00ed program MI a pomoc\u00ed Metadata Publisher vytvo\u0159it vlastn\u00ed API pro seznamy.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ov\u011b\u0159ov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Zaregistrujte SkyPlanner v ION API jako autorizovanou aplikaci s OAuth 2.0. Pou\u017eijte backendovou servisn\u00ed aplikaci se servisn\u00edm \u00fa\u010dtem, aby integrace b\u011b\u017eela bez relace konkr\u00e9tn\u00edho u\u017eivatele. ION API p\u0159i ka\u017ed\u00e9m vol\u00e1n\u00ed uplat\u0148uje limity \u010detnosti po\u017eadavk\u016f a bezpe\u010dnostn\u00ed pravidla tenantu. (<a href=\"https:\/\/developer.infor.com\/?p=1587\">V\u00fdvoj\u00e1\u0159sk\u00fd port\u00e1l Infor<\/a>)<\/p>\n\n\n<p>Na stran\u011b SkyPlanner se p\u0159\u00edstup k REST API ov\u011b\u0159uje pomoc\u00ed API tokenu (SkyPlanner Settings &gt; API). Dokumentace je dostupn\u00e1 ve Swagger\/OpenAPI. Prvn\u00edmi vol\u00e1n\u00edmi v\u00e1s provede <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">n\u00e1vod k integraci<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-event-hub-bods-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Zji\u0161\u0165ov\u00e1n\u00ed zm\u011bn: Event Hub, zpr\u00e1vy BOD a pravideln\u00e9 dotazov\u00e1n\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>M3 m\u016f\u017ee zm\u011bny aktivn\u011b odes\u00edlat, ale tuto funkci je nutn\u00e9 nastavit na stran\u011b Infor:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Event Hub<\/strong> publikuje pouze ud\u00e1losti, kter\u00e9 maj\u00ed aktivn\u00edho odb\u011bratele. ION Enterprise Connector (IEC) je odeb\u00edr\u00e1 prost\u0159ednictv\u00edm kan\u00e1lu EventHub Subscriber.<\/li>\n\n\n<li><strong>Zpr\u00e1vy BOD<\/strong> je nutn\u00e9 povolit pro jednotliv\u00e9 \u00fa\u010detn\u00ed jednotky v BOD Processor. K tomu je pot\u0159eba role M3EC-Administrator. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/bka1516953041992.html\">Dokumentace Infor<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Pokud aktivn\u00ed odes\u00edl\u00e1n\u00ed je\u0161t\u011b nen\u00ed nastaven\u00e9, pravideln\u011b volejte seznamov\u00e9 transakce PMS100MI nebo spou\u0161t\u011bjte dotazy Compass podle \u010dasov\u00fdch raz\u00edtek zm\u011bn.<\/p>\n\n\n<p>D\u00edky vlastn\u00edm webhook\u016fm SkyPlanner je zp\u011btn\u00fd z\u00e1pis od prvn\u00edho dne \u0159\u00edzen ud\u00e1lostmi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapov\u00e1n\u00ed dat<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt Infor M3 (rozhran\u00ed)<\/th><th>Objekt SkyPlanner<\/th><th>Sm\u011br<\/th><th>\u010cetnost<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eka, MMS001 (MITMAS p\u0159es Compass, programy MI pro polo\u017eky)<\/td><td>V\u00fdrobky a materi\u00e1ly<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Hlavi\u010dka struktury v\u00fdrobku PDS001, materi\u00e1ly v PDS002<\/td><td>Struktura v\u00fdrobku, d\u00edl\u010d\u00ed v\u00fdrobky, materi\u00e1ly<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Operace v PDS002: \u010d\u00edslo operace, pracovi\u0161t\u011b, \u010das se\u0159\u00edzen\u00ed a \u010das zpracov\u00e1n\u00ed<\/td><td>Kroky procesu s \u010dasy se\u0159\u00edzen\u00ed a zpracov\u00e1n\u00ed<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 p\u0159i zm\u011bn\u011b<\/td><\/tr><tr><td>Pracovi\u0161t\u011b PDS010, denn\u00ed kapacita PDS015<\/td><td>Pracovi\u0161t\u011b, skupiny pracovi\u0161\u0165, koeficienty efektivity<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed, pot\u00e9 jen z\u0159\u00eddka<\/td><\/tr><tr><td>V\u00fdrobn\u00ed p\u0159\u00edkaz PMS100 (MWOHED), PMS100MI<\/td><td>Zak\u00e1zky s term\u00edny a mno\u017estv\u00edmi<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub nebo pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Operace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (MWOOPE)<\/td><td>Rozvrhovan\u00e9 operace odpov\u00eddaj\u00edc\u00ed jednotliv\u00fdm operac\u00edm v\u00fdrobn\u00edho p\u0159\u00edkazu<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub nebo pravideln\u00e9 dotazov\u00e1n\u00ed<\/td><\/tr><tr><td>Skladov\u00e9 z\u016fstatky<\/td><td>Z\u00e1soby podle materi\u00e1lu<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>\u0158\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek s term\u00edny dod\u00e1n\u00ed<\/td><td>O\u010dek\u00e1van\u00fd materi\u00e1l, dostupn\u00fd k datu dod\u00e1n\u00ed<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Dotazov\u00e1n\u00ed ka\u017edou hodinu nebo p\u0159i spu\u0161t\u011bn\u00ed rozvrhov\u00e1n\u00ed<\/td><\/tr><tr><td>Pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed jednotliv\u00fdch operac\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu<\/td><td>Operace rozvr\u017een\u00e9 v Ganttov\u011b diagramu<\/td><td>SkyPlanner \u2192 M3<\/td><td>P\u0159i zm\u011bn\u011b rozvrhu p\u0159es webhook SkyPlanner<\/td><\/tr><tr><td>PMS070MI Report operation: \u010das se\u0159\u00edzen\u00ed, \u010das zpracov\u00e1n\u00ed, mno\u017estv\u00ed<\/td><td>\u010casov\u00e9 z\u00e1znamy a mno\u017estv\u00ed od oper\u00e1tor\u016f<\/td><td>SkyPlanner \u2192 M3<\/td><td>P\u0159i ka\u017ed\u00e9m potvrzen\u00ed nebo za sm\u011bnu<\/td><\/tr><tr><td>Data o omezen\u00edch ve SkyPlanner<\/td><td>Matice \u010das\u016f p\u0159ese\u0159\u00edzen\u00ed, n\u00e1stroje s omezenou kapacitou, oper\u00e1to\u0159i na operaci, alternativn\u00ed pracovi\u0161t\u011b<\/td><td>Spravov\u00e1no ve SkyPlanner<\/td><td>Nastaven\u00ed b\u011bhem zav\u00e1d\u011bn\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00ed postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Po\u010d\u00e1te\u010dn\u00ed na\u010dten\u00ed kmenov\u00fdch dat.<\/strong> P\u0159es Compass hromadn\u011b na\u010dt\u011bte polo\u017eky, struktury v\u00fdrobk\u016f, operace a pracovi\u0161t\u011b. U ka\u017ed\u00e9ho pracovi\u0161t\u011b promyslete, zda ho namapujete na pracovi\u0161t\u011b, nebo na skupinu pracovi\u0161\u0165 ve SkyPlanner. Pokud pracovi\u0161t\u011b p\u0159edstavuje t\u0159i soub\u011b\u017en\u011b pracuj\u00edc\u00ed stroje a chcete je rozvrhovat samostatn\u011b, vytvo\u0159te z n\u011bj t\u0159i pracovi\u0161t\u011b.<\/p>\n\n\n<p><strong>2. Synchronizace p\u0159\u00edkaz\u016f.<\/strong> Na\u010dt\u011bte uvoln\u011bn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy a jejich operace z PMS100MI nebo MWOOPE a k nim skladov\u00e9 z\u00e1soby a otev\u0159en\u00e9 \u0159\u00e1dky n\u00e1kupn\u00edch objedn\u00e1vek. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky. Jakmile je objedn\u00e1vka ozna\u010dena stavem Delivered, aktualizuje z\u00e1soby. P\u0159i rozvrhov\u00e1n\u00ed kontroluje oboj\u00ed.<\/p>\n\n\n<p>Rozvrhujte pouze pevn\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy. Pl\u00e1novan\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy (PMS170) se znovu generuj\u00ed pomoc\u00ed MRP a M3 p\u0159i ka\u017ed\u00e9m p\u0159epl\u00e1nov\u00e1n\u00ed znovu vytv\u00e1\u0159\u00ed jejich kapacitn\u00ed zat\u00ed\u017een\u00ed.<\/p>\n\n\n<p><strong>3. Zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/strong> U ka\u017ed\u00e9 operace, kterou pl\u00e1novac\u00ed algoritmus za\u0159adil nebo p\u0159esunul, zap\u00ed\u0161e SkyPlanner pl\u00e1novan\u00e9 zah\u00e1jen\u00ed a dokon\u010den\u00ed do operace v\u00fdrobn\u00edho p\u0159\u00edkazu. Vol\u00e1 p\u0159itom transakci M3 MI pro operace v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f z katalogu va\u0161eho tenantu, p\u0159\u00edpadn\u011b program XtendM3 MI, pokud ho va\u0161e nastaven\u00ed vy\u017eaduje. Mno\u017estv\u00ed, stav a kalkulace n\u00e1klad\u016f z\u016fst\u00e1vaj\u00ed v M3.<\/p>\n\n\n<p><strong>4. Potvrzov\u00e1n\u00ed pr\u00e1ce ve v\u00fdrobn\u00edm provozu.<\/strong> Oper\u00e1to\u0159i zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed SkyPlanner Mobile Confirmations nebo Production Timer. SkyPlanner odes\u00edl\u00e1 \u010das se\u0159\u00edzen\u00ed, \u010das zpracov\u00e1n\u00ed a mno\u017estv\u00ed p\u0159es PMS070MI Report operation a po dokon\u010den\u00ed kroku vol\u00e1 Confirm nebo Close operation. Infor uv\u00e1d\u00ed: &#8222;it is important that every operation is reported,&#8220; (je d\u016fle\u017eit\u00e9, aby byla vyk\u00e1z\u00e1na ka\u017ed\u00e1 operace). T\u00edm se udr\u017euje soulad mezi kapacitn\u00edm zat\u00ed\u017een\u00edm v M3 a postupem v\u00fdroby ve SkyPlanner. (<a href=\"https:\/\/developer.infor.com\/pms070mi-740845\/pms070mi-manufacturing-order-report-operation\">PMS070MI<\/a>)<\/p>\n\n\n<p>Pro ka\u017edou operaci zvolte jeden zp\u016fsob vykazov\u00e1n\u00ed. Pokud stejnou operaci vyk\u00e1\u017eete ze SkyPlanner i z PMS070 v M3, mno\u017estv\u00ed se zapo\u010d\u00edtaj\u00ed dvakr\u00e1t.<\/p>\n\n\n<p><strong>5. Pravidla pro spr\u00e1vu dat a \u0159e\u0161en\u00ed konflikt\u016f.<\/strong> Sepi\u0161te je p\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Odpov\u011bdn\u00fd syst\u00e9m<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, struktury v\u00fdrobk\u016f, mno\u017estv\u00ed, stav v\u00fdrobn\u00edho p\u0159\u00edkazu<\/td><td>Infor M3<\/td><\/tr><tr><td>Po\u0159ad\u00ed operac\u00ed, zah\u00e1jen\u00ed a dokon\u010den\u00ed, p\u0159i\u0159azen\u00ed k pracovi\u0161ti<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matice \u010das\u016f p\u0159ese\u0159\u00edzen\u00ed, n\u00e1stroje, oper\u00e1to\u0159i na operaci, alternativy<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sm\u011bny a absence<\/td><td>Jeden syst\u00e9m zvolen\u00fd p\u0159i vymezen\u00ed rozsahu<\/td><\/tr><tr><td>Vykazov\u00e1n\u00ed operac\u00ed<\/td><td>M3 s daty ze SkyPlanner p\u0159es PMS070MI<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Hlavn\u00edm zdrojem konflikt\u016f je vlastn\u00ed logika M3 pro ur\u010dov\u00e1n\u00ed term\u00edn\u016f. Pro kapacitn\u00ed zat\u00ed\u017een\u00ed plat\u00ed: &#8222;is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8220; (Generuje se automaticky p\u0159i vytvo\u0159en\u00ed nebo p\u0159epl\u00e1nov\u00e1n\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu \u010di pl\u00e1novan\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu.) P\u0159epl\u00e1novan\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz pova\u017eujte za novou verzi, znovu ho synchronizujte a nechte SkyPlanner upravit rozvrh. Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b rozvrh automaticky p\u0159epo\u010d\u00edt\u00e1. SkyPlanner nepot\u0159ebuje M3 Scheduling Workbench. Pokud m\u00e1te licenci SWB, sv\u011b\u0159te spr\u00e1vu term\u00edn\u016f operac\u00ed SkyPlanner, aby si syst\u00e9my navz\u00e1jem nep\u0159episovaly data.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd pr\u016fb\u011bh projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementace je obvykle dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed \u00favodn\u00edho nastaven\u00ed. Je\u0161t\u011b p\u0159edt\u00edm si m\u016f\u017eete SkyPlanner na 30 dn\u00ed zdarma vyzkou\u0161et s vlastn\u00edmi daty. Z M3 vyexportujte polo\u017eky, pracovi\u0161t\u011b a otev\u0159en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy pomoc\u00ed obvykl\u00e9ho exportu do Excelu nebo n\u00e1stroje Compass a importujte je ve form\u00e1tu CSV nebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00davodn\u00ed anal\u00fdza se spr\u00e1vcem M3.<\/strong> Ov\u011b\u0159te zp\u016fsob nasazen\u00ed, tenanta ION API, transakce MI ve va\u0161em katalogu, spole\u010dnost a divizi.<\/li>\n\n\n<li><strong>Mapov\u00e1n\u00ed.<\/strong> Stanovte mapovac\u00ed tabulku, pravidla vlastnictv\u00ed dat, \u010detnost synchronizace a kan\u00e1l pro hl\u00e1\u0161en\u00ed z v\u00fdroby.<\/li>\n\n\n<li><strong>Nastaven\u00ed ION API.<\/strong> Zaregistrujte autorizovanou aplikaci a servisn\u00ed \u00fa\u010det, nejprve v testovac\u00edm tenantu.<\/li>\n\n\n<li><strong>Prvotn\u00ed na\u010dten\u00ed.<\/strong> P\u0159es Compass na\u010dt\u011bte polo\u017eky, struktury v\u00fdrobk\u016f, operace a pracovi\u0161t\u011b.<\/li>\n\n\n<li><strong>Synchronizace p\u0159\u00edkaz\u016f a objedn\u00e1vek.<\/strong> V\u00fdrobn\u00ed p\u0159\u00edkazy, jejich operace, z\u00e1soby a n\u00e1kupn\u00ed objedn\u00e1vky synchronizujte pravideln\u00fdm dotazov\u00e1n\u00edm. Event Hub p\u0159idejte, a\u017e bude p\u0159ipraven.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00ed ve SkyPlanner.<\/strong> Nastavte matici \u010das\u016f se\u0159\u00edzen\u00ed, n\u00e1stroje, obsluhu pro jednotliv\u00e9 operace a alternativn\u00ed pracovi\u0161t\u011b.<\/li>\n\n\n<li><strong>Zp\u011btn\u00fd z\u00e1pis a hl\u00e1\u0161en\u00ed z v\u00fdroby.<\/strong> Zapisujte term\u00edny operac\u00ed do M3 a pro hl\u00e1\u0161en\u00ed obsluhy pou\u017e\u00edvejte PMS070MI.<\/li>\n\n\n<li><strong>Soub\u011b\u017en\u00fd provoz a ostr\u00e9 spu\u0161t\u011bn\u00ed.<\/strong> Provozujte SkyPlanner soub\u011b\u017en\u011b se st\u00e1vaj\u00edc\u00edm pl\u00e1nem, opravte kmenov\u00e1 data a pot\u00e9 zapn\u011bte zp\u011btn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S \u010d\u00edm po\u010d\u00edtat p\u0159i integraci s Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Technologick\u00fd postup nem\u00e1 samostatn\u00fd objekt.<\/strong> Operace jsou sou\u010d\u00e1st\u00ed struktury v\u00fdrobku (PDS002) a v\u00fdrobn\u00edho p\u0159\u00edkazu. Samostatn\u00e9 API pro technologick\u00e9 postupy nehledejte.<\/li>\n\n\n<li><strong>Struktury bez operac\u00ed.<\/strong> Struktura v\u00fdrobku mus\u00ed obsahovat alespo\u0148 jednu operaci. Jinak M3 nevytvo\u0159\u00ed \u017e\u00e1dn\u00e9 kapacitn\u00ed zat\u00ed\u017een\u00ed a SkyPlanner neobdr\u017e\u00ed \u017e\u00e1dnou operaci.<\/li>\n\n\n<li><strong>Nastaven\u00ed omezen\u00e9 kapacity v M3 koliduje s extern\u00edm pl\u00e1nem.<\/strong> P\u0159\u00edznak PDS010 a nastaven\u00ed \u00fazk\u00fdch m\u00edst v CRS786 m\u011bn\u00ed vlastn\u00ed term\u00edny v M3. V M3 ponechte pracovi\u0161t\u011b s neomezenou kapacitou a dodr\u017eov\u00e1n\u00ed skute\u010dn\u00e9 kapacity sv\u011b\u0159te syst\u00e9mu SkyPlanner.<\/li>\n\n\n<li><strong>Specifikace API se li\u0161\u00ed podle tenanta.<\/strong> Odpov\u011bdi v1 a v2 se li\u0161\u00ed a n\u00e1zvy transakc\u00ed z\u00e1visej\u00ed na va\u0161em katalogu a roz\u0161\u00ed\u0159en\u00edch XtendM3. Pou\u017e\u00edvejte v2 s v\u00fdslovn\u011b uveden\u00fdmi parametry spole\u010dnosti a divize.<\/li>\n\n\n<li><strong>Automatick\u00e9 zas\u00edl\u00e1n\u00ed zm\u011bn nen\u00ed ve v\u00fdchoz\u00edm stavu zapnut\u00e9.<\/strong> Event Hub vy\u017eaduje odb\u011bratele a BOD je nutn\u00e9 povolit pro ka\u017edou \u00fa\u010detn\u00ed jednotku. Dohodn\u011bte se, kdo nastav\u00ed ION a IEC, nebo za\u010dn\u011bte pravideln\u00fdm dotazov\u00e1n\u00edm.<\/li>\n\n\n<li><strong>Omezen\u00ed po\u017eadavk\u016f a str\u00e1nkov\u00e1n\u00ed.<\/strong> ION API omezuje po\u017eadavky podle pravidel tenanta a Compass vrac\u00ed na jednu str\u00e1nku nejv\u00fd\u0161e 100 000 \u0159\u00e1dk\u016f nebo 10 MB. Pravideln\u011b na\u010d\u00edtejte jen zm\u011bny, nikoli v\u0161echna data znovu.<\/li>\n\n\n<li><strong>M3 nen\u00ed CloudSuite Industrial.<\/strong> CSI pou\u017e\u00edv\u00e1 IDO API, zat\u00edmco M3 pou\u017e\u00edv\u00e1 programy MI. V ka\u017ed\u00e9 specifikaci uv\u00e1d\u011bjte konkr\u00e9tn\u00ed objekty M3.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdo nastavuje integraci s Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00fdm SkyPlanner nastav\u00ed integraci b\u011bhem zav\u00e1d\u011bn\u00ed a po ostr\u00e9m spu\u0161t\u011bn\u00ed zaji\u0161\u0165uje podporu.<\/strong> Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 M3 jinak a pr\u00e1v\u011b p\u0159i nastaven\u00ed se tyto zku\u0161enosti uplatn\u00ed.<\/li>\n\n\n<li><strong>V\u00e1\u0161 partner pro Infor M3 m\u016f\u017ee integraci vytvo\u0159it nebo se na n\u00ed pod\u00edlet.<\/strong> Zn\u00e1 va\u0161eho tenanta, roz\u0161\u00ed\u0159en\u00ed XtendM3 i nastaven\u00ed ION. SkyPlanner poskytuje REST API, dokumentaci Swagger\/OpenAPI a webhooky.<\/li>\n\n\n<li><strong>Integraci mohou vytvo\u0159it i va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i<\/strong> pomoc\u00ed stejn\u00e9ho REST API a tokenu API. Pro za\u010d\u00e1tek sta\u010d\u00ed token API a t\u00fdm SkyPlanner podle pot\u0159eby pom\u016f\u017ee. Intern\u00ed IT t\u00fdm spole\u010dnosti Laboratory &amp; Allied vytvo\u0159il integraci se sv\u00fdm ERP p\u0159ev\u00e1\u017en\u011b vlastn\u00edmi silami, s pomoc\u00ed t\u00fdmu SkyPlanner.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner stoj\u00ed od 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed. Cenu integrace podle va\u0161ich proces\u016f a pot\u0159eb dostanete p\u0159edem spolu s cenou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>, mo\u017enosti vlastn\u00edho pl\u00e1nov\u00e1n\u00ed M3 v \u010dl\u00e1nku <a href=\"\/cs\/integrace\/erp\/infor-m3\/planovani-vyroby\/\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby v Infor M3 s ohledem na skute\u010dnou kapacitu stroj\u016f a obsluhy<\/a>, p\u0159ehled na <a href=\"\/cs\/integrace\/erp\/infor-m3\/\">str\u00e1nce Infor M3<\/a> a dal\u0161\u00ed syst\u00e9my v <a href=\"\/cs\/integrace\/erp\/\">p\u0159ehledu integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, ve v\u00fdrobn\u011b rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme v pl\u00e1nov\u00e1n\u00ed v\u00fdroby p\u0159e\u0161li od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pracovn\u00ed doby a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v ochrann\u00fdch od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Sv\u00e1\u0159e\u010d spole\u010dnosti KJH-Comp brous\u00ed sva\u0159enou ocelovou konstrukci v z\u00e1vod\u011b Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>v\u010dasnost dod\u00e1vek, n\u00e1r\u016fst z p\u0159ibli\u017en\u011b 50 %<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner hraje rozhoduj\u00edc\u00ed roli v tom, \u017ee dok\u00e1\u017eeme udr\u017eovat v\u010dasnost dod\u00e1vek.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd \u0159editel<\/b><br>KJH-Comp \u00b7 Zpracov\u00e1n\u00ed plechu a zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % a rozvrhov\u00e1n\u00ed nyn\u00ed zaji\u0161\u0165uje jeden mistr m\u00edsto dvou.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010d\u00edst hodnocen\u00ed KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>v\u010dasnost dod\u00e1vek od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u00e1ch a d\u00edky n\u011bmu je pl\u00e1nov\u00e1n\u00ed p\u0159edv\u00eddateln\u00e9.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek dosahuje 100 % po celou dobu pou\u017e\u00edv\u00e1n\u00ed syst\u00e9mu SkyPlanner, tedy od roku 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kter\u00e9 API Infor M3 pou\u017e\u00edv\u00e1 SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">M3 API na ION API Gateway, p\u0159es kter\u00e9 vol\u00e1 programy MI, nap\u0159\u00edklad PMS100MI a PMS070MI, pomoc\u00ed REST s OAuth 2.0. Hromadn\u00e9 na\u010d\u00edt\u00e1n\u00ed zaji\u0161\u0165uje Compass v Infor Data Fabric a zm\u011bny se zas\u00edlaj\u00ed p\u0159es Event Hub nebo ION BODs.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdo vytv\u00e1\u0159\u00ed integraci s Infor M3?<\/summary>\n<p class=\"sp-faq__a\">T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nastav\u00ed obousm\u011brnou integraci podle va\u0161\u00ed konfigurace M3 a po ostr\u00e9m spu\u0161t\u011bn\u00ed zaji\u0161\u0165uje podporu. Integraci m\u016f\u017ee vytvo\u0159it i v\u00e1\u0161 partner pro M3 nebo va\u0161i vlastn\u00ed v\u00fdvoj\u00e1\u0159i pomoc\u00ed zdokumentovan\u00e9ho REST API syst\u00e9mu SkyPlanner. Pro za\u010d\u00e1tek sta\u010d\u00ed token API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kter\u00e9 API M3 slou\u017e\u00ed ke zp\u011btn\u00e9mu hl\u00e1\u0161en\u00ed operac\u00ed z v\u00fdrobn\u00edho provozu?<\/summary>\n<p class=\"sp-faq__a\">PMS070MI s transakc\u00ed Report operation pro \u010das se\u0159\u00edzen\u00ed, \u010das chodu a mno\u017estv\u00ed a transakc\u00ed Confirm and Close operation pro dokon\u010den\u00ed operace. SkyPlanner p\u0159es toto API odes\u00edl\u00e1 hl\u00e1\u0161en\u00ed obsluhy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje integrace i s M3 provozovan\u00fdm na vlastn\u00edch serverech?<\/summary>\n<p class=\"sp-faq__a\">Ano. M3 provozovan\u00e9 na vlastn\u00edch serverech zp\u0159\u00edstup\u0148uje stejn\u00e9 M3 API. Bez ION API Gateway se SkyPlanner p\u0159ipoj\u00ed p\u0159es v\u00e1\u0161 lok\u00e1ln\u00ed endpoint ION nebo Grid, p\u0159\u00edpadn\u011b p\u0159es middleware. Zp\u016fsob p\u0159ipojen\u00ed stanov\u00edte p\u0159i \u00favodn\u00ed anal\u00fdze se spr\u00e1vcem M3.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner pro M3 doporu\u010dit M3 Scheduling Workbench, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, pokud z\u00e1kazn\u00edk m\u00edsto hrub\u00e9ho pl\u00e1nu po\u017eaduje skute\u010dn\u00fd pl\u00e1n respektuj\u00edc\u00ed kapacitu stroj\u016f a obsluhy. Infor toti\u017e p\u0159i ostr\u00e9m spu\u0161t\u011bn\u00ed SWB doporu\u010duje za\u010d\u00edt se v\u0161emi v\u00fdrobn\u00edmi zdroji s neomezenou kapacitou a omezit kapacitu pouze u kritick\u00e9ho \u00fazk\u00e9ho m\u00edsta (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">dokumentace Infor<\/a>). Infor uv\u00e1d\u00ed SWB jako dopln\u011bk, kter\u00fd u\u017eivatel\u00e9 spou\u0161t\u011bj\u00ed z RDWeb nebo z nab\u00eddky Start. SkyPlanner se p\u0159ipojuje p\u0159es stejn\u00e9 M3 API, p\u0159i rozvrhov\u00e1n\u00ed respektuje kapacitu ka\u017ed\u00e9ho v\u00fdrobn\u00edho zdroje, automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 a obsluze poskytuje Mobile Confirmations, a to od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner otestovat je\u0161t\u011b p\u0159ed vytvo\u0159en\u00edm integrace?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00edho bezplatn\u00e9ho zku\u0161ebn\u00edho obdob\u00ed m\u016f\u017eete pou\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165 a importovat data z M3 ve form\u00e1tu CSV nebo Excel. Platebn\u00ed karta nen\u00ed pot\u0159eba. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte SkyPlanner<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a> a vymezte rozsah integrace.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Infor M3 Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Infor M3 se SkyPlanner APS. Integrace SkyPlanner s Infor M3 je obousm\u011brn\u00e1: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161emu nastaven\u00ed M3 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu &#8230; <a title=\"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/\" aria-label=\"Read more about Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102932,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103707","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pr\u016fvodce integrac\u00ed Infor M3 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/pruvodce-integraci\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/pruvodce-integraci\\\/\",\"name\":\"Pr\u016fvodce integrac\u00ed Infor M3 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/pruvodce-integraci\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/pruvodce-integraci\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/pruvodce-integraci\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Infor M3: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pr\u016fvodce integrac\u00ed Infor M3 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","description":"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/","og_locale":"cs_CZ","og_type":"article","og_title":"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS","og_description":"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"15 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/","name":"Pr\u016fvodce integrac\u00ed Infor M3 s APS pro rozvrhov\u00e1n\u00ed v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Propojte Infor M3 se SkyPlanner APS: M3 API p\u0159es ION API Gateway, OAuth 2.0, PMS100MI, PMS070MI, Compass, BODs, mapov\u00e1n\u00ed dat a rady pro projekt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/pruvodce-integraci\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Infor M3: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Infor M3 Pr\u016fvodce integrac\u00ed Infor M3 pro rozvrhov\u00e1n\u00ed v\u00fdroby se SkyPlanner APS Tento pr\u016fvodce ukazuje partner\u016fm a IT t\u00fdm\u016fm, jak propojit Infor M3 se SkyPlanner APS. Integrace SkyPlanner s Infor M3 je obousm\u011brn\u00e1: skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161emu nastaven\u00ed M3 a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=103707"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/103707\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/102932"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=103707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}