{"id":102787,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrace\/erp\/acumatica\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"acumatica","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/","title":{"rendered":"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pro Acumatica: <span class=\"hl\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS je dopln\u011bk pro Acumatica Manufacturing Edition, kter\u00fd pl\u00e1nuje v\u00fdrobu podle skute\u010dn\u00fdch kapacit. V cel\u00e9m pl\u00e1novac\u00edm horizontu zohled\u0148uje v ka\u017ed\u00e9m okam\u017eiku omezenou dostupnost ka\u017ed\u00e9ho pracovi\u0161t\u011b, stroje, oper\u00e1tora, n\u00e1stroje i materi\u00e1lu. Vlastn\u00ed APS syst\u00e9mu Acumatica slou\u017e\u00ed k hrub\u00e9mu pl\u00e1nov\u00e1n\u00ed. Pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami se v n\u011bm spou\u0161t\u00ed p\u0159es formul\u00e1\u0159 Rough Cut Planning a Classic APS pl\u00e1nuje v\u0161echny zak\u00e1zky s dokon\u010den\u00edm za v\u00edce ne\u017e 120 dn\u00ed s neomezenou kapacitou (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">zdroj<\/a>). Se SkyPlanner vid\u00edte, kde a kdy bude ka\u017ed\u00e1 operace prob\u00edhat, a Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b pl\u00e1n automaticky p\u0159epo\u010d\u00edt\u00e1.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit prezentaci<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner je se syst\u00e9mem Acumatica propojen obousm\u011brn\u011b: p\u0159eb\u00edr\u00e1 v\u00fdrobn\u00ed zak\u00e1zky, operace, pracovi\u0161t\u011b, stroje, n\u00e1stroje, skladov\u00e9 polo\u017eky a n\u00e1kupn\u00ed objedn\u00e1vky. Zp\u011bt p\u0159ed\u00e1v\u00e1 pl\u00e1novan\u00e9 term\u00edny operac\u00ed a z\u00e1znamy odveden\u00e9 pr\u00e1ce. T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace syst\u00e9mu Acumatica.<\/p>\n\n\n<p>Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Ka\u017ed\u00e9 dal\u0161\u00ed pracovi\u0161t\u011b stoj\u00ed 20 \u20ac m\u011bs\u00ed\u010dn\u011b. Bezplatn\u00e1 zku\u0161ebn\u00ed verze je na 30 dn\u00ed, umo\u017e\u0148uje vyu\u017e\u00edt a\u017e 20 pracovi\u0161\u0165 a nevy\u017eaduje platebn\u00ed kartu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Co se zm\u011bn\u00ed ve va\u0161\u00ed v\u00fdrob\u011b<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u017d\u00e1dn\u00fd v\u00fdrobn\u00ed zdroj nem\u00e1 neomezenou kapacitu. Nikdy.<\/p>\n\n\n<p class=\"fx-pain__b\">Pracovi\u0161t\u011b, stroje, lid\u00e9 i n\u00e1stroje maj\u00ed vlastn\u00ed re\u00e1ln\u00fd rozvrh, kter\u00fd zohled\u0148uje sm\u011bny, absence a p\u0159es\u010dasy. Operaci, kter\u00e1 vy\u017eaduje t\u0159i oper\u00e1tory, syst\u00e9m p\u0159id\u011bl\u00ed t\u0159i lidi s volnou kapacitou na sm\u011bn\u011b. Formu pou\u017e\u00edvanou na jednom stroji nikdy nezarezervuje pro jin\u00fd.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ni\u017e\u0161\u00ed n\u00e1klady na p\u0159ese\u0159\u00edzen\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zn\u00e1 \u010das p\u0159echodu mezi ka\u017edou dvojic\u00ed v\u00fdrobk\u016f, a to v obou sm\u011brech. V potravin\u00e1\u0159stv\u00ed jej m\u016f\u017ee ur\u010dovat alergen: p\u0159echod z v\u00fdrobku bez alergenu na v\u00fdrobek s alergenem nevy\u017eaduje \u010di\u0161t\u011bn\u00ed, opa\u010dn\u00fd sm\u011br vy\u017eaduje \u00fapln\u00e9 vy\u010di\u0161t\u011bn\u00ed. Pl\u00e1novac\u00ed algoritmus \u0159ad\u00ed operace tak, aby se ztratilo co nejm\u00e9n\u011b \u010dasu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Dodac\u00ed term\u00edny, kter\u00e9 m\u016f\u017eete sl\u00edbit.<\/p>\n\n\n<p class=\"fx-pain__b\">Pl\u00e1n ukazuje m\u011bs\u00edce dop\u0159edu, kdy bude ka\u017ed\u00e1 v\u00fdrobn\u00ed zak\u00e1zka skute\u010dn\u011b dokon\u010dena. Z\u00e1kazn\u00edk\u016fm tak nab\u00edz\u00edte term\u00edny podle pl\u00e1nu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed p\u0159i urgentn\u00edch zak\u00e1zk\u00e1ch a poruch\u00e1ch.<\/p>\n\n\n<p class=\"fx-pain__b\">Kdy\u017e se zastav\u00ed stroj nebo p\u0159ijde urgentn\u00ed zak\u00e1zka, Autopilot v\u00fdrobu p\u0159epl\u00e1nuje. P\u0159itom dodr\u017e\u00ed v\u00e1mi nastaven\u00e9 z\u00e1mky a priority.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Za\u010d\u00e1tek podle dostupnosti materi\u00e1lu, ne prostoje kv\u016fli jeho nedostatku.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner kontroluje skladov\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00edch objedn\u00e1vek. Operaci, kter\u00e1 \u010dek\u00e1 na dod\u00e1vku od dodavatele, napl\u00e1nuje a\u017e po term\u00ednu jej\u00edho dod\u00e1n\u00ed.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Obsluha vid\u00ed po\u0159ad\u00ed sv\u00fdch operac\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">Ka\u017ed\u00fd oper\u00e1tor vid\u00ed na telefonu nebo tabletu n\u00e1sleduj\u00edc\u00ed operace a pr\u016fb\u011b\u017en\u011b zaznamen\u00e1v\u00e1 odvedenou pr\u00e1ci. V kancel\u00e1\u0159i vid\u00ed postup v\u00fdroby v re\u00e1ln\u00e9m \u010dase a z\u00e1znamy odveden\u00e9 pr\u00e1ce se p\u0159en\u00e1\u0161ej\u00ed zp\u011bt do syst\u00e9mu Acumatica.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce v UTU, v provozu na v\u00fdrobu rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme p\u0159e\u0161li od pl\u00e1nov\u00e1n\u00ed v\u00fdroby v excelov\u00fdch tabulk\u00e1ch k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby u\u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivity v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchod volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner d\u00e1v\u00e1 ve\u0161ker\u00e9mu pl\u00e1nov\u00e1n\u00ed v\u00fdroby pevn\u00fd a spolehliv\u00fd z\u00e1klad.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu pl\u00e1nu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, nyn\u00ed dost\u00e1vaj\u00ed odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>v\u010dasnost dod\u00e1vek od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1v\u00e1 p\u0159ehled o kapacit\u00e1ch a umo\u017e\u0148uje p\u0159edv\u00eddateln\u00e9 pl\u00e1nov\u00e1n\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1\u0159sk\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Po celou dobu pou\u017e\u00edv\u00e1n\u00ed SkyPlanner, tedy od roku 2021, dosahuje v\u010dasnost dod\u00e1vek 100 %.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/opes-corporation\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-acumatica-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak funguje integrace se syst\u00e9mem Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Acumatica p\u0159ed\u00e1v\u00e1 pr\u00e1ci k napl\u00e1nov\u00e1n\u00ed.<\/strong> Do SkyPlanner se p\u0159en\u00e1\u0161ej\u00ed v\u00fdrobn\u00ed zak\u00e1zky s operacemi, pracovi\u0161t\u011b, stroje, n\u00e1stroje, sm\u011bny, skladov\u00e9 polo\u017eky a n\u00e1kupn\u00ed objedn\u00e1vky.<\/li>\n\n\n<li><strong>SkyPlanner sestav\u00ed pl\u00e1n a udr\u017euje jej aktu\u00e1ln\u00ed.<\/strong> Pl\u00e1novac\u00ed j\u00e1dro Arcturus napl\u00e1nuje ka\u017edou operaci b\u011bhem n\u011bkolika sekund a p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b pl\u00e1n p\u0159epo\u010d\u00edt\u00e1.<\/li>\n\n\n<li><strong>Term\u00edny a z\u00e1znamy odveden\u00e9 pr\u00e1ce se p\u0159en\u00e1\u0161ej\u00ed zp\u011bt.<\/strong> Pl\u00e1novan\u00e9 term\u00edny zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed k operac\u00edm v\u00fdrobn\u00ed zak\u00e1zky v syst\u00e9mu Acumatica. Zak\u00e1zka se zafixuje, aby v n\u00ed Acumatica tyto term\u00edny zachovala. Ze zaznamenan\u00e9 pr\u00e1ce vznikaj\u00ed z\u00e1znamy pr\u00e1ce a meziopera\u010dn\u00edch p\u0159esun\u016f.<\/li>\n\n<\/ol>\n\n\n<p>Acumatica z\u016fst\u00e1v\u00e1 va\u0161\u00edm hlavn\u00edm eviden\u010dn\u00edm syst\u00e9mem. Skladov\u00e9 polo\u017eky, kusovn\u00edky, MRP, n\u00e1kup i kalkulace n\u00e1klad\u016f z\u016fst\u00e1vaj\u00ed tam, kde jsou. SkyPlanner m\u00e1 na starosti jedin\u00e9: po\u0159ad\u00ed a na\u010dasov\u00e1n\u00ed ka\u017ed\u00e9 operace na ka\u017ed\u00e9m v\u00fdrobn\u00edm zdroji.<\/p>\n\n\n<p>SkyPlanner se p\u0159ipojuje p\u0159es vlastn\u00ed rozhran\u00ed syst\u00e9mu Acumatica, contract-based REST API, pomoc\u00ed koncov\u00fdch bod\u016f Manufacturing a Default. Do va\u0161\u00ed instance syst\u00e9mu Acumatica se tedy nic neinstaluje. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 syst\u00e9m Acumatica jinak, a proto t\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161\u00ed konfiguraci a po spu\u0161t\u011bn\u00ed zaji\u0161\u0165uje jej\u00ed podporu. Cenovou nab\u00eddku integrace dostanete p\u0159edem podle sv\u00fdch proces\u016f a pot\u0159eb. V\u00e1\u0161 partner pro syst\u00e9m Acumatica nebo vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vytvo\u0159it propojen\u00ed pomoc\u00ed zdokumentovan\u00e9ho API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>).<\/p>\n\n\n<p>Entity, mapov\u00e1n\u00ed dat a pravidla zp\u011btn\u00e9ho z\u00e1pisu najdete v <a href=\"\/cs\/integrace\/erp\/acumatica\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed se syst\u00e9mem Acumatica pro rozvrhov\u00e1n\u00ed v\u00fdroby<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-acumatica-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Co rozvrhuje Acumatica a co p\u0159id\u00e1v\u00e1 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Advanced Planning and Scheduling (APS) v Acumatica Manufacturing Edition slou\u017e\u00ed k hrub\u00e9mu pl\u00e1nov\u00e1n\u00ed, nikoli k podrobn\u00e9mu rozvrhov\u00e1n\u00ed podle skute\u010dn\u00fdch kapacit. V Classic APS spou\u0161t\u00edte pro vybran\u00e9 zak\u00e1zky formul\u00e1\u0159 Rough Cut Planning (AM501000) (<a href=\"https:\/\/help.myob.com.au\/advanced\/Docs\/Published\/UserGuide\/MFG_APS_GeneralInfo.html\">zdroj<\/a>). Ve verzi 2026 R2 je APS k dispozici se dv\u011bma pl\u00e1novac\u00edmi j\u00e1dry a <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">Acumatica uv\u00e1d\u00ed<\/a>: &#8222;The two APS engines cannot be enabled at the same time.&#8220; (Ob\u011b pl\u00e1novac\u00ed j\u00e1dra APS nelze aktivovat sou\u010dasn\u011b.) Vlastn\u00ed dokumentace syst\u00e9mu Acumatica popisuje tato omezen\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Classic APS zohled\u0148uje omezen\u00e9 kapacity pouze po dobu 120 dn\u00ed.<\/strong> &#8222;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8220; (U v\u00fdrobn\u00edch zak\u00e1zek s term\u00ednem dokon\u010den\u00ed za uvedenou hranic\u00ed pou\u017e\u00edv\u00e1 syst\u00e9m APS pl\u00e1nov\u00e1n\u00ed s neomezenou kapacitou.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Classic APS rezervuje pevn\u00e9 \u010dasov\u00e9 bloky.<\/strong> &#8222;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8220; (Operace se v\u017edy pl\u00e1nuj\u00ed do souvisl\u00fdch blok\u016f, p\u0159i\u010dem\u017e se p\u0159eskakuje nepracovn\u00ed doba a p\u0159est\u00e1vky v rozvrhu.)<\/li>\n\n\n<li><strong>Nov\u00e9 j\u00e1dro Optimized vynech\u00e1v\u00e1 stroje a n\u00e1stroje.<\/strong> &#8222;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8220; (Optimized APS rozvrhuje pracovi\u0161t\u011b, nikoli jednotliv\u00e9 stroje \u010di n\u00e1stroje, a nezohled\u0148uje dostupnost materi\u00e1lu.) Je za\u0159azeno do kategorie Experimental Features. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Po\u0159ad\u00ed operac\u00ed se neur\u010duje podle vlastnost\u00ed v\u00fdrobk\u016f.<\/strong> &#8222;The engine does not use attribute values to determine the scheduling sequence of operations.&#8220; (Pl\u00e1novac\u00ed j\u00e1dro nepou\u017e\u00edv\u00e1 hodnoty atribut\u016f k ur\u010den\u00ed po\u0159ad\u00ed operac\u00ed v pl\u00e1nu.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">zdroj<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>V ka\u017edodenn\u00ed v\u00fdrob\u011b syst\u00e9m pracuje s po\u010dtem pracovn\u00edk\u016f a efektivitou sm\u011bny na pracovi\u0161ti, nikoli s konkr\u00e9tn\u00edmi lidmi. \u010cas se\u0159\u00edzen\u00ed je pro ka\u017edou operaci pevn\u011b dan\u00fd bez ohledu na to, co se vyr\u00e1b\u011blo p\u0159ed n\u00ed. P\u0159epl\u00e1nov\u00e1n\u00ed mus\u00edte sami spustit p\u0159es Rough Cut Planning nebo APS Maintenance Process. V\u00fdsledkem je hrub\u00fd pl\u00e1n: po\u010dty pracovn\u00edk\u016f m\u00edsto konkr\u00e9tn\u00edch lid\u00ed, jeden pevn\u00fd \u010das se\u0159\u00edzen\u00ed na operaci a omezen\u00e9 kapacity jen na 120 dn\u00ed.<\/p>\n\n\n<p>Kontrola materi\u00e1lu v Classic APS funguje zp\u016fsobem v\u0161e, nebo nic. Pokud je zapnut\u00e1, mus\u00ed b\u00fdt p\u0159ed napl\u00e1nov\u00e1n\u00edm zak\u00e1zky k dispozici pln\u00e9 mno\u017estv\u00ed ka\u017ed\u00e9ho materi\u00e1lu. Zak\u00e1zky se do pl\u00e1nu za\u0159azuj\u00ed jedna po druh\u00e9 v pevn\u00e9m po\u0159ad\u00ed: nejprve podle priority zad\u00e1n\u00ed do v\u00fdroby, pak podle omezuj\u00edc\u00edho data a nakonec podle \u010d\u00edsla v\u00fdrobn\u00ed zak\u00e1zky. Chce-li pl\u00e1nova\u010d jin\u00e9 po\u0159ad\u00ed, mus\u00ed zm\u011bnit priority a proces spustit znovu.<\/p>\n\n\n<p>V\u0161echny kroky a omezen\u00ed vysv\u011btluje \u010dl\u00e1nek <a href=\"\/cs\/integrace\/erp\/acumatica\/planovani-vyroby\/\">Um\u00ed Acumatica pl\u00e1novat v\u00fdrobu podle skute\u010dn\u00fdch kapacit?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"acumatica-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Acumatica dnes a se SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Acumatica APS<\/th><th>Acumatica se SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Horizont pl\u00e1nov\u00e1n\u00ed s omezen\u00fdmi kapacitami<\/td><td>Hrub\u00e9 pl\u00e1nov\u00e1n\u00ed: Classic zohled\u0148uje omezen\u00e9 kapacity jen u zak\u00e1zek s dokon\u010den\u00edm do 120 dn\u00ed, d\u00e1le po\u010d\u00edt\u00e1 s neomezenou kapacitou<\/td><td>Omezen\u00e1 dostupnost ka\u017ed\u00e9ho stroje, \u010dlov\u011bka, n\u00e1stroje i materi\u00e1lu v ka\u017ed\u00e9m okam\u017eiku a v cel\u00e9m pl\u00e1novac\u00edm horizontu<\/td><\/tr><tr><td>V\u00fdrobn\u00ed zdroje<\/td><td>Classic: pracovi\u0161t\u011b, stroje, n\u00e1stroje; Optimized: pouze pracovi\u0161t\u011b<\/td><td>Pracovi\u0161t\u011b, stroje, lid\u00e9 a n\u00e1stroje, v\u0161e s omezenou kapacitou<\/td><\/tr><tr><td>Pracovn\u00ed s\u00edla<\/td><td>Po\u010det pracovn\u00edk\u016f a efektivita na sm\u011bn\u011b<\/td><td>Konkr\u00e9tn\u00ed oper\u00e1to\u0159i se sm\u011bnami, absencemi a p\u0159es\u010dasy<\/td><\/tr><tr><td>\u0158azen\u00ed operac\u00ed<\/td><td>Nejprve priorita zapl\u00e1nov\u00e1n\u00ed, pak datum omezen\u00ed a nakonec \u010d\u00edslo zak\u00e1zky<\/td><td>Algoritmus \u0159ad\u00ed operace podle priorit, term\u00edn\u016f a se\u0159izov\u00e1n\u00ed<\/td><\/tr><tr><td>P\u0159estavby<\/td><td>Pevn\u00fd \u010das se\u0159\u00edzen\u00ed pro ka\u017edou operaci<\/td><td>Matice \u010das\u016f p\u0159estavby: nejkrat\u0161\u00ed celkov\u00fd \u010das se\u0159\u00edzen\u00ed<\/td><\/tr><tr><td>Materi\u00e1l<\/td><td>Classic: bu\u010f je ve\u0161ker\u00fd materi\u00e1l k dispozici v pln\u00e9m mno\u017estv\u00ed, nebo zak\u00e1zka \u010dek\u00e1<\/td><td>Skladov\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00edch objedn\u00e1vek podle term\u00ednu dod\u00e1n\u00ed<\/td><\/tr><tr><td>Zm\u011bny<\/td><td>Spu\u0161t\u011bn\u00ed Rough Cut Planning nebo APS Maintenance Process<\/td><td>Autopilot p\u0159epl\u00e1nuje cel\u00fd z\u00e1vod podle va\u0161ich priorit<\/td><\/tr><tr><td>Pohled pl\u00e1nova\u010de<\/td><td>Production Schedule Board: zm\u011bny term\u00edn\u016f a priorit<\/td><td>Interaktivn\u00ed Gantt\u016fv diagram: p\u0159esouv\u00e1te operace, pl\u00e1n z\u016fst\u00e1v\u00e1 konzistentn\u00ed<\/td><\/tr><tr><td>V\u00fdrobn\u00ed provoz<\/td><td>Zad\u00e1v\u00e1n\u00ed p\u0159es Labor, Move a Materials v syst\u00e9mu Acumatica<\/td><td>Oper\u00e1to\u0159i vid\u00ed svou frontu operac\u00ed a vykazuj\u00ed pr\u00e1ci na telefonu nebo tabletu<\/td><\/tr><tr><td>Zah\u00e1jen\u00ed provozu<\/td><td>APS \u201esubject to licensing\u201c (podl\u00e9h\u00e1 licen\u010dn\u00edm podm\u00ednk\u00e1m); Optimized je experiment\u00e1ln\u00ed<\/td><td>Vlastn\u00ed zak\u00e1zky rozvr\u017een\u00e9 b\u011bhem 30denn\u00ed zku\u0161ebn\u00ed doby, ostr\u00fd provoz b\u011bhem n\u011bkolika t\u00fddn\u016f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-acumatica\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak vybrat n\u00e1stroj pro rozvrhov\u00e1n\u00ed v\u00fdroby pro syst\u00e9m Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acumatica APS slou\u017e\u00ed k hrub\u00e9mu pl\u00e1nov\u00e1n\u00ed: spou\u0161t\u00ed se p\u0159es Rough Cut Planning, respektuje omezenou kapacitu po dobu 120 dn\u016f, pracovn\u00ed s\u00edlu vyjad\u0159uje po\u010dtem \u010dlen\u016f t\u00fdmu a pro ka\u017edou operaci pou\u017e\u00edv\u00e1 jeden \u010das se\u0159\u00edzen\u00ed. Zda jej v\u016fbec m\u016f\u017eete pou\u017e\u00edvat, z\u00e1vis\u00ed na va\u0161\u00ed licenci. Acumatica uv\u00e1d\u00ed, \u017ee \u201eAdvanced planning and scheduling is subject to licensing\u201c (pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed a rozvrhov\u00e1n\u00ed podl\u00e9h\u00e1 licen\u010dn\u00edm podm\u00ednk\u00e1m) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">zdroj<\/a>). APS je sou\u010d\u00e1st\u00ed Manufacturing Edition a jeho nov\u00fd algoritmus Optimized je experiment\u00e1ln\u00ed funkc\u00ed verze 2026 R2. Po aktivaci zat\u011b\u017euje kapacity zak\u00e1zkami podle po\u010dtu \u010dlen\u016f t\u00fdmu v pevn\u00e9m po\u0159ad\u00ed priorit. Pl\u00e1nova\u010d jej po ka\u017ed\u00e9 zm\u011bn\u011b spou\u0161t\u00ed znovu. Z\u00e1vod, kter\u00fd p\u0159ech\u00e1z\u00ed z tabulek na pl\u00e1novac\u00ed syst\u00e9m, pot\u0159ebuje rozvrh, kter\u00fd se s\u00e1m aktualizuje a dostane se a\u017e k oper\u00e1tor\u016fm. V obou p\u0159\u00edpadech z\u016fst\u00e1vaj\u00ed data v Acumatica hlavn\u00edm zdrojem.<\/p>\n\n\n<p><strong>Dejte p\u0159ednost SkyPlanner p\u0159ed Acumatica APS, pokud:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Chcete pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00e9 kapacity, ne jen hrub\u00fd pl\u00e1n.<\/strong> U ka\u017ed\u00e9ho stroje, \u010dlov\u011bka, n\u00e1stroje i materi\u00e1lu se zohled\u0148uje omezen\u00e1 dostupnost v konkr\u00e9tn\u00edm \u010dase v cel\u00e9m pl\u00e1novac\u00edm horizontu, v\u010detn\u011b zak\u00e1zek za hranic\u00ed 120 dn\u016f.<\/li>\n\n\n<li><strong>Pl\u00e1n omezuj\u00ed konkr\u00e9tn\u00ed oper\u00e1to\u0159i, ne po\u010det \u010dlen\u016f t\u00fdmu.<\/strong> Sm\u011bny, absence i operace vy\u017eaduj\u00edc\u00ed v\u00edce oper\u00e1tor\u016f se pl\u00e1nuj\u00ed pro jednotliv\u00e9 osoby.<\/li>\n\n\n<li><strong>P\u0159estavby rozhoduj\u00ed o objemu va\u0161\u00ed v\u00fdroby.<\/strong> Matice \u010das\u016f p\u0159estavby ur\u010duje po\u0159ad\u00ed podle alergen\u016f, barev nebo materi\u00e1l\u016f tak, aby byl celkov\u00fd \u010das se\u0159\u00edzen\u00ed co nejkrat\u0161\u00ed.<\/li>\n\n\n<li><strong>Stroje, n\u00e1stroje a materi\u00e1l je nutn\u00e9 kontrolovat spole\u010dn\u011b.<\/strong> V\u0161echna omezen\u00ed se pr\u016fb\u011b\u017en\u011b zohled\u0148uj\u00ed v jednom rozvrhu, ani\u017e byste museli vyb\u00edrat pl\u00e1novac\u00ed algoritmus.<\/li>\n\n\n<li><strong>Pl\u00e1n se m\u011bn\u00ed n\u011bkolikr\u00e1t t\u00fddn\u011b.<\/strong> Autopilot p\u0159i ka\u017ed\u00e9 zm\u011bn\u011b p\u0159epl\u00e1nuje v\u00fdrobu, Running Time Lock zafixuje operace na nejbli\u017e\u0161\u00ed hodiny a nov\u00e9 term\u00edny se ode\u0161lou zp\u011bt do Acumatica.<\/li>\n\n\n<li><strong>Oper\u00e1to\u0159i maj\u00ed pracovat podle vlastn\u00ed fronty operac\u00ed.<\/strong> Mobile Confirmations zp\u0159\u00edstupn\u00ed rozvrh na telefonu nebo tabletu a vyk\u00e1zan\u00e1 pr\u00e1ce se ode\u0161le zp\u011bt do Acumatica.<\/li>\n\n\n<li><strong>Chcete v\u00fdsledky b\u011bhem n\u011bkolika t\u00fddn\u016f.<\/strong> Va\u0161e vlastn\u00ed zak\u00e1zky rozvrhnete b\u011bhem 30denn\u00ed zku\u0161ebn\u00ed doby. T\u00fdm SkyPlanner nastav\u00ed integraci a zajist\u00ed jej\u00ed podporu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak za\u010d\u00edt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vyzkou\u0161ejte zdarma.<\/strong> 30 dn\u016f, a\u017e 20 pracovi\u0161\u0165, v\u0161echny funkce tarifu Basic, bez platebn\u00ed karty.<\/li>\n\n\n<li><strong>Vytvo\u0159te model sv\u00e9 v\u00fdroby.<\/strong> Zadejte do SkyPlanner pracovi\u0161t\u011b, stroje, pracovn\u00edky a sm\u011bny nebo je importujte. Se zaveden\u00edm v\u00e1m m\u016f\u017eeme pomoci.<\/li>\n\n\n<li><strong>Na\u010dt\u011bte sv\u00e9 zak\u00e1zky.<\/strong> Exportujte otev\u0159en\u00e9 v\u00fdrobn\u00ed zak\u00e1zky a jejich operace z Acumatica Generic Inquiry do Excelu, importujte je a porovnejte rozvrh ve SkyPlanner se sv\u00fdm sou\u010dasn\u00fdm pl\u00e1nem.<\/li>\n\n\n<li><strong>Propojte Acumatica.<\/strong> T\u00fdm SkyPlanner nastav\u00ed obousm\u011brnou integraci a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zajist\u00ed jej\u00ed podporu.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cena.<\/strong> Plat\u00edte m\u011bs\u00ed\u010dn\u011b. Pracovi\u0161t\u011b m\u016f\u017eete kdykoli p\u0159id\u00e1vat \u010di odeb\u00edrat a p\u0159edplatn\u00e9 kdykoli zru\u0161it. Podrobnosti najdete v <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edku<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Kontaktovat obchodn\u00ed t\u00fdm<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd je nejlep\u0161\u00ed dopln\u011bk pro rozvrhov\u00e1n\u00ed v\u00fdroby k Acumatica?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS je dopln\u011bk pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00e9 kapacity s obousm\u011brnou integrac\u00ed s Acumatica. Na\u010d\u00edt\u00e1 v\u00fdrobn\u00ed zak\u00e1zky, operace, pracovi\u0161t\u011b, stroje, n\u00e1stroje, skladov\u00e9 polo\u017eky a n\u00e1kupn\u00ed objedn\u00e1vky. Zp\u011bt odes\u00edl\u00e1 pl\u00e1novan\u00e9 term\u00edny operac\u00ed a vyk\u00e1zanou pr\u00e1ci. Zohled\u0148uje omezenou kapacitu ka\u017ed\u00e9ho pracovi\u0161t\u011b, stroje i oper\u00e1tora a dostupnost ka\u017ed\u00e9ho n\u00e1stroje a materi\u00e1lu. Matice \u010das\u016f p\u0159estavby zohled\u0148uje sm\u011br p\u0159echodu a \u0159ad\u00ed operace tak, aby byl celkov\u00fd \u010das se\u0159\u00edzen\u00ed co nejkrat\u0161\u00ed. Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje rozvrh. Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a bezplatn\u00e1 zku\u0161ebn\u00ed doba trv\u00e1 30 dn\u016f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um\u00ed Acumatica pl\u00e1novat v\u00fdrobu podle skute\u010dn\u00e9 kapacity?<\/summary>\n<p class=\"sp-faq__a\">Pouze na \u00farovni hrub\u00e9ho pl\u00e1nov\u00e1n\u00ed. Advanced Planning and Scheduling v Manufacturing Edition funguje jako Rough Cut Planning. Classic APS pl\u00e1nuje zak\u00e1zky s dokon\u010den\u00edm za hranic\u00ed 120 dn\u016f s neomezenou kapacitou a experiment\u00e1ln\u00ed algoritmus Optimized rozvrhuje pouze pracovi\u0161t\u011b. SkyPlanner APS rozvrhuje v\u00fdrobu podle omezen\u00e9 kapacity ka\u017ed\u00e9ho stroje a \u010dlov\u011bka i dostupnosti ka\u017ed\u00e9ho n\u00e1stroje a materi\u00e1lu v cel\u00e9m pl\u00e1novac\u00edm horizontu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mus\u00edme do Acumatica n\u011bco instalovat?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner b\u011b\u017e\u00ed v cloudu soub\u011b\u017en\u011b se syst\u00e9mem Acumatica a p\u0159ipojuje se p\u0159es jeho standardn\u00ed REST API zalo\u017een\u00e9 na kontraktech. Integrace se p\u0159ihla\u0161uje prost\u0159ednictv\u00edm p\u0159ipojen\u00e9 aplikace, kterou zaregistrujete v syst\u00e9mu Acumatica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Nahrazuje SkyPlanner Acumatica Manufacturing Edition?<\/summary>\n<p class=\"sp-faq__a\">Ne, dopl\u0148uje ji. V Acumatica z\u016fst\u00e1vaj\u00ed skladov\u00e9 polo\u017eky, kusovn\u00edky, MRP, n\u00e1kup, z\u00e1soby, kalkulace n\u00e1klad\u016f a finance. SkyPlanner rozvrhuje va\u0161e v\u00fdrobn\u00ed zak\u00e1zky podle skute\u010dn\u00e9 kapacity a odes\u00edl\u00e1 term\u00edny zp\u011bt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1me pou\u017e\u00edvat Acumatica APS, nebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Zvolte SkyPlanner, pokud chcete rozvrh podle skute\u010dn\u00e9 kapacity nam\u00edsto hrub\u00e9ho pl\u00e1nu. Acumatica pl\u00e1nuje s omezenou kapacitou prost\u0159ednictv\u00edm Rough Cut Planning, zat\u00edmco Classic APS za hranic\u00ed 120 dn\u016f po\u010d\u00edt\u00e1 s neomezenou kapacitou. Pou\u017e\u00edv\u00e1n\u00ed APS podl\u00e9h\u00e1 licen\u010dn\u00edm podm\u00ednk\u00e1m. Pracovn\u00ed s\u00edlu modeluje jako po\u010det \u010dlen\u016f t\u00fdmu, pro ka\u017edou operaci pou\u017e\u00edv\u00e1 jeden pevn\u00fd \u010das se\u0159\u00edzen\u00ed a pl\u00e1n p\u0159epo\u010d\u00edt\u00e1, kdy\u017e pl\u00e1nova\u010d spust\u00ed Rough Cut Planning nebo APS Maintenance Process. SkyPlanner zohled\u0148uje omezenou kapacitu ka\u017ed\u00e9ho stroje a \u010dlov\u011bka i dostupnost ka\u017ed\u00e9ho n\u00e1stroje a materi\u00e1lu v konkr\u00e9tn\u00edm \u010dase v cel\u00e9m pl\u00e1novac\u00edm horizontu. Pomoc\u00ed matice \u010das\u016f p\u0159estavby \u0159ad\u00ed operace s ohledem na sm\u011br p\u0159echodu, automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 v\u00fdrobu funkc\u00ed Autopilot a zp\u0159\u00edstup\u0148uje oper\u00e1tor\u016fm jejich frontu operac\u00ed na telefonu nebo tabletu. Ostr\u00fd provoz spust\u00edte b\u011bhem n\u011bkolika t\u00fddn\u016f, od 199 \u20ac m\u011bs\u00ed\u010dn\u011b a s 30denn\u00ed zku\u0161ebn\u00ed dobou na vlastn\u00edch datech. Pokud APS z\u016fstane zapnut\u00e9, SkyPlanner zafixuje ka\u017edou zak\u00e1zku, kterou rozvrhne. Pl\u00e1nov\u00e1n\u00ed s omezenou kapacitou v Acumatica zafixovan\u00e9 zak\u00e1zky nep\u0159epl\u00e1nov\u00e1v\u00e1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kolik stoj\u00ed SkyPlanner pro z\u00e1vod pou\u017e\u00edvaj\u00edc\u00ed Acumatica?<\/summary>\n<p class=\"sp-faq__a\">Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b, p\u0159i\u010dem\u017e cena zahrnuje 5 pracovi\u0161\u0165. Ka\u017ed\u00e9 dal\u0161\u00ed pracovi\u0161t\u011b stoj\u00ed 20 \u20ac m\u011bs\u00ed\u010dn\u011b. Pracovi\u0161t\u011b je v\u00fdrobn\u00ed zdroj s vlastn\u00ed frontou napl\u00e1novan\u00fdch operac\u00ed. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak dlouho trv\u00e1 zaveden\u00ed?<\/summary>\n<p class=\"sp-faq__a\">Zaveden\u00ed obvykle dokon\u010d\u00edme b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed \u00favodn\u00edho nastaven\u00ed. T\u00fdm namapuje va\u0161e pracovi\u0161t\u011b, stroje a operace z kusovn\u00edk\u016f, propoj\u00ed v\u00fdrobn\u00ed zak\u00e1zky a n\u00e1kupn\u00ed objedn\u00e1vky a zajist\u00ed odes\u00edl\u00e1n\u00ed pl\u00e1novan\u00fdch term\u00edn\u016f zp\u011bt. P\u0159ed spu\u0161t\u011bn\u00edm ostr\u00e9ho provozu v\u0161e otestujeme porovn\u00e1n\u00edm s va\u0161\u00edm sou\u010dasn\u00fdm pl\u00e1nem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017eeme SkyPlanner vyzkou\u0161et je\u0161t\u011b p\u0159ed integrac\u00ed s Acumatica?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30denn\u00ed zku\u0161ebn\u00ed doby pracujete s exportem do Excelu z Acumatica Generic Inquiry. Je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm integra\u010dn\u00edch prac\u00ed uvid\u00edte <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pl\u00e1n vlastn\u00ed v\u00fdroby podle skute\u010dn\u00e9 kapacity<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS pro Acumatica: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit SkyPlanner APS je dopln\u011bk pro Acumatica Manufacturing Edition, kter\u00fd pl\u00e1nuje v\u00fdrobu podle skute\u010dn\u00fdch kapacit. V cel\u00e9m pl\u00e1novac\u00edm horizontu zohled\u0148uje v ka\u017ed\u00e9m okam\u017eiku omezenou dostupnost ka\u017ed\u00e9ho pracovi\u0161t\u011b, stroje, oper\u00e1tora, n\u00e1stroje i materi\u00e1lu. Vlastn\u00ed APS syst\u00e9mu Acumatica slou\u017e\u00ed k hrub\u00e9mu pl\u00e1nov\u00e1n\u00ed. &#8230; <a title=\"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/\" aria-label=\"Read more about SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100671,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102787","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica: integrace APS pro pl\u00e1nov\u00e1n\u00ed dle skute\u010dn\u00fdch kapacit<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/acumatica\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/acumatica\\\/\",\"name\":\"Acumatica: integrace APS pro pl\u00e1nov\u00e1n\u00ed dle skute\u010dn\u00fdch kapacit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/acumatica\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/acumatica\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/acumatica\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica: integrace APS pro pl\u00e1nov\u00e1n\u00ed dle skute\u010dn\u00fdch kapacit","description":"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/","og_locale":"cs_CZ","og_type":"article","og_title":"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit","og_description":"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"17 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/","name":"Acumatica: integrace APS pro pl\u00e1nov\u00e1n\u00ed dle skute\u010dn\u00fdch kapacit","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS pro Acumatica: pl\u00e1n dle kapacit v\u0161ech stroj\u016f, lid\u00ed, n\u00e1stroj\u016f i materi\u00e1lu. Dopln\u011bk s obousm\u011brnou integrac\u00ed. Od 199 \u20ac m\u011bs\u00ed\u010dn\u011b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/acumatica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Acumatica: pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS pro Acumatica: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit SkyPlanner APS je dopln\u011bk pro Acumatica Manufacturing Edition, kter\u00fd pl\u00e1nuje v\u00fdrobu podle skute\u010dn\u00fdch kapacit. V cel\u00e9m pl\u00e1novac\u00edm horizontu zohled\u0148uje v ka\u017ed\u00e9m okam\u017eiku omezenou dostupnost ka\u017ed\u00e9ho pracovi\u0161t\u011b, stroje, oper\u00e1tora, n\u00e1stroje i materi\u00e1lu. Vlastn\u00ed APS syst\u00e9mu Acumatica slou\u017e\u00ed k hrub\u00e9mu pl\u00e1nov\u00e1n\u00ed.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/102787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=102787"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/102787\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100671"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=102787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}