{"id":101356,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101356"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"planovani-vyroby","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/","title":{"rendered":"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? <span class=\"hl\">MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Standardn\u00ed rozvrhov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f v Sage X3 neumo\u017e\u0148uje pl\u00e1nov\u00e1n\u00ed v\u00fdroby, kter\u00e9 respektuje skute\u010dn\u00e9 kapacity stroj\u016f a pracovn\u00edk\u016f. Pr\u00e1v\u011b tuto mezeru vypl\u0148uje SkyPlanner APS. X3 pl\u00e1nuje materi\u00e1l pomoc\u00ed MRP a term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f stanovuje funkc\u00ed Scheduling (FUNMAUTJ). Britsk\u00fd t\u00fdm podpory Sage ji popisuje jako pl\u00e1nova\u010d s neomezenou kapacitou: pl\u00e1nuje &#8222;each work order independently&#8220; (ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz samostatn\u011b) a nerozkl\u00e1d\u00e1 p\u0159\u00edkazy v \u010dase podle vyt\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit prezentaci<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit zaji\u0161\u0165uje samostatn\u00e1 vrstva. Sage nab\u00edz\u00ed lok\u00e1ln\u011b provozovan\u00fd Production Scheduler nebo obecn\u00e9 rozhran\u00ed Finite scheduler (GFS) pro propojen\u00ed se Sage X3 Web Scheduling \u010di pl\u00e1nova\u010dem t\u0159et\u00ed strany. Z\u00e1vody, kter\u00e9 pot\u0159ebuj\u00ed <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pl\u00e1novat v\u00fdrobu<\/a> s ohledem na skute\u010dn\u00e9 kapacity ka\u017ed\u00e9ho stroje, pracovn\u00edka i n\u00e1stroje, pou\u017e\u00edvaj\u00ed vedle X3 SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak Sage X3 pl\u00e1nuje a rozvrhuje v\u00fdrobu krok za krokem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Kapacita se definuje na pracovi\u0161t\u00edch<\/h3>\n\n\n<p>Kapacita se nastavuje na pracovi\u0161ti (funkce <strong>GESMWS<\/strong>, tabulka WORKSTATIO). Pro rozvrhov\u00e1n\u00ed jsou d\u016fle\u017eit\u00e1 tato pole:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): t\u00fddenn\u00ed struktura, kter\u00e1 ur\u010duje rozvr\u017een\u00ed sm\u011bn.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): po\u010det v\u00fdrobn\u00edch zdroj\u016f, kter\u00e9 operace na pracovi\u0161ti pot\u0159ebuje. Sage uv\u00e1d\u00ed jako p\u0159\u00edklad pracovi\u0161t\u011b vy\u017eaduj\u00edc\u00ed t\u0159i pracovn\u00edky.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) a <strong>Shrinkage in %<\/strong> (SHR): slou\u017e\u00ed ke korekci \u010das\u016f technologick\u00e9ho postupu.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): stroj, pracovn\u00ed s\u00edla nebo kooperace.<\/li>\n\n\n<li>Za\u0161krt\u00e1vac\u00ed pol\u00ed\u010dko <strong>Constraint<\/strong> a karta Replacement s vlastn\u00edm polem <strong>Work center type<\/strong> (RPLWSTTYP) pro alternativn\u00ed pracovi\u0161t\u011b. Ka\u017ed\u00e9 z nich m\u00e1 p\u0159i\u0159azenou prioritu.<\/li>\n\n\n<li>Tabulka zm\u011bn kapacity pro do\u010dasn\u00e9 \u00fapravy sm\u011bn nebo odst\u00e1vky. Obsahuje datum za\u010d\u00e1tku a konce, d\u016fvod zm\u011bny, upravenou strukturu a upraven\u00fd po\u010det v\u00fdrobn\u00edch zdroj\u016f.<\/li>\n\n<\/ul>\n\n\n<p>Karta Load rozd\u011bluje vyt\u00ed\u017een\u00ed do kategori\u00ed Firm, Planned, MRP a MPS. Pl\u00e1nova\u010d tak vid\u00ed, co je ji\u017e z\u00e1vazn\u00e9 a co je zat\u00edm jen n\u00e1vrh.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP vytv\u00e1\u0159\u00ed n\u00e1vrhy<\/h3>\n\n\n<p>MRP (<strong>FUNMRP<\/strong>) bilancuje nab\u00eddku a popt\u00e1vku podle referen\u010dn\u00edho data a skladov\u00e9ho z\u00e1vodu. Na\u010d\u00edt\u00e1 prodejn\u00ed objedn\u00e1vky, materi\u00e1l pro v\u00fdrobn\u00ed p\u0159\u00edkazy, n\u00e1kupn\u00ed objedn\u00e1vky, v\u00fdrobn\u00ed p\u0159\u00edkazy, objedn\u00e1vky kooperac\u00ed a p\u0159evody. Z nich pak vytv\u00e1\u0159\u00ed n\u00e1vrhy v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a n\u00e1kupn\u00edch objedn\u00e1vek. V\u00fdstup \u0159\u00edd\u00ed pole Suggestion type, Reorder quantity a Splitting na z\u00e1znamu produktu pro dan\u00fd z\u00e1vod.<\/p>\n\n\n<p>Term\u00edny se odvozuj\u00ed z pr\u016fb\u011b\u017en\u00fdch dob. Datum dokon\u010den\u00ed navr\u017een\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu odpov\u00edd\u00e1 datu pot\u0159eby sn\u00ed\u017een\u00e9mu o dobu kontroly kvality. Datum zah\u00e1jen\u00ed se vypo\u010d\u00edt\u00e1 ode\u010dten\u00edm pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby od data dokon\u010den\u00ed. Pokud se doba pro produkt po\u010d\u00edt\u00e1 z technologick\u00e9ho postupu, ode\u010dte se m\u00edsto n\u00ed \u010das tohoto postupu. Jestli\u017ee takto vypo\u010dten\u00e9 zah\u00e1jen\u00ed p\u0159edch\u00e1z\u00ed datu zpracov\u00e1n\u00ed, X3 pou\u017eije datum zpracov\u00e1n\u00ed.<\/p>\n\n\n<p>Kapacit\u011b je v n\u00e1pov\u011bd\u011b MRP v\u011bnov\u00e1na jedin\u00e1 v\u011bta: &#8222;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8220; (P\u0159i odpov\u00eddaj\u00edc\u00edm nastaven\u00ed MRP se soub\u011b\u017en\u011b s v\u00fdpo\u010dtem MRP vytv\u00e1\u0159\u00ed vyt\u00ed\u017een\u00ed.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">N\u00e1pov\u011bda Sage X3, FUNMRP<\/a>) Vyt\u00ed\u017een\u00ed, nikoli kontrola kapacity.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Scheduling (FUNMAUTJ) ur\u010duje term\u00edny operac\u00ed<\/h3>\n\n\n<p>Scheduling rozvrhuje operace ka\u017ed\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu podle jeho technologick\u00e9ho postupu (<strong>GESROU<\/strong>). Postupuje dop\u0159edn\u011b nebo zp\u011btn\u011b podle po\u017eadovan\u00fdch term\u00edn\u016f na p\u0159\u00edkazu. Data zah\u00e1jen\u00ed a dokon\u010den\u00ed se zapisuj\u00ed k operac\u00edm v\u00fdrobn\u00edho p\u0159\u00edkazu (MFGOPE) a stav Scheduling v hlavi\u010dce (MFGHEAD) se zm\u011bn\u00ed na Scheduled.<\/p>\n\n\n<p>Britsk\u00fd t\u00fdm podpory Sage tuto logiku v p\u0159\u00edru\u010dce k rozvrhov\u00e1n\u00ed ve V12 popisuje v\u00fdslovn\u011b: &#8222;The function schedules each work order independently.&#8220; (Funkce rozvrhuje ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz samostatn\u011b.) A d\u00e1le: &#8222;It does not delay or stagger work orders based on overall resource load.&#8220; (Neodsouv\u00e1 ani \u010dasov\u011b nerozkl\u00e1d\u00e1 v\u00fdrobn\u00ed p\u0159\u00edkazy podle celkov\u00e9ho vyt\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) V\u0161ech deset p\u0159\u00edkaz\u016f pro jednu CNC bu\u0148ku tak dostane sv\u00e9 ide\u00e1ln\u00ed term\u00edny bez ohledu na to, co bu\u0148ka skute\u010dn\u011b zvl\u00e1dne.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loads uk\u00e1\u017ee p\u0159et\u00ed\u017een\u00ed, pl\u00e1nova\u010d ho vy\u0159e\u0161\u00ed<\/h3>\n\n\n<p><strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) porovn\u00e1v\u00e1 vyt\u00ed\u017een\u00ed s kapacitou jednotliv\u00fdch pracovi\u0161\u0165 v dan\u00e9m obdob\u00ed. Funkce <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) znovu sestav\u00ed \u00fadaje o vyt\u00ed\u017een\u00ed. \u010cerven\u00fd sloupec znamen\u00e1, \u017ee pracovi\u0161t\u011b je v dan\u00e9m obdob\u00ed p\u0159et\u00ed\u017een\u00e9. Pl\u00e1nova\u010d pak v <strong>Planning workbench<\/strong> p\u0159\u00edkazy p\u0159epl\u00e1nuje nebo zru\u0161\u00ed jejich rozvr\u017een\u00ed, p\u0159esune operace na voln\u00e9 pracovi\u0161t\u011b nebo p\u0159\u00edkazy ru\u010dn\u011b rozlo\u017e\u00ed v \u010dase.<\/p>\n\n\n<p>X3 probl\u00e9m uk\u00e1\u017ee. Vy\u0159e\u0161it ho mus\u00ed \u010dlov\u011bk.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje dopln\u011bk<\/h3>\n\n\n<p>Sage nab\u00edz\u00ed dv\u011b mo\u017enosti. Ob\u011b se zap\u00ednaj\u00ed pomoc\u00ed k\u00f3d\u016f aktivit:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (k\u00f3d aktivity POPS se za\u0161krtnutou volbou Active, funkce FUNPSSCH). Pl\u00e1novac\u00ed n\u00e1stroj, kter\u00fd zobrazuje rozvr\u017een\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f &#8222;in the form of a Gantt chart&#8220; (ve form\u011b Ganttova diagramu). Samostatn\u00fd k\u00f3d aktivity <strong>Finite Capacity<\/strong> zap\u00edn\u00e1 ve funkc\u00edch rozvrhov\u00e1n\u00ed v\u00fdroby re\u017eim pl\u00e1nov\u00e1n\u00ed podle skute\u010dn\u00fdch kapacit. V\u00fdrobn\u00ed p\u0159\u00edkazy se p\u0159ed\u00e1vaj\u00ed funkc\u00ed Submit for scheduling.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (k\u00f3d aktivity <strong>GFS<\/strong>). Obecn\u00e9 rozhran\u00ed vyvinut\u00e9 spole\u010dnost\u00ed Sage propojuje cloudov\u00e9 nebo lok\u00e1ln\u011b provozovan\u00e9 X3 s dopl\u0148kov\u00fdm pl\u00e1nova\u010dem <strong>Sage X3 Web Scheduling<\/strong> nebo s webov\u00fdm pl\u00e1nova\u010dem nez\u00e1visl\u00e9ho dodavatele softwaru. X3 jej ovl\u00e1d\u00e1 funkcemi Submit for scheduling, Resubmit for scheduling a Remove from scheduling (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>X3 tak\u00e9 pro ka\u017edou operaci vypo\u010d\u00edt\u00e1v\u00e1 datum <strong>Earliest start<\/strong> podle dostupnosti komponent (First Date of Material Availability, FDMA). Toto datum p\u0159ed\u00e1v\u00e1 do Production Scheduler nebo webov\u00e9ho pl\u00e1nova\u010de jako omezen\u00ed. Standardn\u00ed rozvrhov\u00e1n\u00ed ho v\u0161ak nepou\u017e\u00edv\u00e1. N\u00e1pov\u011bda k v\u00fdrobn\u00edm p\u0159\u00edkaz\u016fm uv\u00e1d\u00ed: &#8222;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8220; (Proces rozvrhov\u00e1n\u00ed v Sage X3 p\u0159i ur\u010dov\u00e1n\u00ed dat zah\u00e1jen\u00ed operac\u00ed nezohled\u0148uje dostupnost komponent.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde mo\u017enosti Sage X3 kon\u010d\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standardn\u00ed rozvrhov\u00e1n\u00ed nezohled\u0148uje omezen\u00ed kapacit.<\/strong> Podle p\u0159\u00edru\u010dky podpory Sage by \u0159e\u0161en\u00ed p\u0159et\u00ed\u017een\u00ed &#8222;would require finite capacity scheduling or manual adjustment&#8220; (vy\u017eadovalo pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit nebo ru\u010dn\u00ed \u00fapravu). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>\u00dadaje o vyt\u00ed\u017een\u00ed zastar\u00e1vaj\u00ed.<\/strong> Kdy\u017e p\u0159id\u00e1te sm\u011bnu nebo zm\u011bn\u00edte kalend\u00e1\u0159, &#8222;existing load buckets won&#8217;t automatically adjust&#8220; (st\u00e1vaj\u00edc\u00ed vyt\u00ed\u017een\u00ed v jednotliv\u00fdch obdob\u00edch se automaticky neuprav\u00ed), dokud nespust\u00edte Recalculate the loads. P\u0159ehled ve v\u00fdchoz\u00edm nastaven\u00ed zobrazuje pouze rozvr\u017een\u00e9 p\u0159\u00edkazy. N\u00e1vrhy MRP se zobraz\u00ed jen s k\u00f3dem dotazu ALL. (Stejn\u00fd zdroj.)<\/li>\n\n\n<li><strong>Production Scheduler je dostupn\u00fd jen pro lok\u00e1ln\u00ed instalace.<\/strong> &#8222;Production Scheduler is only available for on-premises instances of Sage X3.&#8220; (Production Scheduler je dostupn\u00fd pouze pro lok\u00e1ln\u011b provozovan\u00e9 instance Sage X3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">N\u00e1pov\u011bda Sage X3 V12, POPS<\/a>) Str\u00e1nka pro V11 jde je\u0161t\u011b d\u00e1l: &#8222;Production Scheduler is not available for new Sage X3 installations.&#8220; (Production Scheduler nen\u00ed dostupn\u00fd pro nov\u00e9 instalace Sage X3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">N\u00e1pov\u011bda Sage X3 V11<\/a>)<\/li>\n\n\n<li><strong>Production Scheduler m\u00e1 zdokumentovan\u00e1 omezen\u00ed.<\/strong> Sage uv\u00e1d\u00ed, \u017ee n\u00e1sleduj\u00edc\u00ed funkce nejsou v sou\u010dasnosti dostupn\u00e9 (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">N\u00e1pov\u011bda Sage X3, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; optimalizace se\u0159izovac\u00edch \u010das\u016f podle v\u00edce parametr\u016f polo\u017eky a matice se\u0159\u00edzen\u00ed &#8211; vazby mezi v\u00fdrobn\u00edmi zak\u00e1zkami &#8211; rozvrhov\u00e1n\u00ed v\u00edce v\u00fdrobn\u00edch zdroj\u016f pomoc\u00ed synchronizace soub\u011b\u017en\u00fdch operac\u00ed &#8211; seznamy vyu\u017eiteln\u00fdch v\u00fdrobn\u00edch zdroj\u016f s r\u016fzn\u00fdm v\u00fdrobn\u00edm v\u00fdkonem<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00fdrobn\u00ed p\u0159\u00edkazy jsou p\u0159i optimalizaci uzam\u010den\u00e9.<\/strong> P\u0159\u00edkaz odeslan\u00fd do Production Scheduler dostane stav <strong>Being optimized<\/strong> a plat\u00ed: &#8222;You cannot modify the work order at these statuses.&#8220; (V t\u011bchto stavech nelze v\u00fdrobn\u00ed p\u0159\u00edkaz upravovat.) Uzam\u010den\u00fd z\u016fstane, dokud nen\u00ed odebr\u00e1n z rozvrhov\u00e1n\u00ed. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">N\u00e1pov\u011bda Sage X3, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>Pokro\u010dil\u00e9 rozhran\u00ed GFS vy\u017eaduje jeden v\u00fdrobn\u00ed zdroj na operaci.<\/strong> N\u00e1pov\u011bda k poli No. of resources uv\u00e1d\u00ed: &#8222;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8220; (Pokud pou\u017e\u00edv\u00e1te pokro\u010dil\u00e9 rozhran\u00ed generic Finite scheduler, mus\u00edte toto pole nastavit na 1.) D\u016fvod je n\u00e1sleduj\u00edc\u00ed: &#8222;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8220; (Sage X3 Web Scheduling nedok\u00e1\u017ee optimalizovat v\u00fdrobn\u00ed \u010dasy, pokud je pracovi\u0161ti p\u0159i\u0159azeno v\u00edce v\u00fdrobn\u00edch zdroj\u016f.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">N\u00e1pov\u011bda Sage X3, GESMWS<\/a>) Po\u017eadavek na t\u0159\u00ed\u010dlennou obsluhu operace tak nelze pl\u00e1nova\u010di p\u0159edat.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy vlastn\u00ed pl\u00e1novac\u00ed funkce Sage X3 sta\u010d\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0158ada z\u00e1vod\u016f se Sage X3 nepot\u0159ebuje n\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tempo ur\u010duje materi\u00e1l, ne stroje.<\/strong> V z\u00e1vodech s v\u00fdrobou na sklad nebo s opakovanou v\u00fdrobou p\u0159edstavuje hlavn\u00ed riziko pozdn\u00ed n\u00e1kup. Spr\u00e1vn\u00e9 kusovn\u00edky, technologick\u00e9 postupy, pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby, velikosti d\u00e1vek a pojistn\u00e9 z\u00e1soby v MRP vy\u0159e\u0161\u00ed v\u011bt\u0161inu probl\u00e9mu.<\/li>\n\n\n<li><strong>Sta\u010d\u00ed p\u0159ehled o vyt\u00ed\u017een\u00ed.<\/strong> T\u00fddenn\u00ed kontrola v Loads a n\u011bkolik ru\u010dn\u00edch p\u0159esun\u016f v Planning workbench sta\u010d\u00ed k tomu, aby z\u00e1vod plnil term\u00edny.<\/li>\n\n\n<li><strong>U\u017e m\u00e1te Production Scheduler v lok\u00e1ln\u00ed instalaci.<\/strong> Pro \u0159azen\u00ed operac\u00ed v Ganttov\u011b diagramu bez matic se\u0159\u00edzen\u00ed, vazeb mezi zak\u00e1zkami nebo synchronizovan\u00fdch soub\u011b\u017en\u00fdch operac\u00ed posta\u010d\u00ed.<\/li>\n\n\n<li><strong>U\u017e pou\u017e\u00edv\u00e1te Web Scheduling<\/strong> s polem No. of resources nastaven\u00fdm na 1 a pl\u00e1n odpov\u00edd\u00e1 realit\u011b ve v\u00fdrobn\u00edm provozu.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u010cty\u0159i zp\u016fsoby rozvrhov\u00e1n\u00ed v\u00fdroby se Sage X3<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1novac\u00ed tabule v klientu X3:<\/strong> Planning workbench a Loads nebo tabule s ovl\u00e1d\u00e1n\u00edm p\u0159eta\u017een\u00edm p\u0159\u00edmo na obrazovk\u00e1ch X3. Hod\u00ed se tam, kde p\u0159ehled o vyt\u00ed\u017een\u00ed a ru\u010dn\u00ed p\u0159esuny sta\u010d\u00ed k dodr\u017eov\u00e1n\u00ed term\u00edn\u016f.<\/li>\n\n\n<li><strong>Vlastn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit od Sage:<\/strong> lok\u00e1ln\u011b provozovan\u00fd Production Scheduler nebo Sage X3 Web Scheduling p\u0159es rozhran\u00ed GFS s polem No. of resources nastaven\u00fdm na 1.<\/li>\n\n\n<li><strong>Rozs\u00e1hl\u00e9 syst\u00e9my APS:<\/strong> komplexn\u00ed pl\u00e1novac\u00ed syst\u00e9my zav\u00e1d\u011bn\u00e9 integr\u00e1torem v r\u00e1mci n\u011bkolikam\u011bs\u00ed\u010dn\u00edho projektu. Jsou ur\u010den\u00e9 pro z\u00e1vody s vlastn\u00edm pl\u00e1novac\u00edm odd\u011blen\u00edm.<\/li>\n\n\n<li><strong>Cloudov\u00e9 APS s \u0159\u00edzen\u00edm pr\u00e1ce ve v\u00fdrobn\u00edm provozu:<\/strong> SkyPlanner APS b\u011bhem n\u011bkolika sekund rozvrhne pr\u00e1ci se zohledn\u011bn\u00edm ka\u017ed\u00e9ho pracovi\u0161t\u011b, oper\u00e1tora, n\u00e1stroje i materi\u00e1lu. Oper\u00e1to\u0159i pracuj\u00ed na telefonu nebo tabletu. Hod\u00ed se pro v\u00fdrobce se syst\u00e9mem X3, kte\u0159\u00ed cht\u011bj\u00ed zah\u00e1jit provoz b\u011bhem n\u011bkolika t\u00fddn\u016f.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy pot\u0159ebujete n\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>Loads je v\u011bt\u0161inu t\u00fddn\u016f \u010derven\u00fd a pr\u00e1ce v Planning workbench u\u017e zab\u00edr\u00e1 cel\u00fd \u00favazek.<\/li>\n\n\n<li>Sl\u00edben\u00e9 term\u00edny se odvozuj\u00ed z pr\u016fb\u011b\u017en\u00fdch dob v\u00fdroby, tak\u017ee se obchod a v\u00fdroba neshodnou na tom, co je re\u00e1ln\u00e9.<\/li>\n\n\n<li>P\u0159etypov\u00e1n\u00ed z\u00e1sadn\u011b ovliv\u0148uje pr\u016fchodnost v\u00fdroby, ale standardn\u00ed rozvrhov\u00e1n\u00ed v X3 ne\u0159ad\u00ed operace tak, aby p\u0159etypov\u00e1n\u00ed omezilo.<\/li>\n\n\n<li>Operace vy\u017eaduj\u00ed n\u011bkolik oper\u00e1tor\u016f sou\u010dasn\u011b nebo se mezi stroji sd\u00edlej\u00ed n\u00e1stroje a p\u0159\u00edpravky.<\/li>\n\n\n<li>Provozujete Sage X3 v cloudu, tak\u017ee lok\u00e1ln\u011b instalovan\u00fd Production Scheduler nep\u0159ipad\u00e1 v \u00favahu.<\/li>\n\n\n<li>Kv\u016fli urgentn\u00edm zak\u00e1zk\u00e1m a poruch\u00e1m mus\u00edte pl\u00e1n ru\u010dn\u011b p\u0159epracov\u00e1vat, \u010dasto v Excelu.<\/li>\n\n\n<li>Oper\u00e1to\u0159i pot\u0159ebuj\u00ed vlastn\u00ed frontu operac\u00ed, ne vyti\u0161t\u011bn\u00fd seznam v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Na co se p\u0159i v\u00fdb\u011bru zam\u011b\u0159it<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit jednotliv\u00fdch v\u00fdrobn\u00edch zdroj\u016f, sm\u011bn a pracovn\u00edk\u016f<\/strong> se zohledn\u011bn\u00edm absenc\u00ed a p\u0159es\u010das\u016f.<\/li>\n\n\n<li><strong>Se\u0159\u00edzen\u00ed podle po\u0159ad\u00ed operac\u00ed<\/strong>: matice \u010das\u016f se\u0159\u00edzen\u00ed, v n\u00ed\u017e m\u016f\u017ee p\u0159echod z A na B trvat d\u00e9le ne\u017e z B na A, a v\u00fdpo\u010detn\u00ed j\u00e1dro, kter\u00e9 zvol\u00ed po\u0159ad\u00ed s nejkrat\u0161\u00ed celkovou dobou se\u0159\u00edzen\u00ed.<\/li>\n\n\n<li><strong>N\u00e1stroje a pracovn\u00ed t\u00fdmy jako omezen\u00ed<\/strong>: sd\u00edlen\u00fd n\u00e1stroj lze v danou chv\u00edli rezervovat jen pro jeden stroj a operace mohou vy\u017eadovat n\u011bkolik oper\u00e1tor\u016f sou\u010dasn\u011b.<\/li>\n\n\n<li><strong>Kontrola dostupnosti materi\u00e1lu p\u0159i rozvrhov\u00e1n\u00ed<\/strong> podle skladov\u00fdch z\u00e1sob a otev\u0159en\u00fdch n\u00e1kupn\u00edch objedn\u00e1vek s o\u010dek\u00e1van\u00fdmi term\u00edny dod\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Alternativn\u00ed stroje a pracovn\u00edci<\/strong> i v\u00fdrobky s v\u00edce\u00farov\u0148ovou strukturou, jejich\u017e rozvrhov\u00e1n\u00ed \u0159e\u0161\u00ed v\u00fdpo\u010detn\u00ed j\u00e1dro, nikoli pl\u00e1nova\u010d.<\/li>\n\n\n<li><strong>P\u0159epl\u00e1nov\u00e1n\u00ed bez ru\u010dn\u00edho spou\u0161t\u011bn\u00ed<\/strong> po odveden\u00ed v\u00fdrobn\u00edho p\u0159\u00edkazu nebo p\u0159ijet\u00ed nov\u00e9 zak\u00e1zky, bez samostatn\u00e9ho b\u011bhu rozvrhov\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Jasn\u00e9 rozd\u011blen\u00ed odpov\u011bdnost\u00ed mezi syst\u00e9mem a X3<\/strong>: kter\u00fd syst\u00e9m ur\u010duje term\u00edny, jak se zach\u00e1z\u00ed s uzam\u010den\u00fdmi v\u00fdrobn\u00edmi p\u0159\u00edkazy a co se p\u0159ed\u00e1v\u00e1 zp\u011bt (term\u00edny operac\u00ed, stav, odv\u00e1d\u011bn\u00ed v\u00fdroby).<\/li>\n\n\n<li><strong>Nasazen\u00ed odpov\u00eddaj\u00edc\u00ed va\u0161emu prost\u0159ed\u00ed.<\/strong> Cloudov\u00e9 X3 neposkytuje p\u0159\u00edm\u00fd p\u0159\u00edstup k souborov\u00e9mu syst\u00e9mu ani datab\u00e1zi, tak\u017ee n\u00e1stroj pro rozvrhov\u00e1n\u00ed mus\u00ed vyu\u017e\u00edvat GraphQL API, webov\u00e9 slu\u017eby nebo hostovan\u00fd p\u0159enos soubor\u016f.<\/li>\n\n\n<li><strong>Rychl\u00e9 ov\u011b\u0159en\u00ed p\u0159\u00ednosu<\/strong>: test s vlastn\u00edmi daty je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm integra\u010dn\u00edho projektu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde se uplatn\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS je cloudov\u00fd n\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit. V kombinaci se Sage X3 \u0159e\u0161\u00ed v\u0161echny v\u00fd\u0161e uveden\u00e9 nedostatky:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u017edy aktu\u00e1ln\u00ed rozvrh.<\/strong> V\u00fdpo\u010detn\u00ed j\u00e1dro Arcturus AI vytvo\u0159\u00ed b\u011bhem n\u011bkolika sekund pl\u00e1n v\u00fdroby, kter\u00fd respektuje skute\u010dn\u00e9 kapacity, a Autopilot jej p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje. Nen\u00ed pot\u0159eba samostatn\u00fd krok Recalculate the loads a nez\u016fst\u00e1v\u00e1 \u017e\u00e1dn\u00e9 p\u0159et\u00ed\u017een\u00ed, kter\u00e9 by pl\u00e1nova\u010d musel ru\u010dn\u011b \u0159e\u0161it.<\/li>\n\n\n<li><strong>T\u00fdmy a alternativy bez \u00faprav modelu.<\/strong> Na jednom pracovi\u0161ti m\u016f\u017ee sou\u010dasn\u011b pracovat n\u011bkolik oper\u00e1tor\u016f, tak\u017ee operace pro t\u0159i pracovn\u00edky z\u016fst\u00e1v\u00e1 jedinou operac\u00ed. Paraleln\u00ed stroje tvo\u0159\u00ed skupinu pracovi\u0161\u0165, z nich\u017e ka\u017ed\u00e9 m\u00e1 vlastn\u00ed efektivitu. Pokud je prim\u00e1rn\u00ed stroj nebo pracovn\u00edk nedostupn\u00fd, v\u00fdpo\u010detn\u00ed j\u00e1dro p\u0159esune operace na alternativn\u00ed stroje \u010di pracovn\u00edky, p\u0159\u00edpadn\u011b operaci rozd\u011bl\u00ed mezi n\u011bkolik z nich.<\/li>\n\n\n<li><strong>Matice se\u0159\u00edzen\u00ed, kter\u00e1 podle dokumentace v Production Scheduler chyb\u00ed.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed obsahuje doby p\u0159etypov\u00e1n\u00ed mezi v\u00fdrobky z\u00e1visl\u00e9 na jejich po\u0159ad\u00ed (z modr\u00e9 na \u010dervenou 30 min, z \u010derven\u00e9 na modrou 60 min). V\u00fdpo\u010detn\u00ed j\u00e1dro zvol\u00ed po\u0159ad\u00ed s nejkrat\u0161\u00ed celkovou dobou se\u0159\u00edzen\u00ed. Model zahrnuje i \u010dasy p\u0159\u00edpravy a ukon\u010dovac\u00edch prac\u00ed.<\/li>\n\n\n<li><strong>N\u00e1stroje s omezenou dostupnost\u00ed.<\/strong> N\u00e1stroj pou\u017e\u00edvan\u00fd na jednom pracovi\u0161ti se ve stejnou dobu nenapl\u00e1nuje na jin\u00e9.<\/li>\n\n\n<li><strong>Rozvrhov\u00e1n\u00ed podle dostupnosti materi\u00e1lu.<\/strong> V\u00fdpo\u010detn\u00ed j\u00e1dro simuluje budouc\u00ed stav z\u00e1sob, tak\u017ee operace pl\u00e1nuje pouze na dobu, kdy je pot\u0159ebn\u00fd materi\u00e1l dostupn\u00fd. Objednan\u00fd materi\u00e1l se pova\u017euje za dostupn\u00fd k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a stav z\u00e1sob se aktualizuje po jej\u00edm ozna\u010den\u00ed stavem Delivered (<a href=\"\/cs\/docs\/co-je-to-funkce-objednavky-a-jak-ji-pouzivat\/\">n\u00e1kupn\u00ed objedn\u00e1vky v dokumentaci SkyPlanner<\/a>).<\/li>\n\n\n<li><strong>Priority a z\u00e1mky pod va\u0161\u00ed kontrolou.<\/strong> V\u00fdpo\u010detn\u00ed j\u00e1dro se \u0159\u00edd\u00ed prioritou operac\u00ed, up\u0159ednostn\u011bn\u00edm podle term\u00ednu dokon\u010den\u00ed, prioritou z\u00e1kazn\u00edka a funkcemi Fast Track a Dynamic Priorities. D\u00edky funkc\u00edm Running Time Lock a Bulldozer, kter\u00e1 posouv\u00e1 navazuj\u00edc\u00ed operace, si pl\u00e1nova\u010di zachov\u00e1vaj\u00ed kontrolu.<\/li>\n\n\n<li><strong>Pr\u00e1ce p\u0159\u00edmo ve v\u00fdrobn\u00edm provozu.<\/strong> Oper\u00e1to\u0159i vid\u00ed svou frontu operac\u00ed a zaznamen\u00e1vaj\u00ed pr\u00e1ci na telefonu nebo tabletu pomoc\u00ed funkc\u00ed Mobile Confirmations, Production Timer a Quick Log Mode.<\/li>\n\n\n<li><strong>Cloud bez ohledu na nasazen\u00ed X3.<\/strong> SkyPlanner funguje stejn\u011b, a\u0165 X3 provozujete v cloudu Sage, nebo na vlastn\u00edch serverech.<\/li>\n\n<\/ul>\n\n\n<p><strong>Zvolte SkyPlanner, pokud v cloudov\u00e9m X3 pot\u0159ebujete pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit<\/strong> a Production Scheduler nep\u0159ipad\u00e1 v \u00favahu.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud operace vy\u017eaduj\u00ed pracovn\u00ed t\u00fdmy nebo alternativn\u00ed stroje<\/strong> a nechcete vynucen\u011b nastavovat No. of resources na 1.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud chcete pl\u00e1nov\u00e1n\u00ed i evidenci \u010dasu oper\u00e1tor\u016f v jednom n\u00e1stroji,<\/strong> kter\u00fd p\u0159ed\u00e1v\u00e1 \u010dasov\u00e9 z\u00e1znamy zp\u011bt do X3 jako odv\u00e1d\u011bn\u00ed v\u00fdroby.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud chcete pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit zprovoznit b\u011bhem t\u00fddn\u016f,<\/strong> ne a\u017e po n\u011bkolikam\u011bs\u00ed\u010dn\u00edm projektu APS.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Integrace se Sage X3<\/h3>\n\n\n<p>SkyPlanner se se Sage X3 propojuje obousm\u011brn\u011b. Z X3 p\u0159eb\u00edr\u00e1 v\u00fdrobn\u00ed p\u0159\u00edkazy (MFGHEAD, MFGOPE), technologick\u00e9 postupy, pracovi\u0161t\u011b, kalend\u00e1\u0159e, skladov\u00e9 z\u00e1soby a otev\u0159en\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky. Pl\u00e1novan\u00e9 term\u00edny operac\u00ed p\u0159ed\u00e1v\u00e1 zp\u011bt prost\u0159ednictv\u00edm webov\u00e9 slu\u017eby Work order (GESMFG) a zaznamenan\u00e9 hodiny zapisuje jako Production tracking (GESMTK). Webhooky SkyPlanner odes\u00edlaj\u00ed ka\u017edou zm\u011bnu rozvrhu ihned, jakmile nastane.<\/p>\n\n\n<p>Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 X3 jinak, proto t\u00fdm SkyPlanner nastav\u00ed integraci podle va\u0161eho prost\u0159ed\u00ed a poskytuje podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. V\u00e1\u0161 partner pro Sage X3 nebo intern\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vyu\u017e\u00edt zdokumentovan\u00e9 SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>). Pro za\u010d\u00e1tek sta\u010d\u00ed kl\u00ed\u010d API.<\/p>\n\n\n<p>X3 z\u016fst\u00e1v\u00e1 va\u0161\u00edm syst\u00e9mem pro MRP, v\u00fdrobky, kusovn\u00edky, technologick\u00e9 postupy, n\u00e1kup a skladov\u00e9 z\u00e1soby.<\/p>\n\n\n<p>Za\u010dn\u011bte importem CSV v r\u00e1mci bezplatn\u00e9 zku\u0161ebn\u00ed verze na 30 dn\u00ed. Cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b a zahrnuje 5 pracovi\u0161\u0165. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu, abyste celkov\u00e9 n\u00e1klady znali je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm.<\/p>\n\n\n<p>Pod\u00edvejte se na <a href=\"\/cs\/integrace\/erp\/sage-x3\/\">SkyPlanner APS pro Sage X3<\/a>, <a href=\"\/cs\/integrace\/erp\/sage-x3\/pruvodce-integraci\/\">pr\u016fvodce integrac\u00ed se Sage X3<\/a> s mapov\u00e1n\u00edm dat, <a href=\"\/cs\/funkce\/\">funkce<\/a> a <a href=\"\/cs\/stanoveni-cen\/\">cen\u00edk<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce v UTU, ve v\u00fdrob\u011b rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner jsme v pl\u00e1nov\u00e1n\u00ed v\u00fdroby p\u0159e\u0161li od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby se ka\u017ed\u00fd t\u00fdden u\u0161et\u0159\u00ed 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve Fredman Operations, vedle robotick\u00e9 paletiza\u010dn\u00ed bu\u0148ky v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchodn\u00edci volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner je spolehliv\u00fdm z\u00e1kladem ve\u0161ker\u00e9ho pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Pap\u00edry pro balen\u00ed potravin<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00edci vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu rozvrhu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, nyn\u00ed dostanou odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na z\u00e1vod Piristeel na v\u00fdrobu st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f v Kauhav\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2 %<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m umo\u017enil l\u00e9pe odhalovat \u00fazk\u00e1 m\u00edsta a zp\u0159ehlednil \u0159\u00edzen\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky a okapov\u00e9 syst\u00e9my<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a rozvrhov\u00e1n\u00ed \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pr\u00e1ce denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pl\u00e1nuje Sage X3 do omezen\u00fdch, nebo neomezen\u00fdch kapacit?<\/summary>\n<p class=\"sp-faq__a\">Ve standardn\u00ed verzi se kapacitn\u00ed omezen\u00ed nezohled\u0148uj\u00ed. Scheduling (FUNMAUTJ) stanovuje term\u00edny jednotliv\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f podle technologick\u00e9ho postupu, ani\u017e by p\u0159\u00edkazy \u010dasov\u011b rozlo\u017eil s ohledem na vyt\u00ed\u017een\u00ed v\u00fdrobn\u00edch zdroj\u016f. Loads (CONSMWK) zobraz\u00ed p\u0159et\u00ed\u017een\u00ed a pl\u00e1nova\u010d je \u0159e\u0161\u00ed ru\u010dn\u011b. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit vy\u017eaduje Production Scheduler nebo n\u00e1stroj pro rozvrhov\u00e1n\u00ed p\u0159ipojen\u00fd p\u0159es rozhran\u00ed GFS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Lze Sage X3 Production Scheduler st\u00e1le zakoupit?<\/summary>\n<p class=\"sp-faq__a\">Podle n\u00e1pov\u011bdy V12 pouze pro lok\u00e1ln\u011b provozovan\u00e9 X3. N\u00e1pov\u011bda V11 uv\u00e1d\u00ed, \u017ee pro nov\u00e9 instalace nen\u00ed dostupn\u00fd, proto v\u00e1m aktu\u00e1ln\u00ed nab\u00eddku potvrd\u00ed v\u00e1\u0161 partner Sage. Pro cloudov\u00e9 Sage X3 je v dokumentaci uvedeno obecn\u00e9 rozhran\u00ed Finite scheduler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd je rozd\u00edl mezi Production Scheduler a Sage X3 Web Scheduling?<\/summary>\n<p class=\"sp-faq__a\">Production Scheduler je vestav\u011bn\u00fd n\u00e1stroj pro rozvrhov\u00e1n\u00ed v Ganttov\u011b diagramu ur\u010den\u00fd pro lok\u00e1ln\u00ed nasazen\u00ed. Aktivuje se k\u00f3dem aktivity POPS. Web Scheduling je samostatn\u00fd dopln\u011bk Sage, kter\u00fd vyu\u017e\u00edv\u00e1 obecn\u00e9 rozhran\u00ed Finite scheduler (GFS), je\u017e funguje s cloudov\u00fdm i lok\u00e1ln\u011b provozovan\u00fdm X3. Web Scheduling 2023.3.4 p\u0159idal integraci p\u0159es GraphQL, kter\u00e1 vy\u017eaduje Sage X3 2024 R1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje SkyPlanner APS se Sage X3?<\/summary>\n<p class=\"sp-faq__a\">Ano. SkyPlanner nab\u00edz\u00ed obousm\u011brnou integraci se Sage X3 v cloudu i p\u0159i lok\u00e1ln\u00edm nasazen\u00ed. P\u0159eb\u00edr\u00e1 v\u00fdrobn\u00ed p\u0159\u00edkazy, technologick\u00e9 postupy a pracovi\u0161t\u011b a zp\u011bt p\u0159ed\u00e1v\u00e1 pl\u00e1novan\u00e9 term\u00edny a odv\u00e1d\u011bn\u00ed v\u00fdroby. Za\u010dn\u011bte s <a href=\"\/cs\/zkusebni-verze\/\">bezplatnou zku\u0161ebn\u00ed verz\u00ed<\/a> a exporty CSV; t\u00fdm SkyPlanner nastav\u00ed integraci b\u011bhem zav\u00e1d\u011bn\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mus\u00edm kv\u016fli pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit zm\u011bnit model sv\u00fdch pracovi\u0161\u0165?<\/summary>\n<p class=\"sp-faq__a\">U obecn\u00e9ho rozhran\u00ed Finite scheduler advanced ano. Sage vy\u017eaduje na ka\u017ed\u00e9m pracovi\u0161ti nastaven\u00ed No. of resources = 1, tak\u017ee se u operac\u00ed, kter\u00e9 pot\u0159ebuj\u00ed v\u00edce\u010dlennou obsluhu, tato informace ztr\u00e1c\u00ed. Se SkyPlannerem ne. Na jednom pracovi\u0161ti m\u016f\u017ee sou\u010dasn\u011b pracovat n\u011bkolik oper\u00e1tor\u016f, paraleln\u00ed stroje se sdru\u017e\u00ed do skupiny pracovi\u0161\u0165 a va\u0161e pracovi\u0161t\u011b v X3 z\u016fstanou beze zm\u011bny.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0158ad\u00ed Sage X3 operace tak, aby omezil p\u0159etypov\u00e1n\u00ed?<\/summary>\n<p class=\"sp-faq__a\">Ve standardn\u00edm rozvrhov\u00e1n\u00ed ne a Production Scheduler uv\u00e1d\u00ed, \u017ee optimalizace podle matice se\u0159izovac\u00edch \u010das\u016f nen\u00ed v sou\u010dasnosti dostupn\u00e1. Matice se\u0159izovac\u00edch \u010das\u016f ve SkyPlanneru uchov\u00e1v\u00e1 \u010dasy p\u0159etypov\u00e1n\u00ed pro ka\u017edou dvojici v\u00fdrobk\u016f v obou sm\u011brech. Pl\u00e1novac\u00ed algoritmus pak \u0159ad\u00ed operace tak, aby byl celkov\u00fd \u010das se\u0159izov\u00e1n\u00ed co nejkrat\u0161\u00ed.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Sage X3 Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS Standardn\u00ed rozvrhov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f v Sage X3 neumo\u017e\u0148uje pl\u00e1nov\u00e1n\u00ed v\u00fdroby, kter\u00e9 respektuje skute\u010dn\u00e9 kapacity stroj\u016f a pracovn\u00edk\u016f. Pr\u00e1v\u011b tuto mezeru vypl\u0148uje SkyPlanner APS. X3 pl\u00e1nuje materi\u00e1l pomoc\u00ed MRP a term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f stanovuje funkc\u00ed Scheduling (FUNMAUTJ). Britsk\u00fd &#8230; <a title=\"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/\" aria-label=\"Read more about Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100909,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101356","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu?<\/title>\n<meta name=\"description\" content=\"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/planovani-vyroby\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/planovani-vyroby\\\/\",\"name\":\"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/planovani-vyroby\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/planovani-vyroby\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/planovani-vyroby\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Sage X3: pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu?","description":"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/","og_locale":"cs_CZ","og_type":"article","og_title":"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS","og_description":"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"20 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/","name":"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Sage X3 standardn\u011b pl\u00e1nuje bez omezen\u00ed kapacit. Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit vy\u017eaduje Production Scheduler \u010di rozhran\u00ed GFS. Co funguje a kdy pot\u0159ebujete APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/planovani-vyroby\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Sage X3: pl\u00e1nov\u00e1n\u00ed v\u00fdroby","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Sage X3 Um\u00ed Sage X3 pl\u00e1novat v\u00fdrobu? MRP, vyt\u00ed\u017een\u00ed, pl\u00e1nova\u010de v\u00fdroby a SkyPlanner APS Standardn\u00ed rozvrhov\u00e1n\u00ed v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f v Sage X3 neumo\u017e\u0148uje pl\u00e1nov\u00e1n\u00ed v\u00fdroby, kter\u00e9 respektuje skute\u010dn\u00e9 kapacity stroj\u016f a pracovn\u00edk\u016f. Pr\u00e1v\u011b tuto mezeru vypl\u0148uje SkyPlanner APS. X3 pl\u00e1nuje materi\u00e1l pomoc\u00ed MRP a term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f stanovuje funkc\u00ed Scheduling (FUNMAUTJ). Britsk\u00fd&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101356"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101356\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100909"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}