{"id":101296,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101296"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"planovani-vyroby","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/","title":{"rendered":"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? <span class=\"hl\">Vlastn\u00ed APS, Scheduler a SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ano. Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupnou kapacitu stroj\u016f i pracovn\u00edk\u016f. Infor CloudSuite Industrial (d\u0159\u00edve SyteLine, \u010dasto ozna\u010dovan\u00fd jako CSI) p\u0159i rozvrhov\u00e1n\u00ed zohled\u0148uje kapacitn\u00ed omezen\u00ed v\u00fdrobn\u00edch zdroj\u016f na dvou m\u00edstech:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li><strong>Licencovan\u00fd modul APS Planning<\/strong> pl\u00e1nuje po\u017eadavky s ohledem na kapacitu v\u00fdrobn\u00edch zdroj\u016f a pomoc\u00ed Get CTP potvrzuje term\u00edny. Bez licence APS b\u011b\u017e\u00ed v re\u017eimu Infinite.<\/li>\n\n\n<li><strong>Scheduler<\/strong> ur\u010duje po\u0159ad\u00ed operac\u00ed v kr\u00e1tkodob\u00e9m horizontu s ohledem na omezenou kapacitu v\u00fdrobn\u00edch zdroj\u016f a zobrazuje je v upraviteln\u00e9m diagramu Resource Gantt.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat si uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram v SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS funguje vedle CSI a po ka\u017ed\u00e9m naru\u0161en\u00ed v\u00fdroby automaticky p\u0159epl\u00e1nuje cel\u00fd provoz. V jednom rozvrhu zohled\u0148uje p\u0159etypov\u00e1n\u00ed, n\u00e1stroje, pracovn\u00ed t\u00fdmy i p\u0159\u00edchoz\u00ed materi\u00e1l.<\/p>\n\n\n<p>Infor M3, Infor LN a Infor Production Scheduling jsou samostatn\u00e9 produkty a nic z tohoto \u010dl\u00e1nku se na n\u011b nevztahuje.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-cloudsuite-industrial-plans-capacity-step-by\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak CloudSuite Industrial pl\u00e1nuje kapacity krok za krokem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CSI m\u00e1 t\u0159i vrstvy, kter\u00e9 si lid\u00e9 \u010dasto zam\u011b\u0148uj\u00ed: <strong>MRP<\/strong>, <strong>APS Planning<\/strong> a <strong>Scheduler<\/strong>. Ka\u017ed\u00e1 odpov\u00edd\u00e1 na jinou ot\u00e1zku.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Kapacitn\u00ed model: v\u00fdrobn\u00ed zdroje, nikoli pracovi\u0161t\u011b<\/h3>\n\n\n<p>Kapacita se definuje u <strong>Resources<\/strong> a <strong>Resource Groups<\/strong>, tedy v\u00fdrobn\u00edch zdroj\u016f a jejich skupin. Ka\u017ed\u00e1 operace mus\u00ed m\u00edt uvedenou alespo\u0148 jednu skupinu v\u00fdrobn\u00edch zdroj\u016f. Dokumentace Infor dopl\u0148uje: &#8222;You cannot use a resource group on an operation unless it has at least one resource assigned to it.&#8220; (Skupinu v\u00fdrobn\u00edch zdroj\u016f nelze pou\u017e\u00edt u operace, pokud k n\u00ed nen\u00ed p\u0159i\u0159azen alespo\u0148 jeden v\u00fdrobn\u00ed zdroj.) Dostupnost ur\u010duj\u00ed sm\u011bny v <strong>Shifts<\/strong>.<\/p>\n\n\n<p>Pracovi\u0161t\u011b v syst\u00e9mu nad\u00e1le existuj\u00ed, ale slou\u017e\u00ed jen ke kalkulaci n\u00e1klad\u016f: &#8222;The work center now captures costs only and does not affect the actual planning or scheduling.&#8220; (Pracovi\u0161t\u011b nyn\u00ed eviduje pouze n\u00e1klady a neovliv\u0148uje samotn\u00e9 pl\u00e1nov\u00e1n\u00ed ani rozvrhov\u00e1n\u00ed.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144439334.html\">zdroj<\/a>) To mate ka\u017ed\u00e9ho, kdo p\u0159ich\u00e1z\u00ed z ERP, v n\u011bm\u017e je pracovi\u0161t\u011b z\u00e1kladn\u00ed jednotkou rozvrhov\u00e1n\u00ed.<\/p>\n\n\n<p>Zp\u016fsob v\u00fdb\u011bru a zat\u011b\u017eov\u00e1n\u00ed v\u00fdrobn\u00edch zdroj\u016f ur\u010duj\u00ed dv\u011b nastaven\u00ed. Pole <strong>Seq<\/strong> na kart\u011b Resources \u0159\u00edd\u00ed p\u0159id\u011blov\u00e1n\u00ed podle pravidel Select in Sequence a Cyclic: ta &#8222;allocate the resource with the lower Seq value first.&#8220; (nejprve p\u0159id\u011bl\u00ed v\u00fdrobn\u00ed zdroj s ni\u017e\u0161\u00ed hodnotou Seq.) Ve v\u00fdchoz\u00edm nastaven\u00ed maj\u00ed v\u00fdrobn\u00ed zdroje omezenou kapacitu. Zdroj nebo celou skupinu ozna\u010d\u00edte jako <strong>Infinite<\/strong>, pokud m\u00e1 p\u0159ij\u00edmat &#8222;an unlimited number of operations simultaneously, but only when on-shift.&#8220; (neomezen\u00fd po\u010det operac\u00ed sou\u010dasn\u011b, ale pouze b\u011bhem sm\u011bny.) (<a href=\"https:\/\/docs.infor.com\/csi\/2026.10\/en-us\/csbiolh\/inventory_user_cl_sl\/mergedprojects\/sl_invprod\/fields\/i\/infinite_scheduling_resources.html\">zdroj<\/a>) Provoz tak m\u016f\u017ee p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby zohled\u0148ovat kapacitn\u00ed omezen\u00ed pouze u \u00fazk\u00fdch m\u00edst a v\u0161ude jinde po\u010d\u00edtat s neomezenou kapacitou.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP: pouze materi\u00e1l<\/h3>\n\n\n<p>MRP je z\u00e1klad, kter\u00fd m\u00e1 k dispozici ka\u017ed\u00fd provoz s CSI. Pl\u00e1nuje materi\u00e1l, ale v\u00fdrobn\u00ed provoz nezohled\u0148uje: &#8222;Unlike APS, MRP does not consider routing times, resource capacity, or shifts.&#8220; (Na rozd\u00edl od APS nezohled\u0148uje MRP \u010dasy v technologick\u00fdch postupech, kapacitu v\u00fdrobn\u00edch zdroj\u016f ani sm\u011bny.) Infor jasn\u011b \u0159\u00edk\u00e1, kdo mus\u00ed kapacitu ov\u011b\u0159it: &#8222;The responsibility rests with you, the planner, to make sure your shop floor has the available capacity to work the plan.&#8220; (Za ov\u011b\u0159en\u00ed, \u017ee m\u00e1 v\u00fdrobn\u00ed provoz dostate\u010dnou kapacitu k realizaci pl\u00e1nu, odpov\u00edd\u00e1te vy jako pl\u00e1nova\u010d.) (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144401657.html\">zdroj<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. APS Planning: omezen\u00e9 kapacity nebo re\u017eim Infinite, \u00fapln\u00e9 p\u0159epo\u010dty a Plan on Save<\/h3>\n\n\n<p>APS spust\u00edte z formul\u00e1\u0159e <strong>APS Planning<\/strong> v jednom ze dvou re\u017eim\u016f:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Re\u017eim<\/th><th>Co zohled\u0148uje<\/th><th>Potvrzov\u00e1n\u00ed term\u00edn\u016f zak\u00e1zek<\/th><\/tr><\/thead><tbody><tr><td>APS (omezen\u00e9 kapacity)<\/td><td>&#8222;whether the crew and machines are on-shift and not busy working on another demand&#8220; (zda maj\u00ed pracovn\u00ed t\u00fdm a stroje sm\u011bnu a nejsou vyt\u00ed\u017eeny jin\u00fdm po\u017eadavkem)<\/td><td><strong>Get CTP<\/strong> ve formul\u00e1\u0159\u00edch Customer Order Lines a Job Orders<\/td><\/tr><tr><td>Infinite APS<\/td><td>Neomezen\u00fd po\u010det operac\u00ed na v\u00fdrobn\u00ed zdroj b\u011bhem sm\u011bny, s vyu\u017eit\u00edm \u010das\u016f Move, Queue, Setup, Run a Finish<\/td><td><strong>Get ATP<\/strong> m\u00edsto Get CTP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Rozhoduje tato licen\u010dn\u00ed podm\u00ednka: &#8222;If the APS module is unlicensed, APS Planning can only be run in Infinite mode.&#8220; (Bez licence modulu APS lze APS Planning spustit pouze v re\u017eimu Infinite.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">zdroj<\/a>)<\/p>\n\n\n<p>APS pl\u00e1nuje ka\u017ed\u00fd po\u017eadavek &#8222;based on order priority and each demand&#8217;s due date.&#8220; (podle priority zak\u00e1zky a po\u017eadovan\u00e9ho term\u00ednu ka\u017ed\u00e9ho po\u017eadavku.) Pl\u00e1nuje zp\u011btn\u011b od po\u017eadovan\u00e9ho term\u00ednu, a pokud se zak\u00e1zka nevejde, pak dop\u0159edn\u011b od dne\u0161ka. Prioritu ur\u010duje formul\u00e1\u0159 <strong>APS Order Priority<\/strong>: &#8222;Order types with lower priority numbers consume available capacity before order types with higher priority numbers.&#8220; (Typy zak\u00e1zek s ni\u017e\u0161\u00edm \u010d\u00edslem priority \u010derpaj\u00ed dostupnou kapacitu p\u0159ed typy s vy\u0161\u0161\u00edm \u010d\u00edslem priority.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144404699.html\">zdroj<\/a>) Infor doporu\u010duje dlouh\u00fd horizont: &#8222;In most situations, you will run APS Planning for a long horizon, such as one or two months.&#8220; (Ve v\u011bt\u0161in\u011b p\u0159\u00edpad\u016f budete APS Planning spou\u0161t\u011bt pro dlouh\u00fd horizont, nap\u0159\u00edklad jeden nebo dva m\u011bs\u00edce.)<\/p>\n\n\n<p>\u00dapln\u00fd p\u0159epo\u010det za\u010d\u00edn\u00e1 od nuly: &#8222;The system deletes all existing plan information and regenerates it using the latest data.&#8220; (Syst\u00e9m odstran\u00ed v\u0161echny st\u00e1vaj\u00edc\u00ed \u00fadaje pl\u00e1nu a vytvo\u0159\u00ed je znovu z nejnov\u011bj\u0161\u00edch dat.) Infor doporu\u010duje spou\u0161t\u011bt jej pravideln\u011b, nap\u0159\u00edklad ka\u017edou noc. Mezi \u00fapln\u00fdmi p\u0159epo\u010dty vkl\u00e1d\u00e1 funkce <strong>Plan on Save<\/strong> nov\u011b ulo\u017eenou z\u00e1kaznickou objedn\u00e1vku nebo v\u00fdrobn\u00ed p\u0159\u00edkaz do st\u00e1vaj\u00edc\u00edho pl\u00e1nu. Vyu\u017e\u00edv\u00e1 pouze z\u00e1soby, dod\u00e1vky a kapacitu, kter\u00e9 p\u0159edchoz\u00ed p\u0159epo\u010dty ponechaly nep\u0159id\u011blen\u00e9. Zm\u011bny kmenov\u00fdch dat a v\u011bt\u0161ina ostatn\u00edch transakc\u00ed \u010dekaj\u00ed na dal\u0161\u00ed \u00fapln\u00fd p\u0159epo\u010det. (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144402967.html\">zdroj<\/a>) V\u00fdstupem jsou pl\u00e1novan\u00e9 p\u0159\u00edkazy a v\u00fdjimkov\u00e1 hl\u00e1\u0161en\u00ed. Pl\u00e1nova\u010di je kontroluj\u00ed ve formul\u00e1\u0159i <strong>Planning Detail APS<\/strong> a potvrzen\u00edm p\u0159ev\u00e1d\u011bj\u00ed na v\u00fdrobn\u00ed p\u0159\u00edkazy, n\u00e1kupn\u00ed objedn\u00e1vky, n\u00e1kupn\u00ed po\u017eadavky, v\u00fdrobn\u00ed rozvrhy nebo p\u0159evodn\u00ed p\u0159\u00edkazy.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduler a Resource Gantt<\/h3>\n\n\n<p><strong>Scheduler<\/strong> se spou\u0161t\u00ed jako samostatn\u00e1 \u00faloha <strong>Scheduling<\/strong>, obvykle za\u0159azen\u00e1 do Background Queue. Podle Infor lze rozvrhov\u00e1n\u00ed spustit &#8222;over any horizon&#8220; (pro libovoln\u00fd horizont): sm\u011bnu, den, t\u00fdden nebo m\u011bs\u00edc. V praxi &#8222;you will usually run it for a one-day horizon, and you will usually run it each day.&#8220; (jej obvykle budete spou\u0161t\u011bt pro jednodenn\u00ed horizont, a to ka\u017ed\u00fd den.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144439334.html\">zdroj<\/a>)<\/p>\n\n\n<p>Ur\u010duje za\u010d\u00e1tky a konce operac\u00ed na v\u00fdrobn\u00edch zdroj\u00edch s omezenou kapacitou a navrhuje jejich po\u0159ad\u00ed. Respektuje skupiny zdroj\u016f pro se\u0159\u00edzen\u00ed i vyhled\u00e1vac\u00ed tabulky \u010das\u016f se\u0159\u00edzen\u00ed a pro v\u00fdrobn\u00ed provoz tiskne <strong>Resource Group Dispatch List<\/strong>, tedy seznam operac\u00ed k proveden\u00ed podle skupin zdroj\u016f. Pravidla \u0159azen\u00ed, nap\u0159\u00edklad Due Date nebo Critical Ratio, se nastavuj\u00ed v <strong>Global Priority Settings<\/strong>.<\/p>\n\n\n<p>Pl\u00e1nova\u010di upravuj\u00ed v\u00fdsledek v <strong>Resource Gantt Chart &#8211; Scheduler<\/strong>. P\u0159esunut\u00edm pruhu se otev\u0159e <strong>Gantt Edit Operation<\/strong>, kde mohou zm\u011bnit term\u00edn zah\u00e1jen\u00ed a dokon\u010den\u00ed operace, p\u0159esunout ji na jin\u00fd v\u00fdrobn\u00ed zdroj nebo zafixovat v\u00fdrobn\u00ed p\u0159\u00edkaz \u010di operaci. CSI ka\u017edou zm\u011bnu ov\u011b\u0159uje a upozorn\u00ed, pokud poru\u0161uje pravidla po\u0159ad\u00ed nebo v\u00fdrobn\u00edch zdroj\u016f. Pl\u00e1nova\u010d m\u016f\u017ee zm\u011bnu p\u0159esto potvrdit, nebo ji zru\u0161it. (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144446183.html\">zdroj<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Jak spolupracuj\u00ed APS a Scheduler<\/h3>\n\n\n<p>Je-li v <strong>Shop Floor Control Parameters<\/strong> zapnuto nastaven\u00ed pro pl\u00e1novan\u00e9 p\u0159\u00edkazy, Scheduler pova\u017euje pl\u00e1novan\u00e9 p\u0159\u00edkazy z APS za po\u017eadavky, kter\u00e9 \u010derpaj\u00ed kapacitu v\u00fdrobn\u00edch zdroj\u016f. P\u0159i n\u00e1sledn\u00e9m p\u0159epo\u010dtu APS pova\u017euje rozvr\u017een\u00e9 operace za zafixovan\u00e9. Dal\u0161\u00ed spu\u0161t\u011bn\u00ed n\u00e1stroje Scheduler je v\u0161ak m\u016f\u017ee znovu p\u0159esunout. V praxi tedy postup vypad\u00e1 takto: spustit Scheduling, zkontrolovat Gantt\u016fv diagram a p\u0159ehledy vyt\u00ed\u017een\u00ed, vy\u0159e\u0161it p\u0159et\u00ed\u017een\u00ed p\u0159es\u010dasy, zm\u011bnou priorit nebo ru\u010dn\u00edmi \u00fapravami diagramu, znovu spustit rozvrhov\u00e1n\u00ed a vytisknout seznam operac\u00ed pro v\u00fdrobu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-cloudsuite-industrial-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde m\u00e1 CloudSuite Industrial sv\u00e9 limity<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby v APS podle skute\u010dn\u00fdch kapacit vy\u017eaduje licenci.<\/strong> Bez modulu APS b\u011b\u017e\u00ed APS Planning pouze v re\u017eimu Infinite a Get CTP nen\u00ed k dispozici. Scheduler i nad\u00e1le kr\u00e1tkodob\u011b rozvrhuje operace na v\u00fdrobn\u00edch zdroj\u00edch s omezenou kapacitou. (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Naru\u0161en\u00ed v\u00fdroby \u0159e\u0161\u00ed pl\u00e1nova\u010d.<\/strong> Plan on Save vlo\u017e\u00ed nov\u00fd po\u017eadavek do voln\u00e9 kapacity, ale nem\u011bn\u00ed po\u0159ad\u00ed ji\u017e napl\u00e1novan\u00e9 pr\u00e1ce. Po poru\u0161e z\u016fst\u00e1v\u00e1 zbytek rozvrhu beze zm\u011bny, dokud pl\u00e1nova\u010d neuprav\u00ed operace v Ganttov\u011b diagramu nebo znovu nespust\u00ed Scheduler.<\/li>\n\n\n<li><strong>V Ganttov\u011b diagramu se upravuje v\u017edy jen jedna operace.<\/strong> Gantt Edit Operation ov\u011b\u0159uje ka\u017ed\u00fd p\u0159esun. Pokud p\u0159esun naru\u0161\u00ed po\u0159ad\u00ed operac\u00ed, CSI na to upozorn\u00ed. Pl\u00e1nova\u010d pak bu\u010f zm\u011bnu p\u0159esto potvrd\u00ed, nebo ru\u010dn\u011b oprav\u00ed navazuj\u00edc\u00ed operace.<\/li>\n\n\n<li><strong>Do minulosti pl\u00e1novat nelze.<\/strong> &#8222;APS never plans into the past (unlike MRP, which allows start dates in the past).&#8220; (APS nikdy nepl\u00e1nuje do minulosti, na rozd\u00edl od MRP, kter\u00e9 povoluje term\u00edny zah\u00e1jen\u00ed v minulosti.) Dokumentace Infor dopl\u0148uje, \u017ee APS kv\u016fli spln\u011bn\u00ed po\u017eadavku ne v\u017edy p\u0159esune existuj\u00edc\u00ed v\u00fdrobn\u00ed p\u0159\u00edkaz na d\u0159\u00edv\u011bj\u0161\u00ed term\u00edn. M\u00edsto toho m\u016f\u017ee vytvo\u0159it nov\u00fd pl\u00e1novan\u00fd p\u0159\u00edkaz s d\u0159\u00edv\u011bj\u0161\u00edm term\u00ednem dokon\u010den\u00ed. (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Bez automatick\u00e9ho slu\u010dov\u00e1n\u00ed.<\/strong> &#8222;APS does not automatically combine planned orders for items that are needed within the same period of time.&#8220; (APS automaticky neslu\u010duje pl\u00e1novan\u00e9 p\u0159\u00edkazy na polo\u017eky pot\u0159ebn\u00e9 ve stejn\u00e9m obdob\u00ed.) Slu\u010dov\u00e1n\u00ed nastavujete v Planning Parameters.<\/li>\n\n\n<li><strong>P\u0159i ov\u011b\u0159ov\u00e1n\u00ed maj\u00ed term\u00edny CTP nejni\u017e\u0161\u00ed prioritu.<\/strong> Partner Infor, spole\u010dnost Visual South, vysv\u011btluje, \u017ee term\u00edn CTP zohled\u0148uj\u00edc\u00ed omezen\u00e9 kapacity &#8222;is considered the lowest priority at the time you check the CTP date.&#8220; (m\u00e1 p\u0159i ov\u011b\u0159ov\u00e1n\u00ed term\u00ednu CTP nejni\u017e\u0161\u00ed prioritu.) P\u0159i dal\u0161\u00edm \u00fapln\u00e9m p\u0159epo\u010dtu APS se priorita zak\u00e1zky p\u0159ehodnot\u00ed. (<a href=\"https:\/\/www.visualsouth.com\/blog\/advanced-planning-and-scheduling\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Dva v\u00fdpo\u010detn\u00ed n\u00e1stroje, jejich\u017e v\u00fdsledky je t\u0159eba sladit.<\/strong> APS zafixuje to, co Scheduler rozvrhl, ale Scheduler to m\u016f\u017ee znovu p\u0159esunout. Pl\u00e1nova\u010di mus\u00ed v\u011bd\u011bt, kter\u00fd p\u0159epo\u010det vytvo\u0159il kter\u00fd term\u00edn.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-cloudsuite-industrial-s-native-scheduling-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy vlastn\u00ed rozvrhov\u00e1n\u00ed v CloudSuite Industrial sta\u010d\u00ed<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Z\u016fsta\u0148te u APS a n\u00e1stroje Scheduler, pokud pro v\u00e1s plat\u00ed v\u011bt\u0161ina n\u00e1sleduj\u00edc\u00edch bod\u016f:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>M\u00e1te licencovan\u00fd a nastaven\u00fd modul APS s p\u0159esn\u00fdmi technologick\u00fdmi postupy, skupinami v\u00fdrobn\u00edch zdroj\u016f, sm\u011bnami a \u010dasy se\u0159\u00edzen\u00ed.<\/li>\n\n\n<li>Mezi jednotliv\u00fdmi spu\u0161t\u011bn\u00edmi n\u00e1stroje Scheduler se situace v provozu p\u0159\u00edli\u0161 nem\u011bn\u00ed a v\u00fdroba pracuje podle seznamu operac\u00ed.<\/li>\n\n\n<li>Pl\u00e1nova\u010di p\u0159ij\u00edmaj\u00ed po\u0159ad\u00ed navr\u017een\u00e9 n\u00e1strojem Scheduler a b\u011bhem sm\u011bny upravuj\u00ed Gantt\u016fv diagram ru\u010dn\u011b jen ob\u010das.<\/li>\n\n\n<li>Kapacitn\u00ed probl\u00e9my se soust\u0159ed\u00ed na jedno nebo dv\u011b \u00fazk\u00e1 m\u00edsta. P\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby zohled\u0148ujte kapacitn\u00ed omezen\u00ed t\u011bchto \u00fazk\u00fdch m\u00edst a u ostatn\u00edch v\u00fdrobn\u00edch zdroj\u016f ponechte neomezenou kapacitu. Visual South tento postup popisuje jako b\u011b\u017enou strategii.<\/li>\n\n\n<li>Pot\u0159ebujete p\u0159edev\u0161\u00edm potvrzovat term\u00edny zak\u00e1zek pomoc\u00ed Get CTP na \u0159\u00e1dc\u00edch z\u00e1kaznick\u00fdch objedn\u00e1vek.<\/li>\n\n<\/ul>\n\n\n<p>Pokud to odpov\u00edd\u00e1 va\u0161emu provozu, nejprve dola\u010fte vlastn\u00ed APS a Scheduler.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy pot\u0159ebujete n\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Poohl\u00e9dn\u011bte se po jin\u00e9m ne\u017e vestav\u011bn\u00e9m \u0159e\u0161en\u00ed, pokud:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Nem\u00e1te licenci APS a pl\u00e1nova\u010di neust\u00e1le pracuj\u00ed v tabulk\u00e1ch, kde dopl\u0148uj\u00ed pl\u00e1ny z re\u017eimu Infinite.<\/li>\n\n\n<li>Rozvrh se m\u011bn\u00ed n\u011bkolikr\u00e1t za sm\u011bnu kv\u016fli urgentn\u00edm zak\u00e1zk\u00e1m, poruch\u00e1m, chyb\u011bj\u00edc\u00edmu materi\u00e1lu nebo absenc\u00edm. Pl\u00e1nova\u010di tr\u00e1v\u00ed hodiny ru\u010dn\u00edmi \u00fapravami Ganttova diagramu a opakovan\u00fdmi p\u0159epo\u010dty.<\/li>\n\n\n<li>\u010casy p\u0159etypov\u00e1n\u00ed z\u00e1visej\u00ed na tom, kter\u00fd v\u00fdrobek se vyr\u00e1b\u011bl p\u0159edt\u00edm, a po\u0159ad\u00ed v\u00fdroby rozhoduje o jej\u00ed pr\u016fchodnosti.<\/li>\n\n\n<li>Sd\u00edlen\u00e9 n\u00e1stroje a operace, kter\u00e9 vy\u017eaduj\u00ed n\u011bkolik oper\u00e1tor\u016f sou\u010dasn\u011b, omezuj\u00ed v\u00fdkon v\u00fdroby stejn\u011b jako stroje.<\/li>\n\n\n<li>Oper\u00e1to\u0159i by m\u011bli odv\u00e1d\u011bt pr\u00e1ci p\u0159\u00edmo ve v\u00fdrobn\u00edm provozu a pl\u00e1n by na to m\u011bl reagovat.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Na co se zam\u011b\u0159it<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed.<\/strong> Cel\u00fd rozvrh by se m\u011bl aktualizovat podle postupu v\u00fdroby nebo zm\u011bn zak\u00e1zek, ani\u017e by pl\u00e1nova\u010d musel p\u0159esouvat operace jednu po druh\u00e9.<\/li>\n\n\n<li><strong>Model odpov\u00eddaj\u00edc\u00ed CSI.<\/strong> V\u00fdrobn\u00ed zdroje a jejich skupiny, sm\u011bny a sv\u00e1tky, alternativn\u00ed zdroje. N\u00e1stroj, kter\u00fd na\u010d\u00edt\u00e1 pouze pracovi\u0161t\u011b (SLWcs), nezachycuje skute\u010dn\u00fd model rozvrhov\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Podrobn\u00e9 zohledn\u011bn\u00ed omezen\u00ed.<\/strong> Matice p\u0159etypov\u00e1n\u00ed podle po\u0159ad\u00ed v\u00fdrobk\u016f, n\u00e1stroje jako sd\u00edlen\u00e9 zdroje s omezenou kapacitou, t\u00fdmy n\u011bkolika oper\u00e1tor\u016f a alternativn\u00ed stroje i pracovn\u00edci.<\/li>\n\n\n<li><strong>Zohledn\u011bn\u00ed materi\u00e1lu.<\/strong> Kontrola materi\u00e1lu pro v\u00fdrobn\u00ed zak\u00e1zky, skladov\u00fdch z\u00e1sob a n\u00e1kupn\u00edch objedn\u00e1vek p\u0159i rozvrhov\u00e1n\u00ed.<\/li>\n\n\n<li><strong>Zp\u011btn\u00e1 vazba z v\u00fdroby.<\/strong> Odv\u00e1d\u011bn\u00ed pr\u00e1ce, kter\u00e9 aktualizuje pl\u00e1n a zapisuje se zp\u011bt jako transakce v\u00fdrobn\u00edch zak\u00e1zek.<\/li>\n\n\n<li><strong>Jasn\u00fd zp\u016fsob integrace.<\/strong> V Infor Cloud p\u0159es Mongoose IDO REST API prost\u0159ednictv\u00edm ION API Gateway, s licenc\u00ed Automation pro p\u0159ipojen\u00ed. Zpr\u00e1vy ProductionOrder BOD oznamuj\u00ed zm\u011bny a aktualizace IDO zaji\u0161\u0165uj\u00ed zp\u011btn\u00fd z\u00e1pis rozvrhu.<\/li>\n\n\n<li><strong>Jasn\u00e9 rozd\u011blen\u00ed odpov\u011bdnosti.<\/strong> Ur\u010dete, kter\u00fd syst\u00e9m bude \u0159\u00eddit podrobn\u00e9 po\u0159ad\u00ed operac\u00ed, a p\u0159\u00edslu\u0161n\u00e9 zdroje vy\u0159a\u010fte z p\u016fsobnosti vestav\u011bn\u00e9ho n\u00e1stroje Scheduler i jeho nastaven\u00ed pro pl\u00e1novan\u00e9 p\u0159\u00edkazy.<\/li>\n\n\n<li><strong>Vyzkou\u0161en\u00ed s n\u00edzk\u00fdm rizikem.<\/strong> Ne\u017e se zav\u00e1\u017eete k integra\u010dn\u00edmu projektu, otestujte \u0159e\u0161en\u00ed na vlastn\u00edch datech.<\/li>\n\n<\/ol>\n\n\n<p>Mo\u017enosti se d\u011bl\u00ed do \u010dty\u0159 skupin:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vlastn\u00ed APS a Scheduler v CSI<\/strong> zaji\u0161\u0165uj\u00ed potvrzov\u00e1n\u00ed term\u00edn\u016f zak\u00e1zek pomoc\u00ed Get CTP a ur\u010dov\u00e1n\u00ed po\u0159ad\u00ed operac\u00ed v kr\u00e1tk\u00e9m horizontu, kter\u00e9 se ru\u010dn\u011b upravuje v Resource Gantt.<\/li>\n\n\n<li><strong>Pl\u00e1novac\u00ed tabule v klientu ERP<\/strong> nab\u00edzej\u00ed t\u00fdm\u016fm, kter\u00e9 pl\u00e1nuj\u00ed ru\u010dn\u011b, jin\u00fd pohled na data CSI. Toto zobrazen\u00ed obvykle spravuje partner.<\/li>\n\n\n<li><strong>Rozs\u00e1hl\u00e9 podnikov\u00e9 syst\u00e9my APS<\/strong> se p\u0159ipojuj\u00ed v r\u00e1mci implementa\u010dn\u00edho projektu a obsluhuje je specializovan\u00fd pl\u00e1novac\u00ed t\u00fdm.<\/li>\n\n\n<li><strong>Cloudov\u00e9 APS s podporou \u0159\u00edzen\u00ed pr\u00e1ce ve v\u00fdrob\u011b<\/strong>, kam pat\u0159\u00ed SkyPlanner, automaticky rozvrhuje v\u0161echny v\u00fdrobn\u00ed zdroje vedle CSI. Pr\u016fb\u011b\u017en\u011b p\u0159epl\u00e1nov\u00e1v\u00e1 podle zm\u011bn ve v\u00fdrob\u011b a zp\u0159\u00edstup\u0148uje rozvrh oper\u00e1tor\u016fm.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde se uplatn\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS p\u0159eb\u00edr\u00e1 v\u00fdrobn\u00ed zak\u00e1zky, operace a v\u00fdrobn\u00ed zdroje, kter\u00e9 ji\u017e evidujete v CSI, a rozvrhuje je na interaktivn\u00ed \u010dasov\u00e9 ose Ganttova diagramu. Na ka\u017ed\u00fd z v\u00fd\u0161e uveden\u00fdch bod\u016f m\u00e1 konkr\u00e9tn\u00ed odpov\u011b\u010f:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dnes v CSI<\/th><th>Co nab\u00edz\u00ed SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby v APS podle skute\u010dn\u00fdch kapacit vy\u017eaduje licenci<\/td><td>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit se zohledn\u011bn\u00edm ka\u017ed\u00e9ho pracovi\u0161t\u011b, sm\u011bny, pracovn\u00edka i nep\u0159\u00edtomnosti, od 199 \u20ac m\u011bs\u00ed\u010dn\u011b s 5 pracovi\u0161ti<\/td><\/tr><tr><td>\u00dapln\u00e9 v\u00fdpo\u010dty APS, Plan on Save a spou\u0161t\u011bn\u00ed n\u00e1stroje Scheduler na vy\u017e\u00e1d\u00e1n\u00ed<\/td><td>Arcturus vytvo\u0159\u00ed pl\u00e1n v\u00fdroby podle skute\u010dn\u00fdch kapacit b\u011bhem n\u011bkolika sekund. Autopilot automaticky p\u0159epl\u00e1nov\u00e1v\u00e1 p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b<\/td><\/tr><tr><td>Ru\u010dn\u00ed \u00fapravy Ganttova diagramu, operaci po operaci<\/td><td>Pl\u00e1nova\u010di p\u0159etahuj\u00ed operace v Ganttov\u011b diagramu a pl\u00e1novac\u00ed algoritmus udr\u017euje cel\u00fd rozvrh v souladu. Bulldozer posouv\u00e1 navazuj\u00edc\u00ed operace<\/td><\/tr><tr><td>Skupiny zdroj\u016f pro se\u0159izov\u00e1n\u00ed a vyhled\u00e1vac\u00ed tabulky \u010das\u016f se\u0159\u00edzen\u00ed<\/td><td>Matice se\u0159izovac\u00edch \u010das\u016f zohled\u0148uje asymetrick\u00e9 \u010dasy p\u0159etypov\u00e1n\u00ed mezi v\u00fdrobky podle jejich po\u0159ad\u00ed a slou\u017e\u00ed k v\u00fdb\u011bru po\u0159ad\u00ed s nejkrat\u0161\u00ed celkovou dobou se\u0159izov\u00e1n\u00ed<\/td><\/tr><tr><td>Skupiny v\u00fdrobn\u00edch zdroj\u016f pro jednotliv\u00e9 operace<\/td><td>N\u00e1stroje jako sd\u00edlen\u00e9 zdroje s omezenou kapacitou, n\u011bkolik oper\u00e1tor\u016f na jednom pracovi\u0161ti sou\u010dasn\u011b, alternativn\u00ed stroje a pracovn\u00edci p\u0159i obsazen\u00ed prim\u00e1rn\u00edho zdroje<\/td><\/tr><tr><td>Dva pl\u00e1novac\u00ed algoritmy, jejich\u017e v\u00fdsledky je nutn\u00e9 sladit<\/td><td>Jeden rozvrh pro zdroje, jejich\u017e pl\u00e1nov\u00e1n\u00ed \u0159\u00edd\u00ed SkyPlanner, se zp\u011btn\u00fdm z\u00e1pisem pl\u00e1novan\u00fdch term\u00edn\u016f operac\u00ed do CSI<\/td><\/tr><tr><td>Pl\u00e1nov\u00e1n\u00ed z\u00e1sobov\u00e1n\u00ed pomoc\u00ed MRP bez pohledu na kapacity<\/td><td>U ka\u017ed\u00e9 operace se kontroluj\u00ed skladov\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00edch objedn\u00e1vek v CSI; objednan\u00fd materi\u00e1l se pova\u017euje za dostupn\u00fd k term\u00ednu dod\u00e1n\u00ed uveden\u00e9mu na n\u00e1kupn\u00ed objedn\u00e1vce<\/td><\/tr><tr><td>Seznam pr\u00e1ce pro v\u00fdrobn\u00ed provoz<\/td><td>Oper\u00e1to\u0159i vid\u00ed svou frontu pr\u00e1ce a zaznamen\u00e1vaj\u00ed pr\u00e1ci na telefonu nebo tabletu pomoc\u00ed funkc\u00ed Mobile Confirmations, Production Timer a Quick Log Mode<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Model zohled\u0148uje skupiny pracovi\u0161\u0165 i jejich v\u00fdkonnost a jednu operaci lze rozd\u011blit mezi n\u011bkolik pracovi\u0161\u0165. Po\u0159ad\u00ed se ur\u010duje podle priority v\u00fdrobn\u00ed zak\u00e1zky, term\u00ednu dokon\u010den\u00ed, priority z\u00e1kazn\u00edka a funkc\u00ed Fast Track a Dynamic Priorities.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> pl\u00e1nova\u010di po ka\u017ed\u00e9 poru\u0161e ru\u010dn\u011b sestavuj\u00ed denn\u00ed pl\u00e1n znovu. Autopilot p\u0159epl\u00e1nuje v\u0161echny otev\u0159en\u00e9 operace a Running Time Lock ponech\u00e1 rozpracovan\u00e9 operace na m\u00edst\u011b.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> va\u0161i kapacitu ur\u010duj\u00ed \u010dasy p\u0159etypov\u00e1n\u00ed. P\u0159echod z modr\u00e9 na \u010dervenou m\u016f\u017ee trvat 30 minut a z \u010derven\u00e9 na modrou 60. Pl\u00e1novac\u00ed algoritmus vybere po\u0159ad\u00ed s nejkrat\u0161\u00ed celkovou dobou se\u0159izov\u00e1n\u00ed.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> pou\u017e\u00edv\u00e1te CSI bez licence APS a pl\u00e1nujete v tabulk\u00e1ch na z\u00e1klad\u011b pl\u00e1n\u016f z re\u017eimu Infinite. MRP nad\u00e1le pl\u00e1nuje materi\u00e1l v CSI a implementace je obvykle hotov\u00e1 b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p>SkyPlanner se s CloudSuite Industrial propojuje obousm\u011brn\u011b:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>V\u00fdrobn\u00ed zak\u00e1zky, operace, v\u00fdrobn\u00ed zdroje a n\u00e1kupn\u00ed objedn\u00e1vky se na\u010d\u00edtaj\u00ed p\u0159es IDO REST API.<\/li>\n\n\n<li>Pl\u00e1novan\u00e9 term\u00edny operac\u00ed se zapisuj\u00ed zp\u011bt pomoc\u00ed aktualizac\u00ed IDO a vyk\u00e1zan\u00e1 pr\u00e1ce se p\u0159ed\u00e1v\u00e1 jako \u0159\u00e1dky SLJobtrans, kter\u00e9 CSI za\u00fa\u010dtuje.<\/li>\n\n\n<li>Webhooky odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou.<\/li>\n\n<\/ul>\n\n\n<p>T\u00fdm SkyPlanner b\u011bhem zav\u00e1d\u011bn\u00ed nakonfiguruje integraci podle va\u0161eho nastaven\u00ed CSI a po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu zaji\u0161\u0165uje jej\u00ed podporu. Cenu integrace stanov\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s cenou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Integraci m\u016f\u017ee vytvo\u0159it tak\u00e9 v\u00e1\u0161 partner Infor nebo va\u0161i v\u00fdvoj\u00e1\u0159i pomoc\u00ed zdokumentovan\u00e9ho REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>).<\/p>\n\n\n<p>Bezplatn\u00e1 zku\u0161ebn\u00ed verze na 30 dn\u00ed zahrnuje a\u017e 20 pracovi\u0161\u0165, nevy\u017eaduje platebn\u00ed kartu a pracuje s exporty CSV nebo Excel. Vlastn\u00ed operace uvid\u00edte v pl\u00e1nu v\u00fdroby, kter\u00fd respektuje skute\u010dn\u00e9 kapacity, je\u0161t\u011b p\u0159edt\u00edm, ne\u017e kdokoli za\u010dne pracovat s IDO. Plat\u00ed se m\u011bs\u00ed\u010dn\u011b a slu\u017ebu m\u016f\u017eete kdykoli zru\u0161it.<\/p>\n\n\n<p>Celkov\u00fd p\u0159ehled najdete na <a href=\"\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/\">str\u00e1nce Infor CloudSuite Industrial<\/a>, technick\u00fd postup v <a href=\"\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed<\/a> a dal\u0161\u00ed informace v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci SkyPlanner<\/a>. Nebo si <a href=\"\/cs\/zkusebni-verze\/\">spus\u0165te bezplatnou zku\u0161ebn\u00ed verzi<\/a>. Pokud s n\u00e1mi chcete proj\u00edt sv\u00e9 nastaven\u00ed CSI, <a href=\"\/cs\/kontaktni-prodej\/\">rezervujte si uk\u00e1zku<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Zku\u0161enosti v\u00fdrobn\u00edch firem se syst\u00e9mem SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu na v\u00fdrobu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pracovn\u00ed doby a nov\u00e1 fronta pr\u00e1ce se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b zabere m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd pohled na z\u00e1vod spole\u010dnosti Piristeel na v\u00fdrobu st\u0159e\u0161n\u00edch bezpe\u010dnostn\u00edch prvk\u016f v Kauhav\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>v\u010dasnost dod\u00e1vek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eD\u00edky SkyPlanner m\u00e1me lep\u0161\u00ed p\u0159ehled o tom, kde vznikaj\u00ed \u00fazk\u00e1 m\u00edsta, a \u0159\u00edzen\u00ed v\u00fdroby je p\u0159ehledn\u011bj\u0161\u00ed.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vedouc\u00ed v\u00fdroby<\/b><br>Piristeel \u00b7 St\u0159e\u0161n\u00ed bezpe\u010dnostn\u00ed prvky a okapov\u00e9 syst\u00e9my<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek letos dos\u00e1hla 99,2 % a rozvrhov\u00e1n\u00ed \u0161et\u0159\u00ed a\u017e \u010dty\u0159i hodiny pracovn\u00ed doby denn\u011b.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/piristeel\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale firmy v Lohje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000s<\/b><span>automaticky rozvr\u017een\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00fapln\u011b jinak a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na zcela jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f se rozvrhuj\u00ed automaticky a cel\u00e1 firma m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010dt\u011bte si zku\u0161enosti Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pl\u00e1nuje SyteLine APS do omezen\u00fdch, nebo neomezen\u00fdch kapacit?<\/summary>\n<p class=\"sp-faq__a\">Oboj\u00ed. Re\u017eim APS p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby zohled\u0148uje dostupnou kapacitu a kontroluje, zda maj\u00ed pracovn\u00edci a stroje sm\u011bnu a jsou voln\u00ed. Infinite APS umo\u017e\u0148uje b\u011bhem sm\u011bny p\u0159i\u0159adit jednomu zdroji neomezen\u00fd po\u010det \u00fakol\u016f. Bez licence APS lze pou\u017e\u00edvat pouze re\u017eim Infinite.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 CloudSuite Industrial Gantt\u016fv diagram?<\/summary>\n<p class=\"sp-faq__a\">Ano. Resource Gantt Chart &#8211; Scheduler zobrazuje napl\u00e1novan\u00e9 operace podle v\u00fdrobn\u00edch zdroj\u016f. P\u0159esunut\u00edm pruhu se otev\u0159e Gantt Edit Operation, kde lze zm\u011bnit term\u00edny \u010di zdroj nebo operaci zafixovat. Gantt\u016fv diagram v syst\u00e9mu SkyPlanner se li\u0161\u00ed t\u00edm, co n\u00e1sleduje: pl\u00e1novac\u00ed algoritmus automaticky p\u0159epl\u00e1nuje dot\u010den\u00e9 operace, m\u00edsto aby navazuj\u00edc\u00ed p\u0159esuny nechal na pl\u00e1nova\u010di.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd je rozd\u00edl mezi APS a n\u00e1strojem Scheduler v CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">APS Planning pl\u00e1nuje popt\u00e1vku, z\u00e1sobov\u00e1n\u00ed a kapacity v dlouh\u00e9m horizontu, obvykle na jeden nebo dva m\u011bs\u00edce. Vytv\u00e1\u0159\u00ed pl\u00e1novan\u00e9 p\u0159\u00edkazy a pomoc\u00ed Plan on Save vkl\u00e1d\u00e1 novou popt\u00e1vku. Scheduler ur\u010duje po\u0159ad\u00ed operac\u00ed v kr\u00e1tk\u00e9m horizontu na zdroj\u00edch s omezenou kapacitou, obvykle na jeden den, a tiskne Resource Group Dispatch List.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pot\u0159ebuji pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit v CloudSuite Industrial dal\u0161\u00ed licenci?<\/summary>\n<p class=\"sp-faq__a\">Pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit pomoc\u00ed APS Planning a pro funkci Get CTP ano: vy\u017eaduj\u00ed modul APS. SkyPlanner APS pl\u00e1nuje v\u00fdrobu podle skute\u010dn\u00fdch kapacit na z\u00e1klad\u011b v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a zdroj\u016f z CSI i bez tohoto modulu. Extern\u00ed aplikace p\u0159ipojen\u00e1 p\u0159es vrstvu IDO vyu\u017e\u00edv\u00e1 licenci Automation.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Zvl\u00e1dne SkyPlanner se\u0159izov\u00e1n\u00ed z\u00e1visl\u00e9 na po\u0159ad\u00ed v\u00fdroby, n\u00e1stroje i pracovn\u00ed t\u00fdmy?<\/summary>\n<p class=\"sp-faq__a\">Ano. Matice se\u0159izovac\u00edch \u010das\u016f obsahuje asymetrick\u00e9 \u010dasy p\u0159etypov\u00e1n\u00ed mezi v\u00fdrobky. N\u00e1stroje jsou zdroje s omezenou kapacitou a nelze je pou\u017e\u00edvat na dvou pracovi\u0161t\u00edch sou\u010dasn\u011b. U operac\u00ed, kter\u00e9 vy\u017eaduj\u00ed t\u00fdm, lze k jednomu pracovi\u0161ti p\u0159i\u0159adit v\u00edce oper\u00e1tor\u016f. Pokud je prim\u00e1rn\u00ed zdroj obsazen\u00fd, vyu\u017eij\u00ed se alternativn\u00ed stroje a pracovn\u00edci.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pro\u010d CSI nezohled\u0148uje kapacitu m\u00e9ho pracovi\u0161t\u011b?<\/summary>\n<p class=\"sp-faq__a\">Proto\u017ee pracovi\u0161t\u011b v CloudSuite Industrial slou\u017e\u00ed pouze k evidenci n\u00e1klad\u016f. Kapacita se definuje u v\u00fdrobn\u00edch zdroj\u016f, skupin zdroj\u016f a sm\u011bn.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Lze SkyPlanner APS propojit s CloudSuite Industrial nebo SyteLine?<\/summary>\n<p class=\"sp-faq__a\">Ano, obousm\u011brn\u011b. V\u00fdrobn\u00ed p\u0159\u00edkazy, operace a v\u00fdrobn\u00ed zdroje se na\u010d\u00edtaj\u00ed p\u0159es IDO REST API. Pl\u00e1novan\u00e9 term\u00edny operac\u00ed se zapisuj\u00ed zp\u011bt prost\u0159ednictv\u00edm aktualizac\u00ed IDO a odveden\u00e1 pr\u00e1ce jako \u0159\u00e1dky SLJobtrans. T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace a poskytuje podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. Integraci m\u016f\u017ee s vyu\u017eit\u00edm zdokumentovan\u00e9ho REST API vytvo\u0159it tak\u00e9 v\u00e1\u0161 partner Infor nebo va\u0161i v\u00fdvoj\u00e1\u0159i. Projd\u011bte si <a href=\"\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/pruvodce-integraci\/\">pr\u016fvodce integrac\u00ed<\/a>, <a href=\"\/cs\/zkusebni-verze\/\">vyzkou\u0161ejte SkyPlanner zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Infor CloudSuite Industrial Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS Ano. Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupnou kapacitu stroj\u016f i pracovn\u00edk\u016f. Infor CloudSuite Industrial (d\u0159\u00edve SyteLine, \u010dasto ozna\u010dovan\u00fd jako CSI) p\u0159i rozvrhov\u00e1n\u00ed zohled\u0148uje kapacitn\u00ed omezen\u00ed v\u00fdrobn\u00edch zdroj\u016f na dvou m\u00edstech: &#8230; <a title=\"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/\" aria-label=\"Read more about Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100879,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101296","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Um\u00ed CloudSuite Industrial pl\u00e1novat v\u00fdrobu?<\/title>\n<meta name=\"description\" content=\"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/planovani-vyroby\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/planovani-vyroby\\\/\",\"name\":\"Um\u00ed CloudSuite Industrial pl\u00e1novat v\u00fdrobu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/planovani-vyroby\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/planovani-vyroby\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/planovani-vyroby\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Infor CloudSuite Industrial (SyteLine): pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Um\u00ed CloudSuite Industrial pl\u00e1novat v\u00fdrobu?","description":"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/","og_locale":"cs_CZ","og_type":"article","og_title":"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS","og_description":"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"21 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/","name":"Um\u00ed CloudSuite Industrial pl\u00e1novat v\u00fdrobu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Ano: CloudSuite Industrial (SyteLine) m\u00e1 licencovan\u00e9 APS a Scheduler zohled\u0148uj\u00edc\u00ed kapacity s Resource Gantt. Funkce, limity a kdy p\u0159idat SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/planovani-vyroby\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Infor CloudSuite Industrial (SyteLine): pl\u00e1nov\u00e1n\u00ed v\u00fdroby","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Infor CloudSuite Industrial Um\u00ed Infor CloudSuite Industrial pl\u00e1novat v\u00fdrobu? Vlastn\u00ed APS, Scheduler a SkyPlanner APS Ano. Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupnou kapacitu stroj\u016f i pracovn\u00edk\u016f. Infor CloudSuite Industrial (d\u0159\u00edve SyteLine, \u010dasto ozna\u010dovan\u00fd jako CSI) p\u0159i rozvrhov\u00e1n\u00ed zohled\u0148uje kapacitn\u00ed omezen\u00ed v\u00fdrobn\u00edch zdroj\u016f na dvou m\u00edstech:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101296"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101296\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100879"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}