{"id":101177,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101177"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"planovani-vyroby","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/","title":{"rendered":"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? <span class=\"hl\">Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Odoo nab\u00edz\u00ed z\u00e1kladn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle voln\u00fdch kapacit v kalend\u00e1\u0159i pracovi\u0161t\u011b. Tla\u010d\u00edtko <strong>Plan<\/strong> v Odoo Manufacturing za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho intervalu v kalend\u00e1\u0159i p\u0159\u00edslu\u0161n\u00e9ho pracovi\u0161t\u011b. Dva napl\u00e1novan\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy se tak na jednom pracovi\u0161ti nikdy nep\u0159ekr\u00fdvaj\u00ed. Pl\u00e1nuje ale v\u017edy jen jednu v\u00fdrobn\u00ed zak\u00e1zku a zohled\u0148uje jedin\u00e9 omezen\u00ed. Nap\u0159\u00ed\u010d zak\u00e1zkami nem\u011bn\u00ed po\u0159ad\u00ed, neoptimalizuje ani nep\u0159epl\u00e1nov\u00e1v\u00e1. Z\u00e1vody, kter\u00e9 pot\u0159ebuj\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby respektuj\u00edc\u00ed skute\u010dn\u011b dostupn\u00e9 kapacity stroj\u016f i pracovn\u00edk\u016f a \u0159azen\u00ed v\u0161ech zak\u00e1zek podle term\u00edn\u016f dod\u00e1n\u00ed a se\u0159\u00edzen\u00ed, pou\u017e\u00edvaj\u00ed vedle Odoo syst\u00e9m SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit prezentaci<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo ve sv\u00fdch marketingov\u00fdch materi\u00e1lech uv\u00e1d\u00ed, \u017ee m\u016f\u017eete &#8222;plan resources with finite capacity planning&#8220; (pl\u00e1novat vyu\u017eit\u00ed zdroj\u016f s ohledem na jejich skute\u010dn\u00e9 kapacity) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). N\u00ed\u017ee vysv\u011btlujeme, co to v Odoo 19.0 znamen\u00e1 podle ofici\u00e1ln\u00ed dokumentace a zdrojov\u00e9ho k\u00f3du: jak funguje Plan, kde m\u00e1 hranice a kdy v\u00e1m pln\u011b posta\u010d\u00ed.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak Odoo pl\u00e1nuje v\u00fdrobn\u00ed p\u0159\u00edkazy krok za krokem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Zapn\u011bte v\u00fdrobn\u00ed p\u0159\u00edkazy a nastavte pracovi\u0161t\u011b<\/h3>\n\n\n<p>P\u0159ejd\u011bte do <strong>Manufacturing &gt; Configuration &gt; Settings<\/strong> a zapn\u011bte <strong>Work Orders<\/strong>. V nab\u00eddce <strong>Configuration<\/strong> se pak zobraz\u00ed <strong>Work Centers<\/strong>. Ka\u017ed\u00e9 pracovi\u0161t\u011b (<code>mrp.workcenter<\/code>) obsahuje pole, se kter\u00fdmi pl\u00e1nova\u010d pracuje:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Pole<\/th><th>V\u00fdznam p\u0159i pl\u00e1nov\u00e1n\u00ed<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>Pracovn\u00ed kalend\u00e1\u0159 pracovi\u0161t\u011b. V\u00fdchoz\u00ed nastaven\u00ed je \u201eStandard 40 hours\/week\u201c, od pond\u011bl\u00ed do p\u00e1tku<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Procentn\u00ed hodnota, kter\u00e1 zkracuje nebo prodlu\u017euje dobu ka\u017ed\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu na tomto pracovi\u0161ti<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Minuty p\u0159idan\u00e9 p\u0159ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz a po n\u011bm<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>Dal\u0161\u00ed pracovi\u0161t\u011b, kter\u00e1 m\u016f\u017ee funkce Napl\u00e1novat pou\u017e\u00edt jako n\u00e1hradu<\/td><\/tr><tr><td>Karta Kapacity produkt\u016f<\/td><td>Po\u010det kus\u016f na cyklus a minuty na se\u0159\u00edzen\u00ed a \u00faklid pro konkr\u00e9tn\u00ed produkt (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>C\u00edlov\u00e1 hodnota v\u00fdkonnosti pro v\u00fdkazy, nikoli vstup pro pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>Allowed Employees<\/td><td>Kdo zde sm\u00ed pracovat. Jde o filtr, nikoli o kapacitu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. Operace v kusovn\u00edku<\/h3>\n\n\n<p>Spole\u010dn\u00fd kmenov\u00fd technologick\u00fd postup zde neexistuje. Operace jsou ulo\u017een\u00e9 v jednotliv\u00fdch kusovn\u00edc\u00edch na kart\u011b <strong>Operace<\/strong> (<code>mrp.routing.workcenter<\/code>). Ka\u017ed\u00e1 operace m\u00e1 p\u0159i\u0159azen\u00e9 pracovi\u0161t\u011b v poli <strong>Work Center<\/strong> a nastaven\u00fd zp\u016fsob v\u00fdpo\u010dtu doby trv\u00e1n\u00ed v poli <strong>Duration Computation<\/strong>: bu\u010f pevn\u00fd \u010das, kter\u00fd zad\u00e1te, nebo \u010das vypo\u010dten\u00fd z posledn\u00edch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f (ve v\u00fdchoz\u00edm nastaven\u00ed z 10). O\u010dek\u00e1van\u00e1 doba trv\u00e1n\u00ed se rovn\u00e1 sou\u010dtu \u010dasu se\u0159\u00edzen\u00ed, \u010dasu \u00faklidu a po\u010dtu cykl\u016f n\u00e1soben\u00e9ho dobou cyklu, p\u0159i\u010dem\u017e \u010d\u00e1st p\u0159ipadaj\u00edc\u00ed na cykly se d\u011bl\u00ed hodnotou pole Time Efficiency (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>Po zapnut\u00ed funkce <strong>Work Order Dependencies<\/strong> m\u016f\u017ee b\u00fdt operace blokov\u00e1na jinou operac\u00ed pomoc\u00ed pole <strong>Blocked By<\/strong>. Dokumentace Odoo uv\u00e1d\u00ed: &#8222;A blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.&#8220; (Blokovan\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz se napl\u00e1nuje na konec \u010dasov\u00e9ho \u00faseku ur\u010den\u00e9ho polem Expected Duration u p\u0159edch\u00e1zej\u00edc\u00edho v\u00fdrobn\u00edho p\u0159\u00edkazu.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">zdroj<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Potvr\u010fte v\u00fdrobn\u00ed zak\u00e1zku (MO) a stiskn\u011bte Plan<\/h3>\n\n\n<p>Potvrzen\u00edm v\u00fdrobn\u00ed zak\u00e1zky (<code>mrp.production<\/code>) se vytvo\u0159\u00ed jej\u00ed v\u00fdrobn\u00ed p\u0159\u00edkazy (<code>mrp.workorder<\/code>). Po stisknut\u00ed tla\u010d\u00edtka <strong>Napl\u00e1novat<\/strong> na v\u00fdrobn\u00ed zak\u00e1zce syst\u00e9m za\u010dne od koncov\u00fdch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f a rekurzivn\u011b nejprve napl\u00e1nuje ka\u017ed\u00fd p\u0159\u00edkaz, kter\u00fd je blokuje. Ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz se pl\u00e1nuje dop\u0159edn\u011b v \u010dase za sv\u00e9 p\u0159edch\u016fdce. U ka\u017ed\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu Odoo:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Ze za\u010d\u00e1tku v\u00fdrobn\u00ed zak\u00e1zky, aktu\u00e1ln\u00edho \u010dasu a konce v\u0161ech blokuj\u00edc\u00edch v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f vybere nejpozd\u011bj\u0161\u00ed okam\u017eik.<\/li>\n\n\n<li>Prov\u011b\u0159\u00ed hlavn\u00ed pracovi\u0161t\u011b i v\u0161echna pracovi\u0161t\u011b uveden\u00e1 v Alternative Workcenter.<\/li>\n\n\n<li>V ka\u017ed\u00e9m kalend\u00e1\u0159i hled\u00e1 sm\u011brem do budoucna prvn\u00ed voln\u00fd interval, kter\u00fd je dostate\u010dn\u011b dlouh\u00fd pro o\u010dek\u00e1vanou dobu trv\u00e1n\u00ed.<\/li>\n\n\n<li>Vybere pracovi\u0161t\u011b, na kter\u00e9m p\u0159\u00edkaz skon\u010d\u00ed nejd\u0159\u00edve, a rezervuje v jeho kalend\u00e1\u0159i \u010dasov\u00fd \u00fasek pomoc\u00ed z\u00e1znamu <code>resource.calendar.leaves<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>Zdrojov\u00fd k\u00f3d verze 19.0 pravidlo popisuje jasn\u011b: &#8222;The available interval is disjoinct with all other workorders planned on this workcenter&#8220; (Dostupn\u00fd interval se nep\u0159ekr\u00fdv\u00e1 s \u017e\u00e1dn\u00fdm jin\u00fdm v\u00fdrobn\u00edm p\u0159\u00edkazem napl\u00e1novan\u00fdm na tomto pracovi\u0161ti) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Pr\u00e1v\u011b v tom spo\u010d\u00edv\u00e1 zohledn\u011bn\u00ed omezen\u00e9 kapacity. Pokud v\u00fdrobn\u00ed p\u0159\u00edkaz naraz\u00ed na dobu mimo provoz, pokra\u010duje v dal\u0161\u00edm pracovn\u00edm intervalu. Nenajde-li se vhodn\u00fd term\u00edn b\u011bhem 700 dn\u016f, co\u017e je v\u00fdchoz\u00ed rozsah hled\u00e1n\u00ed, Plan skon\u010d\u00ed hl\u00e1\u0161en\u00edm &#8222;Impossible to plan the workorder.&#8220; (V\u00fdrobn\u00ed p\u0159\u00edkaz nelze napl\u00e1novat.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Odst\u00e1vky a alternativn\u00ed pracovi\u0161t\u011b<\/h3>\n\n\n<p>Pomoc\u00ed aplikace <strong>Time Off<\/strong> a v\u00fdvoj\u00e1\u0159sk\u00e9ho re\u017eimu m\u016f\u017eete pracovi\u0161t\u011b zablokovat kv\u016fli \u00fadr\u017eb\u011b nebo sv\u00e1tku. Plan pak v\u00fdrobn\u00ed p\u0159\u00edkazy sm\u011bruje na Alternative Workcenters. Pokud alternativn\u00ed pracovi\u0161t\u011b chyb\u00ed, podle dokumentace Odoo &#8222;work orders begin to pile up at the work center until it is operational again&#8220; (v\u00fdrobn\u00ed p\u0159\u00edkazy se na pracovi\u0161ti za\u010dnou hromadit, dokud nen\u00ed znovu v provozu) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">zdroj<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Zkontrolujte a upravte pl\u00e1n<\/h3>\n\n\n<p>Volby <strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> a <strong>Planning by Workcenter<\/strong> otev\u00edraj\u00ed zobrazen\u00ed pl\u00e1nu v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f. Enterprise nab\u00edz\u00ed Gantt\u016fv diagram s p\u0159esouv\u00e1n\u00edm polo\u017eek my\u0161\u00ed. Community nab\u00edz\u00ed seznam, kalend\u00e1\u0159, kontingen\u010dn\u00ed tabulku a graf. Dokumentace popisuje \u00fapravy jako ru\u010dn\u00ed: &#8222;Times and planned work centers can be changed by clicking to access the individual work order.&#8220; (\u010casy a pl\u00e1novan\u00e1 pracovi\u0161t\u011b lze zm\u011bnit kliknut\u00edm a otev\u0159en\u00edm jednotliv\u00e9ho v\u00fdrobn\u00edho p\u0159\u00edkazu.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">zdroj<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde m\u00e1 Odoo hranice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv vyr\u00e1b\u00ed.<\/strong> Plan postupuje po jednotliv\u00fdch v\u00fdrobn\u00edch zak\u00e1zk\u00e1ch. Co napl\u00e1nujete jako prvn\u00ed, obsad\u00ed nejbli\u017e\u0161\u00ed voln\u00e9 term\u00edny. P\u0159i v\u00fdb\u011bru v\u00edce zak\u00e1zek je Odoo napl\u00e1nuje ve sv\u00e9m v\u00fdchoz\u00edm po\u0159ad\u00ed: podle priority a pot\u00e9 podle data zah\u00e1jen\u00ed. Term\u00edny dokon\u010den\u00ed nijak nepom\u011b\u0159uje s p\u0159etypov\u00e1n\u00edm a ji\u017e napl\u00e1novanou zak\u00e1zku neodsune kv\u016fli nal\u00e9hav\u011bj\u0161\u00ed.<\/li>\n\n\n<li><strong>Po\u0159ad\u00ed nezohled\u0148uje se\u0159\u00edzen\u00ed.<\/strong> Setup Time p\u0159id\u00e1v\u00e1 ke ka\u017ed\u00e9mu v\u00fdrobn\u00edmu p\u0159\u00edkazu pevnou dobu, v\u017edy stejn\u00fd po\u010det minut bez ohledu na p\u0159edchoz\u00ed v\u00fdrobu. Odoo nem\u00e1 matici p\u0159etypov\u00e1n\u00ed a neseskupuje podobn\u00e9 operace, aby p\u0159etypov\u00e1n\u00ed omezilo.<\/li>\n\n\n<li><strong>Jedin\u00e9 omezen\u00ed.<\/strong> Pl\u00e1n omezuje pouze kalend\u00e1\u0159 pracovi\u0161t\u011b. Obsluha se \u0159e\u0161\u00ed filtrem Allowed Employees. P\u0159i rezervaci intervalu Plan nekontroluje n\u00e1stroje ani dostupnost materi\u00e1lu. Rezervace komponent a term\u00edny n\u00e1kupn\u00edch objedn\u00e1vek slou\u017e\u00ed jen k dopl\u0148ov\u00e1n\u00ed z\u00e1sob.<\/li>\n\n\n<li><strong>MRP nezohled\u0148uje kapacitu.<\/strong> Pravidla dopl\u0148ov\u00e1n\u00ed z\u00e1sob a MTO vytv\u00e1\u0159ej\u00ed v\u00fdrobn\u00ed zak\u00e1zky podle pole <strong>Manuf. Lead Time<\/strong> v kusovn\u00edku, a to v kalend\u00e1\u0159n\u00edch dnech. Dokumentace uv\u00e1d\u00ed: &#8222;Lead times do not consider weekends, holidays, or work center capacity&#8220; (Pr\u016fb\u011b\u017en\u00e9 doby nezohled\u0148uj\u00ed v\u00edkendy, sv\u00e1tky ani kapacitu pracovi\u0161t\u011b) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">zdroj<\/a>). Term\u00edny v\u00fdrobn\u00edch zak\u00e1zek a p\u0159isl\u00edben\u00e9 term\u00edny dod\u00e1n\u00ed vych\u00e1zej\u00ed z kalend\u00e1\u0159n\u00edch dn\u016f, nikoli ze skute\u010dn\u00e9 fronty pr\u00e1ce.<\/li>\n\n\n<li><strong>MPS je seznam n\u00e1vrh\u016f.<\/strong> Ani Master Production Schedule (Enterprise) nezohled\u0148uje vyt\u00ed\u017een\u00ed. &#8222;The MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.&#8220; (MPS pouze navrhuje mno\u017estv\u00ed produktu k dopln\u011bn\u00ed. P\u0159\u00edslu\u0161n\u00e9 n\u00e1kupn\u00ed objedn\u00e1vky a v\u00fdrobn\u00ed zak\u00e1zky mus\u00ed vytvo\u0159it u\u017eivatel.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">zdroj<\/a>)<\/li>\n\n\n<li><strong>Bez automatick\u00e9ho p\u0159epl\u00e1nov\u00e1n\u00ed.<\/strong> Porucha ani urgentn\u00ed zak\u00e1zka samy o sob\u011b nic neposunou. Jakmile za\u010dne n\u011bkter\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz, Odoo odm\u00edtne zru\u0161it napl\u00e1nov\u00e1n\u00ed v\u00fdrobn\u00ed zak\u00e1zky: &#8222;Some work orders have already started, so you cannot unplan this manufacturing order.&#8220; (N\u011bkter\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy ji\u017e byly zah\u00e1jeny, proto nelze zru\u0161it napl\u00e1nov\u00e1n\u00ed t\u00e9to v\u00fdrobn\u00ed zak\u00e1zky.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>Podsestavy se pl\u00e1nuj\u00ed samostatn\u011b.<\/strong> V\u00edce\u00farov\u0148ov\u00e9 kusovn\u00edky vytv\u00e1\u0159ej\u00ed samostatn\u00e9 pod\u0159\u00edzen\u00e9 v\u00fdrobn\u00ed zak\u00e1zky, z nich\u017e se ka\u017ed\u00e1 pl\u00e1nuje zvl\u00e1\u0161\u0165. Pl\u00e1nova\u010d je mus\u00ed napl\u00e1novat ve spr\u00e1vn\u00e9m po\u0159ad\u00ed, aby byla podsestava hotov\u00e1 ve chv\u00edli, kdy ji navazuj\u00edc\u00ed operace pot\u0159ebuje.<\/li>\n\n\n<li><strong>Gantt a MPS jsou sou\u010d\u00e1st\u00ed Enterprise.<\/strong> Na str\u00e1nce s p\u0159ehledem edic jsou funkce Manufacturing &#8222;Scheduling&#8220; (rozvrhov\u00e1n\u00ed) a &#8222;Shopfloor&#8220; (v\u00fdrobn\u00ed provoz) ozna\u010deny jako dostupn\u00e9 pouze v Enterprise (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). Pl\u00e1nova\u010di v Community pracuj\u00ed se seznamy a kalend\u00e1\u0159em.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy v\u00e1m sta\u010d\u00ed pl\u00e1nov\u00e1n\u00ed p\u0159\u00edmo v Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tla\u010d\u00edtko Plan v Odoo v\u00e1m posta\u010d\u00ed, pokud:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ka\u017ed\u00e1 operace m\u00e1 jedno jasn\u011b dan\u00e9 pracovi\u0161t\u011b a objemy v\u00fdroby jsou p\u0159im\u011b\u0159en\u00e9.<\/li>\n\n\n<li>O stejn\u00e9 \u00fazk\u00e9 m\u00edsto se d\u011bl\u00ed jen m\u00e1lo zak\u00e1zek, tak\u017ee po\u0159ad\u00ed podle p\u0159\u00edchodu poskytuje p\u0159ijateln\u00e9 term\u00edny.<\/li>\n\n\n<li>Va\u0161e alternativn\u00ed stroje jsou toto\u017en\u00e9, tak\u017ee Alternative Workcenters spolu s Time Off pokryj\u00ed v\u011bt\u0161inu naru\u0161en\u00ed v\u00fdroby.<\/li>\n\n\n<li>Se\u0159\u00edzen\u00ed je kr\u00e1tk\u00e9 nebo nez\u00e1vis\u00ed na p\u0159edchoz\u00ed operaci.<\/li>\n\n\n<li>Pl\u00e1nova\u010d m\u016f\u017ee jednou denn\u011b zkontrolovat Planning by Workcenter a t\u011bch n\u011bkolik koliz\u00ed upravit ru\u010dn\u011b.<\/li>\n\n<\/ul>\n\n\n<p>Pokud to odpov\u00edd\u00e1 va\u0161emu z\u00e1vodu, v\u011bnujte \u00fasil\u00ed kvalit\u011b dat. Ka\u017ed\u00e9mu pracovi\u0161ti p\u0159i\u0159a\u010fte kalend\u00e1\u0159 a do pol\u00ed Setup a Cleanup Time zadejte re\u00e1ln\u00e9 \u010dasy. Tam, kde historick\u00e1 data v\u00fdrazn\u011b kol\u00edsaj\u00ed, pou\u017eijte pevn\u00e9 doby trv\u00e1n\u00ed. Zapn\u011bte z\u00e1vislosti a pl\u00e1nujte v\u00fdrobn\u00ed zak\u00e1zky podle priority.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy pot\u0159ebujete syst\u00e9m pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Plan v\u00e1m p\u0159est\u00e1v\u00e1 sta\u010dit, pokud plat\u00ed n\u011bkolik z n\u00e1sleduj\u00edc\u00edch bod\u016f:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Mnoho zak\u00e1zek se d\u011bl\u00ed o dv\u011b nebo v\u00edce \u00fazk\u00fdch m\u00edst a po\u0159ad\u00ed mus\u00ed ur\u010dovat term\u00edny dokon\u010den\u00ed.<\/li>\n\n\n<li>Se\u0159\u00edzen\u00ed z\u00e1vis\u00ed na p\u0159edchoz\u00ed v\u00fdrob\u011b, tak\u017ee po\u0159ad\u00ed operac\u00ed ovliv\u0148uje vyroben\u00e9 mno\u017estv\u00ed.<\/li>\n\n\n<li>Lid\u00e9 a sm\u011bny omezuj\u00ed pl\u00e1n stejn\u011b jako stroje.<\/li>\n\n\n<li>O tom, kdy lze operaci zah\u00e1jit, rozhoduje dod\u00e1n\u00ed materi\u00e1lu.<\/li>\n\n\n<li>Urgentn\u00ed zak\u00e1zky, poruchy a opo\u017ed\u011bn\u00e9 dod\u00e1vky v\u00e1s nut\u00ed n\u011bkolikr\u00e1t t\u00fddn\u011b p\u0159epl\u00e1nov\u00e1vat.<\/li>\n\n\n<li>Obchod pot\u0159ebuje term\u00edny dod\u00e1n\u00ed podle skute\u010dn\u00e9 fronty pr\u00e1ce, nikoli podle Manuf. Lead Time.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Na co se p\u0159i v\u00fdb\u011bru zam\u011b\u0159it<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle skute\u010dn\u00fdch kapacit v\u0161ech pracovi\u0161\u0165 sou\u010dasn\u011b<\/strong>, se zohledn\u011bn\u00edm sm\u011bn, person\u00e1lu a nep\u0159\u00edtomnost\u00ed.<\/li>\n\n\n<li><strong>\u0158azen\u00ed operac\u00ed nap\u0159\u00ed\u010d v\u0161emi zak\u00e1zkami<\/strong> podle term\u00ednu dokon\u010den\u00ed a priority, nikoli po jednotliv\u00fdch v\u00fdrobn\u00edch zak\u00e1zk\u00e1ch.<\/li>\n\n\n<li><strong>Matice \u010das\u016f se\u0159\u00edzen\u00ed<\/strong> pro p\u0159etypov\u00e1n\u00ed z\u00e1visl\u00e9 na po\u0159ad\u00ed, podle n\u00ed\u017e v\u00fdpo\u010detn\u00ed j\u00e1dro vybere po\u0159ad\u00ed operac\u00ed s nejkrat\u0161\u00edm celkov\u00fdm \u010dasem se\u0159\u00edzen\u00ed.<\/li>\n\n\n<li><strong>N\u00e1stroje a pracovn\u00ed t\u00fdmy jako omezen\u00ed:<\/strong> sd\u00edlen\u00fd n\u00e1stroj pou\u017e\u00edvan\u00fd na jednom stroji nen\u00ed dostupn\u00fd pro jin\u00fd stroj a operace m\u016f\u017ee vy\u017eadovat n\u011bkolik pracovn\u00edk\u016f obsluhy sou\u010dasn\u011b.<\/li>\n\n\n<li><strong>Rozvrhov\u00e1n\u00ed podle dostupnosti materi\u00e1lu<\/strong>, kter\u00e9 kontroluje skladov\u00e9 z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00edch objedn\u00e1vek.<\/li>\n\n\n<li><strong>Alternativn\u00ed pracovi\u0161t\u011b<\/strong>, kter\u00e1 v\u00fdpo\u010detn\u00ed j\u00e1dro vyb\u00edr\u00e1 s ohledem na cel\u00fd pl\u00e1n, nikoli na jednotliv\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/li>\n\n\n<li><strong>V\u00fdrobky s v\u00edce\u00farov\u0148ovou strukturou<\/strong>, aby byly podsestavy hotov\u00e9 d\u0159\u00edve, ne\u017e je bude pot\u0159ebovat nad\u0159azen\u00e1 sestava.<\/li>\n\n\n<li><strong>Automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed<\/strong> podle postupu v\u00fdroby nebo zm\u011bn zak\u00e1zek.<\/li>\n\n\n<li><strong>Gantt\u016fv diagram pro pl\u00e1nova\u010de a fronta operac\u00ed pro obsluhu<\/strong>, i v Community.<\/li>\n\n\n<li><strong>Jasn\u00e9 pravidlo, kdo \u0159\u00edd\u00ed rozvrh.<\/strong> Term\u00edny v\u00fdrobn\u00edch p\u0159\u00edkaz\u016f v Odoo se po\u010d\u00edtaj\u00ed z rezervac\u00ed v kalend\u00e1\u0159i a op\u011btovn\u00e9 stisknut\u00ed tla\u010d\u00edtka Napl\u00e1novat je p\u0159ep\u00ed\u0161e. Dohodn\u011bte se, \u017ee po\u0159ad\u00ed ur\u010duje rozvrhovac\u00ed syst\u00e9m, zapisujte term\u00edny a pracovi\u0161t\u011b zp\u011bt p\u0159es <code>mrp.workorder<\/code> a vynech\u00e1vejte ji\u017e rozpracovan\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/li>\n\n\n<li><strong>Vhodn\u00e9 API pro va\u0161i verzi a tarif.<\/strong> Odoo 19 nab\u00edz\u00ed External JSON-2 API. XML-RPC a JSON-RPC maj\u00ed b\u00fdt <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">odstran\u011bny<\/a> v Odoo 22 (Odoo Online 21.1). P\u0159\u00edstup k extern\u00edmu API je dostupn\u00fd pouze v tarifech Custom, nikoli v One App Free nebo Standard (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">dokumentace extern\u00edho API<\/a>). Vlastn\u00ed moduly vy\u017eaduj\u00ed Odoo.sh nebo provoz na vlastn\u00ed infrastruktu\u0159e (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">cen\u00edk Odoo<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Mo\u017enosti lze rozd\u011blit do \u010dty\u0159 skupin:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vlastn\u00ed pl\u00e1nov\u00e1n\u00ed Odoo<\/strong> zahrnuje tla\u010d\u00edtko Plan a v Enterprise tak\u00e9 Gantt\u016fv diagram.<\/li>\n\n\n<li><strong>Dopl\u0148kov\u00e9 moduly p\u0159\u00edmo v klientu Odoo<\/strong> vylep\u0161uj\u00ed pl\u00e1novac\u00ed tabuli nebo zp\u016fsob obsazov\u00e1n\u00ed voln\u00fdch interval\u016f. Jejich \u00fadr\u017ebu zaji\u0161\u0165uje partner Odoo.<\/li>\n\n\n<li><strong>V\u00fdpo\u010detn\u00ed syst\u00e9my pro dodavatelsk\u00fd \u0159et\u011bzec a rozs\u00e1hl\u00e1 podnikov\u00e1 \u0159e\u0161en\u00ed APS<\/strong> se p\u0159ipojuj\u00ed v r\u00e1mci implementa\u010dn\u00edho projektu a obsluhuje je specializovan\u00fd pl\u00e1novac\u00ed t\u00fdm.<\/li>\n\n\n<li><strong>Cloudov\u00e9 APS s \u0159\u00edzen\u00edm pr\u00e1ce ve v\u00fdrobn\u00edm provozu<\/strong>, kam pat\u0159\u00ed SkyPlanner, automaticky rozvrhuje v\u0161echny v\u00fdrobn\u00ed zdroje vedle Odoo. Pr\u016fb\u011b\u017en\u011b p\u0159epl\u00e1nov\u00e1v\u00e1 podle zm\u011bn ve v\u00fdrob\u011b a zp\u0159\u00edstup\u0148uje pl\u00e1n obsluze.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde se uplatn\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u0159e\u0161\u00ed ka\u017ed\u00e9 z v\u00fd\u0161e uveden\u00fdch omezen\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M\u00edsto po\u0159ad\u00ed podle p\u0159\u00edchodu promy\u0161len\u00e1 posloupnost.<\/strong> V\u00fdpo\u010detn\u00ed j\u00e1dro Arcturus AI b\u011bhem n\u011bkolika sekund napl\u00e1nuje v\u0161echny otev\u0159en\u00e9 zak\u00e1zky spole\u010dn\u011b s ohledem na skute\u010dn\u00e9 kapacity. \u0158ad\u00ed je podle data dokon\u010den\u00ed, priority, priority z\u00e1kazn\u00edka, Fast Track a Dynamic Priorities.<\/li>\n\n\n<li><strong>M\u00edsto pevn\u00fdch \u010das\u016f krat\u0161\u00ed se\u0159\u00edzen\u00ed.<\/strong> Matice \u010das\u016f se\u0159\u00edzen\u00ed obsahuje dobu p\u0159etypov\u00e1n\u00ed mezi ka\u017edou dvojic\u00ed v\u00fdrobk\u016f. Ta se m\u016f\u017ee li\u0161it podle sm\u011bru: z modr\u00e9 na \u010dervenou 30 minut, z \u010derven\u00e9 na modrou 60. Syst\u00e9m zvol\u00ed po\u0159ad\u00ed s nejkrat\u0161\u00edm celkov\u00fdm \u010dasem se\u0159\u00edzen\u00ed a \u0159ad\u00ed podobn\u00e9 operace za sebe.<\/li>\n\n\n<li><strong>M\u00edsto jednoho omezen\u00ed zohledn\u00edte v\u0161echna.<\/strong> Pracovi\u0161t\u011b, sm\u011bny, pracovn\u00edci, absence, n\u00e1stroje i materi\u00e1ly se kontroluj\u00ed v jednom rozvrhu. Po\u010det n\u00e1stroj\u016f je omezen\u00fd, tak\u017ee p\u0159\u00edpravek pou\u017e\u00edvan\u00fd na jednom stroji nelze ve stejnou dobu rezervovat na jin\u00e9m. Operace m\u016f\u017ee vy\u017eadovat n\u011bkolik oper\u00e1tor\u016f sou\u010dasn\u011b, a pokud prim\u00e1rn\u00ed v\u00fdrobn\u00ed zdroj nen\u00ed dostupn\u00fd, syst\u00e9m s\u00e1hne po alternativn\u00edch stroj\u00edch nebo pracovn\u00edc\u00edch. Do stejn\u00e9ho modelu pat\u0159\u00ed i skupiny pracovi\u0161\u0165, jejich efektivita a rozd\u011blen\u00ed jedn\u00e9 operace mezi v\u00edce pracovi\u0161\u0165. Kontrola materi\u00e1lu zahrnuje skladov\u00e9 z\u00e1soby a otev\u0159en\u00e9 \u0159\u00e1dky <code>purchase.order<\/code>: objednan\u00e9 komponenty se pova\u017euj\u00ed za dostupn\u00e9 k datu dod\u00e1n\u00ed n\u00e1kupn\u00ed objedn\u00e1vky a z\u00e1soby se aktualizuj\u00ed, jakmile je objedn\u00e1vka ozna\u010dena jako Doru\u010deno.<\/li>\n\n\n<li><strong>Podsestavy jsou p\u0159ipraven\u00e9 v\u010das.<\/strong> Polotovary i v\u00fdrobky s v\u00edce\u00farov\u0148ovou strukturou se rozvrhuj\u00ed tak, aby byly d\u00edly p\u0159ipraven\u00e9, kdy\u017e je mont\u00e1\u017e pot\u0159ebuje.<\/li>\n\n\n<li><strong>M\u00edsto ru\u010dn\u00edho p\u0159epl\u00e1nov\u00e1n\u00ed Autopilot.<\/strong> Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epo\u010d\u00edt\u00e1 rozvrh. P\u0159itom respektuje va\u0161e z\u00e1mky, Running Time Lock i priority.<\/li>\n\n\n<li><strong>Community z\u00edsk\u00e1 Gantt\u016fv diagram i n\u00e1stroje pro provoz.<\/strong> Pl\u00e1nova\u010di upravuj\u00ed rozvrh v interaktivn\u00edm Ganttov\u011b diagramu. Obsluha vid\u00ed svou frontu operac\u00ed a zaznamen\u00e1v\u00e1 pr\u00e1ci na telefonu nebo tabletu pomoc\u00ed funkc\u00ed Mobile Confirmations, Production Timer a Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p>Odoo z\u016fst\u00e1v\u00e1 hlavn\u00edm syst\u00e9mem pro evidenci v\u00fdrobk\u016f, kusovn\u00edk\u016f, z\u00e1sob, n\u00e1kupu a \u00fa\u010detnictv\u00ed. SkyPlanner si s n\u00edm vym\u011b\u0148uje data ob\u011bma sm\u011bry p\u0159es External JSON-2 API, u star\u0161\u00edch verz\u00ed p\u0159es XML-RPC a JSON-RPC:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Do SkyPlanneru:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> a otev\u0159en\u00e9 \u0159\u00e1dky <code>purchase.order<\/code>.<\/li>\n\n\n<li><strong>Zp\u011bt do Odoo:<\/strong> pl\u00e1novan\u00fd za\u010d\u00e1tek, konec a vybran\u00e9 pracovi\u0161t\u011b pomoc\u00ed <code>write<\/code> u ka\u017ed\u00e9ho <code>mrp.workorder<\/code> (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). T\u00edm se posune i rezervace v kalend\u00e1\u0159i Odoo, tak\u017ee jeho pl\u00e1novac\u00ed pohledy zobrazuj\u00ed term\u00edny ze SkyPlanneru.<\/li>\n\n\n<li><strong>V\u00fdrobn\u00ed provoz:<\/strong> potvrzen\u00ed oper\u00e1tor\u016f se vytv\u00e1\u0159ej\u00ed jako z\u00e1znamy Time Logs v <code>mrp.workcenter.productivity<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Webhooky SkyPlanner odes\u00edlaj\u00ed zm\u011bny rozvrhu ihned, jakmile nastanou. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edv\u00e1 Odoo jinak, s vlastn\u00edmi operacemi, kalend\u00e1\u0159i a moduly na m\u00edru. T\u00fdm SkyPlanner p\u0159i zav\u00e1d\u011bn\u00ed nastav\u00ed integraci podle va\u0161\u00ed konfigurace a zaji\u0161\u0165uje jej\u00ed podporu i po spu\u0161t\u011bn\u00ed do ostr\u00e9ho provozu. V\u00e1\u0161 partner pro Odoo nebo vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vyu\u017e\u00edt zdokumentovan\u00e9 REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00ed dokumentace API<\/a>). Pro za\u010d\u00e1tek sta\u010d\u00ed kl\u00ed\u010d API. Podrobnosti o API a funkc\u00edch najdete v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> mnoho zak\u00e1zek soupe\u0159\u00ed o kapacitu stejn\u00fdch \u00fazk\u00fdch m\u00edst a term\u00edny dod\u00e1n\u00ed mus\u00ed ur\u010dovat po\u0159ad\u00ed v\u0161ech t\u011bchto zak\u00e1zek.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> p\u0159etypov\u00e1n\u00ed z\u00e1vis\u00ed na po\u0159ad\u00ed operac\u00ed nebo o tom, co lze spustit jako dal\u0161\u00ed, rozhoduj\u00ed sd\u00edlen\u00e9 n\u00e1stroje a operace vy\u017eaduj\u00edc\u00ed v\u00edce pracovn\u00edk\u016f.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> p\u0159epl\u00e1nov\u00e1v\u00e1te n\u011bkolikr\u00e1t t\u00fddn\u011b a chcete m\u00edt funk\u010dn\u00ed rozvrh vlastn\u00ed v\u00fdroby b\u011bhem n\u011bkolika t\u00fddn\u016f, ne a\u017e po dlouh\u00e9m projektu.<\/p>\n\n\n<p>Za\u010dn\u011bte s exportem CSV nebo XLSX v r\u00e1mci <a href=\"\/cs\/zkusebni-verze\/\">bezplatn\u00e9ho vyzkou\u0161en\u00ed na 30 dn\u00ed<\/a> (a\u017e 20 pracovi\u0161\u0165, bez platebn\u00ed karty) a porovnejte rozvrh SkyPlanner s v\u00fdsledky tla\u010d\u00edtka Plan. Pot\u00e9 cena za\u010d\u00edn\u00e1 na 199 \u20ac m\u011bs\u00ed\u010dn\u011b v\u010detn\u011b 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed a mo\u017enost\u00ed kdykoli zru\u0161it p\u0159edplatn\u00e9. Cenovou nab\u00eddku integrace podle va\u0161ich proces\u016f a pot\u0159eb dostanete p\u0159edem spole\u010dn\u011b s nab\u00eddkou tarifu, tak\u017ee celkov\u00e9 n\u00e1klady zn\u00e1te je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Implementace je obvykle dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od zah\u00e1jen\u00ed zav\u00e1d\u011bn\u00ed. Pod\u00edvejte se na <a href=\"\/cs\/stanoveni-cen\/\">ceny<\/a> a <a href=\"\/cs\/funkce\/\">funkce<\/a>.<\/p>\n\n\n<p>Dal\u0161\u00ed informace najdete na str\u00e1nce <a href=\"\/cs\/integrace\/erp\/odoo\/\">SkyPlanner pro Odoo<\/a>, v <a href=\"\/cs\/integrace\/erp\/odoo\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed s Odoo<\/a> a v p\u0159ehledu dal\u0161\u00edch <a href=\"\/cs\/integrace\/erp\/\">integrac\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit prezentaci<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak v\u00fdrobn\u00ed firmy hodnot\u00ed SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, v provozu na v\u00fdrobu rozvad\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>\u00faspory ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1s p\u0159i pl\u00e1nov\u00e1n\u00ed v\u00fdroby posunul od excelov\u00fdch tabulek k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozvad\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pracovn\u00ed doby a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Obsluha v od\u011bvech pro \u010dist\u00e9 prostory u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita ve v\u00fdrob\u011b vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b zabere m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve spole\u010dnosti Fredman Operations, vedle robotick\u00e9 paletiza\u010dn\u00ed bu\u0148ky v Raum\u011b\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchod volnou kapacitu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner poskytuje spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchodn\u00ed odd\u011blen\u00ed vid\u00ed volnou kapacitu na \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu rozvrhu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, te\u010f dost\u00e1v\u00e1 odpov\u011b\u010f b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Sv\u00e1\u0159e\u010d spole\u010dnosti KJH-Comp brous\u00ed sva\u0159enou ocelovou konstrukci v z\u00e1vod\u011b Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98 %<\/b><span>v\u010dasnost dod\u00e1vek oproti p\u016fvodn\u00edm p\u0159ibli\u017en\u011b 50 %<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner hraje rozhoduj\u00edc\u00ed roli v tom, abychom nad\u00e1le dod\u00e1vali v\u010das.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd \u0159editel<\/b><br>KJH-Comp \u00b7 V\u00fdroba plechov\u00fdch d\u00edl\u016f a smluvn\u00ed v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">V\u010dasnost dod\u00e1vek vzrostla z p\u0159ibli\u017en\u011b 50 % a\u017e na 98 % a rozvrhov\u00e1n\u00ed nyn\u00ed zvl\u00e1d\u00e1 jeden mistr m\u00edsto dvou.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/kjh-comp\/\">P\u0159e\u010d\u00edst hodnocen\u00ed spole\u010dnosti KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Umo\u017e\u0148uje Odoo Community rozvrhov\u00e1n\u00ed v\u00fdroby?<\/summary>\n<p class=\"sp-faq__a\">Ano, na z\u00e1kladn\u00ed \u00farovni. Community nab\u00edz\u00ed v\u00fdrobn\u00ed zak\u00e1zky, v\u00fdrobn\u00ed p\u0159\u00edkazy, pracovi\u0161t\u011b a tla\u010d\u00edtko Plan. Data lze zobrazit v seznamech, kalend\u00e1\u0159i, kontingen\u010dn\u00ed tabulce a grafu. Rozvrhov\u00e1n\u00ed v Ganttov\u011b diagramu, Shop Floor a Master Production Schedule jsou funkce edice Enterprise. SkyPlanner poskytuje z\u00e1vod\u016fm pou\u017e\u00edvaj\u00edc\u00edm Community Gantt\u016fv diagram a frontu operac\u00ed pro obsluhu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Zohled\u0148uje Odoo MRP kapacitu pracovi\u0161\u0165?<\/summary>\n<p class=\"sp-faq__a\">Ne. Dopl\u0148ov\u00e1n\u00ed z\u00e1sob pracuje s pr\u016fb\u011b\u017en\u00fdmi dobami v kalend\u00e1\u0159n\u00edch dnech. Dokumentace Odoo uv\u00e1d\u00ed, \u017ee tyto doby &#8222;do not consider weekends, holidays, or work center capacity&#8220; (nezohled\u0148uj\u00ed v\u00edkendy, sv\u00e1tky ani kapacitu pracovi\u0161\u0165). Kapacita se uplatn\u00ed a\u017e po stisknut\u00ed tla\u010d\u00edtka Plan u v\u00fdrobn\u00ed zak\u00e1zky (MO).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Dok\u00e1\u017ee Odoo napl\u00e1novat v\u00edce operac\u00ed na jednom pracovi\u0161ti sou\u010dasn\u011b?<\/summary>\n<p class=\"sp-faq__a\">V rozvrhu ne. K\u00f3d verze 19.0 rezervuje pro ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz \u010dasov\u00fd interval, kter\u00fd se nep\u0159ekr\u00fdv\u00e1 s \u017e\u00e1dn\u00fdm jin\u00fdm v\u00fdrobn\u00edm p\u0159\u00edkazem na dan\u00e9m pracovi\u0161ti. Na kart\u011b Product Capacities se nastavuje po\u010det kus\u016f na cyklus v r\u00e1mci jednoho v\u00fdrobn\u00edho p\u0159\u00edkazu, nikoli soub\u011b\u017en\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um\u00ed Odoo pracovat s \u010dasy se\u0159\u00edzen\u00ed z\u00e1visl\u00fdmi na po\u0159ad\u00ed operac\u00ed?<\/summary>\n<p class=\"sp-faq__a\">Ne. Setup Time a Cleanup Time jsou pevn\u00e9 po\u010dty minut nastaven\u00e9 pro pracovi\u0161t\u011b nebo pro konkr\u00e9tn\u00ed v\u00fdrobek na kart\u011b Product Capacities. Odoo je p\u0159i\u010d\u00edt\u00e1 ke ka\u017ed\u00e9mu v\u00fdrobn\u00edmu p\u0159\u00edkazu bez ohledu na p\u0159edchoz\u00ed operaci. Matice \u010das\u016f se\u0159\u00edzen\u00ed v syst\u00e9mu SkyPlanner uchov\u00e1v\u00e1 \u010dasy p\u0159etypov\u00e1n\u00ed pro ka\u017edou dvojici v\u00fdrobk\u016f i sm\u011br p\u0159echodu a \u0159ad\u00ed operace tak, aby tyto \u010dasy minimalizovala.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak se SkyPlanner APS propojuje s Odoo?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner se s Odoo propojuje obousm\u011brn\u011b p\u0159es extern\u00ed JSON-2 API, ve verz\u00edch 16.0 a\u017e 18.0 pak pomoc\u00ed <code>execute_kw<\/code> p\u0159es XML-RPC nebo JSON-RPC. Pl\u00e1novan\u00e9 term\u00edny a pracovi\u0161t\u011b se zapisuj\u00ed do ka\u017ed\u00e9ho <code>mrp.workorder<\/code> a vyk\u00e1zan\u00fd \u010das se ukl\u00e1d\u00e1 do Time Logs v Odoo. T\u00fdm SkyPlanneru integraci nakonfiguruje b\u011bhem \u00favodn\u00edho zav\u00e1d\u011bn\u00ed a poskytuje podporu i po spu\u0161t\u011bn\u00ed do ostr\u00e9ho provozu. Podrobnosti najdete v <a href=\"\/cs\/integrace\/erp\/odoo\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed s Odoo<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mohu SkyPlanner otestovat p\u0159ed integrac\u00ed s Odoo?<\/summary>\n<p class=\"sp-faq__a\">Ano. B\u011bhem 30 dn\u00ed zku\u0161ebn\u00edho provozu m\u016f\u017eete pracovat s exporty CSV nebo XLSX ze seznamov\u00fdch zobrazen\u00ed Odoo a vyu\u017e\u00edvat a\u017e 20 pracovi\u0161\u0165. Platebn\u00ed kartu nepot\u0159ebujete. Rozvrh SkyPlanner porovn\u00e1te s v\u00fdsledky tla\u010d\u00edtka Plan je\u0161t\u011b p\u0159ed jak\u00fdmkoli propojen\u00edm. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ Odoo Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS Odoo nab\u00edz\u00ed z\u00e1kladn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle voln\u00fdch kapacit v kalend\u00e1\u0159i pracovi\u0161t\u011b. Tla\u010d\u00edtko Plan v Odoo Manufacturing za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho intervalu v kalend\u00e1\u0159i p\u0159\u00edslu\u0161n\u00e9ho pracovi\u0161t\u011b. Dva napl\u00e1novan\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy se tak na jednom pracovi\u0161ti &#8230; <a title=\"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/\" aria-label=\"Read more about Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100820,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101177","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo: pl\u00e1nov\u00e1n\u00ed v\u00fdroby a tla\u010d\u00edtko Plan<\/title>\n<meta name=\"description\" content=\"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/planovani-vyroby\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/planovani-vyroby\\\/\",\"name\":\"Odoo: pl\u00e1nov\u00e1n\u00ed v\u00fdroby a tla\u010d\u00edtko Plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/planovani-vyroby\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/planovani-vyroby\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/planovani-vyroby\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro Odoo: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby a integrace\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo: pl\u00e1nov\u00e1n\u00ed v\u00fdroby a tla\u010d\u00edtko Plan","description":"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/","og_locale":"cs_CZ","og_type":"article","og_title":"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS","og_description":"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"20 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/","name":"Odoo: pl\u00e1nov\u00e1n\u00ed v\u00fdroby a tla\u010d\u00edtko Plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Tla\u010d\u00edtko Plan v Odoo za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho term\u00ednu na pracovi\u0161ti. Co um\u00ed, kde m\u00e1 hranice a kdy pot\u0159ebujete APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/planovani-vyroby\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro Odoo: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby a integrace","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ Odoo Um\u00ed Odoo pl\u00e1novat v\u00fdrobu? Jak funguje tla\u010d\u00edtko Plan a kdy p\u0159idat SkyPlanner APS Odoo nab\u00edz\u00ed z\u00e1kladn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle voln\u00fdch kapacit v kalend\u00e1\u0159i pracovi\u0161t\u011b. Tla\u010d\u00edtko Plan v Odoo Manufacturing za\u0159ad\u00ed ka\u017ed\u00fd v\u00fdrobn\u00ed p\u0159\u00edkaz do prvn\u00edho voln\u00e9ho intervalu v kalend\u00e1\u0159i p\u0159\u00edslu\u0161n\u00e9ho pracovi\u0161t\u011b. Dva napl\u00e1novan\u00e9 v\u00fdrobn\u00ed p\u0159\u00edkazy se tak na jednom pracovi\u0161ti&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101177"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101177\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100820"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}