{"id":101117,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101117"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"planovani-vyroby","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/","title":{"rendered":"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/cs\/integrace\/\">Integrace<\/a> \/ <a href=\"\/cs\/integrace\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? <span class=\"hl\">Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupn\u00e9 kapacity stroj\u016f i pracovn\u00edk\u016f. SAP S\/4HANA nab\u00edz\u00ed pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby dv\u011b mo\u017enosti: ru\u010dn\u00ed vyrovn\u00e1v\u00e1n\u00ed kapacit v z\u00e1kladn\u00edm syst\u00e9mu a automatick\u00e9 rozvrhov\u00e1n\u00ed v integrovan\u00e9m PP\/DS. Term\u00ednov\u00e1n\u00ed podle pr\u016fb\u011b\u017en\u00e9 doby ve standardn\u00edm S\/4HANA kapacitn\u00ed omezen\u00ed nezohled\u0148uje. Operace se za\u0159ad\u00ed s ohledem na dostupn\u00e9 kapacity a\u017e tehdy, kdy\u017e pl\u00e1nova\u010d vyrovn\u00e1 zat\u00ed\u017een\u00ed operac\u00ed na \u00fazk\u00fdch m\u00edstech v kapacitn\u00edch aplikac\u00edch Fiori. PP\/DS, prod\u00e1van\u00e9 jako SAP S\/4HANA Manufacturing for planning and scheduling, je nutn\u00e9 aktivovat, licencovat a zajistit pracovn\u00edky pro jeho obsluhu.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Domluvit prezentaci<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhov\u00e1n\u00ed v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt\u016fv diagram ve SkyPlanner APS s operacemi rozvr\u017een\u00fdmi na jednotliv\u00e1 pracovi\u0161t\u011b a seznamem zak\u00e1zek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Z\u00e1vody, kter\u00e9 pot\u0159ebuj\u00ed <a href=\"\/cs\/zdroje\/planovani-s-omezenou-kapacitou\/\">pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/a> respektuj\u00edc\u00ed kapacitu ka\u017ed\u00e9ho v\u00fdrobn\u00edho zdroje bez projektu zaveden\u00ed PP\/DS, pou\u017e\u00edvaj\u00ed vedle S\/4HANA syst\u00e9m SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sap-s-4hana-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SAP S\/4HANA pl\u00e1nuje v\u00fdrobu krok za krokem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA m\u00e1 dv\u011b \u00farovn\u011b kapacitn\u00edho pl\u00e1nov\u00e1n\u00ed. V\u011bt\u0161ina z\u00e1vod\u016f vyu\u017e\u00edv\u00e1 jen tu prvn\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. MRP a term\u00ednov\u00e1n\u00ed podle pr\u016fb\u011b\u017en\u00e9 doby<\/h3>\n\n\n<p>MRP Live (MD01N) vytv\u00e1\u0159\u00ed pl\u00e1novan\u00e9 zak\u00e1zky. Term\u00ednov\u00e1n\u00ed podle pr\u016fb\u011b\u017en\u00e9 doby pak stanov\u00ed term\u00edny jejich operac\u00ed a vypo\u010d\u00edt\u00e1 kapacitn\u00ed po\u017eadavky podle vzorc\u016f pracovi\u0161t\u011b pro se\u0159\u00edzen\u00ed, zpracov\u00e1n\u00ed a ukon\u010dovac\u00ed pr\u00e1ce. Nezohled\u0148uje p\u0159itom zat\u00ed\u017een\u00ed, kter\u00e9 na dan\u00e9m pracovi\u0161ti ji\u017e vytv\u00e1\u0159ej\u00ed ostatn\u00ed zak\u00e1zky. SAP Learning to \u0159\u00edk\u00e1 jasn\u011b: &#8222;The operations are scheduled infinitely. The non-working times of the work centers are taken into account, but not the capacity requirements of other orders&#8220; (Operace se pl\u00e1nuj\u00ed bez omezen\u00ed kapacit. Zohled\u0148uj\u00ed se nepracovn\u00ed doby pracovi\u0161\u0165, nikoli v\u0161ak kapacitn\u00ed po\u017eadavky ostatn\u00edch zak\u00e1zek) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>). V\u00fdsledkem jsou p\u0159et\u00ed\u017een\u00e1 pracovi\u0161t\u011b.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Kmenov\u00e1 data kapacit pracovi\u0161\u0165<\/h3>\n\n\n<p>Kapacita je definov\u00e1na v objektu <strong>Work Center<\/strong>, nikoli v zak\u00e1zce. Pracovi\u0161t\u011b m\u016f\u017ee m\u00edt n\u011bkolik kategori\u00ed kapacity (p\u0159\u00edklad SAP: 001 Machine a 002 Labor). Ka\u017ed\u00e1 m\u00e1 vlastn\u00ed vzorce, kter\u00e9 p\u0159ev\u00e1d\u011bj\u00ed standardn\u00ed hodnoty technologick\u00e9ho postupu na kapacitn\u00ed po\u017eadavky. <strong>Factory Calendar<\/strong> ur\u010duje pracovn\u00ed dny, \u010dasov\u00e9 intervaly nahrazuj\u00ed standardn\u00ed disponibiln\u00ed kapacitu a verze kapacity (standardn\u00ed, minim\u00e1ln\u00ed, maxim\u00e1ln\u00ed) umo\u017e\u0148uj\u00ed modelovat r\u016fzn\u00e9 sm\u011bnov\u00e9 re\u017eimy.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Vyhodnocen\u00ed kapacit<\/h3>\n\n\n<p>Pl\u00e1nova\u010di porovn\u00e1vaj\u00ed po\u017eadavky s disponibiln\u00ed kapacitou v aplikaci <strong>Manage Work Center Capacity<\/strong>. Pracovn\u00edci odpov\u011bdn\u00ed za MRP ji mohou zkontrolovat tak\u00e9 ze seznamu z\u00e1sob a pot\u0159eb. Vyhodnocen\u00ed uk\u00e1\u017ee p\u0159et\u00ed\u017een\u00ed, ale \u017e\u00e1dn\u00e9 operace nep\u0159esouv\u00e1.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Vyrovn\u00e1v\u00e1n\u00ed kapacit v rukou pl\u00e1nova\u010de<\/h3>\n\n\n<p>Teprve p\u0159i vyrovn\u00e1v\u00e1n\u00ed kapacit se operace za\u0159azuj\u00ed s ohledem na dostupn\u00e9 kapacity. Tento krok \u0159\u00edd\u00ed pl\u00e1nova\u010d. SAP Learning uv\u00e1d\u00ed: &#8222;In capacity leveling, operations are scheduled finitely. They are dispatched to periods with free capacity.&#8220; (P\u0159i vyrovn\u00e1v\u00e1n\u00ed kapacit se operace pl\u00e1nuj\u00ed podle dostupn\u00fdch kapacit. Za\u0159azuj\u00ed se do obdob\u00ed s volnou kapacitou.) K dispozici jsou tyto n\u00e1stroje:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>N\u00e1stroj<\/th><th>Co d\u011bl\u00e1<\/th><\/tr><\/thead><tbody><tr><td>Tabulkov\u00e1 pl\u00e1novac\u00ed tabule<\/td><td>Za\u0159azuje operace do obdob\u00ed s volnou kapacitou. SAP: &#8222;you cannot create a specific sequence for the dispatched operations within a period&#8220; (v r\u00e1mci obdob\u00ed nelze ur\u010dit konkr\u00e9tn\u00ed po\u0159ad\u00ed za\u0159azen\u00fdch operac\u00ed)<\/td><\/tr><tr><td><strong>Capacity Scheduling Table<\/strong> (d\u0159\u00edve Schedule Production)<\/td><td>Za\u0159azuje operace na \u00fazk\u00fdch m\u00edstech do rozvrhu a ru\u0161\u00ed jejich za\u0159azen\u00ed. &#8222;Only bottleneck operations that are assigned to a pacemaker work center are considered.&#8220; (Zohled\u0148uj\u00ed se pouze operace na \u00fazk\u00fdch m\u00edstech p\u0159i\u0159azen\u00e9 k \u0159\u00eddic\u00edmu pracovi\u0161ti.) Ostatn\u00ed operace zak\u00e1zky se term\u00ednuj\u00ed od t\u00e9to operace dop\u0159edu a dozadu<\/td><\/tr><tr><td><strong>Capacity Scheduling Board<\/strong><\/td><td>Grafick\u00fd p\u0159ehled pro za\u0159azov\u00e1n\u00ed jednotliv\u00fdch operac\u00ed na \u00fazk\u00fdch m\u00edstech do rozvrhu \u0159\u00eddic\u00edch pracovi\u0161\u0165, jejich p\u0159epl\u00e1nov\u00e1n\u00ed nebo zru\u0161en\u00ed jejich za\u0159azen\u00ed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Klasick\u00e1 Graphical Planning Table (CM21, CM22 a ostatn\u00ed transakce CM*) spad\u00e1 do rozsahu kompatibility. SAP Learning uv\u00e1d\u00ed: &#8222;The use right for the Graphical Planning Table expires on Dec 31, 2025.&#8220; (Pr\u00e1vo pou\u017e\u00edvat Graphical Planning Table kon\u010d\u00ed k uveden\u00e9mu datu.) Toto datum ji\u017e uplynulo. Pokud va\u0161i pl\u00e1nova\u010di st\u00e1le pracuj\u00ed v transakc\u00edch CM*, s p\u0159echodem na aplikace Fiori u\u017e m\u00e1te zpo\u017ed\u011bn\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Integrovan\u00e9 PP\/DS<\/h3>\n\n\n<p>PP\/DS je n\u00e1stroj SAP pro automatick\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit. D\u0159\u00edve byl sou\u010d\u00e1st\u00ed SAP APO a od verze 1610 je integrov\u00e1n do on-premise S\/4HANA. SAP jej prezentuje jako dal\u0161\u00ed krok po MRP: &#8222;Move beyond classic MRP with SAP S\/4HANA Manufacturing for planning and scheduling software&#8220; (P\u0159ekro\u010dte mo\u017enosti klasick\u00e9ho MRP s t\u00edmto softwarem) (<a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">Produktov\u00e1 str\u00e1nka SAP<\/a>).<\/p>\n\n\n<p>Co p\u0159id\u00e1v\u00e1:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00fdrobn\u00ed zdroje<\/strong> s p\u0159\u00edznakem Finite Scheduling: &#8222;You define whether a resource is finite or infinite in the scheduling parameters for the resource via the Finite Scheduling indicator&#8220; (P\u0159\u00edznakem Finite Scheduling v parametrech rozvrhov\u00e1n\u00ed ur\u010d\u00edte, zda se m\u00e1 u v\u00fdrobn\u00edho zdroje zohled\u0148ovat dostupn\u00e1 kapacita, nebo se m\u00e1 pl\u00e1novat bez kapacitn\u00edch omezen\u00ed) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">N\u00e1pov\u011bda SAP<\/a>). Optimaliz\u00e1tor m\u016f\u017ee toto nastaven\u00ed pro jednotliv\u00fd b\u011bh zm\u011bnit. Jeho optimaliza\u010dn\u00ed profil obsahuje volbu &#8222;Always Schedule as Finite&#8220; (V\u017edy pl\u00e1novat podle dostupn\u00fdch kapacit), kter\u00e1 za\u0159azuje operace na v\u00fdrobn\u00ed zdroje s ohledem na jejich kapacitn\u00ed limity (<a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>).<\/li>\n\n\n<li>Re\u017eimy rozvrhov\u00e1n\u00ed: pl\u00e1nov\u00e1n\u00ed bez omezen\u00ed kapacit, hled\u00e1n\u00ed voln\u00e9ho \u010dasov\u00e9ho \u00faseku, p\u0159id\u00e1n\u00ed operace na konec, vlo\u017een\u00ed operace, vlo\u017een\u00ed operace a uzav\u0159en\u00ed mezer, vt\u011bsn\u00e1n\u00ed operace.<\/li>\n\n\n<li>Heuristiky a optimaliza\u010dn\u00ed b\u011bhy, kter\u00e9 zkracuj\u00ed \u010dasy se\u0159\u00edzen\u00ed, sni\u017euj\u00ed n\u00e1klady na se\u0159\u00edzen\u00ed a omezuj\u00ed zpo\u017ed\u011bn\u00ed.<\/li>\n\n\n<li>Matici se\u0159\u00edzen\u00ed pro p\u0159etypov\u00e1n\u00ed z\u00e1visl\u00e1 na po\u0159ad\u00ed operac\u00ed, minim\u00e1ln\u00ed a maxim\u00e1ln\u00ed \u010dasov\u00e9 odstupy mezi operacemi a alternativn\u00ed re\u017eimy.<\/li>\n\n\n<li>V\u00edce\u00farov\u0148ov\u00e9 vazby mezi pot\u0159ebami a jejich pokryt\u00edm, pl\u00e1nov\u00e1n\u00ed kampan\u00ed a blok\u016f a upozorn\u011bn\u00ed.<\/li>\n\n\n<li><strong>Production Scheduling Board<\/strong> (Gantt\u016fv diagram ve Fiori) a aplikaci <strong>Monitor Capacity Utilization<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p>Zprovozn\u011bn\u00ed vy\u017eaduje pr\u00e1ci. Aktivujete jej v Customizing (Advanced Planning &gt; Basic Settings &gt; Activate Advanced Planning and Scheduling), zprovozn\u00edte liveCache integrovanou s HANA a ozna\u010d\u00edte materi\u00e1ly a pracovi\u0161t\u011b pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed. V\u0161e neozna\u010den\u00e9 z\u016fst\u00e1v\u00e1 v klasick\u00e9m MRP. Podle blogu produktov\u00e9ho experta SAP optimaliz\u00e1tor &#8222;needs to be additionally installed preferably in a separate hardware&#8220; (je nutn\u00e9 doinstalovat, nejl\u00e9pe na samostatn\u00fd hardware) (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>). Tent\u00fd\u017e blog uv\u00e1d\u00ed: &#8222;A dedicated license, Manufacturing for Planning and Scheduling is required if this switch is set to Active.&#8220; (Pokud je tento p\u0159ep\u00edna\u010d nastaven na Active, je nutn\u00e1 samostatn\u00e1 licence Manufacturing for Planning and Scheduling.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sap-s-4hana-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde m\u00e1 SAP S\/4HANA sv\u00e9 hranice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Omezen\u00ed<\/th><th>Zdroj<\/th><th>Co to znamen\u00e1 ve v\u00fdrobn\u00edm provozu<\/th><\/tr><\/thead><tbody><tr><td>Term\u00ednov\u00e1n\u00ed podle pr\u016fb\u011b\u017en\u00e9 doby nezohled\u0148uje kapacitn\u00ed omezen\u00ed<\/td><td>&#8222;The operations are scheduled infinitely&#8220; (Operace se pl\u00e1nuj\u00ed bez omezen\u00ed kapacit) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Ka\u017ed\u00fd pl\u00e1novac\u00ed b\u011bh vytv\u00e1\u0159\u00ed p\u0159et\u00ed\u017een\u00ed, kter\u00e1 pak mus\u00ed n\u011bkdo vy\u0159e\u0161it<\/td><\/tr><tr><td>Vyrovn\u00e1v\u00e1n\u00ed kapacit v z\u00e1kladn\u00edm syst\u00e9mu \u0159\u00edd\u00ed pl\u00e1nova\u010d<\/td><td>&#8222;In capacity leveling, operations are scheduled finitely&#8220; (P\u0159i vyrovn\u00e1v\u00e1n\u00ed kapacit se operace za\u0159azuj\u00ed do pl\u00e1nu v\u00fdroby podle dostupn\u00fdch kapacit) (stejn\u00fd zdroj)<\/td><td>Pl\u00e1n respektuje kapacitn\u00ed omezen\u00ed a\u017e pot\u00e9, co pl\u00e1nova\u010d za\u0159ad\u00ed operace do rozvrhu. Urgentn\u00ed zak\u00e1zka nebo porucha znamen\u00e1 nov\u00e9 za\u0159azov\u00e1n\u00ed<\/td><\/tr><tr><td>Tabulkov\u00e9 vyrovn\u00e1v\u00e1n\u00ed kapacit neur\u010duje po\u0159ad\u00ed operac\u00ed<\/td><td>V r\u00e1mci obdob\u00ed nen\u00ed ur\u010deno po\u0159ad\u00ed za\u0159azen\u00fdch operac\u00ed (stejn\u00fd zdroj)<\/td><td>V\u00edte, \u017ee t\u00fddenn\u00ed pl\u00e1n je provediteln\u00fd, ale nev\u00edte, kter\u00e1 operace se m\u00e1 v \u00fater\u00fd spustit jako prvn\u00ed<\/td><\/tr><tr><td>Capacity Scheduling Table vyrovn\u00e1v\u00e1 kapacity za\u0159azov\u00e1n\u00edm operac\u00ed na \u00fazk\u00fdch m\u00edstech do rozvrhu \u0159\u00eddic\u00edch pracovi\u0161\u0165<\/td><td>&#8222;For an order, only the bottleneck operation is dispatched to the pacemaker work center&#8220; (Ze zak\u00e1zky se na \u0159\u00eddic\u00ed pracovi\u0161t\u011b za\u0159azuje pouze operace na \u00fazk\u00e9m m\u00edst\u011b) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/capacity-leveling-using-the-capacity-scheduling-table\">SAP Learning<\/a>)<\/td><td>Term\u00edny ostatn\u00edch operac\u00ed se odvozuj\u00ed dop\u0159edu a dozadu od t\u00e9to operace, nikoli pl\u00e1nov\u00e1n\u00edm podle dostupn\u00fdch kapacit. Ostatn\u00ed ne\u017e \u0159\u00eddic\u00ed pracovi\u0161t\u011b tak z\u016fst\u00e1vaj\u00ed p\u0159et\u00ed\u017een\u00e1<\/td><\/tr><tr><td>Slo\u017eit\u011bj\u0161\u00ed p\u0159\u00edpady se p\u0159esouvaj\u00ed do PP\/DS<\/td><td>SAP doporu\u010duje PP\/DS pro synchronizaci zak\u00e1zek nap\u0159\u00ed\u010d \u00farovn\u011bmi kusovn\u00edku, zohledn\u011bn\u00ed dostupnosti materi\u00e1lu a koordinaci v\u00edce v\u00fdrobn\u00edch zdroj\u016f p\u0159edstavuj\u00edc\u00edch \u00fazk\u00e1 m\u00edsta (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Pro \u0159azen\u00ed operac\u00ed s ohledem na se\u0159\u00edzen\u00ed a linky s v\u00edce \u00fazk\u00fdmi m\u00edsty pot\u0159ebujete dal\u0161\u00ed modul<\/td><\/tr><tr><td>Zohledn\u011bn\u00ed omezen\u00fdch kapacit v PP\/DS z\u00e1vis\u00ed na nastaven\u00ed modelu<\/td><td>P\u0159\u00edznak Finite Scheduling u jednotliv\u00fdch v\u00fdrobn\u00edch zdroj\u016f, volba &#8222;Always Schedule as Finite&#8220; v optimaliza\u010dn\u00edm profilu (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">N\u00e1pov\u011bda SAP<\/a>, <a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>)<\/td><td>Pl\u00e1nova\u010di udr\u017euj\u00ed parametry v\u00fdrobn\u00edch zdroj\u016f, heuristiky a optimaliza\u010dn\u00ed profily. Pl\u00e1nov\u00e1n\u00ed zahrnuje pouze materi\u00e1ly a v\u00fdrobn\u00ed zdroje nastaven\u00e9 pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed<\/td><\/tr><tr><td>PP\/DS m\u00e1 vlastn\u00ed licenci a technologick\u00e9 z\u00e1zem\u00ed<\/td><td>Samostatn\u00e1 licence, liveCache, odd\u011blen\u011b instalovan\u00fd optimaliz\u00e1tor (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>)<\/td><td>Jde o projekt vy\u017eaduj\u00edc\u00ed zapojen\u00ed t\u00fdmu Basis, vy\u0159e\u0161en\u00ed licenc\u00ed a vy\u0161kolen\u00e9 pl\u00e1nova\u010de, nikoli o pouh\u00e9 nastaven\u00ed<\/td><\/tr><tr><td>Planned Order API nep\u0159ed\u00e1v\u00e1 data do PP\/DS<\/td><td>&#8222;Automatic integration to PP\/DS is not enabled from this API&#8220; (Toto API uvedenou automatickou integraci neumo\u017e\u0148uje) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\">N\u00e1pov\u011bda SAP<\/a>)<\/td><td>Pl\u00e1novan\u00e9 zak\u00e1zky vytvo\u0159en\u00e9 mimo SAP se automaticky nedostanou do pl\u00e1nu PP\/DS<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sap-s-4hana-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy sta\u010d\u00ed vlastn\u00ed pl\u00e1nov\u00e1n\u00ed SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Samotn\u00e9 S\/4HANA pokryje pot\u0159eby z\u00e1vodu v t\u011bchto p\u0159\u00edpadech:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M\u00e1te jedno \u00fazk\u00e9 m\u00edsto a dlouh\u00e9 pr\u016fb\u011b\u017en\u00e9 doby v\u00fdroby.<\/strong> Pl\u00e1novac\u00ed b\u011bhy ukazuj\u00ed p\u0159et\u00ed\u017een\u00ed t\u00fddny dop\u0159edu a pl\u00e1nova\u010d jednou t\u00fddn\u011b vyrovn\u00e1 zat\u00ed\u017een\u00ed \u0159\u00eddic\u00edho pracovi\u0161t\u011b v Capacity Scheduling Table.<\/li>\n\n\n<li><strong>Va\u0161e pot\u0159eby vych\u00e1zej\u00ed p\u0159ev\u00e1\u017en\u011b z MRP a jsou stabiln\u00ed.<\/strong> M\u00e1te m\u00e1lo urgentn\u00edch zak\u00e1zek a m\u00e1lo p\u0159etypov\u00e1n\u00ed, kter\u00e1 v\u00fdrazn\u011b ovliv\u0148uj\u00ed pl\u00e1n.<\/li>\n\n\n<li><strong>Ji\u017e m\u00e1te licenci PP\/DS a person\u00e1l pro pr\u00e1ci s n\u00edm.<\/strong> Va\u0161i pl\u00e1nova\u010di denn\u011b pracuj\u00ed v Production Scheduling Board a v\u0161echny d\u016fle\u017eit\u00e9 materi\u00e1ly i pracovi\u0161t\u011b jsou ozna\u010deny pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdy pot\u0159ebujete n\u00e1stroj pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>V praxi to pozn\u00e1te podle t\u011bchto situac\u00ed:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pl\u00e1nova\u010di po ka\u017ed\u00e9m b\u011bhu MRP znovu sestavuj\u00ed pl\u00e1n v Excelu, proto\u017ee term\u00edny zapl\u00e1novan\u00fdch operac\u00ed u\u017e neplat\u00ed.<\/li>\n\n\n<li>V\u00fdkon v\u00fdroby omezuje n\u011bkolik pracovi\u0161\u0165, ne jedin\u00e9 pracovi\u0161t\u011b ur\u010duj\u00edc\u00ed jej\u00ed tempo.<\/li>\n\n\n<li>Skladba zak\u00e1zek se m\u011bn\u00ed denn\u011b a vyrovn\u00e1vat kapacity jednou t\u00fddn\u011b nesta\u010d\u00ed.<\/li>\n\n\n<li>Obchod slibuje term\u00edny podle pr\u016fb\u011b\u017en\u00fdch dob v\u00fdroby a pod\u00edl v\u010dasn\u00fdch dod\u00e1vek kles\u00e1.<\/li>\n\n\n<li>PP\/DS jste posoudili a zam\u00edtli kv\u016fli n\u00e1klad\u016fm, n\u00e1ro\u010dnosti zaveden\u00ed nebo chyb\u011bj\u00edc\u00edm odborn\u00fdm znalostem. P\u0159\u00edpadn\u011b jde o men\u0161\u00ed z\u00e1vod v r\u00e1mci rozs\u00e1hlej\u0161\u00edho prost\u0159ed\u00ed S\/4HANA, kter\u00fd se vlastn\u00edho projektu PP\/DS nikdy nedo\u010dk\u00e1.<\/li>\n\n\n<li>Oper\u00e1to\u0159i pracuj\u00ed podle vyti\u0161t\u011bn\u00fdch seznam\u016f zak\u00e1zek a odv\u00e1d\u011bj\u00ed pr\u00e1ci se zpo\u017ed\u011bn\u00edm, tak\u017ee pl\u00e1n st\u00e1le zaost\u00e1v\u00e1 za skute\u010dnost\u00ed.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Co od \u0159e\u0161en\u00ed po\u017eadovat<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit v\u0161ech v\u00fdrobn\u00edch zdroj\u016f<\/strong>, v\u010detn\u011b lid\u00ed a sm\u011bn, bez nutnosti modelovat ka\u017ed\u00fd zdroj zvl\u00e1\u0161\u0165.<\/li>\n\n\n<li><strong>Ur\u010dov\u00e1n\u00ed po\u0159ad\u00ed jednotliv\u00fdch operac\u00ed<\/strong> v pr\u016fb\u011bhu dne, ne jen jejich za\u0159azen\u00ed do \u010dasov\u00fdch obdob\u00ed.<\/li>\n\n\n<li><strong>Skute\u010dn\u00e1 omezen\u00ed<\/strong>: \u010dasy p\u0159etypov\u00e1n\u00ed mezi v\u00fdrobky z\u00e1visl\u00e9 na jejich po\u0159ad\u00ed, n\u00e1stroje, kter\u00e9 mohou b\u00fdt v danou chv\u00edli jen na jednom m\u00edst\u011b, operace vy\u017eaduj\u00edc\u00ed v\u00edce oper\u00e1tor\u016f i alternativn\u00ed stroje a pracovn\u00edci.<\/li>\n\n\n<li><strong>Zohledn\u011bn\u00ed dostupnosti materi\u00e1lu<\/strong>: operace by nem\u011bla za\u010d\u00edt, dokud nejsou k dispozici pot\u0159ebn\u00e9 komponenty. Syst\u00e9m mus\u00ed po\u010d\u00edtat se z\u00e1sobami i otev\u0159en\u00fdmi n\u00e1kupn\u00edmi objedn\u00e1vkami.<\/li>\n\n\n<li><strong>Automatick\u00e9 p\u0159epl\u00e1nov\u00e1n\u00ed<\/strong> p\u0159i zm\u011bn\u011b zak\u00e1zky nebo zastaven\u00ed stroje.<\/li>\n\n\n<li><strong>Jasn\u00e9 rozd\u011blen\u00ed odpov\u011bdnost\u00ed v\u016f\u010di S\/4HANA<\/strong>: S\/4HANA spravuje kmenov\u00e1 data, zak\u00e1zky a z\u00e1soby; rozvrhovac\u00ed syst\u00e9m ur\u010duje po\u0159ad\u00ed a term\u00edny. Z\u00e1pis zp\u011bt prob\u00edh\u00e1 p\u0159es ofici\u00e1ln\u011b uvoln\u011bn\u00e1 API, nikoli p\u0159\u00edm\u00fdmi \u00fapravami tabulek.<\/li>\n\n\n<li><strong>Zp\u011btn\u00e1 vazba z v\u00fdrobn\u00edho provozu<\/strong>, kter\u00e1 se v S\/4HANA zap\u00ed\u0161e jako odveden\u00ed v\u00fdroby.<\/li>\n\n\n<li><strong>Mo\u017enost vyzkou\u0161et \u0159e\u0161en\u00ed na CSV exportu vlastn\u00edch v\u00fdrobn\u00edch zak\u00e1zek<\/strong> je\u0161t\u011b p\u0159ed jak\u00fdmkoli z\u00e1sahem do slu\u017eeb OData.<\/li>\n\n<\/ol>\n\n\n<p>Mo\u017enosti lze rozd\u011blit do \u010dty\u0159 skupin:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u00e1novac\u00ed tabule v klientu SAP<\/strong>: z\u00e1kladn\u00ed aplikace pro pr\u00e1ci s kapacitami a dopl\u0148kov\u00e9 tabule v SAP GUI nebo Fiori, kter\u00e9 ovl\u00e1d\u00e1 pl\u00e1nova\u010d. Hod\u00ed se tam, kde tempo v\u00fdroby ur\u010duje jedin\u00e9 pracovi\u0161t\u011b a po\u017eadavky z MRP jsou stabiln\u00ed.<\/li>\n\n\n<li><strong>Pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed p\u0159\u00edmo od SAP<\/strong>: integrovan\u00e9 PP\/DS pro z\u00e1vody, kter\u00e9 si po\u0159\u00edd\u00ed licenci, aktivuj\u00ed je a zajist\u00ed pro n\u011b person\u00e1l.<\/li>\n\n\n<li><strong>Rozs\u00e1hl\u00e9 podnikov\u00e9 syst\u00e9my APS<\/strong>: samostatn\u00e9 platformy p\u0159ipojen\u00e9 v r\u00e1mci implementa\u010dn\u00edho projektu, kter\u00e9 obsluhuje vyhrazen\u00fd pl\u00e1novac\u00ed t\u00fdm.<\/li>\n\n\n<li><strong>Cloudov\u00e9 APS s podporou pr\u00e1ce ve v\u00fdrobn\u00edm provozu<\/strong>, kam pat\u0159\u00ed SkyPlanner: automatick\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle kapacit v\u0161ech v\u00fdrobn\u00edch zdroj\u016f, p\u0159epl\u00e1nov\u00e1n\u00ed pomoc\u00ed funkce Autopilot a pr\u00e1ce oper\u00e1tor\u016f na telefonu nebo tabletu. V provozu b\u011bhem n\u011bkolika t\u00fddn\u016f.<\/li>\n\n<\/ul>\n\n\n<p>V diskus\u00edch o S\/4HANA se objevuj\u00ed i platformy pro pl\u00e1nov\u00e1n\u00ed dodavatelsk\u00e9ho \u0159et\u011bzce, v\u010detn\u011b SAP IBP. Ty pl\u00e1nuj\u00ed celou s\u00ed\u0165, nikoli po\u0159ad\u00ed operac\u00ed na konkr\u00e9tn\u00edm stroji.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kde m\u00e1 sv\u00e9 m\u00edsto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS je cloudov\u00fd n\u00e1stroj pro rozvrhov\u00e1n\u00ed v\u00fdroby s um\u011blou inteligenc\u00ed, kter\u00fd funguje vedle SAP S\/4HANA a p\u0159eklenuje mezeru mezi MRP a pl\u00e1nov\u00e1n\u00edm v\u00fdroby podle dostupn\u00fdch kapacit. MRP z\u016fst\u00e1v\u00e1 v SAP a SkyPlanner p\u0159eb\u00edr\u00e1 vyrovn\u00e1v\u00e1n\u00ed kapacit, kter\u00e9 va\u0161i pl\u00e1nova\u010di nyn\u00ed prov\u00e1d\u011bj\u00ed ru\u010dn\u011b:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respektov\u00e1n\u00ed kapacit v\u0161ech zdroj\u016f. Automaticky.<\/strong> V\u00fdpo\u010detn\u00ed j\u00e1dro Arcturus b\u011bhem n\u011bkolika sekund sestav\u00ed pl\u00e1n v\u00fdroby podle zak\u00e1zek, priorit, omezen\u00ed, kapacit, materi\u00e1lu a pravidel. P\u0159i ka\u017ed\u00e9m v\u00fdpo\u010dtu respektuje kapacitu ka\u017ed\u00e9ho pracovi\u0161t\u011b, sm\u011bny i \u010dlov\u011bka. Nejste omezeni na jedin\u00e9 pracovi\u0161t\u011b ur\u010duj\u00edc\u00ed tempo v\u00fdroby a nemus\u00edte ladit optimaliza\u010dn\u00ed profil.<\/li>\n\n\n<li><strong>Konkr\u00e9tn\u00ed po\u0159ad\u00ed, ne jen \u010dasov\u00e9 obdob\u00ed.<\/strong> V interaktivn\u00edm Ganttov\u011b diagramu pl\u00e1nova\u010di vid\u00ed, kter\u00e1 operace p\u0159ijde v \u00fater\u00fd na \u0159adu jako prvn\u00ed. Kdy\u017e operaci p\u0159et\u00e1hnou, v\u00fdpo\u010detn\u00ed j\u00e1dro zachov\u00e1 n\u00e1vaznosti pl\u00e1nu.<\/li>\n\n\n<li><strong>Podle dostupnosti materi\u00e1lu.<\/strong> U ka\u017ed\u00e9 operace se ov\u011b\u0159uj\u00ed z\u00e1soby a o\u010dek\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00edch objedn\u00e1vek. Objednan\u00fd materi\u00e1l se pova\u017euje za dostupn\u00fd k datu dod\u00e1n\u00ed uveden\u00e9mu v n\u00e1kupn\u00ed objedn\u00e1vce. Z\u00e1soby se aktualizuj\u00ed po ozna\u010den\u00ed objedn\u00e1vky jako dodan\u00e9, tak\u017ee operace neza\u010dne d\u0159\u00edve, ne\u017e jsou k dispozici jej\u00ed komponenty.<\/li>\n\n\n<li><strong>P\u0159etypov\u00e1n\u00ed podle po\u0159ad\u00ed v\u00fdrobk\u016f.<\/strong> Matice se\u0159izovac\u00edch \u010das\u016f uchov\u00e1v\u00e1 \u010dasy p\u0159etypov\u00e1n\u00ed pro dvojice v\u00fdrobk\u016f. Ty se mohou li\u0161it podle sm\u011bru p\u0159echodu (z modr\u00e9 na \u010dervenou 30 minut, z \u010derven\u00e9 na modrou 60). V\u00fdpo\u010detn\u00ed j\u00e1dro podle matice vyb\u00edr\u00e1 po\u0159ad\u00ed s nejkrat\u0161\u00edm celkov\u00fdm \u010dasem se\u0159izov\u00e1n\u00ed. Pravidlo \u201ePovolit podobnost\u201c seskupuje operace se spole\u010dnou vlastnost\u00ed, nap\u0159\u00edklad pou\u017e\u00edvan\u00fdm n\u00e1strojem.<\/li>\n\n\n<li><strong>Zohledn\u011bn\u00ed n\u00e1stroj\u016f i obsluhy.<\/strong> N\u00e1stroj pou\u017e\u00edvan\u00fd na jednom pracovi\u0161ti se ve stejnou dobu nenapl\u00e1nuje na jin\u00e9. Operace, kter\u00e1 pot\u0159ebuje t\u0159i oper\u00e1tory, dostane t\u0159i. Pokud hlavn\u00ed stroj nebo pracovn\u00edk nen\u00ed k dispozici, v\u00fdpo\u010detn\u00ed j\u00e1dro posoud\u00ed alternativy.<\/li>\n\n\n<li><strong>St\u00e1le aktu\u00e1ln\u00ed pl\u00e1n.<\/strong> Autopilot p\u0159i zm\u011bn\u00e1ch ve v\u00fdrob\u011b automaticky p\u0159epl\u00e1nuje rozvrh. M\u00edsto t\u00fddenn\u00edho vyrovn\u00e1v\u00e1n\u00ed kapacit tak m\u00e1te ka\u017ed\u00fd den pl\u00e1n, kter\u00fd odpov\u00edd\u00e1 d\u011bn\u00ed ve v\u00fdrobn\u00edm provozu.<\/li>\n\n\n<li><strong>Odv\u00e1d\u011bn\u00ed p\u0159\u00edmo z v\u00fdroby.<\/strong> Oper\u00e1to\u0159i na telefonu nebo tabletu vid\u00ed svou frontu operac\u00ed a zaznamen\u00e1vaj\u00ed pr\u00e1ci pomoc\u00ed funkc\u00ed Mobile Confirmations, Production Timer a Quick Log Mode. Integrace tyto \u010dasov\u00e9 z\u00e1znamy odes\u00edl\u00e1 do S\/4HANA jako odveden\u00ed v\u00fdrobn\u00edch zak\u00e1zek.<\/li>\n\n<\/ul>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> v\u00fdkon v\u00fdroby omezuje n\u011bkolik pracovi\u0161\u0165 a vyrovn\u00e1v\u00e1n\u00ed kapacit jedin\u00e9ho pracovi\u0161t\u011b ur\u010duj\u00edc\u00edho tempo u\u017e nesta\u010d\u00ed k udr\u017een\u00ed pl\u00e1nu.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> p\u0159etypov\u00e1n\u00ed z\u00e1vis\u00ed na po\u0159ad\u00ed v\u00fdrobk\u016f nebo o dal\u0161\u00ed mo\u017en\u00e9 operaci rozhoduj\u00ed sd\u00edlen\u00e9 n\u00e1stroje a pot\u0159eba v\u00edce oper\u00e1tor\u016f.<\/p>\n\n\n<p><strong>Zvolte SkyPlanner, pokud<\/strong> va\u0161emu z\u00e1vodu u\u017e nesta\u010d\u00ed ru\u010dn\u00ed vyrovn\u00e1v\u00e1n\u00ed kapacit, projekt PP\/DS by byl pro dan\u00fd probl\u00e9m zbyte\u010dn\u011b rozs\u00e1hl\u00fd a chcete m\u00edt b\u011bhem n\u011bkolika t\u00fddn\u016f pl\u00e1n vlastn\u00ed v\u00fdroby, kter\u00fd respektuje dostupn\u00e9 kapacity.<\/p>\n\n\n<p>Materi\u00e1ly, kusovn\u00edky, technologick\u00e9 postupy, pracovi\u0161t\u011b, v\u00fdrobn\u00ed zak\u00e1zky a z\u00e1soby z\u016fst\u00e1vaj\u00ed v S\/4HANA. SkyPlanner s n\u00edm komunikuje obousm\u011brn\u011b:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>V\u00fdrobn\u00ed zak\u00e1zky a operace se na\u010d\u00edtaj\u00ed p\u0159es API_PRODUCTION_ORDER_2_SRV a pracovi\u0161t\u011b p\u0159es API_WORK_CENTERS.<\/li>\n\n\n<li>Ka\u017ed\u00e1 operace se v S\/4HANA zapl\u00e1nuje pomoc\u00ed akce ScheduleProductionOrderOperation v re\u017eimu dop\u0159edn\u00e9ho pl\u00e1nov\u00e1n\u00ed, se stavem zapl\u00e1nov\u00e1n\u00ed a datem a \u010dasem zah\u00e1jen\u00ed ze SkyPlanner.<\/li>\n\n\n<li>Zaznamenan\u00e9 hodiny se zapisuj\u00ed p\u0159es API_PROD_ORDER_CONFIRMATION_2_SRV.<\/li>\n\n\n<li>Webhooky SkyPlanner odes\u00edlaj\u00ed ka\u017edou zm\u011bnu rozvrhu ihned, jakmile nastane.<\/li>\n\n<\/ul>\n\n\n<p>\u017d\u00e1dn\u00e9 dva z\u00e1vody nemaj\u00ed stejn\u011b nastaven\u00e1 pracovi\u0161t\u011b, kategorie kapacit a technologick\u00e9 postupy. T\u00fdm SkyPlanner proto b\u011bhem \u00favodn\u00edho zav\u00e1d\u011bn\u00ed p\u0159izp\u016fsob\u00ed integraci va\u0161emu nastaven\u00ed S\/4HANA a poskytuje podporu i po spu\u0161t\u011bn\u00ed ostr\u00e9ho provozu. V\u00e1\u0161 partner pro SAP nebo vlastn\u00ed v\u00fdvoj\u00e1\u0159i mohou tak\u00e9 vyu\u017e\u00edt zdokumentovan\u00e9 REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">dokumentace API<\/a>). Pro za\u010d\u00e1tek sta\u010d\u00ed kl\u00ed\u010d API.<\/p>\n\n\n<p>Za\u010dn\u011bte s exporty CSV nebo Excel ze S\/4HANA v r\u00e1mci 30denn\u00ed zku\u0161ebn\u00ed verze zdarma (a\u017e 20 pracovi\u0161\u0165, bez platebn\u00ed karty). Vlastn\u00ed rozvrh uvid\u00edte je\u0161t\u011b p\u0159ed jakoukoli prac\u00ed s API. Pot\u00e9 <a href=\"\/cs\/stanoveni-cen\/\">ceny<\/a> za\u010d\u00ednaj\u00ed na 199 \u20ac m\u011bs\u00ed\u010dn\u011b v\u010detn\u011b 5 pracovi\u0161\u0165, s m\u011bs\u00ed\u010dn\u00ed fakturac\u00ed a mo\u017enost\u00ed kdykoli zru\u0161it. Nab\u00eddku integrace p\u0159iprav\u00edme p\u0159edem podle va\u0161ich proces\u016f a pot\u0159eb spole\u010dn\u011b s nab\u00eddkou tarifu, abyste znali celkov\u00e9 n\u00e1klady je\u0161t\u011b p\u0159ed zah\u00e1jen\u00edm. Implementace b\u00fdv\u00e1 dokon\u010dena b\u011bhem n\u011bkolika t\u00fddn\u016f od za\u010d\u00e1tku zav\u00e1d\u011bn\u00ed.<\/p>\n\n\n<p>Na str\u00e1nce <a href=\"\/cs\/integrace\/erp\/sap-s4hana\/\">SkyPlanner pro SAP S\/4HANA<\/a> zjist\u00edte, jak\u00e1 data mezi syst\u00e9my proud\u00ed. Technick\u00fd postup najdete v <a href=\"\/cs\/integrace\/erp\/sap-s4hana\/pruvodce-integraci\/\">pr\u016fvodci integrac\u00ed S\/4HANA<\/a>. Podrobnosti o rozvrhov\u00e1n\u00ed najdete v p\u0159ehledu <a href=\"\/cs\/funkce\/\">funkc\u00ed<\/a> a v <a href=\"\/cs\/docs\/vyukovy-kurz-integrace\/\">dokumentaci SkyPlanner<\/a>, dal\u0161\u00ed syst\u00e9my ERP pak v sekci <a href=\"\/cs\/integrace\/erp\/\">integrace ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161et zdarma<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/cs\/kontaktni-prodej\/\">Rezervovat uk\u00e1zku<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Jak SkyPlanner hodnot\u00ed v\u00fdrobn\u00ed firmy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce ve spole\u010dnosti UTU, ve v\u00fdrobn\u00edm provozu rozv\u00e1d\u011b\u010d\u016f v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161et\u0159en\u00e9 ka\u017ed\u00fd t\u00fdden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner posunul na\u0161e pl\u00e1nov\u00e1n\u00ed v\u00fdroby od tabulek v Excelu k optimalizaci v\u00fdroby v re\u00e1ln\u00e9m \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialista dodavatelsk\u00e9ho \u0159et\u011bzce<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1d\u011b\u010de a sp\u00ednac\u00ed za\u0159\u00edzen\u00ed<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1nov\u00e1n\u00ed v\u00fdroby \u0161et\u0159\u00ed ka\u017ed\u00fd t\u00fdden 2 hodiny pr\u00e1ce a nov\u00e1 fronta operac\u00ed se na linku dostane b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/utu\/\">P\u0159e\u010d\u00edst hodnocen\u00ed UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1to\u0159i v od\u011bvech do \u010dist\u00fdch prostor u linky na pln\u011bn\u00ed lahv\u00ed ve farmaceutick\u00e9m z\u00e1vod\u011b Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efektivita v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfektivita v\u00fdroby vzrostla o 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vedouc\u00ed IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efektivita v\u00fdroby vzrostla o 90 % a vytvo\u0159en\u00ed optimalizovan\u00e9ho pl\u00e1nu na t\u0159i m\u011bs\u00edce pro v\u0161echna pracovi\u0161t\u011b trv\u00e1 m\u00e9n\u011b ne\u017e 30 minut.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/laboratory-allied\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel spole\u010dnosti Mamec, ve v\u00fdrobn\u00ed hale firmy ve m\u011bst\u011b Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000s<\/b><span>automaticky rozvr\u017een\u00fdch v\u00fdrobn\u00edch zak\u00e1zek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou jinak ne\u017e d\u0159\u00edv a n\u00e1\u0161 p\u0159ehled o kapacit\u00e1ch je na \u00fapln\u011b jin\u00e9 \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1ln\u00ed \u0159editel<\/b><br>Mamec \u00b7 Pr\u016fmyslov\u00e1 m\u00edchadla, \u010derpadla a technologicky n\u00e1ro\u010dn\u00e1 zak\u00e1zkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00edch zak\u00e1zek se rozvrhuj\u00ed automaticky a cel\u00e1 organizace m\u00e1 p\u0159ehled o v\u00fdrob\u011b v re\u00e1ln\u00e9m \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/mamec\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby ve spole\u010dnosti Fredman Operations, u robotick\u00e9ho paletiza\u010dn\u00edho pracovi\u0161t\u011b ve m\u011bst\u011b Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u011bs\u00edc\u016f<\/b><span>dop\u0159edu vid\u00ed obchod voln\u00e9 kapacity<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner poskytuje spolehliv\u00fd z\u00e1klad pro ve\u0161ker\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, vedouc\u00ed v\u00fdroby<\/b><br>Fredman Operations \u00b7 Balic\u00ed pap\u00edry pro styk s potravinami<\/p>\n\n\n<p class=\"ind-cust__result\">Obchod vid\u00ed voln\u00e9 kapacity na \u0161est m\u011bs\u00edc\u016f dop\u0159edu. Na po\u017eadavky na zm\u011bnu rozvrhu, jejich\u017e vy\u0159\u00edzen\u00ed d\u0159\u00edve trvalo hodinu i d\u00e9le, se nyn\u00ed odpov\u00edd\u00e1 b\u011bhem n\u011bkolika sekund.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/cs\/pribehy-zakazniku\/fredman-operations\/\">P\u0159e\u010d\u00edst hodnocen\u00ed Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 SAP S\/4HANA n\u00e1stroj pro rozvrhov\u00e1n\u00ed v\u00fdroby?<\/summary>\n<p class=\"sp-faq__a\">Ano, dva. Z\u00e1kladn\u00ed pl\u00e1nov\u00e1n\u00ed v\u00fdroby nab\u00edz\u00ed vyhodnocen\u00ed kapacit a jejich vyrovn\u00e1v\u00e1n\u00ed \u0159\u00edzen\u00e9 pl\u00e1nova\u010dem v aplikac\u00edch Capacity Scheduling Table a grafick\u00e9 Capacity Scheduling Board. Automatizovan\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit s heuristikami, optimalizac\u00ed, matic\u00ed se\u0159\u00edzen\u00ed a n\u00e1strojem Production Scheduling Board zaji\u0161\u0165uje integrovan\u00e9 PP\/DS, prod\u00e1van\u00e9 jako SAP S\/4HANA Manufacturing for planning and scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Zohled\u0148uje MRP v S\/4HANA omezen\u00e9 kapacity?<\/summary>\n<p class=\"sp-faq__a\">Ne. Term\u00ednov\u00e1n\u00ed podle pr\u016fb\u011b\u017en\u00fdch dob respektuje v\u00fdrobn\u00ed kalend\u00e1\u0159 a nepracovn\u00ed \u010dasy, ale nezohled\u0148uje zat\u00ed\u017een\u00ed pracovi\u0161t\u011b ostatn\u00edmi zak\u00e1zkami. K za\u0159azen\u00ed operac\u00ed do pl\u00e1nu v\u00fdroby podle dostupn\u00fdch kapacit doch\u00e1z\u00ed a\u017e pozd\u011bji, p\u0159i vyrovn\u00e1v\u00e1n\u00ed kapacit nebo v PP\/DS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00fd je rozd\u00edl mezi SAP PP a PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">PP v z\u00e1kladn\u00edm syst\u00e9mu pokr\u00fdv\u00e1 MRP, v\u00fdrobn\u00ed zak\u00e1zky, technologick\u00e9 postupy, pracovi\u0161t\u011b a kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed. PP\/DS p\u0159id\u00e1v\u00e1 pl\u00e1nov\u00e1n\u00ed v\u00fdroby podle dostupn\u00fdch kapacit se zohledn\u011bn\u00edm po\u0159ad\u00ed operac\u00ed pro materi\u00e1ly a v\u00fdrobn\u00ed zdroje nastaven\u00e9 pro pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed. M\u00e1 vlastn\u00ed heuristiky, optimaliz\u00e1tor, liveCache a n\u00e1stroj Production Scheduling Board.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Je PP\/DS sou\u010d\u00e1st\u00ed licence S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Doporu\u010den\u00ed SAP pro podnikovou architekturu uv\u00e1d\u011bj\u00ed MRP a CRP jako z\u00e1kladn\u00ed funkce S\/4HANA Enterprise a Manufacturing for planning and scheduling jako samostatnou mo\u017enost. Produktov\u00fd expert SAP na sv\u00e9m blogu uv\u00e1d\u00ed, \u017ee funkce pokro\u010dil\u00e9ho pl\u00e1nov\u00e1n\u00ed &#8222;are not part of the standard SAP S\/4HANA Enterprise license.&#8220; (nejsou sou\u010d\u00e1st\u00ed standardn\u00ed licence tohoto syst\u00e9mu). Ov\u011b\u0159te si podm\u00ednky ve sv\u00e9 smlouv\u011b se SAP.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Co v S\/4HANA nahrazuje CM21 a Graphical Planning Table?<\/summary>\n<p class=\"sp-faq__a\">Aplikace Fiori Manage Work Center Capacity, Capacity Scheduling Table a Capacity Scheduling Board. Pr\u00e1vo na pou\u017e\u00edv\u00e1n\u00ed n\u00e1stroje Graphical Planning Table vypr\u0161elo 31. prosince 2025.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Jak\u00e1 omezen\u00ed by m\u011bl pl\u00e1novac\u00ed n\u00e1stroj pro S\/4HANA zohled\u0148ovat?<\/summary>\n<p class=\"sp-faq__a\">Minim\u00e1ln\u011b skute\u010dnou kapacitu ka\u017ed\u00e9ho stroje, pracovn\u00edka a sm\u011bny; p\u0159etypov\u00e1n\u00ed z\u00e1visl\u00e1 na po\u0159ad\u00ed operac\u00ed; n\u00e1stroje sd\u00edlen\u00e9 mezi pracovi\u0161ti; operace vy\u017eaduj\u00edc\u00ed n\u011bkolik pracovn\u00edk\u016f obsluhy; alternativn\u00ed v\u00fdrobn\u00ed zdroje; a dostupnost materi\u00e1lu v\u010detn\u011b otev\u0159en\u00fdch n\u00e1kupn\u00edch objedn\u00e1vek. SkyPlanner APS toto v\u0161e automaticky zohled\u0148uje p\u0159i ka\u017ed\u00e9m sestaven\u00ed rozvrhu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u016f\u017ee SkyPlanner APS spolupracovat se SAP S\/4HANA bez PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">Ano. SkyPlanner APS s\u00e1m sestavuje pl\u00e1n v\u00fdroby respektuj\u00edc\u00ed dostupn\u00e9 kapacity na z\u00e1klad\u011b v\u00fdrobn\u00edch zak\u00e1zek, operac\u00ed, pracovi\u0161\u0165 a materi\u00e1l\u016f v S\/4HANA. Term\u00edny operac\u00ed a jejich potvrzen\u00ed se vracej\u00ed do S\/4HANA a t\u00fdm SkyPlanner nastav\u00ed integraci b\u011bhem \u00favodn\u00edho zav\u00e1d\u011bn\u00ed. Zku\u0161ebn\u00ed verze za\u010d\u00edn\u00e1 importem dat ze soubor\u016f CSV nebo Excel. <a href=\"\/cs\/zkusebni-verze\/\">Vyzkou\u0161ejte zdarma<\/a> nebo <a href=\"\/cs\/kontaktni-prodej\/\">kontaktujte obchodn\u00ed t\u00fdm<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrace \/ ERP \/ SAP S\/4HANA Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupn\u00e9 kapacity stroj\u016f i pracovn\u00edk\u016f. SAP S\/4HANA nab\u00edz\u00ed pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby dv\u011b mo\u017enosti: ru\u010dn\u00ed vyrovn\u00e1v\u00e1n\u00ed kapacit v z\u00e1kladn\u00edm syst\u00e9mu a automatick\u00e9 rozvrhov\u00e1n\u00ed v integrovan\u00e9m PP\/DS. Term\u00ednov\u00e1n\u00ed podle &#8230; <a title=\"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/\" aria-label=\"Read more about Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100790,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101117","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby?<\/title>\n<meta name=\"description\" content=\"S\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"S\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/planovani-vyroby\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/planovani-vyroby\\\/\",\"name\":\"Podporuje SAP S\\\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"S\\\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\\\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/planovani-vyroby\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/planovani-vyroby\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/planovani-vyroby\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrace ERP a MES softwaru se SkyPlannerem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pro v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pro SAP S\\\/4HANA: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/integrace\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Podporuje SAP S\\\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\\\/DS a SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby?","description":"S\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/","og_locale":"cs_CZ","og_type":"article","og_title":"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS","og_description":"S\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?","og_url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"21 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/","url":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/","name":"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"S\/4HANA term\u00ednuje bez limit\u016f kapacit, pl\u00e1nova\u010di vyrovn\u00e1vaj\u00ed \u0159\u00eddic\u00ed pracovi\u0161t\u011b. PP\/DS pl\u00e1nuje automaticky dle kapacit. Jak funguj\u00ed a kam pat\u0159\u00ed SkyPlanner APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/planovani-vyroby\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Integrace ERP a MES softwaru se SkyPlannerem","item":"https:\/\/skyplanner.ai\/cs\/integrace\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pro v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pro SAP S\/4HANA: Pl\u00e1nov\u00e1n\u00ed v\u00fdroby","item":"https:\/\/skyplanner.ai\/cs\/integrace\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/cs\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrace \/ ERP \/ SAP S\/4HANA Podporuje SAP S\/4HANA pl\u00e1nov\u00e1n\u00ed v\u00fdroby? Vyrovn\u00e1v\u00e1n\u00ed kapacit, PP\/DS a SkyPlanner APS Pl\u00e1nov\u00e1n\u00edm v\u00fdroby se zde obecn\u011b rozum\u00ed sestaven\u00ed rozvrhu, kter\u00fd respektuje skute\u010dn\u011b dostupn\u00e9 kapacity stroj\u016f i pracovn\u00edk\u016f. SAP S\/4HANA nab\u00edz\u00ed pro pl\u00e1nov\u00e1n\u00ed v\u00fdroby dv\u011b mo\u017enosti: ru\u010dn\u00ed vyrovn\u00e1v\u00e1n\u00ed kapacit v z\u00e1kladn\u00edm syst\u00e9mu a automatick\u00e9 rozvrhov\u00e1n\u00ed v integrovan\u00e9m PP\/DS. Term\u00ednov\u00e1n\u00ed podle&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=101117"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/101117\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/pages\/100790"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=101117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}