{"id":61448,"date":"2025-03-06T12:14:16","date_gmt":"2025-03-06T12:14:16","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/casove-zaznamy\/"},"modified":"2025-10-07T11:17:27","modified_gmt":"2025-10-07T11:17:27","password":"","slug":"casove-zaznamy","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/","title":{"rendered":"\u010casov\u00e9 z\u00e1znamy"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">Datov\u00e1 struktura Skyplanner<\/h4>\n\n<p>Ne\u017e se pust\u00edme do \u010dasov\u00fdch z\u00e1znam\u016f, mus\u00edme probrat n\u011bco m\u00e1lo o struktu\u0159e dat v programu Skyplanner a o tom, jak funguj\u00ed v\u011bci pod kapotou. To v\u0161e p\u0159ijde na \u0159adu pozd\u011bji. <\/p>\n\n<p>Pokud jste integrovali \u00fadaje o zak\u00e1zk\u00e1ch\/pracovn\u00edch p\u0159\u00edkazech\/pracovn\u00edch m\u00edstech do Skyplanneru, pravd\u011bpodobn\u011b jste pou\u017eili alespo\u0148 tyto body API:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>phaser-orders<\/li>\n\n\n\n<li>phaser-order-rows<\/li>\n\n\n\n<li>phaser-jobs<\/li>\n<\/ul>\n\n<p>Data vlo\u017een\u00e1 do t\u011bchto koncov\u00fdch bod\u016f jsou v u\u017eivatelsk\u00e9m rozhran\u00ed Skyplanneru reprezentov\u00e1na takto:<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img decoding=\"async\" width=\"1024\" height=\"714\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png\" alt=\"\" class=\"wp-image-55194\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-768x535.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png 1142w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 1.<\/strong>  Objedn\u00e1vka (phaser-orders)<\/figcaption><\/figure>\n<\/div>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"715\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png\" alt=\"\" class=\"wp-image-55228\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-300x210.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-768x536.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26.png 1144w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 2.<\/strong>  Polo\u017eky objedn\u00e1vky (phaser-order-rows (\u010derven\u00e1)), Kroky zpracov\u00e1n\u00ed (phaser-jobs (zelen\u00e1))<\/figcaption><\/figure>\n\n<p>Po vlo\u017een\u00ed objedn\u00e1vek do Skyplanneru <strong>je<\/strong> budete cht\u00edt <strong>exportovat<\/strong> (lze to prov\u00e9st prost\u0159ednictv\u00edm u\u017eivatelsk\u00e9ho rozhran\u00ed nebo koncov\u00e9ho bodu \/phaser-orders\/export-endpoint) do modulu Pl\u00e1nov\u00e1n\u00ed v\u00fdroby:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"596\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png\" alt=\"\" class=\"wp-image-55288\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-768x447.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-360x209.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 3.<\/strong>  Exportov\u00e1n\u00ed prost\u0159ednictv\u00edm u\u017eivatelsk\u00e9ho rozhran\u00ed<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"597\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png\" alt=\"\" class=\"wp-image-55326\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-768x448.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-360x210.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 4.<\/strong>  Exportovan\u00e1 zak\u00e1zka v pl\u00e1nov\u00e1n\u00ed v\u00fdroby<\/figcaption><\/figure>\n\n<p>P\u0159i exportu objedn\u00e1vek Skyplanner efektivn\u011b kop\u00edruje data objedn\u00e1vek z jedn\u00e9 datab\u00e1zov\u00e9 tabulky do druh\u00e9. Pokud tedy n\u011bco zm\u011bn\u00edte nap\u0159\u00edklad prost\u0159ednictv\u00edm koncov\u00e9ho bodu \/phaser-orders, mus\u00edte data znovu exportovat, abyste je mohli aktualizovat v pl\u00e1nov\u00e1n\u00ed v\u00fdroby. To tak\u00e9 znamen\u00e1, \u017ee pro p\u0159\u00edstup k zak\u00e1zk\u00e1m, kter\u00e9 vid\u00edte v okn\u011b Pl\u00e1nov\u00e1n\u00ed v\u00fdroby, mus\u00edte pou\u017e\u00edt jin\u00e9 koncov\u00e9 body API!  <\/p>\n\n<p>&#8222;Zm\u011bn\u011bn\u00e9&#8220; koncov\u00e9 body jsou n\u00e1sleduj\u00edc\u00ed:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\/phaser-orders \u2192 \/orders<\/li>\n\n\n\n<li>\/phaser-order-rows \u2192 \/order-rows<\/li>\n\n\n\n<li>\/phaser-jobs \u2192 \/jobs<\/li>\n<\/ul>\n\n<p>To je d\u016fle\u017eit\u00e9 v\u011bd\u011bt, proto\u017ee p\u0159i pou\u017eit\u00ed koncov\u00e9ho bodu \/timelogs pro z\u00e1znam ud\u00e1lost\u00ed z v\u00fdroby atd. <strong>mus\u00edte pou\u017e\u00edt souvisej\u00edc\u00ed entity, kter\u00e9 se nach\u00e1zej\u00ed v koncov\u00e9m bodu Pl\u00e1nov\u00e1n\u00ed v\u00fdroby!<\/strong><\/p>\n\n<p>Nap\u0159\u00edklad k odesl\u00e1n\u00ed nov\u00e9ho \u010dasov\u00e9ho z\u00e1znamu pot\u0159ebujete <strong>production_planning_job_id <\/strong>(pro zopakov\u00e1n\u00ed: production_planning_jobs jsou entity p\u0159\u00edstupn\u00e9 z koncov\u00e9ho bodu \/jobs):<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"867\" height=\"603\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png\" alt=\"\" class=\"wp-image-55407\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png 867w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-768x534.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-360x250.png 360w\" sizes=\"(max-width: 867px) 100vw, 867px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 5.<\/strong>  Po\u017eadavek POST na \u010dasov\u00fd z\u00e1znam<\/figcaption><\/figure>\n\n<p>Pot\u0159ebn\u00e9 production_planning_job_id najdete bu\u010f v koncov\u00e9m bod\u011b \/phaser-jobs:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"924\" height=\"870\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png\" alt=\"\" class=\"wp-image-55455\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png 924w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-300x282.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-360x339.png 360w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 6.<\/strong> Po\u017eadavek na GET \u00falohy Phaser (\u010derven\u011b je uvedeno phaser_job_id, <strong>NEPOU\u017d\u00cdVEJTE V \u010cASOPISECH<\/strong>)<\/figcaption><\/figure>\n\n<p>Nebo z koncov\u00e9ho bodu \/job:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"926\" height=\"872\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png\" alt=\"\" class=\"wp-image-55490\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png 926w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-300x283.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-360x339.png 360w\" sizes=\"(max-width: 926px) 100vw, 926px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 7.<\/strong>  \/job GET po\u017eadavek<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">Vytv\u00e1\u0159en\u00ed \u010dasov\u00fdch z\u00e1znam\u016f pomoc\u00ed rozhran\u00ed REST-API<\/h4>\n\n<p>Vytv\u00e1\u0159en\u00ed \u010dasov\u00fdch z\u00e1znam\u016f do Skyplanneru prost\u0159ednictv\u00edm rozhran\u00ed API pou\u017e\u00edv\u00e1 stejn\u00e1 pravidla a syst\u00e9my, kter\u00e9 jsou v u\u017eivatelsk\u00e9m rozhran\u00ed. Proto by mohlo b\u00fdt v\u00fdhodn\u00e9 sezn\u00e1mit se s t\u00edm, jak syst\u00e9m funguje v u\u017eivatelsk\u00e9m rozhran\u00ed, ne\u017e se jej pokus\u00edte pou\u017e\u00edt prost\u0159ednictv\u00edm rozhran\u00ed API. <\/p>\n\n<h5 class=\"wp-block-heading\">Z\u00e1klady \u010dasov\u00e9ho z\u00e1znamu<\/h5>\n\n<p>Skyplanner m\u00e1 \u010dty\u0159i typy ud\u00e1lost\u00ed \u010dasov\u00e9ho z\u00e1znamu:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>shift_begin<\/li>\n\n\n\n<li>pozastaveno<\/li>\n\n\n\n<li>pokra\u010dov\u00e1n\u00ed<\/li>\n\n\n\n<li>shift_end<\/li>\n<\/ul>\n\n<p>Ud\u00e1lost Shift_begin je odesl\u00e1na p\u0159i prvn\u00edm spu\u0161t\u011bn\u00ed \u00falohy.  <strong>Nikdy nepos\u00edlejte v\u00edce ne\u017e jednu ud\u00e1lost shift_begin pro ka\u017edou \u00falohu!<\/strong><\/p>\n\n<p>Paused-event pozastav\u00ed \u00falohu.<\/p>\n\n<p>Pokra\u010duj\u00edc\u00ed ud\u00e1lost obnov\u00ed pozastavenou pr\u00e1ci.<\/p>\n\n<p>Shift_end dokon\u010d\u00ed pr\u00e1ci.  <strong>Nikdy nepos\u00edlejte v\u00edce ne\u017e jednu ud\u00e1lost shift_end pro ka\u017edou \u00falohu!<\/strong><\/p>\n\n<p>Po\u017eadovan\u00e9 \u00fadaje pro \u010dasov\u00e9 z\u00e1znamy:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>person_id\n<ul class=\"wp-block-list\">\n<li>Lze zjistit z koncov\u00e9ho bodu \/people<\/li>\n\n\n\n<li>Nen\u00ed to tot\u00e9\u017e jako user_id!<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>planned_workstation_id\n<ul class=\"wp-block-list\">\n<li>Pracovi\u0161t\u011b, na kter\u00e9m se pr\u00e1ce prov\u00e1d\u00ed<\/li>\n\n\n\n<li>Lze je nal\u00e9zt v koncov\u00e9 polo\u017ece \/workstations-endpoint.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>date_time\n<ul class=\"wp-block-list\">\n<li>Okam\u017eik, kdy je ud\u00e1lost provedena<\/li>\n\n\n\n<li>Form\u00e1t: 2024-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>Chcete-li ur\u010dit, jak\u00fd \u010dasov\u00fd z\u00e1znam programu Skyplanner je v\u00e1z\u00e1n na \u010dasov\u00fd z\u00e1znam z jak\u00e9hokoli extern\u00edho syst\u00e9mu, kter\u00fd pou\u017e\u00edv\u00e1te, m\u016f\u017eete pou\u017e\u00edt pole <strong>external_id <\/strong>. Pomoc\u00ed tohoto id pak m\u016f\u017eete nap\u0159\u00edklad zad\u00e1vat po\u017eadavky GET, abyste na\u0161li konkr\u00e9tn\u00ed \u010dasov\u00fd z\u00e1znam ze Skyplanneru. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"438\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png\" alt=\"\" class=\"wp-image-55587\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-300x128.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-768x328.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-360x154.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32.png 1415w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 8.<\/strong>  External_id v \u010dasov\u00fdch z\u00e1znamech<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">Zah\u00e1jen\u00ed pracovn\u00edho pom\u011bru<\/h4>\n\n<p>\u00dalohy m\u016f\u017eete spou\u0161t\u011bt odesl\u00e1n\u00edm po\u017eadavku POST takto na rozhran\u00ed API:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"624\" height=\"766\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png\" alt=\"\" class=\"wp-image-55638\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png 624w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-244x300.png 244w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-360x442.png 360w\" sizes=\"(max-width: 624px) 100vw, 624px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 9.<\/strong>  Shift_begin timelog<\/figcaption><\/figure>\n\n<p>P\u0159i nastavov\u00e1n\u00ed dat POST pro \u010dasov\u00e9 z\u00e1znamy nastavte <strong>workshift_id <\/strong>jako 0 a <strong>timelog_finalized <\/strong>jako <strong>true.<\/strong><\/p>\n\n<h4 class=\"wp-block-heading\">Pozastaven\u00ed \u00falohy<\/h4>\n\n<p>\u00dalohy pozastav\u00edte odesl\u00e1n\u00edm po\u017eadavku POST takto:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"697\" height=\"760\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png\" alt=\"\" class=\"wp-image-55676\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png 697w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-360x393.png 360w\" sizes=\"(max-width: 697px) 100vw, 697px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 10.<\/strong>  Pozastaven\u00fd \u010dasov\u00fd z\u00e1znam<\/figcaption><\/figure>\n\n<p>V \u010dasov\u00fdch z\u00e1znamech typu paused m\u016f\u017eete nastavit <strong>\u010d\u00e1stku <\/strong>a <strong>faulty_amount<\/strong>. V\u0161imn\u011bte si tak\u00e9 <strong>typu <\/strong>timelog a <strong>date_time<\/strong>. <\/p>\n\n<h4 class=\"wp-block-heading\">Pokra\u010dov\u00e1n\u00ed v pr\u00e1ci<\/h4>\n\n<p>Zde je uveden postup, jak pokra\u010dovat v pozastaven\u00e9m \u010dasov\u00e9m z\u00e1znamu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"713\" height=\"722\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png\" alt=\"\" class=\"wp-image-55715\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png 713w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-296x300.png 296w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-360x365.png 360w\" sizes=\"(max-width: 713px) 100vw, 713px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 11.<\/strong>  Pokra\u010dov\u00e1n\u00ed \u010dasov\u00e9ho z\u00e1znamu<\/figcaption><\/figure>\n\n<p>V\u0161imn\u011bte si, \u017ee pokud se pokus\u00edte pokra\u010dovat v \u00faloze, kter\u00e1 byla ukon\u010dena ud\u00e1lost\u00ed shift_end, dojde k chyb\u011b.<\/p>\n\n<h4 class=\"wp-block-heading\">Ukon\u010den\u00ed pracovn\u00edho pom\u011bru<\/h4>\n\n<p>Zde je uveden zp\u016fsob ukon\u010den\u00ed \u00falohy pomoc\u00ed \u010dasov\u00e9ho z\u00e1znamu shift_end:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"711\" height=\"764\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png\" alt=\"\" class=\"wp-image-55761\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png 711w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-279x300.png 279w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-360x387.png 360w\" sizes=\"(max-width: 711px) 100vw, 711px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 12.<\/strong>  Shift_end timelog<\/figcaption><\/figure>\n\n<p>V shift_end-events m\u016f\u017eete zadat hodnoty <strong>amount <\/strong>a <strong>faulty_amount <\/strong>stejn\u011b jako v paused-events. V\u0161imn\u011bte si, \u017ee pokud se pokus\u00edte prov\u00e9st shift_end-event pro \u00falohu, kter\u00e1 nen\u00ed spu\u0161t\u011bna, zobraz\u00ed se chyba. <\/p>\n\n<h4 class=\"wp-block-heading\">Aktualizace \u010dasov\u00fdch z\u00e1znam\u016f<\/h4>\n\n<p>Data \u010dasov\u00e9ho z\u00e1znamu m\u016f\u017eete aktualizovat odesl\u00e1n\u00edm po\u017eadavku PUT na koncov\u00fd bod \/timelogs-endpoint, nap\u0159\u00edklad takto:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"694\" height=\"757\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png\" alt=\"\" class=\"wp-image-55796\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png 694w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-360x393.png 360w\" sizes=\"(max-width: 694px) 100vw, 694px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 13.<\/strong>  \u00daprava \u010dasov\u00fdch z\u00e1znam\u016f<\/figcaption><\/figure>\n\n<p>V\u0161imn\u011bte si, \u017ee pro proveden\u00ed aktualizace mus\u00edte m\u00edt nastaveny \u00fadaje <strong>beginTimelog <\/strong>i <strong>endTimelog <\/strong>. \u010casov\u00e9 z\u00e1znamy v programu Skyplanner jsou ulo\u017eeny takto: ka\u017ed\u00fd &#8222;\u00fapln\u00fd&#8220; (\u010dasov\u00fd z\u00e1znam, kter\u00fd m\u00e1 za\u010d\u00e1tek i konec (nap\u0159. shift_begin\/continued &amp; paused\/shift_end) \u010dasov\u00fd z\u00e1znam m\u00e1 samostatnou entitu pro za\u010d\u00e1tek a konec. <\/p>\n\n<p>Ty se p\u00e1ruj\u00ed podle hodnoty <strong>begin_id <\/strong>nalezen\u00e9 v endlogu. Ve v\u00fd\u0161e uveden\u00e9m p\u0159\u00edkladu m\u00e1 beginTimelog hodnotu id 1, a proto m\u00e1 jeho endTimelog hodnotu <strong>begin_id <\/strong>1. <\/p>\n\n<p>Hodnoty <strong>person_id <\/strong>a <strong>endTimelog <\/strong>mus\u00edte zadat tak\u00e9 p\u0159i ka\u017ed\u00e9m po\u017eadavku na aktualizaci, i kdy\u017e je nem\u011bn\u00edte.<\/p>\n\n<h4 class=\"wp-block-heading\">Alternativn\u00ed zp\u016fsoby tvorby \u010dasov\u00fdch z\u00e1znam\u016f<\/h4>\n\n<p>Zde je n\u011bkolik alternativn\u00edch zp\u016fsob\u016f, jak se m\u016f\u017eete p\u0159ihl\u00e1sit k \u00faloh\u00e1m pomoc\u00ed rozhran\u00ed API.<\/p>\n\n<h5 class=\"wp-block-heading\">Logfull<\/h5>\n\n<p>Pokud chcete odeslat po\u010d\u00e1te\u010dn\u00ed i koncov\u00fd \u010dasov\u00fd z\u00e1znam v jednom po\u017eadavku, m\u016f\u017eete pou\u017e\u00edt <strong>\/timelogs\/log-full<\/strong> -endpoint, nap\u0159\u00edklad takto:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"691\" height=\"721\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png\" alt=\"\" class=\"wp-image-55828\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png 691w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-360x376.png 360w\" sizes=\"(max-width: 691px) 100vw, 691px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 14.<\/strong>  Pln\u00e1 \u017e\u00e1dost protokolu<\/figcaption><\/figure>\n\n<p>V\u0161imn\u011bte si, jak jsou zde zas\u00edl\u00e1ny \u010d\u00e1stky: prvn\u00ed hodnota &#8222;amount&#8220; ozna\u010duje <strong>chybnou \u010d\u00e1stku<\/strong> a druh\u00e1 <strong>\u010d\u00e1stku<\/strong>. Tento po\u017eadavek vytv\u00e1\u0159\u00ed entity beginlog a endlog v jedin\u00e9m po\u017eadavku. <\/p>\n\n<h5 class=\"wp-block-heading\">Quicklog<\/h5>\n\n<p>&#8222;Rychl\u00e9 p\u0159ihl\u00e1\u0161en\u00ed&#8220; k \u00faloze ji dokon\u010d\u00ed v jedin\u00e9m po\u017eadavku, nastav\u00ed dokon\u010den\u00e9 mno\u017estv\u00ed produkt\u016f tak, aby odpov\u00eddalo hodnot\u011b nastaven\u00e9 v polo\u017ece objedn\u00e1vky. Quicklogging se prov\u00e1d\u00ed pomoc\u00ed <strong>\/timelogs\/quick-log<\/strong> -endpoint: <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"695\" height=\"723\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png\" alt=\"\" class=\"wp-image-55857\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png 695w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-360x375.png 360w\" sizes=\"(max-width: 695px) 100vw, 695px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 15.<\/strong>  Quicklogging<\/figcaption><\/figure>\n\n<p>V\u0161imn\u011bte si, \u017ee zde sta\u010d\u00ed zadat pouze <strong>production_planning_job_id<\/strong>, <strong>planned_workstation_id <\/strong>a <strong>person_id<\/strong>. Hodnoty \u010dasu a \u010d\u00e1stky se vypln\u00ed automaticky. V\u0161imn\u011bte si tak\u00e9, \u017ee quicklogovan\u00e9 \u00falohy jsou v\u017edy ukon\u010deny ud\u00e1lost\u00ed shift_end-event, tak\u017ee po quicklogu nen\u00ed mo\u017en\u00e9 \u017e\u00e1dn\u00e9 dal\u0161\u00ed logov\u00e1n\u00ed!  <\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Datov\u00e1 struktura Skyplanner Ne\u017e se pust\u00edme do \u010dasov\u00fdch z\u00e1znam\u016f, mus\u00edme probrat n\u011bco m\u00e1lo o struktu\u0159e dat v programu Skyplanner a o tom, jak funguj\u00ed v\u011bci pod kapotou. To v\u0161e p\u0159ijde na \u0159adu pozd\u011bji. Pokud jste integrovali \u00fadaje o zak\u00e1zk\u00e1ch\/pracovn\u00edch p\u0159\u00edkazech\/pracovn\u00edch m\u00edstech do Skyplanneru, pravd\u011bpodobn\u011b jste pou\u017eili alespo\u0148 tyto body API: Data vlo\u017een\u00e1 do t\u011bchto koncov\u00fdch &#8230; <a title=\"\u010casov\u00e9 z\u00e1znamy\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/\" aria-label=\"Read more about \u010casov\u00e9 z\u00e1znamy\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[621],"doc_tag":[622,1517],"class_list":["post-61448","docs","type-docs","status-publish","hentry","doc_category-integrace","doc_tag-api-cs","doc_tag-integrace"],"acf":[],"year_month":"2026-11","word_count":1200,"total_views":"188","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/cs\/author\/sami\/"},"doc_category_info":[{"term_name":"Integrace","term_url":"https:\/\/skyplanner.ai\/cs\/docs-category\/integrace\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/cs\/docs-tag\/api-cs\/"},{"term_name":"Integrace","term_url":"https:\/\/skyplanner.ai\/cs\/docs-tag\/integrace\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u010casov\u00e9 z\u00e1znamy\" \/>\n<meta property=\"og:description\" content=\"Datov\u00e1 struktura Skyplanner Ne\u017e se pust\u00edme do \u010dasov\u00fdch z\u00e1znam\u016f, mus\u00edme probrat n\u011bco m\u00e1lo o struktu\u0159e dat v programu Skyplanner a o tom, jak funguj\u00ed v\u011bci pod kapotou. To v\u0161e p\u0159ijde na \u0159adu pozd\u011bji. Pokud jste integrovali \u00fadaje o zak\u00e1zk\u00e1ch\/pracovn\u00edch p\u0159\u00edkazech\/pracovn\u00edch m\u00edstech do Skyplanneru, pravd\u011bpodobn\u011b jste pou\u017eili alespo\u0148 tyto body API: Data vlo\u017een\u00e1 do t\u011bchto koncov\u00fdch ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T11:17:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1142\" \/>\n\t<meta property=\"og:image:height\" content=\"796\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/\",\"name\":\"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"datePublished\":\"2025-03-06T12:14:16+00:00\",\"dateModified\":\"2025-10-07T11:17:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/casove-zaznamy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u010casov\u00e9 z\u00e1znamy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/","og_locale":"cs_CZ","og_type":"article","og_title":"\u010casov\u00e9 z\u00e1znamy","og_description":"Datov\u00e1 struktura Skyplanner Ne\u017e se pust\u00edme do \u010dasov\u00fdch z\u00e1znam\u016f, mus\u00edme probrat n\u011bco m\u00e1lo o struktu\u0159e dat v programu Skyplanner a o tom, jak funguj\u00ed v\u011bci pod kapotou. To v\u0161e p\u0159ijde na \u0159adu pozd\u011bji. Pokud jste integrovali \u00fadaje o zak\u00e1zk\u00e1ch\/pracovn\u00edch p\u0159\u00edkazech\/pracovn\u00edch m\u00edstech do Skyplanneru, pravd\u011bpodobn\u011b jste pou\u017eili alespo\u0148 tyto body API: Data vlo\u017een\u00e1 do t\u011bchto koncov\u00fdch ... Read more","og_url":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T11:17:27+00:00","og_image":[{"width":1142,"height":796,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Odhadovan\u00e1 doba \u010dten\u00ed":"6 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/","url":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/","name":"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","datePublished":"2025-03-06T12:14:16+00:00","dateModified":"2025-10-07T11:17:27+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/cs\/docs\/casove-zaznamy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/cs\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/cs\/docs\/"},{"@type":"ListItem","position":3,"name":"\u010casov\u00e9 z\u00e1znamy"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/cs\/#website","url":"https:\/\/skyplanner.ai\/cs\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/cs\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/cs\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/cs\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"Datov\u00e1 struktura Skyplanner Ne\u017e se pust\u00edme do \u010dasov\u00fdch z\u00e1znam\u016f, mus\u00edme probrat n\u011bco m\u00e1lo o struktu\u0159e dat v programu Skyplanner a o tom, jak funguj\u00ed v\u011bci pod kapotou. To v\u0161e p\u0159ijde na \u0159adu pozd\u011bji. Pokud jste integrovali \u00fadaje o zak\u00e1zk\u00e1ch\/pracovn\u00edch p\u0159\u00edkazech\/pracovn\u00edch m\u00edstech do Skyplanneru, pravd\u011bpodobn\u011b jste pou\u017eili alespo\u0148 tyto body API: Data vlo\u017een\u00e1 do t\u011bchto koncov\u00fdch&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/docs\/61448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/comments?post=61448"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/docs\/61448\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/media?parent=61448"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/doc_category?post=61448"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/cs\/wp-json\/wp\/v2\/doc_tag?post=61448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}