{"id":37331,"date":"2023-07-15T16:44:06","date_gmt":"2023-07-15T16:44:06","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/"},"modified":"2024-08-07T07:15:13","modified_gmt":"2024-08-07T07:15:13","slug":"%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/","title":{"rendered":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-what-is-manufacturing-as-a-service-maas\">\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/\">\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/\">\u0627\u0644\u0645\u0635\u0627\u062f\u0631<\/a> &#8221; \u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0645\u0642\u062f\u0631 \u0644\u0644\u0642\u0631\u0627\u0621\u0629 <\/span><span class=\"yoast-reading-time__reading-time\">25<\/span><span class=\"yoast-reading-time__time-unit\"> \u062f\u0642\u0627\u0626\u0642<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\u062a\u062e\u064a\u0644 \u0639\u0627\u0644\u0645\u0627\u064b \u062a\u0643\u0648\u0646 \u0641\u064a\u0647 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0633\u0644\u0633\u0629 \u0648\u0641\u0639\u0627\u0644\u0629 \u0648\u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0643\u064a\u0641 \u0628\u062f\u0631\u062c\u0629 \u0643\u0628\u064a\u0631\u0629.\n\u0639\u0627\u0644\u0645 \u062a\u0633\u062a\u0637\u064a\u0639 \u0641\u064a\u0647 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642 \u0641\u064a \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a.\n\u0647\u0630\u0647 \u0647\u064a \u0642\u0648\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u060c \u0648\u0647\u0648 \u0645\u0641\u0647\u0648\u0645 \u062b\u0648\u0631\u064a \u064a\u064f\u062d\u062f\u062b \u062a\u062d\u0648\u0644\u0627\u064b \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639.  <\/p>\n\n\n\n<p>\u0633\u0648\u0641 \u062a\u0633\u062a\u0643\u0634\u0641 \u0647\u0630\u0647 \u0627\u0644\u0645\u0642\u0627\u0644\u0629 \u062a\u0639\u0631\u064a\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0648\u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629 \u0639\u0644\u064a\u0647\u060c \u0648\u0645\u0642\u0627\u0631\u0646\u062a\u0647 \u0628\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a\u0629\u060c \u0648\u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u062f\u0639\u0645 \u0645\u0641\u0647\u0648\u0645 &#8220;MaaS&#8221;\u060c \u0648\u062a\u0633\u0644\u064a\u0637 \u0627\u0644\u0636\u0648\u0621 \u0639\u0644\u0649 \u0641\u0648\u0627\u0626\u062f\u0647\u060c \u0648\u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a\u060c \u0648\u0627\u0633\u062a\u0643\u0634\u0627\u0641 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a\u0629 \u0644\u0647\u0630\u0627 \u0627\u0644\u0646\u0647\u062c \u0627\u0644\u0630\u064a \u064a\u063a\u064a\u0631 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u0644\u0639\u0628\u0629.\n\u0633\u0648\u0627\u0621 \u0643\u0646\u062a \u0645\u062e\u0637\u0637\u064b\u0627 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u0635\u0627\u062d\u0628 \u0639\u0645\u0644\u060c \u0641\u0625\u0646 \u0641\u0647\u0645\u0643 \u0644\u0645\u0641\u0647\u0648\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0648\u062a\u0637\u0628\u064a\u0642\u0647 \u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0648\u0641\u0631 \u0644\u0643 \u0645\u064a\u0632\u0629 \u062a\u0646\u0627\u0641\u0633\u064a\u0629 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u062a\u063a\u064a\u0631 \u0628\u0627\u0633\u062a\u0645\u0631\u0627\u0631. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-1a4fa64d      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u062e\u0644\u0627\u0635\u0629-\u0627\u0644\u0642\u0648\u0644-\u0648\u0627\u0644\u0635\u0648\u0631\u0629\" class=\"uagb-toc-link__trigger\">\u062e\u0644\u0627\u0635\u0629 \u0627\u0644\u0642\u0648\u0644\u061b \u0648\u0627\u0644\u0635\u0648\u0631\u0629<\/a><li class=\"uagb-toc__list\"><a href=\"#\u062a\u0639\u0631\u064a\u0641-\u0648\u0644\u0645\u062d\u0629-\u0639\u0627\u0645\u0629-\u0639\u0646-\u0627\u0644\u062a\u0635\u0646\u064a\u0639-\u0643\u062e\u062f\u0645\u0629-maas\" class=\"uagb-toc-link__trigger\">\u062a\u0639\u0631\u064a\u0641 \u0648\u0644\u0645\u062d\u0629 \u0639\u0627\u0645\u0629 \u0639\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a-\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629-\u0627\u0644\u062a\u064a-\u062a\u0639\u0645\u0644-\u0639\u0644\u0649-\u062a\u0634\u063a\u064a\u0644-\u062e\u062f\u0645\u0629-maas\" class=\"uagb-toc-link__trigger\">\u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0639\u0644\u0649 \u062a\u0634\u063a\u064a\u0644 \u062e\u062f\u0645\u0629 MaaS<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0641\u0648\u0627\u0626\u062f-\u0627\u0644\u062a\u0635\u0646\u064a\u0639-\u0643\u062e\u062f\u0645\u0629\" class=\"uagb-toc-link__trigger\">\u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a-\u0648\u0627\u0644\u062d\u0644\u0648\u0644-\u0641\u064a-\u0645\u062c\u0627\u0644-maas\" class=\"uagb-toc-link__trigger\">\u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u062d\u0644\u0648\u0644 \u0641\u064a \u0645\u062c\u0627\u0644 MaaS<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a-\u0627\u0644\u0645\u0633\u062a\u0641\u064a\u062f\u0629-\u0645\u0646-\u0627\u0644\u062a\u0635\u0646\u064a\u0639-\u0643\u062e\u062f\u0645\u0629\" class=\"uagb-toc-link__trigger\">\u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0641\u064a\u062f\u0629 \u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0645\u0633\u062a\u0642\u0628\u0644-\u062e\u062f\u0645\u0629-maas\" class=\"uagb-toc-link__trigger\">\u0645\u0633\u062a\u0642\u0628\u0644 \u062e\u062f\u0645\u0629 MaaS<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0643\u064a\u0641-\u062a\u0637\u0628\u0642-maas-\u0641\u064a-\u0634\u0631\u0643\u062a\u0643\" class=\"uagb-toc-link__trigger\">\u0643\u064a\u0641 \u062a\u0637\u0628\u0651\u0642 &quot;MaaS&quot; \u0641\u064a \u0634\u0631\u0643\u062a\u0643<\/a><li class=\"uagb-toc__list\"><a href=\"#\u062a\u0639\u0632\u064a\u0632-\u0643\u0641\u0627\u0621\u0629-\u0627\u0644\u062a\u0635\u0646\u064a\u0639-\u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645-\u0646\u0638\u0627\u0645-aps\" class=\"uagb-toc-link__trigger\">\u062a\u0639\u0632\u064a\u0632 \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0638\u0627\u0645 APS<\/a><li class=\"uagb-toc__list\"><a href=\"#\u0627\u0644\u0623\u0633\u0626\u0644\u0629-\u0627\u0644\u0634\u0627\u0626\u0639\u0629\" class=\"uagb-toc-link__trigger\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-102dcdbf gb-headline-text\">\u062e\u0644\u0627\u0635\u0629 \u0627\u0644\u0642\u0648\u0644\u061b \u0648\u0627\u0644\u0635\u0648\u0631\u0629<\/h2>\n\n\n\n<p><strong>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS) \u0647\u0648 \u0645\u0641\u0647\u0648\u0645 \u062a\u062d\u0648\u064a\u0644\u064a \u064a\u0633\u0645\u062d \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0628\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0643\u0628\u064a\u0631\u0629.<\/strong>  \u062a\u0633\u062a\u0643\u0634\u0641 \u0647\u0630\u0647 \u0627\u0644\u0645\u0642\u0627\u0644\u0629 \u062a\u0639\u0631\u064a\u0641 \u0648\u0646\u0628\u0630\u0629 \u0639\u0646 \u0645\u0641\u0647\u0648\u0645 &#8220;MaaS&#8221;\u060c \u0648\u062a\u0642\u0627\u0631\u0646\u0647 \u0628\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a\u060c \u0648\u062a\u0633\u0644\u0637 \u0627\u0644\u0636\u0648\u0621 \u0639\u0644\u0649 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0642\u0648\u062f \u0647\u0630\u0627 \u0627\u0644\u0646\u0648\u0639 \u0645\u0646 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0648\u062a\u0646\u0627\u0642\u0634 \u0641\u0648\u0627\u0626\u062f\u0647 \u0648\u062a\u062a\u0646\u0627\u0648\u0644 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0648\u0627\u062c\u0647\u0647 \u0648\u062a\u0628\u062d\u062b \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a\u0629.\n\u062a\u0642\u062f\u0645 \u062e\u062f\u0645\u0627\u062a MaaS \u0645\u0632\u0627\u064a\u0627 \u0645\u062b\u0644 \u062e\u0641\u0636 \u0627\u0644\u062a\u0643\u0644\u0641\u0629\u060c \u0648\u0633\u0631\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0648\u0633\u0639\u060c \u0648\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u062e\u0628\u0631\u0627\u062a\u060c \u0648\u062a\u062e\u0641\u064a\u0641 \u0627\u0644\u0645\u062e\u0627\u0637\u0631\u060c \u0648\u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631\u060c \u0648\u0627\u0644\u0627\u0646\u062a\u0634\u0627\u0631 \u0627\u0644\u0639\u0627\u0644\u0645\u064a\u060c \u0648\u0627\u0644\u0627\u0633\u062a\u062f\u0627\u0645\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629.\n\u062a\u0634\u0645\u0644 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u062c\u0648\u062f\u0629\u060c \u0648\u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0641\u0643\u0631\u064a\u0629\u060c \u0648\u0648\u0636\u0648\u062d \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u060c \u0648\u0627\u0644\u062a\u0648\u0627\u0635\u0644.\n\u064a\u0646\u0637\u0648\u064a \u0645\u0633\u062a\u0642\u0628\u0644 \u0645\u0641\u0647\u0648\u0645 &#8220;MaaS&#8221; \u0639\u0644\u0649 \u0632\u064a\u0627\u062f\u0629 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0647\u0630\u0647 \u0627\u0644\u062e\u062f\u0645\u0629\u060c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062a\u0643\u0646\u0648\u0644\u0648\u062c\u064a\u060c \u0648\u0634\u0628\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0648\u0632\u0639\u0629\u060c \u0648\u0627\u0644\u0645\u0645\u0627\u0631\u0633\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629.\n\u064a\u0646\u0637\u0648\u064a \u062a\u0637\u0628\u064a\u0642 \u0646\u0638\u0627\u0645 MaaS \u0639\u0644\u0649 \u062a\u0642\u064a\u064a\u0645 \u0627\u0644\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u060c \u0648\u0627\u0644\u0628\u062d\u062b \u0639\u0646 \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a\u060c \u0648\u0648\u0636\u0639 \u062e\u0637\u0629 \u0627\u0646\u062a\u0642\u0627\u0644\u064a\u0629\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639\u060c \u0648\u062a\u0648\u0633\u064a\u0639 \u0646\u0637\u0627\u0642\u0647\u0627\u060c \u0648\u0627\u0644\u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0645\u0633\u062a\u0645\u0631.\n\u064a\u0639\u0645\u0644 \u0646\u0638\u0627\u0645 APS \u0645\u062b\u0644 Skyplanner \u0639\u0644\u0649 \u062a\u0639\u0632\u064a\u0632 \u0645\u0632\u0627\u064a\u0627 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0642\u062f\u064e\u0651\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 \u0645\u0646 \u062e\u0644\u0627\u0644 \u062a\u062d\u0633\u064a\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u062e\u0635\u064a\u0635 \u0627\u0644\u0645\u0648\u0627\u0631\u062f.     <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-7d316c01 gb-headline-text\">\u062a\u0639\u0631\u064a\u0641 \u0648\u0644\u0645\u062d\u0629 \u0639\u0627\u0645\u0629 \u0639\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u064a\u0645\u062b\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0628\u0634\u0643\u0644 \u0639\u0627\u0645 \u0646\u0642\u0644\u0629 \u0646\u0648\u0639\u064a\u0629 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u062d\u064a\u062b \u064a\u0633\u062a\u0641\u064a\u062f \u0645\u0646 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0642\u0645\u064a\u0629 \u0648\u0634\u0628\u0643\u0629 \u0645\u0646 \u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u062a\u0642\u062f\u064a\u0645 \u062d\u0644\u0648\u0644 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0637\u0648\u064a\u0631 \u0648\u0641\u0639\u0627\u0644\u0629 \u0645\u0646 \u062d\u064a\u062b \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0648\u0627\u0644\u0643\u0641\u0627\u0621\u0629.<\/p>\n\n\n\n<p>\u0641\u064a \u0627\u0644\u0645\u0627\u0636\u064a\u060c \u0643\u0627\u0646 \u064a\u064f\u0637\u0644\u0628 \u0645\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0642\u064a\u0627\u0645 \u0628\u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0631\u0623\u0633\u0645\u0627\u0644\u064a\u0629 \u0643\u0628\u064a\u0631\u0629 \u0644\u0625\u0646\u0634\u0627\u0621 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647\u0627.\n\u0648\u0647\u0630\u0627 \u064a\u0639\u0646\u064a \u0623\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0623\u0635\u063a\u0631 \u0630\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u062d\u062f\u0648\u062f\u0629 \u063a\u0627\u0644\u0628\u0627\u064b \u0645\u0627 \u0643\u0627\u0646\u062a \u062a\u0648\u0627\u062c\u0647 \u0639\u0648\u0627\u0626\u0642 \u0641\u064a \u062f\u062e\u0648\u0644 \u0627\u0644\u0635\u0646\u0627\u0639\u0629.\n\u0648\u0644\u0643\u0646\u060c \u0645\u0639 \u0638\u0647\u0648\u0631 \u062e\u062f\u0645\u0629 MaaS\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0634\u0628\u0643\u0629 \u0639\u0627\u0644\u0645\u064a\u0629 \u0645\u0646 \u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0630\u064a\u0646 \u064a\u0642\u062f\u0645\u0648\u0646 \u062e\u0628\u0631\u0627\u062a\u0647\u0645 \u0648\u0645\u0639\u062f\u0627\u062a\u0647\u0645 \u0648\u0645\u0631\u0627\u0641\u0642\u0647\u0645 \u0639\u0644\u0649 \u0623\u0633\u0627\u0633 \u062a\u0639\u0627\u0642\u062f\u064a.  <\/p>\n\n\n\n<p>\u0644\u0642\u062f \u0627\u0643\u062a\u0633\u0628\u062a \u062e\u062f\u0645\u0627\u062a MaaS \u0632\u062e\u0645\u064b\u0627 \u0643\u0628\u064a\u0631\u064b\u0627 \u0641\u064a \u0627\u0644\u0633\u0646\u0648\u0627\u062a \u0627\u0644\u0623\u062e\u064a\u0631\u0629\u060c \u0648\u064a\u062a\u0628\u0646\u0649 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0647\u0630\u0627 \u0627\u0644\u0646\u0645\u0648\u0630\u062c \u0644\u062a\u062d\u0633\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0647\u0627.\n\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0642\u062f\u0631\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0625\u0639\u0637\u0627\u0621 \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629 \u0644\u0646\u0642\u0627\u0637 \u0642\u0648\u062a\u0647\u0627 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0648\u062a\u0641\u0648\u064a\u0636 \u0645\u0633\u0624\u0648\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646.\n\u0648\u0647\u0630\u0627 \u0644\u0627 \u064a\u0642\u0644\u0644 \u0645\u0646 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641 \u0641\u062d\u0633\u0628\u060c \u0628\u0644 \u064a\u062d\u0633\u0646 \u0623\u064a\u0636\u064b\u0627 \u0645\u0646 \u0633\u0631\u0639\u0629 \u0627\u0644\u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0644\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0633\u0648\u0642 \u0628\u0634\u0643\u0644 \u0623\u0643\u062b\u0631 \u0641\u0639\u0627\u0644\u064a\u0629.  <\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-74ea7411 gb-headline-text\">\u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u0642\u062f\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 \u0645\u0642\u0627\u0628\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a<\/h3>\n\n\n\n<p>\u0644\u0641\u0647\u0645 \u0627\u0644\u0645\u0632\u0627\u064a\u0627 \u0627\u0644\u0645\u062a\u0645\u064a\u0632\u0629 \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629\u060c \u062f\u0639\u0646\u0627 \u0646\u0642\u0627\u0631\u0646\u0647\u0627 \u0628\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a\u0629.\n\u064a\u062a\u0636\u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a \u0625\u0646\u0634\u0627\u0621 \u0648\u0635\u064a\u0627\u0646\u0629 \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0642\u0648\u0649 \u0627\u0644\u0639\u0627\u0645\u0644\u0629 \u0627\u0644\u0645\u0627\u0647\u0631\u0629.\n\u0648\u0641\u064a \u062d\u064a\u0646 \u0623\u0646 \u0647\u0630\u0627 \u0627\u0644\u0646\u0647\u062c \u064a\u0648\u0641\u0631 \u0627\u0644\u062a\u062d\u0643\u0645 \u0641\u064a \u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0623\u0643\u0645\u0644\u0647\u0627\u060c \u0625\u0644\u0627 \u0623\u0646\u0647 \u064a\u0646\u0637\u0648\u064a \u0623\u064a\u0636\u0627\u064b \u0639\u0644\u0649 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0627\u0644\u0642\u064a\u0648\u062f \u0648\u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a.  <\/p>\n\n\n\n<p>\u0645\u0646 \u0646\u0627\u062d\u064a\u0629 \u0623\u062e\u0631\u0649\u060c \u062a\u0648\u0641\u0631 \u062e\u062f\u0645\u0627\u062a MaaS \u0628\u062f\u064a\u0644\u0627\u064b \u0645\u0631\u0646\u0627\u064b \u0648\u0642\u0627\u0628\u0644\u0627\u064b \u0644\u0644\u062a\u0637\u0648\u064a\u0631.\n\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0639\u0627\u0646\u0629 \u0628\u0645\u0635\u0627\u062f\u0631 \u062e\u0627\u0631\u062c\u064a\u0629 \u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u062c\u0645\u0648\u0639\u0629 \u0648\u0627\u0633\u0639\u0629 \u0645\u0646 \u0627\u0644\u0642\u062f\u0631\u0627\u062a \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0631\u0623\u0633\u0645\u0627\u0644\u064a\u0629 \u0643\u0628\u064a\u0631\u0629.\n\u062a\u0632\u064a\u0644 \u062e\u062f\u0645\u0627\u062a MaaS \u0639\u0628\u0621 \u0635\u064a\u0627\u0646\u0629 \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u062a\u062d\u062f\u064a\u062b \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u062a\u062f\u0631\u064a\u0628 \u0627\u0644\u0645\u0648\u0638\u0641\u064a\u0646\u060c \u0645\u0645\u0627 \u064a\u0633\u0645\u062d \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0628\u0627\u0644\u062a\u0631\u0643\u064a\u0632 \u0639\u0644\u0649 \u0643\u0641\u0627\u0621\u0627\u062a\u0647\u0627 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-6b8368e6 gb-headline-text\">\u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0639\u0644\u0649 \u062a\u0634\u063a\u064a\u0644 \u062e\u062f\u0645\u0629 MaaS<\/h2>\n\n\n\n<p>\u064a\u0633\u062a\u0641\u064a\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0645\u0646 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u0623\u062d\u062f\u062b\u062a \u062b\u0648\u0631\u0629 \u0641\u064a \u0627\u0644\u0635\u0646\u0627\u0639\u0629.\n\u062a\u0639\u0645\u0644 \u0647\u0630\u0647 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0628\u0627\u0644\u062a\u0622\u0632\u0631 \u0644\u062a\u0645\u0643\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0641\u0639\u0627\u0644\u0629 \u0648\u0627\u0644\u0645\u0631\u0646\u0629.\n\u062f\u0639\u0648\u0646\u0627 \u0646\u0633\u062a\u0643\u0634\u0641 \u0628\u0639\u0636 \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0639\u0644\u0649 \u062a\u0634\u063a\u064a\u0644 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629:  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cc1506b8 gb-headline-text\">\u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a (AI)<\/h4>\n\n\n\n<p>\u0644\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a \u062f\u0648\u0631 \u0645\u062d\u0648\u0631\u064a \u0641\u064a \u062a\u062d\u0633\u064a\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0635\u064a\u0627\u0646\u0629 \u0627\u0644\u062a\u0646\u0628\u0624\u064a\u0629 \u0648\u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u062c\u0648\u062f\u0629 \u0648\u0625\u062f\u0627\u0631\u0629 \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f.\n\u062a\u0642\u0648\u0645 \u0627\u0644\u062e\u0648\u0627\u0631\u0632\u0645\u064a\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0628\u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a \u0628\u062a\u062d\u0644\u064a\u0644 \u0643\u0645\u064a\u0627\u062a \u0647\u0627\u0626\u0644\u0629 \u0645\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0623\u0646\u0645\u0627\u0637\u060c \u0648\u0627\u062a\u062e\u0627\u0630 \u0642\u0631\u0627\u0631\u0627\u062a \u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0644\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u0643\u0641\u0627\u0621\u0629 \u0648\u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1a537c78 gb-headline-text\">\u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621 (IoT)<\/h4>\n\n\n\n<p>\u062a\u0642\u0648\u0645 \u0623\u062c\u0647\u0632\u0629 <a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d8%a5%d9%86%d8%aa%d8%b1%d9%86%d8%aa-%d8%a7%d9%84%d8%a3%d8%b4%d9%8a%d8%a7%d8%a1-%d8%aa%d9%85%d9%83%d9%8a%d9%86-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9\/\">\u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621<\/a> \u0628\u062c\u0645\u0639 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a \u0645\u0646 \u0645\u062e\u062a\u0644\u0641 \u0645\u0631\u0627\u062d\u0644 \u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0645\u0645\u0627 \u064a\u062a\u064a\u062d \u0627\u0644\u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u0627\u0633\u062a\u0628\u0627\u0642\u064a\u0629 \u0648\u0627\u0644\u0635\u064a\u0627\u0646\u0629 \u0627\u0644\u0648\u0642\u0627\u0626\u064a\u0629 \u0648\u062a\u062d\u0633\u064a\u0646 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0623\u0635\u0648\u0644.\n\u062a\u0633\u0645\u062d \u0623\u062c\u0647\u0632\u0629 \u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u0648\u0627\u0644\u0627\u062a\u0635\u0627\u0644 \u0628\u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u0633\u0644\u0633 \u0628\u064a\u0646 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0648\u0623\u0635\u062d\u0627\u0628 \u0627\u0644\u0645\u0635\u0644\u062d\u0629\u060c \u0645\u0645\u0627 \u064a\u0624\u062f\u064a \u0625\u0644\u0649 \u0625\u0646\u0634\u0627\u0621 \u0646\u0638\u0627\u0645 \u0628\u064a\u0626\u064a \u062a\u0635\u0646\u064a\u0639\u064a \u0630\u0643\u064a \u0648\u0645\u062a\u0635\u0644. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9f3b6280 gb-headline-text\">\u0627\u0644\u0637\u0628\u0627\u0639\u0629 \u062b\u0644\u0627\u062b\u064a\u0629 \u0627\u0644\u0623\u0628\u0639\u0627\u062f<\/h4>\n\n\n\n<p>\u062a\u062a\u064a\u062d \u0627\u0644\u0637\u0628\u0627\u0639\u0629 \u062b\u0644\u0627\u062b\u064a\u0629 \u0627\u0644\u0623\u0628\u0639\u0627\u062f\u060c \u0627\u0644\u0645\u0639\u0631\u0648\u0641\u0629 \u0628\u0627\u0633\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0625\u0636\u0627\u0641\u064a\u060c \u0625\u0646\u0634\u0627\u0621 \u0646\u0645\u0627\u0630\u062c \u0623\u0648\u0644\u064a\u0629 \u0645\u0639\u0642\u062f\u0629 \u0648\u0623\u062c\u0632\u0627\u0621 \u0644\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0646\u0647\u0627\u0626\u064a \u0628\u062f\u0642\u0629 \u0648\u0633\u0631\u0639\u0629.\n\u062a\u0642\u0644\u0644 \u0647\u0630\u0647 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0645\u0646 \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0648\u062a\u0642\u0644\u0644 \u0645\u0646 \u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u062a\u0633\u0645\u062d \u0628\u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0644\u0628\u060c \u0645\u0645\u0627 \u064a\u062c\u0639\u0644\u0647\u0627 \u0645\u0646\u0627\u0633\u0628\u0629 \u062a\u0645\u0627\u0645\u064b\u0627 \u0644\u062e\u062f\u0645\u0627\u062a MaaS. <a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%83%d9%8a%d9%81-%d9%8a%d9%85%d9%83%d9%86-%d8%aa%d8%ad%d8%b3%d9%8a%d9%86-%d8%a7%d9%84%d9%85%d9%87%d9%84%d8%a9-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9-%d9%81%d9%8a-%d8%a7%d9%84%d8%aa%d8%b5%d9%86\/\"> <\/a><a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%83%d9%8a%d9%81-%d9%8a%d9%85%d9%83%d9%86-%d8%aa%d8%ad%d8%b3%d9%8a%d9%86-%d8%a7%d9%84%d9%85%d9%87%d9%84%d8%a9-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9-%d9%81%d9%8a-%d8%a7%d9%84%d8%aa%d8%b5%d9%86\/\"> \u0627\u0643\u062a\u0634\u0641 \u0643\u064a\u0641\u064a\u0629 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629. <\/a> <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-65e00346 gb-headline-text\">\u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a<\/h4>\n\n\n\n<p>\u062a\u064f\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a \u0639\u0644\u0649 \u0646\u0637\u0627\u0642 \u0648\u0627\u0633\u0639 \u0641\u064a \u0645\u062c\u0627\u0644 MaaS \u0644\u0623\u062a\u0645\u062a\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062a\u0643\u0631\u0631\u0629 \u0648\u0632\u064a\u0627\u062f\u0629 \u0633\u0631\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u062f\u0642\u0629.\n\u062a\u0639\u0645\u0644 \u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a \u0627\u0644\u062a\u0639\u0627\u0648\u0646\u064a\u0629\u060c \u0623\u0648 <a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d8%a7%d9%84%d8%b1%d9%88%d8%a8%d9%88%d8%aa%d8%a7%d8%aa-%d8%a7%d9%84%d8%a2%d9%84%d9%8a%d8%a9-%d9%86%d9%87%d8%b6%d8%a9-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9\/\">\u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a \u0627\u0644\u0622\u0644\u064a\u0629<\/a> \u0627\u0644\u062a\u0639\u0627\u0648\u0646\u064a\u0629\u060c \u062c\u0646\u0628\u0627\u064b \u0625\u0644\u0649 \u062c\u0646\u0628 \u0645\u0639 \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646 \u0627\u0644\u0628\u0634\u0631\u064a\u064a\u0646\u060c \u0645\u0645\u0627 \u064a\u0632\u064a\u062f \u0645\u0646 \u0642\u062f\u0631\u0627\u062a\u0647\u0645 \u0648\u064a\u062d\u0633\u0646 \u0627\u0644\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0643\u0644\u064a\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b87ebda0 gb-headline-text\">\u0627\u0644\u062d\u0648\u0633\u0628\u0629 \u0627\u0644\u0633\u062d\u0627\u0628\u064a\u0629<\/h4>\n\n\n\n<p>\u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0646\u0635\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0646\u062f\u0629 \u0625\u0644\u0649 \u0627\u0644\u0633\u062d\u0627\u0628\u0629 \u0628\u0646\u064a\u0629 \u062a\u062d\u062a\u064a\u0629 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0637\u0648\u064a\u0631 \u0648\u0622\u0645\u0646\u0629 \u0644\u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u062a\u062d\u0644\u064a\u0644\u0627\u062a \u0648\u0627\u0644\u062a\u0639\u0627\u0648\u0646.\n\u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0648\u0645\u0631\u0627\u0642\u0628\u0629 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0646 \u0628\u064f\u0639\u062f\u060c \u0648\u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0633\u0644\u0627\u0633\u0629 \u0645\u0639 \u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0648\u0627\u0644\u0634\u0631\u0643\u0627\u0621 \u0627\u0644\u0622\u062e\u0631\u064a\u0646. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-edbab0a7 gb-headline-text\">\u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629<\/h2>\n\n\n\n<p>\u064a\u0648\u0641\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0627\u0644\u0645\u0632\u0627\u064a\u0627 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0641\u064a \u0645\u062c\u0627\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639.\n\u062f\u0639\u0648\u0646\u0627 \u0646\u0633\u062a\u0643\u0634\u0641 \u062b\u0645\u0627\u0646\u064a \u0645\u0632\u0627\u064a\u0627 \u0631\u0626\u064a\u0633\u064a\u0629 \u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8dc1ce04 gb-headline-text\">\u062a\u062e\u0641\u064a\u0636 \u0627\u0644\u062a\u0643\u0644\u0641\u0629<\/h4>\n\n\n\n<p>\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u063a\u0646\u0627\u0621 \u0639\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0631\u0623\u0633\u0645\u0627\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642 \u0641\u064a \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a\u060c \u062a\u0642\u0644\u0644 MaaS \u0628\u0634\u0643\u0644 \u0643\u0628\u064a\u0631 \u0645\u0646 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0623\u0648\u0644\u064a\u0629.\n\u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628\u060c \u0648\u0627\u0644\u062f\u0641\u0639 \u0645\u0642\u0627\u0628\u0644 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0641\u0642\u0637.\n\u0648\u0647\u0630\u0627 \u064a\u0633\u0645\u062d \u0628\u0625\u062f\u0627\u0631\u0629 \u0645\u0627\u0644\u064a\u0629 \u0623\u0641\u0636\u0644 \u0648\u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0631\u0628\u062d\u064a\u0629.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-20e8d6fb gb-headline-text\">\u0633\u0631\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/h4>\n\n\n\n<p>\u062a\u062a\u064a\u062d \u062e\u062f\u0645\u0627\u062a MaaS \u0627\u0644\u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0627\u0644\u0633\u0631\u064a\u0639\u0629 \u0644\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0633\u0648\u0642.\n\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u062e\u0628\u0631\u0627\u062a \u0648\u0645\u0648\u0627\u0631\u062f \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u0643\u064a\u064a\u0641 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647\u0627 \u0628\u0633\u0631\u0639\u0629 \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0644\u0627\u0632\u0645 \u0644\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0633\u0648\u0642.\n\u062a\u0633\u0627\u0639\u062f \u0647\u0630\u0647 \u0627\u0644\u0645\u0631\u0648\u0646\u0629 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0639\u0644\u0649 \u0627\u0644\u0628\u0642\u0627\u0621 \u0641\u064a \u0635\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u0627\u0641\u0633\u0629 \u0648\u0627\u063a\u062a\u0646\u0627\u0645 \u0627\u0644\u0641\u0631\u0635 \u0627\u0644\u0646\u0627\u0634\u0626\u0629.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7f7ccfb7 gb-headline-text\">\u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0648\u0633\u0639<\/h4>\n\n\n\n<p>\u064a\u0648\u0641\u0631 \u0646\u0638\u0627\u0645 MaaS \u0642\u0627\u0628\u0644\u064a\u0629 \u062a\u0648\u0633\u0639 \u0644\u0627 \u0645\u062b\u064a\u0644 \u0644\u0647\u0627\u060c \u0645\u0645\u0627 \u064a\u0633\u0645\u062d \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0628\u062a\u0639\u062f\u064a\u0644 \u0623\u062d\u062c\u0627\u0645 \u0625\u0646\u062a\u0627\u062c\u0647\u0627 \u062d\u0633\u0628 \u0627\u0644\u062d\u0627\u062c\u0629.\n\u0633\u0648\u0627\u0621 \u0643\u0627\u0646 \u0630\u0644\u0643 \u0628\u0632\u064a\u0627\u062f\u0629 \u062d\u062c\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u062b\u0646\u0627\u0621 \u0630\u0631\u0648\u0629 \u0627\u0644\u0637\u0644\u0628 \u0623\u0648 \u062a\u0642\u0644\u064a\u0635\u0647 \u0644\u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641\u060c \u0641\u0625\u0646 \u062e\u062f\u0645\u0629 MaaS \u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0631\u0648\u0646\u0629 \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u062a\u0644\u0628\u064a\u0629 \u0638\u0631\u0648\u0641 \u0627\u0644\u0633\u0648\u0642 \u0627\u0644\u0645\u062a\u063a\u064a\u0631\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e9098ce gb-headline-text\">\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u062e\u0628\u0631\u0627\u062a<\/h4>\n\n\n\n<p>\u062a\u0631\u0628\u0637 MaaS \u0628\u064a\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0648\u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0645\u062a\u0644\u0643\u0648\u0646 \u0645\u0639\u0631\u0641\u0629 \u0648\u062e\u0628\u0631\u0629 \u0639\u0645\u064a\u0642\u0629 \u0641\u064a \u0627\u0644\u0645\u062c\u0627\u0644.\n\u064a\u062a\u064a\u062d \u0647\u0630\u0627 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0634\u0628\u0643\u0629 \u0639\u0627\u0644\u0645\u064a\u0629 \u0645\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646 \u0641\u064a \u0645\u062c\u0627\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0623\u062d\u062f\u062b \u0627\u0644\u0645\u0645\u0627\u0631\u0633\u0627\u062a \u0627\u0644\u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0645\u0628\u062a\u0643\u0631\u0629 \u0648\u0627\u0644\u0627\u062a\u062c\u0627\u0647\u0627\u062a \u0627\u0644\u0646\u0627\u0634\u0626\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-88e2374e gb-headline-text\">\u062a\u062e\u0641\u064a\u0641 \u0627\u0644\u0645\u062e\u0627\u0637\u0631<\/h4>\n\n\n\n<p>\u062a\u0642\u0644\u0644 MaaS \u0645\u0646 \u0627\u0644\u0645\u062e\u0627\u0637\u0631 \u0627\u0644\u0645\u0631\u062a\u0628\u0637\u0629 \u0628\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a\u060c \u0645\u062b\u0644 \u062a\u0642\u0627\u062f\u0645 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0634\u0643\u0644\u0627\u062a \u0627\u0644\u062c\u0648\u062f\u0629.\n\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0642\u062f\u0631\u0627\u062a \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0630\u0648\u064a \u0627\u0644\u062e\u0628\u0631\u0629\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u062a\u062e\u0641\u064a\u0641 \u0645\u0646 \u0647\u0630\u0647 \u0627\u0644\u0645\u062e\u0627\u0637\u0631 \u0648\u0636\u0645\u0627\u0646 \u062b\u0628\u0627\u062a \u0627\u0644\u062c\u0648\u062f\u0629 \u0648\u0627\u0644\u0645\u0648\u062b\u0648\u0642\u064a\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e9898522 gb-headline-text\">\u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631 \u0648\u0627\u0644\u062a\u062e\u0635\u064a\u0635<\/h4>\n\n\n\n<p>\u062a\u0634\u062c\u0639 MaaS \u0639\u0644\u0649 \u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631 \u0645\u0646 \u062e\u0644\u0627\u0644 \u062a\u0648\u0641\u064a\u0631 \u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0623\u062d\u062f\u062b \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0648\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639.\n\u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u062c\u0631\u0628\u0629 \u062a\u0635\u0645\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0648\u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u0646\u0645\u0627\u0630\u062c \u0627\u0644\u0623\u0648\u0644\u064a\u0629 \u0648\u062a\u0642\u062f\u064a\u0645 \u062d\u0644\u0648\u0644 \u0645\u062e\u0635\u0635\u0629 \u0644\u0644\u0633\u0648\u0642 \u0628\u0634\u0643\u0644 \u0623\u0633\u0631\u0639. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-40d772a0 gb-headline-text\">\u0627\u0644\u0648\u0635\u0648\u0644 \u0627\u0644\u0639\u0627\u0644\u0645\u064a<\/h4>\n\n\n\n<p>\u0645\u0639 \u062e\u062f\u0645\u0629 MaaS\u060c \u0644\u0645 \u062a\u0639\u062f \u0627\u0644\u062d\u062f\u0648\u062f \u0627\u0644\u062c\u063a\u0631\u0627\u0641\u064a\u0629 \u062a\u0634\u0643\u0644 \u0642\u064a\u062f\u0627\u064b.\n\u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0634\u0628\u0643\u0629 \u0639\u0627\u0644\u0645\u064a\u0629 \u0645\u0646 \u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646\u060c \u0645\u0645\u0627 \u064a\u0633\u0645\u062d \u0644\u0647\u0627 \u0628\u062e\u062f\u0645\u0629 \u0627\u0644\u0623\u0633\u0648\u0627\u0642 \u0627\u0644\u062f\u0648\u0644\u064a\u0629 \u0628\u0643\u0641\u0627\u0621\u0629.\n\u0648\u0647\u0630\u0627 \u064a\u0648\u0633\u0639 \u0646\u0637\u0627\u0642 \u0627\u0644\u0633\u0648\u0642 \u0648\u064a\u062e\u0644\u0642 \u0641\u0631\u0635 \u0646\u0645\u0648 \u062c\u062f\u064a\u062f\u0629.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-902c2dfe gb-headline-text\">\u0627\u0644\u0627\u0633\u062a\u062f\u0627\u0645\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629<\/h4>\n\n\n\n<p>\u064a\u0639\u0632\u0632 \u0646\u0638\u0627\u0645 MaaS \u0645\u0645\u0627\u0631\u0633\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645.\n\u064a\u0642\u0644\u0644 MaaS \u0645\u0646 \u0627\u0644\u0646\u0641\u0627\u064a\u0627\u062a \u0648\u0627\u0633\u062a\u0647\u0644\u0627\u0643 \u0627\u0644\u0637\u0627\u0642\u0629 \u0648\u0627\u0646\u0628\u0639\u0627\u062b\u0627\u062a \u0627\u0644\u0643\u0631\u0628\u0648\u0646 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0645\u0634\u0627\u0631\u0643\u0629 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u062a\u062d\u0633\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c.\n\u0648\u064a\u0633\u0627\u0647\u0645 \u0630\u0644\u0643 \u0641\u064a \u0635\u0646\u0627\u0639\u0629 \u0635\u0646\u0627\u0639\u064a\u0629 \u0623\u0643\u062b\u0631 \u0645\u0631\u0627\u0639\u0627\u0629 \u0644\u0644\u0628\u064a\u0626\u0629 \u0648\u0623\u0643\u062b\u0631 \u0648\u0639\u064a\u0627\u064b \u0628\u0627\u0644\u0628\u064a\u0626\u0629.  <\/p>\n\n\n\n<p>\u0648\u0645\u0646 \u0627\u0644\u0623\u0645\u062b\u0644\u0629 \u0627\u0644\u0648\u0627\u0642\u0639\u064a\u0629 \u0639\u0644\u0649 \u062a\u0637\u0628\u064a\u0642 \u0645\u0641\u0647\u0648\u0645 &#8220;MaaS&#8221;\u060c \u0645\u062b\u0644 \u0627\u0644\u0627\u0633\u062a\u0639\u0627\u0646\u0629 \u0628\u0645\u0635\u0627\u062f\u0631 \u062e\u0627\u0631\u062c\u064a\u0629 \u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0644\u0627\u0628\u0633 \u0623\u0648 \u0634\u0631\u0643\u0629 \u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u0627\u062a \u062a\u0633\u062a\u062e\u062f\u0645 \u0634\u0631\u0643\u0629 \u062a\u0635\u0646\u064a\u0639 \u0645\u062a\u0639\u0627\u0642\u062f\u0629 \u0644\u062a\u062c\u0645\u064a\u0639 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629\u060c \u0645\u0645\u0627 \u064a\u0633\u0644\u0637 \u0627\u0644\u0636\u0648\u0621 \u0639\u0644\u0649 \u0647\u0630\u0647 \u0627\u0644\u0641\u0648\u0627\u0626\u062f.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-51e65f04 gb-headline-text\">\u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u062d\u0644\u0648\u0644 \u0641\u064a \u0645\u062c\u0627\u0644 MaaS<\/h2>\n\n\n\n<p>\u0639\u0644\u0649 \u0627\u0644\u0631\u063a\u0645 \u0645\u0646 \u0623\u0646 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 MaaS \u064a\u0648\u0641\u0631 \u0645\u0632\u0627\u064a\u0627 \u0643\u0628\u064a\u0631\u0629\u060c \u0625\u0644\u0627 \u0623\u0646 \u0647\u0646\u0627\u0643 \u0623\u064a\u0636\u064b\u0627 \u062a\u062d\u062f\u064a\u0627\u062a \u0645\u0631\u062a\u0628\u0637\u0629 \u0628\u062a\u0637\u0628\u064a\u0642\u0647.\n\u062f\u0639\u0648\u0646\u0627 \u0646\u062a\u0646\u0627\u0648\u0644 \u0628\u0639\u0636 \u0627\u0644\u0639\u0642\u0628\u0627\u062a \u0627\u0644\u0634\u0627\u0626\u0639\u0629 \u0648\u0646\u0642\u062f\u0645 \u062d\u0644\u0648\u0644\u0627\u064b \u0639\u0645\u0644\u064a\u0629: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-232542e8 gb-headline-text\">\u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u062c\u0648\u062f\u0629<\/h4>\n\n\n\n<p>\u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0645\u062b\u0644 \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u062c\u0648\u062f\u0629 \u0645\u062a\u0633\u0642\u0629 \u0639\u0628\u0631 \u0645\u062e\u062a\u0644\u0641 \u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u062a\u062d\u062f\u064a\u064b\u0627.\n\u0625\u0646 \u062a\u0646\u0641\u064a\u0630 \u0639\u0645\u0644\u064a\u0627\u062a \u0645\u0648\u062d\u062f\u0629 \u0644\u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u062c\u0648\u062f\u0629\u060c \u0648\u0625\u062c\u0631\u0627\u0621 \u0639\u0645\u0644\u064a\u0627\u062a \u062a\u062f\u0642\u064a\u0642 \u0645\u0646\u062a\u0638\u0645\u0629\u060c \u0648\u0625\u0646\u0634\u0627\u0621 \u0642\u0646\u0648\u0627\u062a \u0627\u062a\u0635\u0627\u0644 \u0648\u0627\u0636\u062d\u0629 \u0647\u064a \u0627\u0644\u0645\u0641\u062a\u0627\u062d \u0644\u0627\u0633\u062a\u064a\u0641\u0627\u0621 \u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062c\u0648\u062f\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-12ce109f gb-headline-text\">\u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0641\u0643\u0631\u064a\u0629<\/h4>\n\n\n\n<p>\u062a\u062a\u0637\u0644\u0628 \u0645\u0634\u0627\u0631\u0643\u0629 \u062a\u0635\u0645\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0627\u0644\u062d\u0633\u0627\u0633\u0629 \u0645\u0639 \u0634\u0631\u0643\u0627\u0621 \u062e\u0627\u0631\u062c\u064a\u064a\u0646 \u062a\u062f\u0627\u0628\u064a\u0631 \u0642\u0648\u064a\u0629 \u0644\u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0641\u0643\u0631\u064a\u0629.\n\u064a\u0645\u0643\u0646 \u0623\u0646 \u062a\u0633\u0627\u0639\u062f \u0627\u062a\u0641\u0627\u0642\u064a\u0627\u062a \u0639\u062f\u0645 \u0627\u0644\u0625\u0641\u0635\u0627\u062d \u0648\u0645\u0646\u0635\u0627\u062a \u0645\u0634\u0627\u0631\u0643\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0622\u0645\u0646\u0629 \u0648\u0627\u0644\u0627\u062a\u0641\u0627\u0642\u064a\u0627\u062a \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a\u0629 \u0627\u0644\u0635\u0627\u0631\u0645\u0629 \u0641\u064a \u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0641\u0643\u0631\u064a\u0629.   <a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d8%a5%d8%af%d8%a7%d8%b1%d8%a9-%d8%a8%d9%8a%d8%a7%d9%86%d8%a7%d8%aa-%d8%a7%d9%84%d9%85%d9%86%d8%aa%d8%ac-pdm\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d8%a5%d8%af%d8%a7%d8%b1%d8%a9-%d8%a8%d9%8a%d8%a7%d9%86%d8%a7%d8%aa-%d8%a7%d9%84%d9%85%d9%86%d8%aa%d8%ac-pdm\/\">\u062a\u0639\u0631\u0651\u0641 \u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u0644\u0625\u062f\u0627\u0631\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c (PDM) \u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0627\u0644\u062d\u0633\u0627\u0633\u0629 \u0641\u064a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS).<\/a><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d85c00e0 gb-headline-text\">\u0631\u0624\u064a\u0629 \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f<\/h4>\n\n\n\n<p>\u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0643\u0648\u0646 \u062a\u0646\u0633\u064a\u0642 \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u0648\u0645\u0631\u0627\u0642\u0628\u062a\u0647\u0627 \u0623\u0645\u0631\u064b\u0627 \u0645\u0639\u0642\u062f\u064b\u0627 \u0639\u0646\u062f \u0627\u0644\u0639\u0645\u0644 \u0645\u0639 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a.\n\u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0648\u0641\u0631 \u062a\u0637\u0628\u064a\u0642 \u0623\u0646\u0638\u0645\u0629 \u0625\u062f\u0627\u0631\u0629 \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u0627\u0644\u0645\u062a\u0642\u062f\u0645\u0629 \u0648\u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0645\u0633\u062a\u0634\u0639\u0631\u0627\u062a \u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u0631\u0624\u064a\u0629 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a \u0644\u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0623\u0643\u0645\u0644\u0647\u0627. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4727e1a2 gb-headline-text\">\u0627\u0644\u062a\u0648\u0627\u0635\u0644 \u0648\u0627\u0644\u062a\u0639\u0627\u0648\u0646<\/h4>\n\n\n\n<p>\u064a\u0639\u062f \u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0648\u0627\u0644\u062a\u0648\u0627\u0635\u0644 \u0627\u0644\u0641\u0639\u0627\u0644 \u0628\u064a\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0648\u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0623\u0645\u0631\u064b\u0627 \u062d\u064a\u0648\u064a\u064b\u0627 \u0644\u0646\u062c\u0627\u062d \u062a\u0637\u0628\u064a\u0642 MaaS.\n\u0648\u0645\u0646 \u0634\u0623\u0646 \u0648\u0636\u0639 \u062a\u0648\u0642\u0639\u0627\u062a \u0648\u0627\u0636\u062d\u0629\u060c \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0623\u062f\u0648\u0627\u062a \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0648\u0646\u064a\u0629\u060c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u0634\u0631\u0627\u0643\u0627\u062a \u0627\u0644\u0642\u0648\u064a\u0629 \u0623\u0646 \u064a\u0633\u0647\u0644 \u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0627\u0644\u0633\u0644\u0633. <\/p>\n\n\n\n<p>\u0645\u0646 \u062e\u0644\u0627\u0644 \u0645\u0639\u0627\u0644\u062c\u0629 \u0647\u0630\u0647 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0628\u0634\u0643\u0644 \u0627\u0633\u062a\u0628\u0627\u0642\u064a\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0636\u0645\u0627\u0646 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0627\u0644\u0633\u0644\u0633 \u0625\u0644\u0649 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 MaaS \u0648\u062a\u0639\u0638\u064a\u0645 \u0641\u0648\u0627\u0626\u062f\u0647.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-9a24ad69 gb-headline-text\">\u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0641\u064a\u062f\u0629 \u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u0632\u064a\u0627\u0621 \u0648\u0627\u0644\u0645\u0644\u0627\u0628\u0633: <\/strong>\u064a\u0645\u0643\u0646 \u0644\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u0632\u064a\u0627\u0621 \u0648\u0627\u0644\u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0639\u0627\u0646\u0629 \u0628\u0645\u0635\u0627\u062f\u0631 \u062e\u0627\u0631\u062c\u064a\u0629 \u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0644\u0627\u0628\u0633.\n\u062a\u062a\u064a\u062d \u062e\u062f\u0645\u0629 MaaS \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646 \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628\u060c \u0645\u0645\u0627 \u064a\u062a\u064a\u062d \u0633\u0631\u0639\u0629 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0633\u0648\u0642 \u0648\u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0648\u0633\u0639 \u0648\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0643\u0644\u0641\u0629. <\/li>\n\n\n\n<li><strong>\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u0627\u062a:<\/strong> \u0641\u064a \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u0627\u062a\u060c \u064a\u062a\u064a\u062d \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0627\u0644\u0641\u0631\u0635\u0629 \u0644\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u0639\u0627\u0642\u062f\u064a\u0646 \u0644\u062a\u062c\u0645\u064a\u0639 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062f\u0648\u0627\u0626\u0631 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0648\u063a\u064a\u0631\u0647\u0627 \u0645\u0646 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u0629.\n\u064a\u0648\u0641\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0645\u062a\u0642\u062f\u0645\u0629\u060c \u0648\u0627\u0644\u062e\u0628\u0631\u0629 \u0641\u064a \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u0627\u062a\u060c \u0648\u0627\u0644\u0642\u062f\u0631\u0629 \u0639\u0644\u0649 \u062a\u0644\u0628\u064a\u0629 \u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0633\u0648\u0642 \u0627\u0644\u0645\u062a\u063a\u064a\u0631\u0629 \u0628\u0641\u0639\u0627\u0644\u064a\u0629. <\/li>\n\n\n\n<li><strong>\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0633\u064a\u0627\u0631\u0627\u062a: <\/strong>\u064a\u0645\u0643\u0646 \u0644\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0633\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0641\u064a \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u062e\u062a\u0644\u0641\u0629 \u0645\u062b\u0644 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0648\u0627\u0644\u062a\u062c\u0645\u064a\u0639 \u0648\u0627\u0644\u062a\u062e\u0635\u064a\u0635.\n\u062a\u064f\u0645\u0643\u0650\u0651\u0646 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0634\u0631\u0643\u0627\u062a \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0633\u064a\u0627\u0631\u0627\u062a \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0634\u0628\u0643\u0629 \u0639\u0627\u0644\u0645\u064a\u0629 \u0645\u0646 \u0627\u0644\u0645\u0635\u0646\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u0645\u0645\u0627 \u064a\u0633\u0647\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0641\u0639\u0627\u0644 \u0648\u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u062e\u0635\u064a\u0635 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0627\u0644\u0623\u0633\u0631\u0639. <\/li>\n\n\n\n<li><strong>\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u0637\u0628\u064a\u0629: <\/strong>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0645\u0641\u064a\u062f \u0628\u0634\u0643\u0644 \u062e\u0627\u0635 \u0644\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u0637\u0628\u064a\u0629.\n\u0641\u0647\u064a \u062a\u062a\u064a\u062d \u0644\u0645\u0635\u0646\u0639\u064a \u0627\u0644\u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u0637\u0628\u064a\u0629 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0645\u0631\u0627\u0641\u0642 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u0629 \u0648\u0627\u0644\u062e\u0628\u0631\u0627\u062a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062f\u0642\u064a\u0642 \u0648\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0639\u0642\u064a\u0645 \u0648\u0627\u0644\u0627\u0645\u062a\u062b\u0627\u0644 \u0644\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062a\u0646\u0638\u064a\u0645\u064a\u0629 \u0627\u0644\u0635\u0627\u0631\u0645\u0629.\n\u062a\u062a\u064a\u062d \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0625\u0646\u062a\u0627\u062c\u0627\u064b \u0641\u0639\u0627\u0644\u0627\u064b \u0645\u0646 \u062d\u064a\u062b \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0645\u0639 \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062c\u0648\u062f\u0629 \u0627\u0644\u0639\u0627\u0644\u064a\u0629 \u0648\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0627\u0644\u0644\u0648\u0627\u0626\u062d \u0627\u0644\u062a\u0646\u0638\u064a\u0645\u064a\u0629.  <\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-4a545cbd gb-headline-text\">\u0645\u0633\u062a\u0642\u0628\u0644 \u062e\u062f\u0645\u0629 MaaS<\/h2>\n\n\n\n<p>\u064a\u0633\u062a\u0639\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0644\u0625\u0639\u0627\u062f\u0629 \u062a\u0634\u0643\u064a\u0644 \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a \u0627\u0644\u0633\u0646\u0648\u0627\u062a \u0627\u0644\u0642\u0627\u062f\u0645\u0629.\n\u062a\u0634\u064a\u0631 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u0627\u062a \u0625\u0644\u0649 \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0630\u064a \u062a\u0633\u064a\u0631 \u0641\u064a\u0647 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f527714e gb-headline-text\">\u0632\u064a\u0627\u062f\u0629 \u0627\u0644\u062a\u0628\u0646\u064a<\/h4>\n\n\n\n<p>\u0645\u0639 \u0625\u062f\u0631\u0627\u0643 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0644\u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0642\u062f\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u060c \u0645\u0646 \u0627\u0644\u0645\u062a\u0648\u0642\u0639 \u0623\u0646 \u062a\u0631\u062a\u0641\u0639 \u0645\u0639\u062f\u0644\u0627\u062a \u062a\u0628\u0646\u064a\u0647\u0627.\n\u0633\u062a\u0639\u062a\u0645\u062f \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0635\u063a\u064a\u0631\u0629 \u0648\u0627\u0644\u0645\u062a\u0648\u0633\u0637\u0629 \u0627\u0644\u062d\u062c\u0645\u060c \u0639\u0644\u0649 \u0648\u062c\u0647 \u0627\u0644\u062e\u0635\u0648\u0635\u060c \u0639\u0644\u0649 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0642\u062f\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 \u0644\u0644\u062a\u0646\u0627\u0641\u0633 \u0645\u0639 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0643\u0628\u064a\u0631\u0629 \u0648\u0627\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0645\u0648\u0637\u0626 \u0642\u062f\u0645 \u0641\u064a \u0627\u0644\u0633\u0648\u0642. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b53bc335 gb-headline-text\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u0645\u0639\u0632\u0632 \u0644\u0644\u062a\u0642\u0646\u064a\u0627\u062a<\/h4>\n\n\n\n<p>\u0633\u064a\u0624\u062f\u064a \u0627\u0644\u062a\u0642\u0627\u0631\u0628 \u0628\u064a\u0646 \u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a \u0648\u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u0648\u0627\u0644\u0637\u0628\u0627\u0639\u0629 \u062b\u0644\u0627\u062b\u064a\u0629 \u0627\u0644\u0623\u0628\u0639\u0627\u062f \u0648\u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a \u0625\u0644\u0649 \u062a\u0639\u0632\u064a\u0632 \u0642\u062f\u0631\u0627\u062a &#8220;MaaS&#8221;.\n\u0633\u064a\u0624\u062f\u064a \u062f\u0645\u062c \u0647\u0630\u0647 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0625\u0644\u0649 \u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u0623\u062a\u0645\u062a\u0629 \u0648\u062a\u062d\u0633\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u0645\u0643\u064a\u0646 \u0645\u0633\u062a\u0648\u064a\u0627\u062a \u062c\u062f\u064a\u062f\u0629 \u0645\u0646 \u0627\u0644\u0643\u0641\u0627\u0621\u0629 \u0648\u0627\u0644\u062a\u062e\u0635\u064a\u0635. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f84583c9 gb-headline-text\">\u0634\u0628\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0648\u0632\u0639\u0629<\/h4>\n\n\n\n<p>\u0633\u062a\u0639\u0632\u0632 \u0645\u0646\u0635\u0629 MaaS \u062a\u0637\u0648\u064a\u0631 \u0634\u0628\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0648\u0632\u0639\u0629\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0628\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a \u062c\u0645\u064a\u0639 \u0623\u0646\u062d\u0627\u0621 \u0627\u0644\u0639\u0627\u0644\u0645.\n\u0633\u064a\u062a\u064a\u062d \u0647\u0630\u0627 \u0627\u0644\u0646\u0647\u062c \u0627\u0644\u0634\u0628\u0643\u064a \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0627\u0644\u062e\u0628\u0631\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u0629\u060c \u0628\u063a\u0636 \u0627\u0644\u0646\u0638\u0631 \u0639\u0646 \u0627\u0644\u0645\u0648\u0642\u0639 \u0627\u0644\u062c\u063a\u0631\u0627\u0641\u064a. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cfb02197 gb-headline-text\">\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645<\/h4>\n\n\n\n<p>\u0633\u062a\u0643\u0648\u0646 \u0627\u0644\u0627\u0633\u062a\u062f\u0627\u0645\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629 \u0645\u062d\u0648\u0631\u064b\u0627 \u0631\u0626\u064a\u0633\u064a\u064b\u0627 \u0641\u064a \u0645\u0633\u062a\u0642\u0628\u0644 \u0642\u0637\u0627\u0639 MaaS.\n\u0633\u0648\u0641 \u064a\u062a\u0628\u0646\u0649 \u0627\u0644\u0645\u0635\u0646\u0639\u0648\u0646 \u0628\u0634\u0643\u0644 \u0645\u062a\u0632\u0627\u064a\u062f \u0645\u0645\u0627\u0631\u0633\u0627\u062a \u0635\u062f\u064a\u0642\u0629 \u0644\u0644\u0628\u064a\u0626\u0629 \u0648\u064a\u0642\u0644\u0644\u0648\u0646 \u0645\u0646 \u0627\u0644\u0646\u0641\u0627\u064a\u0627\u062a \u0648\u064a\u062d\u0633\u0646\u0648\u0646 \u0645\u0646 \u0627\u0633\u062a\u0647\u0644\u0627\u0643 \u0627\u0644\u0637\u0627\u0642\u0629 \u0644\u062e\u0644\u0642 \u0646\u0638\u0627\u0645 \u0628\u064a\u0626\u064a \u062a\u0635\u0646\u064a\u0639\u064a \u0623\u0643\u062b\u0631 \u0627\u0633\u062a\u062f\u0627\u0645\u0629 \u0648\u0645\u0633\u0624\u0648\u0644\u064a\u0629. <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-c6394760 gb-headline-text\">\u0643\u064a\u0641 \u062a\u0637\u0628\u0651\u0642 &#8220;MaaS&#8221; \u0641\u064a \u0634\u0631\u0643\u062a\u0643<\/h2>\n\n\n\n<p>\u0625\u0630\u0627 \u0643\u0646\u062a \u062a\u0641\u0643\u0631 \u0641\u064a \u062a\u0637\u0628\u064a\u0642 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0641\u064a \u0634\u0631\u0643\u062a\u0643\u060c \u0641\u0625\u0644\u064a\u0643 \u062f\u0644\u064a\u0644 \u062a\u0641\u0635\u064a\u0644\u064a \u0644\u0644\u0628\u062f\u0621:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u062a\u0642\u064a\u064a\u0645 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643<\/strong>: \u0642\u0645 \u0628\u062a\u0642\u064a\u064a\u0645 \u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0644\u062f\u064a\u0643\u060c \u0648\u062d\u062f\u062f \u0627\u0644\u0645\u062c\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u0623\u0646 \u062a\u0636\u064a\u0641 \u0641\u064a\u0647\u0627 \u062e\u062f\u0645\u0627\u062a MaaS \u0642\u064a\u0645\u0629 \u0645\u0636\u0627\u0641\u0629\u060c \u0648\u062d\u062f\u062f \u0623\u0647\u062f\u0627\u0641\u064b\u0627 \u0648\u0627\u0636\u062d\u0629 \u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u0646\u0645\u0648\u0630\u062c.<\/li>\n\n\n\n<li><strong>\u0627\u0628\u062d\u062b \u0639\u0646 \u0645\u0632\u0648\u062f\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a<\/strong>: \u0627\u0633\u062a\u0643\u0634\u0641 \u0627\u0644\u0633\u0648\u0642 \u0628\u062d\u062b\u064b\u0627 \u0639\u0646 \u0645\u0632\u0648\u062f\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0630\u064a\u0646 \u064a\u062a\u0648\u0627\u0641\u0642\u0648\u0646 \u0645\u0639 \u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0639\u0645\u0644\u0643.\n\u0636\u0639 \u0641\u064a \u0627\u0639\u062a\u0628\u0627\u0631\u0643 \u0639\u0648\u0627\u0645\u0644 \u0645\u062b\u0644 \u0627\u0644\u062e\u0628\u0631\u0629 \u0648\u0627\u0644\u0642\u062f\u0631\u0629 \u0648\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062c\u0648\u062f\u0629 \u0648\u0627\u0644\u0645\u0648\u0642\u0639 \u0627\u0644\u062c\u063a\u0631\u0627\u0641\u064a. <\/li>\n\n\n\n<li><strong>\u0648\u0636\u0639 \u062e\u0637\u0629 \u0627\u0646\u062a\u0642\u0627\u0644\u064a\u0629<\/strong>: \u0642\u0645 \u0628\u0625\u0646\u0634\u0627\u0621 \u062e\u0627\u0631\u0637\u0629 \u0637\u0631\u064a\u0642 \u0644\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0625\u0644\u0649 \u0646\u0638\u0627\u0645 MaaS\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0627\u0644\u062c\u062f\u0627\u0648\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0648\u062a\u062e\u0635\u064a\u0635 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0633\u062a\u0631\u0627\u062a\u064a\u062c\u064a\u0629 \u0627\u0644\u062a\u0648\u0627\u0635\u0644.\n\u062a\u0623\u0643\u062f \u0645\u0646 \u0645\u0648\u0627\u0641\u0642\u0629 \u0623\u0635\u062d\u0627\u0628 \u0627\u0644\u0645\u0635\u0644\u062d\u0629 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u064a\u0646 \u0648\u0623\u0634\u0631\u0643 \u0641\u0631\u064a\u0642\u0643 \u0641\u064a \u0627\u0644\u0639\u0645\u0644\u064a\u0629. <\/li>\n\n\n\n<li><strong>\u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u062a\u062c\u0631\u064a\u0628\u064a\u0629<\/strong>: \u0627\u0628\u062f\u0623 \u0628\u0645\u0634\u0627\u0631\u064a\u0639 \u062a\u062c\u0631\u064a\u0628\u064a\u0629 \u0639\u0644\u0649 \u0646\u0637\u0627\u0642 \u0635\u063a\u064a\u0631 \u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u062c\u062f\u0648\u0649 \u0648\u0641\u0648\u0627\u0626\u062f \u0627\u0633\u062a\u062e\u062f\u0627\u0645 MaaS.\n\u0631\u0627\u0642\u0628 \u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0623\u062f\u0627\u0621 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0648\u0627\u062c\u0645\u0639 \u0627\u0644\u0645\u0644\u0627\u062d\u0638\u0627\u062a \u0644\u062a\u062d\u0633\u064a\u0646 \u0627\u0633\u062a\u0631\u0627\u062a\u064a\u062c\u064a\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630. <\/li>\n\n\n\n<li><strong>\u062a\u0648\u0633\u064a\u0639 \u0627\u0644\u0646\u0637\u0627\u0642<\/strong>: \u0628\u0645\u062c\u0631\u062f \u0623\u0646 \u062a\u062a\u062d\u0642\u0642 \u0645\u0646 \u0635\u062d\u0629 \u0645\u0632\u0627\u064a\u0627 \u062e\u062f\u0645\u0627\u062a MaaS\u060c \u0642\u0645 \u0628\u062a\u0648\u0633\u064a\u0639 \u0646\u0637\u0627\u0642 \u0645\u0634\u0627\u0631\u0643\u062a\u0643 \u0645\u0639 \u0645\u0632\u0648\u062f\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639.\n\u0623\u0646\u0634\u0626 \u0634\u0631\u0627\u0643\u0627\u062a \u0637\u0648\u064a\u0644\u0629 \u0627\u0644\u0623\u062c\u0644 \u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u062b\u0642\u0629 \u0627\u0644\u0645\u062a\u0628\u0627\u062f\u0644\u0629 \u0648\u0627\u0644\u0634\u0641\u0627\u0641\u064a\u0629 \u0648\u0627\u0644\u0623\u0647\u062f\u0627\u0641 \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629. <\/li>\n\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0645\u0633\u062a\u0645\u0631<\/strong>: \u0642\u0645 \u0628\u0645\u0631\u0627\u062c\u0639\u0629 \u0648\u062a\u062d\u0633\u064a\u0646 \u062a\u0637\u0628\u064a\u0642 MaaS \u0627\u0644\u062e\u0627\u0635 \u0628\u0643 \u0628\u0627\u0646\u062a\u0638\u0627\u0645.\n\u0627\u0633\u062a\u0641\u062f \u0645\u0646 \u062a\u062d\u0644\u064a\u0644\u0627\u062a \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u0630\u064a\u0629 \u0627\u0644\u0631\u0627\u062c\u0639\u0629 \u0644\u062a\u062d\u062f\u064a\u062f \u0645\u062c\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u062d\u0633\u064a\u0646 \u0648\u062f\u0641\u0639 \u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631 \u0627\u0644\u0645\u0633\u062a\u0645\u0631. <\/li>\n<\/ol>\n\n\n\n<p>\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u062a\u0628\u0627\u0639 \u0647\u0630\u0647 \u0627\u0644\u062e\u0637\u0648\u0627\u062a\u060c \u064a\u0645\u0643\u0646\u0643 \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0639\u0646\u0627\u0646 \u0644\u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0642\u062f\u064e\u0651\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 (MaaS) \u0648\u062a\u0647\u064a\u0626\u0629 \u0634\u0631\u0643\u062a\u0643 \u0644\u0644\u0646\u062c\u0627\u062d \u0641\u064a \u0645\u0634\u0647\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062f\u064a\u0646\u0627\u0645\u064a\u0643\u064a.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-6bab3fe2 gb-headline-text\">\u062a\u0639\u0632\u064a\u0632 \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0638\u0627\u0645 APS<\/h2>\n\n\n\n<p>\u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0624\u062f\u064a \u062a\u0637\u0628\u064a\u0642 \u0646\u0638\u0627\u0645 \u062a\u062e\u0637\u064a\u0637 \u0648\u062c\u062f\u0648\u0644\u0629 \u0645\u062a\u0642\u062f\u0645 \u0625\u0644\u0649 \u062a\u0639\u0632\u064a\u0632 \u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629. \u064a\u064f\u0645\u0643\u0650\u0651\u0646 <a href=\"https:\/\/skyplanner.ai\/\">\u0646\u0638\u0627\u0645 Skyplanner \u0644\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062a\u0642\u062f\u0645 \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0646 Skyplanner <\/a>\u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u062a\u062d\u0633\u064a\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u062e\u0635\u064a\u0635 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629\u060c \u0645\u0645\u0627 \u064a\u0624\u062f\u064a \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0643\u0641\u0627\u0621\u0629 \u0648\u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629.<\/p>\n\n\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 \u0628\u0631\u0646\u0627\u0645\u062c \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u062a\u0642\u062f\u0645 \u0645\u0639 \u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a \u0627\u0644\u062e\u0627\u0635 \u0628\u0646\u0627 \u0628\u0633\u0644\u0627\u0633\u0629 \u0645\u0639 \u062d\u0644\u0648\u0644 MaaS\u060c \u0645\u0645\u0627 \u064a\u0648\u0641\u0631 \u0631\u0624\u064a\u0629 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a \u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u062a\u0646\u0628\u0624 \u0628\u0627\u0644\u0637\u0644\u0628 \u0648\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0633\u0639\u0629.\n\u0643\u0645\u0627 \u0623\u0646\u0647 \u064a\u064f\u0645\u0643\u0650\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u062a\u062e\u0627\u0630 \u0642\u0631\u0627\u0631\u0627\u062a \u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u062a\u062d\u0633\u064a\u0646 \u0645\u0633\u062a\u0648\u064a\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0644\u062a\u0644\u0628\u064a\u0629 \u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u0627\u0621 \u0628\u0641\u0639\u0627\u0644\u064a\u0629. <\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%8a%d8%b2%d8%a7%d8%aa\/\">\u062a\u062a\u062e\u0635\u0635 \u0634\u0631\u0643\u0629 Skyplanner \u0641\u064a \u062a\u0648\u0641\u064a\u0631 \u0623\u062d\u062f\u062b \u0628\u0631\u0645\u062c\u064a\u0627\u062a \u0623\u0646\u0638\u0645\u0629 \u062f\u0639\u0645 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u0645\u062a\u0642\u062f\u0645\u0629<\/a> \u0627\u0644\u062a\u064a \u062a\u064f\u0645\u0643\u0650\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0627\u0644\u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629.\n\u0648\u0628\u0641\u0636\u0644 \u0642\u062f\u0631\u0627\u062a Skyplanner \u0627\u0644\u0645\u062a\u0642\u062f\u0645\u0629\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u062d\u0642\u064a\u0642 \u0643\u0641\u0627\u0621\u0629 \u062a\u0634\u063a\u064a\u0644\u064a\u0629 \u0623\u0639\u0644\u0649\u060c \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641\u060c \u0648\u0627\u0643\u062a\u0633\u0627\u0628 \u0645\u064a\u0632\u0629 \u062a\u0646\u0627\u0641\u0633\u064a\u0629 \u0641\u064a \u0645\u062c\u0627\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639. <\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062a\u0635\u0644 \u0628\u0641\u0631\u064a\u0642\u0646\u0627 \u0627\u0644\u064a\u0648\u0645<\/a> \u0644\u0645\u0639\u0631\u0641\u0629 \u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u0644 Skyplanner \u0645\u0633\u0627\u0639\u062f\u0629 \u0634\u0631\u0643\u062a\u0643 \u0641\u064a \u062a\u0637\u0628\u064a\u0642 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0648\u0632\u064a\u0627\u062f\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a.<\/p>\n\n\n\n<p>\u064a\u064f\u062d\u062f\u062b \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u062b\u0648\u0631\u0629 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u062d\u064a\u062b \u064a\u0648\u0641\u0631 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0631\u0648\u0646\u0629 \u0644\u0627 \u0645\u062b\u064a\u0644 \u0644\u0647\u0627 \u0648\u0642\u0627\u0628\u0644\u064a\u0629 \u0644\u0644\u062a\u0637\u0648\u064a\u0631 \u0648\u0643\u0641\u0627\u0621\u0629 \u0645\u0646 \u062d\u064a\u062b \u0627\u0644\u062a\u0643\u0644\u0641\u0629.\n\u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0642\u0648\u0629 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0642\u0645\u064a\u0629\u060c \u0648\u0627\u0644\u062e\u0628\u0631\u0629 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u0629\u060c \u0648\u0634\u0628\u0643\u0629 \u0645\u0646 \u0645\u0642\u062f\u0645\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u062d\u0633\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u062e\u0641\u0636 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641\u060c \u0648\u0627\u0644\u0628\u0642\u0627\u0621 \u0641\u064a \u0635\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u0627\u0641\u0633\u0629.\n\u064a\u064f\u0639\u062f\u0651 \u062a\u0628\u0646\u064a \u062e\u062f\u0645\u0627\u062a MaaS\u060c \u0628\u0627\u0644\u0625\u0636\u0627\u0641\u0629 \u0625\u0644\u0649 \u0646\u0638\u0627\u0645 APS \u0645\u062b\u0644 \u0646\u0638\u0627\u0645 Skyplanner\u060c \u0647\u0648 \u0627\u0644\u0645\u0641\u062a\u0627\u062d \u0644\u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0639\u0646\u0627\u0646 \u0644\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a \u0645\u0634\u0647\u062f \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u062f\u064a\u0646\u0627\u0645\u064a\u0643\u064a \u0627\u0644\u064a\u0648\u0645.  <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner &#x627;&#x644;&#x62A;&#x62E;&#x637;&#x64A;&#x637; &#x648;&#x627;&#x644;&#x62C;&#x62F;&#x648;&#x644;&#x629; &#x627;&#x644;&#x645;&#x62A;&#x642;&#x62F;&#x645;&#x629; &#x62D;&#x644;&#x648;&#x644; &#x627;&#x644;&#x62A;&#x62E;&#x637;&#x64A;&#x637; &#x648;&#x627;&#x644;&#x62C;&#x62F;&#x648;&#x644;&#x629; &#x627;&#x644;&#x645;&#x62A;&#x642;&#x62F;&#x645;&#x629; &#x644;&#x645;&#x634;&#x627;&#x643;&#x644; &#x627;&#x644;&#x625;&#x646;&#x62A;&#x627;&#x62C;\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-509a8a4d gb-headline-text\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n\n\n<p>\u0641\u064a\u0645\u0627 \u064a\u0644\u064a \u0628\u0639\u0636 \u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0645\u062a\u062f\u0627\u0648\u0644\u0629 \u062d\u0648\u0644 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS) \u0644\u0645\u0633\u0627\u0639\u062f\u062a\u0643 \u0639\u0644\u0649 \u0641\u0647\u0645 \u0647\u0630\u0627 \u0627\u0644\u0645\u0641\u0647\u0648\u0645 \u0627\u0644\u062a\u062d\u0648\u064a\u0644\u064a \u0648\u0622\u062b\u0627\u0631\u0647 \u0639\u0644\u0649 \u0627\u0644\u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u062a\u062d\u0648\u064a\u0644\u064a\u0629.\n\u062a\u0642\u062f\u0645 \u0647\u0630\u0647 \u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629 \u0631\u0624\u0649 \u0642\u064a\u0645\u0629 \u062d\u0648\u0644 \u0647\u0630\u0627 \u0627\u0644\u0646\u0647\u062c \u0627\u0644\u0645\u0628\u062a\u0643\u0631\u060c \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 \u062a\u0639\u0631\u064a\u0641 \u0648\u0641\u0648\u0627\u0626\u062f &#8220;MaaS&#8221; \u0625\u0644\u0649 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u0627\u062a\u062c\u0627\u0647\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a\u0629.\n\u0633\u0648\u0627\u0621\u064b \u0643\u0646\u062a \u0645\u0647\u062a\u0645\u064b\u0627 \u0628\u062a\u0637\u0628\u064a\u0642 \u0645\u0641\u0647\u0648\u0645 &#8220;MaaS&#8221; \u0623\u0648 \u062a\u0631\u063a\u0628 \u0641\u064a \u0627\u0633\u062a\u0643\u0634\u0627\u0641 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u062f\u0639\u0645\u0647\u060c \u0641\u0625\u0646 \u0642\u0633\u0645 \u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629 \u0647\u0630\u0627 \u0633\u064a\u0648\u0641\u0631 \u0644\u0643 \u0643\u0644 \u0645\u0627 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u064a\u0647.\n\u0627\u0643\u062a\u0633\u0628 \u0641\u0647\u0645\u0627\u064b \u0623\u0639\u0645\u0642 \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0648\u0642\u062f\u0631\u062a\u0647 \u0639\u0644\u0649 \u0625\u062d\u062f\u0627\u062b \u062b\u0648\u0631\u0629 \u0641\u064a \u0643\u064a\u0641\u064a\u0629 \u062a\u0639\u0627\u0645\u0644 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0639 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.   <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c2a2d786 gb-headline-text\">\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f<\/h4>\n\n\n\n<p>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0633\u0645\u062d \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0628\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.\n\u0648\u064a\u0633\u062a\u0641\u064a\u062f \u0647\u0630\u0627 \u0627\u0644\u0646\u0645\u0648\u0630\u062c \u0645\u0646 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0642\u0645\u064a\u0629 \u0648\u0634\u0628\u0643\u0629 \u0645\u0646 \u0645\u0632\u0648\u062f\u064a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u062a\u0642\u062f\u064a\u0645 \u062d\u0644\u0648\u0644 \u0625\u0646\u062a\u0627\u062c \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0637\u0648\u064a\u0631 \u0648\u0641\u0639\u0627\u0644\u0629 \u0645\u0646 \u062d\u064a\u062b \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0648\u0627\u0644\u0643\u0641\u0627\u0621\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bc2ed937 gb-headline-text\">\u0643\u064a\u0641 \u062a\u062e\u062a\u0644\u0641 \u062e\u062f\u0645\u0627\u062a MaaS \u0639\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a\u061f<\/h4>\n\n\n\n<p>\u064a\u0646\u0637\u0648\u064a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0642\u0644\u064a\u062f\u064a \u0639\u0644\u0649 \u0625\u0646\u0634\u0627\u0621 \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0635\u064a\u0627\u0646\u062a\u0647\u0627\u060c \u0641\u064a \u062d\u064a\u0646 \u0623\u0646 \u062e\u062f\u0645\u0627\u062a MaaS \u062a\u0648\u0641\u0631 \u0628\u062f\u064a\u0644\u0627\u064b \u0645\u0631\u0646\u0627\u064b \u0648\u0642\u0627\u0628\u0644\u0627\u064b \u0644\u0644\u062a\u0637\u0648\u064a\u0631.\n\u062a\u062a\u064a\u062d \u062e\u062f\u0645\u0627\u062a MaaS \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0639\u0627\u0646\u0629 \u0628\u0645\u0635\u0627\u062f\u0631 \u062e\u0627\u0631\u062c\u064a\u0629 \u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0644\u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u0645\u0645\u0627 \u064a\u0642\u0644\u0644 \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0627\u0644\u0631\u0623\u0633\u0645\u0627\u0644\u064a\u0629 \u0641\u064a \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a.\n\u0648\u0647\u0630\u0627 \u0645\u0646 \u0634\u0623\u0646\u0647 \u062a\u0645\u0643\u064a\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0625\u0639\u0637\u0627\u0621 \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629 \u0644\u0645\u062c\u0627\u0644\u0627\u062a \u0643\u0641\u0627\u0621\u062a\u0647\u0627 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0648\u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u062e\u0628\u0631\u0627\u062a \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8dfbc30e gb-headline-text\">\u0645\u0627 \u0647\u064a \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0639\u0644\u0649 \u062a\u0634\u063a\u064a\u0644 \u062e\u062f\u0645\u0629 MaaS\u061f<\/h4>\n\n\n\n<p>\u062a\u0633\u062a\u0641\u064a\u062f MaaS \u0645\u0646 \u0627\u0644\u0639\u062f\u064a\u062f \u0645\u0646 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0625\u0646\u062a\u0631\u0646\u062a \u0627\u0644\u0623\u0634\u064a\u0627\u0621 (IoT) \u0648\u0627\u0644\u0637\u0628\u0627\u0639\u0629 \u062b\u0644\u0627\u062b\u064a\u0629 \u0627\u0644\u0623\u0628\u0639\u0627\u062f \u0648\u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a \u0648\u0627\u0644\u0631\u0648\u0628\u0648\u062a\u0627\u062a \u0648\u0627\u0644\u062d\u0648\u0633\u0628\u0629 \u0627\u0644\u0633\u062d\u0627\u0628\u064a\u0629.\n\u062a\u0639\u0645\u0644 \u0647\u0630\u0647 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a \u0645\u0639\u0627\u064b \u0644\u062a\u062d\u0633\u064a\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u062a\u062d\u0633\u064a\u0646 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0623\u0635\u0648\u0644\u060c \u0648\u062a\u0645\u0643\u064a\u0646 \u0627\u0644\u062a\u062e\u0635\u064a\u0635\u060c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0641\u064a \u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-431a9d0c gb-headline-text\">\u0645\u0627 \u0647\u064a \u0641\u0648\u0627\u0626\u062f \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629\u061f<\/h4>\n\n\n\n<p>\u0645\u0646 \u062e\u0644\u0627\u0644 \u062a\u0628\u0646\u064a \u0645\u0641\u0647\u0648\u0645 MaaS\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0645\u0632\u0627\u064a\u0627 \u0645\u062b\u0644 \u062e\u0641\u0636 \u0627\u0644\u062a\u0643\u0644\u0641\u0629\u060c \u0648\u0633\u0631\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0648\u0633\u0639\u060c \u0648\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u062e\u0628\u0631\u0627\u062a\u060c \u0648\u062a\u062e\u0641\u064a\u0641 \u0627\u0644\u0645\u062e\u0627\u0637\u0631\u060c \u0648\u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631\u060c \u0648\u0627\u0644\u0648\u0635\u0648\u0644 \u0627\u0644\u0639\u0627\u0644\u0645\u064a\u060c \u0648\u0627\u0644\u0627\u0633\u062a\u062f\u0627\u0645\u0629 \u0627\u0644\u0628\u064a\u0626\u064a\u0629.\n\u062a\u062a\u064a\u062d &#8220;MaaS&#8221; \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0634\u0628\u0643\u0629 \u0645\u0646 \u0627\u0644\u0645\u064f\u0635\u0646\u0650\u0651\u0639\u064a\u0646 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u064a\u0646\u060c \u0648\u062a\u062d\u0633\u064a\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0642\u062f\u0631\u062a\u0647\u0627 \u0627\u0644\u062a\u0646\u0627\u0641\u0633\u064a\u0629 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u062a\u0637\u0648\u0631. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f66f175d gb-headline-text\">\u0645\u0627 \u0647\u064a \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0627\u0644\u0645\u0631\u062a\u0628\u0637\u0629 \u0628\u062a\u0637\u0628\u064a\u0642 \u0645\u0641\u0647\u0648\u0645 MaaS\u061f<\/h4>\n\n\n\n<p>\u062a\u0634\u0645\u0644 \u0628\u0639\u0636 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0627\u0644\u0634\u0627\u0626\u0639\u0629 \u0641\u064a \u062a\u0646\u0641\u064a\u0630 \u062e\u062f\u0645\u0627\u062a MaaS \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u062c\u0648\u062f\u0629 \u0645\u062a\u0633\u0642\u0629 \u0639\u0628\u0631 \u0645\u062e\u062a\u0644\u0641 \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a\u060c \u0648\u062d\u0645\u0627\u064a\u0629 \u0627\u0644\u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0641\u0643\u0631\u064a\u0629\u060c \u0648\u0636\u0645\u0627\u0646 \u0648\u0636\u0648\u062d \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u060c \u0648\u0625\u0642\u0627\u0645\u0629 \u062a\u0648\u0627\u0635\u0644 \u0648\u062a\u0639\u0627\u0648\u0646 \u0641\u0639\u0627\u0644\u064a\u0646.\n\u0648\u0645\u0639 \u0630\u0644\u0643\u060c \u064a\u0645\u0643\u0646 \u0645\u0648\u0627\u062c\u0647\u0629 \u0647\u0630\u0647 \u0627\u0644\u062a\u062d\u062f\u064a\u0627\u062a \u0645\u0646 \u062e\u0644\u0627\u0644 \u062a\u0646\u0641\u064a\u0630 \u0639\u0645\u0644\u064a\u0627\u062a \u0645\u0648\u062d\u062f\u0629 \u0644\u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u062c\u0648\u062f\u0629\u060c \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0646\u0635\u0627\u062a \u0622\u0645\u0646\u0629 \u0644\u0645\u0634\u0627\u0631\u0643\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u0634\u0631\u0627\u0643\u0627\u062a \u0627\u0644\u0642\u0648\u064a\u0629. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ea9c933e gb-headline-text\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062e\u0628\u0626\u0647 \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644 \u0644\u062e\u062f\u0645\u0627\u062a MaaS\u061f<\/h4>\n\n\n\n<p>\u064a\u0646\u0637\u0648\u064a \u0645\u0633\u062a\u0642\u0628\u0644 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0639\u062f\u0651\u0629 \u0644\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0643\u062e\u062f\u0645\u0629 \u0639\u0644\u0649 \u0632\u064a\u0627\u062f\u0629 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0647\u0630\u0647 \u0627\u0644\u062e\u062f\u0645\u0629\u060c \u0648\u062a\u0639\u0632\u064a\u0632 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u064a\u0646 \u0627\u0644\u062a\u0642\u0646\u064a\u0627\u062a\u060c \u0648\u062a\u0637\u0648\u064a\u0631 \u0634\u0628\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0648\u0632\u0639\u0629\u060c \u0648\u0627\u0644\u062a\u0631\u0643\u064a\u0632 \u0639\u0644\u0649 \u0645\u0645\u0627\u0631\u0633\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645.\n\u0648\u0645\u0639 \u0625\u062f\u0631\u0627\u0643 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0644\u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u064f\u0642\u062f\u064e\u0651\u0645\u0629 \u0643\u062e\u062f\u0645\u0629 \u0633\u062a\u0633\u062a\u0645\u0631 \u0641\u064a \u0625\u0639\u0627\u062f\u0629 \u062a\u0634\u0643\u064a\u0644 \u0642\u0637\u0627\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u0645\u0645\u0627 \u064a\u0648\u0641\u0631 \u0641\u0631\u0635\u064b\u0627 \u0644\u0644\u0646\u0645\u0648 \u0648\u0627\u0644\u0627\u0628\u062a\u0643\u0627\u0631. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d073317f gb-headline-text\">\u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u0637\u0628\u064a\u0642 &#8220;MaaS&#8221; \u0641\u064a \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u061f<\/h4>\n\n\n\n<p>\u0648\u0644\u062a\u0646\u0641\u064a\u0630 \u0645\u0641\u0647\u0648\u0645 MaaS\u060c \u064a\u062c\u0628 \u0639\u0644\u0649 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u062a\u0642\u064a\u064a\u0645 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0647\u0627\u060c \u0648\u0627\u0644\u0628\u062d\u062b \u0639\u0646 \u0645\u0642\u062f\u0645\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0645\u0646\u0627\u0633\u0628\u064a\u0646\u060c \u0648\u0648\u0636\u0639 \u062e\u0637\u0629 \u0627\u0646\u062a\u0642\u0627\u0644\u064a\u0629\u060c \u0648\u0627\u0644\u0628\u062f\u0621 \u0628\u0645\u0634\u0627\u0631\u064a\u0639 \u062a\u062c\u0631\u064a\u0628\u064a\u0629\u060c \u0648\u062a\u0648\u0633\u064a\u0639 \u0646\u0637\u0627\u0642\u0647\u0627 \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0627\u0644\u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062a\u064a \u064a\u062a\u0645 \u0645\u0644\u0627\u062d\u0638\u062a\u0647\u0627\u060c \u0648\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u062a\u062d\u0633\u064a\u0646\u0647 \u0628\u0627\u0633\u062a\u0645\u0631\u0627\u0631.\n\u0648\u0628\u0627\u062a\u0628\u0627\u0639 \u0647\u0630\u0647 \u0627\u0644\u062e\u0637\u0648\u0627\u062a\u060c \u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0623\u0646 \u062a\u0646\u062c\u062d \u0641\u064a \u062f\u0645\u062c \u062e\u062f\u0645\u0627\u062a MaaS \u0641\u064a \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647\u0627. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1a5eb120 gb-headline-text\">\u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u0644\u0646\u0638\u0627\u0645 APS \u0623\u0646 \u064a\u0639\u0632\u0632 \u062a\u0637\u0628\u064a\u0642 MaaS\u061f<\/h4>\n\n\n\n<p>\u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0624\u062f\u064a \u062a\u0637\u0628\u064a\u0642 \u0646\u0638\u0627\u0645 APS\u060c \u0645\u062b\u0644 \u0646\u0638\u0627\u0645 APS \u0645\u0646 Skyplanner\u060c \u0625\u0644\u0649 \u0632\u064a\u0627\u062f\u0629 \u062a\u062d\u0633\u064a\u0646 \u0641\u0648\u0627\u0626\u062f \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629.\n\u064a\u062d\u0633\u0646 \u0646\u0638\u0627\u0645 APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u062e\u0635\u064a\u0635 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629\u060c \u0645\u0645\u0627 \u064a\u062d\u0633\u0646 \u0627\u0644\u0643\u0641\u0627\u0621\u0629 \u0648\u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629.\n\u0648\u0647\u0648 \u064a\u062a\u0643\u0627\u0645\u0644 \u0628\u0633\u0644\u0627\u0633\u0629 \u0645\u0639 \u062d\u0644\u0648\u0644 MaaS\u060c \u0645\u0645\u0627 \u064a\u0648\u0641\u0631 \u0631\u0624\u064a\u0629 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a \u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u064a\u062a\u064a\u062d \u0627\u062a\u062e\u0627\u0630 \u0627\u0644\u0642\u0631\u0627\u0631\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0646\u062f\u0629 \u0625\u0644\u0649 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0644\u062a\u062d\u0633\u064a\u0646 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0644\u0628\u064a\u0629 \u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u0627\u0621 \u0628\u0641\u0639\u0627\u0644\u064a\u0629  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 &#8221; \u0627\u0644\u0645\u0635\u0627\u062f\u0631 &#8221; \u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f \u062a\u062e\u064a\u0644 \u0639\u0627\u0644\u0645\u0627\u064b \u062a\u0643\u0648\u0646 \u0641\u064a\u0647 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0633\u0644\u0633\u0629 \u0648\u0641\u0639\u0627\u0644\u0629 \u0648\u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0643\u064a\u0641 \u0628\u062f\u0631\u062c\u0629 \u0643\u0628\u064a\u0631\u0629. \u0639\u0627\u0644\u0645 \u062a\u0633\u062a\u0637\u064a\u0639 \u0641\u064a\u0647 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642 \u0641\u064a \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a. \u0647\u0630\u0647 \u0647\u064a \u0642\u0648\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u060c \u0648\u0647\u0648 \u0645\u0641\u0647\u0648\u0645 \u062b\u0648\u0631\u064a &#8230; <a title=\"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/\" aria-label=\"Read more about \u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":6,"featured_media":37333,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[454,2544],"tags":[],"class_list":["post-37331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-454","category-2544","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-15T16:44:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-07T07:15:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f\",\"datePublished\":\"2023-07-15T16:44:06+00:00\",\"dateModified\":\"2024-08-07T07:15:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/\"},\"wordCount\":87,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"articleSection\":[\"\u0627\u0644\u0645\u0648\u0627\u0631\u062f\",\"\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\"],\"inLanguage\":\"ar\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/\",\"name\":\"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"datePublished\":\"2023-07-15T16:44:06+00:00\",\"dateModified\":\"2024-08-07T07:15:13+00:00\",\"description\":\"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Manufacturing as a Service\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\\\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f &#8211; SkyPlanner","description":"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/","og_locale":"ar_AR","og_type":"article","og_title":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f","og_description":"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/","og_site_name":"SkyPlanner","article_published_time":"2023-07-15T16:44:06+00:00","article_modified_time":"2024-08-07T07:15:13+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f","datePublished":"2023-07-15T16:44:06+00:00","dateModified":"2024-08-07T07:15:13+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/"},"wordCount":87,"publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","articleSection":["\u0627\u0644\u0645\u0648\u0627\u0631\u062f","\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639"],"inLanguage":"ar"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/","name":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","datePublished":"2023-07-15T16:44:06+00:00","dateModified":"2024-08-07T07:15:13+00:00","description":"\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 \u0647\u0648 \u0646\u0645\u0648\u0630\u062c \u0623\u0639\u0645\u0627\u0644 \u064a\u0645\u0643\u0651\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0645\u0646 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0648\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631 \u0641\u064a \u0645\u0631\u0627\u0641\u0642 \u0625\u0646\u062a\u0627\u062c \u062f\u0627\u062e\u0644\u064a\u0629 \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","width":2560,"height":1707,"caption":"Manufacturing as a Service"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/%d9%85%d8%a7-%d9%87%d9%88-%d8%a7%d9%84%d8%aa%d8%b5%d9%86%d9%8a%d8%b9-%d9%83%d8%ae%d8%af%d9%85%d8%a9-maas%d8%9f\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ar\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 &#8221; \u0627\u0644\u0645\u0635\u0627\u062f\u0631 &#8221; \u0645\u0627 \u0647\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u061f \u062a\u062e\u064a\u0644 \u0639\u0627\u0644\u0645\u0627\u064b \u062a\u0643\u0648\u0646 \u0641\u064a\u0647 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0633\u0644\u0633\u0629 \u0648\u0641\u0639\u0627\u0644\u0629 \u0648\u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0643\u064a\u0641 \u0628\u062f\u0631\u062c\u0629 \u0643\u0628\u064a\u0631\u0629. \u0639\u0627\u0644\u0645 \u062a\u0633\u062a\u0637\u064a\u0639 \u0641\u064a\u0647 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628 \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u0627\u062a \u0648\u0627\u0633\u0639\u0629 \u0627\u0644\u0646\u0637\u0627\u0642 \u0641\u064a \u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a. \u0647\u0630\u0647 \u0647\u064a \u0642\u0648\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u062e\u062f\u0645\u0629 (MaaS)\u060c \u0648\u0647\u0648 \u0645\u0641\u0647\u0648\u0645 \u062b\u0648\u0631\u064a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/posts\/37331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=37331"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/posts\/37331\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media\/37333"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=37331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/categories?post=37331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/tags?post=37331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}