{"id":107762,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign <span class=\"hl\">\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ByDesign \u0628\u0640SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ByDesign \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0627\u0644\u062a\u064a \u0623\u0635\u062f\u0631\u062a\u0647\u0627 SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u064a\u0633\u062a\u0642\u0628\u0644 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0635\u0627\u062f\u0631\u0629 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648Production Models\u060c \u0648Bills of Material\u060c \u0648Bills of Operations\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0627\u0644\u0639\u0645\u0627\u0644\u0629\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u0625\u0644\u0649 ByDesign \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0628\u062f\u0627\u064a\u0629 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629.<\/li>\n\n\n<li>\u064a\u0645\u0643\u0646 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0647\u0627\u0644\u0643 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0641\u064a \u062f\u0641\u0639\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a ByDesign.<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u0622\u0644\u064a\u0627\u062a webhooks \u0641\u064a SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0628\u064a\u0626\u0629 ByDesign \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0645 \u0639\u0628\u0631 REST API \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0645\u0648\u062c\u0647 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0627\u0644\u0645\u0637\u0648\u0631\u064a\u0646 \u0627\u0644\u0631\u0627\u063a\u0628\u064a\u0646 \u0641\u064a \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629\u060c \u0623\u0648 \u0641\u064a \u062a\u0637\u0648\u064a\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0623\u0646\u0641\u0633\u0647\u0645 \u0628\u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 REST API \u0627\u0644\u0645\u0648\u062b\u0642\u0629 \u0644\u062f\u0649 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a SAP ByDesign<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0646\u0634\u0631 ByDesign \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 A2X SOAP \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0625\u0635\u062f\u0627\u0631 \u0641\u064a <a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/IntegrationServices.html\">\u0642\u0627\u0626\u0645\u0629 API \u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628<\/a>. \u0648\u064a\u0633\u062a\u062e\u062f\u0645 \u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manage Production Orders (ManageProductionOrderIn).<\/strong> \u062a\u064f\u0631\u062c\u0639 READ_PROD_ORDER \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629\u060c \u0648\u0623\u0642\u0631\u0628 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0648\u0623\u0628\u0639\u062f\u0647\u0627\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0645\u0639 \u0627\u0644\u0645\u062f\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0627\u0644\u0645\u0646\u0641\u0630\u0629\u060c \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629\u060c \u0648\u062d\u0627\u0644\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u060c \u0648\u062d\u0627\u0644\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629. \u0648\u062a\u062d\u062f\u0651\u062b MAINTAIN_BUNDLE_V2 \u0627\u0644\u062d\u0642\u0644 EarliestStartPeriod \u0623\u0648 LatestEndPeriod\u060c \u0648\u0643\u0630\u0644\u0643 \u0627\u0644\u062d\u0642\u0644 MainResourceID \u0644\u0644\u0639\u0645\u0644\u064a\u0629 (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_ORDER_IN.html\">\u0645\u0633\u0627\u0639\u062f\u0629 SAP<\/a>).<\/li>\n\n\n<li><strong>Manage Production Lots (ManageProductionLotsIn).<\/strong> \u062a\u064f\u0646\u0634\u0626 MaintainBundle \u0645\u0647\u0627\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u062a\u062d\u062f\u0651\u062b\u0647\u0627\u060c \u0628\u0645\u0627 \u064a\u0634\u0645\u0644 \u0627\u0644\u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0647\u0627\u0644\u0643 \u0648\u0645\u0624\u0634\u0631 \u0627\u0643\u062a\u0645\u0627\u0644 \u0627\u0644\u062a\u0623\u0643\u064a\u062f \u0644\u0643\u0644 \u0646\u0642\u0637\u0629 \u0625\u0628\u0644\u0627\u063a\u060c \u0648\u0625\u0646\u0647\u0627\u0621 \u0627\u0644\u0645\u0647\u0645\u0629 \u0645\u0639 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0645\u0648\u0638\u0641 \u0627\u0644\u0645\u0646\u0641\u0630 \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u060c \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0627\u0631\u062f (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_LOT_IN.html\">\u0645\u0633\u0627\u0639\u062f\u0629 SAP<\/a>).<\/li>\n\n\n<li><strong>\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645.<\/strong> Query Production Orders\u060c \u0648Query Production Lots\u060c \u0648Query Production Model\u060c \u0648Query Production Bill of Materials\u060c \u0648Query Production Bill of Operations (\u062d\u0633\u0628 \u0627\u0644\u0645\u0648\u0631\u062f \u0623\u064a\u0636\u064b\u0627)\u060c \u0648Query Materials\u060c \u0648Read Equipment Resources\u060c \u0648Query Labour Resource\u060c \u0648Query Purchase Orders\u060c \u0648Query Identified Stocks\u060c \u0648Determine Availability of Products.<\/li>\n\n\n<li><strong>OData.<\/strong> \u062e\u062f\u0645\u0627\u062a OData \u0645\u062e\u0635\u0635\u0629 \u0644\u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 OData \u0644\u0645\u0635\u0627\u062f\u0631 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u062a\u0642\u0627\u0631\u064a\u0631 \u0627\u0644\u062a\u062d\u0644\u064a\u0644\u064a\u0629. \u0648\u062a\u0642\u0648\u0644 SAP: &#8220;companies are fully empowered to decide which business objects&#8221; (\u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0643\u0627\u0645\u0644 \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0629 \u0644\u062a\u062d\u062f\u064a\u062f \u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u062a\u064a \u062a\u064f\u062a\u0627\u062d \u0639\u0628\u0631 \u0627\u0644\u0648\u0627\u062c\u0647\u0627\u062a) (<a href=\"https:\/\/help.sap.com\/doc\/7f6eeef4edc84312870d687b2ce0f3a1\/2608\/en-US\/IntegrationScenarios.html\">\u0633\u064a\u0646\u0627\u0631\u064a\u0648\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0644\u062f\u0649 SAP<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>\u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 \u062e\u062f\u0645\u0627\u062a Query \u0623\u0648 OData \u0644\u0644\u0642\u0631\u0627\u0621\u0629\u060c \u0648\u062e\u062f\u0645\u062a\u064a Manage \u0644\u062c\u0645\u064a\u0639 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0643\u062a\u0627\u0628\u0629.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0648\u0627\u0644\u062a\u0631\u062e\u064a\u0635<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0641\u064a ByDesign\u060c \u0623\u0646\u0634\u0626\u0648\u0627 \u0646\u0638\u0627\u0645 \u0627\u062a\u0635\u0627\u0644 \u0644\u0640SkyPlanner \u0648\u062a\u0631\u062a\u064a\u0628 \u0627\u062a\u0635\u0627\u0644 \u0644\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u062e\u062f\u0645\u0648\u0646\u0647\u0627. \u0644\u0643\u0644 \u062a\u0631\u062a\u064a\u0628 \u0645\u0633\u062a\u062e\u062f\u0645 \u062a\u0642\u0646\u064a \u062e\u0627\u0635 \u0628\u0647. \u064a\u062d\u062f\u062f \u062f\u0644\u064a\u0644 \u0627\u0644\u0623\u0645\u0627\u0646 \u0644\u062f\u0649 SAP \u0648\u0633\u0627\u0626\u0644 \u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0628\u0627\u0644\u0639\u0628\u0627\u0631\u0629 &#8220;user ID plus password, and the X.509 client certificate&#8221; (\u0645\u0639\u0631\u0651\u0641 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0645\u0639 \u0643\u0644\u0645\u0629 \u0627\u0644\u0645\u0631\u0648\u0631\u060c \u0648\u0634\u0647\u0627\u062f\u0629 \u0627\u0644\u0639\u0645\u064a\u0644 \u0627\u0644\u0645\u0630\u0643\u0648\u0631\u0629) (<a href=\"https:\/\/help.sap.com\/doc\/e9674bba2e9f423da76f05c02c4a8554\/2608\/en-US\/Security_Guide_for_SAP_Business_ByDesign.pdf\">\u062f\u0644\u064a\u0644 \u0627\u0644\u0623\u0645\u0627\u0646<\/a>). \u0648\u064a\u0645\u0643\u0646 \u0625\u0639\u062f\u0627\u062f OAuth 2.0 \u0644\u062e\u062f\u0645\u0627\u062a OData. \u0646\u0632\u0651\u0644\u0648\u0627 \u0645\u0644\u0641 WSDL \u0644\u0643\u0644 \u062e\u062f\u0645\u0629 \u0645\u0646 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0627\u062a\u0635\u0627\u0644 \u0623\u0648 \u0645\u0646 Service Explorer.<\/p>\n\n\n<p>\u0641\u064a SkyPlanner\u060c \u064a\u062a\u0636\u0645\u0646 \u0643\u0644 \u0627\u0633\u062a\u062f\u0639\u0627\u0621 \u0631\u0645\u0632 API \u0641\u064a \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code>. \u0623\u0646\u0634\u0626\u0648\u0627 \u0627\u0644\u0631\u0645\u0632 \u0641\u064a SkyPlanner \u0645\u0646 Settings &gt; API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0628\u062f\u0621 \u0627\u0644\u062a\u0637\u0648\u064a\u0631.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0639\u0646\u062f \u0643\u0644 \u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0641\u062a\u064f\u0643\u062a\u0628 \u0627\u0644\u062a\u062d\u062f\u064a\u062b\u0627\u062a \u0641\u064a ByDesign \u0645\u0639 \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062e\u0637\u0629.<\/p>\n\n\n<p>\u0644\u0627\u0633\u062a\u0642\u0628\u0627\u0644 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0645\u0646 ByDesign\u060c \u0627\u0633\u062a\u0639\u0644\u0645\u0648\u0627 \u062f\u0648\u0631\u064a\u064b\u0627 \u0639\u0628\u0631 \u062e\u062f\u0645\u0627\u062a Query. \u0627\u0642\u0631\u0623\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0635\u0627\u062f\u0631\u0629 \u0648\u062f\u0641\u0639\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0628\u0648\u062a\u064a\u0631\u0629 \u0623\u0642\u0644. \u062a\u064f\u0642\u0633\u0651\u0645 \u0646\u062a\u0627\u0626\u062c \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 QueryHitsMaximumNumberValue \u0648LastReturnedObjectID\u061b \u0648\u062a\u0648\u062b\u0651\u0642 SAP \u062d\u062c\u0645 \u0627\u0644\u0635\u0641\u062d\u0629 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a \u0641\u064a <a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/34de7a7c1a7e43178141074817068fb1\/37faab74f63049d7816184add8077065.html\">\u0635\u0641\u062d\u0629 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 ByDesign (\u0627\u0644\u0648\u0627\u062c\u0647\u0629)<\/th><th>\u0643\u0627\u0626\u0646 SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u062a\u062d\u062f\u064a\u062b<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0645\u0648\u0627\u062f (Query Materials)<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a<\/td><\/tr><tr><td>Production Bill of Material (Query Production Bill of Materials)<\/td><td>\u0628\u0646\u064a\u0629 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0643\u0644 \u0645\u0646\u062a\u062c<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>Production Bill of Operations: \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0623\u0646\u0634\u0637\u0629 Setup \u0648Produce \u0648Tear down (Query Production Bill of Operations)<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u062f\u062f\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>Production Model (Query Production Model)<\/td><td>\u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0644\u0645\u0646\u062a\u062c \u0641\u064a \u0643\u0644 \u0645\u0648\u0642\u0639<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u0631\u062f (Read Equipment Resources)<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644 \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644 \u0648\u0623\u062f\u0648\u0627\u062a<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u0648\u0646\u0627\u062f\u0631\u064b\u0627 \u0628\u0639\u062f \u0630\u0644\u0643<\/td><\/tr><tr><td>\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0639\u0645\u0627\u0644\u0629 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0639\u0645\u0644 (Query Labour Resource)<\/td><td>\u0627\u0644\u0645\u0648\u0638\u0641\u0648\u0646 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0623\u0648 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0635\u0627\u062f\u0631\u0629 \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 (Query Production Orders\u060c READ_PROD_ORDER)<\/td><td>\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0647\u0627 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>\u062f\u0641\u0639\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0647\u0627\u0645\u0647\u0627 (Query Production Lots)<\/td><td>\u062a\u0642\u062f\u0645 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0645\u0647\u0627\u0645<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0645\u0639\u0631\u0651\u0641 \u0648\u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a (Query Identified Stocks\u060c Determine Availability of Products)<\/td><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 (Query Purchase Orders)<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u062d\u0633\u0628 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>EarliestStartPeriod \u0648MainResourceID \u0644\u0644\u0639\u0645\u0644\u064a\u0629 (Manage Production Orders\u060c MAINTAIN_BUNDLE_V2)<\/td><td>\u0627\u0644\u0628\u062f\u0627\u064a\u0629 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0639\u064a\u0651\u0646\u0629<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0639\u0628\u0631 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0647\u0627\u0644\u0643 \u0648\u0625\u0646\u0647\u0627\u0621 \u0627\u0644\u0645\u0647\u0645\u0629 (Manage Production Lots\u060c MaintainBundle)<\/td><td>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0648\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0643\u0644 \u0648\u0631\u062f\u064a\u0629\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u064a\u0631 \u0630\u0644\u0643<\/td><\/tr><tr><td>\u063a\u064a\u0631 \u0645\u0648\u062c\u0648\u062f\u0629 \u0641\u064a ByDesign<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u062a\u0639\u062f\u062f \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0638\u0641\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0636\u0628\u0637 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u0646\u0645\u0627\u0637 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0627\u0644\u0645\u0648\u0627\u062f \u0648Production Models \u0648Bills of Material \u0648Bills of Operations \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0627\u0644\u0639\u0645\u0627\u0644\u0629. \u062d\u062f\u0651\u062f\u0648\u0627 \u0628\u0639\u0646\u0627\u064a\u0629 \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 \u0627\u0644\u0645\u0648\u0627\u0631\u062f: \u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0648\u0627\u0631\u062f \u062a\u0636\u0645 \u0623\u0631\u0628\u0639 \u0622\u0644\u0627\u062a \u062a\u0642\u0627\u0628\u0644\u0647\u0627 \u0645\u062c\u0645\u0648\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u0645\u0646 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0623\u0631\u0628\u0639 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644. \u0623\u0645\u0627 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0645\u062b\u0644 \u0623\u062f\u0648\u0627\u062a\u060c \u0641\u062a\u064f\u0639\u0631\u0651\u0641 \u0641\u064a SkyPlanner \u0643\u0623\u062f\u0648\u0627\u062a \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u062a\u0648\u0627\u0641\u0631.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0635\u0627\u062f\u0631\u0629 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0645\u0648\u0627\u062f\u0647\u0627\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u064a\u0639\u062a\u0628\u0631 SkyPlanner \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u062d\u062f\u0651\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 Delivered. \u0648\u062a\u0628\u0642\u0649 \u0645\u0642\u062a\u0631\u062d\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a ByDesign Supply Planning \u0625\u0644\u0649 \u0623\u0646 \u062a\u062a\u062d\u0648\u0644 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<p><strong>3. \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u064a\u064f\u062f\u0631\u062c \u0627\u0644\u0645\u062d\u0631\u0643 \u0623\u0645\u0631\u064b\u0627 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0648 \u064a\u063a\u064a\u0651\u0631 \u0645\u0648\u0639\u062f\u0647\u060c \u064a\u064f\u0637\u0644\u0642 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner \u0627\u0633\u062a\u062f\u0639\u0627\u0621 MAINTAIN_BUNDLE_V2 \u0641\u064a Manage Production Orders. \u0648\u064a\u0636\u0628\u0637 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621 EarliestStartPeriod \u0648MainResourceID \u0644\u0644\u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u062a\u064a \u0627\u062e\u062a\u0627\u0631\u0647\u0627 SkyPlanner.<\/p>\n\n\n<p><strong>4. \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0641\u064a \u0623\u0631\u0636 \u0627\u0644\u0645\u0635\u0646\u0639.<\/strong> \u064a\u0633\u062c\u0644 \u0627\u0644\u0645\u0634\u063a\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner Mobile Confirmations \u0623\u0648 Production Timer\u060c \u0648\u062a\u064f\u0628\u0642\u064a \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062d\u062f\u0651\u062b\u064b\u0627. \u0623\u0646\u062a\u0645 \u062a\u0642\u0631\u0631\u0648\u0646 \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0633\u062a\u064f\u0639\u0627\u062f \u0625\u0644\u0649 ByDesign. \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643\u060c \u062a\u0633\u062c\u0651\u0644 MaintainBundle \u0641\u064a Manage Production Lots \u0627\u0644\u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0647\u0627\u0644\u0643 \u0648\u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0645\u0639 \u0627\u0644\u0645\u0648\u0638\u0641 \u0627\u0644\u0645\u0646\u0641\u0630. \u0648\u0625\u0646 \u0644\u0645 \u062a\u062e\u062a\u0627\u0631\u0648\u0627 \u0630\u0644\u0643\u060c \u062a\u064f\u062f\u062e\u0644 \u0627\u0644\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0641\u064a ByDesign \u0643\u0627\u0644\u0645\u0639\u062a\u0627\u062f.<\/p>\n\n\n<p><strong>5. \u0642\u0648\u0627\u0639\u062f \u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/strong> \u0648\u062b\u0651\u0642\u0648\u0647\u0627 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0645\u0648\u0627\u062f \u0648Production Models \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0648\u062d\u0627\u0644\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0627\u0644\u062f\u0641\u0639\u0627\u062a<\/td><td>ByDesign<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0648\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0645\u0648\u0627\u0631\u062f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0628\u062f\u064a\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0627\u062a<\/td><td>\u0646\u0638\u0627\u0645 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u0623\u062b\u0646\u0627\u0621 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0648\u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0628\u0636\u0627\u0626\u0639 \u0648\u0627\u062d\u062a\u0633\u0627\u0628 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641<\/td><td>ByDesign\u061b \u062a\u064f\u062f\u062e\u0644 \u0641\u064a\u0647 \u0645\u0628\u0627\u0634\u0631\u0629 \u0623\u0648 \u062a\u064f\u0631\u062d\u0651\u0644 \u0625\u0644\u064a\u0647 \u0645\u0646 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u062d\u062f\u0651\u062f\u0648\u0627 \u0646\u0638\u0627\u0645\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0644\u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0623\u0648\u0627\u0645\u0631. \u0644\u0627 \u062a\u0634\u063a\u0651\u0644\u0648\u0627 Load Leveling \u0639\u0644\u0649 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u062a\u064a \u064a\u062c\u062f\u0648\u0644\u0647\u0627 SkyPlanner\u060c \u0648\u062a\u062d\u0642\u0642\u0648\u0627 \u0645\u0646 \u0623\u0646 \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0627 \u064a\u063a\u064a\u0651\u0631 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0635\u0627\u062f\u0631\u0629 \u0627\u0644\u062a\u064a \u064a\u062a\u0648\u0644\u0649 SkyPlanner \u0625\u062f\u0627\u0631\u062a\u0647\u0627.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u062a\u062d\u0642\u0642\u0648\u0627 \u0645\u0646 \u0635\u062d\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u062a\u062c\u0631\u064a\u0628\u064a\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0627\u0644\u0628\u0627\u0644\u063a\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648Bills of Operations \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0627\u0644\u062a\u064a \u062a\u064f\u0635\u062f\u0651\u0631 \u0645\u0646 ByDesign \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u0627\u0639\u062a\u0645\u062f\u0648\u0627 \u062c\u062f\u0648\u0644 \u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0642\u0648\u0627\u0639\u062f \u0627\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0639\u0646 \u062a\u062d\u062f\u064a\u062b\u0647\u0627 \u0648\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u0645\u0632\u0627\u0645\u0646\u0629\u060c \u0648\u062d\u062f\u0651\u062f\u0648\u0627 \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0633\u062a\u064f\u0639\u0627\u062f \u0625\u0644\u0649 ByDesign.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 ByDesign.<\/strong> \u0623\u0646\u0634\u0626\u0648\u0627 \u0646\u0638\u0627\u0645 \u0627\u0644\u0627\u062a\u0635\u0627\u0644 \u0648\u062a\u0631\u062a\u064a\u0628\u0627\u062a \u0627\u0644\u0627\u062a\u0635\u0627\u0644\u060c \u0648\u0646\u0632\u0651\u0644\u0648\u0627 \u0645\u0644\u0641\u0627\u062a WSDL. \u0627\u062e\u062a\u0628\u0631\u0648\u0627 \u0623\u0648\u0644\u064b\u0627 \u0641\u064a \u0628\u064a\u0626\u0629 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0645 \u0641\u064a ByDesign.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> \u0627\u0644\u0645\u0648\u0627\u062f \u0648Production Models \u0648Bills of Material \u0648Bills of Operations \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0634\u0631\u0627\u0621.<\/strong> \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0645\u0639 \u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a\u060c \u0648\u062a\u0635\u0641\u064a\u0629 \u0627\u0644\u0646\u062a\u0627\u0626\u062c\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0645\u062d\u0627\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0639\u062f\u062f \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0645\u0648\u0638\u0641\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629.<\/strong> \u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a MAINTAIN_BUNDLE_V2 \u0627\u0644\u062a\u064a \u062a\u064f\u0637\u0644\u0642\u0647\u0627 \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0645\u0646 SkyPlanner\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u062f\u0641\u0639\u0627\u062a \u0625\u0630\u0627 \u0627\u062e\u062a\u064a\u0631 \u0630\u0644\u0643.<\/li>\n\n\n<li><strong>\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/strong> \u0634\u063a\u0651\u0644\u0648\u0627 SkyPlanner \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a \u0645\u0639 \u0627\u0644\u062e\u0637\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0648\u0642\u0627\u0631\u0646\u0648\u0627 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e\u060c \u0648\u0635\u062d\u0651\u062d\u0648\u0627 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/li>\n\n\n<li><strong>\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0641\u0639\u0651\u0644\u0648\u0627 \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u0639\u062f \u062a\u0637\u0627\u0628\u0642\u0647\u0627.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-sap-bydesign-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u0646\u0628\u063a\u064a \u0645\u0631\u0627\u0639\u0627\u062a\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SAP ByDesign<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u0627\u0631\u064a\u062e \u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0627\u0633\u062a\u062f\u0639\u0627\u0621.<\/strong> &#8220;The EarliestStartPeriod and the LatestEndPeriod cannot be updated together.&#8221; (\u0644\u0627 \u064a\u0645\u0643\u0646 \u062a\u062d\u062f\u064a\u062b EarliestStartPeriod \u0648LatestEndPeriod \u0645\u0639\u064b\u0627.) \u0627\u0639\u062a\u0645\u062f \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0645\u0631\u062c\u0639\u064b\u0627 \u0644\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/li>\n\n\n<li><strong>\u0644\u0627 \u062a\u062a\u0648\u0641\u0631 \u0622\u0644\u064a\u0629 \u0642\u0641\u0644.<\/strong> \u062e\u062f\u0645\u0627\u062a A2X \u0644\u0627 \u062a\u062d\u062a\u0641\u0638 \u0628\u0627\u0644\u062d\u0627\u0644\u0629\u060c \u0648\u0644\u0630\u0644\u0643 \u062a\u0648\u0636\u062d SAP \u0623\u0646\u0647 \u0644\u0627 \u064a\u0645\u0643\u0646 \u0641\u0631\u0636 \u0642\u0641\u0644 \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0623\u0648 \u0642\u0641\u0644 \u0645\u0646\u0637\u0642\u064a. \u0623\u0639\u062f \u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0623\u0645\u0631 \u0642\u0628\u0644 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0643\u062a\u0627\u0628\u0629\u060c \u0648\u0639\u0627\u0644\u062c \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/li>\n\n\n<li><strong>\u0625\u0646\u0647\u0627\u0621 \u0627\u0644\u0645\u0647\u0645\u0629 \u0646\u0647\u0627\u0626\u064a.<\/strong> &#8220;Confirmation Finished Indicator cannot be unchecked once it is set.&#8221; (\u0644\u0627 \u064a\u0645\u0643\u0646 \u0625\u0644\u063a\u0627\u0621 \u062a\u062d\u062f\u064a\u062f Confirmation Finished Indicator \u0628\u0639\u062f \u062a\u0641\u0639\u064a\u0644\u0647.) \u0644\u0627 \u062a\u0633\u062c\u0651\u0644 \u0627\u0644\u0625\u0646\u0647\u0627\u0621 \u0625\u0644\u0627 \u0639\u0646\u062f\u0645\u0627 \u064a\u064f\u063a\u0644\u0642 \u0627\u0644\u0645\u0634\u063a\u0651\u0644 \u0627\u0644\u0645\u0647\u0645\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0648\u0627\u0644\u0625\u0636\u0627\u0641\u064a\u0629.<\/strong> \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u064a ByDesign \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629. \u0639\u0631\u0651\u0641 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u062f\u0631\u062c\u0629 \u0636\u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0636\u0627\u0641\u064a\u0629 \u0628\u0648\u0635\u0641\u0647\u0627 \u0645\u0648\u0627\u0631\u062f \u0630\u0627\u062a \u0637\u0627\u0642\u0629 \u0645\u062d\u062f\u0648\u062f\u0629 \u0641\u064a SkyPlanner\u060c \u0644\u0643\u064a \u062a\u062a\u062d\u0642\u0642 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0646 \u062a\u0648\u0627\u0641\u0631\u0647\u0627.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643.<\/strong> \u062a\u062a\u0636\u0645\u0646 Bills of Operations \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643 \u0628\u0648\u0635\u0641\u0647\u0645\u0627 \u0623\u0646\u0634\u0637\u0629. \u0627\u0646\u0642\u0644 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u062a\u064a \u062a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0625\u0644\u0649 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-sap-bydesign-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SAP ByDesign \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629 \u0648\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c<\/strong> \u0648\u0630\u0644\u0643 \u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0648\u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a OData \u0627\u0644\u0645\u062a\u0641\u0642 \u0639\u0644\u064a\u0647\u0627. \u062a\u062e\u062a\u0644\u0641 \u0637\u0631\u064a\u0642\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 ByDesign \u0645\u0646 \u0634\u0631\u0643\u0629 \u0625\u0644\u0649 \u0623\u062e\u0631\u0649\u060c \u0648\u0647\u0646\u0627 \u062a\u064f\u0648\u0638\u064e\u0651\u0641 \u0627\u0644\u062e\u0628\u0631\u0629 \u0628\u0647\u0630\u0647 \u0627\u0644\u0627\u062e\u062a\u0644\u0627\u0641\u0627\u062a.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 SAP ByDesign \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629.<\/strong> \u0641\u0647\u0648 \u064a\u0639\u0631\u0641 \u0628\u064a\u0626\u0629 ByDesign \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643 \u0648\u0646\u0637\u0627\u0642\u0647\u0627 \u0627\u0644\u0645\u062d\u062f\u062f \u0648\u0627\u0644\u0625\u0636\u0627\u0641\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0641\u064a\u0647\u0627\u060c \u0648\u064a\u0645\u0643\u0646\u0647 \u0625\u0639\u062f\u0627\u062f \u062a\u0631\u062a\u064a\u0628\u0627\u062a \u0627\u0644\u0627\u062a\u0635\u0627\u0644 \u0628\u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0645\u0639 \u0641\u0631\u064a\u0642 SkyPlanner.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u062a\u0637\u0648\u064a\u0631 \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner\u060c \u0645\u0639 \u0631\u0645\u0632 API \u0641\u064a \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code>. \u0648\u064a\u0642\u062f\u0651\u0645 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u0645\u0633\u0627\u0639\u062f\u0629 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629. \u062a\u062a\u0648\u0641\u0631 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u0648\u064a\u064f\u0642\u062f\u064e\u0651\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0645\u0639 \u0628\u0627\u0642\u062a\u0643\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0633\u064a\u0631 \u0639\u0645\u0644\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP ByDesign \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/\">\u0635\u0641\u062d\u0629 SAP Business ByDesign<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0645\u0631\u0643\u0632 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0623\u0646\u0638\u0645\u0629 ERP<\/a>. \u0648\u0644\u0623\u0646\u0638\u0645\u0629 SAP \u0627\u0644\u0623\u062e\u0631\u0649 \u0623\u062f\u0644\u0629 \u062e\u0627\u0635\u0629 \u0628\u0647\u0627: <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/\">SAP Business One<\/a> \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0648\u0631\u0634\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u062a\u0648\u0641\u064a\u0631\u064b\u0627 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062d\u0638\u064a\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0633\u0628\u0648\u0639\u064a\u064b\u0627\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646\u0630 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0645\u0646\u062d\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u064a\u062c\u0639\u0644 \u0646\u062a\u0627\u0626\u062c \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0648\u0642\u0639.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund\u060c COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0643\u064a\u0645\u064a\u0627\u0626\u064a\u0629 \u0648\u0627\u0644\u063a\u0630\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 100% \u0637\u0648\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner\u060c \u0645\u0646\u0630 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/opes-corporation\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>\u062a\u0648\u0642\u0641\u0627\u062a \u0623\u0642\u0644<\/b><span>\u0628\u0633\u0628\u0628 \u0646\u0642\u0635 \u0627\u0644\u0645\u0648\u0627\u062f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u062a\u0643\u0645\u0646 \u0642\u064a\u0645\u0629 SkyPlanner \u0628\u0627\u0644\u0646\u0633\u0628\u0629 \u0625\u0644\u064a\u0646\u0627 \u0641\u064a \u0623\u0646\u0647 \u0623\u062f\u0627\u0629 \u0641\u0639\u0651\u0627\u0644\u0629 \u0641\u064a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u064a\u0648\u0645\u064a\u060c \u0644\u0627 \u0633\u064a\u0645\u0627 \u0639\u0646\u062f \u062a\u062d\u062f\u064a\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6\u060c \u0645\u062f\u064a\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Eskomatic \u00b7 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a \u062d\u0633\u0628 \u0627\u0644\u062a\u0639\u0627\u0642\u062f<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u062a\u064a\u062d \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u0644\u0642\u0627\u0626\u064a\u0629 \u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u0639\u0645\u0644 \u062a\u062d\u062f\u064a\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645 \u0623\u062f\u0642\u060c \u0648\u0642\u062f \u0627\u0646\u062e\u0641\u0636\u062a \u062a\u0648\u0642\u0641\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0646\u0627\u062c\u0645\u0629 \u0639\u0646 \u0646\u0642\u0635 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0646\u062e\u0641\u0627\u0636\u064b\u0627 \u062d\u0627\u062f\u064b\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/eskomatic\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0648\u0627\u062c\u0647\u0627\u062a API \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062e\u062f\u0645\u0647\u0627 SkyPlanner \u0641\u064a SAP ByDesign\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0633\u062a\u062e\u062f\u0645 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 A2X \u0627\u0644\u062a\u064a \u0623\u0635\u062f\u0631\u062a\u0647\u0627 SAP. \u0648\u062a\u062a\u0645 \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0639\u0628\u0631 \u062e\u062f\u0645\u0627\u062a Query\u060c \u0645\u062b\u0644 Query Production Orders \u0648Query Purchase Orders\u060c \u0623\u0648 \u0639\u0628\u0631 OData \u0645\u062e\u0635\u0651\u0635\u0629. \u0623\u0645\u0627 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0641\u062a\u062a\u0645 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u0639\u064a\u062f SkyPlanner \u0643\u062a\u0627\u0628\u062a\u0647\u0627 \u0641\u064a ByDesign\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0639\u064a\u062f \u0643\u062a\u0627\u0628\u0629 EarliestStartPeriod \u0648MainResourceID \u0627\u0644\u062e\u0627\u0635 \u0628\u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c. \u0648\u064a\u0645\u0643\u0646\u0643 \u0623\u064a\u0636\u064b\u0627 \u0627\u062e\u062a\u064a\u0627\u0631 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0647\u0627\u0644\u0643 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0641\u064a \u062f\u0641\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0631\u0633\u0644 ByDesign \u0623\u062d\u062f\u0627\u062b\u064b\u0627 \u0625\u0644\u0649 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0633\u062a\u0639\u0644\u0645 SkyPlanner \u0645\u0646 \u062e\u062f\u0645\u0627\u062a Query \u0641\u064a ByDesign \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642 \u0639\u0646 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u062f\u0641\u0639\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0648\u064a\u0631\u0633\u0644 SkyPlanner \u0646\u0641\u0633\u0647 webhooks \u0639\u0646\u062f \u0643\u0644 \u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0641\u062a\u064f\u0637\u0644\u0650\u0642 \u0647\u0630\u0647 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0639\u0645\u0644\u064a\u0629 \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u064a\u062c\u0631\u064a SkyPlanner \u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0644\u062f\u0649 ByDesign\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0639\u0628\u0631 \u0646\u0638\u0627\u0645 \u0627\u062a\u0635\u0627\u0644 \u0648\u062a\u0631\u062a\u064a\u0628 \u0627\u062a\u0635\u0627\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0633\u062a\u062e\u062f\u0645 \u062a\u0642\u0646\u064a\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0645\u0627 \u064a\u0648\u0636\u062d\u0647 \u062f\u0644\u064a\u0644 \u0627\u0644\u0623\u0645\u0627\u0646 \u0645\u0646 SAP. \u0623\u0645\u0627 API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0641\u062a\u0633\u062a\u062e\u062f\u0645 \u0631\u0645\u0632 API \u0641\u064a \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u062a\u064f\u0631\u0633\u064e\u0644 \u0645\u0642\u062a\u0631\u062d\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062c\u062f\u0648\u0644 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u0623\u064f\u0635\u062f\u0631\u062a \u0644\u0644\u062a\u0646\u0641\u064a\u0630. \u0648\u062a\u0628\u0642\u0649 \u0627\u0644\u0645\u0642\u062a\u0631\u062d\u0627\u062a \u0641\u064a ByDesign Supply Planning \u0625\u0644\u0649 \u0623\u0646 \u062a\u062a\u062d\u0648\u0644 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629 \u0648\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u0645\u0643\u0646 \u0623\u064a\u0636\u064b\u0627 \u0644\u0634\u0631\u064a\u0643 SAP ByDesign \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0623\u0648 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u062a\u0637\u0648\u064a\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0648\u0631\u0645\u0632 API.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ SAP Business ByDesign \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ByDesign \u0628\u0640SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ByDesign \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0627\u0644\u062a\u064a \u0623\u0635\u062f\u0631\u062a\u0647\u0627 SAP: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0628\u064a\u0626\u0629 &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106600,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107762","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP ByDesign \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP ByDesign \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0645\u0639 SAP Business ByDesign: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0636\u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-bydesign\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP ByDesign \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP ByDesign \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u0627\u0631\u0628\u0637 SAP Business ByDesign \u0628\u0640SkyPlanner APS: \u062e\u062f\u0645\u0627\u062a \u0648\u064a\u0628 A2X\u060c \u0648OData\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 Manage Production Orders \u0648Manage Production Lots\u060c \u0648\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0645\u0639 SAP Business ByDesign: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0636\u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-bydesign\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ SAP Business ByDesign \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 SAP Business ByDesign \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ByDesign \u0628\u0640SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ByDesign \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0627\u0644\u062a\u064a \u0623\u0635\u062f\u0631\u062a\u0647\u0627 SAP: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0628\u064a\u0626\u0629&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=107762"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107762\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106600"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=107762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}