{"id":107354,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid <span class=\"hl\">\u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 \u0623\u0646\u0638\u0645\u0629 Cegid \u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u0635\u0646\u0627\u0639\u064a\u0629 \u0628\u0640SkyPlanner APS\u060c \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 Cegid PMI \u062b\u0645 Cegid Primavera \u0648Cegid Ekon. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Cegid \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a Cegid \u0646\u0641\u0633\u0647\u0627:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u062a\u064f\u0633\u062a\u0648\u0631\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF \u200f(ordres de fabrication\u060c ordens de fabrico\u060c \u00f3rdenes de fabricaci\u00f3n) \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 gammes \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f nomenclatures \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 postes de charge \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0636\u0645\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF.<\/li>\n\n\n<li>\u064a\u0645\u0643\u0646\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643\u060c \u0625\u0639\u0627\u062f\u0629 \u062a\u0633\u062c\u064a\u0644 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0628\u0635\u064a\u063a\u0629 pointages \u0641\u064a PMI \u0623\u0648 Di\u00e1rios de Trabalho \u0641\u064a Primavera \u0623\u0648 imputaciones \u0641\u064a Ekon.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0645\u0647\u0627\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0623\u0633\u0641\u0644\u0647.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> \u062a\u0648\u0641\u0631 Cegid \u0648\u0627\u062c\u0647\u0629 Web API \u0644\u0640PMI: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (\u0633\u0647\u0651\u0644\u0648\u0627 \u062a\u0628\u0627\u062f\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u0623\u0645\u0627\u0646 \u0645\u0639 \u062a\u0637\u0628\u064a\u0642\u0627\u062a\u0643\u0645 \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a Web API \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u0646\u0638\u0627\u0645 Cegid \u0644\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.) \u062a\u062d\u0627\u0641\u0638 Web API \u0639\u0644\u0649 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640Manufacturing PMI \u0639\u0646\u062f \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). \u0648\u064a\u0648\u0641\u0631 PMI \u0623\u064a\u0636\u064b\u0627 \u062a\u0628\u0627\u062f\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\u064b\u0627 \u0639\u0628\u0631 EDI\u060c \u0648\u0645\u0644\u0641\u0627\u062a XML \u0645\u0648\u062d\u0651\u062f\u0629 \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u0645\u0646 CAD\u060c \u0648\u0623\u062f\u0627\u0629 \u0644\u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u062a\u0642\u0627\u0631\u064a\u0631 \u0645\u0639 \u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u062a\u0635\u062f\u064a\u0631\u0647\u0627 \u0625\u0644\u0649 Excel. \u0648\u0627\u0644\u062a\u0635\u062f\u064a\u0631 \u0625\u0644\u0649 Excel \u0647\u0648 \u0623\u0633\u0631\u0639 \u0637\u0631\u064a\u0642\u0629 \u0644\u062a\u0648\u0641\u064a\u0631 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u062c\u0631\u0628\u0629.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> \u062a\u062a\u064a\u062d PRIMAVERA ERP V10 API \u0645\u0627 \u064a\u0644\u064a: &#8220;allows third party applications to perform both data query and writing operations&#8221; (\u062a\u0645\u0643\u0651\u0646 \u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u062c\u0647\u0627\u062a \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0639\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0643\u062a\u0627\u0628\u062a\u0647\u0627)\u060c \u0648\u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0648\u062d\u062f\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">\u0648\u062b\u0627\u0626\u0642 V10 API<\/a>). \u0648\u062a\u062a\u0648\u0641\u0631 \u0648\u062b\u0627\u0626\u0642 Web API \u0648\u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u0627\u0633\u062a\u062f\u0639\u0627\u0626\u0647\u0627 \u0639\u0628\u0631 Swagger\u060c \u0645\u0639 \u0641\u0635\u0644 \u0627\u0644\u0648\u0627\u062c\u0647\u0627\u062a \u0628\u062d\u0633\u0628 \u0627\u0644\u0648\u062d\u062f\u0629 (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">\u062a\u0648\u062b\u064a\u0642 Web API \u0639\u0628\u0631 Swagger<\/a>). \u062a\u0634\u0645\u0644 \u0648\u062d\u062f\u0629 Produ\u00e7\u00e3o (GPR) \u0627\u0644\u0628\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 fichas t\u00e9cnicas\u060c \u0648\u0635\u0627\u0641\u064a \u0627\u0644\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u060c \u0648\u0625\u0637\u0644\u0627\u0642 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF\u060c \u0648Planeamento\u060c \u0648\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">\u0645\u0631\u062c\u0639 Produ\u00e7\u00e3o<\/a>). \u0648\u0641\u064a\u0645\u0627 \u064a\u0644\u064a \u0627\u0644\u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0644\u0644\u062c\u062f\u0648\u0644\u0629:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u062a\u0642\u0631\u0623 <strong>IGprBSOrdensFabrico<\/strong> \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 ordens de fabrico \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 (GprBEOFOperacao).<\/li>\n\n\n<li>\u062a\u064f\u062d\u0645\u0651\u0644 <strong>IGprBSPlaneamento<\/strong> \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF \u0644\u0644\u062a\u062e\u0637\u064a\u0637\u060c \u0648\u062a\u064f\u062d\u062f\u0651\u062b \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li>\u062a\u0642\u0631\u0623 <strong>IGprBSCentrosTrabalho<\/strong> \u0648<strong>IGprBSPostosTrabalho<\/strong> \u0648<strong>IGprBSOperadores<\/strong> \u0648<strong>IGprBSRoteiros<\/strong> \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 centros de trabalho \u0648\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 postos \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 operadores \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 roteiros\u060c \u0639\u0644\u0649 \u0627\u0644\u062a\u0631\u062a\u064a\u0628.<\/li>\n\n\n<li>\u062a\u0633\u062c\u0651\u0644 <strong>IGprBSDiariosTrabalho<\/strong> \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <strong>IniciaPicagem<\/strong> \u0648<strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> \u062a\u0630\u0643\u0631 Cegid \u0623\u0646 Ekon \u064a\u062a\u0635\u0644 \u0628\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0634\u0631\u0643\u0629 (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). \u0648\u064a\u062d\u062f\u062f \u0641\u0631\u064a\u0642 SkyPlanner \u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0631\u0628\u0637 \u0627\u0644\u0645\u0646\u0627\u0633\u0628\u0629 \u0644\u0646\u0633\u062e\u0629 Ekon \u0644\u062f\u064a\u0643\u0645 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0648\u0627\u0644\u062a\u0631\u0627\u062e\u064a\u0635<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> \u064a\u064f\u0641\u0639\u0651\u0644 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 Web API \u0644\u063a\u0631\u0636 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a \u0646\u0633\u062e\u0629 PMI \u0644\u062f\u064a\u0643\u0645 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642\u060c \u0628\u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0645\u0639 \u0634\u0631\u064a\u0643 Cegid.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> \u064a\u062a\u064a\u062d \u0643\u0644 \u0643\u064a\u0627\u0646 \u0641\u064a Web API \u062f\u0627\u0644\u0629 Login \u062a\u064f\u0631\u062c\u0639 \u0631\u0645\u0632 Bearer \u0645\u0639 \u0645\u0641\u062a\u0627\u062d \u062c\u0644\u0633\u0629\u060c \u0648\u064a\u064f\u062c\u062f\u0651\u062f \u0627\u0644\u0631\u0645\u0632 \u0639\u0628\u0631 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 token (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">\u062a\u0648\u062b\u064a\u0642 Web API \u0639\u0628\u0631 Swagger<\/a>). \u0648\u064a\u062d\u062a\u0627\u062c \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0625\u0644\u0649 \u062a\u0631\u0627\u062e\u064a\u0635 Produ\u00e7\u00e3o \u0644\u0644\u0623\u0642\u0633\u0627\u0645 \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062f\u0639\u064a\u0647\u0627.<\/li>\n\n\n<li><strong>\u0645\u0646 \u062c\u0647\u0629 SkyPlanner.<\/strong> \u062a\u0633\u062a\u062e\u062f\u0645 REST API \u0631\u0645\u0632 API \u0644\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0636\u0645\u0646 \u062a\u0631\u0648\u064a\u0633\u0629 Authorization-Token (SkyPlanner Settings &gt; API)\u060c \u0648\u062a\u062a\u0648\u0641\u0631 \u0648\u062b\u0627\u0626\u0642\u0647\u0627 \u0628\u0635\u064a\u063a\u0629 Swagger\/OpenAPI. \u064a\u0634\u0631\u062d <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0627\u0644\u062f\u0631\u0633 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u064a \u0644\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \u0643\u064a\u0641\u064a\u0629 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u0623\u0648\u0644\u0649.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u064f\u062c\u0644\u0628 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 Cegid \u0628\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a. \u0648\u062a\u0643\u0634\u0641 \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a \u0639\u0646 \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0639\u0628\u0631 \u062a\u0635\u0641\u064a\u0629 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0644\u062a\u0634\u0645\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0648\u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u0623\u062e\u064a\u0631\u0629. \u064a\u064f\u062d\u062f\u0651\u062f \u062a\u0643\u0631\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0644\u0643\u0644 \u0645\u0635\u0646\u0639\u060c \u0645\u0646 \u0645\u0631\u0629 \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642 \u0644\u0623\u0648\u0627\u0645\u0631 OF \u0625\u0644\u0649 \u0645\u0631\u0629 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0644\u0644\u0645\u062e\u0632\u0648\u0646.<\/p>\n\n\n<p>\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062d\u0627\u0644\u0629 \u0623\u0648 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0644\u0630\u0627 \u062a\u0639\u062a\u0645\u062f \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Cegid \u0639\u0644\u0649 \u0627\u0644\u0623\u062d\u062f\u0627\u062b.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 Cegid \u200f(PMI \/ Primavera)<\/th><th>\u0643\u0627\u0626\u0646 SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0627\u0644\u062a\u0643\u0631\u0627\u0631<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641 (Articles \/ artigos)<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u062f\u0648\u0631\u064a<\/td><\/tr><tr><td>\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0628\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 \u0648\u0627\u0644\u0645\u0643\u0648\u0651\u0646\u0627\u062a (Nomenclatures \/ fichas t\u00e9cnicas, componentes)<\/td><td>\u0647\u064a\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0643\u0644 \u0645\u0646\u062a\u062c<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0648\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a (Gammes \/ roteiros, opera\u00e7\u00f5es)<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0645\u0639 \u0645\u062f\u062f\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0641\u0643<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0622\u0644\u0627\u062a \/ \u0645\u0631\u0627\u0643\u0632 \u0648\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 (Postes de charge \/ centros de trabalho, postos de trabalho)<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a\u0647\u0627 \u0648\u0645\u0639\u062f\u0644\u0627\u062a \u0627\u0644\u0643\u0641\u0627\u0621\u0629<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u0648\u0646\u0627\u062f\u0631\u064b\u0627 \u0628\u0639\u062f \u0630\u0644\u0643<\/td><\/tr><tr><td>\u0627\u0644\u0645\u0648\u0638\u0641\u0648\u0646 \/ \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 (Salari\u00e9s \/ operadores)<\/td><td>\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u062a\u0642\u0627\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0633\u062a\u062b\u0646\u0627\u0621\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 (exce\u00e7\u00f5es de capacidade)<\/td><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0629<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0623\u0648 \u062a\u064f\u062f\u0627\u0631 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0642\u0648\u0627\u0644\u0628 Ferramentas e moldes \u200f(Primavera)<\/td><td>\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0628\u0648\u0635\u0641\u0647\u0627 \u0645\u0648\u0627\u0631\u062f \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u062a\u0648\u0627\u0641\u0631<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u062a\u0642\u062f\u064a\u0631\u064a\u0629 (fermes \u0648pr\u00e9visionnels) \/ ordens de fabrico \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627<\/td><td>\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0647\u0627 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u062d\u0633\u0628 \u0627\u0644\u0635\u0646\u0641 \u0648\u0627\u0644\u0645\u0633\u062a\u0648\u062f\u0639<\/td><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0645\u0639 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u062d\u0633\u0628 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0644\u0639\u0645\u0644\u064a\u0629 OF \/ \u0627\u0644\u062d\u0642\u0644\u0627\u0646 DataIniPrevista \u0648DataFimPrevista \u0641\u064a GprBEOFOperacao \u0639\u0628\u0631 ActualizaPlaneamentoOperacao<\/td><td>\u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0644\u0643\u0644 \u062e\u0637\u0648\u0629\u060c \u0648\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0639\u064a\u0651\u0646\u0629 \u0644\u0647\u0627<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0639\u0628\u0631 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner<\/td><\/tr><tr><td>\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a Pointages \/ Di\u00e1rios de Trabalho \u200f(IniciaPicagem, TerminaPicagem)<\/td><td>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0648\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0643\u0644 \u0648\u0631\u062f\u064a\u0629\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u064a\u0631 \u0647\u0630\u0627 \u0627\u0644\u062e\u064a\u0627\u0631<\/td><\/tr><tr><td>\u063a\u064a\u0631 \u0645\u0648\u062c\u0648\u062f\u0629 \u0641\u064a Cegid<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0628\u0648\u0635\u0641\u0647\u0627 \u0645\u0648\u0627\u0631\u062f \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u062a\u0648\u0627\u0641\u0631 (PMI)\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0636\u0628\u0637 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u0646\u0645\u0627\u0637 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u062a\u064f\u0642\u0631\u0623 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0648\u062a\u0642\u0627\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644. \u0627\u0636\u0628\u0637\u0648\u0627 \u0631\u0628\u0637 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0628\u0639\u0646\u0627\u064a\u0629: \u064a\u062a\u062d\u0648\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 poste de charge \u064a\u0636\u0645 \u0623\u0631\u0628\u0639 \u0622\u0644\u0627\u062a \u0625\u0644\u0649 \u0645\u062c\u0645\u0648\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u062a\u0636\u0645 \u0623\u0631\u0628\u0639 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF.<\/strong> \u062a\u064f\u0642\u0631\u0623 \u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0645\u0643\u0648\u0651\u0646\u0627\u062a\u0647\u0627\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u064a\u0639\u062a\u0628\u0631 SkyPlanner \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 PO\u060c \u0648\u064a\u064f\u062d\u062f\u0651\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 Delivered. \u062d\u062f\u062f\u0648\u0627 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642 \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0633\u062a\u0634\u0645\u0644 \u0623\u064a\u0636\u064b\u0627 \u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u062e\u0637\u0637\u0629 (OF pr\u00e9visionnels)\u060c \u0623\u0645 \u0633\u062a\u0642\u062a\u0635\u0631 \u0639\u0644\u0649 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u0624\u0643\u062f\u0629.<\/p>\n\n\n<p><strong>3. \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u064a Cegid.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u064a\u0636\u0639 \u0627\u0644\u0645\u062d\u0631\u0643 \u0645\u0647\u0645\u0629 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0648 \u064a\u0646\u0642\u0644\u0647\u0627\u060c \u064a\u064f\u0637\u0644\u0642 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner \u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0641\u064a Cegid. \u0641\u064a PMI\u060c \u062a\u064f\u0631\u0633\u0644 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0648\u0627\u0645\u0631 OF \u0639\u0628\u0631 Web API\u060c \u0648\u0641\u0642 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u0639\u0645\u0644 \u0641\u064a PMI. \u0623\u0645\u0627 \u0641\u064a Primavera\u060c \u0641\u064a\u0633\u062a\u062f\u0639\u064a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 IGprBSPlaneamento.ActualizaPlaneamentoOperacao \u0645\u0639 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0648\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 centro de trabalho \u0648\u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u064a\u0646\u060c \u0641\u064a\u064f\u062d\u062f\u0651\u062b \u0627\u0644\u062d\u0642\u0644\u064a\u0646 DataIniPrevista \u0648DataFimPrevista \u0641\u064a \u0639\u0645\u0644\u064a\u0629 \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 ordem de fabrico.<\/p>\n\n\n<p><strong>4. \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0623\u0631\u0636 \u0627\u0644\u0645\u0635\u0646\u0639.<\/strong> \u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner Mobile Confirmations \u0623\u0648 Production Timer\u060c \u0648\u062a\u064f\u0628\u0642\u064a \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062d\u062f\u0651\u062b\u064b\u0627. \u0648\u064a\u0645\u0643\u0646\u0643\u0645 \u0627\u062e\u062a\u064a\u0627\u0631 \u0625\u0639\u0627\u062f\u0629 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0641\u064a Cegid \u0645\u0646 \u0639\u062f\u0645\u0647\u0627. \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643\u060c \u062a\u064f\u0633\u062c\u0651\u0644 \u0628\u0635\u064a\u063a\u0629 pointages \u0641\u064a PMI\u060c \u0623\u0648 \u0639\u0628\u0631 IniciaPicagem \u0648TerminaPicagem \u0641\u064a Di\u00e1rios de Trabalho \u0636\u0645\u0646 Primavera. \u0648\u0625\u0646 \u0644\u0645 \u062a\u062e\u062a\u0627\u0631\u0648\u0627 \u0630\u0644\u0643\u060c \u064a\u0633\u062a\u0645\u0631 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0641\u064a Cegid \u0628\u0627\u0644\u0628\u0627\u0631\u0643\u0648\u062f \u0643\u0645\u0627 \u0643\u0627\u0646 \u0645\u0646 \u0642\u0628\u0644.<\/p>\n\n\n<p><strong>5. \u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u062a\u0639\u0627\u0631\u0636.<\/strong> \u0648\u062b\u0651\u0642\u0648\u0647\u0627 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0648\u0643\u0645\u064a\u0627\u062a \u0623\u0648\u0627\u0645\u0631 OF \u0648\u062d\u0627\u0644\u062a\u0647\u0627<\/td><td>Cegid<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0648\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0628\u062f\u064a\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0629<\/td><td>\u0646\u0638\u0627\u0645 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642<\/td><\/tr><tr><td>\u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0647\u0644\u0627\u0643 \u0648\u0625\u062a\u0645\u0627\u0645 \u0627\u0644\u0639\u0645\u0644<\/td><td>Cegid\u060c \u0628\u0625\u062f\u062e\u0627\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a\u0647 \u0645\u0628\u0627\u0634\u0631\u0629 \u0623\u0648 \u062a\u0631\u062d\u064a\u0644\u0647\u0627 \u0645\u0646 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0627\u062e\u062a\u0627\u0631\u0648\u0627 \u0646\u0638\u0627\u0645\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0644\u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 OF. \u064a\u062d\u0644 SkyPlanner \u0645\u062d\u0644 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a PMI \u0648\u062e\u0648\u0627\u0631\u0632\u0645\u064a\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a Primavera \u0628\u0648\u0635\u0641\u0647 \u0627\u0644\u0645\u0633\u0624\u0648\u0644 \u0639\u0646 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629. \u0623\u0648\u0642\u0641\u0648\u0627 \u062a\u0634\u063a\u064a\u0644 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0643 \u0644\u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u062a\u064a \u064a\u062c\u062f\u0648\u0644\u0647\u0627 SkyPlanner\u060c \u062d\u062a\u0649 \u0644\u0627 \u064a\u0643\u062a\u0628 \u0623\u064a \u0645\u0646 \u0627\u0644\u0646\u0638\u0627\u0645\u064a\u0646 \u0641\u0648\u0642 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0622\u062e\u0631.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629 \u0644\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u062a\u062d\u0642\u0651\u0642 \u0645\u0646 \u0627\u0644\u062c\u062f\u0648\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u062a\u062c\u0631\u064a\u0628\u064a\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 postes \u0648gammes \u0648\u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0627\u0644\u0645\u0635\u062f\u0651\u064e\u0631\u0629 \u0645\u0646 Cegid \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u0627\u0639\u062a\u0645\u062f \u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0637\u0627\u0628\u0642\u0629 \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u0645\u0632\u0627\u0645\u0646\u0629\u060c \u0648\u062d\u062f\u0651\u062f \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0633\u062a\u064f\u0639\u0627\u062f \u0625\u0644\u0649 Cegid.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 Cegid.<\/strong> \u0623\u0646\u0634\u0626 \u062d\u0633\u0627\u0628 \u0645\u0633\u062a\u062e\u062f\u0645 \u0644\u0644\u062a\u0643\u0627\u0645\u0644\u060c \u0648\u062a\u062d\u0642\u0651\u0642 \u0645\u0646 \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0648\u0627\u0644\u062a\u0631\u0627\u062e\u064a\u0635 \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0627\u062e\u062a\u0628\u0631 \u0623\u0648\u0644\u064b\u0627 \u0636\u0645\u0646 \u0634\u0631\u0643\u0629 \u0627\u062e\u062a\u0628\u0627\u0631.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> Articles \u0648nomenclatures \u0648gammes \u0648postes de charge \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0648\u062a\u0642\u0627\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 OF \u0648\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646.<\/strong> \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0645\u0639 \u062a\u0635\u0641\u064a\u0629 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0648\u062a\u0642\u0633\u064a\u0645\u0647\u0627 \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0645\u062d\u0627\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0639\u062f\u062f \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0623\u0641\u0631\u0627\u062f \u0627\u0644\u0628\u062f\u0644\u0627\u0621.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 Cegid.<\/strong> \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u0639\u0628\u0631 webhooks \u0645\u0646 SkyPlanner\u060c \u0645\u0639 \u062a\u0631\u062d\u064a\u0644 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a \u0630\u0644\u0643.<\/li>\n\n\n<li><strong>\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/strong> \u0634\u063a\u0651\u0644 SkyPlanner \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a \u0645\u0639 \u0627\u0644\u062e\u0637\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0648\u0642\u0627\u0631\u0646 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0648\u0635\u062d\u0651\u062d \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/li>\n\n\n<li><strong>\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0641\u0639\u0651\u0644 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Cegid \u0628\u0639\u062f \u062a\u0637\u0627\u0628\u0642 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u062c\u0628 \u0645\u0631\u0627\u0639\u0627\u062a\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0645\u062e\u0637\u0637\u0629.<\/strong> \u064a\u0646\u0634\u0626 PMI \u0627\u0644\u0646\u0648\u0639\u064a\u0646 \u0627\u0646\u0637\u0644\u0627\u0642\u064b\u0627 \u0645\u0646 CBN. \u0648\u062a\u064f\u0638\u0647\u0631 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0623\u0639\u0628\u0627\u0621 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a\u0629\u060c \u0644\u0643\u0646 \u064a\u062c\u0628 \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 OF \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0641\u0642\u0637.<\/li>\n\n\n<li><strong>\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0628\u0639\u062f\u0629 \u0645\u0646 \u0627\u0644\u062a\u062e\u0637\u064a\u0637.<\/strong> \u064a\u0645\u0643\u0646 \u0641\u064a Primavera \u062a\u062d\u062f\u064a\u062f \u0639\u0645\u0644\u064a\u0629 \u0639\u0644\u0649 \u0623\u0646\u0647\u0627 \u063a\u064a\u0631 \u062e\u0627\u0636\u0639\u0629 \u0644\u0644\u062a\u062e\u0637\u064a\u0637 (NaoSujeitaPlaneamento). \u0627\u0633\u062a\u0628\u0639\u062f \u0647\u0630\u0647 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0639\u0646\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u0627\u0644\u0622\u0644\u0629 \u0648\u0648\u0642\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644.<\/strong> \u064a\u062d\u062a\u0641\u0638 Primavera \u0628\u0648\u0642\u062a \u0627\u0644\u0622\u0644\u0629 \u0648\u0648\u0642\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644 \u0628\u0635\u0648\u0631\u0629 \u0645\u0646\u0641\u0635\u0644\u0629 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629. \u0637\u0627\u0628\u0642 \u0643\u0644\u064a\u0647\u0645\u0627 \u0644\u0636\u0645\u0627\u0646 \u062a\u062e\u0635\u064a\u0635 \u0641\u0631\u064a\u0642 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0646\u0627\u0633\u0628 \u0644\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u062a\u0637\u0644\u0628 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/li>\n\n\n<li><strong>\u062a\u062f\u0627\u062e\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a.<\/strong> \u062a\u062a\u0636\u0645\u0646 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u064a Primavera \u0645\u0639\u0627\u0645\u0644\u064b\u0627 \u0644\u0644\u062a\u062f\u0627\u062e\u0644. \u0637\u0627\u0628\u0642\u0647 \u0645\u0639 \u062a\u0648\u0642\u064a\u062a \u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a SkyPlanner\u060c \u0648\u0625\u0644\u0627 \u0641\u0633\u064a\u064f\u062f\u0631\u062c \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u062a\u0631\u0627\u062a \u0627\u0646\u062a\u0638\u0627\u0631 \u0623\u0637\u0648\u0644 \u0645\u0645\u0627 \u064a\u062d\u062f\u062b \u0641\u0639\u0644\u064a\u064b\u0627 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639.<\/li>\n\n\n<li><strong>\u062a\u062d\u062f\u064a\u062f \u0646\u0638\u0627\u0645 ERP \u0645\u0646 Cegid.<\/strong> \u062a\u0633\u062a\u062e\u062f\u0645 PMI \u0648Primavera \u0648Ekon \u0648\u0627\u062c\u0647\u0627\u062a \u0645\u062e\u062a\u0644\u0641\u0629. \u062a\u062d\u0642\u0651\u0642 \u0623\u0648\u0644\u064b\u0627 \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0625\u0635\u062f\u0627\u0631\u0647\u060c \u0648\u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Cegid XRP Flex \u0627\u0633\u062a\u062e\u062f\u0645 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/acumatica\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Acumatica<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Cegid \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c<\/strong> \u0636\u0645\u0646 \u0646\u0637\u0627\u0642 \u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a Cegid API \u0627\u0644\u0645\u062a\u0641\u0642 \u0639\u0644\u064a\u0647\u0627. \u062a\u062e\u062a\u0644\u0641 \u0637\u0631\u064a\u0642\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 Cegid \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0648\u0647\u0646\u0627 \u062a\u064f\u0648\u0638\u0651\u064e\u0641 \u0627\u0644\u062e\u0628\u0631\u0629 \u0628\u0647\u0630\u0647 \u0627\u0644\u0627\u062e\u062a\u0644\u0627\u0641\u0627\u062a.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 Cegid \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629.<\/strong> \u0641\u0647\u0648 \u064a\u0639\u0631\u0641 \u0625\u0639\u062f\u0627\u062f\u0627\u062a\u0643 \u0648\u062a\u062e\u0635\u064a\u0635\u0627\u062a\u0643 \u0648\u062a\u0631\u0627\u062e\u064a\u0635\u0643\u060c \u0648\u064a\u0645\u0643\u0646\u0647 \u0625\u0639\u062f\u0627\u062f \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 API \u0628\u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0645\u0639 \u0641\u0631\u064a\u0642 SkyPlanner.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u062a\u0648\u0633\u064a\u0639 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0648\u0631\u0645\u0632 API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621\u060c \u0648\u064a\u0642\u062f\u0651\u0645 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u0645\u0633\u0627\u0639\u062f\u0629 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629. \u062a\u062c\u062f \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644 \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u0648\u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0645\u0639 \u0628\u0627\u0642\u062a\u0643\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 Cegid \u0636\u0645\u0646 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/\">\u0635\u0641\u062d\u0629 Cegid<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0645\u0631\u0643\u0632 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0623\u0646\u0638\u0645\u0629 ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u063a\u0631\u0641 \u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Fredman Operations\u060c \u0628\u062c\u0648\u0627\u0631 \u062e\u0644\u064a\u0629 \u0631\u0648\u0628\u0648\u062a\u064a\u0629 \u0644\u0631\u0635 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u0635\u0627\u062a \u0641\u064a \u0631\u0627\u0648\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 \u0623\u0634\u0647\u0631<\/b><span>\u064a\u0645\u0643\u0646 \u0644\u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0627\u0644\u0627\u0637\u0651\u0644\u0627\u0639 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u062e\u0644\u0627\u0644\u0647\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0648\u0641\u0651\u0631 SkyPlanner \u0623\u0633\u0627\u0633\u064b\u0627 \u0645\u0648\u062b\u0648\u0642\u064b\u0627 \u0644\u062c\u0645\u064a\u0639 \u0623\u0639\u0645\u0627\u0644 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Fredman Operations \u00b7 \u0623\u0648\u0631\u0627\u0642 \u062a\u063a\u0644\u064a\u0641 \u0622\u0645\u0646\u0629 \u0644\u0645\u0644\u0627\u0645\u0633\u0629 \u0627\u0644\u0623\u063a\u0630\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0633\u062a\u0637\u064a\u0639 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0627\u0644\u0627\u0637\u0651\u0644\u0627\u0639 \u0639\u0644\u0649 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0644\u0623\u0634\u0647\u0631 \u0627\u0644\u0633\u062a\u0629 \u0627\u0644\u0645\u0642\u0628\u0644\u0629\u060c \u0648\u0623\u0635\u0628\u062d \u0627\u0644\u0631\u062f\u0651 \u0639\u0644\u0649 \u0637\u0644\u0628\u0627\u062a \u062a\u0639\u062f\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644 \u064a\u0633\u062a\u063a\u0631\u0642 \u062b\u0648\u0627\u0646\u064d \u0628\u0639\u062f\u0645\u0627 \u0643\u0627\u0646 \u064a\u0633\u062a\u063a\u0631\u0642 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0623\u0643\u062b\u0631.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/fredman-operations\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646\u0630 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0645\u0646\u062d\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u064a\u062c\u0639\u0644 \u0646\u062a\u0627\u0626\u062c \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0648\u0642\u0651\u0639.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0645\u0627\u0644\u064a COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0643\u064a\u0645\u064a\u0627\u0626\u064a\u0629 \u0648\u0627\u0644\u063a\u0630\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 100% \u0637\u0648\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner\u060c \u0645\u0646\u0630 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/opes-corporation\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 Cegid PMI \u0648\u0627\u062c\u0647\u0629 API\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u0648\u0641\u0651\u0631 Cegid \u0648\u0627\u062c\u0647\u0629 Web API \u0644\u0646\u0638\u0627\u0645 PMI \u0644\u062a\u0628\u0627\u062f\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u0623\u0645\u0627\u0646 \u0645\u0639 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629\u060c \u0645\u0639 \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u0639\u0645\u0644 \u0641\u064a Manufacturing PMI. \u0648\u064a\u0633\u062a\u062e\u062f\u0645\u0647\u0627 SkyPlanner \u0644\u0642\u0631\u0627\u0621\u0629 OF \u0648\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0633\u062c\u0644\u0627\u062a pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 Cegid Primavera \u0648\u0627\u062c\u0647\u0629 API \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0648\u0627\u062c\u0647\u0629 PRIMAVERA V10 API \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0641\u064a \u062c\u0645\u064a\u0639 \u0627\u0644\u0648\u062d\u062f\u0627\u062a. \u0648\u062a\u062a\u064a\u062d \u0648\u062d\u062f\u0629 Produ\u00e7\u00e3o \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 ordens de fabrico \u0648Planeamento \u0645\u0639 ActualizaPlaneamentoOperacao \u0648Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u064f\u0646\u0642\u064e\u0644 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 Cegid\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0641\u064a PMI\u060c \u062a\u064f\u0643\u062a\u0628 \u0639\u0628\u0631 Web API \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0636\u0645\u0646 OF. \u0648\u0641\u064a Primavera\u060c \u062a\u064f\u0643\u062a\u0628 \u0639\u0628\u0631 IGprBSPlaneamento.ActualizaPlaneamentoOperacao\u060c \u0627\u0644\u062a\u064a \u062a\u062d\u062f\u0651\u062f \u0627\u0644\u0628\u062f\u0627\u064a\u0629 \u0648\u0627\u0644\u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0645\u062e\u0637\u0637\u062a\u064a\u0646 \u0644\u0639\u0645\u0644\u064a\u0629 ordem de fabrico.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 Cegid \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0633\u062a\u0639\u0644\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0646 Cegid \u062f\u0648\u0631\u064a\u064b\u0627 \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u0644\u0643\u0644 \u0645\u0635\u0646\u0639. \u0648\u062a\u0631\u0633\u0644 webhooks \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627\u060c \u0641\u062a\u0635\u0644 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0644\u0649 Cegid \u0645\u0628\u0627\u0634\u0631\u0629\u064b \u0628\u0639\u062f \u0643\u0644 \u0625\u0639\u0627\u062f\u0629 \u062a\u062e\u0637\u064a\u0637.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0646\u0628\u063a\u064a \u0644\u0634\u0631\u064a\u0643 Cegid \u0627\u0642\u062a\u0631\u0627\u062d \u0623\u062f\u0627\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0641\u064a Cegid \u0623\u0645 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner\u060c \u0639\u0646\u062f\u0645\u0627 \u062a\u062a\u062c\u0627\u0648\u0632 \u0642\u064a\u0648\u062f \u0627\u0644\u0639\u0645\u064a\u0644 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646. \u0648\u062a\u0648\u0635\u064a Cegid \u0646\u0641\u0633\u0647\u0627 \u0628\u0631\u0628\u0637 \u0623\u062f\u0648\u0627\u062a \u062a\u062e\u0637\u064a\u0637 \u0645\u062a\u0642\u062f\u0645\u0629 \u0644\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0642\u064a\u0648\u062f \u0625\u0636\u0627\u0641\u064a\u0629 (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). \u064a\u062e\u0637\u0651\u0637 SkyPlanner \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0648\u064a\u062a\u064a\u062d \u0639\u062f\u062f\u064b\u0627 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f \u0645\u0646 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0628\u0633\u0639\u0631 \u064a\u0628\u062f\u0623 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0645\u0639 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 Cegid \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel\u060c \u0648\u0644\u0627 \u062a\u062a\u0637\u0644\u0628 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a> \u0644\u062a\u062d\u062f\u064a\u062f \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ Cegid \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 \u0623\u0646\u0638\u0645\u0629 Cegid \u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u0635\u0646\u0627\u0639\u064a\u0629 \u0628\u0640SkyPlanner APS\u060c \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 Cegid PMI \u062b\u0645 Cegid Primavera \u0648Cegid Ekon. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Cegid \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a Cegid \u0646\u0641\u0633\u0647\u0627: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u062c\u0647\u0627\u062a &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106397,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107354","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0640 Cegid: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u0627\u0631\u0628\u0637 Cegid PMI \u0648Cegid Primavera \u0628\u0640SkyPlanner APS: PMI Web API \u0648PRIMAVERA V10 API\u060c \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Planeamento\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0640 Cegid: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ Cegid \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Cegid \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 \u0623\u0646\u0638\u0645\u0629 Cegid \u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u0635\u0646\u0627\u0639\u064a\u0629 \u0628\u0640SkyPlanner APS\u060c \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 Cegid PMI \u062b\u0645 Cegid Primavera \u0648Cegid Ekon. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Cegid \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a Cegid \u0646\u0641\u0633\u0647\u0627: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u062c\u0647\u0627\u062a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=107354"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107354\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106397"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=107354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}