{"id":107180,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Visma Nova<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS <span class=\"hl\">\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u062a\u064f\u0633\u062a\u0648\u0631\u062f \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a (nimike) \u0645\u0639 \u0647\u064a\u0627\u0643\u0644\u0647\u0627 (tuoterakenne) \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 (ty\u00f6vaiheet)\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0646\u062c\u0632 \u0648\u0627\u0644\u062f\u0641\u0639\u0627\u062a \u0648\u0645\u0644\u0635\u0642\u0627\u062a \u0627\u0644\u0637\u0628\u0627\u0644\u064a \u0648\u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0625\u0644\u0649 Nova \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n\n<li>\u062a\u064f\u0631\u062d\u0651\u0644 \u0623\u0648\u0642\u0627\u062a \u0628\u062f\u0621 \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0648\u0627\u0646\u062a\u0647\u0627\u0626\u0647\u0627 \u0625\u0644\u0649 Nova \u0643\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0644\u0644\u0645\u0631\u0627\u062d\u0644 (vaihekuittaus).<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u0622\u0644\u064a\u0627\u062a webhooks \u0641\u064a SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0633\u0628\u0642 \u062f\u0645\u062c SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0645\u0634\u0627\u0631\u064a\u0639 \u0644\u0639\u0645\u0644\u0627\u0621\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 \u0634\u0631\u0643\u062a\u0627 Piristeel \u0648Opes Corporation \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u0646\u0627\u0633\u0628 \u0625\u0639\u062f\u0627\u062f\u0627\u062a Nova \u0644\u062f\u064a\u0643\u0645 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0627\u0644\u0645\u0637\u0648\u0631\u064a\u0646 \u0623\u064a\u0636\u064b\u0627 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-nova-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a Visma Nova<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0648\u0636\u062d Visma \u0623\u0646 Nova \u064a\u0648\u0641\u0631 \u0648\u0627\u062c\u0647\u0627\u062a \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0639\u0628\u0631 \u0627\u0644\u0645\u0644\u0641\u0627\u062a \u0639\u0644\u0649 \u062f\u0641\u0639\u0627\u062a \u0648\u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a (<a href=\"https:\/\/www.novaerp.fi\/integraatiot\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u0648\u064a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SkyPlanner \u0643\u0644\u064a\u0647\u0645\u0627.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nova WebService (Nova SDK).<\/strong> \u062e\u062f\u0645\u0629 SOAP \u062a\u062a\u0636\u0645\u0646 \u0627\u0644\u0637\u0631\u064a\u0642\u062a\u064a\u0646 <code>Execute<\/code> \u0648<code>Execute2<\/code>\u060c \u0648\u062a\u064f\u062b\u0628\u0651\u064e\u062a \u0639\u0644\u0649 \u062e\u0627\u062f\u0645 Windows \u0627\u0644\u062e\u0627\u0635 \u0628\u0643\u0645 \u0645\u0639 IIS. \u062a\u062a\u0635\u0644 \u0628\u0642\u0627\u0639\u062f\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0634\u0631\u0643\u0629 \u0648\u0627\u062d\u062f\u0629 \u0641\u064a Nova\u060c \u0648\u062a\u0646\u0642\u0644 \u0631\u0633\u0627\u0626\u0644 XML \u0644\u0644\u0642\u0631\u0627\u0621\u0629 \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/848784-visma-nova-webservice-installation-and-user-manual\">\u0627\u0644\u062f\u0644\u064a\u0644<\/a>).<\/li>\n\n\n<li><strong>\u0646\u0642\u0644 \u0627\u0644\u0645\u0644\u0641\u0627\u062a \u0622\u0644\u064a\u064b\u0627.<\/strong> \u062a\u0642\u0631\u0623 \u0648\u0638\u064a\u0641\u062a\u0627 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062a\u0635\u062f\u064a\u0631\u0647\u0627 \u0641\u064a Nova \u200f(Tiedon tuonti\u060c Tiedon vienti) \u0645\u0644\u0641\u0627\u062a UTF-8 \u0645\u0641\u0635\u0648\u0644\u0629 \u0628\u0641\u0648\u0627\u0635\u0644 \u0645\u0646\u0642\u0648\u0637\u0629 \u0645\u0646 \u0645\u062c\u0644\u062f\u060c \u0648\u062a\u0643\u062a\u0628\u0627\u0646 \u0641\u064a\u0647 \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 \u0632\u0645\u0646\u064a (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832785-siirtotiedostojen-muoto\">\u062a\u0646\u0633\u064a\u0642 \u0627\u0644\u0645\u0644\u0641\u0627\u062a<\/a>\u060c <a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/833045-automatisoitu-tiedonsiirto-tiedon-tuonti\">\u0627\u0644\u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0622\u0644\u064a<\/a>\u060c <a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/833046-automatisoitu-tiedonsiirto-tiedon-vienti\">\u0627\u0644\u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0622\u0644\u064a<\/a>).<\/li>\n\n\n<li><strong>\u0623\u0646\u0648\u0627\u0639 \u0627\u0644\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0645\u0647\u0645\u0629 \u0644\u0644\u062c\u062f\u0648\u0644\u0629.<\/strong> PRODUCT\u060c \u0628\u0645\u0627 \u064a\u0634\u0645\u0644 \u0633\u0637\u0648\u0631 \u0647\u064a\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0633\u0637\u0648\u0631 \u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644. \u0648\u0643\u0630\u0644\u0643 SALES ORDER \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648PHASE STAMP \u0644\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832818-vaihekuittauksien-yleiskuvaus\">\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>\u064a\u0639\u0645\u0644 Nova \u0639\u0644\u0649 Windows \u062f\u0627\u062e\u0644 \u0645\u0646\u0634\u0623\u062a\u0643\u0645 \u0623\u0648 \u0636\u0645\u0646 \u062e\u062f\u0645\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0636\u0627\u0641\u0629 \u0644\u062f\u0649 Visma. \u0648\u0641\u064a \u0627\u0644\u062d\u0627\u0644\u062a\u064a\u0646\u060c \u064a\u0628\u0642\u0649 SkyPlanner \u0641\u064a \u0627\u0644\u0633\u062d\u0627\u0628\u0629 \u0648\u0644\u0627 \u064a\u064f\u062b\u0628\u0651\u064e\u062a \u0623\u064a \u0634\u064a\u0621 \u0641\u064a \u0628\u0631\u0646\u0627\u0645\u062c Nova \u0644\u062f\u0649 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nova WebService.<\/strong> \u064a\u064f\u0646\u0634\u0623 \u0645\u0641\u062a\u0627\u062d \u0641\u0631\u064a\u062f \u0639\u0646\u062f \u062a\u062b\u0628\u064a\u062a WebService\u060c \u0648\u064a\u064f\u0631\u0633\u0644 \u0636\u0645\u0646 \u062c\u0632\u0621 Login \u0645\u0646 \u0643\u0644 \u0631\u0633\u0627\u0644\u0629 XML. \u064a\u062d\u062a\u0627\u062c \u0627\u0644\u062e\u0627\u062f\u0645 \u0625\u0644\u0649 \u0639\u0646\u0648\u0627\u0646 \u0639\u0627\u0645\u060c \u0648\u064a\u062c\u0628 \u0627\u0644\u0627\u062a\u0641\u0627\u0642 \u0645\u0639 \u0645\u0646\u0641\u0651\u0630 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0639\u0644\u0649 \u0642\u0648\u0627\u0639\u062f \u062c\u062f\u0627\u0631 \u0627\u0644\u062d\u0645\u0627\u064a\u0629 (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/848784-visma-nova-webservice-installation-and-user-manual\">\u0627\u0644\u062f\u0644\u064a\u0644<\/a>).<\/li>\n\n\n<li><strong>\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644.<\/strong> \u062a\u064f\u0639\u0627\u0644\u064e\u062c \u0647\u0630\u0647 \u0627\u0644\u0645\u0644\u0641\u0627\u062a \u062f\u0627\u062e\u0644 \u0628\u064a\u0626\u0629 Nova \u0644\u062f\u064a\u0643\u0645. \u0648\u062a\u064f\u0636\u0628\u0637 \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u064a\u0647\u0627 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0645\u062c\u0644\u062f \u0627\u0644\u0646\u0642\u0644.<\/li>\n\n<\/ul>\n\n\n<p>\u0645\u0646 \u062c\u0627\u0646\u0628 SkyPlanner\u060c \u062a\u062a\u0645 \u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0641\u064a REST API \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0631\u0645\u0632 API \u064a\u064f\u0631\u0633\u0644 \u0641\u064a \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code>. \u064a\u0645\u0643\u0646\u0643\u0645 \u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u0631\u0645\u0632 \u0636\u0645\u0646 Settings &gt; API. \u0648\u064a\u0634\u0631\u062d <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u064a<\/a> \u0643\u064a\u0641\u064a\u0629 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u0623\u0648\u0644\u0649.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0631\u0635\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0644\u0627 \u062a\u062a\u0636\u0645\u0646 \u0648\u062b\u0627\u0626\u0642 Nova \u0623\u064a webhooks. \u0648\u062a\u064f\u0631\u0635\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0628\u0637\u0631\u064a\u0642\u062a\u064a\u0646:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0645\u062c\u062f\u0648\u0644.<\/strong> \u064a\u0645\u0643\u0646 \u0644\u0644\u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0622\u0644\u064a \u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u062d\u064f\u062f\u0651\u062b\u062a \u0645\u0646\u0630 \u0622\u062e\u0631 \u062a\u0634\u063a\u064a\u0644 \u0641\u0642\u0637\u060c \u0645\u0639 \u062a\u0635\u0641\u064a\u062a\u0647\u0627 \u062d\u0633\u0628 \u0627\u0644\u062a\u0627\u0631\u064a\u062e \u0623\u0648 \u0627\u0644\u0631\u0642\u0645 \u0623\u0648 \u0627\u0644\u0646\u0648\u0639 \u0623\u0648 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li><strong>\u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0639\u0628\u0631 WebService.<\/strong> \u064a\u0642\u0631\u0623 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0639\u0644\u0649 \u0641\u062a\u0631\u0627\u062a \u0642\u0635\u064a\u0631\u0629.<\/li>\n\n<\/ul>\n\n\n<p>\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062d\u0627\u0644\u0629 \u0623\u0648 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0644\u0630\u0627 \u062a\u064f\u0639\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 Nova \u0627\u0633\u062a\u062c\u0627\u0628\u0629\u064b \u0644\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u062a\u0635\u0644 \u0625\u0644\u064a\u0647 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 Visma Nova (\u0627\u0644\u0648\u0627\u062c\u0647\u0629)<\/th><th>\u0643\u0627\u0626\u0646 SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u0646\u0642\u0644<\/th><\/tr><\/thead><tbody><tr><td>Nimike (\u0645\u0644\u0641 PRODUCT\u060c WebService)<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0633\u0637\u0648\u0631 Tuoterakenne (\u0633\u0637\u0648\u0631 \u0627\u0644\u0647\u064a\u0643\u0644 \u0641\u064a PRODUCT)<\/td><td>\u0647\u064a\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0633\u0637\u0648\u0631 Ty\u00f6vaiheet: \u0645\u062c\u0645\u0648\u0639\u0629 \u0627\u0644\u0622\u0644\u0627\u062a\u060c \u0648\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 (\u0633\u0637\u0648\u0631 \u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a PRODUCT)<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0645\u0639 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0648\u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a\u0647\u0627<\/td><td>\u062a\u064f\u0639\u062f\u0651 \u0641\u064a SkyPlanner \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0628\u064a\u0627\u0646\u0627\u062a Nova<\/td><td>\u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 (SALES ORDER\u060c WebService)<\/td><td>\u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0648\u0623\u0648\u0644\u0648\u064a\u0629 \u0627\u0644\u0639\u0645\u064a\u0644<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>\u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>Nova \u2192 SkyPlanner<\/td><td>\u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0627\u0644\u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0646\u062c\u0632\u0629\u060c \u0648\u0627\u0644\u062f\u0641\u0639\u0629\u060c \u0648\u0645\u0644\u0635\u0642 \u0627\u0644\u0637\u0628\u0644\u064a\u0629\u060c \u0648\u062d\u0631\u0643\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0625\u0646\u062c\u0627\u0632 \u0641\u064a Mobile Confirmations<\/td><td>SkyPlanner \u2192 Nova<\/td><td>\u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a<\/td><\/tr><tr><td>\u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0645\u0631\u062d\u0644\u0629: \u0631\u0642\u0645 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0627\u0644\u0645\u0631\u062d\u0644\u0629\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u0628\u062f\u0621\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621\u060c \u0648\u0627\u0644\u0634\u062e\u0635 (PHASE STAMP)<\/td><td>\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629<\/td><td>SkyPlanner \u2192 Nova<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0625\u0646\u062c\u0627\u0632<\/td><\/tr><tr><td>\u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a SkyPlanner<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u0645\u0648\u062d \u0628\u0647\u0627\u060c \u0648\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646\u060c \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0639\u062f\u0651 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u0627\u0642\u0631\u0624\u0648\u0627 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0645\u0639 \u0647\u064a\u0627\u0643\u0644\u0647\u0627 \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644. \u0623\u0646\u0634\u0626\u0648\u0627 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0627\u062d\u062f\u0629 \u0641\u064a SkyPlanner \u0644\u0643\u0644 \u0622\u0644\u0629\u060c \u0648\u0627\u062c\u0645\u0639\u0648\u0647\u0627 \u0628\u062d\u0633\u0628 \u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0627\u0644\u0622\u0644\u0627\u062a \u0641\u064a Nova. \u0627\u0631\u0628\u0637\u0648\u0627 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0644\u0643\u0644 \u0645\u0631\u062d\u0644\u0629 \u0628\u062e\u0637\u0648\u0629 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0645\u0642\u0627\u0628\u0644\u0629.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.<\/strong> \u0627\u0633\u062a\u0648\u0631\u062f\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645\u0647\u0627. \u064a\u062a\u062d\u0648\u0644 \u0643\u0644 \u0633\u0637\u0631 \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0625\u0644\u0649 \u0637\u0644\u0628\u060c \u0648\u062a\u062a\u062d\u0648\u0644 \u0645\u0631\u0627\u062d\u0644 \u0639\u0645\u0644 \u0645\u0646\u062a\u062c\u0647 \u0625\u0644\u0649 \u0645\u0647\u0627\u0645. \u0648\u0627\u0633\u062a\u0648\u0631\u062f\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0623\u064a\u0636\u064b\u0627\u060c \u0644\u0643\u064a \u062a\u0646\u062a\u0638\u0631 \u0627\u0644\u0645\u0631\u062d\u0644\u0629 \u0645\u0648\u0639\u062f \u062a\u0633\u0644\u064a\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0647\u0627.<\/p>\n\n\n<p><strong>3. \u0627\u0644\u062c\u062f\u0648\u0644\u0629.<\/strong> \u064a\u062d\u0633\u0651\u0646 Arcturus \u0627\u0644\u062e\u0637\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627 \u0641\u064a \u062b\u0648\u0627\u0646\u064d. \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0637\u0644\u0628 \u0623\u0648 \u0643\u0645\u064a\u0629 \u0623\u0648 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0645\u062e\u0632\u0648\u0646.<\/p>\n\n\n<p><strong>4. \u0625\u0639\u0627\u062f\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 Nova.<\/strong> \u064a\u0624\u0643\u062f \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0625\u0646\u062c\u0627\u0632 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Mobile Confirmations \u0623\u0648 Production Timer. \u0648\u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0648\u0627\u0644\u062f\u0641\u0639\u0627\u062a \u0648\u0645\u0644\u0635\u0642\u0627\u062a \u0627\u0644\u0637\u0628\u0627\u0644\u064a \u0625\u0644\u0649 Nova \u0643\u062d\u0631\u0643\u0627\u062a \u0645\u062e\u0632\u0648\u0646 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0645\u0639\u0627\u0644\u062c\u062a\u0647\u0627 \u0639\u0644\u0649 \u062f\u0641\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u0641\u064a \u0627\u0644\u064a\u0648\u0645 \u0627\u0644\u062a\u0627\u0644\u064a. \u0648\u062a\u064f\u0631\u062d\u0651\u0644 \u0623\u0648\u0642\u0627\u062a \u0628\u062f\u0621 \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0648\u0627\u0646\u062a\u0647\u0627\u0626\u0647\u0627 \u0643\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0644\u0644\u0645\u0631\u0627\u062d\u0644 \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0647\u0627 \u0641\u064a \u062d\u0633\u0627\u0628 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0628\u0639\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c (J\u00e4lkilaskenta).<\/p>\n\n\n<p><strong>5. \u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/strong> \u0648\u062b\u0651\u0642\u0648\u0627 \u0647\u0630\u0647 \u0627\u0644\u0642\u0648\u0627\u0639\u062f \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0647\u064a\u0627\u0643\u0644 \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0648\u0627\u0644\u0634\u0631\u0627\u0621<\/td><td>Visma Nova<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0648\u0627\u062e\u062a\u064a\u0627\u0631 \u0627\u0644\u0622\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u0645\u0648\u062d \u0628\u0647\u0627\u060c \u0648\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646\u060c \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u062a\u0627\u0645\u0629 \u0627\u0644\u0635\u0646\u0639<\/td><td>Visma Nova\u060c \u0645\u0639 \u062a\u0631\u062d\u064a\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0625\u0646\u062c\u0627\u0632 \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0627\u0644\u0645\u0635\u062f\u0631 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0644\u0644\u062a\u0639\u0627\u0631\u0636 \u0647\u0648 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u064a \u0627\u0644\u0646\u0638\u0627\u0645\u064a\u0646 \u0645\u0639\u064b\u0627. \u0623\u0628\u0642\u0648\u0627 \u0642\u0627\u0626\u0645\u0629 \u0627\u0646\u062a\u0638\u0627\u0631 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a Nova \u0644\u0625\u062f\u0627\u0631\u0629 \u062a\u062f\u0641\u0642 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0648\u062d\u062c\u0632 \u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u0627\u062a\u0631\u0643\u0648\u0627 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0644\u0640 SkyPlanner. \u0648\u0631\u062d\u0651\u0644\u0648\u0627 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0646 \u0645\u0643\u0627\u0646 \u0648\u0627\u062d\u062f \u0641\u0642\u0637\u060c \u0625\u0645\u0627 SkyPlanner \u0623\u0648 Ty\u00f6piste\u060c \u062d\u062a\u0649 \u0644\u0627 \u064a\u064f\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0645\u0631\u062a\u064a\u0646.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629 \u0644\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u064a\u0645\u0643\u0646\u0643\u0645 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0639 \u0628\u064a\u0627\u0646\u0627\u062a\u0643\u0645 \u0627\u0644\u062e\u0627\u0635\u0629\u060c \u0628\u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0645\u0646 Nova.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642.<\/strong> \u0627\u0639\u062a\u0645\u062f\u0648\u0627 \u062c\u062f\u0648\u0644 \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u062a\u0647\u0627 \u0648\u0627\u0644\u0641\u0627\u0635\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0644\u0644\u0645\u0632\u0627\u0645\u0646\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0627\u062c\u0647\u0627\u062a.<\/strong> \u062b\u0628\u0651\u062a\u0648\u0627 Nova WebService \u0639\u0644\u0649 \u062e\u0627\u062f\u0645\u0643\u0645\u060c \u0623\u0648 \u0623\u0639\u062f\u0651\u0648\u0627 \u0645\u062c\u0644\u062f\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a. \u064a\u064f\u0648\u0635\u0649 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0628\u064a\u0626\u0629 \u0627\u062e\u062a\u0628\u0627\u0631.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0647\u064a\u0627\u0643\u0644 \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646.<\/strong> \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0628\u064a\u0639 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u0645\u0648\u062d \u0628\u0647\u0627 \u0648\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 Nova.<\/strong> \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644\u060c \u0645\u0639 \u0627\u062e\u062a\u0628\u0627\u0631\u0647\u0627 \u0641\u064a \u0628\u064a\u0626\u0629 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0645\u062a\u0648\u0627\u0632\u064a \u0648\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0642\u0627\u0631\u0646\u0648\u0627 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0628\u0642\u0627\u0626\u0645\u0629 \u0627\u0646\u062a\u0638\u0627\u0631 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0648\u0635\u062d\u0651\u062d\u0648\u0627 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629\u060c \u062b\u0645 \u0641\u0639\u0651\u0644\u0648\u0627 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 Nova \u0641\u064a \u0628\u064a\u0626\u0629 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-visma-nova-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u062c\u0628 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Visma Nova<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u062e\u0627\u062f\u0645.<\/strong> \u062a\u0639\u0645\u0644 WebService \u0639\u0644\u0649 \u062e\u0627\u062f\u0645 IIS \u0627\u0644\u062e\u0627\u0635 \u0628\u0643\u0645 \u0628\u0639\u0646\u0648\u0627\u0646 \u0639\u0627\u0645. \u0627\u062a\u0641\u0642\u0648\u0627 \u0639\u0644\u0649 \u0642\u0648\u0627\u0639\u062f \u062c\u062f\u0627\u0631 \u0627\u0644\u062d\u0645\u0627\u064a\u0629 \u0645\u0628\u0643\u0631\u064b\u0627.<\/li>\n\n\n<li><strong>\u0645\u0633\u062a\u0648\u064a\u0627\u062a \u0647\u064a\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c.<\/strong> \u064a\u0639\u0627\u0644\u062c Nova \u0627\u0644\u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0623\u0648\u0644 \u0645\u0646 \u0627\u0644\u0647\u064a\u0643\u0644 \u0627\u0641\u062a\u0631\u0627\u0636\u064a\u064b\u0627 (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832872-tuoterakenne\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u062d\u062f\u062f\u0648\u0627 \u0643\u064a\u0641\u064a\u0629 \u0646\u0642\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0646\u0635\u0641 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u0629 \u0625\u0644\u0649 SkyPlanner \u0643\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u0631\u0639\u064a\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629.<\/strong> \u064a\u062d\u062a\u0641\u0638 Nova \u0628\u0639\u062f\u062f \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0623\u0633\u0628\u0648\u0639\u064a\u0629 \u0644\u0643\u0644 \u0645\u0648\u0631\u062f (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832996-resurssit\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u0627\u0636\u0628\u0637\u0648\u0627 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner \u0628\u0645\u0627 \u064a\u0639\u0643\u0633 \u0627\u0644\u0648\u0627\u0642\u0639 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n\n<li><strong>\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0627\u0644\u0622\u0644\u0627\u062a.<\/strong> \u064a\u062d\u0633\u0628 Nova \u0627\u0644\u062d\u0645\u0644 \u0644\u0643\u0644 \u0645\u062c\u0645\u0648\u0639\u0629 \u0622\u0644\u0627\u062a. \u0627\u0641\u0635\u0644 \u0643\u0644 \u0645\u062c\u0645\u0648\u0639\u0629 \u0625\u0644\u0649 \u0622\u0644\u0627\u062a \u0645\u0646\u0641\u0631\u062f\u0629 \u0641\u064a SkyPlanner.<\/li>\n\n\n<li><strong>\u0648\u062d\u062f\u0627\u062a \u0642\u064a\u0627\u0633 \u0627\u0644\u0645\u0631\u0627\u062d\u0644.<\/strong> \u064a\u0645\u0643\u0646 \u0627\u0644\u062a\u0639\u0628\u064a\u0631 \u0639\u0646 \u0637\u0627\u0642\u0629 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0644\u0642\u0637\u0639 \u0641\u064a \u0627\u0644\u0633\u0627\u0639\u0629\u060c \u0623\u0648 \u0628\u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0644\u0643\u0644 \u0642\u0637\u0639\u0629\u060c \u0623\u0648 \u0628\u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0644\u0643\u0644 \u0642\u0637\u0639\u0629. \u062d\u0648\u0651\u0644 \u0643\u0644\u064b\u0627 \u0645\u0646\u0647\u0627 \u0625\u0644\u0649 \u0632\u0645\u0646 \u062a\u0634\u063a\u064a\u0644 \u0644\u0643\u0644 \u0642\u0637\u0639\u0629.<\/li>\n\n\n<li><strong>\u0645\u0633\u0627\u0631 \u0648\u0627\u062d\u062f \u0644\u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u062d\u062f\u0651\u062f \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0633\u064a\u0633\u062c\u0651\u0644\u0648\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a SkyPlanner \u0623\u0645 \u0641\u064a Ty\u00f6piste.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-visma-nova-integration-who-configures-and-su\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Visma Nova: \u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f\u0647 \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0634\u0645\u0644 \u0627\u0644\u0639\u0645\u0644 \u0645\u0648\u0627\u0621\u0645\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0645\u0646\u062a\u062c\u0627\u062a\u0643 \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 \u0648\u0625\u0639\u062f\u0627\u062f\u0627\u062a Nova \u0644\u062f\u064a\u0643. \u0648\u064a\u0634\u0645\u0644 \u0623\u064a\u0636\u064b\u0627 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0641\u0638 \u0628\u0647\u0627 \u0641\u064a SkyPlanner: \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u0645\u0648\u062d \u0628\u0647\u0627\u060c \u0648\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0628\u062f\u0621 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u060c \u0648\u064a\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u064a\u0633\u062a\u062e\u062f\u0645 \u0643\u0644 \u0645\u0635\u0646\u0639 Nova \u0628\u0637\u0631\u064a\u0642\u062a\u0647 \u0627\u0644\u062e\u0627\u0635\u0629\u060c \u0648\u062a\u064f\u0648\u0638\u0651\u064e\u0641 \u0627\u0644\u062e\u0628\u0631\u0629 \u0628\u0647\u0630\u0647 \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644 \u0641\u064a \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 Visma \u0644\u062f\u064a\u0643 \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629.<\/strong> \u0642\u062f\u0651\u0645 \u0634\u0631\u0643\u0627\u0621 Visma \u0646\u0638\u0627\u0645 SkyPlanner \u0644\u0639\u0645\u0644\u0627\u0621 Nova\u061b \u0641\u0642\u062f \u0627\u0646\u0636\u0645\u062a Piristeel \u0639\u0628\u0631 \u0645\u0648\u0631\u0651\u062f \u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0647\u0627\u060c Rauhala Group. \u0648\u064a\u0645\u0643\u0646 \u0644\u0644\u0634\u0631\u064a\u0643 \u062a\u0648\u0644\u0651\u064a \u062a\u062b\u0628\u064a\u062a WebService \u0648\u0625\u0639\u062f\u0627\u062f \u0645\u062c\u0644\u062f\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0648\u0628\u064a\u0626\u0629 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631. \u0648\u064a\u0648\u0641\u0651\u0631 SkyPlanner \u0648\u0627\u062c\u0647\u0629 REST API \u0648\u0648\u062b\u0627\u0626\u0642 Swagger\/OpenAPI \u0648webhooks.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u062a\u0637\u0648\u064a\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0646\u0641\u0633\u0647\u0627 \u0648\u0631\u0645\u0632 API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621\u060c \u0648\u064a\u0633\u0627\u0639\u062f \u0641\u0631\u064a\u0642 SkyPlanner \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u0648\u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0628\u0627\u0642\u062a\u0643\u060c \u0644\u062a\u0639\u0631\u0641 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621.<\/p>\n\n\n<p>\u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 \u0645\u0642\u0627\u0631\u0646\u0629 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0641\u064a Nova \u0641\u064a \u0645\u0642\u0627\u0644 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u0647\u0644 \u064a\u062f\u0639\u0645 Visma Nova \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f<\/a> \u062a\u062c\u062f \u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629 \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/\">\u0635\u0641\u062d\u0629 Visma Nova<\/a>\u060c \u0648\u0623\u0646\u0638\u0645\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0645\u0631\u0643\u0632 \u062a\u0643\u0627\u0645\u0644\u0627\u062a ERP<\/a>. \u0647\u0644 \u062a\u0633\u062a\u062e\u062f\u0645 Visma Net \u0628\u062f\u0644\u064b\u0627 \u0645\u0646\u0647\u061f \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-net\/\">\u0635\u0641\u062d\u0629 Visma Net<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u0645\u0646\u0638\u0631 \u062c\u0648\u064a \u0644\u0645\u0635\u0646\u0639 Piristeel \u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0641\u064a \u0643\u0627\u0648\u0647\u0627\u0641\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99.2%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u062a\u0627\u062d \u0644\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0623\u0648\u0636\u062d \u0644\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a\u060c \u0648\u062c\u0639\u0644 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0643\u062b\u0631 \u0648\u0636\u0648\u062d\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Piristeel \u00b7 \u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0648\u0623\u0646\u0638\u0645\u0629 \u062a\u0635\u0631\u064a\u0641 \u0645\u064a\u0627\u0647 \u0627\u0644\u0623\u0645\u0637\u0627\u0631<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 99.2% \u0647\u0630\u0627 \u0627\u0644\u0639\u0627\u0645\u060c \u0648\u062a\u0648\u0641\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 \u0623\u0631\u0628\u0639 \u0633\u0627\u0639\u0627\u062a \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0648\u0645\u064a\u064b\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/piristeel\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646\u0630 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0645\u0646\u062d\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629\u060c \u0648\u064a\u062c\u0639\u0644 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0627\u0628\u0644\u064b\u0627 \u0644\u0644\u062a\u0646\u0628\u0624.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0645\u0627\u0644\u064a (COO\/CFO)<\/b><br>Opes Corporation \u00b7 \u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0643\u064a\u0645\u064a\u0627\u0626\u064a\u0629 \u0648\u0627\u0644\u063a\u0630\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0638\u0644\u0651 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0639\u0646\u062f 100% \u0637\u0648\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner\u060c \u0645\u0646\u0630 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/opes-corporation\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0644\u062f\u0649 UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u064a\u062a\u0645 \u062a\u0648\u0641\u064a\u0631\u0647\u0627 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0643\u0644 \u0623\u0633\u0628\u0648\u0639 \u0633\u0627\u0639\u062a\u064a\u0646 (2) \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 Visma Nova \u0648\u0627\u062c\u0647\u0629 API\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u064a\u0648\u0641\u0651\u0631 Nova \u062e\u062f\u0645\u0629 Nova WebService\u060c \u0648\u0647\u064a \u062e\u062f\u0645\u0629 SOAP \u062a\u064f\u062b\u0628\u0651\u064e\u062a \u0639\u0644\u0649 \u062e\u0627\u062f\u0645\u0643 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0643\u0645\u0627 \u064a\u0648\u0641\u0651\u0631 \u0645\u0644\u0641\u0627\u062a \u0646\u0642\u0644 \u0622\u0644\u064a\u0629 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0639\u0644\u0649 \u062f\u0641\u0639\u0627\u062a. \u0648\u064a\u0646\u0642\u0644 \u0643\u0644\u0627 \u0627\u0644\u062e\u064a\u0627\u0631\u064a\u0646 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0647\u064a\u0627\u0643\u0644\u0647\u0627 \u0648\u0645\u0631\u0627\u062d\u0644 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0623\u0648\u0627\u0645\u0631.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u0639\u064a\u062f\u0647\u0627 SkyPlanner \u0625\u0644\u0649 Visma Nova\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629\u060c \u0648\u0627\u0644\u062f\u0641\u0639\u0627\u062a\u060c \u0648\u0645\u0644\u0635\u0642\u0627\u062a \u0627\u0644\u0645\u0646\u0635\u0627\u062a \u0627\u0644\u0646\u0642\u0627\u0644\u0629\u060c \u0648\u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u062a\u064f\u0633\u062c\u0651\u064e\u0644 \u0623\u0648\u0642\u0627\u062a \u0628\u062f\u0621 \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0648\u0627\u0646\u062a\u0647\u0627\u0626\u0647\u0627 \u0643\u0623\u062e\u062a\u0627\u0645 \u0632\u0645\u0646\u064a\u0629 \u0644\u0644\u0645\u0631\u0627\u062d\u0644 \u0641\u064a Nova\u060c \u0644\u062a\u0633\u062a\u0646\u062f \u062d\u0633\u0627\u0628\u0627\u062a \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0644\u0627\u062d\u0642\u0629 \u0641\u064a Nova \u0625\u0644\u0649 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 Visma Nova \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627 \u062a\u0648\u062c\u062f \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0645\u0648\u062b\u0651\u0642\u0629. \u062a\u064f\u0642\u0631\u0623 \u062a\u063a\u064a\u064a\u0631\u0627\u062a Nova \u0639\u0628\u0631 \u0639\u0645\u0644\u064a\u0627\u062a \u062a\u0635\u062f\u064a\u0631 \u0645\u062c\u062f\u0648\u0644\u0629 \u0644\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0645\u062d\u062f\u0651\u064e\u062b\u0629 \u0648\u0639\u0645\u0644\u064a\u0627\u062a \u0642\u0631\u0627\u0621\u0629 \u0639\u0628\u0631 WebService. \u0623\u0645\u0627 \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640SkyPlanner\u060c \u0641\u062a\u0631\u0633\u0644 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0628\u0631\u0646\u0627\u0645\u062c \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0630\u064a \u064a\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Visma Nova\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner APS \u0645\u0639 Visma Nova \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646\u060c \u0648\u062a\u064f\u062f\u0631\u062c Visma \u0634\u0631\u0643\u0629 Skycode \u0645\u0639 SkyPlanner \u0641\u064a <a href=\"https:\/\/www.novaerp.fi\/integraatiot\">\u0635\u0641\u062d\u0629 \u062a\u0643\u0627\u0645\u0644\u0627\u062a Nova<\/a>. \u0648\u062a\u0633\u062a\u062e\u062f\u0645\u0647 Piristeel \u0648Opes Corporation.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Visma Nova\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0644\u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0625\u0639\u062f\u0627\u062f\u0627\u062a Nova \u0644\u062f\u064a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0628\u062f\u0621 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u060c \u0648\u064a\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u0645\u0643\u0646 \u0623\u064a\u0636\u064b\u0627 \u0644\u0634\u0631\u064a\u0643 Visma \u0644\u062f\u064a\u0643 \u0623\u0648 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u062a\u0637\u0648\u064a\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0645\u0646 SkyPlanner\u060c \u0648\u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0645\u0639 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 Nova \u0628\u0635\u064a\u063a\u0629 Excel \u0623\u0648 CSV\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a> \u0644\u062a\u062d\u062f\u064a\u062f \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Visma Nova \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0633\u0628\u0642 \u062f\u0645\u062c SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0645\u0634\u0627\u0631\u064a\u0639 \u0644\u0639\u0645\u0644\u0627\u0621\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 \u0634\u0631\u0643\u062a\u0627 Piristeel \u0648Opes Corporation \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644. &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106310,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107180","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u062f\u0642\u064a\u0642\u0629\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Visma Nova: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0636\u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/visma-nova\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"1 \u062f\u0642\u064a\u0642\u0629"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS \u0639\u0628\u0631 Nova WebService \u0648\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0646\u0642\u0644 \u0627\u0644\u0622\u0644\u064a\u060c \u0648\u0645\u0632\u0627\u0645\u0646\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628\u0627\u062a\u060c \u0648\u0625\u0639\u0627\u062f\u0629 \u062d\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062a\u0633\u062c\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062d\u0644 \u0625\u0644\u0649 Nova.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Visma Nova: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0636\u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/visma-nova\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Visma Nova \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Visma Nova \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Visma Nova \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0633\u0628\u0642 \u062f\u0645\u062c SkyPlanner \u0645\u0639 Visma Nova \u0641\u064a \u0645\u0634\u0627\u0631\u064a\u0639 \u0644\u0639\u0645\u0644\u0627\u0621\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 \u0634\u0631\u0643\u062a\u0627 Piristeel \u0648Opes Corporation \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107180","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=107180"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/107180\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106310"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=107180"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}