{"id":106948,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP <span class=\"hl\">\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0646\u0638\u0627\u0645 SkyPlanner APS\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0633\u0627\u0628\u0642\u0629 QAD Enterprise Edition \u0648MFG\/PRO. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0627\u062a QAD \u0646\u0641\u0633\u0647\u0627:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u062a\u064f\u0646\u0642\u0644 \u0625\u0644\u0649 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0639\u060c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0648\u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 Work Order Maintenance (16.1).<\/li>\n\n\n<li>\u062a\u064f\u0631\u062d\u0651\u0644 \u0633\u062c\u0644\u0627\u062a \u0648\u0642\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0625\u0644\u0649 Labor Feedback by Work Order (16.20.1)\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0625\u0644\u0649 Work Order Receipt (16.11).<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u0622\u0644\u064a\u0627\u062a webhooks \u0641\u064a SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0625\u0639\u062f\u0627\u062f\u0627\u062a QAD \u0644\u062f\u064a\u0643\u0645 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0645\u0648\u062c\u0651\u0647 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0627\u0644\u0645\u0637\u0648\u0631\u064a\u0646 \u0627\u0644\u0631\u0627\u063a\u0628\u064a\u0646 \u0641\u064a \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629 \u0623\u0648 \u062a\u0637\u0648\u064a\u0631 \u062d\u0644\u0648\u0644 \u0628\u0623\u0646\u0641\u0633\u0647\u0645 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0645\u0646 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a QAD<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u064a\u062d QAD \u062b\u0644\u0627\u062b \u0637\u0631\u0642 \u0644\u0631\u0628\u0637 \u0646\u0638\u0627\u0645 \u062e\u0627\u0631\u062c\u064a \u0644\u0644\u062c\u062f\u0648\u0644\u0629:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> \u062a\u0635\u0641\u0647 QAD \u0628\u0623\u0646\u0647 &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (\u0625\u0637\u0627\u0631 XML \u0642\u0627\u0626\u0645 \u0639\u0644\u0649 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0648\u0645\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 SOAP\u060c \u064a\u062a\u064a\u062d \u0627\u0644\u0648\u0635\u0648\u0644 \u0627\u0644\u0643\u0627\u0645\u0644 \u0625\u0644\u0649 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0641\u064a QAD Enterprise Applications \u062f\u0648\u0646 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0645\u0646\u0635\u0629 \u0645\u062d\u062f\u062f\u0629). \u0643\u0644 \u0637\u0644\u0628 \u0647\u0648 <strong>QDoc<\/strong> \u064a\u0634\u063a\u0651\u0644 \u0628\u0631\u0646\u0627\u0645\u062c\u064b\u0627 \u0641\u064a QAD \u0645\u0639 \u062a\u0637\u0628\u064a\u0642 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062a\u062d\u0642\u0642 \u0646\u0641\u0633\u0647\u0627 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0641\u064a \u0634\u0627\u0634\u0629 \u0627\u0644\u0628\u0631\u0646\u0627\u0645\u062c\u060c \u0648\u064a\u064f\u0631\u062c\u0639 \u0643\u0644 \u0637\u0644\u0628 \u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0628\u0635\u064a\u063a\u0629 QDoc. \u062a\u0634\u0645\u0644 \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDoc \u0627\u0644\u0645\u062a\u0627\u062d\u0629 <code>maintainItemMaster<\/code> \u0648<code>maintainRouting<\/code> \u0648<code>maintainPurchaseOrder<\/code>. \u0648\u0644\u0644\u0628\u0631\u0627\u0645\u062c \u0627\u0644\u062a\u064a \u0644\u0627 \u064a\u062a\u0648\u0641\u0631 \u0644\u0647\u0627 QDoc \u062c\u0627\u0647\u0632\u060c \u062a\u064f\u0633\u062a\u062e\u062f\u0645 \u0623\u062f\u0627\u0629 <strong>QGen<\/strong> \u0645\u0646 QAD \u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0631\u0628\u0637 \u0645\u0639 \u0627\u0644\u0628\u0631\u0646\u0627\u0645\u062c \u0627\u0644\u0645\u062a\u0627\u062d \u0645\u0646 \u0627\u0644\u0642\u0627\u0626\u0645\u0629: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (\u062a\u064f\u0633\u062a\u062e\u062f\u0645 QGen \u0644\u0631\u0628\u0637 \u0627\u0644\u0628\u0631\u0627\u0645\u062c \u0627\u0644\u0645\u062e\u0635\u0635\u0629 \u0623\u0648 \u0628\u0631\u0627\u0645\u062c QAD Enterprise Applications \u0627\u0644\u062a\u064a \u0644\u0627 \u062a\u062a\u0648\u0641\u0631 \u0644\u0647\u0627 \u0645\u062e\u0637\u0637\u0627\u062a QDoc \u0648\u0645\u0644\u0641\u0627\u062a \u0623\u062d\u062f\u0627\u062b \u062c\u0627\u0647\u0632\u0629). \u0648\u062a\u0633\u062a\u062e\u062f\u0645 QAD \u0646\u0641\u0633\u0647\u0627 \u0647\u0630\u0647 \u0627\u0644\u0637\u0631\u064a\u0642\u0629: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (\u064a\u0633\u062a\u062e\u062f\u0645 QAD Production Scheduler \u0623\u062f\u0627\u0629 QAD QXtend \u0644\u062a\u062d\u062f\u064a\u062b \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c). (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">\u062f\u0644\u064a\u0644 QXtend<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> \u064a\u0642\u0648\u0645 QXO \u0628\u0645\u0627 \u064a\u0644\u064a: &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (\u064a\u0635\u062f\u0651\u0631 \u0643\u0627\u0626\u0646\u0627\u062a \u0623\u0639\u0645\u0627\u0644 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0647\u064a\u0626\u0629 \u0645\u0646 \u0642\u0650\u0628\u0644 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0645\u0646 \u0645\u0646\u062a\u062c\u0627\u062a QAD \u0628\u0635\u064a\u063a\u0629 XML QDocs). \u0648\u062a\u0634\u0645\u0644 \u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 Item \u0648Product Structure \u0648Routing \u0648Work Center \u0648Department \u0648Inventory Transaction \u0648Inventory Status.<\/li>\n\n\n<li><strong>\u0648\u0627\u062c\u0647\u0627\u062a REST API \u0644\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644.<\/strong> \u0645\u0646\u0630 \u0625\u0635\u062f\u0627\u0631 Adaptive ERP 2022.1\u060c &#8220;Query REST APIs are now available for business documents,&#8221; (\u0623\u0635\u0628\u062d\u062a \u0648\u0627\u062c\u0647\u0627\u062a REST API \u0644\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0645\u062a\u0627\u062d\u0629 \u0644\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644)\u060c \u0645\u0639 \u062f\u0639\u0645 \u0627\u0644\u062a\u0635\u0641\u064a\u0629 \u0648\u0627\u0644\u0641\u0631\u0632 \u0648\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0648\u0627\u0633\u062a\u0631\u062c\u0627\u0639 \u062c\u0632\u0621 \u0645\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a. \u0648\u062a\u0648\u062b\u064a\u0642\u0647\u0627 \u0645\u062a\u0627\u062d \u0641\u064a Swagger \u0639\u0644\u0649 \u0646\u0633\u062e\u0629 \u0627\u0644\u0646\u0638\u0627\u0645 \u0644\u062f\u064a\u0643\u0645 (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">\u0645\u0644\u0627\u062d\u0638\u0627\u062a \u0627\u0644\u0625\u0635\u062f\u0627\u0631<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>\u062a\u064f\u0646\u0641\u0651\u0630 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 QXtend\u060c \u0648\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0639\u0628\u0631 QXO \u0648\u0648\u0627\u062c\u0647\u0627\u062a REST API \u0644\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0648\u0627\u0644\u062a\u0631\u062e\u064a\u0635<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> \u0639\u0646\u062f \u062a\u0641\u0639\u064a\u0644 Require Authentication \u0639\u0644\u0649 \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0650\u0644\u060c \u064a\u062d\u0645\u0644 \u0643\u0644 QDoc \u0642\u064a\u0645\u0629 Session ID \u0623\u0648 \u0627\u0633\u0645 \u0645\u0633\u062a\u062e\u062f\u0645 QAD \u0648\u0643\u0644\u0645\u0629 \u0645\u0631\u0648\u0631\u0647. \u0648\u064a\u062a\u062d\u0642\u0642 QXI \u0645\u0646 \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0644\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0642\u0628\u0644 \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0628\u0631\u0646\u0627\u0645\u062c.<\/li>\n\n\n<li><strong>\u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/strong> \u0623\u0646\u0634\u0626\u0648\u0627 \u0645\u0633\u062a\u062e\u062f\u0645\u064b\u0627 \u0645\u062e\u0635\u0635\u064b\u0627 \u0641\u064a QAD\u060c \u0648\u0627\u0645\u0646\u062d\u0648\u0647 \u0635\u0644\u0627\u062d\u064a\u0629 \u0627\u0644\u0648\u0635\u0648\u0644 \u0641\u0642\u0637 \u0625\u0644\u0649 \u0628\u0631\u0627\u0645\u062c \u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062f\u0639\u064a\u0647\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644: Work Order Maintenance \u0648Labor Feedback by Work Order \u0648Work Order Receipt \u0648\u0628\u0631\u0627\u0645\u062c \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/li>\n\n\n<li><strong>\u062a\u0631\u062e\u064a\u0635 QXtend.<\/strong> \u064a\u064f\u0631\u062e\u0651\u064e\u0635 QXtend \u0628\u062d\u0633\u0628 \u0627\u0644\u0648\u0643\u0644\u0627\u0621 \u0648\u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0650\u0644\u0627\u062a. \u0648\u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 QAD \u0623\u0646 \u062d\u0631\u0643\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0645\u0646 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 \u0648\u0625\u0644\u064a\u0647\u0627 \u0644\u064a\u0633\u062a \u0645\u062c\u0627\u0646\u064a\u0629\u060c \u0644\u0630\u0627 \u062a\u062d\u0642\u0651\u0642\u0648\u0627 \u0645\u0646 \u062a\u0631\u062e\u064a\u0635 QXtend \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u0645\u0634\u0631\u0648\u0639.<\/li>\n\n<\/ul>\n\n\n<p>\u0641\u064a SkyPlanner\u060c \u062a\u0633\u062a\u062e\u062f\u0645 REST API \u0631\u0645\u0632 API \u0644\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0641\u064a \u0627\u0644\u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API)\u060c \u0648\u0647\u064a \u0645\u0648\u062b\u0651\u0642\u0629 \u0641\u064a Swagger\/OpenAPI. \u064a\u0634\u0631\u062d <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0627\u0644\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0639\u0644\u064a\u0645\u064a \u0644\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \u0643\u064a\u0641\u064a\u0629 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u0623\u0648\u0644\u0649 \u062e\u0637\u0648\u0629 \u0628\u062e\u0637\u0648\u0629.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u062a\u063a\u064a\u0651\u0631\u0627\u062a \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0633\u062a\u062e\u062f\u0645 QAD \u0623\u062f\u0627\u0629 QXtend Outbound \u0644\u0631\u0635\u062f \u062a\u063a\u064a\u0651\u0631\u0627\u062a \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0646\u0642\u0644\u0647\u0627. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (\u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062e\u0627\u0636\u0639\u0629 \u0644\u0644\u0645\u0631\u0627\u0642\u0628\u0629 \u0641\u064a QAD Enterprise Applications\u060c \u062a\u064f\u0643\u062a\u0628 \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0642\u0627\u0639\u062f\u0629 \u0628\u064a\u0627\u0646\u0627\u062a qxevents). \u062b\u0645 \u064a\u064f\u0646\u0634\u0626 QXO \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDoc \u0648\u064a\u0631\u0633\u0644\u0647\u0627 &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (\u0625\u0644\u0649 \u0645\u062c\u0644\u062f \u064a\u062a\u062d\u0642\u0642 \u0645\u0646\u0647 \u0627\u0644\u0645\u0634\u062a\u0631\u0650\u0643 \u062f\u0648\u0631\u064a\u064b\u0627 \u0644\u0627\u0633\u062a\u0644\u0627\u0645 \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDoc \u0627\u0644\u062c\u062f\u064a\u062f\u0629)\u060c \u0623\u0648 \u0625\u0644\u0649 \u062e\u062f\u0645\u0629 \u0648\u064a\u0628 \u062a\u0633\u062a\u0642\u0628\u0644 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0639\u0644\u0649 \u0639\u0646\u0648\u0627\u0646 URL.<\/p>\n\n\n<p>\u064a\u0634\u062a\u0631\u0643 SkyPlanner \u0628\u0648\u0635\u0641\u0647 \u062e\u062f\u0645\u0629 \u0648\u064a\u0628 \u0644\u0627\u0633\u062a\u0642\u0628\u0627\u0644 \u0645\u0627 \u064a\u0646\u0634\u0631\u0647 QXO\u060c \u0648\u064a\u0633\u062a\u0639\u0644\u0645 \u062f\u0648\u0631\u064a\u064b\u0627 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a REST API \u0639\u0646 \u0623\u064a \u0628\u064a\u0627\u0646\u0627\u062a \u0644\u0627 \u064a\u063a\u0637\u064a\u0647\u0627 QXO. \u0648\u0644\u0627 \u064a\u064f\u0639\u062f Work Order \u0645\u0646 \u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a QXO\u060c \u0644\u0630\u0627 \u064a\u0636\u064a\u0641 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0625\u0645\u0627 \u0643\u0627\u0626\u0646 \u0623\u0639\u0645\u0627\u0644 \u0641\u064a QXO \u064a\u0633\u062a\u0646\u062f \u0625\u0644\u0649 \u062c\u062f\u0627\u0648\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c (<code>wo_mstr<\/code>\u060c <code>wr_route<\/code>)\u060c \u0623\u0648 \u064a\u0633\u062a\u0639\u0644\u0645 \u0639\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a REST API \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642.<\/p>\n\n\n<p>\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062d\u0627\u0644\u0629 \u0623\u0648 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0644\u0630\u0627 \u062a\u0639\u062a\u0645\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 QAD \u0639\u0644\u0649 \u0627\u0644\u0623\u062d\u062f\u0627\u062b.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 QAD (\u0627\u0644\u0628\u0631\u0646\u0627\u0645\u062c\u060c \u0627\u0644\u0648\u0627\u062c\u0647\u0629)<\/th><th>\u0627\u0644\u0643\u0627\u0626\u0646 \u0641\u064a SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u062a\u062d\u062f\u064a\u062b<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641 (Item Master Maintenance 1.4.1\u061b QXO Item)<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0628\u0631 QXO<\/td><\/tr><tr><td>\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a (13.5\u061b QXO Product Structure)<\/td><td>\u0628\u0646\u064a\u0629 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0644 \u0645\u0646\u062a\u062c<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0628\u0631 QXO<\/td><\/tr><tr><td>\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c (14.13.1\u061b QXO Routing): \u0627\u0644\u0627\u0646\u062a\u0638\u0627\u0631 \u0641\u064a \u0627\u0644\u0637\u0627\u0628\u0648\u0631\u060c \u0648\u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644\u060c \u0648\u0627\u0644\u0627\u0646\u062a\u0638\u0627\u0631\u060c \u0648\u0627\u0644\u0646\u0642\u0644<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0645\u0639 \u0645\u062f\u062f\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0628\u0631 QXO<\/td><\/tr><tr><td>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 (14.5) \u0648\u0627\u0644\u0623\u0642\u0633\u0627\u0645 (14.1\u061b QXO Work Center\u060c Department)<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a\u0647\u0627 \u0648\u0645\u0639\u062f\u0644\u0627\u062a \u0643\u0641\u0627\u0621\u062a\u0647\u0627<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0646\u0627\u062f\u0631\u064b\u0627 \u0628\u0639\u062f \u0630\u0644\u0643<\/td><\/tr><tr><td>\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0639 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644<\/td><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0639\u062f\u0645 \u0627\u0644\u0639\u0645\u0644<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0623\u0648 \u062a\u064f\u062f\u0627\u0631 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0628\u0634\u0643\u0644 \u0645\u0633\u062a\u0642\u0644 \u0641\u064a SkyPlanner<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c (16.1) \u0645\u0639 \u0645\u0633\u0627\u0631\u0627\u062a\u0647\u0627 (16.13.13) \u0648\u0645\u0643\u0648\u0651\u0646\u0627\u062a\u0647\u0627<\/td><td>\u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0643\u0627\u0626\u0646 QXO \u0645\u062e\u0635\u0635 \u0623\u0648 \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0639\u0628\u0631 REST \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>\u0627\u0644\u0645\u062e\u0632\u0648\u0646 (QXO Inventory Status\u060c Inventory Transaction)<\/td><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0623\u0648 \u0643\u0644 \u0633\u0627\u0639\u0629<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u062d\u0633\u0628 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0635\u062f\u0627\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 (Work Order Maintenance 16.1\u060c QXtend Inbound QDoc)<\/td><td>\u0627\u0644\u0628\u062f\u0627\u064a\u0629 \u0648\u0627\u0644\u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0645\u062e\u0637\u0637\u062a\u0627\u0646 \u0644\u0643\u0644 \u0623\u0645\u0631<\/td><td>SkyPlanner \u2192 QAD<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0639\u0628\u0631 webhook \u0645\u0646 SkyPlanner<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): \u0648\u0642\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629<\/td><td>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0648\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/td><td>SkyPlanner \u2192 QAD<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0643\u0644 \u0648\u0631\u062f\u064a\u0629\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629<\/td><td>SkyPlanner \u2192 QAD<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643<\/td><\/tr><tr><td>\u063a\u064a\u0631 \u0645\u0648\u062c\u0648\u062f \u0641\u064a QAD<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0643\u0645\u0648\u0627\u0631\u062f \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u0633\u0639\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0623\u0641\u0631\u0627\u062f \u0627\u0644\u0628\u062f\u0644\u0627\u0621<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0636\u0628\u0637 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u0646\u0645\u0627\u0637 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0639\u0628\u0631 QXO \u0623\u0648 \u0648\u0627\u062c\u0647\u0627\u062a REST API \u0644\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645. \u062d\u062f\u0651\u062f\u0648\u0627 \u0628\u0639\u0646\u0627\u064a\u0629 \u0643\u064a\u0641\u064a\u0629 \u062a\u0645\u062b\u064a\u0644 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644: \u064a\u0645\u0643\u0646 \u062a\u0645\u062b\u064a\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u064a\u0636\u0645 \u0623\u0631\u0628\u0639 \u0622\u0644\u0627\u062a \u0628\u0645\u062c\u0645\u0648\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u0645\u0646 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0628\u0623\u0631\u0628\u0639 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644. \u0648\u064a\u0645\u0643\u0646 \u0623\u064a\u0636\u064b\u0627 \u062a\u0645\u062b\u064a\u0644 \u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a \u0645\u0646 Production Line Maintenance \u0628\u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0627\u0644\u0645\u0624\u0643\u062f\u0629 \u0648\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0635\u0627\u062f\u0631\u0629\u060c \u0645\u0639 \u0645\u0633\u0627\u0631\u0627\u062a\u0647\u0627 \u0648\u0645\u0643\u0648\u0651\u0646\u0627\u062a\u0647\u0627\u060c \u0628\u0627\u0644\u0625\u0636\u0627\u0641\u0629 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u064a\u0639\u062a\u0628\u0631 SkyPlanner \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u062d\u062f\u0651\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 Delivered.<\/p>\n\n\n<p>\u062c\u062f\u0648\u0644\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u0627 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0641\u064a MRP. \u064a\u062c\u0628 \u0623\u0648\u0644\u064b\u0627 \u062a\u062d\u0648\u064a\u0644 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0641\u064a QAD \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0645\u062e\u0637\u0637\u0629 \u0645\u0624\u0643\u062f\u0629 \u0623\u0648 \u0635\u0627\u062f\u0631\u0629.<\/p>\n\n\n<p><strong>3. \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 QAD.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u064a\u0636\u0639 \u0627\u0644\u0645\u062d\u0631\u0643 \u0623\u0645\u0631\u064b\u0627 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0648 \u064a\u063a\u064a\u0651\u0631 \u0645\u0648\u0639\u062f\u0647\u060c \u064a\u064f\u0637\u0644\u0650\u0642 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner \u0637\u0644\u0628 QXtend Inbound QDoc \u0644\u062a\u0634\u063a\u064a\u0644 Work Order Maintenance (16.1). \u0648\u064a\u0636\u0628\u0637 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0648\u0641\u0642\u064b\u0627 \u0644\u0623\u0648\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u062c\u062f\u0648\u0644\u0629\u060c \u0648\u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0648\u0641\u0642\u064b\u0627 \u0644\u0622\u062e\u0631 \u0639\u0645\u0644\u064a\u0629. \u064a\u0634\u063a\u0651\u0644 QXtend \u0627\u0644\u0628\u0631\u0646\u0627\u0645\u062c \u0645\u0639 \u062a\u0637\u0628\u064a\u0642 \u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062a\u062d\u0642\u0642 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640QAD\u060c \u0648\u064a\u064f\u0631\u062c\u0639 \u0627\u0633\u062a\u062c\u0627\u0628\u0629 QDoc \u064a\u062a\u062d\u0642\u0642 \u0645\u0646\u0647\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n\n\n<p>\u064a\u0628\u0642\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0639\u0644\u0649 \u0643\u0644 \u0622\u0644\u0629 \u0641\u064a SkyPlanner\u060c \u0648\u064a\u0635\u0644 \u0625\u0644\u0649 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0639\u0628\u0631 Mobile Confirmations. \u0648\u0628\u0630\u0644\u0643 \u0644\u0627 \u064a\u062a\u0623\u062b\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0642\u0641\u0644 \u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u0637\u0628\u0651\u0642\u0647 QAD \u0639\u0644\u0649 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0635\u0627\u062f\u0631\u0629.<\/p>\n\n\n<p><strong>4. \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639.<\/strong> \u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner Mobile Confirmations \u0623\u0648 Production Timer\u060c \u0648\u062a\u064f\u0628\u0642\u064a \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062d\u062f\u0651\u062b\u064b\u0627. \u0648\u064a\u0645\u0643\u0646\u0643\u0645 \u0627\u062e\u062a\u064a\u0627\u0631 \u062a\u0631\u062d\u064a\u0644 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0625\u0644\u0649 QAD \u0645\u0646 \u0639\u062f\u0645\u0647. \u0639\u0646\u062f \u062a\u0641\u0639\u064a\u0644 \u0627\u0644\u062a\u0631\u062d\u064a\u0644\u060c \u064a\u064f\u0631\u0633\u0644 \u0648\u0642\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0625\u0644\u0649 Labor Feedback by Work Order\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0625\u0644\u0649 Work Order Receipt. \u0648\u0625\u0646 \u0644\u0645 \u064a\u064f\u0641\u0639\u0651\u0644\u060c \u062a\u064f\u062f\u062e\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a QAD \u0643\u0645\u0627 \u0641\u064a \u0627\u0644\u0633\u0627\u0628\u0642.<\/p>\n\n\n<p><strong>5. \u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/strong> \u0648\u062b\u0651\u0642\u0648\u0647\u0627 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a\u060c \u0648\u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>QAD<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621\u060c \u0648\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0635\u062f\u0627\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627<\/td><td>\u064a\u0643\u062a\u0628\u0647\u0627 SkyPlanner \u0648\u064a\u062e\u0632\u0651\u0646\u0647\u0627 QAD<\/td><\/tr><tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0628\u062f\u064a\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0648\u0631\u062f\u064a\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0629<\/td><td>\u0646\u0638\u0627\u0645 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642<\/td><\/tr><tr><td>\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0635\u0631\u0641 \u0627\u0644\u0645\u0643\u0648\u0651\u0646\u0627\u062a\u060c \u0648\u0627\u0644\u0627\u0633\u062a\u0644\u0627\u0645\u0627\u062a<\/td><td>QAD\u060c \u0628\u0625\u062f\u062e\u0627\u0644\u0647\u0627 \u0641\u064a\u0647 \u0645\u0628\u0627\u0634\u0631\u0629 \u0623\u0648 \u0628\u062a\u0631\u062d\u064a\u0644\u0647\u0627 \u0645\u0646 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0627\u062e\u062a\u0627\u0631\u0648\u0627 \u0646\u0638\u0627\u0645\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0644\u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0644\u0627 \u064a\u062d\u062a\u0627\u062c SkyPlanner \u0625\u0644\u0649 \u0648\u062d\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u0645\u0646 QAD\u060c \u0644\u0630\u0627 \u064a\u062d\u0644 \u0645\u062d\u0644 \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0623\u0648 \u0623\u0646\u0638\u0645\u062a\u0647\u0627 \u0627\u0644\u0623\u062e\u0631\u0649 \u0641\u064a \u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u064a \u064a\u062c\u062f\u0648\u0644\u0647\u0627.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629 \u0644\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u062a\u062d\u0642\u0651\u0642\u0648\u0627 \u0645\u0646 \u0635\u062d\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0627\u0644\u0645\u0635\u062f\u0651\u0631\u0629 \u0645\u0646 QAD \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u0627\u0639\u062a\u0645\u062f\u0648\u0627 \u062c\u062f\u0648\u0644 \u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u062a\u0647\u0627\u060c \u0648\u062d\u062f\u0651\u062f\u0648\u0627 \u0627\u0644\u0645\u0648\u0627\u0642\u0639 \u0648\u0627\u0644\u0646\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0645\u0634\u0645\u0648\u0644\u0629\u060c \u0648\u0645\u0639\u062f\u0644\u0627\u062a \u062a\u0643\u0631\u0627\u0631 \u0627\u0644\u0645\u0632\u0627\u0645\u0646\u0629\u060c \u0648\u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0633\u062a\u064f\u0631\u062d\u0651\u0644 \u0625\u0644\u0649 QAD.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 QAD.<\/strong> \u0623\u0646\u0634\u0626\u0648\u0627 \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u060c \u0648\u062a\u062d\u0642\u0651\u0642\u0648\u0627 \u0645\u0646 \u062a\u0631\u062e\u064a\u0635 QXtend\u060c \u0648\u0623\u0639\u062f\u0651\u0648\u0627 \u0645\u0633\u062a\u0642\u0628\u0650\u0644 QXtend \u0648\u0645\u0634\u062a\u0631\u0650\u0643 QXO. \u0623\u062c\u0631\u0648\u0627 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a \u0641\u064a \u0646\u0637\u0627\u0642 \u0627\u062e\u062a\u0628\u0627\u0631\u064a \u0623\u0648\u0644\u064b\u0627.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f QDoc.<\/strong> \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDoc \u0627\u0644\u062c\u0627\u0647\u0632\u0629 \u062d\u064a\u062b\u0645\u0627 \u062a\u0648\u0641\u0631\u062a\u060c \u0648\u0623\u0646\u0634\u0626\u0648\u0627 \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDoc \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 QGen \u0644\u0628\u0631\u0627\u0645\u062c Work Order Maintenance \u0648Labor Feedback by Work Order \u0648Work Order Receipt \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> \u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645\u0627\u062a.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0634\u0631\u0627\u0621.<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0623\u062d\u062f\u0627\u062b QXO \u0623\u0648 \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0627\u0644\u062f\u0648\u0631\u064a \u0639\u0628\u0631 REST\u060c \u0645\u0639 \u0627\u0644\u062a\u0635\u0641\u064a\u0629 \u0648\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0645\u062d\u0627\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0623\u0639\u062f\u0627\u062f \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0623\u0641\u0631\u0627\u062f \u0627\u0644\u0628\u062f\u0644\u0627\u0621.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u062c\u062f\u0648\u0644 \u0648\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/strong> \u0631\u062d\u0651\u0644\u0648\u0627 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0645\u0646 SkyPlanner\u060c \u0648\u0634\u063a\u0651\u0644\u0648\u0627 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a \u0645\u0639 \u0627\u0644\u062e\u0637\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0648\u0642\u0627\u0631\u0646\u0648\u0627 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e\u060c \u0648\u0635\u062d\u0651\u062d\u0648\u0627 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/li>\n\n\n<li><strong>\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0641\u0639\u0651\u0644\u0648\u0627 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 QAD \u0628\u0645\u062c\u0631\u062f \u062a\u0637\u0627\u0628\u0642 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u062c\u0628 \u0645\u0631\u0627\u0639\u0627\u062a\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u062a\u0634\u063a\u064a\u0644 CRP.<\/strong> \u064a\u0639\u064a\u062f CRP \u062c\u062f\u0648\u0644\u0629 \u062c\u0645\u064a\u0639 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062d\u062f\u062f\u0629. \u0648\u0644\u0627 \u064a\u062d\u062a\u0641\u0638 QAD \u0628\u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062f\u062e\u0644\u0629 \u064a\u062f\u0648\u064a\u064b\u0627 \u0625\u0644\u0627 \u0639\u0646\u062f \u062a\u062d\u0642\u0642 \u0627\u0644\u0634\u0631\u0637 \u0627\u0644\u062a\u0627\u0644\u064a: &#8220;you also adjusted the work order release and due date to match,&#8221; (\u0623\u0646 \u062a\u0643\u0648\u0646 \u0642\u062f \u0639\u062f\u0651\u0644\u062a \u0623\u064a\u0636\u064b\u0627 \u062a\u0627\u0631\u064a\u062e\u064e\u064a \u0625\u0635\u062f\u0627\u0631 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647 \u0644\u064a\u062a\u0648\u0627\u0641\u0642\u0627 \u0645\u0639 \u062a\u0644\u0643 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e)\u060c \u0648\u0647\u0630\u0627 \u0628\u0627\u0644\u0636\u0628\u0637 \u0645\u0627 \u064a\u0643\u062a\u0628\u0647 SkyPlanner. \u0634\u063a\u0651\u0644 CRP \u0628\u0639\u062f \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 QAD\u060c \u0623\u0648 \u0627\u0633\u062a\u062b\u0646\u0650 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u064a \u064a\u062c\u062f\u0648\u0644\u0647\u0627 SkyPlanner.<\/li>\n\n\n<li><strong>\u062a\u062b\u0628\u064a\u062a \u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0639\u062f \u0627\u0644\u0625\u0635\u062f\u0627\u0631.<\/strong> &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (\u0628\u0645\u062c\u0631\u062f \u0623\u0646 \u062a\u0635\u0628\u062d \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c Exploded \u0623\u0648 Allocated \u0623\u0648 Released\u060c \u0644\u0627 \u064a\u0645\u0643\u0646 \u0625\u062c\u0631\u0627\u0621 \u0623\u064a \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0623\u062e\u0631\u0649 \u0639\u0644\u0649 \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.) \u0627\u0642\u0631\u0623 \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0646\u062f \u0625\u0635\u062f\u0627\u0631 \u0627\u0644\u0623\u0645\u0631\u060c \u0648\u0644\u0627 \u062a\u0639\u062f\u0651\u0644 \u0627\u0644\u0645\u0633\u0627\u0631\u0627\u062a \u0625\u0644\u0627 \u0644\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0623\u0648 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0627\u0644\u0645\u0624\u0643\u062f\u0629.<\/li>\n\n\n<li><strong>\u0648\u062d\u062f\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u064a\u064f\u062d\u062a\u0633\u0628 \u0648\u0642\u062a\u0627 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0636\u0645\u0646 \u0627\u0644\u062d\u0645\u0644\u060c \u0628\u064a\u0646\u0645\u0627 &#8220;queue, wait, and move times are excluded from load calculations.&#8221; (\u062a\u064f\u0633\u062a\u0628\u0639\u062f \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0627\u0635\u0637\u0641\u0627\u0641 \u0648\u0627\u0644\u0627\u0646\u062a\u0638\u0627\u0631 \u0648\u0627\u0644\u0646\u0642\u0644 \u0645\u0646 \u062d\u0633\u0627\u0628\u0627\u062a \u0627\u0644\u062d\u0645\u0644.) \u0645\u062b\u0651\u0644 \u0647\u0630\u0647 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0641\u064a SkyPlanner \u0628\u062e\u0637\u0648\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0641\u0642\u0637\u060c \u0648\u062a\u062d\u0642\u0642 \u0645\u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646 \u0648\u0642\u062a \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0645\u062d\u0633\u0648\u0628\u064b\u0627 \u0644\u0643\u0644 \u0648\u062d\u062f\u0629 \u0623\u0645 \u0644\u0643\u0644 \u0623\u0645\u0631.<\/li>\n\n\n<li><strong>\u0642\u062f\u0631\u0629 QXtend \u0639\u0644\u0649 \u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u062a\u062d\u0630\u0651\u0631 QAD \u0645\u0646 \u0623\u0646 &#8220;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (\u0642\u062f \u064a\u0643\u0648\u0646 \u0623\u062f\u0627\u0621 \u0645\u062d\u0648\u0651\u0644 UI API \u063a\u064a\u0631 \u0645\u0642\u0628\u0648\u0644 \u0639\u0646\u062f \u0645\u0639\u0627\u0644\u062c\u0629 \u0643\u0645\u064a\u0627\u062a \u0643\u0628\u064a\u0631\u0629 \u0645\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0623\u0648 \u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0622\u0646\u064a\u0629.) \u0623\u0631\u0633\u0644 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u064a \u062a\u063a\u064a\u0651\u0631\u062a \u0641\u0642\u0637\u060c \u0639\u0644\u0649 \u062f\u0641\u0639\u0627\u062a\u060c \u0648\u0627\u0633\u062a\u062e\u062f\u0645 QDocs \u0627\u0644\u0623\u0635\u0644\u064a\u0629 \u062d\u064a\u062b\u0645\u0627 \u062a\u0648\u0641\u0631\u062a.<\/li>\n\n\n<li><strong>\u0627\u0644\u0646\u0637\u0627\u0642\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0642\u0639.<\/strong> \u062a\u062d\u062a\u0641\u0638 \u0623\u0646\u0638\u0645\u0629 QAD \u0645\u062a\u0639\u062f\u062f\u0629 \u0627\u0644\u0646\u0637\u0627\u0642\u0627\u062a \u0628\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0643\u0644 \u0646\u0637\u0627\u0642 \u0648\u0645\u0648\u0642\u0639 \u0639\u0644\u0649 \u062d\u062f\u0629. \u0627\u0631\u0628\u0637 \u0643\u0644 \u0645\u0648\u0642\u0639 \u0645\u0634\u0645\u0648\u0644 \u0628\u0627\u0644\u0646\u0637\u0627\u0642 \u0628\u0645\u062c\u0645\u0648\u0639\u0629 \u062e\u0627\u0635\u0629 \u0628\u0647 \u0645\u0646 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li><strong>\u0627\u0644\u062c\u0645\u0639 \u0628\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a \u0648\u0627\u0644\u0645\u0646\u0641\u0635\u0644.<\/strong> \u062a\u0633\u062a\u062e\u062f\u0645 \u062e\u0637\u0648\u0637 Advanced Repetitive \u062c\u062f\u0627\u0648\u0644 \u0625\u0646\u062a\u0627\u062c \u062a\u0643\u0631\u0627\u0631\u064a\u060c \u0648\u0644\u064a\u0633 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c. \u0641\u064a \u0645\u0631\u062d\u0644\u0629 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642\u060c \u0642\u0631\u0651\u0631 \u0623\u064a\u0651 \u0627\u0644\u062e\u0637\u0648\u0637 \u0633\u064a\u062a\u0648\u0644\u0649 SkyPlanner \u062c\u062f\u0648\u0644\u062a\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 QAD \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629 \u0648\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c<\/strong> \u0648\u0630\u0644\u0643 \u0636\u0645\u0646 \u0645\u0627 \u062a\u0645 \u0627\u0644\u0627\u062a\u0641\u0627\u0642 \u0639\u0644\u064a\u0647 \u0645\u0646 QDocs \u0648\u0627\u0634\u062a\u0631\u0627\u0643\u0627\u062a QXO \u0648\u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a REST. \u064a\u062e\u062a\u0644\u0641 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 QAD \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0648\u0647\u0646\u0627 \u062a\u0638\u0647\u0631 \u0642\u064a\u0645\u0629 \u0647\u0630\u0647 \u0627\u0644\u062e\u0628\u0631\u0629.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 QAD \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629.<\/strong> \u0641\u0647\u0648 \u064a\u0639\u0631\u0641 \u0646\u0637\u0627\u0642\u0627\u062a\u0643 \u0648\u062a\u062e\u0635\u064a\u0635\u0627\u062a\u0643 \u0648\u062a\u0631\u0627\u062e\u064a\u0635\u0643\u060c \u0648\u064a\u0645\u0643\u0646\u0647 \u0625\u0639\u062f\u0627\u062f QXtend \u0648QGen QDocs \u0648\u062d\u0633\u0627\u0628 \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0645\u0639 \u0641\u0631\u064a\u0642 SkyPlanner.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0627\u0644\u0628\u0646\u0627\u0621 \u0639\u0644\u0649 \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0648\u0631\u0645\u0632 API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621\u060c \u0648\u064a\u0633\u0627\u0639\u062f\u0643 \u0641\u0631\u064a\u0642 SkyPlanner \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629. \u062a\u062a\u0648\u0641\u0631 \u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 \u062a\u0643\u0627\u0645\u0644 SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0645\u0639 \u0628\u0627\u0642\u062a\u0643\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 QAD Adaptive ERP \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/\">\u0635\u0641\u062d\u0629 QAD Adaptive ERP<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0645\u0631\u0643\u0632 \u062a\u0643\u0627\u0645\u0644\u0627\u062a ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u062a\u0648\u0641\u064a\u0631 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a \u0644\u0634\u0631\u0643\u0629 Mamec\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0627\u0628\u0639\u0629 \u0644\u0644\u0634\u0631\u0643\u0629 \u0641\u064a \u0644\u0648\u0647\u064a\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>\u0622\u0644\u0627\u0641 (1,000s)<\/b><span>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u0635\u0628\u062d\u0646\u0627 \u0646\u062a\u062d\u0643\u0645 \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0631\u064a\u0642\u0629 \u0645\u062e\u062a\u0644\u0641\u0629\u060c \u0648\u0648\u0635\u0644 \u0641\u0647\u0645\u0646\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0625\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062e\u062a\u0644\u0641 \u062a\u0645\u0627\u0645\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a<\/b><br>Mamec \u00b7 \u062e\u0644\u0627\u0637\u0627\u062a \u0648\u0645\u0636\u062e\u0627\u062a \u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u062a\u0635\u0646\u064a\u0639 \u062a\u0639\u0627\u0642\u062f\u064a \u0628\u062a\u0642\u0646\u064a\u0627\u062a \u0645\u062a\u0642\u062f\u0645\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u064f\u062c\u062f\u0648\u0644 \u0622\u0644\u0627\u0641 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0625\u062a\u0627\u062d\u0629 \u0631\u0624\u064a\u0629 \u0622\u0646\u064a\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062c\u0645\u064a\u0639 \u0623\u0642\u0633\u0627\u0645 \u0627\u0644\u0645\u0624\u0633\u0633\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/mamec\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u0635\u0648\u0631\u0629 \u062c\u0648\u064a\u0629 \u0644\u0645\u0635\u0646\u0639 Piristeel \u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0641\u064a \u0643\u0627\u0648\u0647\u0627\u0641\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99.2%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u062a\u0627\u062d \u0644\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a\u060c \u0648\u062c\u0639\u0644 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0643\u062b\u0631 \u0648\u0636\u0648\u062d\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Piristeel \u00b7 \u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0648\u062a\u0635\u0631\u064a\u0641 \u0645\u064a\u0627\u0647 \u0627\u0644\u0623\u0645\u0637\u0627\u0631<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 99.2% \u0647\u0630\u0627 \u0627\u0644\u0639\u0627\u0645\u060c \u0648\u062a\u0648\u0641\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 \u0623\u0631\u0628\u0639 \u0633\u0627\u0639\u0627\u062a \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0648\u0645\u064a\u064b\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/piristeel\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 QAD Adaptive ERP \u0648\u0627\u062c\u0647\u0629 API \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u064a\u0634\u063a\u0651\u0644 QXtend Inbound \u0628\u0631\u0646\u0627\u0645\u062c Work Order Maintenance \u0648\u0628\u0631\u0627\u0645\u062c \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0628\u0631 SOAP \u0648QDocs \u0628\u0635\u064a\u063a\u0629 XML\u060c \u0648\u062a\u064f\u0646\u0634\u0623 \u0647\u0630\u0647 \u0627\u0644\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 QGen \u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0641\u0631 QDoc \u0645\u064f\u0635\u062f\u0631. \u0648\u062a\u062a\u064a\u062d REST APIs \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0645\u0639 \u0627\u0644\u062a\u0635\u0641\u064a\u0629 \u0648\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 QAD \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0639\u062a\u0645\u062f QAD \u0639\u0644\u0649 QXtend Outbound \u0644\u0645\u0639\u0627\u0644\u062c\u0629 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a: \u062a\u0633\u062c\u0651\u0644 \u0645\u0634\u063a\u0651\u0644\u0627\u062a \u0627\u0644\u062c\u062f\u0627\u0648\u0644 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a\u060c \u062b\u0645 \u064a\u0631\u0633\u0644 QXO \u0645\u0633\u062a\u0646\u062f\u0627\u062a QDocs \u0625\u0644\u0649 \u0639\u0646\u0648\u0627\u0646 URL \u0644\u062e\u062f\u0645\u0629 \u0648\u064a\u0628 \u0623\u0648 \u0625\u0644\u0649 \u0645\u062c\u0644\u062f \u064a\u064f\u0641\u062d\u064e\u0635 \u062f\u0648\u0631\u064a\u064b\u0627. \u0623\u0645\u0627 \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0641\u062a\u0631\u0633\u0644 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u064f\u0631\u0633\u064e\u0644 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 QAD \u0644\u062a\u062d\u062f\u064a\u062b\u0647\u0627 \u0641\u064a\u0647\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0639\u0628\u0631 QDoc \u0645\u0646 QXtend Inbound \u0644\u0628\u0631\u0646\u0627\u0645\u062c Work Order Maintenance (16.1)\u060c \u064a\u0636\u0628\u0637 \u062a\u0627\u0631\u064a\u062e\u064e\u064a \u0625\u0635\u062f\u0627\u0631 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647 \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 SkyPlanner. \u064a\u062a\u062d\u0642\u0642 QAD \u0645\u0646 \u0635\u062d\u0629 QDoc \u0628\u0627\u0644\u0642\u0648\u0627\u0639\u062f \u0646\u0641\u0633\u0647\u0627 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0641\u064a \u0627\u0644\u0634\u0627\u0634\u0629\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0641\u064a \u0645\u0633\u062a\u0646\u062f QDoc.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u0635\u0644 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0625\u0644\u0649 QAD\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u064f\u0633\u062c\u0651\u064e\u0644 \u0648\u0642\u062a\u0627 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0639\u0628\u0631 Labor Feedback by Work Order (16.20.1)\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0639\u0628\u0631 Work Order Receipt (16.11)\u060c \u0648\u0643\u0644\u0627\u0647\u0645\u0627 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 QDocs \u0645\u0646 QXtend Inbound. \u0648\u064a\u064f\u062a\u062e\u0630 \u0642\u0631\u0627\u0631 \u0625\u0639\u0627\u062f\u0629 \u062a\u0633\u062c\u064a\u0644 \u0647\u0630\u0647 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0646\u0628\u063a\u064a \u0644\u0634\u0631\u064a\u0643 QAD \u0627\u0642\u062a\u0631\u0627\u062d QAD Advanced Scheduling \u0623\u0645 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner\u060c \u0639\u0646\u062f\u0645\u0627 \u064a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0639\u0645\u064a\u0644 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0646\u0641\u0635\u0644 \u0648\u064a\u0631\u064a\u062f \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u062c\u062f\u0648\u0644\u064b\u0627 \u0642\u0627\u0628\u0644\u064b\u0627 \u0644\u0644\u062a\u0646\u0641\u064a\u0630 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629. \u062a\u0635\u0641 QAD \u0645\u0646\u062a\u062c Advanced Scheduling \u0628\u0623\u0646\u0647 \u062c\u062f\u0648\u0644 \u0644\u0643\u0644 \u062e\u0637 \u0639\u0644\u0649 \u062d\u062f\u0629 \u0641\u064a \u0643\u0644 \u0645\u0635\u0646\u0639\u060c \u0648\u062a\u0639\u0631\u0636\u0647 \u0645\u0639 DSCP Production Planning \u0648Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). \u064a\u062a\u0635\u0644 SkyPlanner \u0639\u0628\u0631 QXtend\u060c \u0648\u064a\u062c\u062f\u0648\u0644 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0648\u064a\u062a\u064a\u062d \u0639\u062f\u062f\u064b\u0627 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f \u0645\u0646 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0628\u0633\u0639\u0631 \u064a\u0628\u062f\u0623 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0645\u0639 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 QAD \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a> \u0644\u062a\u062d\u062f\u064a\u062f \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ QAD Adaptive ERP \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0646\u0638\u0627\u0645 SkyPlanner APS\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0633\u0627\u0628\u0642\u0629 QAD Enterprise Edition \u0648MFG\/PRO. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0627\u062a QAD &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106194,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106948","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS","og_description":"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u0627\u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0640SkyPlanner APS: QXtend Inbound QDocs \u0625\u0644\u0649 Work Order Maintenance\u060c \u0623\u062d\u062f\u0627\u062b QXtend Outbound\u060c \u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ QAD Adaptive ERP \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 QAD Adaptive ERP \u0628\u0646\u0638\u0627\u0645 SkyPlanner APS\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643 \u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0633\u0627\u0628\u0642\u0629 QAD Enterprise Edition \u0648MFG\/PRO. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0627\u062a QAD&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=106948"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106948\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106194"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=106948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}