{"id":106890,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud <span class=\"hl\">\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Oracle Fusion Cloud Manufacturing \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Oracle Fusion Cloud \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0648\u0627\u0631\u062f REST \u0627\u0644\u062a\u064a \u062a\u0648\u0641\u0631\u0647\u0627 Oracle:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u064a\u0633\u062a\u0642\u0628\u0644 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u062a\u0642\u0627\u0648\u064a\u0645\u060c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0625\u0643\u0645\u0627\u0644 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0625\u0644\u0649 Oracle \u0644\u062a\u0633\u062c\u064a\u0644\u0647\u0627 \u0643\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0645\u0648\u0627\u0631\u062f.<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u0622\u0644\u064a\u0627\u062a webhooks \u0641\u064a SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u0646\u0627\u0633\u0628 \u0625\u0639\u062f\u0627\u062f\u0627\u062a Oracle Fusion Cloud \u0644\u062f\u064a\u0643\u0645 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0645\u062e\u0635\u0635 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0627\u0644\u0645\u0637\u0648\u0631\u064a\u0646 \u0627\u0644\u0631\u0627\u063a\u0628\u064a\u0646 \u0641\u064a \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629 \u0623\u0648 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0623\u0646\u0641\u0633\u0647\u0645 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0645\u0646 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0641\u0631 Oracle Fusion Cloud \u062b\u0644\u0627\u062b\u0629 \u0645\u0633\u0627\u0631\u0627\u062a \u0644\u062a\u0628\u0627\u062f\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0639 \u0646\u0638\u0627\u0645 \u062c\u062f\u0648\u0644\u0629 \u062e\u0627\u0631\u062c\u064a:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API \u0644\u0640 Oracle Fusion Cloud SCM.<\/strong> \u0627\u0644\u0645\u0633\u0627\u0631 \u0627\u0644\u0623\u0633\u0627\u0633\u064a \u0647\u0648 <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. \u064a\u0633\u062a\u062e\u062f\u0645 \u0646\u0638\u0627\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u062a\u0627\u0644\u064a\u0629: <code>workOrders<\/code> (\u0648\u0645\u0648\u0627\u0631\u062f\u0647 \u0627\u0644\u0641\u0631\u0639\u064a\u0629 <code>WorkOrderOperation<\/code> \u0648<code>WorkOrderOperationResource<\/code> \u0648<code>WorkOrderOperationMaterial<\/code>)\u060c \u0648<code>processWorkOrders<\/code>\u060c \u0648<code>workDefinitions<\/code>\u060c \u0648<code>workCenters<\/code>\u060c \u0648<code>productionResources<\/code>\u060c \u0648<code>calendars<\/code>\u060c \u0648<code>itemsV2<\/code>\u060c \u0648<code>itemStructures<\/code>\u060c \u0648<code>inventoryOnhandBalances<\/code>. \u062a\u064f\u0631\u0633\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u062a\u0642\u062f\u0645 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0625\u0644\u0649 <code>operationTransactions<\/code> \u0648<code>resourceTransactions<\/code> \u0648<code>materialTransactions<\/code>. \u0648\u062a\u064f\u062c\u0644\u0628 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0645\u0646 <code>purchaseOrders<\/code> \u0639\u0628\u0631 Procurement REST API. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">\u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 REST<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> \u062a\u0646\u0634\u0626 \u0639\u0645\u0644\u064a\u0629 Import Work Orders \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u062a\u062d\u062f\u0651\u062b\u0647\u0627 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0646\u0637\u0644\u0627\u0642\u064b\u0627 \u0645\u0646 \u0642\u0627\u0644\u0628\u060c \u0628\u064a\u0646\u0645\u0627 \u062a\u062d\u0645\u0651\u0644 \u0639\u0645\u0644\u064a\u0629 Import Work Order Resource Transactions \u0642\u064a\u0648\u062f \u0627\u0644\u0645\u0648\u0627\u0631\u062f. \u0648\u062a\u0648\u0636\u062d Oracle \u0627\u0644\u0642\u064a\u062f \u0627\u0644\u0632\u0645\u0646\u064a \u0635\u0631\u0627\u062d\u0629\u064b: &#8220;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8221; (\u0647\u0630\u0627 \u0627\u0644\u062e\u064a\u0627\u0631 \u063a\u064a\u0631 \u0645\u0646\u0627\u0633\u0628 \u0644\u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> \u062a\u062a\u0648\u0644\u0649 \u0645\u0646\u0635\u0629 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0646 Oracle \u0646\u0642\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u064a\u0646 Fusion \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0623\u062e\u0631\u0649. \u0648\u064a\u062a\u0648\u0641\u0631 \u0641\u064a Oracle Integration \u0642\u0627\u0644\u0628 \u062a\u0643\u0627\u0645\u0644 \u064a\u0633\u062a\u0645\u0639 \u0625\u0644\u0649 \u062d\u062f\u062b Work Order Status Change \u0641\u064a Oracle Fusion Cloud Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 \u0647\u0630\u0627 \u0627\u0644\u0645\u0633\u0627\u0631 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0634\u0631\u0643\u062a\u0643\u0645 \u062a\u0633\u062a\u062e\u062f\u0645 OIC \u0628\u0627\u0644\u0641\u0639\u0644.<\/li>\n\n<\/ol>\n\n\n<p>REST \u0647\u0648 \u0627\u0644\u0645\u0633\u0627\u0631 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0644\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u0628\u0627\u0634\u0631\u0629\u060c \u0623\u0645\u0627 FBDI \u0641\u064a\u0646\u0627\u0633\u0628 \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0648\u0627\u0644\u0648\u0635\u0648\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0623\u0645\u0627\u0646 REST \u0641\u064a Oracle.<\/strong> &#8220;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8221; (\u062a\u0633\u062a\u062e\u062f\u0645 \u0648\u0627\u062c\u0647\u0627\u062a REST API \u0641\u064a Fusion Applications \u0633\u064a\u0627\u0633\u0629 \u0623\u0645\u0627\u0646 \u0639\u0627\u0645\u0629 \u0645\u0646 Oracle Web Services Manager (OWSM) \u062a\u0633\u0645\u0649 Multi Token Over SSL RESTful Service Policy.) \u062a\u0642\u0628\u0644 \u0647\u0630\u0647 \u0627\u0644\u0633\u064a\u0627\u0633\u0629 \u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0639\u0628\u0631 SSL \u0648\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0631\u0645\u0648\u0632\u060c \u0645\u062b\u0644 \u0631\u0645\u0632 \u062d\u0627\u0645\u0644 SAML 2.0. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">\u062f\u0644\u064a\u0644 \u0627\u0644\u0628\u062f\u0621 \u0627\u0644\u0633\u0631\u064a\u0639<\/a>)<\/li>\n\n\n<li><strong>\u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/strong> \u0623\u0646\u0634\u0626\u0648\u0627 \u0645\u0633\u062a\u062e\u062f\u0645\u064b\u0627 \u0645\u062e\u0635\u0635\u064b\u0627 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a Oracle\u060c \u0648\u0623\u0633\u0646\u062f\u0648\u0627 \u0625\u0644\u064a\u0647 \u0623\u062f\u0648\u0627\u0631\u064b\u0627 \u0648\u0638\u064a\u0641\u064a\u0629 \u062a\u0645\u0646\u062d\u0647 \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0645\u0639\u0627\u0645\u0644\u0627\u062a\u060c \u0645\u0639 \u0642\u0635\u0631\u0647\u0627 \u0639\u0644\u0649 \u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0634\u0645\u0648\u0644\u0629 \u0628\u0627\u0644\u0646\u0637\u0627\u0642.<\/li>\n\n\n<li><strong>\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a.<\/strong> \u062a\u0636\u0639 Oracle \u062d\u062f\u064b\u0627 \u0644\u0639\u062f\u062f \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u0639\u064a\u062f\u0647\u0627 \u0627\u0633\u062a\u062f\u0639\u0627\u0621 SCM REST \u0627\u0644\u0648\u0627\u062d\u062f\u060c \u0644\u0630\u0627 \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 <code>limit<\/code> \u0648<code>offset<\/code> \u0639\u0646\u062f \u0627\u0644\u0642\u0631\u0627\u0621\u0629\u060c \u0645\u0639 \u062a\u0635\u0641\u064a\u0629 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u062d\u0633\u0628 \u0627\u0644\u0645\u0624\u0633\u0633\u0629 \u0648\u0627\u0644\u062d\u0627\u0644\u0629 (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u0641\u064a SkyPlanner\u060c \u062a\u0633\u062a\u062e\u062f\u0645 REST API \u0631\u0645\u0632 API \u0644\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0636\u0645\u0646 \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code> (\u0625\u0639\u062f\u0627\u062f\u0627\u062a SkyPlanner &gt; API)\u060c \u0648\u0647\u064a \u0645\u0648\u062b\u0651\u0642\u0629 \u0641\u064a Swagger\/OpenAPI. \u064a\u0634\u0631\u062d <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062a\u0639\u0644\u064a\u0645\u064a<\/a> \u062e\u0637\u0648\u0627\u062a \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u0623\u0648\u0644\u0649.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u064f\u062c\u0644\u0628 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 Oracle \u0628\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a. \u062a\u0644\u062a\u0642\u0637 \u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a REST \u0627\u0644\u0645\u0635\u0641\u0651\u0627\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0651\u0644\u0629\u060c \u0648\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062d\u0627\u0644\u0629 \u0625\u0644\u0649 \u0645\u064f\u0635\u062f\u064e\u0631\u060c \u0648\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621. \u064a\u064f\u0636\u0628\u0637 \u062a\u0643\u0631\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0644\u0643\u0644 \u0645\u0635\u0646\u0639\u060c \u0645\u0646 \u0645\u0631\u0629 \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0631\u0629 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0644\u0644\u0645\u062e\u0632\u0648\u0646. \u0648\u0625\u0630\u0627 \u0643\u0646\u062a\u0645 \u062a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 Oracle Integration\u060c \u0641\u064a\u0645\u0643\u0646 \u0644\u062d\u062f\u062b Work Order Status Change \u0623\u0646 \u064a\u0637\u0644\u0642 \u0642\u0631\u0627\u0621\u0629 \u0641\u0648\u0631\u064a\u0629.<\/p>\n\n\n<p>\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhook \u0639\u0646\u062f \u062a\u063a\u064a\u0631 \u0627\u0644\u062d\u0627\u0644\u0629 \u0623\u0648 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0644\u0630\u0627 \u062a\u0639\u062a\u0645\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u062d\u062f\u0627\u062b.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 Oracle Fusion Cloud (\u0645\u0648\u0631\u062f REST)<\/th><th>\u0643\u0627\u0626\u0646 SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0627\u0644\u062a\u0643\u0631\u0627\u0631<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641 (<code>itemsV2<\/code>)\u060c \u0648\u0648\u062d\u062f\u0627\u062a \u0627\u0644\u0642\u064a\u0627\u0633<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u062f\u0648\u0631\u064a<\/td><\/tr><tr><td>\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 (<code>itemStructures<\/code>)<\/td><td>\u0647\u064a\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u060c \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0644\u0643\u0644 \u0645\u0646\u062a\u062c<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 (<code>workDefinitions<\/code>): \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u060c \u0648Basis Type<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0645\u0639 \u0645\u062f\u062f\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 (<code>workCenters<\/code>)\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c (<code>productionResources<\/code>) \u0644\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0627\u0644\u0639\u0645\u0627\u0644\u0629<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646\u060c \u0648\u0645\u0639\u062f\u0644\u0627\u062a \u0627\u0644\u0643\u0641\u0627\u0621\u0629<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u0648\u0646\u0627\u062f\u0631\u064b\u0627 \u0628\u0639\u062f \u0630\u0644\u0643<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0642\u0627\u0648\u064a\u0645 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a (<code>calendars<\/code>\u060c \u0648\u0627\u0633\u062a\u062b\u0646\u0627\u0621\u0627\u062a \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a)<\/td><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0639\u062f\u0645 \u0627\u0644\u0639\u0645\u0644<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0623\u0648 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0645\u0628\u0627\u0634\u0631\u0629\u064b \u0641\u064a SkyPlanner<\/td><\/tr><tr><td>\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639<\/td><td>\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0644\u0643\u0644 \u0645\u0635\u0646\u0639<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c (<code>workOrders<\/code>\u060c <code>processWorkOrders<\/code>) \u0645\u0639 <code>WorkOrderOperation<\/code> \u0648<code>WorkOrderOperationMaterial<\/code><\/td><td>\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0647\u0627 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0641\u0639\u0644\u064a (<code>inventoryOnhandBalances<\/code>)<\/td><td>\u0623\u0631\u0635\u062f\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 (<code>purchaseOrders<\/code>) \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0627\u0644\u0645\u062a\u0639\u0647\u062f \u0628\u0647\u0627<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u062d\u0633\u0628 \u0645\u0648\u0639\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>\u060c <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>\u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0639\u0628\u0631 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner<\/td><\/tr><tr><td>\u062a\u0648\u0627\u0631\u064a\u062e <code>WorkOrderOperationResource<\/code> (PATCH)<\/td><td>\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0644\u0643\u0644 \u0645\u0647\u0645\u0629<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0625\u0630\u0627 \u0627\u0639\u062a\u064f\u0645\u062f \u0647\u0630\u0627 \u0627\u0644\u062e\u064a\u0627\u0631<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a: \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0627\u0644\u0629 \u0648\u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0643\u0644 \u0648\u0631\u062f\u064a\u0629\u060c \u0625\u0630\u0627 \u0627\u0639\u062a\u064f\u0645\u062f \u0647\u0630\u0627 \u0627\u0644\u062e\u064a\u0627\u0631<\/td><\/tr><tr><td>\u063a\u064a\u0631 \u0645\u0648\u062c\u0648\u062f \u0641\u064a Oracle Fusion Cloud<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0643\u0645\u0648\u0627\u0631\u062f \u0630\u0627\u062a \u0637\u0627\u0642\u0629 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0636\u0628\u0637 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u0646\u0645\u0627\u0637 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u062a\u0642\u0627\u0648\u064a\u0645 \u0639\u0628\u0631 REST\u060c \u0623\u0648 \u062d\u0645\u0651\u0644\u0648\u0647\u0627 \u0645\u0631\u0629 \u0648\u0627\u062d\u062f\u0629 \u0645\u0646 \u0645\u0633\u062a\u062e\u0631\u062c\u0627\u062a FBDI. \u062d\u062f\u0651\u062f\u0648\u0627 \u0628\u0639\u0646\u0627\u064a\u0629 \u0643\u064a\u0641\u064a\u0629 \u062a\u0645\u062b\u064a\u0644 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644: \u064a\u0645\u0643\u0646 \u062a\u0645\u062b\u064a\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u064a\u0636\u0645 \u0623\u0631\u0628\u0639 \u0622\u0644\u0627\u062a \u0645\u0646 \u0627\u0644\u0645\u0648\u0631\u062f \u0646\u0641\u0633\u0647 \u0628\u0645\u062c\u0645\u0648\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u0644\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0628\u0623\u0631\u0628\u0639 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644. \u0648\u062a\u064f\u0645\u062b\u0651\u064e\u0644 \u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062a\u0635\u0646\u064a\u0639 \u0628\u0645\u062c\u0645\u0648\u0639\u0629 \u0644\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0644\u062a\u062c\u062a\u0645\u0639 \u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0641\u064a \u062e\u0637\u0629 \u0648\u0627\u062d\u062f\u0629.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u064f\u0635\u062f\u064e\u0631\u0629 \u0648\u063a\u064a\u0631 \u0627\u0644\u0645\u064f\u0635\u062f\u064e\u0631\u0629 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0645\u0648\u0627\u062f\u0647\u0627\u060c \u0625\u0636\u0627\u0641\u0629\u064b \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u064a\u0639\u062a\u0628\u0631 SkyPlanner \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629\u064b \u0641\u064a \u0645\u0648\u0639\u062f \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u062d\u062f\u0651\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 Delivered.<\/p>\n\n\n<p>\u062c\u062f\u0648\u0650\u0644\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u0627 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0641\u064a Supply Planning. \u064a\u062c\u0628 \u062a\u062d\u0648\u064a\u0644 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a Oracle \u0623\u0648\u0644\u064b\u0627.<\/p>\n\n\n<p><strong>3. \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 Oracle.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u064a\u0636\u0639 \u0627\u0644\u0645\u062d\u0631\u0643 \u0645\u0647\u0645\u0629 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0648 \u064a\u0646\u0642\u0644\u0647\u0627\u060c \u064a\u0637\u0644\u0642 \u0625\u0634\u0639\u0627\u0631 webhook \u0645\u0646 SkyPlanner \u0637\u0644\u0628 PATCH \u0625\u0644\u0649 <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code> \u064a\u062a\u0636\u0645\u0646 <code>PlannedStartDate<\/code> \u0648<code>PlannedCompletionDate<\/code>. \u0648\u062a\u0633\u0631\u064a \u0642\u0627\u0639\u062f\u0629 Oracle \u0627\u0644\u062a\u0627\u0644\u064a\u0629: &#8220;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8221; (\u064a\u062c\u0628 \u0623\u0644\u0627 \u064a\u0633\u0628\u0642 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0627\u0644\u0645\u062e\u0637\u0637 \u062a\u0627\u0631\u064a\u062e \u0628\u062f\u0621 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u064a\u062a\u062c\u0627\u0648\u0632 \u062a\u0627\u0631\u064a\u062e \u0627\u0646\u062a\u0647\u0627\u0626\u0647.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>) \u0644\u0630\u0644\u0643\u060c \u0625\u0630\u0627 \u0627\u0645\u062a\u062f \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u062c\u062f\u064a\u062f \u062e\u0627\u0631\u062c \u0647\u0630\u0647 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e\u060c \u064a\u062d\u062f\u0651\u062b \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0623\u0648\u0644\u064b\u0627 \u062a\u0648\u0627\u0631\u064a\u062e \u0631\u0623\u0633 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0644\u0628 PATCH\u060c \u062b\u0645 \u064a\u062d\u062f\u0651\u062b \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a.<\/p>\n\n\n<p><strong>4. \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639.<\/strong> \u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner Mobile Confirmations \u0623\u0648 Production Timer\u060c \u0648\u062a\u064f\u0628\u0642\u064a \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062d\u062f\u0651\u062b\u064b\u0627. \u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0625\u0644\u0649 <code>operationTransactions<\/code>\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0627\u0644\u0629 \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0625\u0644\u0649 <code>resourceTransactions<\/code>. \u0648\u0625\u0630\u0627 \u0643\u0627\u0646 \u0645\u0635\u0646\u0639\u0643\u0645 \u064a\u0633\u062c\u0651\u0644 \u062a\u0642\u062f\u0645 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0641\u064a Oracle \u0628\u0627\u0644\u0641\u0639\u0644\u060c \u0641\u0625\u0646 SkyPlanner \u064a\u0642\u0631\u0623 \u0647\u0630\u0647 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0630\u0644\u0643.<\/p>\n\n\n<p><strong>5. \u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/strong> \u062f\u0648\u0651\u0646\u0647\u0627 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a\u060c \u0648\u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0625\u0643\u0645\u0627\u0644\u060c \u0648\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0645\u0648\u0627\u0631\u062f<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0628\u062f\u064a\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0639\u062f\u0645 \u0627\u0644\u0639\u0645\u0644<\/td><td>\u0646\u0638\u0627\u0645 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642<\/td><\/tr><tr><td>\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>Oracle\u060c \u0628\u0625\u062f\u062e\u0627\u0644\u0647\u0627 \u0641\u064a\u0647 \u0645\u0628\u0627\u0634\u0631\u0629\u064b \u0623\u0648 \u0628\u0625\u0631\u0633\u0627\u0644\u0647\u0627 \u0645\u0646 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u062d\u062f\u0651\u062f \u0646\u0638\u0627\u0645\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0644\u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a. \u0644\u0627 \u064a\u062d\u062a\u0627\u062c SkyPlanner \u0625\u0644\u0649 \u0645\u0633\u0627\u062d\u0629 \u0639\u0645\u0644 \u0644\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u064a Oracle\u060c \u0644\u0630\u0627 \u064a\u062d\u0644\u0651 \u0645\u062d\u0644 Production Scheduling \u0641\u064a \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629. \u0648\u0625\u0630\u0627 \u0627\u0633\u062a\u0645\u0631 Production Scheduling \u0641\u064a \u0625\u0635\u062f\u0627\u0631 \u0627\u0644\u062c\u062f\u0627\u0648\u0644\u060c \u0641\u0627\u0641\u0635\u0644 \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u062a\u0648\u0644\u0649 \u062c\u062f\u0648\u0644\u062a\u0647\u0627 \u0639\u0646 \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u062c\u062f\u0648\u0644\u0647\u0627 SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u062d\u062a\u0649 \u0641\u064a \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0643\u0628\u064a\u0631\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u062a\u062d\u0642\u0651\u0642 \u0645\u0646 \u0635\u062d\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0627\u0644\u0645\u0635\u062f\u0651\u0631\u0629 \u0645\u0646 Oracle \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u0627\u0639\u062a\u0645\u062f \u062c\u062f\u0648\u0644 \u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u062a\u0647\u0627\u060c \u0648\u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u0645\u0634\u0645\u0648\u0644\u0629 \u0628\u0627\u0644\u0646\u0637\u0627\u0642\u060c \u0648\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u0645\u0632\u0627\u0645\u0646\u0629\u060c \u0648\u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0633\u062a\u064f\u0631\u062d\u0651\u0644 \u0625\u0644\u0649 Oracle.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 Oracle.<\/strong> \u0623\u0646\u0634\u0626 \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u0631. \u0627\u062e\u062a\u0628\u0631 \u0623\u0648\u0644\u064b\u0627 \u0641\u064a \u0628\u064a\u0626\u0629 Oracle \u063a\u064a\u0631 \u0645\u062e\u0635\u0635\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> \u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645\u0627\u062a.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/strong> \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u062f\u0648\u0631\u064a \u0645\u0639 \u0627\u0644\u062a\u0635\u0641\u064a\u0629 \u0648\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0645\u062d\u0627\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0627\u0636\u0628\u0637 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0639\u062f\u062f \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u0625\u0644\u0649 Oracle.<\/strong> \u0637\u0644\u0628\u0627\u062a PATCH \u062a\u0646\u0637\u0644\u0642 \u0645\u0646 \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0641\u064a SkyPlanner\u060c \u0645\u0639 \u062a\u0631\u062d\u064a\u0644 \u0627\u0644\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a \u0630\u0644\u0643.<\/li>\n\n\n<li><strong>\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/strong> \u0634\u063a\u0651\u0644 SkyPlanner \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a \u0645\u0639 \u0627\u0644\u062e\u0637\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0648\u0642\u0627\u0631\u0646 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e\u060c \u0648\u0635\u062d\u0651\u062d \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/li>\n\n\n<li><strong>\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0641\u0639\u0651\u0644 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0625\u0644\u0649 Oracle \u0641\u064a \u0643\u0644 \u0645\u0635\u0646\u0639 \u0639\u0644\u0649 \u062d\u062f\u0629 \u0628\u0639\u062f \u062a\u0637\u0627\u0628\u0642 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u062c\u0628 \u0645\u0631\u0627\u0639\u0627\u062a\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0633\u0644\u0648\u0643 \u0645\u062d\u0631\u0643 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a.<\/strong> \u064a\u0639\u0645\u0644 \u0645\u062d\u0631\u0643 Oracle \u0627\u0644\u0630\u064a \u0644\u0627 \u064a\u0631\u0627\u0639\u064a \u0642\u064a\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0627\u0633\u062a\u064a\u0639\u0627\u0628\u064a\u0629 \u0639\u0646\u062f \u0627\u0644\u0625\u0646\u0634\u0627\u0621 \u0648\u0639\u0646\u062f &#8220;certain update actions&#8221; (\u0625\u062c\u0631\u0627\u0621\u0627\u062a \u062a\u062d\u062f\u064a\u062b \u0645\u0639\u064a\u0651\u0646\u0629). \u0627\u062e\u062a\u0628\u0631 \u0641\u064a \u0628\u064a\u0626\u062a\u0643 \u0623\u064a\u0651 \u0627\u0644\u062a\u062d\u062f\u064a\u062b\u0627\u062a \u062a\u0639\u064a\u062f \u062d\u0633\u0627\u0628 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e\u060c \u0648\u0627\u062c\u0639\u0644 SkyPlanner \u0622\u062e\u0631 \u0646\u0638\u0627\u0645 \u064a\u0643\u062a\u0628 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a.<\/li>\n\n\n<li><strong>\u0627\u0644\u0646\u0637\u0627\u0642 \u0627\u0644\u0632\u0645\u0646\u064a \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u064a\u062c\u0628 \u0623\u0646 \u062a\u0642\u0639 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0628\u064a\u0646 \u062a\u0627\u0631\u064a\u062e\u064e\u064a \u0628\u062f\u0621 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0625\u0643\u0645\u0627\u0644\u0647. \u062d\u062f\u0651\u062b \u0631\u0623\u0633 \u0627\u0644\u0623\u0645\u0631 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 PATCH \u0623\u0648\u0644\u064b\u0627.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> \u064a\u064f\u062d\u0633\u0628 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0631\u062f \u0644\u0643\u0644 \u0648\u062d\u062f\u0629 \u0641\u0642\u0637 \u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0642\u064a\u0645\u0629 Basis Type \u0647\u064a Variable. \u0623\u0645\u0627 Fixed \u0641\u064a\u0639\u0646\u064a \u0648\u0642\u062a\u064b\u0627 \u062b\u0627\u0628\u062a\u064b\u0627 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629. \u062d\u0648\u0651\u0644 \u0627\u0644\u0642\u064a\u0645 \u0639\u0646\u062f \u0627\u0644\u0627\u0633\u062a\u064a\u0631\u0627\u062f\u060c \u0648\u0625\u0644\u0627 \u0641\u0633\u062a\u0643\u0648\u0646 \u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u062f\u062f \u063a\u064a\u0631 \u0635\u062d\u064a\u062d\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0646\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0628\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a.<\/strong> \u062a\u0633\u062a\u062e\u062f\u0645 \u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0646\u0641\u0635\u0644 <code>workOrders<\/code>\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 \u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0628\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a <code>processWorkOrders<\/code>. \u0623\u062f\u0631\u062c \u0627\u0644\u0627\u062b\u0646\u064a\u0646 \u0641\u064a \u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0630\u0627 \u0643\u0646\u062a \u062a\u0633\u062a\u062e\u062f\u0645 \u0646\u0645\u0637\u064e\u064a \u0627\u0644\u062a\u0635\u0646\u064a\u0639.<\/li>\n\n\n<li><strong>\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a.<\/strong> \u064a\u0636\u0639 Oracle \u062d\u062f\u064b\u0627 \u0644\u0639\u062f\u062f \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0641\u064a \u0643\u0644 \u0627\u0633\u062a\u062f\u0639\u0627\u0621 REST. \u0642\u0633\u0651\u0645 \u0646\u062a\u0627\u0626\u062c \u0643\u0644 \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a\u060c \u0648\u0635\u0641\u0651\u0650\u0647\u0627 \u062d\u0633\u0628 \u0627\u0644\u0645\u0624\u0633\u0633\u0629 \u0648\u0627\u0644\u062d\u0627\u0644\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u062f\u064a\u062b\u0627\u062a \u0631\u0628\u0639 \u0627\u0644\u0633\u0646\u0648\u064a\u0629.<\/strong> \u062a\u062d\u062f\u0651\u062b Oracle \u0646\u0638\u0627\u0645 Fusion \u0643\u0644 \u0631\u0628\u0639 \u0633\u0646\u0629. \u062b\u0628\u0651\u062a \u0625\u0635\u062f\u0627\u0631 REST \u0641\u064a \u0627\u0644\u0645\u0633\u0627\u0631\u060c \u0648\u0623\u0639\u062f \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0639\u062f \u0643\u0644 \u062a\u062d\u062f\u064a\u062b.<\/li>\n\n\n<li><strong>\u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062d\u0627\u0644\u0629.<\/strong> \u064a\u062c\u0628 \u0623\u0644\u0627 \u062a\u064f\u0639\u064a\u0651\u064e\u0646 \u062a\u0648\u0627\u0631\u064a\u062e \u062c\u062f\u064a\u062f\u0629 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u062a\u0643\u0648\u0646 \u062d\u0627\u0644\u062a\u0647\u0627 Pending Approval \u0623\u0648 \u062a\u0643\u0648\u0646 \u0645\u063a\u0644\u0642\u0629. \u0627\u0633\u062a\u0628\u0639\u062f\u0647\u0627 \u0628\u0627\u0644\u062a\u0635\u0641\u064a\u0629 \u0639\u0646\u062f \u0627\u0644\u0642\u0631\u0627\u0621\u0629.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Oracle Fusion Cloud \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c<\/strong> \u0636\u0645\u0646 \u0645\u0648\u0627\u0631\u062f REST \u0648\u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0627\u0644\u0645\u062a\u0641\u0642 \u0639\u0644\u064a\u0647\u0627. \u062a\u062e\u062a\u0644\u0641 \u0637\u0631\u064a\u0642\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 Oracle Fusion Cloud \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0648\u0647\u0646\u0627 \u062a\u064f\u0648\u0638\u0651\u064e\u0641 \u0647\u0630\u0647 \u0627\u0644\u062e\u0628\u0631\u0629.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 Oracle \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629.<\/strong> \u0641\u0647\u0648 \u064a\u0639\u0631\u0641 \u0645\u0624\u0633\u0633\u0627\u062a\u0643 \u0648\u0623\u062f\u0648\u0627\u0631\u0643 \u0648\u0627\u0645\u062a\u062f\u0627\u062f\u0627\u062a\u0643\u060c \u0648\u064a\u0645\u0643\u0646\u0647 \u0625\u0639\u062f\u0627\u062f \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u0631 \u0648\u0623\u064a \u062a\u062f\u0641\u0642\u0627\u062a \u0641\u064a Oracle Integration \u0628\u0627\u0644\u062a\u0639\u0627\u0648\u0646 \u0645\u0639 \u0641\u0631\u064a\u0642 SkyPlanner.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0627\u0644\u0628\u0646\u0627\u0621 \u0639\u0644\u0649 \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635 \u0628\u0640 SkyPlanner \u0648\u0631\u0645\u0632 API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621\u060c \u0648\u064a\u0642\u062f\u0651\u0645 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u0645\u0633\u0627\u0639\u062f\u0629 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629. \u062a\u062a\u0648\u0641\u0631 \u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 \u062a\u0643\u0627\u0645\u0644 SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0645\u0639 \u0628\u0627\u0642\u062a\u0643\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 Oracle Fusion Cloud \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/\">\u0635\u0641\u062d\u0629 Oracle Fusion Cloud<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0645\u0631\u0643\u0632 \u062a\u0643\u0627\u0645\u0644\u0627\u062a ERP<\/a>. \u0647\u0644 \u062a\u0633\u062a\u062e\u062f\u0645 NetSuite\u061f \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u0644\u062f\u0649 UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u0635\u0648\u0631\u0629 \u062c\u0648\u064a\u0629 \u0644\u0645\u0635\u0646\u0639 Piristeel \u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0641\u064a \u0643\u0627\u0648\u0647\u0627\u0641\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99.2%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u062a\u0627\u062d SkyPlanner \u0631\u0624\u064a\u0629 \u0623\u0648\u0636\u062d \u0644\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a\u060c \u0648\u062c\u0639\u0644 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0643\u062b\u0631 \u0648\u0636\u0648\u062d\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u062a\u0648\u0646\u064a \u062a\u0648\u0648\u0631\u064a\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Piristeel \u00b7 \u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0648\u062a\u0635\u0631\u064a\u0641 \u0645\u064a\u0627\u0647 \u0627\u0644\u0623\u0645\u0637\u0627\u0631<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 99.2% \u0647\u0630\u0627 \u0627\u0644\u0639\u0627\u0645\u060c \u0648\u062a\u0648\u0641\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 \u0623\u0631\u0628\u0639 \u0633\u0627\u0639\u0627\u062a \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0648\u0645\u064a\u064b\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/piristeel\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"\u0647\u0627\u0646\u0648 \u0631\u064a\u0646\u0627\u0646\u0646\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a \u0644\u0634\u0631\u0643\u0629 Mamec\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0627\u0628\u0639\u0629 \u0644\u0644\u0634\u0631\u0643\u0629 \u0641\u064a \u0644\u0648\u0647\u064a\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1,000s<\/b><span>\u0645\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u0635\u0628\u062d\u062a \u0633\u064a\u0637\u0631\u062a\u0646\u0627 \u0639\u0644\u0649 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u062e\u062a\u0644\u0641\u0629\u060c \u0648\u0627\u0646\u062a\u0642\u0644 \u0641\u0647\u0645\u0646\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0627\u0633\u062a\u064a\u0639\u0627\u0628\u064a\u0629 \u0625\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062e\u062a\u0644\u0641 \u062a\u0645\u0627\u0645\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0647\u0627\u0646\u0648 \u0631\u064a\u0646\u0627\u0646\u0646\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a<\/b><br>Mamec \u00b7 \u062e\u0644\u0627\u0637\u0627\u062a \u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u0645\u0636\u062e\u0627\u062a \u0648\u062a\u0635\u0646\u064a\u0639 \u062a\u0639\u0627\u0642\u062f\u064a \u0639\u0627\u0644\u064a \u0627\u0644\u062a\u0642\u0646\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u064f\u062c\u062f\u0648\u0644 \u0622\u0644\u0627\u0641 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0625\u062a\u0627\u062d\u0629 \u0631\u0624\u064a\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a \u0644\u062c\u0645\u064a\u0639 \u0623\u0642\u0633\u0627\u0645 \u0627\u0644\u0645\u0624\u0633\u0633\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/mamec\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 Oracle Fusion Cloud \u0648\u0627\u062c\u0647\u0629 API \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062a\u0636\u0645\u0646 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 Oracle Fusion Cloud SCM \u0627\u0644\u0645\u0648\u0631\u062f <code>workOrders<\/code> \u0645\u0639 \u0645\u0648\u0627\u0631\u062f \u0641\u0631\u0639\u064a\u0629 \u0644\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0625\u0636\u0627\u0641\u0629\u064b \u0625\u0644\u0649 <code>processWorkOrders<\/code> \u0644\u0644\u062a\u0635\u0646\u064a\u0639 \u0628\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a. \u0648\u0647\u064a \u062a\u062f\u0639\u0645 GET \u0648POST \u0648PATCH.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u064f\u0639\u0627\u062f \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 Oracle Fusion Cloud \u0648\u062a\u064f\u0633\u062c\u0651\u064e\u0644 \u0641\u064a\u0647\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0637\u0644\u0628 PATCH \u0639\u0644\u0649 \u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0641\u0631\u0639\u064a <code>WorkOrderOperation<\/code> \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u062a\u0639\u064a\u064a\u0646 <code>PlannedStartDate<\/code> \u0648<code>PlannedCompletionDate<\/code>. \u064a\u062c\u0628 \u0623\u0646 \u062a\u0628\u0642\u0649 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0636\u0645\u0646 \u0627\u0644\u0646\u0637\u0627\u0642 \u0627\u0644\u0632\u0645\u0646\u064a \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u0630\u0627 \u064a\u064f\u062d\u062f\u0651\u064e\u062b \u0631\u0623\u0633 \u0627\u0644\u0623\u0645\u0631 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 PATCH \u0623\u0648\u0644\u064b\u0627 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u0635\u0644 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0625\u0644\u0649 Oracle\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062a\u064f\u0631\u062d\u0651\u064e\u0644 \u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0625\u0644\u0649 <code>operationTransactions<\/code>\u060c \u0648\u0623\u0648\u0642\u0627\u062a \u0639\u0645\u0644 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0625\u0644\u0649 <code>resourceTransactions<\/code>. \u0648\u0643\u0644\u0627\u0647\u0645\u0627 \u0645\u0648\u0631\u062f REST \u064a\u062f\u0639\u0645 POST \u0641\u064a Fusion Manufacturing.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 Oracle Fusion Cloud \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0646\u0634\u0631 Fusion \u0623\u062d\u062f\u0627\u062b \u0623\u0639\u0645\u0627\u0644 \u0645\u062b\u0644 Work Order Status Change\u060c \u0648\u064a\u0645\u0643\u0646 \u0644\u0640 Oracle Integration \u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0643 \u0641\u064a\u0647\u0627. \u0648\u0645\u0646 \u062f\u0648\u0646 Oracle Integration\u060c \u064a\u0633\u062a\u0639\u0644\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062f\u0648\u0631\u064a\u064b\u0627 \u0645\u0646 REST API \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u0644\u0643\u0644 \u0645\u0635\u0646\u0639. \u0623\u0645\u0627 \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0641\u062a\u0631\u0633\u0644 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0646\u0628\u063a\u064a \u0644\u0634\u0631\u064a\u0643 Oracle \u0627\u0642\u062a\u0631\u0627\u062d Oracle Production Scheduling \u0623\u0645 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner\u060c \u0639\u0646\u062f\u0645\u0627 \u064a\u0631\u064a\u062f \u0627\u0644\u0639\u0645\u064a\u0644 \u062c\u062f\u0648\u0644\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0639\u0628\u0631 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0627\u0633\u062a\u064a\u0639\u0627\u0628\u064a\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u064a\u062d\u062f\u0651\u062b \u0646\u0641\u0633\u0647 \u0628\u0627\u0633\u062a\u0645\u0631\u0627\u0631. \u064a\u064f\u0641\u0639\u0651\u064e\u0644 Production Scheduling \u0636\u0645\u0646 \u0639\u0631\u0636 Supply Chain Planning\u060c \u0648\u064a\u062d\u0633\u0628 \u0627\u0644\u062c\u062f\u0648\u0644 \u0644\u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u062d\u062f\u0629\u060c \u0648\u0644\u0627 \u064a\u0637\u0628\u0651\u0642 \u0642\u0648\u0627\u0639\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0625\u0644\u0627 \u0639\u0644\u0649 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0648\u062d\u062f\u0629 \u0627\u0644\u0648\u0627\u062d\u062f\u0629 (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">\u0648\u062b\u0627\u0626\u0642 Oracle<\/a>). \u064a\u062a\u0635\u0644 SkyPlanner \u0639\u0628\u0631 SCM REST API\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0648\u064a\u062e\u0637\u0637 \u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u064a\u062a\u064a\u062d \u0639\u062f\u062f\u064b\u0627 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f \u0645\u0646 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0628\u0633\u0639\u0631 \u064a\u0628\u062f\u0623 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0645\u0639 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 Oracle \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 Excel\u060c \u0648\u0644\u0627 \u062a\u062a\u0637\u0644\u0628 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a> \u0644\u062a\u062d\u062f\u064a\u062f \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle Fusion Cloud \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Oracle Fusion Cloud Manufacturing \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Oracle Fusion Cloud \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0648\u0627\u0631\u062f REST \u0627\u0644\u062a\u064a \u062a\u0648\u0641\u0631\u0647\u0627 Oracle: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637 &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106165,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106890","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Cloud \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Cloud \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0640 Oracle Fusion Cloud: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Cloud \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS","og_description":"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Cloud \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u0627\u0631\u0628\u0637 Oracle Fusion Cloud \u0628\u0640 SkyPlanner APS: \u200fSCM REST API\u060c \u0648workOrders PATCH \u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0645\u0639\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0640 Oracle Fusion Cloud: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle Fusion Cloud \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 Oracle Fusion Cloud \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 Oracle Fusion Cloud Manufacturing \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Oracle Fusion Cloud \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0648\u0627\u0631\u062f REST \u0627\u0644\u062a\u064a \u062a\u0648\u0641\u0631\u0647\u0627 Oracle: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=106890"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106890\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106165"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=106890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}