{"id":106861,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","title":{"rendered":"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f <span class=\"hl\">\u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u0644\u064a\u0633 \u0636\u0645\u0646 Oracle Fusion Cloud Manufacturing \u0646\u0641\u0633\u0647. \u062a\u0648\u0636\u062d Oracle \u0623\u0646 \u0645\u062d\u0631\u0643 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u064a\u0648\u062f \u0648\u064a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0623\u0645\u0627 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0641\u062a\u062a\u0648\u0641\u0631 \u0641\u064a Oracle Production Scheduling\u060c \u0648\u0647\u0648 \u0645\u0633\u0627\u062d\u0629 \u0639\u0645\u0644 \u0636\u0645\u0646 \u062d\u0632\u0645\u0629 Supply Chain Planning\u060c \u0628\u064a\u0646\u0645\u0627 \u064a\u062e\u0637\u0637 Supply Planning \u0644\u0644\u0637\u0627\u0642\u0629 \u0639\u0644\u0649 \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0645\u062c\u0645\u0651\u0639\u0629. \u0648\u062a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u0629 SkyPlanner APS \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 Oracle Fusion Cloud \u0639\u0646\u062f\u0645\u0627 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/finite-capacity-scheduling\/\">\u062c\u062f\u0648\u0644\u0629 \u062a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0648\u0627\u0644\u062a\u0648\u0627\u0641\u0631<\/a> \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0639\u0627\u0645\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629 \u0639\u0628\u0631 \u0645\u0635\u0627\u0646\u0639\u0647\u0627.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0633\u062a\u0646\u062f \u0647\u0630\u0627 \u0627\u0644\u0645\u0642\u0627\u0644 \u0625\u0644\u0649 \u0648\u062b\u0627\u0626\u0642 Oracle \u0644\u0644\u0625\u0635\u062f\u0627\u0631 26C. \u0643\u0627\u0646\u062a \u0644\u062f\u0649 Oracle E-Business Suite \u0645\u0646\u062a\u062c\u0627\u062a \u0623\u0642\u062f\u0645 \u062e\u0627\u0635\u0629 \u0628\u0647\u0627 \u0644\u0644\u062c\u062f\u0648\u0644\u0629\u060c \u0643\u0645\u0627 \u0623\u0646 Oracle NetSuite \u0646\u0638\u0627\u0645 ERP \u0645\u062e\u062a\u0644\u0641. \u0644\u0630\u0627 \u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c \u0627\u0644\u0630\u064a \u062a\u062a\u0646\u0627\u0648\u0644\u0647 \u0627\u0644\u0635\u0641\u062d\u0629 \u0642\u0628\u0644 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u064a\u0647\u0627.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-oracle-fusion-cloud-plans-production-step-by\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u062e\u0637\u0637 Oracle Fusion Cloud \u0644\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u062e\u0637\u0648\u0629 \u0628\u062e\u0637\u0648\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0644\u0644\u062a\u0635\u0646\u064a\u0639<\/h3>\n\n\n<p>\u064a\u0628\u062f\u0623 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0641\u064a Oracle Fusion Cloud Manufacturing \u0645\u0646 <strong>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644<\/strong> \u0648<strong>\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/strong>. \u0648\u064a\u0643\u0648\u0646 \u0627\u0644\u0645\u0648\u0631\u062f \u0645\u0639\u062f\u0627\u062a \u0623\u0648 \u0639\u0645\u0627\u0644\u0629\u060c \u0648\u0644\u0647 \u062a\u0642\u0648\u064a\u0645\u0647 \u0648\u0648\u0631\u062f\u064a\u0627\u062a\u0647 \u0627\u0644\u062e\u0627\u0635\u0629. \u062a\u062a\u0636\u0645\u0646 <strong>\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644<\/strong> \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0644\u0635\u0646\u0641. \u0648\u062a\u0628\u064a\u0651\u0646 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 <strong>\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0647\u0627<\/strong>\u060c \u0645\u0639 \u0645\u0642\u062f\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0642\u064a\u0645\u0629 Basis Type\u060c \u0648\u0643\u0630\u0644\u0643 <strong>\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0647\u0627<\/strong>. \u0648\u062a\u064f\u0633\u062a\u0645\u062f \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0645\u0646 <strong>\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641<\/strong> \u0641\u064a Product Information Management.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c: \u0628\u0644\u0627 \u0642\u064a\u0648\u062f \u0628\u062d\u0643\u0645 \u0627\u0644\u062a\u0635\u0645\u064a\u0645<\/h3>\n\n\n<p>\u0639\u0646\u062f\u0645\u0627 \u062a\u0646\u0634\u0626 <strong>\u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c<\/strong>\u060c \u064a\u062a\u0648\u0644\u0649 Fusion \u062c\u062f\u0648\u0644\u062a\u0647. \u0648\u062a\u0634\u0631\u062d Oracle \u0622\u0644\u064a\u0629 \u0627\u0644\u0645\u062d\u0631\u0643 \u0628\u0648\u0636\u0648\u062d: &#8220;Oracle Manufacturing uses unconstrained scheduling engine in the background to schedule work orders during create and certain update actions.&#8221; (\u064a\u0633\u062a\u062e\u062f\u0645 Oracle Manufacturing \u0645\u062d\u0631\u0643 \u062c\u062f\u0648\u0644\u0629 \u0628\u0644\u0627 \u0642\u064a\u0648\u062f \u0641\u064a \u0627\u0644\u062e\u0644\u0641\u064a\u0629 \u0644\u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0646\u062f \u0625\u0646\u0634\u0627\u0626\u0647\u0627 \u0648\u0639\u0646\u062f \u0625\u062c\u0631\u0627\u0621 \u0628\u0639\u0636 \u0627\u0644\u062a\u062d\u062f\u064a\u062b\u0627\u062a.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faumf\/how-work-orders-are-scheduled.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n\n<p>\u062a\u064f\u062d\u0633\u0628 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0645\u0642\u062f\u0627\u0631 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0631\u062f\u060c \u0648\u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0645\u062e\u0635\u0635 \u0644\u0644\u0639\u0645\u0644\u064a\u0629\u060c \u0648\u062a\u0642\u0648\u064a\u0645 \u0627\u0644\u0645\u0648\u0631\u062f. \u0648\u0645\u0646\u0647\u0627 \u062a\u064f\u062d\u062f\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u062b\u0645 \u0645\u0648\u0627\u0639\u064a\u062f \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0648\u062a\u0648\u0636\u062d \u0627\u0644\u0635\u0641\u062d\u0629 \u0646\u0641\u0633\u0647\u0627 \u0642\u0627\u0639\u062f\u0629 \u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0627\u0644\u0637\u0627\u0642\u0629: &#8220;resources are assumed to have infinite capacity and the scheduling engine disregards loads on the resources from other work orders.&#8221; (\u064a\u064f\u0641\u062a\u0631\u0636 \u0623\u0646 \u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0648\u064a\u062a\u062c\u0627\u0647\u0644 \u0645\u062d\u0631\u0643 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u062a\u064a \u062a\u0641\u0631\u0636\u0647\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0623\u062e\u0631\u0649 \u0639\u0644\u0649 \u0647\u0630\u0647 \u0627\u0644\u0645\u0648\u0627\u0631\u062f.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0648\u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641 \u0648\u0645\u0646 \u0646\u0642\u0637\u0629 \u0648\u0633\u0637\u064a\u0629<\/h3>\n\n\n<p>\u062a\u062a\u0645 \u062c\u062f\u0648\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0627\u0646\u0637\u0644\u0627\u0642\u064b\u0627 \u0645\u0646 \u062a\u0627\u0631\u064a\u062e \u0628\u062f\u0626\u0647\u060c \u0623\u0648 \u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641 \u0627\u0646\u0637\u0644\u0627\u0642\u064b\u0627 \u0645\u0646 \u062a\u0627\u0631\u064a\u062e \u0625\u0643\u0645\u0627\u0644\u0647. \u0648\u0644\u0627 \u062a\u0624\u062b\u0631 \u0627\u0644\u0643\u0645\u064a\u0629 \u0641\u064a \u0627\u0644\u0645\u062f\u0629 \u0625\u0644\u0627 \u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0642\u064a\u0645\u0629 Basis Type \u0644\u0644\u0645\u0648\u0631\u062f \u0647\u064a Variable. \u0648\u064a\u062a\u062e\u0630 \u0625\u062c\u0631\u0627\u0621 REST \u0627\u0644\u0645\u0633\u0645\u0649 <code>midpointRescheduleWorkOrderOperation<\/code> \u0639\u0645\u0644\u064a\u0629 \u0648\u0627\u062d\u062f\u0629 \u0646\u0642\u0637\u0629 \u0627\u0631\u062a\u0643\u0627\u0632\u061b \u0625\u0630 \u062a\u0648\u0636\u062d Oracle \u0623\u0646\u0647 &#8220;backward schedules the resources for operations that already occurred, and forward schedules the resources for subsequent operations.&#8221; (\u064a\u062c\u062f\u0648\u0644 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u064a \u062d\u062f\u062b\u062a \u0628\u0627\u0644\u0641\u0639\u0644 \u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641\u060c \u0648\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0644\u0627\u062d\u0642\u0629 \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-action-midpointrescheduleworkorderoperation-post.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Supply Planning: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0637\u0627\u0642\u0629 \u0636\u0645\u0646 \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0645\u062c\u0645\u0651\u0639\u0629<\/h3>\n\n\n<p>\u064a\u0645\u0643\u0646 \u0644\u0640 Oracle Supply Planning \u062a\u0634\u063a\u064a\u0644 \u062e\u0637\u0629 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u064a\u0648\u062f. \u0648\u062a\u0648\u0636\u062d \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0623\u0646\u0647 &#8220;respects constraints by moving orders to earlier time buckets or offloading to an alternate resource, work definition, or supply source.&#8221; (\u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u064a\u0648\u062f \u0628\u0646\u0642\u0644 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0625\u0644\u0649 \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0623\u0628\u0643\u0631\u060c \u0623\u0648 \u062a\u062d\u0648\u064a\u0644 \u0627\u0644\u062d\u0645\u0644 \u0625\u0644\u0649 \u0645\u0648\u0631\u062f \u0623\u0648 \u062a\u0639\u0631\u064a\u0641 \u0639\u0645\u0644 \u0623\u0648 \u0645\u0635\u062f\u0631 \u062a\u0648\u0631\u064a\u062f \u0628\u062f\u064a\u0644.) \u0648\u0639\u0646\u062f\u0645\u0627 \u0644\u0627 \u064a\u0643\u0641\u064a \u0630\u0644\u0643\u060c &#8220;the constrained supply plan, as a last resort, overloads resource and supplier capacity to meet demands on time.&#8221; (\u062a\u062a\u062c\u0627\u0648\u0632 \u062e\u0637\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u0627\u0644\u0645\u0642\u064a\u0651\u062f\u0629\u060c \u0643\u062d\u0644 \u0623\u062e\u064a\u0631\u060c \u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0644\u062a\u0644\u0628\u064a\u0629 \u0627\u0644\u0637\u0644\u0628 \u0641\u064a \u0645\u0648\u0639\u062f\u0647.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fausp\/overview-of-constraint-based-supply-planning.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Oracle Production Scheduling: \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629<\/h3>\n\n\n<p>Oracle Production Scheduling \u0647\u0648 \u0623\u062f\u0627\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629. \u0648\u062a\u0635\u0641 Oracle \u0627\u0644\u063a\u0631\u0636 \u0645\u0646\u0647 \u0643\u0645\u0627 \u064a\u0644\u064a: &#8220;Using Oracle Production Scheduling, you can consider resource capacity constraints and the changeovers on resources that occur throughout production.&#8221; (\u064a\u062a\u064a\u062d \u0644\u0643 Oracle Production Scheduling \u0645\u0631\u0627\u0639\u0627\u0629 \u0642\u064a\u0648\u062f \u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u064a\u0647\u0627 \u062e\u0644\u0627\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n\n<p>\u062a\u0641\u0639\u0651\u0644\u0647 \u0628\u0648\u0635\u0641\u0647 \u0645\u0633\u0627\u062d\u0629 \u0639\u0645\u0644 \u0636\u0645\u0646 &#8220;Offering: Supply Chain Planning&#8221; (\u0627\u0644\u062d\u0632\u0645\u0629: Supply Chain Planning) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/how-to-enable-the-production-scheduling-work-area.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u0648\u0628\u0639\u062f \u0630\u0644\u0643\u060c \u064a\u062a\u0639\u0627\u0645\u0644 \u0627\u0644\u0645\u062e\u0637\u0637 \u0645\u0639 \u062c\u062f\u0648\u0644 \u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u062e\u0637\u0648\u0629<\/th><th>\u0645\u0627 \u064a\u062d\u062f\u062b<\/th><\/tr><\/thead><tbody><tr><td>\u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><td>\u062a\u062d\u062f\u064a\u062f \u0623\u0641\u0642 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0648\u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u062b\u0627\u0628\u062a\u0629 \u0648\u0623\u0641\u0642 \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0644\u0644\u0645\u0624\u0633\u0633\u0629<\/td><\/tr><tr><td>\u062a\u062d\u062f\u064a\u062b \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/td><td>\u062c\u0644\u0628 \u0623\u062d\u062f\u062b \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0645\u062a\u0627\u062d \u0648\u0627\u0644\u0625\u0645\u062f\u0627\u062f\u0627\u062a \u0648\u0627\u0644\u0637\u0644\u0628 \u0645\u0646 SCM<\/td><\/tr><tr><td>\u062d\u0633\u0627\u0628 \u0627\u0644\u062c\u062f\u0648\u0644<\/td><td>\u0625\u0646\u0634\u0627\u0621 \u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u0642\u0648\u0627\u0639\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u062a\u0635\u062d\u064a\u062d \u0627\u0644\u062c\u062f\u0648\u0644<\/td><td>\u062a\u0637\u0628\u064a\u0642 \u062a\u0639\u062f\u064a\u0644\u0627\u062a \u0627\u0644\u0645\u062e\u0637\u0637 \u0639\u0644\u0649 \u0645\u062e\u0637\u0637 Gantt \u0623\u0648 \u0642\u0627\u0626\u0645\u0629 \u062a\u0648\u062c\u064a\u0647 \u0627\u0644\u0639\u0645\u0644<\/td><\/tr><tr><td>\u0627\u0644\u0625\u0635\u062f\u0627\u0631<\/td><td>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0645\u0648\u0627\u0639\u064a\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u062e\u062a\u0627\u0631\u0629 \u0641\u064a Manufacturing<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u064a\u0645\u0643\u0646 \u0623\u064a\u0636\u064b\u0627 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u062f\u0648\u0631\u0629 \u0643\u0627\u0645\u0644\u0629 \u0639\u0628\u0631 \u0645\u0648\u0631\u062f REST \u0627\u0644\u0645\u0633\u0645\u0649 <code>productionSchedulingPlans<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u0628\u0642\u0649 \u0639\u0644\u0649 \u0639\u0627\u062a\u0642 \u0627\u0644\u0645\u062e\u0637\u0637<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u062a\u062a\u062c\u0627\u0647\u0644 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0623\u062e\u0631\u0649.<\/strong> \u064a\u062d\u062f\u062f Fusion Manufacturing \u0645\u0648\u0627\u0639\u064a\u062f \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0648\u062a\u0634\u064a\u0631 Oracle \u0625\u0644\u0649 \u0623\u0646\u0647 &#8220;potentially plans to execute production for multiple work orders simultaneously.&#8221; (\u0642\u062f \u064a\u062e\u0637\u0637 \u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u062f\u0629 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>\u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0645\u062c\u0645\u0651\u0639\u0629 \u0641\u064a Supply Planning.<\/strong> \u062a\u0646\u0642\u0644 \u0627\u0644\u062e\u0637\u0637 \u0627\u0644\u0645\u0642\u064a\u0651\u062f\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0628\u064a\u0646 \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0648\u062a\u062a\u062c\u0627\u0648\u0632 \u0627\u0644\u0637\u0627\u0642\u0629 \u0643\u062d\u0644 \u0623\u062e\u064a\u0631.<\/li>\n\n\n<li><strong>\u0645\u0624\u0633\u0633\u0629 \u0648\u0627\u062d\u062f\u0629 \u0644\u0643\u0644 \u062c\u062f\u0648\u0644.<\/strong> \u064a\u062d\u0633\u0628 Production Scheduling \u062c\u062f\u0648\u0644\u064b\u0627 \u0644\u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0644\u0644\u0645\u0639\u062f\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0648\u062d\u062f\u0629 \u0627\u0644\u0648\u0627\u062d\u062f\u0629.<\/strong> &#8220;Changeover rules are applied only on resources that have resource type set to equipment and default units available set to 1.&#8221; (\u062a\u064f\u0637\u0628\u0651\u0642 \u0642\u0648\u0627\u0639\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0641\u0642\u0637 \u0639\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0648\u062d\u062f\u0629 \u0627\u0644\u0648\u0627\u062d\u062f\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0627\u0641\u062a\u0631\u0627\u0636\u064a\u064b\u0627.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>\u0644\u0644\u0625\u0635\u062f\u0627\u0631 \u0623\u0641\u0642 \u0632\u0645\u0646\u064a.<\/strong> &#8220;Only work orders within the release horizon specified in the schedule options will be released.&#8221; (\u0644\u0646 \u062a\u064f\u0635\u062f\u0631 \u0625\u0644\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0648\u0627\u0642\u0639\u0629 \u0636\u0645\u0646 \u0623\u0641\u0642 \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0627\u0644\u0645\u062d\u062f\u062f \u0641\u064a \u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/use_case_manage_production_schedule.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>\u062d\u062f\u0651\u062b \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0642\u0628\u0644 \u0627\u0644\u0625\u0635\u062f\u0627\u0631.<\/strong> &#8220;If the schedule isn&#8217;t refreshed after the previous release, changes to the schedule for some work orders might not be released.&#8221; (\u0625\u0630\u0627 \u0644\u0645 \u062a\u064f\u062d\u062f\u0651\u062b \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0628\u0639\u062f \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0628\u0642\u060c \u0641\u0642\u062f \u0644\u0627 \u062a\u064f\u0635\u062f\u0631 \u062a\u0639\u062f\u064a\u0644\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0644\u0628\u0639\u0636 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.) \u0648\u0644\u0627 \u062a\u064f\u062d\u062f\u0651\u062b \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u062a\u0643\u0648\u0646 \u062d\u0627\u0644\u062a\u0647\u0627 Pending Approval\u060c \u0643\u0645\u0627 \u0644\u0627 \u062a\u064f\u0635\u062f\u0631 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0645\u0646 Supply Planning \u0644\u0644\u062a\u0646\u0641\u064a\u0630. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/release-analysis-and-actions.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u062e\u0637\u0637 \u0645\u0633\u0624\u0648\u0644 \u0639\u0646 \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062f\u0648\u0631\u0629.<\/strong> \u062a\u064f\u0646\u0641\u0651\u0630 \u062e\u0637\u0648\u0627\u062a \u062a\u062d\u062f\u064a\u062b \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0633\u0627\u0628 \u0627\u0644\u062c\u062f\u0648\u0644 \u0648\u062a\u0635\u062d\u064a\u062d\u0647 \u0648\u0625\u0635\u062f\u0627\u0631\u0647 \u0628\u0625\u062c\u0631\u0627\u0621\u0627\u062a \u064a\u062a\u062e\u0630\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0637 \u0623\u0648 \u0628\u0645\u0647\u0627\u0645 \u0645\u062c\u062f\u0648\u0644\u0629.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-oracle-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u062a\u0643\u0641\u064a \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0641\u064a Oracle\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0641\u064a \u0623\u062f\u0648\u0627\u062a Oracle Fusion Cloud \u0646\u0641\u0633\u0647\u0627 \u0628\u0627\u0644\u063a\u0631\u0636 \u0639\u0646\u062f\u0645\u0627:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u062a\u0643\u0648\u0646 \u0645\u0648\u0627\u0639\u064a\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062d\u0633\u0648\u0628\u0629 \u0645\u0646 \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u062f\u0642\u064a\u0642\u0629 \u0628\u0645\u0627 \u064a\u0643\u0641\u064a \u0644\u0644\u0648\u0641\u0627\u0621 \u0628\u0627\u0644\u062a\u0632\u0627\u0645\u0627\u062a\u0643.<\/li>\n\n\n<li>\u062a\u0643\u0648\u0646 \u0627\u0644\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a \u0646\u0627\u062f\u0631\u0629\u060c \u0648\u064a\u0645\u0643\u0646 \u0644\u0645\u062e\u0637\u0637 \u0648\u0627\u062d\u062f \u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a \u064a\u062f\u0648\u064a\u064b\u0627.<\/li>\n\n\n<li>\u062a\u0633\u062a\u062e\u062f\u0645 Supply Chain Planning \u0628\u0627\u0644\u0641\u0639\u0644\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 \u062a\u062e\u0637\u064a\u0637 \u0645\u0631\u0643\u0632\u064a \u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629.<\/li>\n\n\n<li>\u062a\u0643\u0648\u0646 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0645\u0624\u062b\u0631\u0629 \u0623\u0633\u0627\u0633\u064b\u0627 \u0639\u0644\u0649 \u0627\u0644\u0622\u0644\u0627\u062a \u0627\u0644\u0645\u0646\u0641\u0631\u062f\u0629.<\/li>\n\n\n<li>\u064a\u062e\u0637\u0637 \u0643\u0644 \u0645\u0635\u0646\u0639 \u0628\u0635\u0648\u0631\u0629 \u0645\u0633\u062a\u0642\u0644\u0629\u060c \u0648\u0644\u0627 \u064a\u062d\u062a\u0627\u062c \u0627\u0644\u0645\u0634\u063a\u0644\u0648\u0646 \u0641\u064a \u0623\u0631\u0636 \u0627\u0644\u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0627\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u062d\u062f\u0651\u062b \u0644\u062d\u0638\u0629 \u0628\u0644\u062d\u0638\u0629.<\/li>\n\n<\/ul>\n\n\n<p>\u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0647\u0630\u0647 \u0627\u0644\u0638\u0631\u0648\u0641 \u062a\u0646\u0637\u0628\u0642 \u0639\u0644\u064a\u0643\u060c \u0641\u0627\u062d\u0631\u0635 \u0639\u0644\u0649 \u062f\u0642\u0629 \u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u062d\u062f\u0651\u062b \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0642\u0628\u0644 \u0643\u0644 \u0625\u0635\u062f\u0627\u0631.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0623\u062f\u0627\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0643\u0648\u0646 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643 \u0642\u062f \u062a\u062c\u0627\u0648\u0632\u062a \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0639\u0646\u062f\u0645\u0627 \u062a\u0646\u0637\u0628\u0642 \u0639\u062f\u0629 \u062d\u0627\u0644\u0627\u062a \u0645\u0645\u0627 \u064a\u0644\u064a:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u062a\u062a\u0623\u062e\u0631 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0631\u063a\u0645 \u0623\u0646 \u062e\u0637\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u062a\u0628\u062f\u0648 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0646\u062f \u0627\u0644\u0646\u0638\u0631 \u0625\u0644\u0649 \u0643\u0644 \u0641\u062a\u0631\u0629 \u0632\u0645\u0646\u064a\u0629 \u0645\u062c\u0645\u0651\u0639\u0629.<\/li>\n\n\n<li>\u064a\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u062a\u0631\u062a\u064a\u0628 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062c\u062f\u0627\u0648\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u0639\u062f \u0643\u0644 \u0637\u0644\u0628 \u0639\u0627\u062c\u0644 \u0623\u0648 \u0639\u0637\u0644.<\/li>\n\n\n<li>\u064a\u0639\u062a\u0645\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u062a\u062c \u0627\u0644\u0630\u064a \u0633\u0628\u0642 \u062a\u0634\u063a\u064a\u0644\u0647\u060c \u0633\u0648\u0627\u0621 \u0639\u0644\u0649 \u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u0644\u062f\u0649 \u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0645\u062a\u0639\u062f\u062f\u0629 \u0627\u0644\u0648\u062d\u062f\u0627\u062a.<\/li>\n\n\n<li>\u064a\u062d\u062f\u0651 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646 \u0648\u0646\u0638\u0627\u0645 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u062d\u0627\u0644\u0627\u062a \u0627\u0644\u063a\u064a\u0627\u0628 \u0645\u0646 \u062d\u062c\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0642\u062f\u0631 \u0645\u0627 \u062a\u062d\u062f\u0651\u0647 \u0627\u0644\u0622\u0644\u0627\u062a.<\/li>\n\n\n<li>\u062a\u0646\u062a\u0642\u0644 \u0642\u0648\u0627\u0644\u0628 \u0627\u0644\u062a\u0634\u0643\u064a\u0644 \u0623\u0648 \u0627\u0644\u0635\u0628 \u0623\u0648 \u062a\u062c\u0647\u064a\u0632\u0627\u062a \u0627\u0644\u062a\u062b\u0628\u064a\u062a \u0628\u064a\u0646 \u0627\u0644\u0622\u0644\u0627\u062a.<\/li>\n\n\n<li>\u064a\u0646\u062a\u0642\u0644 \u0627\u0644\u0639\u0645\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0635\u0627\u0646\u0639\u060c \u0648\u064a\u062d\u062a\u0627\u062c \u0643\u0644 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0627\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u062c\u062f\u0627\u0648\u0644 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u0623\u062e\u0631\u0649.<\/li>\n\n\n<li>\u062a\u0633\u062a\u062e\u062f\u0645 Fusion Manufacturing \u062f\u0648\u0646 Supply Chain Planning.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u062a\u0628\u062d\u062b \u0639\u0646\u0647\u061f<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0645\u0631\u0627\u0639\u0627\u0629 \u062d\u062f\u0648\u062f \u0637\u0627\u0642\u0629 \u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0641\u064a \u0622\u0646 \u0648\u0627\u062d\u062f:<\/strong> \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0644\u0627 \u0645\u062c\u0631\u062f \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0645\u062c\u0645\u0651\u0639\u0629.<\/li>\n\n\n<li><strong>\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a<\/strong> \u0628\u062d\u0633\u0628 \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u0648\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642.<\/li>\n\n\n<li><strong>\u0645\u0635\u0641\u0648\u0641\u0629 \u0644\u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f<\/strong> \u062a\u062a\u0636\u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0628\u062d\u064a\u062b \u064a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u064a\u062e\u062a\u0644\u0641 \u0628\u0627\u062e\u062a\u0644\u0627\u0641 \u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0643\u0645\u0648\u0627\u0631\u062f \u0645\u0634\u062a\u0631\u0643\u0629 \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u0637\u0627\u0642\u0629<\/strong> \u0648\u062f\u0639\u0645 <strong>\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u062a\u0637\u0644\u0628 \u0639\u062f\u0629 \u0645\u0634\u063a\u0644\u064a\u0646<\/strong>.<\/li>\n\n\n<li><strong>\u062c\u062f\u0648\u0644\u0629 \u062a\u0631\u0627\u0639\u064a \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f<\/strong> \u0648\u062a\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0645\u062a\u0627\u062d \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0648\u0627\u0631\u062f\u0629.<\/li>\n\n\n<li><strong>\u062a\u062e\u0637\u064a\u0637 \u0639\u062f\u0629 \u0645\u0635\u0627\u0646\u0639<\/strong> \u0636\u0645\u0646 \u062c\u062f\u0648\u0644 \u0648\u0627\u062d\u062f.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/strong> \u0639\u0646\u062f \u062a\u063a\u064a\u0631 \u062a\u0642\u062f\u0645 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.<\/li>\n\n\n<li><strong>\u0645\u0633\u0627\u0631 \u0648\u0627\u0636\u062d \u0644\u062a\u0628\u0627\u062f\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0639 Oracle.<\/strong> \u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0643\u062a\u0627\u0628\u062a\u0647\u0627 \u0639\u0628\u0631 REST API \u0627\u0644\u062e\u0627\u0635 \u0628\u0640 Oracle Fusion Cloud SCM\u060c \u0645\u0639 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0644\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0627\u0633\u0623\u0644 \u0643\u0644 \u0645\u0632\u0648\u0651\u062f \u0639\u0646 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062f\u0639\u064a\u0647\u0627\u060c \u0648\u0627\u0644\u062c\u0647\u0629 \u0627\u0644\u062a\u064a \u062a\u062a\u0648\u0644\u0649 \u062f\u0639\u0645 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n<\/ul>\n\n\n<p>\u0644\u0644\u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u0647\u062c \u0627\u0644\u0639\u0627\u0645\u060c \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/finite-capacity-scheduling\/\">\u062f\u0644\u064a\u0644 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u064a\u0646 \u064a\u0623\u062a\u064a \u062f\u0648\u0631 SkyPlanner\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0633\u062f SkyPlanner APS \u0643\u0644 \u0641\u062c\u0648\u0629 \u0645\u0630\u0643\u0648\u0631\u0629 \u0623\u0639\u0644\u0627\u0647. \u0641\u0647\u0648 \u064a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0637\u0627\u0642\u0629 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0639\u0627\u0645\u0644 \u0648\u0623\u062f\u0627\u0629. \u0648\u064a\u0646\u0634\u0626 \u0645\u062d\u0631\u0643 Arcturus AI \u062c\u062f\u0648\u0644\u064b\u0627 \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u064a \u062b\u0648\u0627\u0646\u064d\u060c \u0648\u064a\u0631\u062a\u0628 \u0627\u0644\u0639\u0645\u0644 \u0628\u062d\u0633\u0628 \u0623\u0648\u0644\u0648\u064a\u0629 \u0627\u0644\u0645\u0647\u0645\u0629 \u0648\u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0643\u0645\u0627\u0644 \u0648\u0623\u0648\u0644\u0648\u064a\u0629 \u0627\u0644\u0639\u0645\u064a\u0644 \u0648Fast Track \u0648Dynamic Priorities.<\/p>\n\n\n<p>\u062a\u062a\u0636\u0645\u0646 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646\u060c \u0648\u064a\u062e\u062a\u0627\u0631 \u0627\u0644\u0645\u062d\u0631\u0643 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0630\u064a \u064a\u062a\u0637\u0644\u0628 \u0623\u0642\u0644 \u0642\u062f\u0631 \u0645\u0646 \u0627\u0644\u0625\u0639\u062f\u0627\u062f. \u0648\u064a\u0639\u0627\u0645\u0644 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0643\u0645\u0648\u0627\u0631\u062f \u0645\u0634\u062a\u0631\u0643\u0629 \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u0637\u0627\u0642\u0629\u060c \u0648\u064a\u0645\u0643\u0646 \u0644\u0639\u062f\u0629 \u0623\u0634\u062e\u0627\u0635 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0627\u0644\u0645\u0647\u0645\u0629 \u0646\u0641\u0633\u0647\u0627 \u0641\u064a \u0622\u0646 \u0648\u0627\u062d\u062f. \u0648\u064a\u0646\u062a\u0642\u0644 \u0627\u0644\u0639\u0645\u0644 \u0625\u0644\u0649 \u0622\u0644\u0627\u062a \u0623\u0648 \u0639\u0627\u0645\u0644\u064a\u0646 \u0628\u062f\u0644\u0627\u0621 \u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a. \u0648\u062a\u064f\u0645\u062b\u0651\u0644 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0643\u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u0646 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0636\u0645\u0646 \u062e\u0637\u0629 \u0648\u0627\u062d\u062f\u0629\u060c \u0645\u0639 \u0627\u062d\u062a\u0633\u0627\u0628 \u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0646\u0642\u0644 \u0628\u064a\u0646\u0647\u0627.<\/p>\n\n\n<p>\u062a\u062d\u0627\u0643\u064a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a \u0627\u0646\u0637\u0644\u0627\u0642\u064b\u0627 \u0645\u0646 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u062d\u0627\u0644\u064a \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0648\u0627\u0631\u062f\u0629\u060c \u0641\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0647\u0645\u0629 \u0639\u0646\u062f \u062a\u0648\u0641\u0631 \u0645\u0648\u0627\u062f\u0647\u0627. \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u062b\u0628\u0651\u062a Running Time Lock \u062c\u062f\u0648\u0644 \u0627\u0644\u0639\u0645\u0644 \u0644\u0644\u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0645\u0642\u0628\u0644\u0629 \u062d\u062a\u0649 \u0644\u0627 \u064a\u062a\u0639\u0637\u0644 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639. \u0648\u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0639\u0628\u0631 \u0627\u0644\u0647\u0627\u062a\u0641 \u0623\u0648 \u0627\u0644\u062c\u0647\u0627\u0632 \u0627\u0644\u0644\u0648\u062d\u064a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Mobile Confirmations \u0648Production Timer \u0648Quick Log Mode.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 Oracle Production Scheduling \u0639\u0646\u062f\u0645\u0627:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u0633\u062a\u062e\u062f\u0645 Fusion Manufacturing \u062f\u0648\u0646 Supply Chain Planning.<\/strong> \u062a\u062a\u064a\u062d Oracle \u0648\u062d\u062f\u0629 Production Scheduling \u0636\u0645\u0646 \u062d\u0632\u0645\u0629 Supply Chain Planning. \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u062c\u062f\u0648\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 Manufacturing \u0627\u0644\u0630\u064a \u062a\u0633\u062a\u062e\u062f\u0645\u0647 \u0628\u0627\u0644\u0641\u0639\u0644.<\/li>\n\n\n<li><strong>\u064a\u0634\u0645\u0644 \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0643\u062b\u0631 \u0645\u0646 \u0645\u0635\u0646\u0639 \u0648\u0627\u062d\u062f.<\/strong> \u064a\u062d\u0633\u0628 Production Scheduling \u0627\u0644\u062c\u062f\u0648\u0644 \u0644\u0643\u0644 \u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u062d\u062f\u0629. \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u062e\u0637\u0637 \u0644\u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0645\u0639\u064b\u0627.<\/li>\n\n\n<li><strong>\u062a\u062d\u062f\u062f \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0647\u0627\u0645.<\/strong> \u062a\u0639\u0645\u0644 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0639\u0644\u0649 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u064a\u062c\u0645\u0639 \u062c\u062f\u0648\u0644 \u0648\u0627\u062d\u062f \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u062a\u0648\u0641\u0631 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u064a\u0634\u062a\u0631\u0643 \u0641\u064a\u0647\u0627 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0648\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0628\u062f\u064a\u0644\u0629 \u0648\u0645\u0648\u0627\u0639\u064a\u062f \u0648\u0635\u0648\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li><strong>\u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062e\u0637\u0629 \u062a\u0648\u0627\u0643\u0628 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627.<\/strong> \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0639\u0646\u062f \u0643\u0644 \u062a\u063a\u064a\u064a\u0631 \u0645\u0624\u062b\u0631\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u062a\u0646\u0641\u064a\u0630 \u062f\u0648\u0631\u0629 Refresh \u0648Release.<\/li>\n\n\n<li><strong>\u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0625\u062a\u0627\u062d\u0629 \u0627\u0644\u062e\u0637\u0629 \u0644\u0643\u0644 \u0645\u0634\u063a\u0651\u0644.<\/strong> \u0644\u0627 \u064a\u062d\u062f\u0651 SkyPlanner \u0645\u0646 \u0639\u062f\u062f \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0648\u062a\u062a\u064a\u062d Mobile Confirmations \u0639\u0631\u0636 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u0644\u0649 \u0643\u0644 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a.<\/li>\n\n<\/ul>\n\n\n<p>\u0627\u0628\u062f\u0623 \u0628\u062a\u0635\u062f\u064a\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0645\u0646 Oracle \u0625\u0644\u0649 \u0645\u0644\u0641 Excel \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0647 \u062e\u0644\u0627\u0644 <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627<\/a> (\u062d\u062a\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u062f\u0648\u0646 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646). \u0628\u0639\u062f \u0630\u0644\u0643\u060c \u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u0648\u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0644\u0643 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0633\u064a\u0631 \u0639\u0645\u0644\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0634\u062a\u0631\u0627\u0643\u0643.<\/p>\n\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Oracle Fusion Cloud \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 SCM REST API. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629\u060c \u0648\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643\u0643 \u0623\u0648 \u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629. \u0631\u0627\u062c\u0639 \u0635\u0641\u062d\u0629 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/\">SkyPlanner \u0645\u0639 Oracle Fusion Cloud<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Oracle Fusion Cloud<\/a>\u060c \u0623\u0648 \u062c\u0645\u064a\u0639 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0623\u0646\u0638\u0645\u0629 ERP<\/a>. \u0647\u0644 \u062a\u0633\u062a\u062e\u062f\u0645 NetSuite\u061f \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/\">SkyPlanner \u0645\u0639 NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u062a\u0648\u0641\u064a\u0631 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0628\u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u0623\u0635\u0628\u062d \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0633\u062a\u063a\u0631\u0642 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0639\u0627\u0645\u0644 \u0644\u062d\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u064e\u0644\u062e \u0647\u064a\u0643\u0644\u064b\u0627 \u0641\u0648\u0644\u0627\u0630\u064a\u064b\u0627 \u0645\u0644\u062d\u0648\u0645\u064b\u0627 \u0641\u064a \u0645\u0635\u0646\u0639 \u0623\u0644\u0627\u0647\u0627\u0631\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0627\u0631\u062a\u0641\u0627\u0639\u064b\u0627 \u0645\u0646 \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u064b\u0627 \u062d\u0627\u0633\u0645\u064b\u0627 \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0644\u062a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0634\u0631\u0641 \u0648\u0627\u062d\u062f \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0645\u0634\u0631\u0641\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646\u0630 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u064a\u0645\u0646\u062d\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u064a\u062c\u0639\u0644 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0627\u0628\u0644\u064b\u0627 \u0644\u0644\u062a\u0646\u0628\u0624.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0645\u0627\u0644\u064a (COO\/CFO)<\/b><br>Opes Corporation \u00b7 \u0627\u0644\u0635\u0646\u0627\u0639\u0627\u062a \u0627\u0644\u0643\u064a\u0645\u064a\u0627\u0626\u064a\u0629 \u0648\u0627\u0644\u063a\u0630\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 100% \u0637\u0648\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner\u060c \u0645\u0646\u0630 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/opes-corporation\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Manufacturing \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u062a\u0648\u0636\u062d Oracle \u0623\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u0628\u0648\u0627\u0633\u0637\u0629 \u0645\u062d\u0631\u0643 \u063a\u064a\u0631 \u0645\u0642\u064a\u0651\u062f \u064a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629 \u0648\u064a\u062a\u062c\u0627\u0647\u0644 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u0646\u0627\u062a\u062c\u0629 \u0639\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0623\u062e\u0631\u0649. \u0623\u0645\u0627 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629\u060c \u0641\u064a\u062a\u0648\u0641\u0631 \u0641\u064a Oracle Production Scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 Oracle Production Scheduling \u062c\u0632\u0621 \u0645\u0646 Fusion Manufacturing\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u062a\u062a\u064a\u062d Oracle \u0648\u062d\u062f\u0629 Production Scheduling \u0643\u0645\u0633\u0627\u062d\u0629 \u0639\u0645\u0644 \u0636\u0645\u0646 \u062d\u0632\u0645\u0629 Supply Chain Planning. \u0648\u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0645\u0646 \u062c\u062f\u0627\u0648\u0644\u0647\u0627 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Manufacturing.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0627\u0644\u0641\u0631\u0642 \u0628\u064a\u0646 Oracle Supply Planning \u0648Production Scheduling\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062e\u0637\u0637 Supply Planning \u0644\u0644\u0625\u0645\u062f\u0627\u062f \u0636\u0645\u0646 \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629\u060c \u0648\u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0642\u064a\u0648\u062f\u060c \u064a\u062a\u062c\u0627\u0648\u0632 \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0643\u062d\u0644 \u0623\u062e\u064a\u0631. \u0623\u0645\u0627 Production Scheduling \u0641\u064a\u062d\u062f\u062f \u062a\u0633\u0644\u0633\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0644\u0645\u0624\u0633\u0633\u0629 \u062c\u062f\u0648\u0644\u0629 \u0648\u0627\u062d\u062f\u0629\u060c \u0648\u064a\u064f\u0635\u062f\u0631 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0648\u0627\u0642\u0639\u0629 \u0636\u0645\u0646 \u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0644\u0644\u0625\u0635\u062f\u0627\u0631.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062a\u0639\u0627\u0645\u0644 Oracle Fusion Cloud \u0645\u0639 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u064a \u062a\u062a\u063a\u064a\u0631 \u0628\u062d\u0633\u0628 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0647\u0627\u0645\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645\u060c \u0641\u064a Production Scheduling\u060c \u0645\u0646 \u062e\u0644\u0627\u0644 \u0642\u0648\u0627\u0639\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u0645\u0637\u0628\u0651\u0642\u0629 \u0639\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u062a\u0648\u0641\u0631 \u0645\u0646\u0647\u0627 \u0648\u062d\u062f\u0629 \u0648\u0627\u062d\u062f\u0629. \u0623\u0645\u0627 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0641\u064a SkyPlanner \u0641\u062a\u062e\u0632\u0651\u0646 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0644\u0649 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u062a\u0631\u062a\u0651\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0647\u0630\u0647 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u064a \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0631\u0628\u0637\u0647 \u0645\u0639 Oracle Fusion Cloud\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u0627\u0633\u062a\u0648\u0631\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0648\u062a\u0639\u0631\u064a\u0641\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u0646 Oracle \u0628\u0635\u064a\u063a\u0629 Excel \u0623\u0648 CSV \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u0645\u0631 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0648\u0642\u0627\u0631\u0646 \u0627\u0644\u062c\u062f\u0648\u0644 \u0628\u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle Fusion Cloud \u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling \u0644\u064a\u0633 \u0636\u0645\u0646 Oracle Fusion Cloud Manufacturing \u0646\u0641\u0633\u0647. \u062a\u0648\u0636\u062d Oracle \u0623\u0646 \u0645\u062d\u0631\u0643 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u064a\u0648\u062f \u0648\u064a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0623\u0645\u0627 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0641\u062a\u062a\u0648\u0641\u0631 \u0641\u064a Oracle &#8230; <a title=\"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" aria-label=\"Read more about \u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106165,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106861","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0647\u0644 \u064a\u062f\u0639\u0645 Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u061f<\/title>\n<meta name=\"description\" content=\"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling\" \/>\n<meta property=\"og:description\" content=\"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"name\":\"\u0647\u0644 \u064a\u062f\u0639\u0645 Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u061f\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0640 Oracle Fusion Cloud: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0647\u0644 \u064a\u062f\u0639\u0645 Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u061f","description":"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_locale":"ar_AR","og_type":"article","og_title":"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling","og_description":"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","name":"\u0647\u0644 \u064a\u062f\u0639\u0645 Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u061f","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"\u064a\u062c\u062f\u0648\u0644 Oracle Fusion Manufacturing \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0645\u0627\u0630\u0627 \u064a\u0636\u064a\u0641 Production Scheduling \u0648Supply Planning\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS\u061f","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0640 Oracle Fusion Cloud: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"\u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle Fusion Cloud \u0647\u0644 \u064a\u062a\u064a\u062d Oracle Fusion Cloud \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f \u0634\u0631\u062d \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648Production Scheduling \u0644\u064a\u0633 \u0636\u0645\u0646 Oracle Fusion Cloud Manufacturing \u0646\u0641\u0633\u0647. \u062a\u0648\u0636\u062d Oracle \u0623\u0646 \u0645\u062d\u0631\u0643 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u064a\u0648\u062f \u0648\u064a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0623\u0645\u0627 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0641\u062a\u062a\u0648\u0641\u0631 \u0641\u064a Oracle&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=106861"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106861\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106165"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=106861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}