{"id":106194,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"qad-adaptive-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/","title":{"rendered":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: <span class=\"hl\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP (\u0627\u0644\u0645\u0639\u0631\u0648\u0641 \u0633\u0627\u0628\u0642\u064b\u0627 \u0628\u0627\u0633\u0645 QAD Enterprise Applications \u0648MFG\/PRO)\u060c \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0639\u0631\u0641 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u0630 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646: \u064a\u0633\u062a\u0642\u0628\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621. \u0648\u064a\u064f\u0639\u064a\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0648\u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 Work Order Maintenance \u0639\u0628\u0631 QAD QXtend\u060c \u0643\u0645\u0627 \u064a\u0631\u062d\u0651\u0644 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0625\u0644\u0649 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0641\u0639\u0644\u064a \u0648\u0627\u0633\u062a\u0644\u0627\u0645\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0644\u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0625\u0639\u062f\u0627\u062f\u0627\u062a QAD \u0644\u062f\u064a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629.<\/p>\n\n\n<p>\u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0648\u062a\u0628\u0644\u063a \u062a\u0643\u0644\u0641\u0629 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627. \u062a\u0633\u062a\u0645\u0631 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062a\u063a\u064a\u0651\u0631 \u0641\u064a \u0625\u0646\u062a\u0627\u062c\u0643\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u062a\u0633\u0644\u0633\u0644 \u0639\u0645\u0644 \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0641\u0642 \u0637\u0627\u0642\u062a\u0647\u0627 \u0627\u0644\u0645\u062a\u0627\u062d\u0629.<\/p>\n\n\n<p class=\"fx-pain__b\">\u062a\u0639\u0631\u0636 \u0648\u062d\u062f\u0629 Capacity Requirements Planning \u0641\u064a QAD \u0627\u0644\u062d\u0645\u0644 \u0639\u0644\u0649 \u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644. \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u064f\u0633\u0646\u062f \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0622\u0644\u0629 \u0623\u0648 \u0634\u062e\u0635 \u0645\u062d\u062f\u062f \u0641\u064a \u0648\u0642\u062a \u0645\u062d\u062f\u062f\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u0627\u0644\u063a\u064a\u0627\u0628 \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0625\u0636\u0627\u0641\u064a.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0644\u0627 \u0645\u0632\u064a\u062f \u0645\u0646 \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u062f\u0648\u0646 \u0633\u064a\u0637\u0631\u062a\u0643.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u062d\u0627\u0641\u0638 SkyPlanner \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u062a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639\u0647 \u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0635\u062f\u0627\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0641\u064a QAD. \u0641\u0644\u0627 \u064a\u0639\u0648\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u0628\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0625\u0639\u0627\u062f\u0629 \u0625\u062f\u062e\u0627\u0644 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0628\u0639\u062f \u0643\u0644 \u062a\u0634\u063a\u064a\u0644 \u0644\u0640 CRP.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0628\u062a\u0643\u0644\u0641\u0629 \u0623\u0642\u0644.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u062d\u062a\u0641\u0638 SkyPlanner \u0628\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0645\u0646\u062a\u062c\u064a\u0646\u060c \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u0641\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0645\u0646 \u0644\u0648\u0646 \u0641\u0627\u062a\u062d \u0625\u0644\u0649 \u062f\u0627\u0643\u0646 \u0642\u062f \u0644\u0627 \u064a\u062d\u062a\u0627\u062c \u0633\u0648\u0649 \u0634\u0637\u0641 \u0633\u0631\u064a\u0639\u060c \u0628\u064a\u0646\u0645\u0627 \u064a\u062a\u0637\u0644\u0628 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0645\u0646 \u0627\u0644\u062f\u0627\u0643\u0646 \u0625\u0644\u0649 \u0627\u0644\u0641\u0627\u062a\u062d \u062a\u0646\u0638\u064a\u0641\u064b\u0627 \u0643\u0627\u0645\u0644\u064b\u0627. \u0648\u064a\u0631\u062a\u0651\u0628 \u0627\u0644\u0645\u062d\u0631\u0643 \u0627\u0644\u0645\u0647\u0627\u0645 \u0628\u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0630\u064a \u064a\u0647\u062f\u0631 \u0623\u0642\u0644 \u0648\u0642\u062a.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0645\u062d\u062f\u0648\u062f \u0623\u064a\u0636\u064b\u0627.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062b\u0644\u0627\u062b\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u062a\u064f\u0633\u0646\u062f \u0625\u0644\u0649 \u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u062e\u0627\u0635 \u0645\u062a\u0627\u062d\u064a\u0646 \u0641\u064a \u0648\u0631\u062f\u064a\u0627\u062a\u0647\u0645. \u0648\u0644\u0627 \u064a\u064f\u062d\u062c\u0632 \u0642\u0627\u0644\u0628 \u0645\u0633\u062a\u062e\u062f\u0645 \u0639\u0644\u0649 \u0645\u0643\u0628\u0633 \u0644\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0645\u0643\u0628\u0633 \u0622\u062e\u0631 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647. \u0648\u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0622\u0644\u0629 \u0645\u0634\u063a\u0648\u0644\u0629\u060c \u064a\u064f\u0646\u0642\u0644 \u0627\u0644\u0639\u0645\u0644 \u0625\u0644\u0649 \u0622\u0644\u0629 \u0623\u0648 \u0634\u062e\u0635 \u0628\u062f\u064a\u0644.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f \u064a\u062d\u062f\u0651\u062f \u0645\u0648\u0639\u062f \u0627\u0644\u0628\u062f\u0621.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0641\u062d\u0635 SkyPlanner \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631\u0629 \u0644\u0643\u0644 \u0635\u0646\u0641. \u0648\u064a\u064f\u062e\u0637\u0651\u064e\u0637 \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u0646\u062a\u0638\u0631 \u062a\u0648\u0631\u064a\u062f\u064b\u0627 \u0645\u0646 \u0623\u062d\u062f \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0628\u0639\u062f \u0645\u0648\u0639\u062f \u0648\u0635\u0648\u0644\u0647\u060c \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u0639\u0645\u0644 \u062b\u0645 \u0625\u064a\u0642\u0627\u0641\u0647 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0631\u0649 \u0643\u0644 \u0645\u0634\u063a\u0651\u0644 \u0645\u0647\u0627\u0645\u0647 \u0627\u0644\u062a\u0627\u0644\u064a\u0629 \u0639\u0644\u0649 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a\u060c \u0648\u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0639\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u062a\u0646\u0641\u064a\u0630\u0647. \u0648\u064a\u062a\u0627\u0628\u0639 \u0627\u0644\u0645\u0643\u062a\u0628 \u0627\u0644\u062a\u0642\u062f\u0651\u0645 \u0645\u0628\u0627\u0634\u0631\u0629\u060c \u0648\u062a\u0639\u0648\u062f \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0641\u0639\u0644\u064a \u0625\u0644\u0649 QAD.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u062a\u062c\u0631\u0628\u0629 UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0628\u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u062a\u062c\u0631\u0628\u0629 Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646\u0630 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0645\u0646\u062d\u0646\u0627 SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u060c \u0648\u064a\u062c\u0639\u0644 \u0646\u062a\u0627\u0626\u062c \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u062a\u0648\u0642\u0639.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund\u060c COO\/CFO<\/b><br>Opes Corporation \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0643\u064a\u0645\u064a\u0627\u0626\u064a\u0629 \u0648\u0627\u0644\u0623\u063a\u0630\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 100% \u0637\u0648\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner\u060c \u0645\u0646\u0630 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/opes-corporation\/\">\u0627\u0642\u0631\u0623 \u062a\u0642\u064a\u064a\u0645 Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0644\u062d\u0651\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u0644\u062e \u0647\u064a\u0643\u0644\u064b\u0627 \u0641\u0648\u0644\u0627\u0630\u064a\u064b\u0627 \u0645\u0644\u062d\u0648\u0645\u064b\u0627 \u0641\u064a \u0645\u0635\u0646\u0639 Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0628\u0639\u062f \u0623\u0646 \u0643\u0627\u0646\u062a \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u064b\u0627 \u062d\u0627\u0633\u0645\u064b\u0627 \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0625\u0644\u0649 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0634\u0631\u0641 \u0648\u0627\u062d\u062f \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0645\u0634\u0631\u0641\u064e\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u062a\u062c\u0631\u0628\u0629 KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-qad-adaptive-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u0639\u0645\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u0631\u0633\u0644 QAD \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644.<\/strong> \u062a\u0646\u062a\u0642\u0644 \u0625\u0644\u0649 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641\u060c \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li><strong>\u064a\u0646\u0634\u0626 SkyPlanner \u0627\u0644\u062c\u062f\u0648\u0644 \u0648\u064a\u064f\u0628\u0642\u064a\u0647 \u0645\u062d\u062f\u0651\u062b\u064b\u0627.<\/strong> \u064a\u064f\u062d\u0633\u0651\u0646 \u0645\u062d\u0631\u0643 Arcturus \u0627\u0644\u062e\u0637\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627 \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0639 \u062a\u063a\u064a\u0651\u0631 \u0638\u0631\u0648\u0641 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li><strong>\u062a\u0639\u0648\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0625\u0644\u0649 QAD.<\/strong> \u062a\u064f\u0639\u0627\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0648\u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0639\u0628\u0631 QXtend Inbound QDoc \u0641\u064a Work Order Maintenance (16.1). \u0648\u062a\u064f\u0631\u062d\u0651\u064e\u0644 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0639\u0628\u0631 Labor Feedback by Work Order (16.20.1) \u0648Work Order Receipt (16.11).<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u0642\u0649 QAD \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0631\u062c\u0639\u064a \u0644\u0628\u064a\u0627\u0646\u0627\u062a\u0643. \u0648\u062a\u0638\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648MRP \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u062d\u0633\u0627\u0628 \u0627\u0644\u062a\u0643\u0627\u0644\u064a\u0641 \u0648\u0627\u0644\u0634\u0624\u0648\u0646 \u0627\u0644\u0645\u0627\u0644\u064a\u0629 \u0641\u064a \u0645\u0643\u0627\u0646\u0647\u0627. \u0648\u064a\u062a\u0648\u0644\u0649 SkyPlanner \u0623\u0645\u0631\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627: \u062a\u062d\u062f\u064a\u062f \u062a\u0633\u0644\u0633\u0644 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0648\u062a\u0648\u0642\u064a\u062a\u0647\u0627 \u0639\u0644\u0649 \u0643\u0644 \u0645\u0648\u0631\u062f \u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<p>\u064a\u0642\u0631\u0623 SkyPlanner \u0628\u064a\u0627\u0646\u0627\u062a QAD \u0639\u0628\u0631 \u0643\u0627\u0626\u0646\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0641\u064a QAD QXtend Outbound \u200f(Item, Product Structure, Routing, Work Center, Inventory Transaction)\u060c \u0648\u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0627\u062a REST \u0644\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0639\u0646 \u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0641\u064a QAD. \u0648\u064a\u0643\u062a\u0628 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 QAD \u0639\u0628\u0631 QAD QXtend Inbound\u060c \u0648\u0647\u064a \u0648\u0627\u062c\u0647\u0629 SOAP \u0648XML \u0627\u0644\u062a\u064a \u062a\u062a\u064a\u062d \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0628\u0631\u0627\u0645\u062c \u0646\u0641\u0633\u0647\u0627 \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062e\u062f\u0645\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0637. \u0648\u062a\u064f\u0631\u0633\u0644 \u062e\u0637\u0627\u0641\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0641\u064a SkyPlanner \u0643\u0644 \u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647.<\/p>\n\n\n<p>\u062a\u062e\u062a\u0644\u0641 \u0637\u0631\u064a\u0642\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 QAD \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0644\u0630\u0627 \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0641\u0642 \u0625\u0639\u062f\u0627\u062f\u0627\u062a\u0643 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0648\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 QAD \u0623\u0648 \u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0623\u064a\u0636\u064b\u0627 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0644\u062f\u0649 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n\n<p>\u062a\u062c\u062f \u062a\u0641\u0627\u0635\u064a\u0644 QDocs\u060c \u0648\u0631\u0628\u0637 \u062d\u0642\u0648\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0642\u0648\u0627\u0639\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 QAD \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-qad-adaptive-erp-schedules-and-what-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u064f\u062c\u062f\u0648\u0644\u0647 QAD Adaptive ERP\u060c \u0648\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u0636\u064a\u0641\u0647 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062e\u0637\u0637 QAD \u0644\u0644\u0645\u0648\u0627\u062f \u0628\u0643\u0641\u0627\u0621\u0629\u060c \u0648\u064a\u062f\u064a\u0631 \u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Line Schedule Workbench. \u0623\u0645\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0646\u0641\u0635\u0644\u0629\u060c \u0641\u062a\u064f\u062e\u0637\u0651\u064e\u0637 \u0637\u0627\u0642\u062a\u0647\u0627 \u0639\u0628\u0631 Capacity Requirements Planning. \u0648\u064a\u0648\u0636\u062d <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">\u062f\u0644\u064a\u0644 \u0645\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a QAD<\/a> \u0642\u0648\u0627\u0639\u062f \u0639\u0645\u0644\u0647:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u064a\u064f\u062c\u0631\u064a CRP \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0631\u062c\u0648\u0639\u064b\u0627 \u0645\u0646 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642.<\/strong> \u0641\u0647\u0648 &#8220;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (\u064a\u0639\u062a\u0645\u062f \u062a\u0627\u0631\u064a\u062e \u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0623\u0645\u0631 \u0623\u0648 \u062c\u062f\u0648\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a\u060c \u0648\u064a\u062c\u062f\u0648\u0644 \u0639\u0645\u0644\u064a\u0627\u062a\u0647 \u0631\u062c\u0648\u0639\u064b\u0627 \u0645\u0646 \u0622\u062e\u0631 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u064a\u0629 \u0625\u0644\u0649 \u0623\u0648\u0644\u0647\u0627.)<\/li>\n\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0627\u0644\u0645\u062e\u0637\u0637 \u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u0632\u0627\u0626\u062f\u0629.<\/strong> &#8220;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (\u0625\u0630\u0627 \u0632\u0627\u062f \u062d\u0645\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u0623\u0648 \u0622\u0644\u0629 \u0623\u0648 \u0627\u0646\u062e\u0641\u0636 \u0639\u0646 \u0637\u0627\u0642\u062a\u0647\u060c \u064a\u0645\u0643\u0646\u0643 \u062a\u0639\u062f\u064a\u0644 \u0627\u0644\u0637\u0627\u0642\u0629 \u0623\u0648 \u062a\u0648\u0642\u064a\u062a \u0627\u0644\u062d\u0645\u0644 \u0623\u0648 \u062d\u062c\u0645\u0647.)<\/li>\n\n\n<li><strong>\u064a\u064f\u062d\u0645\u0651\u064e\u0644 \u064a\u0648\u0645 \u0648\u0627\u062d\u062f \u0628\u0643\u0627\u0645\u0644 \u0627\u0644\u0639\u0645\u0644.<\/strong> &#8220;The system assigns the entire load for an operation to its scheduled start date.&#8221; (\u064a\u064f\u0633\u0646\u062f \u0627\u0644\u0646\u0638\u0627\u0645 \u0643\u0627\u0645\u0644 \u062d\u0645\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0625\u0644\u0649 \u062a\u0627\u0631\u064a\u062e \u0628\u062f\u0626\u0647\u0627 \u0627\u0644\u0645\u062c\u062f\u0648\u0644.)<\/li>\n\n\n<li><strong>\u062a\u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0639\u0646\u062f \u0625\u0639\u0627\u062f\u0629 \u062a\u0634\u063a\u064a\u0644 CRP.<\/strong> &#8220;When you run CRP, all open operations for selected work orders are rescheduled.&#8221; (\u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 CRP\u060c \u062a\u064f\u0639\u0627\u062f \u062c\u062f\u0648\u0644\u0629 \u062c\u0645\u064a\u0639 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062d\u062f\u062f\u0629.)<\/li>\n\n<\/ul>\n\n\n<p>\u062a\u062a\u0648\u0641\u0631 \u0641\u064a \u0646\u0638\u0627\u0645 QAD \u0627\u0644\u0623\u0633\u0627\u0633\u064a \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0636\u0645\u0646 Advanced Repetitive\u060c \u062d\u064a\u062b \u062a\u064f\u062c\u062f\u0648\u0644 Line Schedule Workbench \u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0623\u0645\u0627 Master and Production Scheduling Workbenches \u0641\u0647\u064a &#8220;.NET UI-only scheduling tools&#8221; (\u0623\u062f\u0648\u0627\u062a \u062c\u062f\u0648\u0644\u0629 \u062a\u0639\u0645\u0644 \u0641\u0642\u0637 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 .NET)\u060c \u0648\u062a\u062a\u0637\u0644\u0628 \u062a\u0631\u062e\u064a\u0635 Maintenance \u0633\u0627\u0631\u064a\u064b\u0627 (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">\u062f\u0644\u064a\u0644 QAD<\/a>). \u0648\u062a\u0648\u0641\u0631 QAD \u0623\u062f\u0627\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u0633\u0644\u0633\u0644\u064a\u0629 \u0641\u064a \u0645\u0646\u062a\u062c \u0645\u0646\u0641\u0635\u0644 \u0647\u0648 QAD Advanced Scheduling\u060c \u0627\u0644\u0630\u064a \u0637\u064f\u0631\u062d \u0641\u064a 2024 (<a href=\"https:\/\/www.qad.com\/solutions\/supply-chain-planning\/advanced-scheduling\">QAD<\/a>).<\/p>\n\n\n<p>\u062a\u062c\u062f \u0634\u0631\u062d\u064b\u0627 \u0644\u0643\u0644 \u062e\u0637\u0648\u0629 \u0648\u0644\u0643\u0644 \u0642\u064a\u062f \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u0647\u0644 \u064a\u062f\u0639\u0645 QAD Adaptive ERP \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u061f<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-adaptive-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP \u0627\u0644\u064a\u0648\u0645\u060c \u0648\u0645\u0639 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QAD CRP \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/th><th>QAD Adaptive ERP \u0645\u0639 SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629<\/td><td>\u064a\u064f\u062c\u0631\u064a CRP \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0631\u062c\u0648\u0639\u064b\u0627 \u0648\u064a\u0639\u0631\u0636 \u0627\u0644\u062d\u0645\u0644 \u0645\u0642\u0627\u0631\u0646\u0629\u064b \u0628\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629<\/td><td>\u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0634\u062e\u0635 \u0648\u0623\u062f\u0627\u0629\u060c \u0648\u0641\u0642 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629<\/td><\/tr><tr><td>\u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u0632\u0627\u0626\u062f\u0629<\/td><td>\u064a\u064f\u0639\u062f\u0651\u0644 \u0627\u0644\u0645\u062e\u0637\u0637 \u0627\u0644\u0637\u0627\u0642\u0629 \u0623\u0648 \u062a\u0648\u0642\u064a\u062a \u0627\u0644\u062d\u0645\u0644<\/td><td>\u064a\u0639\u064a\u062f \u0627\u0644\u0645\u062d\u0631\u0643 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u0641\u0642 \u0623\u0648\u0644\u0648\u064a\u0627\u062a\u0643<\/td><\/tr><tr><td>\u0627\u0644\u062d\u0645\u0644<\/td><td>\u0643\u0627\u0645\u0644 \u062d\u0645\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u0628\u062f\u0626\u0647\u0627<\/td><td>\u062a\u062d\u062f\u064a\u062f \u0648\u0642\u062a \u0641\u0639\u0644\u064a \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u064a\u0648\u0645<\/td><\/tr><tr><td>\u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a<\/td><td>\u062a\u064f\u0639\u0627\u062f \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0639\u0646\u062f \u0643\u0644 \u062a\u0634\u063a\u064a\u0644 \u0644\u0640 CRP<\/td><td>\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u061b \u0648\u062a\u062b\u0628\u0651\u062a \u0645\u064a\u0632\u0629 Running Time Lock \u062c\u062f\u0648\u0644 \u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0642\u0627\u062f\u0645\u0629<\/td><\/tr><tr><td>\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><td>\u0648\u0642\u062a \u062a\u0647\u064a\u0626\u0629 \u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061b \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u0649 \u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0644\u062a\u0642\u0644\u064a\u0644 \u0625\u062c\u0645\u0627\u0644\u064a \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0627\u0644\u062d\u062f \u0627\u0644\u0623\u062f\u0646\u0649<\/td><\/tr><tr><td>\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a<\/td><td>\u062a\u064f\u062d\u062f\u0651\u064e\u062f \u0637\u0627\u0642\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/td><td>\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0645\u062d\u062f\u062f\u0648\u0646 \u0628\u0627\u0644\u0627\u0633\u0645 \u0645\u0639 \u0648\u0631\u062f\u064a\u0627\u062a\u0647\u0645\u060c \u0648\u0645\u0647\u0627\u0645 \u062a\u062a\u0637\u0644\u0628 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0623\u062f\u0648\u0627\u062a \u062a\u064f\u062c\u062f\u0648\u0644 \u0643\u0645\u0648\u0627\u0631\u062f \u0645\u0634\u062a\u0631\u0643\u0629 \u0645\u062d\u062f\u0648\u062f\u0629 \u0627\u0644\u062a\u0648\u0627\u0641\u0631<\/td><\/tr><tr><td>\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u064a\u062e\u0637\u0637 \u0644\u0647\u0627 MRP \u0628\u0645\u0639\u0632\u0644 \u0639\u0646 \u0623\u0648\u0642\u0627\u062a \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>\u062a\u0628\u062f\u0623 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u0646\u062f \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0623\u0648 \u0648\u0635\u0648\u0644 \u062a\u0648\u0631\u064a\u062f\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631\u0629<\/td><\/tr><tr><td>\u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0645\u062e\u0637\u0637<\/td><td>Input\/Output Inquiry \u0648\u062a\u0642\u0627\u0631\u064a\u0631 CRP\u061b \u0648\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 .NET<\/td><td>\u0645\u062e\u0637\u0637 Gantt \u062a\u0641\u0627\u0639\u0644\u064a \u0641\u064a \u0627\u0644\u0645\u062a\u0635\u0641\u062d: \u0627\u0646\u0642\u0644 \u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0628\u0642\u0627\u0621 \u0627\u0644\u062e\u0637\u0629 \u0645\u062a\u0651\u0633\u0642\u0629<\/td><\/tr><tr><td>\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>\u0625\u062f\u062e\u0627\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0641\u0639\u0644\u064a \u0641\u064a QAD<\/td><td>\u064a\u0631\u0649 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0645\u0647\u0627\u0645\u0647\u0645 \u0628\u0627\u0644\u062a\u0631\u062a\u064a\u0628 \u0648\u064a\u0633\u062c\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0627\u0644\u0647\u0627\u062a\u0641 \u0623\u0648 \u0627\u0644\u062c\u0647\u0627\u0632 \u0627\u0644\u0644\u0648\u062d\u064a<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"qad-adaptive-erp-scheduling-software-and-add-ons\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0642\u0627\u0631\u0646\u0629 \u0628\u0631\u0627\u0645\u062c \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0648\u0625\u0636\u0627\u0641\u0627\u062a\u0647\u0627 \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0627\u0644\u062e\u064a\u0627\u0631<\/th><th>\u0645\u0627 \u0647\u0648<\/th><th>\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643<\/th><\/tr><\/thead><tbody><tr><td>QAD Advanced Scheduling (\u0645\u0639 QAD DSCP Production Planning \u0648QAD Redzone)<\/td><td>\u0645\u0646\u062a\u062c\u0627\u062a \u0645\u0646\u0641\u0635\u0644\u0629 \u0645\u0646 QAD \u0644\u0644\u062a\u062e\u0637\u064a\u0637 \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0639\u0645\u0644 \u0645\u0639 \u0646\u0638\u0627\u0645 ERP \u0627\u0644\u062e\u0627\u0635 \u0628\u0647\u0627<\/td><td>\u062a\u062e\u0637\u0637 \u0644\u0643\u0644 \u062e\u0637 \u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u062d\u062f\u0629 \u0648\u062a\u0631\u064a\u062f \u0627\u0644\u0628\u0642\u0627\u0621 \u0636\u0645\u0646 \u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0646\u062a\u062c\u0627\u062a QAD<\/td><\/tr><tr><td>\u0646\u0638\u0627\u0645 APS \u0645\u062b\u0628\u062a \u0645\u062d\u0644\u064a\u064b\u0627 \u0648\u0645\u0631\u062a\u0628\u0637 \u0628\u0640 QAD (\u0645\u062b\u0644 Asprova \u0648PlanetTogether)<\/td><td>\u0628\u0631\u0627\u0645\u062c \u062c\u062f\u0648\u0644\u0629 \u062a\u0639\u0645\u0644 \u0639\u0644\u0649 \u0623\u062c\u0647\u0632\u0629 \u0645\u0643\u062a\u0628\u064a\u0629 \u0623\u0648 \u062e\u0648\u0627\u062f\u0645\u060c \u0648\u062a\u062a\u0644\u0642\u0649 \u0628\u064a\u0627\u0646\u0627\u062a QAD \u0639\u0628\u0631 \u0648\u0635\u0644\u0629 \u0631\u0628\u0637 \u0623\u0648 \u0645\u0634\u0631\u0648\u0639 \u062a\u0643\u0627\u0645\u0644<\/td><td>\u064a\u062f\u064a\u0631 \u0641\u0631\u064a\u0642 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0646\u0645\u0648\u0630\u062c\u064b\u0627 \u0645\u0646\u0641\u0635\u0644\u064b\u0627 \u0644\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0645\u0646\u0635\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0648\u0648\u0643\u0644\u0627\u0621 \u0627\u0644\u0630\u0643\u0627\u0621 \u0627\u0644\u0627\u0635\u0637\u0646\u0627\u0639\u064a (\u0645\u062b\u0644 b2wise \u0648Zentio)<\/td><td>\u0623\u062f\u0648\u0627\u062a \u062a\u062e\u0637\u064a\u0637 \u062a\u064f\u062f\u0631\u062c QAD \u0636\u0645\u0646 \u0623\u0646\u0638\u0645\u0629 ERP \u0627\u0644\u062a\u064a \u062a\u062a\u0635\u0644 \u0628\u0647\u0627<\/td><td>\u062a\u0631\u064a\u062f \u0625\u0636\u0627\u0641\u0629 \u062a\u062d\u0644\u064a\u0644\u0627\u062a \u0644\u0644\u0645\u062e\u0632\u0648\u0646 \u0623\u0648 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0625\u0644\u0649 QAD<\/td><\/tr><tr><td>\u0646\u0638\u0627\u0645 APS \u0633\u062d\u0627\u0628\u064a \u0645\u062a\u0635\u0644 \u0628\u0640 QAD \u200f(SkyPlanner APS)<\/td><td>\u0623\u062f\u0627\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u062a\u0639\u0645\u0644 \u0641\u064a \u0627\u0644\u0645\u062a\u0635\u0641\u062d \u0648\u062a\u062a\u0632\u0627\u0645\u0646 \u0645\u0639 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646<\/td><td>\u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062c\u062f\u0648\u0644 \u064a\u062a\u062d\u062f\u0651\u062b \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0648\u064a\u0635\u0644 \u0625\u0644\u0649 \u0643\u0644 \u0645\u0634\u063a\u0651\u0644<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 QAD Advanced Scheduling \u0648\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0639\u0646\u062f\u0645\u0627:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u064f\u0646\u0641\u0651\u0630 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0645\u0646\u0641\u0635\u0644\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646.<\/strong> \u062a\u0635\u0641 QAD \u0645\u0646\u062a\u062c Advanced Scheduling \u0628\u0623\u0646\u0647 &#8220;a minute-by-minute, line-by-line optimized production schedule for each plant&#8221; (\u062c\u062f\u0648\u0644 \u0625\u0646\u062a\u0627\u062c \u0645\u062d\u0633\u0651\u0646 \u0644\u0643\u0644 \u0645\u0635\u0646\u0639\u060c \u062f\u0642\u064a\u0642\u0629 \u0628\u062f\u0642\u064a\u0642\u0629 \u0648\u062e\u0637\u064b\u0627 \u0628\u062e\u0637) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">\u0645\u062f\u0648\u0646\u0629 QAD<\/a>). \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u0631\u062a\u0651\u0628 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629.<\/li>\n\n\n<li><strong>\u062a\u0631\u064a\u062f \u062c\u062f\u0648\u0644\u064b\u0627 \u0644\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u0627 \u062d\u0632\u0645\u0629 \u062a\u062e\u0637\u064a\u0637 \u0645\u062a\u0643\u0627\u0645\u0644\u0629.<\/strong> \u062a\u0637\u0631\u062d QAD \u0645\u0646\u062a\u062c Advanced Scheduling \u0645\u0639 DSCP Production Planning \u0648Redzone. \u0623\u0645\u0627 SkyPlanner \u0641\u0647\u0648 \u0645\u0646\u062a\u062c \u0648\u0627\u062d\u062f \u064a\u0639\u0645\u0644 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 QAD\u060c \u062a\u062e\u062a\u0628\u0631\u0647 \u0639\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u0645\u0631 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0648\u064a\u0628\u062f\u0623 \u062a\u0634\u063a\u064a\u0644\u0647 \u0627\u0644\u0641\u0639\u0644\u064a \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629.<\/li>\n\n\n<li><strong>\u064a\u062c\u0628 \u0623\u0646 \u062a\u0628\u0642\u0649 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u062b\u0627\u0628\u062a\u0629 \u0628\u0639\u062f \u0643\u0644 \u062a\u0634\u063a\u064a\u0644 \u0644\u0640CRP.<\/strong> \u062a\u062d\u0630\u0651\u0631 QAD \u0645\u0646 \u0623\u0646 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u0639\u062f\u0651\u0644\u0629 \u064a\u062f\u0648\u064a\u064b\u0627 &#8220;will probably be changed&#8221; (\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u0651\u062d \u0623\u0646 \u062a\u062a\u063a\u064a\u0651\u0631) \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 CRP. \u064a\u0643\u062a\u0628 SkyPlanner \u062a\u0648\u0627\u0631\u064a\u062e \u0625\u0635\u062f\u0627\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u0647\u0627 \u0628\u0645\u0627 \u064a\u0637\u0627\u0628\u0642 \u062c\u062f\u0648\u0644\u0647\u060c \u0644\u062a\u062a\u0648\u0627\u0641\u0642 \u0646\u062a\u0627\u0626\u062c CRP \u0645\u0639 \u0627\u0644\u062e\u0637\u0629.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u064a\u062d\u062f\u062f \u062d\u062c\u0645 \u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u062a\u062d\u0641\u0638 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0641\u064a \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0628\u062d\u0633\u0628 \u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0645\u0646 \u0645\u0646\u062a\u062c \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0648\u062a\u0631\u062a\u0651\u0628 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0623\u0644\u0648\u0627\u0646 \u0623\u0648 \u0627\u0644\u0646\u0643\u0647\u0627\u062a \u0623\u0648 \u0627\u0644\u0645\u0648\u0627\u062f \u0628\u062d\u064a\u062b \u064a\u0643\u0648\u0646 \u0625\u062c\u0645\u0627\u0644\u064a \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0641\u064a \u0623\u062f\u0646\u0649 \u062d\u062f.<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0639\u0645\u0644\u0648\u0646 \u0639\u0628\u0631 \u0627\u0644\u0645\u062a\u0635\u0641\u062d.<\/strong> \u0644\u0627 \u062a\u0639\u0645\u0644 \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u064a QAD \u0625\u0644\u0627 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 .NET UI. \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u0639\u0645\u0644 \u0639\u0628\u0631 \u0627\u0644\u0645\u062a\u0635\u0641\u062d\u060c \u062f\u0648\u0646 \u062d\u062f \u0644\u0639\u062f\u062f \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0648\u062a\u062a\u064a\u062d \u0645\u064a\u0632\u0629 Mobile Confirmations \u0639\u0631\u0636 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u062d\u062f\u0651\u062b\u0629 \u0639\u0644\u0649 \u0627\u0644\u0647\u0627\u062a\u0641 \u0623\u0648 \u0627\u0644\u062c\u0647\u0627\u0632 \u0627\u0644\u0644\u0648\u062d\u064a.<\/li>\n\n\n<li><strong>\u062a\u0631\u064a\u062f \u0633\u0639\u0631\u064b\u0627 \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627.<\/strong> \u064a\u0628\u062f\u0623 \u0627\u0644\u0633\u0639\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0645\u0639 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0645\u0633\u0628\u0642 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0648\u062f\u0639\u0645 \u0645\u0646 \u0641\u0631\u064a\u0642 SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u062a\u0628\u062f\u0623<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629.<\/strong> 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0648\u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u062c\u0645\u064a\u0639 \u0645\u064a\u0632\u0627\u062a Basic\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646.<\/li>\n\n\n<li><strong>\u0639\u0631\u0651\u0641 \u0645\u0648\u0627\u0631\u062f \u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u0623\u0636\u0641 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner\u060c \u0623\u0648 \u0627\u0633\u062a\u0648\u0631\u062f \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u0646 QAD. \u062a\u062a\u0648\u0641\u0631 \u0645\u0633\u0627\u0639\u062f\u0629 \u0641\u064a \u0627\u0644\u062a\u0647\u064a\u0626\u0629.<\/li>\n\n\n<li><strong>\u062d\u0645\u0651\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0635\u062f\u0651\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0625\u0646\u062a\u0627\u062c\u0647\u0627 \u0645\u0646 QAD \u0625\u0644\u0649 Excel\u060c \u062b\u0645 \u0627\u0633\u062a\u0648\u0631\u062f\u0647\u0627 \u0648\u0642\u0627\u0631\u0646 \u062c\u062f\u0648\u0644 SkyPlanner \u0628\u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629.<\/li>\n\n\n<li><strong>\u0627\u0631\u0628\u0637 QAD Adaptive ERP.<\/strong> \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0639\u0628\u0631 QXtend\u060c \u0648\u064a\u0648\u0641\u0631 \u0627\u0644\u062f\u0639\u0645 \u0644\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u0627\u0644\u0623\u0633\u0639\u0627\u0631.<\/strong> \u062a\u064f\u062d\u062a\u0633\u0628 \u0631\u0633\u0648\u0645 \u0627\u0644\u0628\u0627\u0642\u0627\u062a \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644 \u0623\u0648 \u0625\u0632\u0627\u0644\u062a\u0647\u0627 \u0623\u0648 \u0625\u0644\u063a\u0627\u0621 \u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0643 \u0641\u064a \u0623\u064a \u0648\u0642\u062a. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a> \u0644\u0645\u0639\u0631\u0641\u0629 \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644\u060c \u0623\u0648 \u0627\u0642\u0631\u0623 <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/advanced-planning-and-scheduling\/\">\u062f\u0644\u064a\u0644 APS<\/a>\u060c \u0623\u0648 \u062a\u0635\u0641\u0651\u062d <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u062c\u0645\u064a\u0639 \u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0623\u0641\u0636\u0644 \u0625\u0636\u0627\u0641\u0629 \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP\u061f<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0648\u062a\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u062a\u0633\u062a\u0642\u0628\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u062a\u0639\u064a\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0646\u0641\u0651\u0630. \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u062d\u062f\u0648\u062f \u0637\u0627\u0642\u0629 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u062a\u064f\u0631\u062a\u0651\u0628 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0628\u062d\u0633\u0628 \u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0628\u064a\u0646\u0647\u0627 \u0644\u062a\u0642\u0644\u064a\u0644 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f. \u062a\u0639\u064a\u062f \u0645\u064a\u0632\u0629 Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u064a\u0628\u062f\u0623 \u0627\u0644\u0633\u0639\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u0633\u062a\u0645\u0631 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 30 \u064a\u0648\u0645\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062a\u064a\u062d QAD Adaptive ERP \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0645\u0648\u0627\u0631\u062f\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645\u060c \u0644\u062e\u0637\u0648\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0643\u0631\u0627\u0631\u064a: \u062a\u064f\u062d\u0645\u0651\u0644 \u0623\u062f\u0627\u0629 Line Schedule Workbench \u0641\u064a Advanced Repetitive \u0627\u0644\u062e\u0637\u0648\u0637 \u0628\u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0636\u0645\u0646 \u062d\u062f\u0648\u062f \u0637\u0627\u0642\u062a\u0647\u0627. \u0623\u0645\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0646\u0641\u0635\u0644\u0629\u060c \u0641\u064a\u062c\u062f\u0648\u0644\u0647\u0627 CRP \u0631\u062c\u0648\u0639\u064b\u0627 \u0645\u0646 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642\u060c \u0648\u064a\u062a\u0631\u0643 \u0644\u0644\u0645\u062e\u0637\u0637 \u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0627\u0644\u0632\u0627\u0626\u062f\u0629. \u0648\u062a\u0648\u0641\u0651\u0631 QAD \u062c\u062f\u0648\u0644\u0629 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0639\u0628\u0631 \u0645\u0646\u062a\u062c \u0645\u0633\u062a\u0642\u0644 \u0647\u0648 QAD Advanced Scheduling. \u0623\u0645\u0627 SkyPlanner APS \u0641\u064a\u0639\u0645\u0644 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 QAD \u0648\u064a\u062c\u062f\u0648\u0644 \u0627\u0644\u0639\u0645\u0644 \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u062d\u062f\u0648\u062f \u0637\u0627\u0642\u0629 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0639\u0627\u0645\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0628\u0631\u0646\u0627\u0645\u062c \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 QAD Adaptive ERP\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner APS \u0645\u0639 QAD Adaptive ERP \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u064a\u0642\u0631\u0623 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0647\u064a\u0627\u0643\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0628\u0631 QXtend Outbound \u0648\u0648\u0627\u062c\u0647\u0627\u062a REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0641\u064a QAD. \u0648\u062a\u0639\u0648\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0648\u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 Work Order Maintenance \u0639\u0628\u0631 QXtend Inbound QDoc\u060c \u0648\u062a\u064f\u0633\u062c\u0651\u0644 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0645\u0646 \u062e\u0644\u0627\u0644 Labor Feedback by Work Order \u0648Work Order Receipt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u0646\u062e\u062a\u0627\u0631 QAD Advanced Scheduling \u0623\u0645 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0627\u062e\u062a\u0631 SkyPlanner \u0625\u0630\u0627 \u0643\u0646\u062a \u062a\u0631\u064a\u062f \u062c\u062f\u0648\u0644\u064b\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0639\u0627\u0645\u0644 \u0648\u064a\u0628\u062f\u0623 \u0627\u0644\u0639\u0645\u0644 \u0628\u0647 \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639. \u062a\u0635\u0641 QAD \u0645\u0646\u062a\u062c Advanced Scheduling \u0628\u0623\u0646\u0647 \u062c\u062f\u0648\u0644 \u0644\u0643\u0644 \u062e\u0637 \u0641\u064a \u0643\u0644 \u0645\u0635\u0646\u0639\u060c \u0648\u062a\u0637\u0631\u062d\u0647 \u0645\u0639 DSCP Production Planning \u0648Redzone. \u064a\u0631\u062a\u0651\u0628 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0646\u0641\u0635\u0644\u0629\u060c \u0648\u064a\u062e\u0637\u0637 \u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0648\u064a\u062a\u064a\u062d \u0644\u0643\u0644 \u0645\u0634\u063a\u0651\u0644 \u0627\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u0642\u0627\u0626\u0645\u0629 \u0639\u0645\u0644\u0647 \u0639\u0628\u0631 \u0627\u0644\u0647\u0627\u062a\u0641\u060c \u062f\u0648\u0646 \u062d\u062f \u0644\u0639\u062f\u062f \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0639\u0645\u0644 SkyPlanner \u0645\u0639 MFG\/PRO \u0648QAD Enterprise Edition\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. QAD Adaptive ERP \u0647\u0648 \u0627\u0644\u0627\u0633\u0645 \u0627\u0644\u062d\u0627\u0644\u064a \u0644\u0646\u0638\u0627\u0645 ERP \u0645\u0646 QAD\u060c \u0648\u064a\u0634\u0645\u0644 \u0645\u0627 \u0643\u0627\u0646 \u064a\u064f\u0639\u0631\u0641 \u0628\u0627\u0633\u0645 QAD Enterprise Applications Enterprise Edition \u0648QAD Cloud ERP. \u0648\u064a\u0639\u062a\u0645\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0639\u0644\u0649 \u0627\u0644\u0628\u0631\u0627\u0645\u062c \u0646\u0641\u0633\u0647\u0627 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0639\u0644\u0649 \u0648\u0627\u062c\u0647\u0629 QXtend.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u0645 \u062a\u0628\u0644\u063a \u062a\u0643\u0644\u0641\u0629 SkyPlanner \u0644\u0645\u0635\u0646\u0639 \u064a\u0633\u062a\u062e\u062f\u0645 QAD\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062a\u0628\u062f\u0623 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629. \u0648\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0647\u064a \u0645\u0648\u0631\u062f \u0625\u0646\u062a\u0627\u062c \u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0639\u0645\u0644 \u0645\u062c\u062f\u0648\u0644\u0629 \u062e\u0627\u0635\u0629 \u0628\u0647. \u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0628\u0627\u0642\u062a\u0643\u060c \u0644\u062a\u0639\u0631\u0641 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u0645 \u064a\u0633\u062a\u063a\u0631\u0642 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u064a\u0637\u0627\u0628\u0642 \u0627\u0644\u0641\u0631\u064a\u0642 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0628\u064a\u0646 \u0627\u0644\u0646\u0638\u0627\u0645\u064a\u0646\u060c \u0648\u064a\u0631\u0628\u0637 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 QAD. \u0648\u064a\u064f\u062e\u062a\u0628\u0631 \u0643\u0644 \u0634\u064a\u0621 \u0628\u0645\u0642\u0627\u0631\u0646\u062a\u0647 \u0628\u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u0627\u062e\u062a\u0628\u0627\u0631 SkyPlanner \u0642\u0628\u0644 \u0631\u0628\u0637\u0647 \u0628\u0640QAD\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u0639\u062a\u0645\u062f \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u0645\u0631 30 \u064a\u0648\u0645\u064b\u0627 \u0639\u0644\u0649 \u0645\u0644\u0641 Excel \u062a\u0635\u062f\u0651\u0631\u0647 \u0645\u0646 QAD \u0648\u064a\u0636\u0645 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u0641\u062a\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/finite-capacity-scheduling\/\">\u062e\u0637\u0629 \u0644\u0625\u0646\u062a\u0627\u062c\u0643 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0645\u0648\u0627\u0631\u062f<\/a> \u0642\u0628\u0644 \u0628\u062f\u0621 \u0623\u064a \u0623\u0639\u0645\u0627\u0644 \u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ QAD Adaptive ERP SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP (\u0627\u0644\u0645\u0639\u0631\u0648\u0641 \u0633\u0627\u0628\u0642\u064b\u0627 \u0628\u0627\u0633\u0645 QAD Enterprise Applications \u0648MFG\/PRO)\u060c \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0639\u0631\u0641 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u0630 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0646 &#8230; <a title=\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/\" aria-label=\"Read more about SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100693,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106194","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP: \u0646\u0638\u0627\u0645 APS \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/\",\"name\":\"\u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP: \u0646\u0638\u0627\u0645 APS \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP: \u0646\u0638\u0627\u0645 APS \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629","description":"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/","og_locale":"ar_AR","og_type":"article","og_title":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","og_description":"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/","name":"\u062a\u0643\u0627\u0645\u0644 QAD Adaptive ERP: \u0646\u0638\u0627\u0645 APS \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP \u0648\u0641\u0642 \u0637\u0627\u0642\u0629 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0628\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/qad-adaptive-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ QAD Adaptive ERP SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 QAD Adaptive ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 SkyPlanner APS \u0625\u0636\u0627\u0641\u0629 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a QAD Adaptive ERP (\u0627\u0644\u0645\u0639\u0631\u0648\u0641 \u0633\u0627\u0628\u0642\u064b\u0627 \u0628\u0627\u0633\u0645 QAD Enterprise Applications \u0648MFG\/PRO)\u060c \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0643\u0644 \u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0639\u0631\u0641 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u0630 \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0646&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=106194"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/106194\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100693"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=106194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}