{"id":104257,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","title":{"rendered":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ ProShop ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP <span class=\"hl\">\u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop \u0647\u0630\u0627 \u0644\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0646 \u0648\u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a\u064a\u0646 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ProShop ERP \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ProShop \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 ProShop:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u064a\u0633\u062a\u0648\u0631\u062f SkyPlanner \u0628\u064a\u0627\u0646\u0627\u062a Work Orders \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627\u060c \u0648Parts\u060c \u0648\u0633\u062c\u0644\u0627\u062a Work Order BOM\u060c \u0648Work Cells\u060c \u0648Users\u060c \u0648Tools\u060c \u0648Fixtures\u060c \u0648Purchase Orders.<\/li>\n\n\n<li>\u062a\u064f\u0639\u0627\u062f \u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0641\u064a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li>\u064a\u0645\u0643\u0646 \u0625\u0631\u0633\u0627\u0644 \u0623\u0648\u0642\u0627\u062a \u0639\u0645\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0625\u0644\u0649 ProShop Time Tracking \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643.<\/li>\n\n\n<li>\u062a\u064f\u0631\u0633\u0644 \u0622\u0644\u064a\u0627\u062a webhooks \u0641\u064a SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0625\u0639\u062f\u0627\u062f\u0627\u062a ProShop \u0644\u062f\u064a\u0643\u0645 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0645\u0648\u062c\u0651\u0647 \u0644\u0644\u0634\u0631\u0643\u0627\u0621 \u0648\u0627\u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0646 \u0627\u0644\u0631\u0627\u063a\u0628\u064a\u0646 \u0641\u064a \u0627\u0644\u0645\u0634\u0627\u0631\u0643\u0629 \u0623\u0648 \u062a\u0637\u0648\u064a\u0631 \u062d\u0644\u0648\u0644 \u0628\u0623\u0646\u0641\u0633\u0647\u0645 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0644\u062f\u0649 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proshop-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0641\u064a ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u064a\u062d ProShop \u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062e\u0627\u0631\u062c\u064a \u0645\u0633\u0627\u0631\u064a\u0646\u060c \u0645\u0648\u062b\u0651\u0642\u064a\u0646 \u0641\u064a \u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0646 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 ProShop API:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ProShop GraphQL API.<\/strong> &#8220;ProShop provides a GraphQL API, available via HTTP(S).&#8221; (\u064a\u0648\u0641\u0651\u0631 ProShop \u0648\u0627\u062c\u0647\u0629 GraphQL API \u0645\u062a\u0627\u062d\u0629 \u0639\u0628\u0631 HTTP(S).) \u062a\u0648\u062c\u062f \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062d\u062f\u0629: \u064a\u064f\u0631\u0633\u064e\u0644 \u0643\u0644 \u0627\u0633\u062a\u062f\u0639\u0627\u0621 \u0643\u0637\u0644\u0628 HTTP POST \u0625\u0644\u0649 <code>&lt;proshop root&gt;\/api\/graphql<\/code>\u060c \u0645\u0639 <code>query<\/code> \u0648<code>variables<\/code> \u0648<code>operationName<\/code> \u0641\u064a \u062c\u0633\u0645 \u0627\u0644\u0637\u0644\u0628 \u0628\u062a\u0646\u0633\u064a\u0642 JSON. \u0644\u0643\u0644 \u0648\u062d\u062f\u0629 \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0628\u0635\u064a\u063a\u0629 \u0627\u0644\u0645\u0641\u0631\u062f \u0644\u062c\u0644\u0628 \u0633\u062c\u0644 \u0648\u0627\u062d\u062f\u060c \u0648\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0628\u0635\u064a\u063a\u0629 \u0627\u0644\u062c\u0645\u0639 \u0644\u062c\u0644\u0628 \u0627\u0644\u0642\u0648\u0627\u0626\u0645. \u062a\u064f\u0642\u0633\u0651\u064e\u0645 \u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <code>pageSize<\/code> (\u0648\u0642\u064a\u0645\u062a\u0647 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a\u0629 20) \u0648<code>pageStart<\/code>\u060c \u0648\u062a\u064f\u0631\u062c\u0639 <code>records<\/code> \u0648<code>totalRecords<\/code>. \u0643\u0645\u0627 \u062a\u0642\u0628\u0644 \u0648\u0633\u064a\u0637\u064e\u064a <code>filter<\/code> \u0648<code>query<\/code> \u0627\u0644\u0645\u0637\u0627\u0628\u0642\u064a\u0646 \u0644\u0648\u0638\u064a\u0641\u0629 Advanced Search \u0641\u064a \u0643\u0644 \u0648\u062d\u062f\u0629. \u0648\u064a\u0645\u0643\u0646 \u0641\u062d\u0635 \u0627\u0644\u0645\u062e\u0637\u0637 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0627\u0633\u062a\u0628\u0637\u0627\u0646. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/460554241\/Introduction+to+the+ProShop+API\">\u0645\u0642\u062f\u0645\u0629 \u0625\u0644\u0649 ProShop API<\/a>)<\/li>\n\n\n<li><strong>Recently Updated Records API.<\/strong> &#8220;A simple REST interface allows external integrations to request information between arbitrary points in time.&#8221; (\u062a\u062a\u064a\u062d \u0648\u0627\u062c\u0647\u0629 REST \u0628\u0633\u064a\u0637\u0629 \u0644\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 \u0637\u0644\u0628 \u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0628\u064a\u0646 \u0646\u0642\u0637\u062a\u064a\u0646 \u0632\u0645\u0646\u064a\u062a\u064a\u0646 \u062a\u062e\u062a\u0627\u0631\u0648\u0646\u0647\u0645\u0627.) \u0627\u0633\u062a\u062f\u0639\u0648\u0627 <code>&lt;proshop root&gt;\/recentlyupdatedrecords<\/code> \u0645\u0639 <code>start<\/code> (\u0628\u062a\u0646\u0633\u064a\u0642 ISO 8601)\u060c \u0648\u064a\u0645\u0643\u0646 \u0625\u0636\u0627\u0641\u0629 <code>end<\/code> \u0648<code>filterby<\/code> \u0627\u062e\u062a\u064a\u0627\u0631\u064a\u064b\u0627\u060c \u0645\u062b\u0644 <code>workorders,workcells,purchaseorders,timetracking,deletions<\/code>. \u064a\u064f\u0641\u0639\u0651\u0644 \u0641\u0631\u064a\u0642 ProShop \u0627\u0644\u0641\u0647\u0631\u0633 \u0623\u0648\u0644\u064b\u0627. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/2214100993\/The+Recently+Updated+Records+API\">\u0648\u0627\u062c\u0647\u0629 Recently Updated Records API<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>\u062a\u062a\u0645 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0628\u0631 <strong>mutations<\/strong> \u0641\u064a GraphQL. \u0648\u0627\u0644\u0645\u062b\u0627\u0644 \u0627\u0644\u0645\u0648\u062b\u0651\u0642 \u0647\u0648 Time Tracking Login\u060c \u0648\u062a\u064f\u0645\u0646\u062d \u0635\u0644\u0627\u062d\u064a\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0644\u0643\u0644 \u0648\u062d\u062f\u0629 \u0639\u0644\u0649 \u062d\u062f\u0629 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0646\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-scopes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0648\u0646\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0631\u0645\u0632 \u0648\u0635\u0648\u0644 \u0645\u0639 \u0643\u0644 \u0627\u0633\u062a\u062f\u0639\u0627\u0621.<\/strong> \u0623\u0631\u0633\u0644\u0648\u0647 \u0628\u0635\u064a\u063a\u0629 <code>Authorization: Bearer &lt;token&gt;<\/code> \u0623\u0648 \u0643\u0645\u0639\u0627\u0645\u0644 \u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0628\u0627\u0633\u0645 <code>token<\/code>.<\/li>\n\n\n<li><strong>OAuth 2.0 Client Credentials<\/strong> (\u0641\u064a ProShop 5.2.3 \u0648\u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0623\u062d\u062f\u062b). \u064a\u0641\u062a\u062d \u0645\u0633\u0624\u0648\u0644 \u0646\u0638\u0627\u0645 ProShop \u0627\u0644\u0645\u0633\u0627\u0631 System Config &gt; Manage Authorizations\u060c \u0648\u064a\u0646\u0634\u0626 Authorization \u0645\u0639 \u062a\u062d\u062f\u064a\u062f Name \u0648Maximum Scope\u060c \u062b\u0645 \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u062e\u064a\u0627\u0631\u064a\u0646 <strong>Direct Login<\/strong> \u0648<strong>Active<\/strong>. \u062a\u064f\u0633\u062a\u062e\u062f\u0645 \u0642\u064a\u0645\u062a\u0627 Unique ID \u0648Shared Secret \u0628\u0648\u0635\u0641\u0647\u0645\u0627 <code>client_id<\/code> \u0648<code>client_secret<\/code>. \u064a\u0631\u0633\u0644 \u0627\u0644\u062a\u0637\u0628\u064a\u0642 <code>grant_type=client_credentials<\/code> \u0628\u0637\u0644\u0628 POST \u0625\u0644\u0649 <code>&lt;proshop root&gt;\/home\/member\/oauth\/accesstoken<\/code>\u060c \u0648\u064a\u062d\u0635\u0644 \u0639\u0644\u0649 \u0631\u0645\u0632 Bearer \u0645\u0639 <code>expires_in<\/code>. \u0644\u0627 \u064a\u0648\u062c\u062f \u0631\u0645\u0632 \u062a\u062d\u062f\u064a\u062b\u060c \u0644\u0630\u0627 \u0627\u0637\u0644\u0628\u0648\u0627 \u0631\u0645\u0632\u064b\u0627 \u062c\u062f\u064a\u062f\u064b\u0627 \u0639\u0646\u062f \u0627\u0646\u062a\u0647\u0627\u0621 \u0635\u0644\u0627\u062d\u064a\u062a\u0647. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1230209075\/OAuth+2.0+Client+Credentials+Flow\">\u062a\u062f\u0641\u0642 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u0639\u0645\u064a\u0644<\/a>)<\/li>\n\n\n<li><strong>OAuth 2.0 Authorization Flow<\/strong> \u0644\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u062a\u0637\u0644\u0628 \u0633\u064a\u0627\u0642 \u0645\u0633\u062a\u062e\u062f\u0645\u060c \u0645\u062b\u0644 Time Tracking Login.<\/li>\n\n\n<li><strong>\u0646\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a.<\/strong> \u062a\u064f\u0643\u062a\u0628 \u0628\u0627\u0644\u0635\u064a\u063a\u0629 <code>SCOPE_NAME:[{r|w|d|p}]<\/code> \u0644\u0644\u0642\u0631\u0627\u0621\u0629 \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0648\u0627\u0644\u062d\u0630\u0641 \u0648\u0627\u0644\u062a\u0641\u0636\u064a\u0644\u0627\u062a\u060c \u0639\u0644\u0649 \u0627\u0644\u062a\u0631\u062a\u064a\u0628. \u064a\u0637\u0644\u0628 \u0646\u0638\u0627\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0639\u0627\u062f\u0629\u064b <code>workorders:rw parts:r purchaseorders:r users:r tools:r<\/code>\u060c \u0625\u0636\u0627\u0641\u0629\u064b \u0625\u0644\u0649 Time Tracking \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0633\u062a\u064f\u0631\u0633\u064e\u0644 \u0625\u0644\u0649 ProShop. \u0648\u0645\u0646\u0630 ProShop 5.1.9\u060c &#8220;a scope grant request is now required on all connections to the API.&#8221; (\u0623\u0635\u0628\u062d \u0637\u0644\u0628 \u0645\u0646\u062d \u0646\u0637\u0627\u0642 \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0625\u0644\u0632\u0627\u0645\u064a\u064b\u0627 \u0644\u062c\u0645\u064a\u0639 \u0627\u0644\u0627\u062a\u0635\u0627\u0644\u0627\u062a \u0628\u0648\u0627\u062c\u0647\u0629 API.) (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1444184068\/Authorization+scopes\">\u0646\u0637\u0627\u0642\u0627\u062a \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0627\u0644\u062a\u0641\u0648\u064a\u0636<\/a>)<\/li>\n\n\n<li><strong>\u0633\u062c\u0644 \u0627\u0644\u062a\u062f\u0642\u064a\u0642.<\/strong> \u062a\u064f\u0638\u0647\u0631 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u062e\u062f\u0645 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u0639\u0645\u064a\u0644 \u0627\u0633\u0645 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u060c \u0644\u0627 \u0627\u0633\u0645 \u0645\u0633\u062a\u062e\u062f\u0645.<\/li>\n\n<\/ul>\n\n\n<p>\u0645\u0646 \u062c\u0627\u0646\u0628 SkyPlanner\u060c \u062a\u0633\u062a\u062e\u062f\u0645 REST API \u0631\u0645\u0632 API \u0644\u0644\u0645\u0635\u0627\u062f\u0642\u0629 \u0641\u064a \u062a\u0631\u0648\u064a\u0633\u0629 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API)\u060c \u0648\u0647\u064a \u0645\u0648\u062b\u0651\u0642\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Swagger\/OpenAPI. \u0648\u064a\u0634\u0631\u062d <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0627\u0644\u062f\u0631\u0633 \u0627\u0644\u062a\u0639\u0644\u064a\u0645\u064a \u0644\u0644\u062a\u0643\u0627\u0645\u0644<\/a> \u0643\u064a\u0641\u064a\u0629 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0627\u0633\u062a\u062f\u0639\u0627\u0621\u0627\u062a \u0627\u0644\u0623\u0648\u0644\u0649.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0648\u0627\u0644\u0627\u0633\u062a\u0637\u0644\u0627\u0639 \u0627\u0644\u062f\u0648\u0631\u064a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0644\u0627 \u062a\u0630\u0643\u0631 \u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0646 \u0644\u062f\u0649 ProShop \u0623\u064a webhooks \u0635\u0627\u062f\u0631\u0629 \u0623\u0648 \u0627\u0634\u062a\u0631\u0627\u0643\u0627\u062a GraphQL. \u062a\u064f\u062c\u0644\u064e\u0628 \u0627\u0644\u062a\u062d\u062f\u064a\u062b\u0627\u062a \u0645\u0646 ProShop \u0628\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a\u060c \u0648\u062a\u062e\u0641\u0651\u0641 Recently Updated Records API \u0639\u0628\u0621 \u0647\u0630\u0647 \u0627\u0644\u0639\u0645\u0644\u064a\u0629: \u0627\u0637\u0644\u0628\u0648\u0627 \u0643\u0644 \u0645\u0627 \u0623\u064f\u0646\u0634\u0626 \u0623\u0648 \u0639\u064f\u062f\u0651\u0644 \u0623\u0648 \u062d\u064f\u0630\u0641 \u0645\u0646\u0630 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0633\u0627\u0628\u0642\u060c \u0645\u0639 \u062a\u0635\u0641\u064a\u0629 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0628\u062d\u0633\u0628 \u0623\u0646\u0648\u0627\u0639 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c\u0647\u0627 \u0627\u0644\u062c\u062f\u0648\u0644\u0629. \u062b\u0645 \u0627\u062c\u0644\u0628\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u062a\u063a\u064a\u0651\u0631\u062a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0623\u0631\u0642\u0627\u0645\u0647\u0627 \u0639\u0628\u0631 GraphQL\u061b \u0648\u064a\u0634\u064a\u0631 ProShop \u0625\u0644\u0649 \u0623\u0646 \u0630\u0644\u0643 \u0623\u0633\u0631\u0639 \u0645\u0646 \u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <code>lastModifiedTime<\/code>.<\/p>\n\n\n<p>\u0645\u0646 \u0627\u0644\u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629 \u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u062e\u0645\u0633 \u062f\u0642\u0627\u0626\u0642 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u062a\u0628\u0639 \u0627\u0644\u0648\u0642\u062a\u060c \u0648\u0643\u0644 \u0633\u0627\u0639\u0629 \u0644\u0644\u0642\u0637\u0639 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621. \u0648\u064a\u0631\u0633\u0644 SkyPlanner \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062d\u0627\u0644\u0629 \u0623\u0648 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0644\u0630\u0627 \u062a\u0639\u062a\u0645\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u062d\u062f\u0627\u062b.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0643\u0627\u0626\u0646 ProShop \u200f(API)<\/th><th>\u0627\u0644\u0643\u0627\u0626\u0646 \u0641\u064a SkyPlanner<\/th><th>\u0627\u0644\u0627\u062a\u062c\u0627\u0647<\/th><th>\u0648\u062a\u064a\u0631\u0629 \u0627\u0644\u062a\u062d\u062f\u064a\u062b<\/th><\/tr><\/thead><tbody><tr><td>Parts\u060c \u0648COTS (\u0646\u0637\u0627\u0642 <code>parts<\/code> \u0641\u064a GraphQL)<\/td><td>\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u062a\u062d\u0645\u064a\u0644 \u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u0633\u062c\u0644\u0627\u062a Work Order BOM<\/td><td>\u0628\u0646\u064a\u0629 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0644 \u0623\u0645\u0631<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0645\u0639 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c<\/td><\/tr><tr><td>\u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c: \u062e\u0644\u064a\u0629 \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0648\u0642\u062a\u0627 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062f\u0648\u0631\u0629 \u0627\u0644\u0645\u0642\u062f\u0651\u0631\u0627\u0646 (\u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629)<\/td><td>\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0645\u0639 \u0645\u062f\u062f\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0641\u0643\u064a\u0643<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0645\u0639 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c<\/td><\/tr><tr><td>Work Cells (\u0622\u0644\u0629\u060c \u0623\u0648 \u0645\u0646\u0636\u062f\u0629 \u0639\u0645\u0644\u060c \u0623\u0648 \u0645\u0639\u062f\u0627\u062a)<\/td><td>\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u062c\u0645\u0648\u0639\u0627\u062a\u0647\u0627 \u0648\u0645\u0639\u062f\u0644\u0627\u062a \u0643\u0641\u0627\u0621\u062a\u0647\u0627<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0646\u0627\u062f\u0631\u064b\u0627 \u0628\u0639\u062f \u0630\u0644\u0643<\/td><\/tr><tr><td>Work Cells \u0627\u0644\u0645\u062e\u0635\u0651\u0635\u0629 \u0644\u0644\u0623\u0641\u0631\u0627\u062f\u060c \u0648Users<\/td><td>\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0648\u062a\u0639\u064a\u064a\u0646\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>\u062c\u062f\u0627\u0648\u0644 \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644 (\u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a)<\/td><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0629<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0623\u0648 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner<\/td><\/tr><tr><td>Work Orders (\u0627\u0644\u0643\u0645\u064a\u0629\u060c \u0648\u0645\u0648\u0639\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0648\u0627\u0644\u062d\u0627\u0644\u0629)<\/td><td>\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645\u0647\u0627 \u0648\u0623\u0648\u0644\u0648\u064a\u0627\u062a\u0647\u0627<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0628\u0636\u0639 \u062f\u0642\u0627\u0626\u0642<\/td><\/tr><tr><td>Tools\u060c \u0648Toolpots\u060c \u0648Fixtures\u060c \u0648RTAs<\/td><td>\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0628\u0648\u0635\u0641\u0647\u0627 \u0645\u0648\u0627\u0631\u062f \u0645\u0634\u062a\u0631\u0643\u0629 \u0645\u062d\u062f\u0648\u062f\u0629<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a\u060c \u062b\u0645 \u0639\u0646\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><\/tr><tr><td>Purchase Orders \u0645\u0639 \u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645\u0647\u0627<\/td><td>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u0628\u062d\u0633\u0628 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0643\u0644 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0639\u0646\u062f \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629<\/td><\/tr><tr><td>\u0645\u0648\u0639\u062f\u0627 \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c (\u0639\u0645\u0644\u064a\u0629 mutation \u0641\u064a GraphQL\u060c \u200f<code>workorders:w<\/code>)<\/td><td>\u0645\u0648\u0639\u062f\u0627 \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>\u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0639\u0628\u0631 webhook \u0645\u0646 SkyPlanner<\/td><\/tr><tr><td>Time Tracking: \u0648\u0642\u062a\u0627 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0648\u0627\u0644\u0642\u0637\u0639 \u0627\u0644\u0645\u0646\u062c\u0632\u0629 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0648\u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>\u0645\u0639 \u0643\u0644 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0643\u0644 \u0648\u0631\u062f\u064a\u0629\u060c \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643<\/td><\/tr><tr><td>\u063a\u064a\u0631 \u0645\u0648\u062c\u0648\u062f \u0641\u064a ProShop<\/td><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u062a\u0637\u0644\u0628 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621<\/td><td>\u062a\u064f\u062f\u0627\u0631 \u0641\u064a SkyPlanner<\/td><td>\u062a\u064f\u0636\u0628\u0637 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u0646\u0645\u0627\u0637 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a \u0644\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629.<\/strong> \u0627\u062c\u0644\u0628\u0648\u0627 \u0635\u0641\u062d\u0627\u062a Parts \u0648Work Cells \u0648Users \u0648Tools \u0648Fixtures \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a \u0628\u0635\u064a\u063a\u0629 \u0627\u0644\u062c\u0645\u0639 \u0641\u064a GraphQL. \u0627\u0636\u0628\u0637\u0648\u0627 <code>pageSize<\/code> \u0639\u0644\u0649 \u0642\u064a\u0645\u0629 \u0645\u0631\u062a\u0641\u0639\u0629 \u0644\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u060c \u0648\u0643\u0631\u0651\u0631\u0648\u0627 \u0627\u0644\u062c\u0644\u0628 \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 <code>totalRecords<\/code>. \u062d\u062f\u0651\u062f\u0648\u0627 \u0643\u064a\u0641\u064a\u0629 \u0645\u0637\u0627\u0628\u0642\u0629 \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644: \u062a\u064f\u0637\u0627\u0628\u064e\u0642 \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062a\u064a \u062a\u0645\u062b\u0651\u0644 \u0622\u0644\u0627\u062a \u0645\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u062a\u0644\u0643 \u0627\u0644\u062a\u064a \u062a\u0645\u062b\u0651\u0644 \u0623\u0634\u062e\u0627\u0635\u064b\u0627 \u0645\u0639 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0628\u062d\u064a\u062b \u064a\u0645\u0643\u0646 \u0644\u0644\u0639\u0645\u0644\u064a\u0629 \u0646\u0641\u0633\u0647\u0627 \u062d\u062c\u0632 \u0627\u0644\u0622\u0644\u0629 \u0648\u0645\u0634\u063a\u0651\u0644\u0647\u0627 \u0645\u0639\u064b\u0627.<\/p>\n\n\n<p><strong>2. \u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0627\u0642\u0631\u0623\u0648\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0646\u0634\u0637\u0629 \u0645\u0639 \u0639\u0645\u0644\u064a\u0627\u062a\u0647\u0627 \u0648\u0623\u0648\u0642\u0627\u062a\u0647\u0627 \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629 \u0648\u0633\u062c\u0644\u0627\u062a BOM\u060c \u0625\u0636\u0627\u0641\u0629\u064b \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629. \u064a\u0639\u062a\u0628\u0631 SkyPlanner \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u062d\u062f\u0651\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f\u0645\u0627 \u062a\u064f\u0636\u0628\u0637 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0639\u0644\u0649 Delivered. \u062a\u064f\u0631\u0635\u062f \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0639\u0628\u0631 Recently Updated Records \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <code>filterby=workorders,purchaseorders,deletions<\/code>.<\/p>\n\n\n<p><strong>3. \u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u064a ProShop.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u064a\u064f\u062f\u0631\u062c \u0627\u0644\u0645\u062d\u0631\u0651\u0643 \u0645\u0647\u0645\u0629 \u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u0648 \u064a\u0646\u0642\u0644\u0647\u0627\u060c \u064a\u064f\u0637\u0644\u0650\u0642 webhook \u0645\u0646 SkyPlanner \u0639\u0645\u0644\u064a\u0629 mutation \u0641\u064a GraphQL \u0644\u0636\u0628\u0637 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Authorization \u064a\u062a\u0636\u0645\u0646 <code>workorders:w<\/code>. \u0639\u0646\u062f\u0647\u0627 \u062a\u0639\u062a\u0645\u062f \u062a\u0648\u0642\u0639\u0627\u062a ProShop \u0644\u0644\u0625\u0646\u062c\u0627\u0632 \u0641\u064a \u0627\u0644\u0645\u0648\u0639\u062f \u0648\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u062d\u062a\u064a\u0627\u062c \u0644\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0639\u0644\u0649 \u062a\u0648\u0627\u0631\u064a\u062e SkyPlanner.<\/p>\n\n\n<p><strong>4. \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639.<\/strong> \u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner Mobile Confirmations \u0623\u0648 Production Timer\u060c \u0648\u062a\u062d\u0627\u0641\u0638 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0639\u0644\u0649 \u062a\u062d\u062f\u064a\u062b \u0627\u0644\u062c\u062f\u0648\u0644. \u062a\u062e\u062a\u0627\u0631\u0648\u0646 \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0633\u062a\u064f\u0631\u0633\u064e\u0644 \u0625\u0644\u0649 ProShop Time Tracking \u0648\u062a\u064f\u0631\u0628\u0637 \u0628\u0639\u0645\u0644\u064a\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0648\u0625\u0630\u0627 \u0644\u0645 \u062a\u062e\u062a\u0627\u0631\u0648\u0627 \u0630\u0644\u0643\u060c \u064a\u0648\u0627\u0635\u0644 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0648\u0642\u062a \u0641\u064a ProShop \u0643\u0645\u0627 \u0641\u064a \u0627\u0644\u0633\u0627\u0628\u0642\u060c \u0648\u064a\u0642\u0631\u0623\u0647 SkyPlanner \u0639\u0628\u0631 <code>timetracking<\/code>.<\/p>\n\n\n<p><strong>5. \u0642\u0648\u0627\u0639\u062f \u0645\u0644\u0643\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u062d\u0644 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a.<\/strong> \u062f\u0648\u0651\u0646\u0647\u0627 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/th><th>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u0624\u0648\u0644<\/th><\/tr><\/thead><tbody><tr><td>Parts\u060c \u0648\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a\u060c \u0648\u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>ProShop<\/td><\/tr><tr><td>\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a\u060c \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621\u060c \u0648\u062a\u0639\u064a\u064a\u0646 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0628\u062f\u064a\u0644\u0629<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0623\u064a\u0627\u0645 \u0627\u0644\u0639\u0637\u0644\u0627\u062a<\/td><td>\u0646\u0638\u0627\u0645 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u062e\u0644\u0627\u0644 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0646\u0637\u0627\u0642<\/td><\/tr><tr><td>Time Tracking\u060c \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646\u060c \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a\u060c \u0648\u062d\u0633\u0627\u0628 \u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0645\u0647\u0627\u0645<\/td><td>ProShop\u061b \u062a\u064f\u062f\u062e\u064e\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a\u0647 \u0623\u0648 \u062a\u064f\u0631\u0633\u064e\u0644 \u0625\u0644\u064a\u0647 \u0645\u0646 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0648\u0642\u062a \u0641\u064a SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u062d\u062f\u0651\u062f\u0648\u0627 \u0646\u0638\u0627\u0645\u064b\u0627 \u0648\u0627\u062d\u062f\u064b\u0627 \u0644\u0643\u062a\u0627\u0628\u0629 \u062a\u0648\u0627\u0631\u064a\u062e \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0628\u0645\u062c\u0631\u062f \u0623\u0646 \u064a\u062a\u0648\u0644\u0649 SkyPlanner \u062c\u062f\u0648\u0644\u0629 \u062e\u0644\u064a\u0629 \u0639\u0645\u0644\u060c \u064a\u062a\u0648\u0642\u0641 \u0627\u0644\u0645\u062e\u0637\u0651\u0637\u0648\u0646 \u0639\u0646 \u0625\u0639\u0627\u062f\u0629 \u062a\u0631\u062a\u064a\u0628 \u0642\u0627\u0626\u0645\u0629 \u062a\u0644\u0643 \u0627\u0644\u062e\u0644\u064a\u0629 \u0641\u064a ProShop\u060c \u062d\u062a\u0649 \u0644\u0627 \u062a\u062a\u0639\u0627\u0631\u0636 \u0627\u0644\u062e\u0637\u062a\u0627\u0646 \u0645\u0637\u0644\u0642\u064b\u0627.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0645\u0639\u062a\u0627\u062f\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0642\u0628\u0644 \u0630\u0644\u0643\u060c \u062a\u062d\u0642\u0651\u0642\u0648\u0627 \u0645\u0646 \u0635\u062d\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0627\u0644\u0645\u0635\u062f\u0651\u064e\u0631\u0629 \u0645\u0646 ProShop \u0628\u062a\u0646\u0633\u064a\u0642 CSV \u0623\u0648 Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0631\u0628\u0637 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/strong> \u0627\u0639\u062a\u0645\u062f\u0648\u0627 \u062c\u062f\u0648\u0644 \u0627\u0644\u0631\u0628\u0637\u060c \u0648\u0642\u0648\u0627\u0639\u062f \u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u062f\u0648\u0631\u064a\u0629 \u0627\u0644\u0645\u0632\u0627\u0645\u0646\u0629\u060c \u0648\u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0633\u062a\u064f\u0631\u0633\u064e\u0644 \u0625\u0644\u0649 ProShop.<\/li>\n\n\n<li><strong>\u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 ProShop.<\/strong> \u064a\u0646\u0634\u0626 \u0627\u0644\u0645\u0633\u0624\u0648\u0644 Authorization \u0628\u0642\u064a\u0645\u0629 Maximum Scope \u0627\u0644\u0645\u062a\u0641\u0642 \u0639\u0644\u064a\u0647\u0627\u060c \u0648\u064a\u0637\u0644\u0628 \u0645\u0646 \u0641\u0631\u064a\u0642 ProShop \u062a\u0641\u0639\u064a\u0644 Recently Updated Records.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u064a.<\/strong> \u062a\u062d\u0645\u064a\u0644 Parts \u0648Work Cells \u0648Users \u0648Tools \u0648Fixtures \u0648\u062c\u062f\u0627\u0648\u0644 \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li><strong>\u0645\u0632\u0627\u0645\u0646\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/strong> \u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0645\u0639 \u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0625\u0644\u0649 \u0635\u0641\u062d\u0627\u062a \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0645\u062d\u0627\u0648\u0644\u0629.<\/li>\n\n\n<li><strong>\u0636\u0628\u0637 \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a SkyPlanner.<\/strong> \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0648\u0639\u062f\u062f \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629\u060c \u0648\u0627\u0644\u0622\u0644\u0627\u062a \u0623\u0648 \u0627\u0644\u0639\u0627\u0645\u0644\u0648\u0646 \u0627\u0644\u0628\u062f\u0644\u0627\u0621.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u064a ProShop.<\/strong> \u062a\u0646\u0641\u064a\u0630 \u0639\u0645\u0644\u064a\u0627\u062a mutations \u0627\u0633\u062a\u062c\u0627\u0628\u0629\u064b \u0644\u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0645\u0646 SkyPlanner\u060c \u0648\u0625\u0636\u0627\u0641\u0629 Time Tracking \u0625\u0630\u0627 \u0627\u062e\u062a\u0631\u062a\u0645 \u0630\u0644\u0643.<\/li>\n\n\n<li><strong>\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/strong> \u0634\u063a\u0651\u0644 SkyPlanner \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u062c\u062f\u0648\u0644 ProShop \u0627\u0644\u062d\u0627\u0644\u064a\u060c \u0648\u0642\u0627\u0631\u0646 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0648\u0635\u062d\u0651\u062d \u0627\u0644\u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629.<\/li>\n\n\n<li><strong>\u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/strong> \u0641\u0639\u0651\u0644 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0628\u0645\u062c\u0631\u062f \u062a\u0637\u0627\u0628\u0642 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proshop-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u064a\u0646\u0628\u063a\u064a \u0645\u0631\u0627\u0639\u0627\u062a\u0647 \u0639\u0646\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629 \u062a\u062d\u0633\u0645 \u0643\u0644 \u0634\u064a\u0621.<\/strong> \u064a\u062d\u0633\u0628 ProShop \u0627\u0644\u0645\u062f\u0629 \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0648\u0627\u0644\u062f\u0648\u0631\u0629 \u0627\u0644\u0645\u0642\u062f\u0651\u0631\u0629. \u0627\u062c\u0644\u0628 \u0627\u0644\u0623\u0632\u0645\u0646\u0629 \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629\u060c \u0644\u0627 \u0627\u0644\u062a\u0642\u062f\u064a\u0631 \u0627\u0644\u0623\u0635\u0644\u064a\u060c \u0648\u0627\u0641\u0635\u0644 \u0648\u0642\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0639\u0646 \u0648\u0642\u062a \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u062d\u062a\u0649 \u062a\u062a\u0645\u0643\u0646 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0645\u0646 \u0627\u0644\u062d\u0644\u0648\u0644 \u0645\u062d\u0644 \u0642\u064a\u0645\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0648\u0627\u062d\u062f\u0629.<\/li>\n\n\n<li><strong>\u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062a\u064a \u062a\u0645\u062b\u0651\u0644 \u0623\u0641\u0631\u0627\u062f\u064b\u0627.<\/strong> \u0642\u062f \u062a\u0645\u062b\u0651\u0644 \u062e\u0644\u064a\u0629 \u0627\u0644\u0639\u0645\u0644 \u0634\u062e\u0635\u064b\u0627. \u0627\u0631\u0628\u0637 \u0647\u0630\u0647 \u0627\u0644\u062e\u0644\u0627\u064a\u0627 \u0628\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0641\u064a SkyPlanner\u060c \u0644\u0627 \u0628\u0627\u0644\u0622\u0644\u0627\u062a\u060c \u0648\u0625\u0644\u0627 \u0641\u0633\u064a\u064f\u0639\u0627\u0645\u0644 \u0643\u0644 \u0645\u0634\u063a\u0651\u0644 \u0643\u0622\u0644\u0629 \u062a\u0639\u0645\u0644 \u0628\u0627\u0644\u062a\u0648\u0627\u0632\u064a.<\/li>\n\n\n<li><strong>\u064a\u062a\u0637\u0644\u0628 Time Tracking \u0645\u0633\u062a\u062e\u062f\u0645\u064b\u0627.<\/strong> \u0645\u0646\u0630 \u0623\u0628\u0631\u064a\u0644 2026\u060c \u064a\u0646\u0637\u0628\u0642 \u0639\u0644\u0649 \u0639\u0645\u0644\u064a\u0629 Time Tracking Login \u0627\u0644\u0634\u0631\u0637 &#8220;requires user context&#8221; (\u062a\u062a\u0637\u0644\u0628 \u0633\u064a\u0627\u0642 \u0645\u0633\u062a\u062e\u062f\u0645)\u060c \u0648\u0644\u0627 \u064a\u064f\u0633\u0645\u062d \u0628\u062a\u0646\u0641\u064a\u0630\u0647\u0627 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Client Credentials. \u0623\u0631\u0633\u0644 \u0648\u0642\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644 \u0639\u0628\u0631 OAuth 2.0 Authorization Flow\u060c \u0623\u0648 \u0648\u0627\u0635\u0644 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0648\u0642\u062a \u0641\u064a ProShop \u0648\u0627\u0642\u0631\u0623\u0647 \u0645\u0646\u0647.<\/li>\n\n\n<li><strong>\u0641\u0639\u0651\u0644 \u0641\u0647\u0631\u0633 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a.<\/strong> \u0644\u0627 \u062a\u0639\u0645\u0644 Recently Updated Records \u0625\u0644\u0627 \u0628\u0639\u062f \u0623\u0646 \u064a\u0641\u0639\u0651\u0644\u0647\u0627 \u0641\u0631\u064a\u0642 ProShop. \u0627\u0637\u0644\u0628 \u062a\u0641\u0639\u064a\u0644\u0647\u0627 \u0641\u064a \u0627\u0644\u0623\u0633\u0628\u0648\u0639 \u0627\u0644\u0623\u0648\u0644.<\/li>\n\n\n<li><strong>\u0633\u062c\u0644\u0627\u062a ITAR.<\/strong> \u064a\u0631\u0634\u0651\u062d ProShop \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062e\u0627\u0636\u0639\u0629 \u0644\u0642\u064a\u0648\u062f ITAR \u0628\u062d\u0633\u0628 \u0643\u0644 \u0627\u062a\u0635\u0627\u0644\u060c \u0648\u064a\u062d\u062f\u062f \u062e\u064a\u0627\u0631 \u0641\u064a Developer System Config \u0645\u0627 \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u0633\u062a\u064f\u0639\u0627\u062f \u0628\u0642\u064a\u0645 null \u0623\u0645 \u0633\u062a\u064f\u0633\u062a\u0628\u0639\u062f \u0645\u0646 \u0627\u0644\u0646\u062a\u0627\u0626\u062c. \u0627\u062a\u0641\u0642 \u0639\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u064a\u0647\u0627\u060c \u0648\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0642\u064a\u0645 null \u0641\u064a \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0642\u0631\u0627\u0621\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0644\u062f\u0649 \u062c\u0647\u0627\u062a \u062e\u0627\u0631\u062c\u064a\u0629.<\/strong> \u062a\u064f\u062d\u062a\u0633\u0628 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0644\u062f\u0649 \u0627\u0644\u0645\u0648\u0631\u0651\u062f\u064a\u0646 \u0643\u0645\u062f\u062f \u0632\u0645\u0646\u064a\u0629\u060c \u0648\u0644\u0627 \u062a\u0633\u062a\u0647\u0644\u0643 \u0637\u0627\u0642\u062a\u0643 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629. \u0645\u062b\u0651\u0644\u0647\u0627 \u0628\u062e\u0637\u0648\u0627\u062a \u062a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u0627\u0644\u0648\u0642\u062a \u0641\u0642\u0637.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-proshop-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0646 \u064a\u062a\u0648\u0644\u0649 \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 ProShop \u0648\u062f\u0639\u0645\u0647\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u064a\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c<\/strong> \u0648\u064a\u0634\u0645\u0644 \u0630\u0644\u0643 \u0627\u0633\u062a\u0639\u0644\u0627\u0645\u0627\u062a GraphQL \u0648\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0639\u062f\u064a\u0644 \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0635\u0627\u0621 \u0627\u0644\u062f\u0648\u0631\u064a \u0639\u0646 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0641\u0642 \u0639\u0644\u064a\u0647\u0627. \u0644\u0643\u0644 \u0645\u0635\u0646\u0639 \u0637\u0631\u064a\u0642\u062a\u0647 \u0641\u064a \u0627\u0633\u062a\u062e\u062f\u0627\u0645 ProShop\u060c \u0648\u0641\u064a \u0647\u0630\u0647 \u0627\u0644\u0645\u0631\u062d\u0644\u0629 \u062a\u064f\u0648\u0638\u0651\u064e\u0641 \u0627\u0644\u062e\u0628\u0631\u0629 \u0628\u0647\u0630\u0647 \u0627\u0644\u0627\u062e\u062a\u0644\u0627\u0641\u0627\u062a.<\/li>\n\n\n<li><strong>\u064a\u0634\u0627\u0631\u0643 \u0645\u0633\u0624\u0648\u0644 ProShop \u0623\u0648 \u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647.<\/strong> \u0641\u0647\u0648 \u064a\u0646\u0634\u0626 Authorization \u0648\u064a\u062d\u062f\u062f \u0646\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0648\u064a\u0637\u0644\u0628 \u062a\u0641\u0639\u064a\u0644 \u0641\u0647\u0631\u0633 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a\u060c \u0648\u0647\u0648 \u0639\u0644\u0649 \u062f\u0631\u0627\u064a\u0629 \u0628\u0625\u0639\u062f\u0627\u062f \u062e\u0644\u0627\u064a\u0627 \u0627\u0644\u0639\u0645\u0644 \u0644\u062f\u064a\u0643.<\/li>\n\n\n<li><strong>\u064a\u0645\u0643\u0646 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0627\u0644\u0628\u0646\u0627\u0621 \u0639\u0644\u0649 \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644<\/strong> \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0648\u0631\u0645\u0632 API. \u064a\u0643\u0641\u064a \u0631\u0645\u0632 API \u0644\u0644\u0628\u062f\u0621\u060c \u0648\u064a\u0633\u0627\u0639\u062f \u0641\u0631\u064a\u0642 SkyPlanner \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629. \u062a\u062a\u0648\u0641\u0631 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>\u064a\u0628\u062f\u0623 \u0633\u0639\u0631 SkyPlanner \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629. \u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0648\u0641\u0642\u064b\u0627 \u0644\u0639\u0645\u0644\u064a\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0628\u0627\u0642\u062a\u0643. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 ProShop \u0636\u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a>\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/\">\u0635\u0641\u062d\u0629 ProShop ERP<\/a>\u060c \u0648<a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%8a%d8%b2%d8%a7%d8%aa\/\">\u0645\u064a\u0632\u0627\u062a<\/a> SkyPlanner\u060c \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u0623\u0646\u0638\u0645\u0629 ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u062a\u0648\u0631\u064a\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0639\u0627\u0645\u0644 \u0644\u062d\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u064e\u0644\u062e \u0647\u064a\u0643\u0644\u064b\u0627 \u0641\u0648\u0644\u0627\u0630\u064a\u064b\u0627 \u0645\u0644\u062d\u0648\u0645\u064b\u0627 \u0641\u064a \u0645\u0635\u0646\u0639 \u0623\u0644\u0627\u0647\u0627\u0631\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0628\u0639\u062f \u0623\u0646 \u0643\u0627\u0646\u062a \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u064b\u0627 \u062d\u0627\u0633\u0645\u064b\u0627 \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0625\u0644\u0649 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0634\u0631\u0641 \u0648\u0627\u062d\u062f \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0645\u0634\u0631\u0641\u064e\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a \u0644\u0634\u0631\u0643\u0629 Mamec\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0627\u0628\u0639\u0629 \u0644\u0644\u0634\u0631\u0643\u0629 \u0641\u064a \u0644\u0648\u0647\u064a\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1,000 \u0648\u0645\u0627 \u0641\u0648\u0642<\/b><span>\u0645\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u0635\u0628\u062d\u0646\u0627 \u0646\u062a\u062d\u0643\u0645 \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0631\u064a\u0642\u0629 \u0645\u062e\u062a\u0644\u0641\u0629\u060c \u0648\u0648\u0635\u0644 \u0641\u0647\u0645\u0646\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0625\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062e\u062a\u0644\u0641 \u062a\u0645\u0627\u0645\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a<\/b><br>Mamec \u00b7 \u062e\u0644\u0627\u0637\u0627\u062a \u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u0645\u0636\u062e\u0627\u062a \u0648\u062a\u0635\u0646\u064a\u0639 \u062a\u0639\u0627\u0642\u062f\u064a \u0639\u0627\u0644\u064a \u0627\u0644\u062a\u0642\u0646\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u064f\u062c\u062f\u0648\u0644 \u0622\u0644\u0627\u0641 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0625\u062a\u0627\u062d\u0629 \u0631\u0624\u064a\u0629 \u0622\u0646\u064a\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0645\u0624\u0633\u0633\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/mamec\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0631 ProShop \u0648\u0627\u062c\u0647\u0629 API\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u064a\u0648\u0641\u0631 ProShop \u0648\u0627\u062c\u0647\u0629 GraphQL API \u0639\u0644\u0649 <code>&lt;proshop root&gt;\/api\/graphql<\/code>\u060c \u0645\u0639 OAuth 2.0 \u0623\u0648 Basic Authentication \u0648\u0646\u0637\u0627\u0642\u0627\u062a \u0635\u0644\u0627\u062d\u064a\u0627\u062a \u0644\u0644\u0648\u062d\u062f\u0627\u062a. \u0648\u062a\u064f\u0639\u064a\u062f \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 REST \u0627\u0644\u0645\u0633\u0645\u0627\u0629 Recently Updated Records \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u0623\u064f\u0646\u0634\u0626\u062a \u0623\u0648 \u0639\u064f\u062f\u0651\u0644\u062a \u0623\u0648 \u062d\u064f\u0630\u0641\u062a \u062e\u0644\u0627\u0644 \u0641\u062a\u0631\u0629 \u0632\u0645\u0646\u064a\u0629 \u0645\u062d\u062f\u062f\u0629.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 ProShop \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627 \u062a\u0635\u0641 \u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0646 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 ProShop \u0623\u064a \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0635\u0627\u062f\u0631\u0629. \u064a\u0633\u062a\u0642\u0635\u064a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0627\u062c\u0647\u0629 Recently Updated Records API \u062f\u0648\u0631\u064a\u064b\u0627 \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u0644\u0643\u0644 \u0645\u0635\u0646\u0639. \u0623\u0645\u0627 \u0625\u0634\u0639\u0627\u0631\u0627\u062a webhooks \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 SkyPlanner \u0641\u062a\u0631\u0633\u0644 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 ProShop \u0644\u062a\u0633\u062c\u064a\u0644\u0647\u0627 \u0641\u064a\u0647\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0645\u0646 \u062e\u0644\u0627\u0644 \u0639\u0645\u0644\u064a\u0629 \u062a\u0639\u062f\u064a\u0644 GraphQL \u0639\u0644\u0649 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Authorization \u064a\u062a\u0636\u0645\u0646 \u0635\u0644\u0627\u062d\u064a\u0629 \u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0639\u0644\u0649 <code>workorders<\/code>. \u0648\u064a\u0634\u063a\u0651\u0644\u0647\u0627 SkyPlanner \u0639\u0628\u0631 \u0625\u0634\u0639\u0627\u0631 webhook \u0643\u0644\u0645\u0627 \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0646 \u064a\u0646\u0634\u0626 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0639\u062a\u0645\u0627\u062f ProShop API\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0646\u0634\u0626\u0647\u0627 \u0645\u0633\u0624\u0648\u0644 \u0646\u0638\u0627\u0645 ProShop \u0645\u0646 System Config &gt; Manage Authorizations. \u064a\u062a\u064a\u062d Direct Login \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0633\u0627\u0631 Client Credentials\u060c \u0648\u064a\u062d\u062f\u062f Maximum Scope \u0645\u0627 \u064a\u0645\u0643\u0646 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0642\u0631\u0627\u0621\u062a\u0647 \u0648\u0643\u062a\u0627\u0628\u062a\u0647.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0646\u0628\u063a\u064a \u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a ProShop \u0623\u0646 \u064a\u0642\u062a\u0631\u062d \u062c\u062f\u0648\u0644\u0629 ProShop \u0623\u0645 SkyPlanner\u061f<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner\u060c \u0639\u0646\u062f\u0645\u0627 \u064a\u0643\u0648\u0646 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u0649 \u0627\u0644\u0639\u0645\u064a\u0644 \u0647\u0648 \u0645\u0627 \u064a\u062d\u0633\u0645 \u0627\u0644\u062a\u0633\u0644\u064a\u0645. \u064a\u0639\u0631\u0636 \u062c\u062f\u0648\u0644 ProShop \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u0648\u062a\u0648\u0642\u0639\u0627\u062a \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0641\u064a \u0627\u0644\u0645\u0648\u0639\u062f \u0644\u0643\u0644 \u062e\u0644\u064a\u0629 \u0639\u0645\u0644\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u062a\u0639\u062f\u064a\u0644 \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a. \u064a\u062a\u0635\u0644 SkyPlanner \u0639\u0628\u0631 GraphQL API\u060c \u0648\u064a\u062d\u0633\u0651\u0646 \u0627\u0644\u062e\u0637\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0648\u064a\u0634\u0645\u0644 \u062a\u062e\u0637\u064a\u0637\u0647 \u062a\u0628\u062f\u064a\u0644 \u0625\u0639\u062f\u0627\u062f\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u064a\u062a\u064a\u062d \u0639\u062f\u062f\u064b\u0627 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f \u0645\u0646 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u064a\u0646\u060c \u0628\u0633\u0639\u0631 \u064a\u0628\u062f\u0623 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u0627\u062e\u062a\u0628\u0627\u0631 SkyPlanner \u0642\u0628\u0644 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0645\u0639 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0645\u0644\u0641\u0627\u062a CSV \u0623\u0648 Excel \u0645\u0646 ProShop\u060c \u0648\u0644\u0627 \u062a\u062a\u0637\u0644\u0628 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629<\/a>\u060c \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a> \u0644\u062a\u062d\u062f\u064a\u062f \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ ProShop ERP \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop \u0647\u0630\u0627 \u0644\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0646 \u0648\u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a\u064a\u0646 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ProShop ERP \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ProShop \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 ProShop: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 &#8230; <a title=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" aria-label=\"Read more about \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103217,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104257","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/title>\n<meta name=\"description\" content=\"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\",\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ProShop ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/proshop-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","description":"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_locale":"ar_AR","og_type":"article","og_title":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/","name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"\u0627\u0631\u0628\u0637 ProShop ERP \u0628\u0640SkyPlanner APS: GraphQL API\u060c \u062a\u0641\u0648\u064a\u0636 OAuth 2.0 \u0648\u0646\u0637\u0627\u0642\u0627\u062a\u0647\u060c Recently Updated Records\u060c \u0645\u0637\u0627\u0628\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0627\u0644\u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u0639\u0643\u0633\u064a\u0629 \u0648\u0646\u0635\u0627\u0626\u062d \u0627\u0644\u0645\u0634\u0631\u0648\u0639.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ProShop ERP: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/proshop-erp\/"},{"@type":"ListItem","position":5,"name":"\u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \/ ERP \/ ProShop ERP \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop ERP \u0645\u0639 SkyPlanner APS \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0636\u062d \u062f\u0644\u064a\u0644 \u062a\u0643\u0627\u0645\u0644 ProShop \u0647\u0630\u0627 \u0644\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0646 \u0648\u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a\u064a\u0646 \u0648\u0641\u0631\u0642 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0643\u064a\u0641\u064a\u0629 \u0631\u0628\u0637 ProShop ERP \u0628\u0640 SkyPlanner APS. \u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 ProShop \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 API \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 ProShop: skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/104257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=104257"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/104257\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/103217"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=104257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}