{"id":101198,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101198"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","title":{"rendered":"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f <span class=\"hl\">\u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0633\u062a\u0648\u0649 \u0623\u0633\u0627\u0633\u064a\u060c \u0648\u0641\u0642 \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u064a\u062d\u062c\u0632 \u0632\u0631 <strong>Plan<\/strong> \u0641\u064a Odoo Manufacturing \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647\u060c \u0641\u0644\u0627 \u064a\u062a\u062f\u0627\u062e\u0644 \u0623\u0645\u0631\u0627\u0646 \u0645\u062e\u0637\u0637\u0627\u0646 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647. \u0644\u0643\u0646\u0647 \u064a\u062e\u0637\u0637 \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 \u0648\u0627\u062d\u062f\u064b\u0627 \u0641\u064a \u0643\u0644 \u0645\u0631\u0629 \u0648\u0641\u0642 \u0642\u064a\u062f \u0648\u0627\u062d\u062f \u0641\u0642\u0637\u060c \u0648\u0644\u0627 \u064a\u0639\u064a\u062f \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0623\u0648 \u064a\u062d\u0633\u0651\u0646 \u062c\u062f\u0648\u0644\u062a\u0647\u0627 \u0623\u0648 \u064a\u0639\u064a\u062f \u062a\u062e\u0637\u064a\u0637\u0647\u0627 \u0645\u0639\u064b\u0627. \u0623\u0645\u0627 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062a\u0631\u062a\u064a\u0628 \u062c\u0645\u064a\u0639 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u0641\u0642 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0636\u0645\u0646 \u062a\u062e\u0637\u064a\u0637 \u0625\u0646\u062a\u0627\u062c \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0641\u0639\u0644\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u0646 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0641\u062a\u0633\u062a\u062e\u062f\u0645 SkyPlanner APS \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 Odoo.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0630\u0643\u0631 \u0645\u0648\u0627\u062f Odoo \u0627\u0644\u062a\u0633\u0648\u064a\u0642\u064a\u0629 \u0623\u0646\u0647 \u064a\u0645\u0643\u0646\u0643 &#8220;plan resources with finite capacity planning&#8221; (\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). \u0648\u0641\u064a\u0645\u0627 \u064a\u0644\u064a \u0645\u0627 \u064a\u0639\u0646\u064a\u0647 \u0630\u0644\u0643 \u0641\u064a Odoo 19.0\u060c \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u0631\u0633\u0645\u064a\u0629 \u0648\u0627\u0644\u0634\u064a\u0641\u0631\u0629 \u0627\u0644\u0645\u0635\u062f\u0631\u064a\u0629: \u0643\u064a\u0641 \u064a\u0639\u0645\u0644 \u0632\u0631 Plan\u060c \u0648\u0645\u0627 \u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u064a\u0643\u0641\u064a \u0648\u062d\u062f\u0647 \u0644\u062a\u0644\u0628\u064a\u0629 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u062e\u0637\u0637 Odoo \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u062e\u0637\u0648\u0629 \u0628\u062e\u0637\u0648\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u062a\u0641\u0639\u064a\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0625\u0639\u062f\u0627\u062f \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644<\/h3>\n\n\n<p>\u0627\u0646\u062a\u0642\u0644 \u0625\u0644\u0649 <strong>\u0627\u0644\u062a\u0635\u0646\u064a\u0639 &gt; \u0627\u0644\u062a\u0647\u064a\u0626\u0629 &gt; \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u0627\u062a<\/strong> \u0648\u0641\u0639\u0651\u0644 <strong>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/strong>. \u0633\u062a\u0638\u0647\u0631 \u0639\u0646\u062f\u0647\u0627 <strong>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644<\/strong> \u0636\u0645\u0646 <strong>\u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/strong>. \u064a\u062a\u0636\u0645\u0646 \u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 (<code>mrp.workcenter<\/code>) \u0627\u0644\u062d\u0642\u0648\u0644 \u0627\u0644\u062a\u064a \u064a\u0633\u062a\u062e\u062f\u0645\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0651\u0650\u0637:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0627\u0644\u062d\u0642\u0644<\/th><th>\u062f\u0648\u0631\u0647 \u0641\u064a \u0627\u0644\u062a\u062e\u0637\u064a\u0637<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>\u062a\u0642\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0630\u064a \u064a\u062a\u0628\u0639\u0647 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a \u0647\u0648 \u00abStandard 40 hours\/week\u00bb\u060c \u0645\u0646 \u0627\u0644\u0627\u062b\u0646\u064a\u0646 \u0625\u0644\u0649 \u0627\u0644\u062c\u0645\u0639\u0629<\/td><\/tr><tr><td>Time Efficiency<\/td><td>\u0646\u0633\u0628\u0629 \u0645\u0626\u0648\u064a\u0629 \u062a\u064f\u0633\u0631\u0651\u0650\u0639 \u0623\u0648 \u062a\u064f\u0628\u0637\u0651\u0650\u0626 \u062a\u0646\u0641\u064a\u0630 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0647\u0630\u0627<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>\u062f\u0642\u0627\u0626\u0642 \u062a\u064f\u0636\u0627\u0641 \u0642\u0628\u0644 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0628\u0639\u062f\u0647<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>\u0645\u0631\u0627\u0643\u0632 \u0639\u0645\u0644 \u0623\u062e\u0631\u0649 \u0642\u062f \u064a\u0633\u062a\u062e\u062f\u0645\u0647\u0627 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0627\u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0623\u0635\u0644\u064a<\/td><\/tr><tr><td>\u0639\u0644\u0627\u0645\u0629 \u062a\u0628\u0648\u064a\u0628 \u0627\u0644\u0637\u0627\u0642\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0644\u0644\u0645\u0646\u062a\u062c\u0627\u062a<\/td><td>\u0639\u062f\u062f \u0627\u0644\u0642\u0637\u0639 \u0641\u064a \u0643\u0644 \u062f\u0648\u0631\u0629 \u0648\u062f\u0642\u0627\u0626\u0642 \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u0627\u0644\u062a\u0646\u0638\u064a\u0641 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0644 \u0645\u0646\u062a\u062c (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>\u0647\u062f\u0641 \u0623\u062f\u0627\u0621 \u064a\u064f\u0633\u062a\u062e\u062f\u0645 \u0641\u064a \u0627\u0644\u062a\u0642\u0627\u0631\u064a\u0631\u060c \u0648\u0644\u064a\u0633 \u0645\u0646 \u0645\u062f\u062e\u0644\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637<\/td><\/tr><tr><td>Allowed Employees<\/td><td>\u064a\u062d\u062f\u062f \u0645\u0646 \u064a\u064f\u0633\u0645\u062d \u0644\u0647 \u0628\u0627\u0644\u0639\u0645\u0644 \u0647\u0646\u0627. \u064a\u064f\u0633\u062a\u062e\u062f\u0645 \u0644\u0644\u062a\u0635\u0641\u064a\u0629\u060c \u0648\u0644\u0627 \u064a\u062d\u062f\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u064a \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0648\u0627\u062f<\/h3>\n\n\n<p>\u0644\u0627 \u064a\u0648\u062c\u062f \u0633\u062c\u0644 \u0631\u0626\u064a\u0633\u064a \u0645\u0634\u062a\u0631\u0643 \u0644\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u062a\u064f\u0639\u0631\u0651\u064e\u0641 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u064a \u0643\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0648\u0627\u062f (BoM)\u060c \u0636\u0645\u0646 \u0639\u0644\u0627\u0645\u0629 \u062a\u0628\u0648\u064a\u0628 <strong>\u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a<\/strong> (<code>mrp.routing.workcenter<\/code>). \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u062d\u0642\u0644 <strong>Work Center<\/strong> \u0648\u062d\u0642\u0644 <strong>Duration Computation<\/strong>: \u0625\u0645\u0627 \u0648\u0642\u062a \u062b\u0627\u0628\u062a \u062a\u064f\u062f\u062e\u0644\u0647\u060c \u0623\u0648 \u0648\u0642\u062a \u064a\u064f\u062d\u0633\u0628 \u0645\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0623\u062e\u064a\u0631\u0629 (10 \u0627\u0641\u062a\u0631\u0627\u0636\u064a\u064b\u0627). \u062a\u064f\u062d\u0633\u0628 \u0627\u0644\u0645\u062f\u0629 \u0627\u0644\u0645\u062a\u0648\u0642\u0639\u0629 \u0628\u062c\u0645\u0639 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u0648\u0642\u062a \u0627\u0644\u062a\u0646\u0638\u064a\u0641 \u0648\u062d\u0627\u0635\u0644 \u0636\u0631\u0628 \u0639\u062f\u062f \u0627\u0644\u062f\u0648\u0631\u0627\u062a \u0641\u064a \u0632\u0645\u0646 \u0627\u0644\u062f\u0648\u0631\u0629\u060c \u0645\u0639 \u0642\u0633\u0645\u0629 \u062c\u0632\u0621 \u0627\u0644\u062f\u0648\u0631\u0627\u062a \u0639\u0644\u0649 \u0642\u064a\u0645\u0629 Time Efficiency (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>\u0639\u0646\u062f \u062a\u0641\u0639\u064a\u0644 <strong>Work Order Dependencies<\/strong>\u060c \u064a\u0645\u0643\u0646 \u0631\u0628\u0637 \u0639\u0645\u0644\u064a\u0629 \u0628\u0623\u062e\u0631\u0649 \u0639\u0628\u0631 <strong>Blocked By<\/strong> \u0628\u062d\u064a\u062b \u062a\u0646\u062a\u0638\u0631 \u0627\u0646\u062a\u0647\u0627\u0621\u0647\u0627. \u0648\u062a\u0648\u0636\u062d \u0648\u062b\u0627\u0626\u0642 Odoo: &#8220;A blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.&#8221; (\u064a\u064f\u062c\u062f\u0648\u0644 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062d\u062c\u0648\u0628 \u0639\u0646\u062f \u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0645\u062f\u0629 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a \u062d\u0642\u0644 Expected Duration \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0633\u0627\u0628\u0642 \u0644\u0647.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u062a\u0623\u0643\u064a\u062f \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 (MO)\u060c \u062b\u0645 \u0627\u0644\u0636\u063a\u0637 \u0639\u0644\u0649 Plan<\/h3>\n\n\n<p>\u0639\u0646\u062f \u062a\u0623\u0643\u064a\u062f \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 (<code>mrp.production<\/code>)\u060c \u062a\u064f\u0646\u0634\u0623 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u0627\u0628\u0639\u0629 \u0644\u0647 (<code>mrp.workorder<\/code>). \u0648\u0639\u0646\u062f \u0627\u0644\u0636\u063a\u0637 \u0639\u0644\u0649 <strong>\u062a\u062e\u0637\u064a\u0637<\/strong> \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 (MO)\u060c \u064a\u0628\u062f\u0623 \u0627\u0644\u0646\u0638\u0627\u0645 \u0645\u0646 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0646\u0647\u0627\u0626\u064a\u0629\u060c \u0648\u064a\u062a\u062a\u0628\u0639 \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0644\u064a\u062e\u0637\u0637 \u0623\u0648\u0644\u064b\u0627 \u0643\u0644 \u0623\u0645\u0631 \u064a\u0645\u0646\u0639 \u0628\u062f\u0621 \u0645\u0627 \u064a\u0644\u064a\u0647. \u062b\u0645 \u064a\u062c\u062f\u0648\u0644 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0632\u0645\u0646\u064a\u064b\u0627 \u0628\u0639\u062f \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0633\u0627\u0628\u0642\u0629 \u0644\u0647. \u0648\u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u064a\u0646\u0641\u0630 Odoo \u0645\u0627 \u064a\u0644\u064a:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>\u064a\u062e\u062a\u0627\u0631 \u0623\u062d\u062f\u062b \u062a\u0648\u0642\u064a\u062a \u0645\u0646 \u0628\u064a\u0646 \u0628\u062f\u0627\u064a\u0629 \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u0648\u0627\u0644\u0648\u0642\u062a \u0627\u0644\u062d\u0627\u0644\u064a\u060c \u0648\u0646\u0647\u0627\u064a\u0629 \u0623\u064a \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u064a\u062c\u0628 \u0627\u0646\u062a\u0638\u0627\u0631 \u0627\u0643\u062a\u0645\u0627\u0644\u0647\u0627.<\/li>\n\n\n<li>\u064a\u062c\u0631\u0651\u0628 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0623\u0633\u0627\u0633\u064a \u0648\u0643\u0644 \u0645\u0631\u0643\u0632 \u0645\u062f\u0631\u062c \u0636\u0645\u0646 Alternative Workcenter.<\/li>\n\n\n<li>\u064a\u0628\u062d\u062b \u0641\u064a \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0639\u0644\u0649 \u0643\u0644 \u062a\u0642\u0648\u064a\u0645 \u0639\u0646 \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u062a\u0643\u0641\u064a \u0644\u0644\u0645\u062f\u0629 \u0627\u0644\u0645\u062a\u0648\u0642\u0639\u0629.<\/li>\n\n\n<li>\u064a\u062e\u062a\u0627\u0631 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0630\u064a \u0633\u064a\u0646\u062a\u0647\u064a \u0645\u0646 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0623\u0648\u0644\u064b\u0627\u060c \u0648\u064a\u062d\u062c\u0632 \u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645\u0647 \u0643\u0633\u062c\u0644 <code>resource.calendar.leaves<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>\u062a\u0648\u0636\u062d \u0627\u0644\u0634\u064a\u0641\u0631\u0629 \u0627\u0644\u0645\u0635\u062f\u0631\u064a\u0629 \u0644\u0644\u0625\u0635\u062f\u0627\u0631 19.0 \u0627\u0644\u0642\u0627\u0639\u062f\u0629 \u0635\u0631\u0627\u062d\u0629\u064b: &#8220;The available interval is disjoinct with all other workorders planned on this workcenter&#8221; (\u0644\u0627 \u062a\u062a\u062f\u0627\u062e\u0644 \u0627\u0644\u0641\u062a\u0631\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0645\u0639 \u0623\u064a \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0623\u062e\u0631\u0649 \u0645\u062e\u0637\u0637\u0629 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0647\u0630\u0627) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). \u0648\u0647\u0630\u0627 \u0647\u0648 \u0627\u0644\u062c\u0627\u0646\u0628 \u0627\u0644\u0630\u064a \u064a\u0631\u0627\u0639\u064a \u062d\u062f\u0648\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629. \u0648\u0625\u0630\u0627 \u0648\u0635\u0644 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0641\u062a\u0631\u0629 \u062a\u0648\u0642\u0641\u060c \u064a\u064f\u0633\u062a\u0643\u0645\u0644 \u0641\u064a \u0641\u062a\u0631\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062a\u0627\u0644\u064a\u0629. \u0648\u0625\u0630\u0627 \u0644\u0645 \u064a\u062c\u062f Plan \u0641\u062a\u0631\u0629 \u0645\u0646\u0627\u0633\u0628\u0629 \u062e\u0644\u0627\u0644 700 \u064a\u0648\u0645 (\u0646\u0637\u0627\u0642 \u0627\u0644\u0628\u062d\u062b \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a)\u060c \u064a\u062a\u0648\u0642\u0641 \u0645\u0639 \u0627\u0644\u0631\u0633\u0627\u0644\u0629 &#8220;Impossible to plan the workorder.&#8221; (\u064a\u062a\u0639\u0630\u0631 \u062a\u062e\u0637\u064a\u0637 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u0641\u062a\u0631\u0627\u062a \u0627\u0644\u062a\u0648\u0642\u0641 \u0648\u0627\u0644\u0628\u062f\u0627\u0626\u0644<\/h3>\n\n\n<p>\u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062a\u0637\u0628\u064a\u0642 <strong>Time Off<\/strong> \u0648\u0648\u0636\u0639 \u0627\u0644\u0645\u0637\u0648\u0651\u0631\u060c \u064a\u0645\u0643\u0646\u0643 \u062d\u062c\u0628 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u0644\u0644\u0635\u064a\u0627\u0646\u0629 \u0623\u0648 \u062e\u0644\u0627\u0644 \u0639\u0637\u0644\u0629. \u0639\u0646\u062f\u0626\u0630\u064d \u064a\u0648\u062c\u0651\u0647 Plan \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0628\u062f\u064a\u0644\u0629. \u0623\u0645\u0627 \u0625\u0630\u0627 \u0644\u0645 \u064a\u062a\u0648\u0641\u0631 \u0628\u062f\u064a\u0644\u060c \u0641\u062a\u0642\u0648\u0644 \u0648\u062b\u0627\u0626\u0642 Odoo: &#8220;work orders begin to pile up at the work center until it is operational again&#8221; (\u062a\u0628\u062f\u0623 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0644\u062a\u0631\u0627\u0643\u0645 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0625\u0644\u0649 \u0623\u0646 \u064a\u0639\u0648\u062f \u0625\u0644\u0649 \u0627\u0644\u062a\u0634\u063a\u064a\u0644) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. \u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629 \u0648\u0627\u0644\u062a\u0639\u062f\u064a\u0644<\/h3>\n\n\n<p>\u064a\u0641\u062a\u062d \u0627\u0644\u0645\u0633\u0627\u0631\u0627\u0646 <strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> \u0648<strong>Planning by Workcenter<\/strong> \u0639\u0631\u0648\u0636 Work Orders Planning. \u064a\u0639\u0631\u0636 \u0625\u0635\u062f\u0627\u0631 Enterprise \u0645\u062e\u0637\u0637 Gantt \u064a\u062f\u0639\u0645 \u0627\u0644\u0633\u062d\u0628 \u0648\u0627\u0644\u0625\u0641\u0644\u0627\u062a\u060c \u0628\u064a\u0646\u0645\u0627 \u064a\u062a\u064a\u062d \u0625\u0635\u062f\u0627\u0631 Community \u0639\u0631\u0648\u0636 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645 \u0648\u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u062d\u0648\u0631\u064a \u0648\u0627\u0644\u0631\u0633\u0645 \u0627\u0644\u0628\u064a\u0627\u0646\u064a. \u0648\u062a\u0635\u0641 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u062a\u0639\u062f\u064a\u0644 \u0628\u0623\u0646\u0647 \u064a\u062f\u0648\u064a: &#8220;Times and planned work centers can be changed by clicking to access the individual work order.&#8221; (\u064a\u0645\u0643\u0646 \u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0628\u0627\u0644\u0646\u0642\u0631 \u0644\u0641\u062a\u062d \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0639\u0646\u064a.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u062d\u062f\u0648\u062f \u0625\u0645\u0643\u0627\u0646\u0627\u062a Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u0623\u0633\u0628\u0642\u064a\u0629 \u0644\u0645\u0646 \u064a\u064f\u062e\u0637\u0637 \u0623\u0648\u0644\u064b\u0627.<\/strong> \u064a\u0639\u0627\u0644\u062c Plan \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 \u0648\u0627\u062d\u062f\u064b\u0627 \u062a\u0644\u0648 \u0627\u0644\u0622\u062e\u0631\u060c \u0641\u064a\u062d\u0635\u0644 \u0645\u0627 \u062a\u062e\u0637\u0637\u0647 \u0623\u0648\u0644\u064b\u0627 \u0639\u0644\u0649 \u0623\u0628\u0643\u0631 \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629. \u0648\u0639\u0646\u062f \u062a\u062d\u062f\u064a\u062f \u0639\u062f\u0629 \u0623\u0648\u0627\u0645\u0631 \u062a\u0635\u0646\u064a\u0639\u060c \u064a\u062e\u0637\u0637\u0647\u0627 \u0648\u0641\u0642 \u062a\u0631\u062a\u064a\u0628 Odoo \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a: \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629\u060c \u062b\u0645 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621. \u0648\u0644\u0627 \u064a\u0648\u0627\u0632\u0646 \u0628\u064a\u0646 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0648\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u060c \u0648\u0644\u0627 \u064a\u0632\u064a\u062d \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 \u0645\u062e\u0637\u0637\u064b\u0627 \u0644\u0625\u0641\u0633\u0627\u062d \u0627\u0644\u0645\u062c\u0627\u0644 \u0644\u0623\u0645\u0631 \u0623\u0643\u062b\u0631 \u0625\u0644\u062d\u0627\u062d\u064b\u0627.<\/li>\n\n\n<li><strong>\u0644\u0627 \u062a\u0631\u062a\u064a\u0628 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u062a\u0647\u064a\u0626\u0629.<\/strong> \u064a\u064f\u0636\u0627\u0641 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u0645\u062d\u062f\u062f \u0641\u064a Setup Time \u0628\u0648\u0635\u0641\u0647 \u0645\u062f\u0629 \u062b\u0627\u0628\u062a\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0628\u0639\u062f\u062f \u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0646\u0641\u0633\u0647 \u0645\u0647\u0645\u0627 \u0643\u0627\u0646\u062a \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0633\u0627\u0628\u0642\u0629. \u0648\u0644\u0627 \u064a\u062a\u0636\u0645\u0646 Odoo \u0645\u0635\u0641\u0648\u0641\u0629 \u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u060c \u0648\u0644\u0627 \u064a\u062c\u0645\u0639 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062a\u0634\u0627\u0628\u0647\u0629 \u0644\u062a\u062c\u0646\u0628 \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646\u0647\u0627.<\/li>\n\n\n<li><strong>\u0642\u064a\u062f \u0648\u0627\u062d\u062f \u0641\u0642\u0637.<\/strong> \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0647\u0648 \u0648\u062d\u062f\u0647 \u0645\u0627 \u064a\u0642\u064a\u0651\u062f \u0627\u0644\u062e\u0637\u0629. \u0648\u064a\u0642\u062a\u0635\u0631 \u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0639\u0644\u0649 \u062a\u062d\u062f\u064a\u062f\u0647\u0645 \u0639\u0628\u0631 \u0639\u0627\u0645\u0644 \u0627\u0644\u062a\u0635\u0641\u064a\u0629 Allowed Employees. \u0648\u0639\u0646\u062f\u0645\u0627 \u064a\u062d\u062c\u0632 Plan \u0641\u062a\u0631\u0629\u060c \u0644\u0627 \u064a\u062a\u062d\u0642\u0642 \u0645\u0646 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0623\u0648 \u0627\u0644\u0645\u0648\u0627\u062f. \u0648\u0644\u0627 \u062a\u064f\u0633\u062a\u062e\u062f\u0645 \u062d\u062c\u0648\u0632\u0627\u062a \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0648\u062a\u0648\u0627\u0631\u064a\u062e \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0627 \u0641\u064a \u062a\u062c\u062f\u064a\u062f \u0627\u0644\u0645\u062e\u0632\u0648\u0646.<\/li>\n\n\n<li><strong>\u064a\u062a\u062c\u0627\u0647\u0644 MRP \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629.<\/strong> \u062a\u0646\u0634\u0626 \u0642\u0648\u0627\u0639\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0637\u0644\u0628 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u062d\u0633\u0628 \u0627\u0644\u0637\u0644\u0628 (MTO) \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u062d\u0642\u0644 <strong>Manuf. Lead Time<\/strong> \u0641\u064a \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0645\u062d\u0633\u0648\u0628\u064b\u0627 \u0628\u0627\u0644\u0623\u064a\u0627\u0645 \u0627\u0644\u062a\u0642\u0648\u064a\u0645\u064a\u0629. \u0648\u062a\u0648\u0636\u062d \u0627\u0644\u0648\u062b\u0627\u0626\u0642: &#8220;Lead times do not consider weekends, holidays, or work center capacity&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0639\u0637\u0644\u0627\u062a \u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0623\u0633\u0628\u0648\u0639 \u0623\u0648 \u0627\u0644\u0639\u0637\u0644\u0627\u062a \u0627\u0644\u0631\u0633\u0645\u064a\u0629 \u0623\u0648 \u0637\u0627\u0642\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>). \u0644\u0630\u0627 \u062a\u064f\u062d\u0633\u0628 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0646\u0647\u0627\u0626\u064a\u0629 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0648\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0627\u0644\u0645\u0648\u0639\u0648\u062f\u0629 \u0628\u0627\u0644\u0623\u064a\u0627\u0645 \u0627\u0644\u062a\u0642\u0648\u064a\u0645\u064a\u0629\u060c \u0644\u0627 \u0648\u0641\u0642 \u0637\u0627\u0628\u0648\u0631 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n\n<li><strong>\u062c\u062f\u0648\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0631\u0626\u064a\u0633\u064a (MPS) \u0645\u062c\u0631\u062f \u0642\u0627\u0626\u0645\u0629 \u0645\u0642\u062a\u0631\u062d\u0627\u062a.<\/strong> \u0641\u0647\u0648 \u0641\u064a \u0625\u0635\u062f\u0627\u0631 Enterprise \u0644\u0627 \u064a\u0631\u0627\u0639\u064a \u062d\u0645\u0644 \u0627\u0644\u0639\u0645\u0644 \u0623\u064a\u0636\u064b\u0627. &#8220;The MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.&#8221; (\u064a\u0642\u062a\u0631\u062d MPS \u0641\u0642\u0637 \u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0646\u062a\u062c \u0627\u0644\u0645\u0637\u0644\u0648\u0628 \u062a\u062c\u062f\u064a\u062f \u0645\u062e\u0632\u0648\u0646\u0647\u0627\u060c \u0648\u0639\u0644\u0649 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0625\u0646\u0634\u0627\u0621 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0623\u0648 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0641\u0639\u0644\u064a\u064b\u0627.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">\u0627\u0644\u0645\u0635\u062f\u0631<\/a>)<\/li>\n\n\n<li><strong>\u0644\u0627 \u0625\u0639\u0627\u062f\u0629 \u062a\u062e\u0637\u064a\u0637 \u062a\u0644\u0642\u0627\u0626\u064a\u0629.<\/strong> \u0644\u0627 \u064a\u0624\u062f\u064a \u0639\u0637\u0644 \u0623\u0648 \u0637\u0644\u0628 \u0639\u0627\u062c\u0644 \u0625\u0644\u0649 \u062a\u062d\u0631\u064a\u0643 \u0623\u064a \u0634\u064a\u0621 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627. \u0648\u0628\u0645\u062c\u0631\u062f \u0628\u062f\u0621 \u0623\u062d\u062f \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u064a\u0631\u0641\u0636 Odoo \u0625\u0644\u063a\u0627\u0621 \u062a\u062e\u0637\u064a\u0637 \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639: &#8220;Some work orders have already started, so you cannot unplan this manufacturing order.&#8221; (\u0628\u062f\u0623\u062a \u0628\u0639\u0636 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0644\u0641\u0639\u0644\u060c \u0644\u0630\u0627 \u0644\u0627 \u064a\u0645\u0643\u0646\u0643 \u0625\u0644\u063a\u0627\u0621 \u062a\u062e\u0637\u064a\u0637 \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0647\u0630\u0627.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>\u062a\u064f\u062e\u0637\u0637 \u0627\u0644\u062a\u062c\u0645\u064a\u0639\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0643\u0644\u0651\u064c \u0639\u0644\u0649 \u062d\u062f\u0629.<\/strong> \u062a\u0646\u0634\u0626 \u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0645\u062a\u0639\u062f\u062f\u0629 \u0627\u0644\u0645\u0633\u062a\u0648\u064a\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 \u0641\u0631\u0639\u064a\u0629 \u0645\u0646\u0641\u0635\u0644\u0629\u060c \u0648\u064a\u064f\u062e\u0637\u0637 \u0643\u0644 \u0645\u0646\u0647\u0627 \u0628\u0635\u0648\u0631\u0629 \u0645\u0633\u062a\u0642\u0644\u0629. \u0648\u0639\u0644\u0649 \u0627\u0644\u0645\u062e\u0637\u0637 \u0623\u0646 \u064a\u0631\u062a\u0628 \u062a\u062e\u0637\u064a\u0637\u0647\u0627 \u0628\u062d\u064a\u062b \u064a\u0643\u0648\u0646 \u0627\u0644\u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0641\u0631\u0639\u064a \u062c\u0627\u0647\u0632\u064b\u0627 \u062d\u064a\u0646 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u064a\u0647 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u0623\u0645.<\/li>\n\n\n<li><strong>\u064a\u062a\u0648\u0641\u0631 Gantt \u0648MPS \u0641\u064a Enterprise.<\/strong> \u062a\u0648\u0636\u062d \u0635\u0641\u062d\u0629 \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0623\u0646 \u0645\u064a\u0632\u062a\u064e\u064a &#8220;Scheduling&#8221; (\u0627\u0644\u062c\u062f\u0648\u0644\u0629) \u0648&#8221;Shopfloor&#8221; (\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c) \u0641\u064a \u062a\u0637\u0628\u064a\u0642 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0645\u062a\u0627\u062d\u062a\u0627\u0646 \u0641\u064a Enterprise \u0641\u0642\u0637 (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). \u0623\u0645\u0627 \u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u0641\u064a Community\u060c \u0641\u064a\u0639\u0645\u0644\u0648\u0646 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u064a\u0643\u0641\u064a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062f\u0645\u062c \u0641\u064a Odoo\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0641\u064a \u0632\u0631 Plan \u0641\u064a Odoo \u0628\u0627\u0644\u063a\u0631\u0636 \u0639\u0646\u062f\u0645\u0627:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u064a\u0643\u0648\u0646 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u0648\u0627\u062d\u062f \u0648\u0627\u0636\u062d \u0627\u0644\u0627\u062e\u062a\u064a\u0627\u0631\u060c \u0648\u062a\u0643\u0648\u0646 \u0623\u062d\u062c\u0627\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639\u062a\u062f\u0644\u0629.<\/li>\n\n\n<li>\u062a\u062a\u0646\u0627\u0641\u0633 \u0623\u0648\u0627\u0645\u0631 \u0642\u0644\u064a\u0644\u0629 \u0639\u0644\u0649 \u0639\u0646\u0642 \u0627\u0644\u0632\u062c\u0627\u062c\u0629 \u0646\u0641\u0633\u0647\u060c \u0641\u062a\u0643\u0648\u0646 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0646\u0627\u062a\u062c\u0629 \u0639\u0646 \u0623\u0633\u0628\u0642\u064a\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0642\u0628\u0648\u0644\u0629.<\/li>\n\n\n<li>\u062a\u0643\u0648\u0646 \u0627\u0644\u0622\u0644\u0627\u062a \u0627\u0644\u0628\u062f\u064a\u0644\u0629 \u0645\u062a\u0637\u0627\u0628\u0642\u0629\u060c \u0628\u062d\u064a\u062b \u062a\u0643\u0641\u064a \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0628\u062f\u064a\u0644\u0629 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a Alternative Workcenters \u0645\u0639 \u062a\u0637\u0628\u064a\u0642 Time Off \u0644\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0645\u0639\u0638\u0645 \u0627\u0644\u0627\u0636\u0637\u0631\u0627\u0628\u0627\u062a.<\/li>\n\n\n<li>\u062a\u0643\u0648\u0646 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0642\u0635\u064a\u0631\u0629 \u0623\u0648 \u0644\u0627 \u062a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0633\u0627\u0628\u0642\u0629.<\/li>\n\n\n<li>\u064a\u0633\u062a\u0637\u064a\u0639 \u0627\u0644\u0645\u062e\u0637\u0637 \u0645\u0631\u0627\u062c\u0639\u0629 \u0639\u0631\u0636 Planning by Workcenter \u0645\u0631\u0629 \u064a\u0648\u0645\u064a\u064b\u0627\u060c \u0648\u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u062a\u0639\u0627\u0631\u0636\u0627\u062a \u0627\u0644\u0642\u0644\u064a\u0644\u0629 \u064a\u062f\u0648\u064a\u064b\u0627.<\/li>\n\n<\/ul>\n\n\n<p>\u0625\u0630\u0627 \u0643\u0627\u0646 \u0647\u0630\u0627 \u064a\u0635\u0641 \u0645\u0635\u0646\u0639\u0643\u060c \u0641\u0631\u0643\u0651\u0632 \u062c\u0647\u062f\u0643 \u0639\u0644\u0649 \u062f\u0642\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a. \u062e\u0635\u0651\u0635 \u062a\u0642\u0648\u064a\u0645\u064b\u0627 \u0644\u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u060c \u0648\u0623\u062f\u062e\u0644 \u0642\u064a\u0645\u064b\u0627 \u0648\u0627\u0642\u0639\u064a\u0629 \u0641\u064a \u062d\u0642\u0644\u064e\u064a Setup Time \u0648Cleanup Time. \u0627\u0633\u062a\u062e\u062f\u0645 \u0645\u062f\u062f\u064b\u0627 \u062b\u0627\u0628\u062a\u0629 \u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0627\u0631\u064a\u062e\u064a\u0629 \u063a\u064a\u0631 \u0645\u0646\u062a\u0638\u0645\u0629\u060c \u0648\u0641\u0639\u0651\u0644 \u0627\u0644\u062a\u0628\u0639\u064a\u0627\u062a\u060c \u0648\u062e\u0637\u0637 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u062d\u0633\u0628 \u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0646\u0638\u0627\u0645 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u062a\u062c\u0627\u0648\u0632 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643 \u0625\u0645\u0643\u0627\u0646\u0627\u062a Plan \u0639\u0646\u062f\u0645\u0627 \u062a\u0646\u0637\u0628\u0642 \u0639\u062f\u0629 \u062d\u0627\u0644\u0627\u062a \u0645\u0645\u0627 \u064a\u0644\u064a:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u062a\u062a\u0646\u0627\u0641\u0633 \u0623\u0648\u0627\u0645\u0631 \u0643\u062b\u064a\u0631\u0629 \u0639\u0644\u0649 \u0639\u0646\u0642\u064e\u064a \u0632\u062c\u0627\u062c\u0629 \u0623\u0648 \u0623\u0643\u062b\u0631\u060c \u0648\u064a\u062c\u0628 \u0623\u0646 \u062a\u062d\u062f\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u062a\u0631\u062a\u064a\u0628 \u062a\u0646\u0641\u064a\u0630\u0647\u0627.<\/li>\n\n\n<li>\u062a\u0639\u062a\u0645\u062f \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0639\u0644\u0649 \u0645\u0627 \u0623\u064f\u0646\u062a\u062c \u0633\u0627\u0628\u0642\u064b\u0627\u060c \u0644\u0630\u0627 \u064a\u0624\u062b\u0631 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0641\u064a \u062d\u062c\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li>\u064a\u0641\u0631\u0636 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0642\u064a\u0648\u062f\u064b\u0627 \u0639\u0644\u0649 \u0627\u0644\u062e\u0637\u0629 \u0628\u0642\u062f\u0631 \u0645\u0627 \u062a\u0641\u0631\u0636\u0647 \u0627\u0644\u0622\u0644\u0627\u062a.<\/li>\n\n\n<li>\u064a\u062d\u062f\u062f \u0648\u0635\u0648\u0644 \u0627\u0644\u0645\u0648\u0627\u062f \u0645\u0648\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u0645\u0647\u0645\u0629.<\/li>\n\n\n<li>\u062a\u0641\u0631\u0636 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0627\u062c\u0644\u0629 \u0648\u0627\u0644\u0623\u0639\u0637\u0627\u0644 \u0648\u062a\u0623\u062e\u0631 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u0627\u062a \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0623\u0633\u0628\u0648\u0639\u064a\u064b\u0627.<\/li>\n\n\n<li>\u064a\u062d\u062a\u0627\u062c \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0625\u0644\u0649 \u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645 \u062a\u0633\u062a\u0646\u062f \u0625\u0644\u0649 \u0637\u0627\u0628\u0648\u0631 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0641\u0639\u0644\u064a\u060c \u0644\u0627 \u0625\u0644\u0649 \u062d\u0642\u0644 Manuf. Lead Time.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u062a\u0628\u062d\u062b \u0639\u0646\u0647 \u0641\u064a \u0627\u0644\u0646\u0638\u0627\u0645\u061f<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0645\u0639\u064b\u0627 \u0648\u0641\u0642 \u0637\u0627\u0642\u062a\u0647\u0627 \u0627\u0644\u0641\u0639\u0644\u064a\u0629<\/strong>\u060c \u0645\u0639 \u0627\u062d\u062a\u0633\u0627\u0628 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062d\u0627\u0644\u0627\u062a \u0627\u0644\u063a\u064a\u0627\u0628.<\/li>\n\n\n<li><strong>\u062a\u0631\u062a\u064a\u0628 \u062c\u0645\u064a\u0639 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0645\u0639\u064b\u0627<\/strong> \u062d\u0633\u0628 \u0645\u0648\u0639\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629\u060c \u0644\u0627 \u0643\u0644 \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 \u0639\u0644\u0649 \u062d\u062f\u0629.<\/li>\n\n\n<li><strong>\u0645\u0635\u0641\u0648\u0641\u0629 \u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629<\/strong> \u062a\u0631\u0627\u0639\u064a \u0627\u062e\u062a\u0644\u0627\u0641 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u0627\u062e\u062a\u0644\u0627\u0641 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0647\u0627\u0645\u060c \u0644\u064a\u062e\u062a\u0627\u0631 \u0627\u0644\u0645\u062d\u0631\u0643 \u0627\u0644\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0630\u064a \u064a\u062a\u0637\u0644\u0628 \u0623\u0642\u0644 \u0648\u0642\u062a \u0644\u0644\u062a\u0647\u064a\u0626\u0629.<\/li>\n\n\n<li><strong>\u0627\u0639\u062a\u0628\u0627\u0631 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0642\u064a\u0648\u062f\u064b\u0627:<\/strong> \u0641\u0627\u0644\u0623\u062f\u0627\u0629 \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0639\u0644\u0649 \u0622\u0644\u0629 \u0644\u0627 \u062a\u0643\u0648\u0646 \u0645\u062a\u0627\u062d\u0629 \u0644\u0622\u0644\u0629 \u0623\u062e\u0631\u0649\u060c \u0648\u0642\u062f \u062a\u062d\u062a\u0627\u062c \u0627\u0644\u0645\u0647\u0645\u0629 \u0625\u0644\u0649 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647.<\/li>\n\n\n<li><strong>\u062c\u062f\u0648\u0644\u0629 \u062a\u0631\u0627\u0639\u064a \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f<\/strong> \u0648\u062a\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631 \u0648\u0635\u0648\u0644\u0647\u0627.<\/li>\n\n\n<li><strong>\u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644 \u0628\u062f\u064a\u0644\u0629<\/strong> \u064a\u062e\u062a\u0627\u0631\u0647\u0627 \u0627\u0644\u0645\u062d\u0631\u0643 \u0628\u0645\u0627 \u064a\u062e\u062f\u0645 \u0627\u0644\u062e\u0637\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627\u060c \u0644\u0627 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0627\u062d\u062f\u064b\u0627 \u0641\u064a \u0643\u0644 \u0645\u0631\u0629.<\/li>\n\n\n<li><strong>\u062f\u0639\u0645 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0645\u062a\u0639\u062f\u062f\u0629 \u0627\u0644\u0645\u0633\u062a\u0648\u064a\u0627\u062a<\/strong> \u0628\u062d\u064a\u062b \u062a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u062c\u0645\u064a\u0639\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0642\u0628\u0644 \u0623\u0646 \u064a\u062d\u062a\u0627\u062c \u0625\u0644\u064a\u0647\u0627 \u0627\u0644\u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0623\u0645.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u0629<\/strong> \u0645\u0639 \u062a\u0642\u062f\u0645 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0648 \u062a\u063a\u064a\u0631 \u0627\u0644\u0623\u0648\u0627\u0645\u0631.<\/li>\n\n\n<li><strong>\u0645\u062e\u0637\u0637 Gantt \u0644\u0644\u0645\u062e\u0637\u0637\u064a\u0646 \u0648\u0637\u0627\u0628\u0648\u0631 \u0645\u0647\u0627\u0645 \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/strong>\u060c \u062d\u062a\u0649 \u0645\u0639 \u0625\u0635\u062f\u0627\u0631 Community.<\/li>\n\n\n<li><strong>\u062a\u062d\u062f\u064a\u062f \u0648\u0627\u0636\u062d \u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0639\u0646\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Odoo.<\/strong> \u062a\u064f\u062d\u0633\u0628 \u062a\u0648\u0627\u0631\u064a\u062e \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Odoo \u0645\u0646 \u0627\u0644\u062d\u062c\u0632 \u0641\u064a \u0627\u0644\u062a\u0642\u0648\u064a\u0645\u060c \u0648\u064a\u0624\u062f\u064a \u0627\u0644\u0636\u063a\u0637 \u0639\u0644\u0649 \u00ab\u062a\u062e\u0637\u064a\u0637\u00bb \u0645\u062c\u062f\u062f\u064b\u0627 \u0625\u0644\u0649 \u0627\u0633\u062a\u0628\u062f\u0627\u0644\u0647\u0627. \u0627\u062a\u0641\u0642\u0648\u0627 \u0639\u0644\u0649 \u0623\u0646 \u0623\u062f\u0627\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0647\u064a \u0627\u0644\u0645\u0633\u0624\u0648\u0644\u0629 \u0639\u0646 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644\u060c \u0648\u0623\u0639\u064a\u062f\u0648\u0627 \u0643\u062a\u0627\u0628\u0629 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0639\u0628\u0631 <code>mrp.workorder<\/code>\u060c \u0645\u0639 \u0627\u0633\u062a\u062b\u0646\u0627\u0621 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u0628\u062f\u0623 \u062a\u0646\u0641\u064a\u0630\u0647\u0627 \u0628\u0627\u0644\u0641\u0639\u0644.<\/li>\n\n\n<li><strong>\u0648\u0627\u062c\u0647\u0629 API \u062a\u0646\u0627\u0633\u0628 \u0625\u0635\u062f\u0627\u0631\u0643 \u0648\u0628\u0627\u0642\u062a\u0643.<\/strong> \u064a\u062a\u0636\u0645\u0646 Odoo 19 \u0648\u0627\u062c\u0647\u0629 External JSON-2 API. \u0648\u0645\u0646 <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">\u0627\u0644\u0645\u0642\u0631\u0631 \u0625\u0632\u0627\u0644\u0629<\/a> XML-RPC \u0648JSON-RPC \u0641\u064a Odoo 22 (Odoo Online 21.1). \u0648\u0644\u0627 \u064a\u062a\u0648\u0641\u0631 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0648\u0627\u062c\u0647\u0629 API \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629 \u0625\u0644\u0627 \u0636\u0645\u0646 \u0628\u0627\u0642\u0627\u062a Custom\u060c \u0648\u0644\u064a\u0633 \u0636\u0645\u0646 One App Free \u0623\u0648 Standard (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">\u0648\u062b\u0627\u0626\u0642 \u0648\u0627\u062c\u0647\u0629 API \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629<\/a>). \u0648\u062a\u062a\u0637\u0644\u0628 \u0627\u0644\u0648\u062d\u062f\u0627\u062a \u0627\u0644\u0645\u062e\u0635\u0635\u0629 \u0627\u0633\u062a\u0636\u0627\u0641\u0629 \u0639\u0644\u0649 Odoo.sh \u0623\u0648 \u0639\u0644\u0649 \u062e\u0648\u0627\u062f\u0645 \u0645\u062d\u0644\u064a\u0629 (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">\u0623\u0633\u0639\u0627\u0631 Odoo<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>\u062a\u0646\u0642\u0633\u0645 \u0627\u0644\u062e\u064a\u0627\u0631\u0627\u062a \u0625\u0644\u0649 \u0623\u0631\u0628\u0639 \u0641\u0626\u0627\u062a:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062f\u0645\u062c \u0641\u064a Odoo<\/strong> \u064a\u0634\u0645\u0644 \u0632\u0631 Plan\u060c \u0648\u0639\u0631\u0636 Gantt \u0641\u064a \u0625\u0635\u062f\u0627\u0631 Enterprise.<\/li>\n\n\n<li><strong>\u0648\u062d\u062f\u0627\u062a \u0625\u0636\u0627\u0641\u064a\u0629 \u062f\u0627\u062e\u0644 \u0648\u0627\u062c\u0647\u0629 Odoo<\/strong> \u062a\u062d\u0633\u0651\u0646 \u0644\u0648\u062d\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0623\u0648 \u0622\u0644\u064a\u0629 \u062d\u062c\u0632 \u0627\u0644\u0641\u062a\u0631\u0627\u062a\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u0635\u064a\u0627\u0646\u062a\u0647\u0627 \u0623\u062d\u062f \u0634\u0631\u0643\u0627\u0621 Odoo.<\/li>\n\n\n<li><strong>\u0645\u062d\u0631\u0643\u0627\u062a \u0633\u0644\u0627\u0633\u0644 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0648\u062d\u0632\u0645 APS \u0644\u0644\u0645\u0624\u0633\u0633\u0627\u062a<\/strong> \u062a\u064f\u0631\u0628\u0637 \u0639\u0628\u0631 \u0645\u0634\u0631\u0648\u0639 \u062a\u0646\u0641\u064a\u0630\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u062a\u0634\u063a\u064a\u0644\u0647\u0627 \u0641\u0631\u064a\u0642 \u0645\u062a\u0641\u0631\u063a \u0644\u0644\u062a\u062e\u0637\u064a\u0637.<\/li>\n\n\n<li><strong>\u0623\u0646\u0638\u0645\u0629 APS \u0627\u0644\u0633\u062d\u0627\u0628\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u062f\u0639\u0645 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/strong>\u060c \u0648\u0647\u064a \u0627\u0644\u0641\u0626\u0629 \u0627\u0644\u062a\u064a \u064a\u0646\u062a\u0645\u064a \u0625\u0644\u064a\u0647\u0627 SkyPlanner\u060c \u062a\u062c\u062f\u0648\u0644 \u0643\u0644 \u0645\u0648\u0631\u062f \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 Odoo. \u0648\u062a\u0648\u0627\u0635\u0644 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0639 \u062a\u063a\u064a\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u062a\u0636\u0639 \u0627\u0644\u062c\u062f\u0648\u0644 \u0628\u064a\u0646 \u0623\u064a\u062f\u064a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u064a\u0646 \u064a\u0623\u062a\u064a \u062f\u0648\u0631 SkyPlanner\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u0639\u0627\u0644\u062c SkyPlanner APS \u0643\u0644 \u0642\u064a\u062f \u0645\u0646 \u0627\u0644\u0642\u064a\u0648\u062f \u0627\u0644\u0645\u0630\u0643\u0648\u0631\u0629 \u0623\u0639\u0644\u0627\u0647:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0628\u062f\u0644 \u0623\u0633\u0628\u0642\u064a\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u060c \u062a\u0631\u062a\u064a\u0628 \u0641\u0639\u0644\u064a \u0644\u0644\u0623\u0648\u0627\u0645\u0631.<\/strong> \u064a\u062e\u0637\u0637 \u0645\u062d\u0631\u0643 Arcturus AI \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062c\u0645\u064a\u0639 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0645\u0639\u064b\u0627 \u0641\u064a \u062b\u0648\u0627\u0646\u064d\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0648\u064a\u0631\u062a\u0628\u0647\u0627 \u0648\u0641\u0642 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0625\u0643\u0645\u0627\u0644 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0629 \u0648\u0623\u0648\u0644\u0648\u064a\u0629 \u0627\u0644\u0639\u0645\u064a\u0644 \u0648Fast Track \u0648Dynamic Priorities.<\/li>\n\n\n<li><strong>\u0628\u062f\u0644 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u062b\u0627\u0628\u062a\u0629\u060c \u062a\u0647\u064a\u0626\u0629 \u0623\u0642\u0635\u0631.<\/strong> \u062a\u0633\u062c\u0651\u0644 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0648\u0642\u062f \u064a\u062e\u062a\u0644\u0641 \u0628\u0627\u062e\u062a\u0644\u0627\u0641 \u0627\u0644\u0627\u062a\u062c\u0627\u0647: \u0645\u0646 \u0627\u0644\u0623\u0632\u0631\u0642 \u0625\u0644\u0649 \u0627\u0644\u0623\u062d\u0645\u0631 30 \u062f\u0642\u064a\u0642\u0629\u060c \u0648\u0645\u0646 \u0627\u0644\u0623\u062d\u0645\u0631 \u0625\u0644\u0649 \u0627\u0644\u0623\u0632\u0631\u0642 60. \u0648\u064a\u062e\u062a\u0627\u0631 \u0646\u0638\u0627\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0630\u064a \u064a\u062a\u0637\u0644\u0628 \u0623\u0642\u0644 \u0648\u0642\u062a \u0644\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0634\u063a\u0651\u0644 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062a\u0634\u0627\u0628\u0647\u0629 \u062a\u0628\u0627\u0639\u064b\u0627.<\/li>\n\n\n<li><strong>\u0645\u0646 \u0642\u064a\u062f \u0648\u0627\u062d\u062f \u0625\u0644\u0649 \u062c\u0645\u064a\u0639 \u0627\u0644\u0642\u064a\u0648\u062f.<\/strong> \u064a\u062c\u0631\u064a \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062d\u0627\u0644\u0627\u062a \u0627\u0644\u063a\u064a\u0627\u0628 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0636\u0645\u0646 \u0627\u0644\u062c\u062f\u0648\u0644 \u0646\u0641\u0633\u0647. \u0648\u0644\u0623\u0646 \u0639\u062f\u062f \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0645\u062d\u062f\u0648\u062f\u060c \u0641\u0644\u0627 \u062a\u064f\u062d\u062c\u0632 \u0623\u062f\u0627\u0629 \u062a\u062b\u0628\u064a\u062a \u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0639\u0644\u0649 \u0622\u0644\u0629 \u0644\u0622\u0644\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647. \u0648\u0642\u062f \u062a\u062a\u0637\u0644\u0628 \u0645\u0647\u0645\u0629 \u0648\u0627\u062d\u062f\u0629 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0641\u064a \u0622\u0646 \u0648\u0627\u062d\u062f\u060c \u0648\u064a\u0644\u062c\u0623 \u0627\u0644\u0645\u062d\u0631\u0643 \u0625\u0644\u0649 \u0622\u0644\u0627\u062a \u0623\u0648 \u0639\u0627\u0645\u0644\u064a\u0646 \u0628\u062f\u0644\u0627\u0621 \u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a. \u0648\u064a\u0634\u0645\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c \u0646\u0641\u0633\u0647 \u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0643\u0641\u0627\u0621\u062a\u0647\u0627 \u0648\u062a\u0642\u0633\u064a\u0645 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0648\u0627\u062d\u062f\u0629 \u0639\u0644\u0649 \u0639\u062f\u0629 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644. \u0648\u064a\u0634\u0645\u0644 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0645\u062a\u0627\u062d \u0648\u0628\u0646\u0648\u062f <code>purchase.order<\/code> \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629: \u062a\u064f\u062d\u062a\u0633\u0628 \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0643\u0645\u0648\u0627\u062f \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u062a\u0633\u0644\u064a\u0645 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u064f\u062d\u062f\u0651\u064e\u062b \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u062d\u0627\u0644\u0629 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 \u00ab\u062a\u0645 \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u00bb.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062c\u0645\u064a\u0639\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u062c\u0627\u0647\u0632\u0629 \u0641\u064a \u0645\u0648\u0639\u062f\u0647\u0627.<\/strong> \u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0648\u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0645\u062a\u0639\u062f\u062f\u0629 \u0627\u0644\u0645\u0633\u062a\u0648\u064a\u0627\u062a \u0628\u062d\u064a\u062b \u062a\u0643\u0648\u0646 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u062c\u0627\u0647\u0632\u0629 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u064a\u0647\u0627 \u0641\u064a \u0627\u0644\u062a\u062c\u0645\u064a\u0639.<\/li>\n\n\n<li><strong>Autopilot \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u064a\u062f\u0648\u064a\u0627\u064b.<\/strong> \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u0627\u064b \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0645\u0639 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0642\u064a\u0648\u062f \u0627\u0644\u062a\u062b\u0628\u064a\u062a \u0627\u0644\u062a\u064a \u062a\u062d\u062f\u062f\u0647\u0627 \u0648\u0645\u064a\u0632\u0629 Running Time Lock \u0648\u0623\u0648\u0644\u0648\u064a\u0627\u062a\u0643.<\/li>\n\n\n<li><strong>\u0645\u062e\u0637\u0637 Gantt \u0648\u0623\u062f\u0648\u0627\u062a \u0644\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Community.<\/strong> \u064a\u0639\u062f\u0651\u0644 \u0627\u0644\u0645\u062e\u0637\u0637\u0648\u0646 \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0639\u0628\u0631 \u0645\u062e\u0637\u0637 Gantt \u062a\u0641\u0627\u0639\u0644\u064a. \u0648\u064a\u0637\u0651\u0644\u0639 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0639\u0644\u0649 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645\u0647\u0645 \u0648\u064a\u0633\u062c\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0645\u0646 \u0627\u0644\u0647\u0627\u062a\u0641 \u0623\u0648 \u0627\u0644\u062c\u0647\u0627\u0632 \u0627\u0644\u0644\u0648\u062d\u064a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Mobile Confirmations \u0648Production Timer \u0648Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p>\u064a\u0628\u0642\u0649 Odoo \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0631\u062c\u0639\u064a \u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062d\u0627\u0633\u0628\u0629. \u0648\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639\u0647 \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 External JSON-2 API\u060c \u0623\u0648 \u0639\u0628\u0631 XML-RPC \u0648JSON-RPC \u0641\u064a \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0627\u0644\u0623\u0642\u062f\u0645:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0648\u0627\u0631\u062f\u0629:<\/strong> <code>mrp.production<\/code> \u0648<code>mrp.workorder<\/code> \u0648<code>mrp.workcenter<\/code> \u0648<code>mrp.bom<\/code> \u0648\u0628\u0646\u0648\u062f <code>purchase.order<\/code> \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629.<\/li>\n\n\n<li><strong>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u064f\u0639\u0627\u062f\u0629:<\/strong> \u062a\u0627\u0631\u064a\u062e\u0627 \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0627\u0646 \u0648\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u062e\u062a\u0627\u0631\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <code>write<\/code> \u0639\u0644\u0649 \u0643\u0644 <code>mrp.workorder<\/code> (<code>date_start<\/code>\u060c <code>date_finished<\/code>\u060c <code>workcenter_id<\/code>). \u064a\u0624\u062f\u064a \u0630\u0644\u0643 \u0625\u0644\u0649 \u0646\u0642\u0644 \u0627\u0644\u062d\u062c\u0632 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 Odoo \u0646\u0641\u0633\u0647\u060c \u0641\u062a\u064f\u0638\u0647\u0631 \u0639\u0631\u0648\u0636 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a Odoo \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u064a \u062d\u062f\u062f\u0647\u0627 SkyPlanner.<\/li>\n\n\n<li><strong>\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c:<\/strong> \u062a\u064f\u0646\u0634\u0623 \u062a\u0623\u0643\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0643\u0633\u062c\u0644\u0627\u062a Time Logs \u0645\u0646 \u0646\u0648\u0639 <code>mrp.workcenter.productivity<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>\u062a\u0631\u0633\u0644 \u0625\u0634\u0639\u0627\u0631\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u0645\u0646 SkyPlanner \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627. \u0648\u064a\u0633\u062a\u062e\u062f\u0645 \u0643\u0644 \u0645\u0635\u0646\u0639 Odoo \u0628\u0637\u0631\u064a\u0642\u062a\u0647\u060c \u0648\u0641\u0642 \u0639\u0645\u0644\u064a\u0627\u062a\u0647 \u0648\u062a\u0642\u0648\u064a\u0645\u0627\u062a\u0647 \u0648\u0648\u062d\u062f\u0627\u062a\u0647 \u0627\u0644\u0645\u062e\u0635\u0635\u0629. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u0646\u0627\u0633\u0628 \u0625\u0639\u062f\u0627\u062f\u0627\u062a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 Odoo \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0623\u0648 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0623\u064a\u0636\u0627\u064b \u062a\u0637\u0648\u064a\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0648\u0627\u062c\u0647\u0629 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0641\u064a SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>). \u064a\u0643\u0641\u064a \u0645\u0641\u062a\u0627\u062d API \u0644\u0644\u0628\u062f\u0621. \u0648\u062a\u062c\u062f \u062a\u0641\u0627\u0635\u064a\u0644 API \u0648\u0627\u0644\u0645\u064a\u0632\u0627\u062a \u0641\u064a <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u062a\u062a\u0646\u0627\u0641\u0633 \u0637\u0644\u0628\u0627\u062a \u0643\u062b\u064a\u0631\u0629 \u0639\u0644\u0649 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0646\u0641\u0633\u0647\u0627 \u0627\u0644\u062a\u064a \u062a\u0634\u0643\u0651\u0644 \u0623\u0639\u0646\u0627\u0642 \u0627\u0644\u0632\u062c\u0627\u062c\u0629\u060c \u0648\u064a\u062c\u0628 \u0623\u0646 \u062a\u062d\u062f\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u062a\u0633\u0644\u0633\u0644 \u062a\u0646\u0641\u064a\u0630\u0647\u0627 \u062c\u0645\u064a\u0639\u0627\u064b.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u064a\u0639\u062a\u0645\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0647\u0627\u0645\u060c \u0623\u0648 \u0639\u0646\u062f\u0645\u0627 \u062a\u062d\u062f\u062f \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629 \u0648\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u062a\u0637\u0644\u0628 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0645\u0627 \u064a\u0645\u0643\u0646 \u062a\u0634\u063a\u064a\u0644\u0647 \u062a\u0627\u0644\u064a\u0627\u064b.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u062a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0623\u0633\u0628\u0648\u0639\u064a\u0627\u064b \u0648\u062a\u0631\u064a\u062f \u062c\u062f\u0648\u0644\u0627\u064b \u0642\u0627\u0628\u0644\u0627\u064b \u0644\u0644\u062a\u0646\u0641\u064a\u0630 \u0644\u0625\u0646\u062a\u0627\u062c\u0643 \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639\u060c \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0644\u0627\u0646\u062a\u0638\u0627\u0631 \u062d\u062a\u0649 \u0646\u0647\u0627\u064a\u0629 \u0645\u0634\u0631\u0648\u0639 \u0637\u0648\u064a\u0644.<\/p>\n\n\n<p>\u0627\u0628\u062f\u0623 \u0628\u0645\u0644\u0641 \u0645\u064f\u0635\u062f\u0651\u064e\u0631 \u0628\u0635\u064a\u063a\u0629 CSV \u0623\u0648 XLSX \u0641\u064a <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u0627\u064b<\/a> (\u062d\u062a\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u062f\u0648\u0646 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646)\u060c \u0648\u0642\u0627\u0631\u0646 \u062c\u062f\u0648\u0644 SkyPlanner \u0628\u0646\u062a\u0627\u0626\u062c \u0632\u0631 Plan. \u0628\u0639\u062f \u0630\u0644\u0643\u060c \u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u0627\u064b \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0628\u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629 \u0648\u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u0627\u0644\u0625\u0644\u063a\u0627\u0621 \u0641\u064a \u0623\u064a \u0648\u0642\u062a. \u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u0627\u064b \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0625\u062c\u0631\u0627\u0621\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0628\u0627\u0642\u062a\u0643\u060c \u0644\u062a\u0639\u0631\u0641 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621. \u0648\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a> \u0648<a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%8a%d8%b2%d8%a7%d8%aa\/\">\u0627\u0644\u0645\u064a\u0632\u0627\u062a<\/a>.<\/p>\n\n\n<p>\u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0627\u0644\u0645\u0632\u064a\u062f \u062d\u0648\u0644 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/\">SkyPlanner \u0645\u0639 Odoo<\/a>\u060c \u0648\u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Odoo<\/a> \u0648<a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0645\u0639 \u0623\u0646\u0638\u0645\u0629 ERP \u0627\u0644\u0623\u062e\u0631\u0649<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u0627\u064b \u062a\u0648\u0636\u064a\u062d\u064a\u0627\u064b<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0634\u0631\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"\u0643\u0627\u0644\u064a \u0643\u0627\u0644\u064a\u0648\u0645\u064e\u0643\u064a\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0643\u0627\u0644\u064a \u0643\u0627\u0644\u064a\u0648\u0645\u064e\u0643\u064a\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0633\u0628\u0648\u0639\u064a\u0627\u064b\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0628\u062f\u0644\u0627\u062a \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0639\u0628\u062f\u0648\u0644 \u0631\u0648\u0633\u064a\u064a\u0646\u063a\u0627\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"\u0622\u0646\u0648 \u064a\u0627\u0631\u0641\u064a\u0646\u0646\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Fredman Operations\u060c \u0628\u062c\u0648\u0627\u0631 \u062e\u0644\u064a\u0629 \u0631\u0648\u0628\u0648\u062a\u064a\u0629 \u0644\u0631\u0635 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u0635\u0627\u062a \u0641\u064a \u0631\u0627\u0648\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 \u0623\u0634\u0647\u0631<\/b><span>\u0645\u0642\u0628\u0644\u0629 \u064a\u0645\u0643\u0646 \u0644\u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0645\u0639\u0631\u0641\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u062e\u0644\u0627\u0644\u0647\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0648\u0641\u0651\u0631 SkyPlanner \u0623\u0633\u0627\u0633\u0627\u064b \u0645\u0648\u062b\u0648\u0642\u0627\u064b \u0644\u0643\u0644 \u0623\u0639\u0645\u0627\u0644 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0622\u0646\u0648 \u064a\u0627\u0631\u0641\u064a\u0646\u0646\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Fredman Operations \u00b7 \u0623\u0648\u0631\u0627\u0642 \u062a\u063a\u0644\u064a\u0641 \u0622\u0645\u0646\u0629 \u0644\u0645\u0644\u0627\u0645\u0633\u0629 \u0627\u0644\u0623\u063a\u0630\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0631\u0649 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0633\u062a\u0629 \u0623\u0634\u0647\u0631 \u0645\u0642\u0628\u0644\u0629\u060c \u0648\u064a\u064f\u0631\u062f\u0651 \u062e\u0644\u0627\u0644 \u062b\u0648\u0627\u0646\u064d \u0639\u0644\u0649 \u0637\u0644\u0628\u0627\u062a \u062a\u0639\u062f\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u062a\u064a \u0643\u0627\u0646\u062a \u062a\u0633\u062a\u063a\u0631\u0642 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0623\u0643\u062b\u0631.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/fredman-operations\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0639\u0627\u0645\u0644 \u0644\u062d\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u0644\u062e \u0647\u064a\u0643\u0644\u0627\u064b \u0641\u0648\u0644\u0627\u0630\u064a\u0627\u064b \u0645\u0644\u062d\u0648\u0645\u0627\u064b \u0641\u064a \u0645\u0635\u0646\u0639 \u0623\u0644\u0627\u0647\u0627\u0631\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0627\u0631\u062a\u0641\u0627\u0639\u0627\u064b \u0645\u0646 \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u0627\u064b \u062d\u0627\u0633\u0645\u0627\u064b \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0647\u0627\u0646\u0648 \u0644\u0627\u0647\u062a\u064a\u0646\u0646\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0644\u064a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062a\u0637\u0644\u0628 \u0645\u0634\u0631\u0641\u0627\u064b \u0648\u0627\u062d\u062f\u0627\u064b \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0645\u0634\u0631\u0641\u064e\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 Odoo Community \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645\u060c \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0623\u0633\u0627\u0633\u064a. \u064a\u0648\u0641\u0651\u0631 Community \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0632\u0631 Plan\u060c \u0645\u0639 \u0637\u0631\u0642 \u0639\u0631\u0636 \u0628\u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645 \u0648\u0627\u0644\u062c\u062f\u0627\u0648\u0644 \u0627\u0644\u0645\u062d\u0648\u0631\u064a\u0629 \u0648\u0627\u0644\u0631\u0633\u0648\u0645 \u0627\u0644\u0628\u064a\u0627\u0646\u064a\u0629. \u0623\u0645\u0627 \u0639\u0631\u0636 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0645\u062e\u0637\u0637 Gantt \u0648\u0648\u062d\u062f\u0629 Shop Floor \u0648\u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0644\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0641\u0647\u064a \u0645\u064a\u0632\u0627\u062a \u0641\u064a Enterprise. \u0648\u064a\u0648\u0641\u0651\u0631 SkyPlanner \u0644\u0644\u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u062e\u062f\u0645 Community \u0645\u062e\u0637\u0637 Gantt \u0648\u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0631\u0627\u0639\u064a Odoo MRP \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u064a\u0639\u062a\u0645\u062f \u062a\u062c\u062f\u064a\u062f \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0639\u0644\u0649 \u0627\u0644\u0645\u0647\u0644 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 (Lead Time) \u0627\u0644\u0645\u062d\u0633\u0648\u0628\u0629 \u0628\u0627\u0644\u0623\u064a\u0627\u0645 \u0627\u0644\u062a\u0642\u0648\u064a\u0645\u064a\u0629\u060c \u0648\u062a\u0630\u0643\u0631 \u0648\u062b\u0627\u0626\u0642 Odoo \u0623\u0646 \u0647\u0630\u0647 \u0627\u0644\u0645\u0647\u0644 &#8220;do not consider weekends, holidays, or work center capacity&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0639\u0637\u0644\u0627\u062a \u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0623\u0633\u0628\u0648\u0639 \u0623\u0648 \u0627\u0644\u0639\u0637\u0644\u0627\u062a \u0627\u0644\u0631\u0633\u0645\u064a\u0629 \u0623\u0648 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644). \u0648\u0644\u0627 \u062a\u0624\u062e\u0630 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0641\u064a \u0627\u0644\u062d\u0633\u0628\u0627\u0646 \u0625\u0644\u0627 \u0639\u0646\u062f \u0627\u0644\u0636\u063a\u0637 \u0639\u0644\u0649 Plan \u0641\u064a \u0623\u0645\u0631 \u062a\u0635\u0646\u064a\u0639 (MO).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0633\u062a\u0637\u064a\u0639 Odoo \u062a\u0634\u063a\u064a\u0644 \u0639\u062f\u0629 \u0645\u0647\u0627\u0645 \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u0648\u0627\u062d\u062f \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u064a\u0633 \u0641\u064a \u0623\u062f\u0627\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637. \u062a\u062d\u062c\u0632 \u0627\u0644\u0634\u064a\u0641\u0631\u0629 \u0641\u064a \u0627\u0644\u0625\u0635\u062f\u0627\u0631 19.0 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u062a\u0631\u0629 \u0632\u0645\u0646\u064a\u0629 \u0644\u0627 \u062a\u062a\u062f\u0627\u062e\u0644 \u0645\u0639 \u0623\u064a \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0622\u062e\u0631 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647. \u0648\u062a\u062d\u062f\u062f \u0639\u0644\u0627\u0645\u0629 \u0627\u0644\u062a\u0628\u0648\u064a\u0628 Product Capacities \u0639\u062f\u062f \u0627\u0644\u0642\u0637\u0639 \u0641\u064a \u0643\u0644 \u062f\u0648\u0631\u0629 \u0636\u0645\u0646 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0627\u062d\u062f\u060c \u0644\u0627 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0645\u062a\u0648\u0627\u0632\u064a\u0629.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u062a\u064a \u062a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0647\u0627\u0645\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u062a\u064f\u062d\u062f\u0651\u064e\u062f \u0642\u064a\u0645\u062a\u0627 Setup Time \u0648Cleanup Time \u0628\u0639\u062f\u062f \u062b\u0627\u0628\u062a \u0645\u0646 \u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0644\u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u060c \u0623\u0648 \u0644\u0643\u0644 \u0645\u0646\u062a\u062c \u0641\u064a \u0639\u0644\u0627\u0645\u0629 \u0627\u0644\u062a\u0628\u0648\u064a\u0628 Product Capacities. \u0648\u064a\u0636\u064a\u0641\u0647\u0645\u0627 Odoo \u0625\u0644\u0649 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0628\u0635\u0631\u0641 \u0627\u0644\u0646\u0638\u0631 \u0639\u0646 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0633\u0627\u0628\u0642\u0629. \u0623\u0645\u0627 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0641\u064a SkyPlanner \u0641\u062a\u062e\u0632\u0651\u0646 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0628\u062d\u0633\u0628 \u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644\u060c \u0648\u062a\u0631\u062a\u0651\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0647\u0630\u0647 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u064a\u0641 \u064a\u062a\u0635\u0644 SkyPlanner APS \u0628\u0646\u0638\u0627\u0645 Odoo\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 Odoo \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0629 JSON-2 API \u0627\u0644\u062e\u0627\u0631\u062c\u064a\u0629\u060c \u0623\u0648 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <code>execute_kw<\/code> \u0639\u0628\u0631 XML-RPC \u0623\u0648 JSON-RPC \u0641\u064a \u0627\u0644\u0625\u0635\u062f\u0627\u0631\u0627\u062a \u0645\u0646 16.0 \u0625\u0644\u0649 18.0. \u062a\u064f\u0643\u062a\u0628 \u0627\u0644\u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0643\u0644 <code>mrp.workorder<\/code>\u060c \u0648\u062a\u062a\u062d\u0648\u0644 \u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0645\u0633\u062c\u0644\u0629 \u0625\u0644\u0649 \u0633\u062c\u0644\u0627\u062a Time Logs \u0641\u064a Odoo. \u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u062a\u0647\u064a\u0626\u0629 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062e\u0644\u0627\u0644 \u0627\u0644\u0625\u0639\u062f\u0627\u062f \u0627\u0644\u0623\u0648\u0644\u064a\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u062a\u062c\u062f \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644 \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 Odoo<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u064a \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0631\u0628\u0637\u0647 \u0628\u0646\u0638\u0627\u0645 Odoo\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u0639\u0645\u0644 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u0627\u064b \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0644\u0641\u0627\u062a CSV \u0623\u0648 XLSX \u0627\u0644\u0645\u064f\u0635\u062f\u0651\u064e\u0631\u0629 \u0645\u0646 \u0639\u0631\u0648\u0636 \u0627\u0644\u0642\u0648\u0627\u0626\u0645 \u0641\u064a Odoo\u060c \u0648\u062a\u0634\u0645\u0644 \u062d\u062a\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646. \u062a\u0642\u0627\u0631\u0646 \u062c\u062f\u0648\u0644 SkyPlanner \u0628\u0646\u062a\u0627\u0626\u062c \u0632\u0631 Plan \u0642\u0628\u0644 \u0625\u062c\u0631\u0627\u0621 \u0623\u064a \u0631\u0628\u0637. <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a> \u0623\u0648 <a href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Odoo \u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0633\u062a\u0648\u0649 \u0623\u0633\u0627\u0633\u064a\u060c \u0648\u0641\u0642 \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo Manufacturing \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647\u060c \u0641\u0644\u0627 \u064a\u062a\u062f\u0627\u062e\u0644 \u0623\u0645\u0631\u0627\u0646 \u0645\u062e\u0637\u0637\u0627\u0646 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647. \u0644\u0643\u0646\u0647 &#8230; <a title=\"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" aria-label=\"Read more about \u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100841,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101198","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan<\/title>\n<meta name=\"description\" content=\"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"name\":\"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Odoo: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u062a\u0643\u0627\u0645\u0644\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan","description":"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_locale":"ar_AR","og_type":"article","og_title":"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS","og_description":"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","name":"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"\u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647. \u062a\u0639\u0631\u0651\u0641 \u0639\u0644\u0649 \u0645\u0627 \u064a\u0641\u0639\u0644\u0647\u060c \u0648\u062d\u062f\u0648\u062f\u0647\u060c \u0648\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Odoo: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u062a\u0643\u0627\u0645\u0644","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"\u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Odoo \u0647\u0644 \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0634\u0631\u062d \u0632\u0631 Plan \u0648\u0645\u062a\u0649 \u062a\u0636\u064a\u0641 SkyPlanner APS \u064a\u062f\u0639\u0645 Odoo \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0633\u062a\u0648\u0649 \u0623\u0633\u0627\u0633\u064a\u060c \u0648\u0641\u0642 \u0627\u0644\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u064a\u062d\u062c\u0632 \u0632\u0631 Plan \u0641\u064a Odoo Manufacturing \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0623\u0648\u0644 \u0641\u062a\u0631\u0629 \u0634\u0627\u063a\u0631\u0629 \u0641\u064a \u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u0647\u060c \u0641\u0644\u0627 \u064a\u062a\u062f\u0627\u062e\u0644 \u0623\u0645\u0631\u0627\u0646 \u0645\u062e\u0637\u0637\u0627\u0646 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647. \u0644\u0643\u0646\u0647&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/101198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=101198"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/101198\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100841"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=101198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}