{"id":101020,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101020"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","title":{"rendered":"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f <span class=\"hl\">\u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u064a\u062c\u062f\u0648\u0644 Oracle NetSuite \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0645\u0627 \u0644\u0645 \u062a\u0636\u0641 Advanced Manufacturing SuiteApp. \u0648\u062a\u0648\u0636\u062d <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">\u0648\u062b\u0627\u0626\u0642 Oracle \u0646\u0641\u0633\u0647\u0627<\/a> \u0623\u0646 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0647\u0630\u0627 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636 &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0627\u0631\u062f). \u0648\u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling\u060c \u0627\u0644\u0630\u064a \u064a\u0637\u0644\u0642 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u062a\u0633\u0644\u0633\u0644 \u064a\u062d\u062f\u062f\u0647 \u0627\u0644\u0645\u062e\u0637\u0637.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0641\u064a \u0647\u0630\u0627 \u0627\u0644\u0625\u062c\u0631\u0627\u0621\u060c \u064a\u062d\u062f\u062f \u0627\u0644\u0645\u062e\u0637\u0637 \u062a\u0633\u0644\u0633\u0644 \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631\u060c \u0648\u064a\u0639\u064a\u062f \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0625\u0637\u0644\u0627\u0642 \u0639\u0646\u062f \u062a\u063a\u064a\u0631 \u0627\u0644\u0638\u0631\u0648\u0641. \u0623\u0645\u0627 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0627\u0644\u062a\u064a \u062a\u0631\u064a\u062f \u0623\u0646 \u064a\u062d\u0633\u0628 \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u0641\u062a\u0633\u062a\u062e\u062f\u0645 SkyPlanner APS \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 NetSuite \u0644\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u062a\u0633\u0644\u0633\u0644 \u064a\u062d\u0633\u0628\u0647 \u0627\u0644\u0646\u0638\u0627\u0645 \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0639\u0627\u0645\u0644 \u0648\u0623\u062f\u0627\u0629<\/li>\n\n\n<li>\u062c\u062f\u0648\u0644\u0629 \u062a\u0631\u0627\u0639\u064a \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u062d\u0633\u0628 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0623\u0639\u0645\u0627\u0644\u060c \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629\u060c \u0648\u062d\u0627\u062c\u0629 \u0627\u0644\u0645\u0647\u0645\u0629 \u0625\u0644\u0649 \u0639\u062f\u0629 \u0645\u0634\u063a\u0644\u064a\u0646<\/li>\n\n\n<li>\u062e\u0637\u0629 \u062a\u0631\u0627\u0639\u064a \u062a\u0648\u0642\u064a\u062a \u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f<\/li>\n\n\n<li>\u062c\u062f\u0648\u0644 \u064a\u064f\u0639\u0627\u062f \u062a\u062e\u0637\u064a\u0637\u0647 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062a\u063a\u064a\u0631 \u0627\u0644\u0638\u0631\u0648\u0641 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-netsuite-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u062c\u062f\u0648\u0644 NetSuite \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u062e\u0637\u0648\u0629 \u0628\u062e\u0637\u0648\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u062a\u0642\u0648\u064a\u0645\u0627\u062a \u0627\u0644\u0639\u0645\u0644<\/h3>\n\n\n<p>\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a NetSuite \u0644\u064a\u0633 \u0633\u062c\u0644\u0627\u064b \u0644\u0622\u0644\u0629\u060c \u0628\u0644 \u0647\u0648 <strong>Group<\/strong> \u062b\u0627\u0628\u062a\u0629 (Lists &gt; Relationships &gt; Groups\u060c <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/subsect_158618203997.html\">Oracle<\/a>) \u0645\u0639 \u062a\u062d\u062f\u064a\u062f \u0645\u0631\u0628\u0639 <strong>Manufacturing Work Center<\/strong>. \u0648\u0641\u064a \u0639\u0644\u0627\u0645\u0629 \u0627\u0644\u062a\u0628\u0648\u064a\u0628 \u0627\u0644\u0641\u0631\u0639\u064a\u0629 <strong>Manufacturing Work Center Settings<\/strong>\u060c \u062a\u062a\u0636\u0645\u0646 \u0627\u0644\u0645\u062c\u0645\u0648\u0639\u0629 \u062d\u0642\u0648\u0644 <strong>Machine Resources<\/strong> \u0648<strong>Labor Resources<\/strong> \u0648<strong>Work Calendar<\/strong>. \u0627\u0644\u0642\u064a\u0645\u0629 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a\u0629 \u0644\u0623\u0639\u062f\u0627\u062f \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0647\u064a 0\u060c \u0648\u0627\u0644\u062a\u0642\u0648\u064a\u0645 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u064a \u0647\u0648 <strong>Default Work Calendar<\/strong>.<\/p>\n\n\n<p>\u0641\u064a \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629\u060c \u062a\u064f\u062d\u062f\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0628\u0639\u062f\u062f \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0639\u062f\u062f \u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u062a\u0642\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644 \u0644\u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644. \u0623\u0645\u0627 \u0627\u0644\u0623\u0635\u0648\u0644 \u0627\u0644\u0641\u0631\u062f\u064a\u0629\u060c \u0641\u064a\u062a\u064a\u062d\u0647\u0627 Advanced Manufacturing Work Bench (\u0627\u0644\u062e\u0637\u0648\u0629 5).<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/h3>\n\n\n<p>\u064a\u0633\u0631\u062f \u0633\u062c\u0644 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Manufacturing Routing<\/a> \u200f(REST: <code>manufacturingRouting<\/code>) \u062e\u0637\u0648\u0627\u062a \u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0645\u0646\u062a\u062c. \u0648\u062a\u062a\u0636\u0645\u0646 \u0643\u0644 \u062e\u0637\u0648\u0629 \u0627\u0644\u062d\u0642\u0648\u0644 <strong>Operation Sequence<\/strong> \u0648<strong>Operation Name<\/strong> \u0648<strong>Manufacturing Work Center<\/strong> \u0648<strong>Setup Time<\/strong> \u0648<strong>Run Rate<\/strong>\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0625\u0639\u062f\u0627\u062f\u0627\u062a \u0627\u0644\u0641\u0627\u0635\u0644 \u0627\u0644\u0632\u0645\u0646\u064a (<strong>Auto-calculate Lag<\/strong> \u0648<strong>Lag Type<\/strong> \u0648<strong>Lag Amount<\/strong> \u0648<strong>Lag Unit<\/strong>). \u064a\u064f\u0642\u0627\u0633 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0641\u064a Setup Time \u0628\u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u064f\u0642\u0627\u0633 \u0645\u0639\u062f\u0644 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0641\u064a Run Rate \u0628\u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0644\u0643\u0644 \u0648\u062d\u062f\u0629. \u0648\u064a\u0633\u062a\u062e\u062f\u0645 NetSuite \u0647\u0627\u062a\u064a\u0646 \u0627\u0644\u0642\u064a\u0645\u062a\u064a\u0646 \u0645\u0639 \u062a\u0642\u0648\u064a\u0645 \u0627\u0644\u0639\u0645\u0644 \u0644\u062a\u062d\u062f\u064a\u062f \u062a\u0648\u0642\u064a\u062a \u0643\u0644 \u062e\u0637\u0648\u0629. \u0648\u0639\u0646\u062f\u0645\u0627 \u064a\u0633\u062a\u062e\u062f\u0645 \u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0633\u0627\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u064a\u0646\u0634\u0626 NetSuite \u0633\u062c\u0644\u0627\u062a <strong>Manufacturing Operation Task<\/strong> \u200f(REST: <code>manufacturingOperationTask<\/code>)\u060c \u0628\u0648\u0627\u0642\u0639 \u0633\u062c\u0644 \u0644\u0643\u0644 \u062e\u0637\u0648\u0629.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0623\u0648 \u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641<\/h3>\n\n\n<p>\u064a\u064f\u062c\u062f\u0648\u0644 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0628\u0625\u062d\u062f\u0649 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_4000988757.html\">\u0637\u0631\u064a\u0642\u062a\u064a\u0646<\/a>. \u0641\u064a <strong>Forward Scheduling<\/strong>\u060c \u062a\u062d\u062f\u062f <strong>Production Start Date<\/strong> \u0648\u064a\u062d\u0633\u0628 NetSuite \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621. \u0648\u0641\u064a <strong>Backward Scheduling<\/strong>\u060c \u062a\u062d\u062f\u062f <strong>Production End Date<\/strong> \u0648\u064a\u062d\u0633\u0628 NetSuite \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0631\u062c\u0648\u0639\u0627\u064b \u0645\u0646 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621\u060c \u0627\u0633\u062a\u0646\u0627\u062f\u0627\u064b \u0625\u0644\u0649 \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u062a\u0642\u0648\u064a\u0645 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u0648\u0644\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0637\u0631\u064a\u0642\u0629 \u0641\u064a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u062a\u062d\u062a\u0627\u062c \u0623\u0648\u0644\u0627\u064b \u0625\u0644\u0649 \u062a\u0641\u0639\u064a\u0644 \u0627\u0644\u062a\u0641\u0636\u064a\u0644 <strong>Generate Work Orders in Supply Planning<\/strong>.<\/p>\n\n\n<p>\u062a\u0641\u062a\u0631\u0636 \u0627\u0644\u0637\u0631\u064a\u0642\u062a\u0627\u0646 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0648\u062a\u0635\u0631\u062d Oracle \u0628\u0648\u0636\u0648\u062d: &#8220;NetSuite uses infinite capacity scheduling to schedule work&#8221; (\u064a\u0633\u062a\u062e\u062f\u0645 NetSuite \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629 \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0639\u0645\u0644)\u060c \u0648\u062a\u0642\u0648\u0644 \u0625\u0646 \u0647\u0630\u0647 \u0627\u0644\u0637\u0631\u064a\u0642\u0629 &#8220;can result in resource overloads.&#8221; (\u0642\u062f \u062a\u0624\u062f\u064a \u0625\u0644\u0649 \u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0641\u0648\u0642 \u0637\u0627\u0642\u062a\u0647\u0627). \u064a\u064f\u062d\u062f\u062f \u062a\u0648\u0642\u064a\u062a \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0645\u0633\u0627\u0631\u0647 \u0648\u062a\u0642\u0648\u064a\u0645\u0647\u060c \u0648\u0643\u0623\u0646 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u062e\u0635\u0635 \u0644\u0647 \u0648\u062d\u062f\u0647. \u0648\u0647\u0643\u0630\u0627 \u0642\u062f \u062a\u064f\u062c\u062f\u0648\u0644 \u0639\u0634\u0631\u0629 \u0623\u0648\u0627\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0645\u0633\u062a\u062d\u0642\u0629 \u064a\u0648\u0645 \u0627\u0644\u062c\u0645\u0639\u0629 \u0643\u0644\u0647\u0627 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647 \u064a\u0648\u0645 \u0627\u0644\u062e\u0645\u064a\u0633. \u0648\u062a\u062d\u0630\u0631 Oracle \u0623\u064a\u0636\u0627\u064b \u0645\u0646 \u0623\u0646 \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0627\u0644\u0645\u062d\u0633\u0648\u0628 \u0628\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641 &#8220;may be a date in the past, prior to the current date.&#8221; (\u0642\u062f \u064a\u0642\u0639 \u0641\u064a \u0627\u0644\u0645\u0627\u0636\u064a\u060c \u0642\u0628\u0644 \u0627\u0644\u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062d\u0627\u0644\u064a).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0648\u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u062c\u0645\u0627\u0644\u064a \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629<\/h3>\n\n\n<p>\u062a\u062d\u062f\u062f <strong>Demand Planning<\/strong> \u0648<strong>Supply Planning<\/strong> \u0648<strong>Master Production Schedule<\/strong> \u0645\u0627 \u064a\u062c\u0628 \u0625\u0646\u062a\u0627\u062c\u0647 \u0648\u0645\u062a\u0649 \u062a\u0643\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u064a\u0647. \u0623\u0645\u0627 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629\u060c \u0641\u064a\u0623\u062a\u064a \u0628\u0635\u0648\u0631\u062a\u064a\u0646:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_0707031656.html\">Rough-Cut Capacity Planning<\/a> (RCCP)<\/strong> \u0636\u0645\u0646 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 (Transactions &gt; Manufacturing &gt; Capacity Planning). \u064a\u0642\u0627\u0631\u0646 \u0637\u0627\u0642\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0628\u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0645\u062e\u0637\u0637 \u0641\u064a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062e\u0637\u0637\u0629\u060c \u0644\u062a\u0642\u062f\u064a\u0645 &#8220;a mid- to long-term view,&#8221; (\u0631\u0624\u064a\u0629 \u0639\u0644\u0649 \u0627\u0644\u0645\u062f\u0649 \u0627\u0644\u0645\u062a\u0648\u0633\u0637 \u0625\u0644\u0649 \u0627\u0644\u0637\u0648\u064a\u0644)\u060c \u0648\u064a\u0634\u064a\u0631 \u0625\u0644\u0649 \u062d\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0632\u0627\u0626\u062f \u0648\u0646\u0642\u0635 \u0627\u0644\u062a\u062d\u0645\u064a\u0644.<\/li>\n\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338018.html\">Rough Cut Capacity Planning<\/a> (RCP)<\/strong> \u0636\u0645\u0646 Advanced Manufacturing (Advanced Manufacturing &gt; Capacity Planning &gt; Capacity Planning &gt; Create Plan). \u064a\u0639\u0631\u0636 \u0646\u0633\u0628 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u062e\u0644\u0627\u0644 \u0641\u062a\u0631\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u060c \u0648\u064a\u062a\u064a\u062d \u0644\u0643 \u0628\u0646\u0627\u0621 \u0633\u064a\u0646\u0627\u0631\u064a\u0648\u0647\u0627\u062a \u00ab\u0645\u0627\u0630\u0627 \u0644\u0648\u00bb.<\/li>\n\n<\/ul>\n\n\n<p>\u0643\u0644\u0627\u0647\u0645\u0627 \u064a\u0642\u062f\u0645 \u062a\u0642\u0627\u0631\u064a\u0631 \u0639\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629. \u0648\u0644\u0627 \u064a\u063a\u064a\u0631 \u0623\u064a \u0645\u0646\u0647\u0645\u0627 \u0645\u0648\u0639\u062f \u0639\u0645\u0644\u064a\u0629 \u0648\u0627\u062d\u062f\u0629.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Advanced Manufacturing: \u200fWork Bench \u0648\u0627\u0644\u0623\u0635\u0648\u0644<\/h3>\n\n\n<p>\u064a\u0636\u064a\u0641 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/chapter_1506100009.html\">Advanced Manufacturing SuiteApp<\/a> \u0633\u062c\u0644\u0627\u064b \u0645\u0646 \u0646\u0648\u0639 <strong>Manufacturing Work Bench<\/strong> \u0644\u0643\u0644 \u062e\u0637\u0648\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0648\u0641\u064a\u0647 \u062a\u062d\u062f\u062f \u0627\u0644\u0623\u0635\u0648\u0644 \u0648\u0641\u062a\u0631\u0627\u062a \u0627\u0644\u0627\u0646\u062a\u0638\u0627\u0631 \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0645\u0627\u0644\u0629 \u0648\u062a\u0639\u0644\u064a\u0645\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0633\u062a\u0647\u0644\u0627\u0643 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0623\u0648\u0642\u0627\u062a \u0627\u0644\u0645\u062e\u0637\u0637\u0629. \u0648\u064a\u062c\u0628 \u0623\u0646 \u064a\u062a\u0637\u0627\u0628\u0642 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0648\u0627\u0633\u0645\u0647\u0627 \u0648\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0641\u064a Work Bench \u0645\u0639 \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Finite Scheduling: \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631<\/h3>\n\n\n<p>\u0647\u0646\u0627 \u062a\u0623\u062a\u064a \u0645\u0631\u062d\u0644\u0629 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u064a\u0641\u062a\u062d \u0627\u0644\u0645\u062e\u0637\u0637 <strong>Advanced Manufacturing &gt; Finite Scheduling &gt; Release Work Orders<\/strong>\u060c \u0648\u064a\u0646\u0641\u0630 \u0627\u0644\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629 \u0639\u0644\u0649 \u0627\u0644\u0634\u0627\u0634\u0629:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>\u0627\u0636\u0628\u0637 \u0645\u0631\u0634\u062d\u0627\u062a \u0627\u0644\u0639\u0631\u0636: <strong>Location<\/strong> \u0648<strong>Production Class<\/strong> \u0648<strong>Horizon Start<\/strong> (\u064a\u062c\u0628 \u0623\u0646 \u064a\u0643\u0648\u0646 \u064a\u0648\u0645 \u0627\u062b\u0646\u064a\u0646) \u0648<strong>Horizon End<\/strong> \u0648<strong>Planned Orders<\/strong> \u0648<strong>Released Orders<\/strong>.<\/li>\n\n\n<li>\u062d\u062f\u062f <strong>Schedule Date<\/strong> \u0648<strong>Schedule Method<\/strong> (\u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0623\u0648 \u0625\u0644\u0649 \u0627\u0644\u062e\u0644\u0641)\u060c \u0648\u0643\u064a\u0641\u064a\u0629 \u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 <strong>Child Work Orders<\/strong>.<\/li>\n\n\n<li>\u062d\u062f\u062f \u0645\u0631\u0628\u0639 <strong>WO Release<\/strong> \u0644\u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0641\u0642 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0637\u0644\u0648\u0628 \u0644\u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631. \u064a\u064f\u0645\u0644\u0623 \u062d\u0642\u0644 <strong>Sequence<\/strong> \u062a\u0644\u0642\u0627\u0626\u064a\u0627\u064b\u060c \u0648\u064a\u0645\u0643\u0646 \u062a\u0639\u062f\u064a\u0644\u0647.<\/li>\n\n\n<li>\u0627\u0646\u0642\u0631 \u0639\u0644\u0649 <strong>Sort Demand<\/strong>\u060c \u062b\u0645 \u0639\u0644\u0649 <strong>Preview Schedule<\/strong> \u0625\u0646 \u0623\u0631\u062f\u062a \u0645\u0639\u0627\u064a\u0646\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u060c \u062b\u0645 \u0639\u0644\u0649 <strong>Release Work Orders<\/strong>.<\/li>\n\n<\/ol>\n\n\n<p>\u0639\u0646\u062f \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631\u060c \u064a\u0639\u064a\u062f NetSuite \u0636\u0628\u0637 \u062a\u0648\u0627\u0631\u064a\u062e \u0628\u062f\u0621 \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0627\u0646\u062a\u0647\u0627\u0626\u0647\u0627 \u0648\u0641\u0642 \u062c\u062f\u0648\u0644 \u0625\u0646\u062a\u0627\u062c \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629. \u0648\u0627\u0641\u062a\u0631\u0627\u0636\u064a\u064b\u0627\u060c \u062a\u064f\u0633\u0646\u062f \u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0625\u0644\u0649 \u0623\u0635\u0644 \u0648\u0627\u062d\u062f \u064a\u064f\u062e\u062a\u0627\u0631 \u0628\u062d\u0633\u0628 \u0623\u0642\u0631\u0628 \u0648\u0642\u062a \u0645\u062a\u0627\u062d. \u0648\u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u062e\u0637\u0637 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0632\u0627\u0645\u0646 \u0644\u062a\u064f\u0646\u0641\u0630 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0639\u0644\u0649 \u0639\u062f\u0629 \u0623\u0635\u0648\u0644 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647.<\/p>\n\n\n<p>\u062a\u0642\u0648\u0644 Oracle \u0625\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Advanced Manufacturing \u200f&#8221;optimizes work center throughput&#8221; (\u064a\u062d\u0633\u0651\u0646 \u0645\u0639\u062f\u0644 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644)\u060c \u0648\u0625\u0646\u0647 &#8220;considers the facility&#8217;s current and future capacity.&#8221; (\u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0648\u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a\u0629 \u0644\u0644\u0645\u0646\u0634\u0623\u0629). \u0648\u062a\u0636\u064a\u0641: &#8220;Planners can influence both the work order sequence and the number of assets that a work order can use at one time.&#8221; (\u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u062e\u0637\u0637\u064a\u0646 \u0627\u0644\u062a\u062d\u0643\u0645 \u0641\u064a \u062a\u0633\u0644\u0633\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0639\u062f\u062f \u0627\u0644\u0623\u0635\u0648\u0644 \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u0644\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0647\u0627 \u0641\u064a \u0648\u0642\u062a \u0648\u0627\u062d\u062f). \u0648\u0647\u0630\u0627\u0646 \u0647\u0645\u0627 \u0639\u0627\u0645\u0644\u0627 \u0627\u0644\u062a\u062d\u0643\u0645 \u0627\u0644\u0645\u062a\u0627\u062d\u0627\u0646.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-documents-and-what-it-leaves-to-the\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u062a\u0648\u0636\u062d\u0647 \u0648\u062b\u0627\u0626\u0642 Oracle\u060c \u0648\u0645\u0627 \u062a\u062a\u0631\u0643\u0647 \u0644\u0644\u0645\u062e\u0637\u0637<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u062a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629.<\/strong> \u0645\u0646 \u062f\u0648\u0646 Advanced Manufacturing\u060c \u064a\u0638\u0647\u0631 \u0627\u0644\u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0632\u0627\u0626\u062f \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0644\u0627 \u0641\u064a \u0627\u0644\u062e\u0637\u0629. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u062e\u0637\u0637 \u0647\u0648 \u0645\u0646 \u064a\u062d\u062f\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644.<\/strong> \u062a\u0642\u0648\u0644 Oracle: &#8220;work orders must be released in sequence after they are created.&#8221; (\u064a\u062c\u0628 \u0625\u0637\u0644\u0627\u0642 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0628\u0639\u062f \u0625\u0646\u0634\u0627\u0626\u0647\u0627). \u064a\u062d\u062f\u062f \u0627\u0644\u0645\u062e\u0637\u0637 WO Release \u0623\u0648 \u064a\u0639\u062f\u0644 \u062d\u0642\u0644 Sequence\u060c \u0648\u062a\u0630\u0643\u0631 Oracle \u062a\u0633\u0644\u0633\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0648\u0635\u0641\u0647 \u0623\u062d\u062f \u0639\u0648\u0627\u0645\u0644 \u0627\u0644\u062a\u062d\u0643\u0645 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0644\u0645\u062e\u0637\u0637. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0648\u0635\u064a\u0629 \u0647\u064a \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0622\u0641\u0627\u0642 \u062a\u062e\u0637\u064a\u0637 \u0642\u0635\u064a\u0631\u0629.<\/strong> \u0644\u062a\u0642\u0644\u064a\u0644 \u0648\u0642\u062a \u0627\u0644\u0645\u0639\u0627\u0644\u062c\u0629\u060c \u062a\u0646\u0635\u062d Oracle \u0628\u0645\u0627 \u064a\u0644\u064a: &#8220;keep horizon periods as short as possible. Generally less than one week.&#8221; (\u0627\u062c\u0639\u0644 \u0641\u062a\u0631\u0627\u062a \u0623\u0641\u0642 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0642\u0635\u064a\u0631\u0629 \u0642\u062f\u0631 \u0627\u0644\u0625\u0645\u0643\u0627\u0646\u060c \u0648\u0623\u0642\u0644 \u0645\u0646 \u0623\u0633\u0628\u0648\u0639 \u0639\u0645\u0648\u0645\u0627\u064b). \u0639\u0645\u0644\u064a\u0627\u064b\u060c \u064a\u0635\u0628\u062d Finite Scheduling \u062f\u0648\u0631\u0629 \u0623\u0633\u0628\u0648\u0639\u064a\u0629 \u0644\u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0639\u0646\u064a \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0645\u0646 \u062c\u062f\u064a\u062f.<\/strong> &#8220;The planner can review existing commitments to capacity and re-schedule them when necessary.&#8221; (\u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u062e\u0637\u0637 \u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u062d\u062c\u0648\u0632\u0627\u062a \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u0625\u0639\u0627\u062f\u0629 \u062c\u062f\u0648\u0644\u062a\u0647\u0627 \u0639\u0646\u062f \u0627\u0644\u062d\u0627\u062c\u0629). \u0648\u064a\u062a\u0648\u0641\u0631 \u0645\u0631\u0634\u062d Released Orders \u0645\u0646 \u0623\u062c\u0644 &#8220;to reschedule released work orders,&#8221; (\u0625\u0639\u0627\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u062a\u064a \u0623\u064f\u0637\u0644\u0642\u062a)\u060c \u062b\u0645 \u064a\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0625\u0637\u0644\u0627\u0642. (\u0627\u0644\u0645\u0635\u062f\u0631 \u0646\u0641\u0633\u0647)<\/li>\n\n\n<li><strong>\u062f\u0639\u0645 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u062c\u0632\u0626\u064a \u0641\u0642\u0637.<\/strong> &#8220;Planned status work orders don&#8217;t support full or end-to-end scheduling, even when Auto-Scheduling is enabled.&#8221; (\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0644\u062d\u0627\u0644\u0629 Planned \u0644\u0627 \u062a\u062f\u0639\u0645 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0623\u0648 \u0627\u0644\u0634\u0627\u0645\u0644\u0629 \u0645\u0646 \u0627\u0644\u0628\u062f\u0627\u064a\u0629 \u0625\u0644\u0649 \u0627\u0644\u0646\u0647\u0627\u064a\u0629\u060c \u062d\u062a\u0649 \u0645\u0639 \u062a\u0641\u0639\u064a\u0644 Auto-Scheduling). (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0644\u0627 \u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0644\u0627 \u0645\u0633\u0627\u0631 \u0625\u0646\u062a\u0627\u062c.<\/strong> &#8220;Work orders not associated with a NetSuite routing should not be scheduled.&#8221; (\u064a\u0646\u0628\u063a\u064a \u0639\u062f\u0645 \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u063a\u064a\u0631 \u0627\u0644\u0645\u0631\u062a\u0628\u0637\u0629 \u0628\u0645\u0633\u0627\u0631 \u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite). (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0644\u0644\u062a\u0632\u0627\u0645\u0646 \u062d\u062f \u0623\u0642\u0635\u0649.<\/strong> &#8220;The number of concurrent assets shouldn&#8217;t exceed the number of assets assigned to the manufacturing work bench operation sequence.&#8221; (\u064a\u0646\u0628\u063a\u064a \u0623\u0644\u0627 \u064a\u062a\u062c\u0627\u0648\u0632 \u0639\u062f\u062f \u0627\u0644\u0623\u0635\u0648\u0644 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0628\u0627\u0644\u062a\u0632\u0627\u0645\u0646 \u0639\u062f\u062f \u0627\u0644\u0623\u0635\u0648\u0644 \u0627\u0644\u0645\u0633\u0646\u062f\u0629 \u0625\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0641\u064a Manufacturing Work Bench). (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0642\u064a\u0645\u0629 \u0645\u062d\u062f\u062f\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u064a\u064f\u062d\u062f\u062f Setup Time \u0641\u064a \u062e\u0637\u0648\u0629 \u0627\u0644\u0645\u0633\u0627\u0631 \u0628\u0627\u0644\u062f\u0642\u0627\u0626\u0642 \u0644\u0643\u0644 \u0623\u0645\u0631\u060c \u0648\u064a\u0628\u0642\u0649 \u062b\u0627\u0628\u062a\u0627\u064b \u0645\u0647\u0645\u0627 \u0643\u0627\u0646 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0630\u064a \u0646\u064f\u0641\u0630 \u0642\u0628\u0644\u0647 \u0641\u064a \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0646\u0641\u0633\u0647. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>\u0643\u0644 \u062a\u0639\u062f\u064a\u0644 \u0644\u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u064f\u0646\u0641\u0630 \u0645\u0631\u062a\u064a\u0646.<\/strong> \u062a\u062d\u062a\u0627\u062c \u0643\u0644 \u062e\u0637\u0648\u0629 \u0641\u064a \u0627\u0644\u0645\u0633\u0627\u0631 \u0625\u0644\u0649 \u0633\u062c\u0644 \u062e\u0627\u0635 \u0628\u0647\u0627 \u0641\u064a Work Bench\u060c \u064a\u062a\u0637\u0627\u0628\u0642 \u0645\u0639\u0647 \u0631\u0642\u0645 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u0627\u0633\u0645 \u0627\u0644\u0639\u0645\u0644\u064a\u0629 \u0648\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u0644\u0630\u0644\u0643 \u064a\u062c\u0628 \u062a\u0643\u0631\u0627\u0631 \u062a\u0639\u062f\u064a\u0644 \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a Work Bench. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508337105.html\">Oracle<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u0639\u0645\u0644\u064a\u0627\u064b\u060c \u064a\u062f\u064a\u0631 \u0627\u0644\u0645\u062e\u0637\u0637 \u062f\u0648\u0631\u0629 \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631\u060c \u0648\u064a\u0628\u0646\u064a \u062a\u0633\u0644\u0633\u0644\u0647\u0627 \u0627\u0639\u062a\u0645\u0627\u062f\u0627\u064b \u0639\u0644\u0649 \u062e\u0628\u0631\u062a\u0647\u060c \u0648\u064a\u0639\u064a\u062f \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0625\u0637\u0644\u0627\u0642 \u0643\u0644\u0645\u0627 \u062a\u0648\u0642\u0641\u062a \u0622\u0644\u0629 \u0623\u0648 \u0648\u0635\u0644 \u0637\u0644\u0628 \u0639\u0627\u062c\u0644.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-netsuite-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u062a\u0643\u0641\u064a \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0641\u064a NetSuite\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0643\u0641\u064a \u0623\u062f\u0648\u0627\u062a NetSuite \u0646\u0641\u0633\u0647\u0627 \u0641\u064a \u0627\u0644\u062d\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u0633\u062a\u062e\u062f\u0645 \u0645\u0648\u0627\u0631\u062f \u0642\u0644\u064a\u0644\u0629 \u0648\u062a\u0646\u062a\u062c \u062a\u0634\u0643\u064a\u0644\u0629 \u0645\u062d\u062f\u0648\u062f\u0629.<\/strong> \u0644\u062f\u064a\u0643 \u0639\u0646\u0642 \u0632\u062c\u0627\u062c\u0629 \u0648\u0627\u062d\u062f \u0623\u0648 \u0627\u062b\u0646\u0627\u0646\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0625\u0646\u062a\u0627\u062c \u0645\u0633\u062a\u0642\u0631\u0629\u060c \u0648\u0645\u0646\u062a\u062c\u0627\u062a \u064a\u062a\u0643\u0631\u0631 \u0625\u0646\u062a\u0627\u062c\u0647\u0627. \u0647\u0646\u0627 \u062a\u0643\u0641\u064a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0645\u0639 Rough-Cut Capacity Planning \u0648\u0645\u062e\u0637\u0637 \u064a\u0631\u0627\u062c\u0639 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0628\u0627\u0644\u0646\u0638\u0631.<\/li>\n\n\n<li><strong>\u062a\u0633\u062a\u062e\u062f\u0645 Advanced Manufacturing \u0628\u0627\u0644\u0641\u0639\u0644\u060c \u0648\u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0643 \u0628\u0633\u064a\u0637.<\/strong> \u0623\u0635\u0644 \u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629\u060c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0625\u0646\u062a\u0627\u062c \u0642\u0635\u064a\u0631\u0629\u060c \u0648\u062f\u0648\u0631\u0629 \u0623\u0633\u0628\u0648\u0639\u064a\u0629\u060c \u0648\u0645\u062e\u0637\u0637 \u0644\u0627 \u064a\u0645\u0627\u0646\u0639 \u0641\u064a \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u064a\u062f\u0648\u064a\u0627\u064b. \u064a\u063a\u0637\u064a Finite Scheduling \u0647\u0630\u0647 \u0627\u0644\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a.<\/li>\n\n\n<li><strong>\u062a\u0639\u0645\u0644 \u0628\u0623\u0633\u0644\u0648\u0628 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0628\u0645\u0647\u0644 \u062a\u0648\u0631\u064a\u062f \u0637\u0648\u064a\u0644\u0629.<\/strong> \u0625\u0630\u0627 \u0643\u0627\u0646 Supply Planning \u064a\u0648\u062c\u0647 \u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a\u060c \u0648\u0643\u0627\u0646 \u0627\u0644\u062a\u062d\u0642\u0642 \u0627\u0644\u0625\u062c\u0645\u0627\u0644\u064a \u0645\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0643\u0627\u0641\u064a\u0627\u064b\u060c \u0641\u0644\u0646 \u064a\u0636\u064a\u0641 \u062c\u062f\u0648\u0644 \u062a\u0641\u0635\u064a\u0644\u064a \u0644\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0641\u0627\u0626\u062f\u0629 \u0643\u0628\u064a\u0631\u0629.<\/li>\n\n<\/ul>\n\n\n<p>\u0628\u0645\u062c\u0631\u062f \u0623\u0646 \u062a\u062a\u0646\u0648\u0639 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0623\u0648 \u062a\u0635\u0644 \u0637\u0644\u0628\u0627\u062a \u0639\u0627\u062c\u0644\u0629 \u0641\u064a \u0645\u0646\u062a\u0635\u0641 \u0627\u0644\u0623\u0633\u0628\u0648\u0639\u060c \u0623\u0648 \u064a\u0635\u0628\u062d \u062a\u0648\u0641\u0631 \u0627\u0644\u0645\u0634\u063a\u0644\u064a\u0646 \u0647\u0648 \u0627\u0644\u0642\u064a\u062f\u060c \u062a\u0638\u0647\u0631 \u0627\u0644\u0639\u0644\u0627\u0645\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u062a\u0649 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0646\u0638\u0627\u0645 \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0643\u0648\u0646 \u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643 \u0642\u062f \u062a\u062c\u0627\u0648\u0632\u062a \u0642\u062f\u0631\u0627\u062a \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0625\u0630\u0627 \u0627\u0646\u0637\u0628\u0642 \u0639\u0644\u064a\u0643 \u0639\u062f\u062f \u0645\u0646 \u0627\u0644\u062d\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u064a\u0635\u0628\u062d \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0623\u0633\u0628\u0648\u0639\u064a \u0644\u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u063a\u064a\u0631 \u0635\u0627\u0644\u062d \u0628\u062d\u0644\u0648\u0644 \u0627\u0644\u062b\u0644\u0627\u062b\u0627\u0621\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637 \u0628\u0646\u0627\u0621\u0647 \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0623\u0633\u0628\u0648\u0639.<\/li>\n\n\n<li>\u062a\u064f\u062d\u062f\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0645\u0647\u0644 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u060c \u0648\u064a\u0648\u0627\u0635\u0644 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u062a\u0642\u062f\u064a\u0645 \u0648\u0639\u0648\u062f \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0644\u0627 \u064a\u0633\u062a\u0637\u064a\u0639 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0647\u0627.<\/li>\n\n\n<li>\u064a\u0639\u062a\u0645\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u062a\u062c \u0627\u0644\u0630\u064a \u0623\u064f\u0646\u062a\u062c \u0633\u0627\u0628\u0642\u064b\u0627\u060c \u0648\u064a\u0645\u0643\u0646 \u0644\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0646\u0627\u0633\u0628 \u062a\u0648\u0641\u064a\u0631 \u0633\u0627\u0639\u0627\u062a \u0643\u0644 \u0623\u0633\u0628\u0648\u0639.<\/li>\n\n\n<li>\u062a\u0646\u062a\u0638\u0631 \u0627\u0644\u0645\u0647\u0627\u0645 \u0623\u062f\u0627\u0629 \u0623\u0648 \u062a\u062c\u0647\u064a\u0632\u0629 \u062a\u062b\u0628\u064a\u062a \u0623\u0648 \u0645\u0627\u062f\u0629 \u0644\u0645 \u064a\u0623\u062e\u0630\u0647\u0627 \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u064a \u0627\u0644\u062d\u0633\u0628\u0627\u0646\u060c \u0623\u0648 \u062a\u062d\u062a\u0627\u062c \u0622\u0644\u062a\u0627\u0646 \u0625\u0644\u0649 \u0627\u0644\u0623\u062f\u0627\u0629 \u0646\u0641\u0633\u0647\u0627 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647.<\/li>\n\n\n<li>\u062a\u062d\u062a\u0627\u062c \u0628\u0639\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0625\u0644\u0649 \u0645\u0634\u063a\u0644\u064e\u064a\u0646 \u0623\u0648 \u062b\u0644\u0627\u062b\u0629 \u0645\u0634\u063a\u0644\u064a\u0646 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647\u060c \u0648\u0644\u0627 \u062a\u0648\u0636\u062d \u0627\u0644\u062e\u0637\u0629 \u0645\u0646 \u0645\u0646\u0647\u0645 \u0645\u062a\u0627\u062d.<\/li>\n\n\n<li>\u0645\u0627 \u064a\u062d\u062f\u062f \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0647\u0648 \u0627\u0644\u0645\u0634\u063a\u0644\u0648\u0646 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u063a\u064a\u0627\u0628\u060c \u0644\u0627 \u0627\u0644\u0639\u062f\u062f \u0627\u0644\u0645\u0633\u062c\u0644 \u0641\u064a Labor Resources \u0636\u0645\u0646 \u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644.<\/li>\n\n\n<li>\u0644\u0627 \u062a\u0633\u062a\u062e\u062f\u0645 Advanced Manufacturing \u0648\u0644\u0627 \u062a\u0631\u064a\u062f \u0625\u0636\u0627\u0641\u062a\u0647 \u0645\u0646 \u0623\u062c\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u0642\u0637.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u0646\u0628\u063a\u064a \u0627\u0644\u0628\u062d\u062b \u0639\u0646\u0647\u061f<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0645\u0648\u0631\u062f<\/strong>\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0625\u062c\u0627\u0632\u0627\u062a \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0625\u0636\u0627\u0641\u064a\u060c \u0644\u0627 \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0641\u062d\u0633\u0628.<\/li>\n\n\n<li><strong>\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/strong> \u0648\u0641\u0642 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a\u060c \u0628\u062d\u064a\u062b \u064a\u064f\u062d\u0633\u0628 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0639\u0645\u0644 \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u062a\u062d\u062f\u064a\u062f\u0647 \u064a\u062f\u0648\u064a\u064b\u0627.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u062a\u063a\u064a\u064a\u0631 \u064a\u0639\u062a\u0645\u062f \u0639\u0644\u0649 \u0627\u0644\u062a\u0633\u0644\u0633\u0644<\/strong>: \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646\u060c \u0648\u064a\u064f\u0633\u062a\u062e\u062f\u0645 \u0644\u0627\u062e\u062a\u064a\u0627\u0631 \u0627\u0644\u062a\u0633\u0644\u0633\u0644.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0643\u0645\u0648\u0627\u0631\u062f \u0645\u062d\u062f\u0648\u062f\u0629<\/strong>\u060c \u0628\u062d\u064a\u062b \u0644\u0627 \u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0644\u0623\u062f\u0627\u0629 \u0646\u0641\u0633\u0647\u0627 \u0623\u0628\u062f\u064b\u0627 \u0639\u0644\u0649 \u0645\u062d\u0637\u062a\u064a \u0639\u0645\u0644 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0630\u0627\u062a\u0647.<\/li>\n\n\n<li><strong>\u0625\u0633\u0646\u0627\u062f \u0627\u0644\u0645\u0647\u0645\u0629 \u0625\u0644\u0649 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646<\/strong>\u060c \u0645\u0639 \u062a\u0648\u0641\u064a\u0631 <strong>\u0622\u0644\u0627\u062a \u0648\u0639\u0627\u0645\u0644\u064a\u0646 \u0628\u062f\u0644\u0627\u0621<\/strong> \u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a.<\/li>\n\n\n<li><strong>\u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f<\/strong> \u0639\u0646\u062f \u0645\u0648\u0639\u062f \u0627\u0644\u0628\u062f\u0621 \u0627\u0644\u0645\u062e\u0637\u0637 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0627\u0644\u0641\u0639\u0644\u064a \u0648\u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0627\u0644\u062a\u064a \u0644\u0645 \u062a\u0635\u0644 \u0628\u0639\u062f.<\/li>\n\n\n<li><strong>\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0627\u0633\u062a\u0645\u0631\u0627\u0631<\/strong> \u0639\u0646\u062f \u062a\u0623\u062e\u0631 \u0625\u0646\u062c\u0627\u0632 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u062a\u0648\u0642\u0641 \u0622\u0644\u0629 \u0623\u0648 \u062a\u063a\u064a\u0651\u0631 \u0637\u0644\u0628.<\/li>\n\n\n<li><strong>\u062c\u062f\u0648\u0644 \u0632\u0645\u0646\u064a \u0645\u0631\u0626\u064a<\/strong> \u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u062e\u0637\u0637\u064a\u0646 \u062a\u0639\u062f\u064a\u0644\u0647\u060c \u0648<strong>\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0646 \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/strong> \u064a\u062a\u062c\u0627\u0648\u0628 \u0645\u0639\u0647\u0627 \u0627\u0644\u062c\u062f\u0648\u0644.<\/li>\n\n\n<li><strong>\u0645\u0633\u0627\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 NetSuite \u064a\u0646\u0627\u0633\u0628 \u0639\u0627\u0645 2026 \u0648\u0645\u0627 \u0628\u0639\u062f\u0647.<\/strong> \u0627\u0639\u062a\u0628\u0627\u0631\u064b\u0627 \u0645\u0646 \u0627\u0644\u0625\u0635\u062f\u0627\u0631 2026.1\u060c <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_2104046421.html\">\u062a\u0642\u0648\u0644 Oracle<\/a> \u0625\u0646 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u064a\u0646\u0628\u063a\u064a \u0623\u0646 \u062a\u064f\u0628\u0646\u0649 \u0639\u0644\u0649 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 REST \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 OAuth 2.0. \u0648\u0627\u0639\u062a\u0628\u0627\u0631\u064b\u0627 \u0645\u0646 \u0627\u0644\u0625\u0635\u062f\u0627\u0631 2027.1\u060c \u0644\u0646 \u064a\u0643\u0648\u0646 \u0628\u0627\u0644\u0625\u0645\u0643\u0627\u0646 \u0625\u0646\u0634\u0627\u0621 \u0639\u0645\u0644\u064a\u0627\u062a \u062a\u0643\u0627\u0645\u0644 \u062c\u062f\u064a\u062f\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SOAP \u0623\u0648 TBA\u060c \u0648\u0633\u062a\u064f\u0639\u0637\u0651\u064e\u0644 \u062c\u0645\u064a\u0639 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 SOAP \u0641\u064a \u0627\u0644\u0625\u0635\u062f\u0627\u0631 2028.2. \u0648\u062a\u064f\u062c\u0631\u0649 \u0639\u0645\u0644\u064a\u0627\u062a \u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0628\u0643\u0645\u064a\u0627\u062a \u0643\u0628\u064a\u0631\u0629 \u0639\u0628\u0631 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_157909186990.html\">SuiteQL<\/a> \u200f(<code>POST \/services\/rest\/query\/v1\/suiteql<\/code>\u060c \u0628\u062d\u062f \u0623\u0642\u0635\u0649 100,000 \u0646\u062a\u064a\u062c\u0629 \u0644\u0643\u0644 \u0627\u0633\u062a\u0639\u0644\u0627\u0645).<\/li>\n\n\n<li><strong>\u062a\u062c\u0631\u0628\u0629 \u0642\u0635\u064a\u0631\u0629 \u0628\u0628\u064a\u0627\u0646\u0627\u062a\u0643 \u0627\u0644\u0641\u0639\u0644\u064a\u0629<\/strong> \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621 \u0628\u0643\u062a\u0627\u0628\u0629 \u0623\u064a \u0634\u064a\u0641\u0631\u0629 \u0644\u0644\u062a\u0643\u0627\u0645\u0644.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0623\u064a\u0646 \u064a\u0623\u062a\u064a \u062f\u0648\u0631 SkyPlanner\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u062d\u0644 \u0633\u062d\u0627\u0628\u064a \u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0639\u0645\u0644 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 NetSuite\u060c \u0648\u064a\u0636\u0639 \u062c\u062f\u0648\u0644\u064b\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646. \u062a\u0628\u0642\u0649 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0634\u0624\u0648\u0646 \u0627\u0644\u0645\u0627\u0644\u064a\u0629 \u0641\u064a NetSuite. \u0623\u0645\u0627 SkyPlanner \u0641\u064a\u062d\u0633\u0628 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0639\u0645\u0644 \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0639\u0627\u0645\u0644 \u0648\u0623\u062f\u0627\u0629\u060c \u0648\u0647\u064a \u0645\u0647\u0627\u0645 \u062a\u062a\u0631\u0643\u0647\u0627 Finite Scheduling \u0644\u0644\u0645\u062e\u0637\u0637.<\/p>\n\n\n<p>\u0625\u0644\u064a\u0643 \u0645\u0627 \u064a\u0642\u062f\u0645\u0647 \u0648\u0641\u0642 \u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u0633\u0627\u0628\u0642\u0629:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u0633\u0644\u0633\u0644 \u0645\u062d\u0633\u0648\u0628\u060c \u0644\u0627 \u062a\u0631\u062a\u064a\u0628 \u064a\u062f\u0648\u064a.<\/strong> \u064a\u0646\u0634\u0626 \u0645\u062d\u0631\u0643 Arcturus \u062c\u062f\u0648\u0644\u064b\u0627 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629\u060c \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u0648\u0623\u0648\u0644\u0648\u064a\u0629 \u0627\u0644\u0639\u0645\u064a\u0644 \u0648\u0627\u0644\u0642\u0648\u0627\u0639\u062f \u0627\u0644\u062a\u064a \u062a\u062d\u062f\u062f\u0647\u0627. \u0648\u064a\u0645\u0643\u0646 \u0644\u0644\u0645\u062e\u0637\u0637\u064a\u0646 \u062a\u0639\u062f\u064a\u0644\u0647 \u0639\u0644\u0649 \u0645\u062e\u0637\u0637 Gantt \u062a\u0641\u0627\u0639\u0644\u064a.<\/li>\n\n\n<li><strong>\u062e\u0637\u0629 \u062a\u062a\u062c\u062f\u062f \u0628\u0627\u0633\u062a\u0645\u0631\u0627\u0631\u060c \u0644\u0627 \u0625\u0637\u0644\u0627\u0642 \u0623\u0633\u0628\u0648\u0639\u064a \u0644\u0644\u0623\u0648\u0627\u0645\u0631.<\/strong> \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0648\u062a\u0628\u0642\u0649 \u0642\u0631\u0627\u0631\u0627\u062a \u062a\u062b\u0628\u064a\u062a \u0627\u0644\u0645\u0647\u0627\u0645 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u062a\u062d\u062a \u0633\u064a\u0637\u0631\u062a\u0643.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u062a\u063a\u064a\u064a\u0631 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u062a\u0633\u0644\u0633\u0644.<\/strong> \u062a\u062a\u0636\u0645\u0646 \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0623\u0648\u0642\u0627\u062a \u062a\u063a\u064a\u064a\u0631 \u062a\u062e\u062a\u0644\u0641 \u0628\u0627\u062e\u062a\u0644\u0627\u0641 \u0627\u062a\u062c\u0627\u0647 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a (\u0645\u0646 \u0627\u0644\u0623\u0632\u0631\u0642 \u0625\u0644\u0649 \u0627\u0644\u0623\u062d\u0645\u0631 30 \u062f\u0642\u064a\u0642\u0629\u060c \u0648\u0645\u0646 \u0627\u0644\u0623\u062d\u0645\u0631 \u0625\u0644\u0649 \u0627\u0644\u0623\u0632\u0631\u0642 60)\u060c \u0648\u064a\u062e\u062a\u0627\u0631 \u0627\u0644\u0645\u062d\u0631\u0643 \u0627\u0644\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0630\u064a \u064a\u062a\u0637\u0644\u0628 \u0623\u0642\u0644 \u0648\u0642\u062a \u0644\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u062a\u064f\u062d\u062a\u0633\u0628 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0648\u0627\u0644\u0641\u0643 \u0644\u0643\u0644 \u0645\u0647\u0645\u0629.<\/li>\n\n\n<li><strong>\u0623\u062f\u0648\u0627\u062a \u0648\u0639\u0627\u0645\u0644\u0648\u0646 \u0648\u0628\u062f\u0627\u0626\u0644.<\/strong> \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0645\u0648\u0627\u0631\u062f \u0645\u0634\u062a\u0631\u0643\u0629 \u0645\u062d\u062f\u0648\u062f\u0629: \u0644\u0627 \u062a\u064f\u062c\u062f\u0648\u0644 \u0623\u062f\u0627\u0629 \u0642\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0641\u064a \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0639\u0644\u0649 \u0645\u062d\u0637\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0630\u0627\u062a\u0647. \u0648\u064a\u0645\u0643\u0646 \u0625\u0633\u0646\u0627\u062f \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0648\u0627\u062d\u062f\u0629 \u0625\u0644\u0649 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0641\u064a \u0622\u0646 \u0648\u0627\u062d\u062f. \u0648\u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0622\u0644\u0629 \u0623\u0648 \u0627\u0644\u0639\u0627\u0645\u0644 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u060c \u064a\u0646\u0638\u0631 \u0627\u0644\u0645\u062d\u0631\u0643 \u0641\u064a \u0627\u0644\u0628\u062f\u0627\u0626\u0644. \u0643\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0646\u0645\u0648\u0630\u062c \u0645\u062c\u0645\u0648\u0639\u0627\u062a \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0643\u0641\u0627\u0621\u0627\u062a\u0647\u0627.<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u0648\u0627\u062f \u062c\u0632\u0621 \u0645\u0646 \u0627\u0644\u062e\u0637\u0629.<\/strong> \u064a\u064f\u062a\u062d\u0642\u0642 \u0645\u0646 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0628\u0627\u0644\u0631\u062c\u0648\u0639 \u0625\u0644\u0649 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631 \u0648\u0635\u0648\u0644\u0647\u0627. \u0648\u062a\u064f\u0639\u062f \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0645\u062a\u0627\u062d\u0629 \u0641\u064a \u062a\u0627\u0631\u064a\u062e \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0627\u0644\u0645\u062d\u062f\u062f \u0641\u064a \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/li>\n\n\n<li><strong>\u0644\u0627 \u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0633\u062c\u0644\u0627\u062a Work Bench \u0645\u0642\u0627\u0628\u0644\u0629.<\/strong> \u064a\u062d\u062a\u0641\u0638 SkyPlanner \u0628\u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647\u060c \u0644\u0630\u0627 \u0644\u0627 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 Advanced Manufacturing \u0623\u0648 \u0625\u0644\u0649 \u0633\u062c\u0644 Work Bench \u0644\u0643\u0644 \u062e\u0637\u0648\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/li>\n\n\n<li><strong>\u0628\u064a\u0627\u0646\u0627\u062a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0623\u062f\u0627\u0629 \u0646\u0641\u0633\u0647\u0627.<\/strong> \u064a\u0631\u0649 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0642\u0627\u0626\u0645\u0629 \u0623\u0639\u0645\u0627\u0644\u0647\u0645 \u0648\u064a\u0633\u062c\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0639\u0628\u0631 \u0627\u0644\u0647\u0627\u062a\u0641 \u0623\u0648 \u0627\u0644\u062c\u0647\u0627\u0632 \u0627\u0644\u0644\u0648\u062d\u064a \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 Mobile Confirmations \u0648Production Timer \u0648Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u064a\u0639\u064a\u062f \u0645\u062e\u0637\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0643 \u0628\u0646\u0627\u0621 \u062a\u0633\u0644\u0633\u0644 \u0625\u0637\u0644\u0627\u0642 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0623\u0633\u0628\u0648\u0639.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u064a\u0639\u062a\u0645\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0639\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a\u060c \u0623\u0648 \u0639\u0646\u062f\u0645\u0627 \u064a\u062a\u062d\u062f\u062f \u0645\u0627 \u064a\u0645\u0643\u0646 \u062a\u0634\u063a\u064a\u0644\u0647 \u0628\u062a\u0648\u0627\u0641\u0631 \u0623\u062f\u0627\u0629 \u0645\u0634\u062a\u0631\u0643\u0629 \u0623\u0648 \u0641\u0631\u064a\u0642 \u0645\u0646 \u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u062e\u0627\u0635.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u062a\u062a\u0637\u0644\u0628 \u0627\u0644\u062e\u0637\u0629 \u0627\u0646\u062a\u0638\u0627\u0631 \u0648\u0635\u0648\u0644 \u0645\u0648\u0627\u062f \u0645\u0637\u0644\u0648\u0628\u0629 \u0628\u0645\u0648\u062c\u0628 \u0623\u0648\u0627\u0645\u0631 \u0634\u0631\u0627\u0621.<\/p>\n\n\n<p><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627<\/strong> \u0644\u0627 \u062a\u0631\u064a\u062f \u0625\u0636\u0627\u0641\u0629 Advanced Manufacturing \u0645\u0646 \u0623\u062c\u0644 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u0642\u0637.<\/p>\n\n\n<p>\u062a\u0633\u062a\u062e\u062f\u0645 UTU Oy\u060c \u0648\u0647\u064a \u0634\u0631\u0643\u0629 \u062a\u0635\u0646\u0651\u0639 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627 \u0628\u0641\u0646\u0644\u0646\u062f\u0627\u060c SkyPlanner \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 Oracle NetSuite. \u0648\u0642\u062f \u0639\u0631\u0636\u062a \u0639\u0644\u064a\u0647\u0627 \u0627\u0644\u0634\u0631\u0643\u0629 \u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u064a\u0629 \u0627\u0644\u0645\u062a\u062e\u0635\u0635\u0629 \u0641\u064a ERP \u062b\u0644\u0627\u062b\u0629 \u062e\u064a\u0627\u0631\u0627\u062a \u0644\u0644\u062c\u062f\u0648\u0644\u0629\u060c \u0641\u0627\u062e\u062a\u0627\u0631\u062a UTU \u0646\u0638\u0627\u0645 SkyPlanner \u0644\u0645\u0631\u0648\u0646\u062a\u0647 \u0648\u0628\u0646\u064a\u062a\u0647 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0639\u0644\u0649 \u0648\u062d\u062f\u0627\u062a. \u0648\u0628\u062f\u0623 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a \u0641\u064a \u0633\u0628\u062a\u0645\u0628\u0631 2025\u060c \u0645\u0639 \u0631\u0628\u0637 SkyPlanner \u0628\u0646\u0638\u0627\u0645 NetSuite \u0648\u0646\u0638\u0627\u0645 \u0627\u0644\u0631\u0648\u0627\u062a\u0628 \u0644\u062f\u0649 UTU.<\/p>\n\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 NetSuite \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u0641\u064a\u0633\u062a\u0642\u0628\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u0639\u064a\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u0642\u062f\u0645 \u0648\u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0644\u0629. \u0643\u0645\u0627 \u062a\u0631\u0633\u0644 \u062e\u0637\u0627\u0641\u0627\u062a \u0627\u0644\u0648\u064a\u0628 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u062c\u062f\u0648\u0644 \u0641\u0648\u0631 \u062d\u062f\u0648\u062b\u0647\u0627.<\/p>\n\n\n<p>\u062a\u062e\u062a\u0644\u0641 \u0625\u0639\u062f\u0627\u062f\u0627\u062a \u0643\u0644 \u062d\u0633\u0627\u0628 NetSuite \u0639\u0646 \u0627\u0644\u0622\u062e\u0631. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0644\u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u062d\u0642\u0648\u0644 \u0627\u0644\u0645\u062e\u0635\u0635\u0629 \u0644\u062f\u064a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0642\u062f\u0645 \u0627\u0644\u062f\u0639\u0645 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 NetSuite \u0623\u0648 \u0627\u0644\u0645\u0637\u0648\u0631\u064a\u0646 \u0644\u062f\u064a\u0643 \u0623\u064a\u0636\u064b\u0627 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 REST API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0645\u0646 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>\u060c <a href=\"\/ar\/docs\/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac-%d8%aa%d8%b9%d9%84%d9%8a%d9%85%d9%8a-%d9%84%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u0648\u062b\u0627\u0626\u0642 SkyPlanner<\/a>)\u060c \u0648\u0644\u0627 \u064a\u0644\u0632\u0645 \u0644\u0630\u0644\u0643 \u0633\u0648\u0649 \u0645\u0641\u062a\u0627\u062d API.<\/p>\n\n\n<p>\u0627\u0628\u062f\u0623 \u0628\u0645\u0644\u0641\u0627\u062a CSV \u0627\u0644\u0645\u0635\u062f\u0651\u0631\u0629 \u0645\u0646 NetSuite \u062e\u0644\u0627\u0644 <a href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627<\/a> (\u062d\u062a\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u062f\u0648\u0646 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646)\u060c \u0648\u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 \u062c\u062f\u0648\u0644 \u0625\u0646\u062a\u0627\u062c\u0643 \u0627\u0644\u0630\u064a \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0642\u0628\u0644 \u0623\u064a \u0645\u0634\u0631\u0648\u0639 \u062a\u0643\u0627\u0645\u0644. \u0628\u0639\u062f \u0630\u0644\u0643\u060c \u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627<\/a> \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0641\u0648\u062a\u0631\u0629 \u0634\u0647\u0631\u064a\u0629 \u0648\u0625\u0645\u0643\u0627\u0646\u064a\u0629 \u0627\u0644\u0625\u0644\u063a\u0627\u0621 \u0641\u064a \u0623\u064a \u0648\u0642\u062a. \u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0633\u0639\u0631 \u062e\u0637\u062a\u0643\u060c \u0644\u062a\u0639\u0631\u0641 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621. \u0648\u064a\u064f\u0646\u062c\u0632 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0641\u062a\u0628\u062f\u0623 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0627\u0646\u062a\u0638\u0627\u0631 \u0645\u0634\u0631\u0648\u0639 \u0637\u0648\u064a\u0644.<\/p>\n\n\n<p>\u0627\u0637\u0651\u0644\u0639 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/\">SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 NetSuite<\/a> \u0644\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629\u060c \u0648\u0639\u0644\u0649 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 NetSuite<\/a> \u0644\u0644\u0627\u0637\u0651\u0644\u0627\u0639 \u0639\u0644\u0649 \u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u062a\u0642\u0646\u064a\u0629.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0644\u062f\u0649 UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u062a\u064f\u0648\u0641\u0651\u064e\u0631 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/customers\/utu\/\">\u0627\u0642\u0631\u0623 \u062a\u0642\u064a\u064a\u0645 UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0628\u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u0623\u0635\u0628\u062d \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0633\u062a\u063a\u0631\u0642 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/customers\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u062a\u0642\u064a\u064a\u0645 Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u0649 Fredman Operations\u060c \u0628\u062c\u0627\u0646\u0628 \u062e\u0644\u064a\u0629 \u0631\u0648\u0628\u0648\u062a\u064a\u0629 \u0644\u0631\u0635 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0639\u0644\u0649 \u0627\u0644\u0645\u0646\u0635\u0627\u062a \u0641\u064a \u0631\u0627\u0648\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 \u0623\u0634\u0647\u0631<\/b><span>\u064a\u0645\u0643\u0646 \u0644\u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0627\u0644\u0627\u0637\u0651\u0644\u0627\u0639 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u062e\u0644\u0627\u0644\u0647\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0648\u0641\u0651\u0631 SkyPlanner \u0623\u0633\u0627\u0633\u064b\u0627 \u0645\u0648\u062b\u0648\u0642\u064b\u0627 \u0644\u062c\u0645\u064a\u0639 \u0623\u0639\u0645\u0627\u0644 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen\u060c \u0645\u062f\u064a\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Fredman Operations \u00b7 \u0623\u0648\u0631\u0627\u0642 \u062a\u063a\u0644\u064a\u0641 \u0622\u0645\u0646\u0629 \u0644\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0639 \u0627\u0644\u0623\u063a\u0630\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0631\u0649 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0633\u062a\u0629 \u0623\u0634\u0647\u0631 \u0645\u0642\u0628\u0644\u0629\u060c \u0648\u064a\u064f\u0631\u062f\u0651 \u0627\u0644\u0622\u0646 \u0641\u064a \u062b\u0648\u0627\u0646\u064d \u0639\u0644\u0649 \u0637\u0644\u0628\u0627\u062a \u062a\u0639\u062f\u064a\u0644 \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u062a\u064a \u0643\u0627\u0646 \u0627\u0644\u0631\u062f \u0639\u0644\u064a\u0647\u0627 \u064a\u0633\u062a\u063a\u0631\u0642 \u0633\u0627\u0639\u0629 \u0623\u0648 \u0623\u0643\u062b\u0631.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/customers\/fredman-operations\/\">\u0627\u0642\u0631\u0623 \u062a\u0642\u064a\u064a\u0645 Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0639\u0627\u0645\u0644 \u0644\u062d\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u0644\u062e \u0647\u064a\u0643\u0644\u064b\u0627 \u0641\u0648\u0644\u0627\u0630\u064a\u064b\u0627 \u0645\u0644\u062d\u0648\u0645\u064b\u0627 \u0641\u064a \u0645\u0635\u0646\u0639 \u0623\u0644\u0627\u0647\u0627\u0631\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0627\u0631\u062a\u0641\u0627\u0639\u064b\u0627 \u0645\u0646 \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u064b\u0627 \u062d\u0627\u0633\u0645\u064b\u0627 \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0625\u0644\u0649 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0634\u0631\u0641 \u0648\u0627\u062d\u062f \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0627\u062b\u0646\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/customers\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u062a\u0642\u064a\u064a\u0645 KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 NetSuite \u0623\u062f\u0627\u0629 \u0644\u0644\u062c\u062f\u0648\u0644\u0629\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u064a\u062c\u062f\u0648\u0644 NetSuite \u0627\u0644\u0642\u064a\u0627\u0633\u064a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 \u0627\u0644\u0623\u0645\u0627\u0645 \u0623\u0648 \u0627\u0644\u062e\u0644\u0641 \u0627\u0639\u062a\u0645\u0627\u062f\u064b\u0627 \u0639\u0644\u0649 Manufacturing Routing \u0648\u062a\u0642\u0627\u0648\u064a\u0645 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644\u060c \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0648\u064a\u0636\u064a\u0641 Advanced Manufacturing SuiteApp \u0645\u064a\u0632\u0629 Finite Scheduling\u060c \u0627\u0644\u062a\u064a \u064a\u062d\u062f\u062f \u0641\u064a\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0637 \u062a\u0633\u0644\u0633\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u064a\u0635\u062f\u0631\u0647\u0627 \u0648\u0641\u0642 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0623\u0635\u0648\u0644.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u0627\u0644\u0641\u0631\u0642 \u0641\u064a NetSuite \u0628\u064a\u0646 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0630\u064a \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0648\u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u062a\u064a \u062a\u0641\u062a\u0631\u0636 \u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062a\u062d\u062f\u062f \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062f\u0648\u0646 \u062d\u062f\u0648\u062f \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u062a\u0648\u0642\u064a\u062a \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0627\u0639\u062a\u0645\u0627\u062f\u064b\u0627 \u0639\u0644\u0649 \u0645\u0633\u0627\u0631\u0647 \u0648\u062a\u0642\u0648\u064a\u0645\u0647\u060c \u0648\u062a\u062a\u062c\u0627\u0647\u0644 \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0623\u062e\u0631\u0649 \u0627\u0644\u0645\u062d\u0645\u0651\u0644\u0629 \u0639\u0644\u0649 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644. \u0623\u0645\u0627 Finite Scheduling \u0641\u064a Advanced Manufacturing \u0641\u062a\u0648\u0632\u0651\u0639 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u0627\u0644\u0623\u0635\u0648\u0644 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0628\u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0630\u064a \u064a\u0635\u062f\u0631\u0647\u0627 \u0628\u0647 \u0627\u0644\u0645\u062e\u0637\u0637\u060c \u0648\u062a\u0648\u0635\u064a Oracle \u0628\u0623\u0646 \u062a\u0643\u0648\u0646 \u0641\u062a\u0631\u0629 \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0639\u0645\u0648\u0645\u064b\u0627 \u0623\u0642\u0644 \u0645\u0646 \u0623\u0633\u0628\u0648\u0639.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 NetSuite \u062a\u062e\u0637\u064a\u0637\u064b\u0627 \u0625\u062c\u0645\u0627\u0644\u064a\u064b\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645\u060c \u0641\u064a \u0645\u0648\u0636\u0639\u064a\u0646. \u062a\u062a\u0636\u0645\u0646 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0645\u064a\u0632\u0629 Rough-Cut Capacity Planning \u0636\u0645\u0646 Transactions &gt; Manufacturing &gt; Capacity Planning\u060c \u0643\u0645\u0627 \u064a\u062a\u0636\u0645\u0646 Advanced Manufacturing \u062e\u0637\u0637 RCP \u062e\u0627\u0635\u0629 \u0628\u0647. \u0648\u064a\u0639\u0631\u0636 \u0643\u0644\u0627\u0647\u0645\u0627 \u062a\u0642\u0627\u0631\u064a\u0631 \u062a\u0642\u0627\u0631\u0646 \u0627\u0644\u062d\u0645\u0644 \u0628\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0644\u0643\u0644 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644\u060c \u0644\u0643\u0646 \u0623\u064a\u064b\u0627 \u0645\u0646\u0647\u0645\u0627 \u0644\u0627 \u064a\u0646\u0634\u0626 \u062c\u062f\u0648\u0644\u064b\u0627 \u0644\u0644\u0639\u0645\u0644\u064a\u0627\u062a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u0623\u062d\u062a\u0627\u062c \u0625\u0644\u0649 Advanced Manufacturing \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner APS \u0645\u0639 NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u064a\u062a\u0648\u0644\u0649 SkyPlanner \u0628\u0646\u0641\u0633\u0647 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0645\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0644\u0630\u0627 \u062a\u0643\u0641\u064a\u0647 \u0628\u064a\u0627\u0646\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u0646 NetSuite \u0627\u0644\u0642\u064a\u0627\u0633\u064a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0633\u062a\u0637\u064a\u0639 SkyPlanner \u0627\u0644\u062a\u0639\u0627\u0645\u0644 \u0645\u0639 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629 \u0639\u0644\u0649 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u062d\u062f\u062f \u0645\u0635\u0641\u0648\u0641\u0629 \u0623\u0648\u0642\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0643\u0644 \u0632\u0648\u062c \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646\u060c \u0648\u064a\u062e\u062a\u0627\u0631 \u0627\u0644\u0645\u062d\u0631\u0643 \u0627\u0644\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0630\u064a \u064a\u062a\u0637\u0644\u0628 \u0623\u0642\u0644 \u0648\u0642\u062a \u0644\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0645\u0648\u0627\u0631\u062f \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0644\u0630\u0627 \u0644\u0627 \u062a\u064f\u062c\u062f\u0648\u0644 \u0623\u062f\u0627\u0629 \u0642\u064a\u062f \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0641\u064a \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0639\u0644\u0649 \u0645\u062d\u0637\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0630\u0627\u062a\u0647. \u0648\u0642\u062f \u062a\u062a\u0637\u0644\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u062f\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u0641\u064a \u0622\u0646 \u0648\u0627\u062d\u062f\u060c \u0648\u064a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0645\u062d\u0631\u0643 \u0622\u0644\u0627\u062a \u0623\u0648 \u0639\u0627\u0645\u0644\u064a\u0646 \u0628\u062f\u0644\u0627\u0621 \u0639\u0646\u062f \u0639\u062f\u0645 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0631\u062f \u0627\u0644\u0623\u0633\u0627\u0633\u064a.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle NetSuite \u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS \u064a\u062c\u062f\u0648\u0644 Oracle NetSuite \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0645\u0627 \u0644\u0645 \u062a\u0636\u0641 Advanced Manufacturing SuiteApp. \u0648\u062a\u0648\u0636\u062d \u0648\u062b\u0627\u0626\u0642 Oracle \u0646\u0641\u0633\u0647\u0627 \u0623\u0646 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0647\u0630\u0627 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636 &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 &#8230; <a title=\"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" aria-label=\"Read more about \u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100752,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101020","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f | SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\",\"name\":\"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f | SkyPlanner","description":"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_locale":"ar_AR","og_type":"article","og_title":"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS","og_description":"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/","name":"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"\u064a\u062c\u062f\u0648\u0644 NetSuite \u0628\u0637\u0627\u0642\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u064a\u0636\u064a\u0641 Advanced Manufacturing \u0625\u062c\u0631\u0627\u0621 Finite Scheduling \u0628\u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0645\u062e\u0637\u0637. \u0625\u0644\u064a\u0643 \u062f\u0648\u0631 \u0643\u0644 \u0645\u0646\u0647\u0645\u0627 \u0648\u0645\u062a\u0649 \u064a\u0646\u0627\u0633\u0628\u0643 SkyPlanner APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/"},{"@type":"ListItem","position":5,"name":"\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle NetSuite \u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f \u0623\u062f\u0648\u0627\u062a\u0647 \u0627\u0644\u0645\u062f\u0645\u062c\u0629 \u0648SkyPlanner APS \u064a\u062c\u062f\u0648\u0644 Oracle NetSuite \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0627\u0641\u062a\u0631\u0627\u0636 \u0637\u0627\u0642\u0629 \u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0645\u0627 \u0644\u0645 \u062a\u0636\u0641 Advanced Manufacturing SuiteApp. \u0648\u062a\u0648\u0636\u062d \u0648\u062b\u0627\u0626\u0642 Oracle \u0646\u0641\u0633\u0647\u0627 \u0623\u0646 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0628\u0647\u0630\u0627 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636 &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/101020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=101020"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/101020\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100752"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=101020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}